Download - IRN-8108577716-432-01-RIL-Audco-17 Jan 2014

Transcript
Page 1: IRN-8108577716-432-01-RIL-Audco-17 Jan 2014

TUV INDIA PVT. LTD. #827 Anna Salai

2nd Floor Dhun Building Chennai 600002

INSPECTION RELEASE NOTE/CERTIFICATE NO. 8108577716-432-01 DATE: 17/01/2014

Distribution list: Client, Vendor, TUV Mumbai, TUV Branch office (Chennai) F/INSP/IRN/03A Rev 0 (Oct, 2012) - Copyright: This report shall not be reproduced in part or full without the consent of TUV India Pvt. Ltd

CUSTOMER : RELIANCE INDUSTRIES PLACE OF ISSUE : CHENNAI

PROJECT : ---------- JOB NO. : NIL

VENDOR/SUB-VENDOR : L&T VALVES LOCATION : MANAPAKKAM

PURCHASE ORDER NO. : JM4/7472084 DATED : 17/08/2013

PO Item No.

Item Code/ Material Description

P.O. Quantity

(Unit)

Quantity Offered

Quantity accepted

Is item QTY complete as

per PO

1

Carbon Steel Gate Valve Item Code : 2000317378 Size : 18” X 300 #, Flanged Ends, RF. Material : SA 216 Gr. WCB Valve Sr. No. : 1008

1 Nos. 1 Nos. 1 Nos. Complete

REFERENCE DOCUMENTS 1. Approved Spec. No : EPCMD-1-ENGG-DEP-PP-018 Rev.00 & EPCMD-1-ENGG-DEP-PP-04 Rev. 03

2. Approved Drawing Nos. : JM4-7482059-000-B02-001 Rev.01 ( 110000891-LP-001 Rev.1) App. by RIL Code. 1

3. Approved QAP/ITP No. : QAP-CSGG-001 Rev.1 App. by RIL

Stages Witnessed :

1. Visual examination carried out on offered Valve – No objection. 2. Witnessed Shell Hydro, Back Seat Hydro, Seat Hydro and Seat Pneumatic Test on offered valve - Found Satisfactory.. 3. Witnessed major dimensional check on the offered valve– Found within acceptable limits. 4. Witnessed Functional test (Open & Close) on the offered valve – Found satisfactory. 5. Witnessed PMI test as per specification on Stem, Seat ring overlay, disc overlay, Studs on the offered valve – Test results

found meeting the standard requirements.

6. Identification Marks verified – Found in order. Documents/records reviewed:

1. Material test certificates reviewed for body, bonnet, stem, disc, seat ring, bonnet bush, fasteners, gasket and packing material – Found in order and attested.

2. Reviewed Radiography report – Found in order and attested for records.

3. Reviewed hardness report for stellited surface – Found acceptable and attested.

4. Reviewed PT reports on weld deposit Surface – Found in order and attested for records.

5. Reviewed MPT reports for body and bonnet – Found in order and attested for records..

6. Calibration validity of instruments and record verified – Found in order .

7. Reviewed welding documents (WPS / PQR) – Found in order & endorsed. NCR/WAIVER(If Any) : Nil

IDENTIFICATION : Inspected items identified with Hard stamp on the Body,

Test samples double stamped.

ORDER STATUS : Complete Incomplete

DATE(s) OF INSPECTION : 17/01/2014

CONCLUSION : All items were inspected within the scope defined in appd. QAP /ITP

& found to meet the requirements of purchase order & spec.

All measuring instruments/ equipment were verified for continued suitability for intended use, proper identification and maintenance and calibration status & found satisfactory. Disclaimer: The issue of this Inspection release note/certificate does not relieve the supplier / manufacturer from his/her responsibility towards the client to supply item(s) concerned, in full compliance with the requirements of the purchase order & project specifications.

P.Venkatamahalakshmaiah

Surveyor to TUV India Private Limited