IRN-8108577716-432-01-RIL-Audco-17 Jan 2014

1
TUV INDIA PVT. LTD. #827 Anna Salai 2nd Floor Dhun Building Chennai 600002 INSPECTION RELEASE NOTE/CERTIFICATE NO. 8108577716-432-01 DATE: 17/01/2014 Distribution list: Client, Vendor, TUV Mumbai, TUV Branch office (Chennai) F/INSP/IRN/03A Rev 0 (Oct, 2012) - Copyright: This report shall not be reproduced in part or full without the consent of TUV India Pvt. Ltd CUSTOMER : RELIANCE INDUSTRIES PLACE OF ISSUE : CHENNAI PROJECT : ---------- JOB NO. : NIL VENDOR/SUB-VENDOR : L&T VALVES LOCATION : MANAPAKKAM PURCHASE ORDER NO. : JM4/7472084 DATED : 17/08/2013 PO Item No. Item Code/ Material Description P.O. Quantity (Unit) Quantity Offered Quantity accepted Is item QTY complete as per PO 1 Carbon Steel Gate Valve Item Code : 2000317378 Size : 18” X 300 #, Flanged Ends, RF. Material : SA 216 Gr. WCB Valve Sr. No. : 1008 1 Nos. 1 Nos. 1 Nos. Complete REFERENCE DOCUMENTS 1. Approved Spec. No : EPCMD-1-ENGG-DEP-PP-018 Rev.00 & EPCMD-1-ENGG-DEP-PP-04 Rev. 03 2. Approved Drawing Nos. : JM4-7482059-000-B02-001 Rev.01 ( 110000891-LP-001 Rev.1) App. by RIL Code. 1 3. Approved QAP/ITP No. : QAP-CSGG-001 Rev.1 App. by RIL Stages Witnessed : 1. Visual examination carried out on offered Valve No objection. 2. Witnessed Shell Hydro, Back Seat Hydro, Seat Hydro and Seat Pneumatic Test on offered valve - Found Satisfactory.. 3. Witnessed major dimensional check on the offered valveFound within acceptable limits. 4. Witnessed Functional test (Open & Close) on the offered valve Found satisfactory. 5. Witnessed PMI test as per specification on Stem, Seat ring overlay, disc overlay, Studs on the offered valve Test results found meeting the standard requirements. 6. Identification Marks verified Found in order. Documents/records reviewed: 1. Material test certificates reviewed for body, bonnet, stem, disc, seat ring, bonnet bush, fasteners, gasket and packing material Found in order and attested. 2. Reviewed Radiography report Found in order and attested for records. 3. Reviewed hardness report for stellited surface Found acceptable and attested. 4. Reviewed PT reports on weld deposit Surface Found in order and attested for records. 5. Reviewed MPT reports for body and bonnet Found in order and attested for records.. 6. Calibration validity of instruments and record verified Found in order . 7. Reviewed welding documents (WPS / PQR) Found in order & endorsed. NCR/ WAIVER(If Any) : Nil IDENTIFICATION : Inspected items identified with Hard stamp on the Body, Test samples double stamped. ORDER STATUS : Complete Incomplete DATE(s) OF INSPECTION : 17/01/2014 CONCLUSION : All items were inspected within the scope defined in appd. QAP /ITP & found to meet the requirements of purchase order & spec. All measuring instruments/ equipment were verified for continued suitability for intended use, proper identification and maintenance and calibration status & found satisfactory. Disclaimer: The issue of this Inspection release note/certificate does not relieve the supplier / manufacturer from his/her responsibility towards the client to supply item(s) concerned, in full compliance with the requirements of the purchase order & project specifications. P.Venkatamahalakshmaiah Surveyor to TUV India Private Limited

description

Inspection

Transcript of IRN-8108577716-432-01-RIL-Audco-17 Jan 2014

Page 1: IRN-8108577716-432-01-RIL-Audco-17 Jan 2014

TUV INDIA PVT. LTD. #827 Anna Salai

2nd Floor Dhun Building Chennai 600002

INSPECTION RELEASE NOTE/CERTIFICATE NO. 8108577716-432-01 DATE: 17/01/2014

Distribution list: Client, Vendor, TUV Mumbai, TUV Branch office (Chennai) F/INSP/IRN/03A Rev 0 (Oct, 2012) - Copyright: This report shall not be reproduced in part or full without the consent of TUV India Pvt. Ltd

CUSTOMER : RELIANCE INDUSTRIES PLACE OF ISSUE : CHENNAI

PROJECT : ---------- JOB NO. : NIL

VENDOR/SUB-VENDOR : L&T VALVES LOCATION : MANAPAKKAM

PURCHASE ORDER NO. : JM4/7472084 DATED : 17/08/2013

PO Item No.

Item Code/ Material Description

P.O. Quantity

(Unit)

Quantity Offered

Quantity accepted

Is item QTY complete as

per PO

1

Carbon Steel Gate Valve Item Code : 2000317378 Size : 18” X 300 #, Flanged Ends, RF. Material : SA 216 Gr. WCB Valve Sr. No. : 1008

1 Nos. 1 Nos. 1 Nos. Complete

REFERENCE DOCUMENTS 1. Approved Spec. No : EPCMD-1-ENGG-DEP-PP-018 Rev.00 & EPCMD-1-ENGG-DEP-PP-04 Rev. 03

2. Approved Drawing Nos. : JM4-7482059-000-B02-001 Rev.01 ( 110000891-LP-001 Rev.1) App. by RIL Code. 1

3. Approved QAP/ITP No. : QAP-CSGG-001 Rev.1 App. by RIL

Stages Witnessed :

1. Visual examination carried out on offered Valve – No objection. 2. Witnessed Shell Hydro, Back Seat Hydro, Seat Hydro and Seat Pneumatic Test on offered valve - Found Satisfactory.. 3. Witnessed major dimensional check on the offered valve– Found within acceptable limits. 4. Witnessed Functional test (Open & Close) on the offered valve – Found satisfactory. 5. Witnessed PMI test as per specification on Stem, Seat ring overlay, disc overlay, Studs on the offered valve – Test results

found meeting the standard requirements.

6. Identification Marks verified – Found in order. Documents/records reviewed:

1. Material test certificates reviewed for body, bonnet, stem, disc, seat ring, bonnet bush, fasteners, gasket and packing material – Found in order and attested.

2. Reviewed Radiography report – Found in order and attested for records.

3. Reviewed hardness report for stellited surface – Found acceptable and attested.

4. Reviewed PT reports on weld deposit Surface – Found in order and attested for records.

5. Reviewed MPT reports for body and bonnet – Found in order and attested for records..

6. Calibration validity of instruments and record verified – Found in order .

7. Reviewed welding documents (WPS / PQR) – Found in order & endorsed. NCR/WAIVER(If Any) : Nil

IDENTIFICATION : Inspected items identified with Hard stamp on the Body,

Test samples double stamped.

ORDER STATUS : Complete Incomplete

DATE(s) OF INSPECTION : 17/01/2014

CONCLUSION : All items were inspected within the scope defined in appd. QAP /ITP

& found to meet the requirements of purchase order & spec.

All measuring instruments/ equipment were verified for continued suitability for intended use, proper identification and maintenance and calibration status & found satisfactory. Disclaimer: The issue of this Inspection release note/certificate does not relieve the supplier / manufacturer from his/her responsibility towards the client to supply item(s) concerned, in full compliance with the requirements of the purchase order & project specifications.

P.Venkatamahalakshmaiah

Surveyor to TUV India Private Limited