CADANGAN KERJA-KERJA UBAHSUAI DAN NAIKTARAF 11 UNIT BANGUNAN RUMAH KEDAI 2-TINGKAT, LOT 20126 - LOT 20137,MUKIM 12, DAERAH SEBERANG PERAI UTARA, PULAU PINANG UNTUK DIJADIKAN POLITEKNIK METRrO TASEK GELUGOR
IMPLEMENTATION SCHEDULE FOR CIVIL AND STRUCTURE CONSULTANCY SERVICES
ITEM ACTIVITIESTIME DURATION (WEEKS)
1 2 3 4 5 6 7 8 9 ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
A PRE-CONSTRUCTION STAGE
1 Schematic Design Phase(Preliminary Stage)
a) Analysis Project Briefb) Preparing Preliminary Conceptual Designc) Preparing and Submitting Relevant
documentation for client's approvalin principal
d) Assisting on Preliminary Cost Estimate
2 Design Development Phase
a) Developing Engineering Detailed Design(subject to final/confirmed dwg. from Architect)
b) Submitting the same c/with necessaryDocuments to Relevant Authorities(Subject to Status of Building Submission)
c) Updating Preliminary Cost Estimate
3 Contract Documentation Phase
a) Preparing Tender Drawings With Regards to the work
b) Assisting on Preparation of all NecessaryDocuments for Tender Exercise inCollaboration with Q.S.
B CONSTRUCTION STAGE
1 Contract Implementation And Management Phase
a) Preparing Contract Drawingsb) Preparing Construction Drawingsc) Conducting Inspection, Visit and Duties
as per Agreement in regards to Construction Matter
d) Supervision
C POST - CONSTRUCTION STAGE
1 CPC2 CCC
PREPARED BY :
FLOATING DUE TO DRAWINGS FINALISATION BY ARCHITECT
FLOATING DUE TO SUBMISSION APPROVAL BY ARCHITECT
FLOATING DUE TO TENDER, EVALUATION AND AWARDED PROCESS