SHIFT HAND-OVER REPORT
Installation / Facility: CS 1 Crew / Department: Drilling
Date: July 26, 2015 Time: 0600 Hrs.
Mud Status: Red
Present Operations: - M/up Cameron washing tool.
Upcoming Operations:- Wash housing bore and seal areas of hanger neck area with sea water.
Equipment Status (Including Equipment Under Repair)- SCR#10 selected with 4 Engines online.- Mud Pumps lined up to pit# 3. Pit#3 filled up with sea water.- Standpipe lined up for drilling.
Permits and/or Isolations in Place: - As required
Other Comments: - Riser filled up with clean up detergent.- Trip tank also filled up with clean up detergent. - Cont. with m/up 5” GPDS stands.- Mix pump1 to trip tank line filled with detergent.- Detergent in trip tank and Riser. - Flow line flushed, emergency kill line flushed , scalpers cleaned with sea water.
Incoming Supervisor (Name): Daniel
Position: Driller
Signature:Signature:
Outgoing Supervisor (Name): Sandeep
Position:Driller
Signature:
REV 00 SEPTEMBER 1, 2011 Form No: HQS-OPS-PP-01 FM 04