Agenda
• Introduction • Project overview • System Architecture • PMU (Phasor Measurement Unit)
Confidential. Not to be copied, distributed, or reproduced without prior approval.
Introduction
October 31, 2016 Presentation Title 3
Confidential. Not to be copied, distributed, or reproduced without prior approval.
Introduction
• Project name: Unified Real Time Dynamic Stability Monitoring System (URTDMS)
• Installed capacity of India exceeds 240 GW
• Wide area measurement system introduction to enhance real time analysis of grid conditions
• Improve operators’ observation and response to disturbances and emerging risks
• Preserve grid stability
Confidential. Not to be copied, distributed, or reproduced without prior approval.
Introduction
• Analysis of grid disturbances
• Detection and analysis of low frequency oscillations and islanding
• PMUs give time synchronized snapshot of grid conditions
• Real-time monitoring to extend available transmission capacity
• Real time data for dynamic state validation (online)
• Historian for dynamic state validation (offline)
Confidential. Not to be copied, distributed, or reproduced without prior approval.
Project Overview
October 31, 2016 Presentation Title 6
Confidential. Not to be copied, distributed, or reproduced without prior approval.
Project Overview
Confidential. Not to be copied, distributed, or reproduced without prior approval.
System Architecture
October 31, 2016 Presentation Title 8
Confidential. Not to be copied, distributed, or reproduced without prior approval.
• PMUs are placed at substation level:
• Grid Substations: 400 kV and above
• 400 kV feeders
• Generating Stations: 220 kV and above
• HVDC terminals
• Inter-regional tie lines
• International tie lines
System Architecture - PMUs Location
Confidential. Not to be copied, distributed, or reproduced without prior approval.
• PDCs are placed at Load Dispatch Centres:
• State
• Regional
• National
• National Transmission Asset Management
System Architecture - PDC Location
Confidential. Not to be copied, distributed, or reproduced without prior approval.
• Fibre optic Ethernet system
• 1 Gbps VLAN
• SDH Technology
• STM-16 for backbone
• STM-4 for branches
• Dual paths
System Architecture - WAMS
Confidential. Not to be copied, distributed, or reproduced without prior approval.
• GPS clock supplies 1PPS synchronizing pulses via fibre optic links to each PMU
Synchrophasors
Ethernetswitch
GPSClock
1PPS
CT CTVT VT
CommunicationNetwork
Some substations have more data acquisition needs
System Architecture - Substation
Confidential. Not to be copied, distributed, or reproduced without prior approval.
The phasor measurements available vary according to the model:
− 3 CT + 3 VT (Typically used for 1 circuit) − 6 CT + 6 VT (Typically used for 2 circuits)
System Architecture - PMU
Confidential. Not to be copied, distributed, or reproduced without prior approval.
• Modular design allows separation of core functions
• Dual redundant servers with software modules
• Optimizes performance, and increases throughput
System Architecture – Control Centre
Confidential. Not to be copied, distributed, or reproduced without prior approval.
PMU – Phasor Measurement Unit
October 31, 2016 Presentation Title 15
Confidential. Not to be copied, distributed, or reproduced without prior approval.
• Performance requirements
• IEEE C37.118.1-2011 with amendment IEEEC37.118.1a-2014
• Two classes of measurement: o M class for precision analytic measurement.
• Includes filters for out of band signals • Higher rejection of harmonics than P class • Less fluctuations of signal so M class used for URTDSM system
o P class is not considered in the current project phase
PMU– Specifications
Confidential. Not to be copied, distributed, or reproduced without prior approval.
• Measures accurate, time-synchronised power system data such as current phasors, voltage phasors, frequency, rate of change of frequency and binary signals to IEEE37.118.1-2011 (50 Hz)
• Transmits IEEE C37.118.2-2011 compliant data at speeds of up to 50 frames per second on a 50 Hz system
• A key component part of GE’s end-to-end synchrophasor solutions, from the PMU and PDC through to synchrophasor applications and EMS integration
• Applications include: visualisation, oscillatory stability monitoring, post event analysis, network defence schemes and network resynchronisation
PMU– Details
Confidential. Not to be copied, distributed, or reproduced without prior approval.
IRIG-B
Earthing Terminals
Copper Ethernet
Fibre Ethernet
GPS 1PPS
Dual-rated CTs & VTs
Digital Inputs
Output Contacts
Power Supply, Watchdog
Contacts and K-BUS/RS485
PMU– Rear View
Confidential. Not to be copied, distributed, or reproduced without prior approval.
Fibre optic cables connect GPS receivers in racks with PMUs mounted below
Front view of test racks Rear view of test racks
PMU– Factory Acceptance Tests
Confidential. Not to be copied, distributed, or reproduced without prior approval.
PMU - Certification to C37.118.1-2011/2014 specification • Third Party Certification performed
on PMU
• Voltage and current tests
• GPS synchronized inputs
• Static tests • Magnitude
• Frequency
• Phase angle
• Harmonic distortion
• Out of band interference
Confidential. Not to be copied, distributed, or reproduced without prior approval.
Steady-state tests
Voltage 10% to 120%.
PMU - Certification Tests
Confidential. Not to be copied, distributed, or reproduced without prior approval.
Out-of-band Frequency performance of the PMU and C37.118 Total Vector Error limits
Tested over range 10 Hz to 100 Hz (2x Fo)
PMU - Certification Tests
Confidential. Not to be copied, distributed, or reproduced without prior approval.
• Harmonic rejection performance of the PMU and C37.118 Total Vector Error limits
PMU - Certification Tests
Confidential. Not to be copied, distributed, or reproduced without prior approval.
• Dynamic Characteristics of the PMU and C37.118 Total Vector Error limits for M class response
• Phase and amplitude modulation tested up to 5.0 Hz • Modulation tests up to Fs/5 = 5 Hz for a data rate of 25 FPS
• Dynamic Bandwidth Amplitude Modulation tests • 10% magnitude modulation (kx=0.1)
• Dynamic Bandwidth Phase Angle Modulation tests • 0.1 radian modulation (ka=0.1)
• Error must remain within 3% TVE
PMU - Certification Tests
Confidential. Not to be copied, distributed, or reproduced without prior approval.
• Dynamic Characteristics of the PMU and C37.118 Error limits
• Frequency ramp tests from 45 to 55 Hz (catering for abrupt change in ROCOF)
PMU - Certification Tests
Confidential. Not to be copied, distributed, or reproduced without prior approval.
• Dynamic Characteristics of the PMU and C37.118 Error limits
• Step response tests of 10 degree phase and amplitude
PMU - Certification Tests
Top Related