CADANGAN KERJA-KERJA UBAHSUAI DAN NAIKTARAF 11 UNIT BANGUNAN RUMAH KEDAI 2-TINGKAT, LOT 20126 - LOT 20137,MUKIM 12, DAERAH SEBERANG PERAI UTARA, PULAU PINANG UNTUK DIJADIKAN POLITEKNIK METRrO TASEK GELUGOR

IMPLEMENTATION SCHEDULE FOR CIVIL AND STRUCTURE CONSULTANCY SERVICES

ITEM ACTIVITIESTIME DURATION (WEEKS)

1 2 3 4 5 6 7 8 9 ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

A PRE-CONSTRUCTION STAGE

1 Schematic Design Phase(Preliminary Stage)

a) Analysis Project Briefb) Preparing Preliminary Conceptual Designc) Preparing and Submitting Relevant

documentation for client's approvalin principal

d) Assisting on Preliminary Cost Estimate

2 Design Development Phase

a) Developing Engineering Detailed Design(subject to final/confirmed dwg. from Architect)

b) Submitting the same c/with necessaryDocuments to Relevant Authorities(Subject to Status of Building Submission)

c) Updating Preliminary Cost Estimate

3 Contract Documentation Phase

a) Preparing Tender Drawings With Regards to the work

b) Assisting on Preparation of all NecessaryDocuments for Tender Exercise inCollaboration with Q.S.

B CONSTRUCTION STAGE

1 Contract Implementation And Management Phase

a) Preparing Contract Drawingsb) Preparing Construction Drawingsc) Conducting Inspection, Visit and Duties

as per Agreement in regards to Construction Matter

d) Supervision

C POST - CONSTRUCTION STAGE

1 CPC2 CCC

PREPARED BY :

FLOATING DUE TO DRAWINGS FINALISATION BY ARCHITECT

FLOATING DUE TO SUBMISSION APPROVAL BY ARCHITECT

FLOATING DUE TO TENDER, EVALUATION AND AWARDED PROCESS

1

2

3

1

2

3