ASX Announcement
4 June 2008
Exploration Exchange Macao Conference Presentation
The attached presentation will be made today at the Exploration Exchange Macao Conference, by Mr Greg Runge of D’Aguilar Gold Limited. On behalf of the Board DP Cornish Company Secretary For further information contact: Mr Nicholas Mather Managing Director Ph: 07 3303 0680 or 0417 880 448 Mr Greg Runge General Manager Ph: 07 3303 0680 or 0418 546 739 Mr Duncan Cornish Company Secretary Ph: 07 3303 0680 or 0407 623 302 Email: [email protected] Electronic copies and more information are available on the Company website: www.daguilar.com.au
XX Macao and XX Macao and Asia Miner Conference
A resourcefactfact
ASX DGRASX : DGR
company p ytorytory
June 2008
Booth Number MO7
Forward LookiForward Looki
Whilst this document and presentatiosources which are considered reliabemployees and consultants do notexpressly or impliedly that the iexpressly or impliedly , that the ipresentation is complete or accurateby law , D'Aguilar Gold Ltd disclai
i i t f thi d t drecipient of this document andsubsequently comes to its noticeinformation contained in this docume
ng Statementng Statement
on is based on the information fromle , D'Aguilar Gold Ltd , its directors,t represent, warrant or guarantee,nformation in this document andnformation in this document ande. To the maximum extent permittedims any responsibility to inform any
t ti f tt th tpresentation of any matter that, which may affect any of the
ent and presentation.p
June 2008
C tCorporate
145.6m shares24.1m unlisted optioG h $3 7Group cash - $3.7mMarket cap $21 7mMarket cap $21.7mSix companies in onpSolomon Gold plc in
S h te Snapshot
ons m
nenvestment
June 2008
We make resourWe make resour
Define the project straon commodity directioon commodity directioCreate subsidiaryIdentify & secure the aRaise seed capitalRaise seed capitalProve the modelEngage accomplishedIPO & Li t b idi (IPO & List subsidiary (sp
rce companies:rce companies:
tegy and model based onsons
asset
d managementi ff)pin-off)
June 2008
Project ChaProject ChaLarge scale: extenLarge scale: extenlarge upside: statelarge upside: statesignificancegNew geological mNew areas, proveRe-evaluation
aracteristicsaracteristicsnsive tenurensive tenuree or national e or national
models or en models
June 2008
What's hapCamt
DrilNewdiscdisc
$7m$7mPho
New
A A n
OnSolomon Gold plc On
ppeningpex estimates in Prep for feasibility 33 @ 0.06 % Mo
ling Oxide Ni at Mt cobaltw high grade copper silver coveries Silver Valleycoveries – Silver Valley
m IPO in July 08m IPO in July 08osphate & copper assets
w silver - gold discoveries at Rannes
l t it I P inew laterite Iron Province
going drilling following 32 m@ 9 45g/t going drilling following 32 m@ 9.45g/t June 2008
Project specific subsidiaries
June 2008
Aggressive drilling prograams
June 2008
17,500m drillingg- underway:
Target MarCompany Prospect
Target Metal/s
Mar
AusNiCo BlacksnakeCu Ni Au Ag
PtMt C b ltMt Cobalt-
RidleysNi Co
Central MineralsRannes Au Ag
Gayndah Au Ag CuCl t A (M )Clermont Au (Mo)
D'Aguilar Gold
Peenam Au Cu
Ban Ban Cu Zn Ag Mo
Bathurst Au Ag Cu
Apr May Jun Jul Aug Sep OctApr May Jun Jul Aug Sep OctPlanned drilling meters
800m
4,000m
4,000m 3,000m800m
1 0001,000m
300m
800m
2,000mJune 2008
New CEO – Peter SpierC O Sp$7m IPO/ ASX listing in DGR 48.2%One of the most minerOne of the most minerworld
iNew IOCG province –Olympic Dam* style taOlympic Dam style taSubstantial phosphate
*not assets of the company
rs (ex Western Mining) ( g)July 2008
ralised terrains in the ralised terrains in the
i i irapid drillingrgetsrgets project
June 2008
Gregory ProjectSignificant scale of oppor
Gregory ProjectMultiple Targets
Mre
strinteBulls-eye gravity
anomalyanomaly
Ernest Henry Structural Analogue
2M Gal gravanomaly at 300
depth spatiadepth spatiaseparated fromagnetic hig
10kmMetasomatic system 84m of 30% to 50% magnetite to EOH.
*not assets of the company
rtunity
Comparative Size IOCG D itDeposits
Carrapateena*
Major egional ructural ersection
Hematite Breccia Envelope(800m x 600m)
Olympic Dam8H i B i E l
ity 0m (?) ally Hematite Breccia Envelope
(~5km x ~2.5km)
ally om gh
June 2008
Gregory Project
World-class mineral World class mineral provinceProject overlies a major
fmineralising fault systemMt Oxide* (>0.2 Mt Cu)
Mt Gordon* (>0.7 Mt Cu)
Valhalla* / Skal (U)
Mt Isa *Cu (8 Mt Cu)
Hilton* Pb Zn Ag (>200Mt @ 15% Hilton Pb Zn Ag (>200Mt @ 15%
Zn+Pb)
Isa* Pb Zn Ag (>250Mt @ 15% Zn+Pb)Isa Pb Zn Ag (>250Mt @ 15% Zn+Pb)
One drill hole in 1,900 km2*not assets of the company
GregoryGregoryGregory ProjectGregory Project
GunpowderGunpowderGunpowder Fault
Gunpowder Fault
40km
Sources company reports.
June 2008
A Phosphate Surprise aInferred Resource 169 Average grade 15 9% Average grade 15.9% Previous exploration mby International Miningby International Mining15 km strike phosphoritwide on Mt Isa Metals Up to 10 m thick, averaUp to 10 m thick, averaFurther exploration up250k f th t250km from the coast,
at D-Tree West deposit mt @ 3.1:1 strip ratio P2O5 (P2O5 cutoff 10%) P2O5 (P2O5 cutoff 10%)
more than 150 drillholesg Corp mid 1960sg Corp mid 1960ste horizon,1.4 to 3.4km (DGR 48%) groundage 5m thickage 5m thickside to west 120k th Mt I, 120km north Mt Isa
June 2008
EPMA 15763EPMA 15763 Georgina Georgina BasinBasin
Historical lease Historical lease boundaryboundary
Priority Target Areas (high grade zones)grade zones)
5km
Mount Isa Mount Isa InlierInlier
Schematic EW Cross Section
200:1 (H:V)
Drill holes
IMC (1967-68)
Continental Oil (1966)
CRA Expl’n (1994)
Phosphate MineralisationPhosphate Mineralisation
+10% P2O5
+15% P2O5June 2008
DGR 90%DGR 90%New Nickel provincNew Nickel provincExtensive 0.8% NickeNew copper silver d
ll 4 @ 2% CValley 14m @1.2% CsilversilverNickel, copper & silv
e – 40km2e 40kmel mineralisationdiscovery at Silver C d 2 8 /t Copper and 2.8 oz/t
ver price re-ratingsJune 2008
E t i O id Ni k l MExtensive Oxide Nickel M- Mt C
Mi li ti t Ridl Mineralisation at Ridleys Cobalt
June 2008
June 2008
New gold province1m oz historical prod120km south120km southGold mineralisationTrend, Nevada USADGR t l ti DGR controls entire 30km x 15km30km x 15km
*not an asset of the company
duction at Cracow*,
style similar to Carlin yA
t system
June 2008
Rannes – An new goldd and silver provinceFirst pass drilling program – 16 holesCrunchie Prospect32m from surface @ 1.84 g/t Au & 41g/t Ag and g/t Au & 41g/t Ag and 40 m from 12m @1.17 g/t Au and 76g/t Agg gKauffmans Prospect38 m from 28m @ 1.78g/t Au & 25g/t AgPorcupine Prospect8 f 4 @ 6 23 /t 8m from 4m @ 6.23g/t Au & 5.9g/t Ag
June 2008
A new iron ore provinA new iron ore province with a railway linece with a railway line• Ridge Exploration
(DGR 100%)(DGR 100%) Exploration Permit applicationsapplications
• Evergreen Formation – potential for sedimentary uranium and iron ore
• Supported by airborne• Supported by airborne geophysical data
June 2008
i iExtensive laterite i iron prospectsJune 2008
New resource estimoptimisation total roptimisation - total r32Mt @ 0.06% Mo eqCapital cost estimaMetallurgy underwa
*refer footnote
mation and pit resource resource q*.tes in preparation
ay
June 2008
ConConNick Math
0417 880 448 oDuncan Cornish (SecDuncan Cornish (Sec
Greg Runge (GM+61 418
Stuart Ballyhoo Marketing a
+61 414 +61 414
www.daguigASX : ThankThank
tacttacther (CEO) or 07 3303 0680cretary) 07 3303 0680cretary) 07 3303 0680M) 07 3303 0680 546739 Crow nd Communications449 442449 442
ilar.com.au DGRk youk you
June 2008
FOOTNOTE:
Molybdenum equivalents (“Mo Eq”) assumptions:
Cut-off grades are based on Molybdenum Equivalence (“Mo Equiv”) and
1 troy ounce (oz) = 31.103477 grams (gm)
1 pound (lb) = 453.5924 grams (gm)
Metal*Prices (US$)
Feb 2007 outlookUnits
Price (US$) per gram (gm)
Ratio
Where Mo = Molybdenum, Ag = Silver and Cu = Copper (all in ppm)
Mo $25.00 / lb $0.055 / gm 1.00Ag $13.50 / troy ounce $0.434 / gm 7.88Cu $2.50 / lb $0.006 / gm 0.1
In the Company’s opinion all elements included in the metal equivalents calculathe proportions of 70% to 85% for Mo, 75% to 85% for Ag and 70% to 80% for Cu bmay change as testwork proceeds. On this basis, the formula used to calculate Mcalculation):
Mo Equiv = Mo + 7.88xAg + 0.1xCu
Competent Perso
The information in this report that relates to Exploration Results and Mineral Resources is based onInstitute of Mining and Metallurgy Mr Mather is employed by Samuel Holdings Pty Ltd which providInstitute of Mining and Metallurgy. Mr. Mather is employed by Samuel Holdings Pty Ltd which providD’Aguilar Gold Ltd (and a director of D’Aguilar Gold Ltd’s subsidiaries).
Mr. Mather has sufficient experience which is relevant to the style of mineralisation and type of depodefined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Minerals Rein this report of the matters based on the information in the form and context in which it appears.
d the inputs for this calculation are:
Today’s Spot Prices for comparison withthe February outlook prices used
US$33.20lbUS$16.91/ozUS$3.59/lb
ation have a reasonable potential to be recovered, approximately in ased on preliminary metallurgical testwork results to date. Recoveries Mo Equiv is as follows (note no recoveries have been included in this
ons Statement
information compiled by Nicholas Mather B.Sc (Hons) Geol., who is a Member of The Australianes certain consultancy services including the provision of Mr Mather as the Managing Director ofes certain consultancy services including the provision of Mr. Mather as the Managing Director of
osit being reported and to the activity which he is undertaking to qualify as a Competent Person asesources and Ore Reserves’ (the JORC Code). Mr. Mather has consented in writing to the inclusion
Top Related