ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
ECE260B CSE241AWinter 2007
Floorplanning, Partitioning and Placement
Website: http://vlsicad.ucsd.edu/courses/ece260b-w07
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
ECE260B CSE241AWinter 2007
Floorplanning
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Floorplanning Input
Design netlist (required)
Area requirements (required)
Power requirements (required)
Timing constraints (required)
Physical partitioning information (required)
Die size vs. performance vs. schedule trade-off (required)
I/O placement (optional)
Macro placement information (optional)
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Floorplanning Output
Die/block area
I/Os placed
Macros placed
Power grid designed
Power pre-routing
Standard cell placement areas
Design ready for standard cell placement
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Floorplanning Output
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Floorplan
data path
RAMstd cell
blocks
I/O pads
Routing channels
Blocks inside a pad frame
Routing inside, between blocks
Different-sized blocks more difficult than standard cells to place and route
BlocksHard, soft, semi-softRectangular, L-shaped, T-shaped, rectilinearCan rotate, mirror,
Courtesy K. Yang, UCLA
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Size Estimation
Why we care: If area is too small: P&R will not finish or meet timing, will run too longSchedule and die size inversely relatedPerformance and die size have complex relationship
Rule of thumb (must correct for power, clock, etc.):- 3LM: Cell utilization 65 percent // what is utilization?- 3LM: Cell utilization 70 percent- 5LM: Cell utilization 75 percent- 6LM: Cell utilization 80 percent
Floorplan metricsLow interconnect density Cell util (standard cell area/standard cell row area)High interconnect density Net util (number of nets/standard cell area)
Die size
Physical DesignSchedulePerf
Die size
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Channels
Channels end at block boundaries
Alternate channel definitions possible, depending on position of blocks
A
B C
channel 1
ch 2
ch 1 ch 2ch 3
A
B C
A
B C
Courtesy K. Yang, UCLA
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Channel Intersection Graph
Nodes are channels, edges correspond to pairs of channels that touch
Channel graph shows paths between channels
Channel graph can be used to guide global routing
A BC
D
E
Courtesy K. Yang, UCLA
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Slicing Floorplan Represented by Binary Tree
A slicing floorplan can be recursively cut in two without cutting any blocks
A slicing floorplan is guaranteed to have no wheels, therefore guaranteed to have a feasible order of routing for the channels
A slicing floorplan can be represented as a binary tree, with internal nodes representing slices in the floorplan and leaves representing blocks.
Courtesy K. Yang, UCLA
A
B
C
D
E
1
23
4
12 3
4CA B
D E
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
O-Tree
Partial ordering based on projection overlapping (with given physical locations)
Transforming into binary trees by pivoting, etc.
Coded in a node sequence given a tree traversal algorithm
E.g., OACBDEF for DFS
Condensed solution spaceB
C
D E
F
Courtesy K. Yang, UCLA
A
O
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Sequence Pair
Based on layout partitions by non-overlapping ascending/descending staircases
Coded in two node sequences E.g., CEDFAB for descending staircases and ABCDEF for ascending staircases
Larger solution space, finer representation
B
C
D E
F
A
Courtesy K. Yang, UCLA
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
ECE260B CSE241AWinter 2007
Partitioning
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Hypergraphs in VLSI CAD
Circuit netlist represented by hypergraph
Courtesy K. Yang, UCLA
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Hypergraph Partitioning in VLSI
Circuit netlist represented by hypergraphVariants
- directed/undirected hypergraphs- weighted/unweighted vertices, edges- constraints, objectives,
Human-designed instancesBenchmarks
- up to 4,000,000 vertices- sparse (vertex degree 4, hyperedge size 4)- small number of very large hyperedges
Efficiency, flexibility: KL-FM style preferred
Courtesy K. Yang, UCLA
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Hypergraph Partitioning in VLSI
Circuit netlist represented by hypergraphVariants
- directed/undirected hypergraphs- weighted/unweighted vertices, edges- constraints, objectives,
Human-designed instancesBenchmarks
- up to 4,000,000 vertices- sparse (vertex degree 4, hyperedge size 4)- small number of very large hyperedges
Efficiency, flexibility: KL-FM style preferred
Courtesy K. Yang, UCLA
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Example: Partitioning of a Circuit
Courtesy K. Yang, UCLA
Input size: 48
Cut 1=4Size 1=15
Cut 2=4Size 2=16 Size 3=17
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Hierarchical Partitioning
Levels of partitioning:System-level partitioning:Each sub-system can be designed as a single PCBBoard-level partitioning:Circuit assigned to a PCB is partitioned into sub-circuitseach fabricated as a VLSI chipChip-level partitioning:Circuit assigned to the chip is divided into manageable sub-circuitsNOTE: physically not necessary
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Delay at Different Levels of Partitions
AB
C
PCB1
D
x
10x
20xPCB2
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Delay at Different Levels of Partitions
AB
C
PCB1
D
x
10x
20xPCB2
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Delay at Different Levels of Partitions
etc
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Context: Top-Down Placement
Speed- 6,000 cells/minute to final detailed placement- partitioning used only in top-down global placement- implied partitioning runtime: 1 second for 25,000 cells, < 30
seconds for 750,000 cells
Structure- tight balance constraint on total cell areas in partitions- widely varying cell areas- fixed terminals (pads, terminal propagation, etc.)
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Fiduccia-Mattheyses (FM) Approach
Pass:start with all vertices free to move (unlocked)label each possible move with immediate change in cost that it causes (gain)iteratively select and execute a move with highest gain, lock the moving vertex (i.e., cannot move again during the pass), and update affected gainsbest solution seen during the pass is adopted as starting solution for next pass
FM:start with some initial solutionperform passes until a pass fails to improve solution quality
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Cut During One Pass (Bipartitioning)
Moves
Cut
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Multilevel Partitioning
RefinementClustering
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
ECE260B CSE241AWinter 2007
Placement
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
VLSI Design Flow and Physical Design Stage
Global Placement
Detail Placement
Clock Tree Synthesisand Routing
Global Routing
Detail Routing
Power/Ground Stripes, Rings Routing
Extraction and Delay Calc.
Timing Verification
IO Pad Placement
Definitions:
Cell: a circuit component to be placed on the chip area. In placement, the functionality of the component is ignored.
Net: specifying a subset of terminals, to connect several cells.
Netlist: a set of nets which contains the connectivity information of the circuit.
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Placement Problem
Input:A set of cells and their complete information (a cell library).Connectivity information between cells (netlist information).
Output:A set of locations on the chip; one location for each cell
Goal:The cells are placed to produce a routable chip that meets
timing and other constraints (e.g., low-power, noise, etc.)
Challenge:The number of cells in a design is very large (> 1 million)The timing constraints are very tight
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Optimal Relative Order:
A B C
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
To spread ...
A B C
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
.. or not to spread
A B C
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Place to the left
A B C
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
or to the right
A B C
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Optimal Relative Order:
A B C
Without free space, the placement problem is dominated by order
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Placement Problem
A bad placement A good placement
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Global and Detailed Placement
In global placement, we decide the approximate locations for cells by placing cells in global bins.
In detailed placement, we make some local adjustment to obtain the final non-overlapping placement.
Global Placement
Detailed Placement
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Placement Footprints:Standard Cell:
Data Path:
IP - Floorplanning
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Placement Footprints:
Core
ControlIO
Reserved areas
Mixed Data Path &sea of gates:
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Placement Footprints:
Perimeter IO
Area IO
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Placement objectives are subject to user constraints / design style
Hierarchical Design Constraintspin locationpower rail reserved layers
Flat Design with Floorplan Constraints
Fixed Circuits
I/O Connections
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Standard Cells
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Standard Cells
Power connected by abutment, placed in sea-of-rowsRarely rotatedDRC clean in any combinationCircuit clean (I.e. no naked T-gates, no huge input capacitances)8,9,10+ tracks in heightMetal 1 only used (hopefully)Multi-height stdcells possibleBuffers: sizes, intrinsic delay steps, optimal repeater selectionSpecial clock buffers + gates (balanced P:N)Special metastability hardened flopsCap cells (metal1 used?)Gap fillers (metal1 used?)Tie-high, tie-low
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
UnconstrainedPlacement
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Floor plannedPlacement
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Traditional Placement Algorithms
Quadratic Placement
Simulated Annealing
Bi-Partitioning / Quadrisection
Force Directed Placement
Hybrid Algorithm
Cost Function
Netlis
t Gran
ularity
Layo
ut C
oars
enes
s
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Quadratic Placement
Quadratic Placement
x4x4
x3x3x1x1
x2x2
Min Min [(x1[(x1--x3)x3)22 + (x1+ (x1--x2)x2)2 2 + (x2+ (x2--x4)x4)22] : ] : FF
F/F/x1 = 0; x1 = 0;
F/F/x2 = 0;x2 = 0;Ax = BAx = B
2 2 --11--1 2 1 2 x =
x = x1x1x2x2A = A = B = B =
x3x3x4x4
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Analytical Placement
Get a solution with lots of overlaps
What do we do with the overlap?
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Pros and Cons of QP
ProsVery fast analytical solutionCan handle large design sizesCan be used as an initial seed placement engine
ConsCan generate overlapped solutions: post-processing neededNot suitable for timing-driven placementNot suitable for simultaneous optimization of other aspects of physical design (clocks, crosstalk, )Gives trivial solutions without pads (and close to trivial with pads)
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Simulated Annealing Placement
Initial Placement Improved through Initial Placement Improved through Swaps and MovesSwaps and Moves
Accept a Swap/Move if it improves Accept a Swap/Move if it improves costcost
Accept a Swap/Move that degrades Accept a Swap/Move that degrades cost under some probability cost under some probability conditionsconditions
TimeTime
CostCost
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Pros and Cons of SA
Pros:Can Reach Globally Optimal Solution (given enough time)Open Cost Function.Can Optimize Simultaneously all Aspects of Physical DesignCan be Used for End Case Placement
Cons:Extremely Slow Process of Reaching a Good Solution
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Bi-Partitioning / Quadrisection
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Pros and Cons of Partitioning Based Placement
Pros:More Suitable to Timing Driven Placement since it is Move BasedNew Innovation (hMetis) in Partitioning Algorithms have made this Extremely FastOpen Cost FunctionMove Based means Simultaneous Optimization of all Design Aspects Possible
Cons:Not Well UnderstoodLots of indifferent movesMay not work well with some cost functions.
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Cost Functions of Placement
Net-cut
Linear wirelength
Quadratic wirelength
Congestion
Timing
Coupling
Other performance related cost functions
Undiscovered: crossing
Algorithm
Cost Function
Netlis
t
Gran
ularity
Layo
ut C
oars
enes
s
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Net-cut Cost for Global Placement
The netThe net--cut cost is defined as cut cost is defined as the number of external nets the number of external nets between different global binsbetween different global bins
Minimizing netMinimizing net--cut in global cut in global placement tends to put highly placement tends to put highly connected cells close to each connected cells close to each other.other.
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Linear Wirelength Cost
The linear length of a net The linear length of a net between cell 1 and cell 2 isbetween cell 1 and cell 2 is
l12 = l12 = |x1|x1--x2| +|y1x2| +|y1--y2|y2|
The linear The linear wirelengthwirelength cost is cost is the summation of the linear the summation of the linear length of all nets.length of all nets.
(x1,y1)(x1,y1)
(x2,y2)(x2,y2)
11
22
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Quadratic Wirelength Cost
The quadratic length of a net The quadratic length of a net between cell 1 and cell 2 isbetween cell 1 and cell 2 is
l12 = l12 = (x1(x1--x2)2 +(y1x2)2 +(y1--y2)2y2)2
The quadratic The quadratic wirelengthwirelength cost cost is the summation of the is the summation of the quadratic length of all nets.quadratic length of all nets.
(x1,y1)(x1,y1)
(x2,y2)(x2,y2)
11
22
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Timing Cost
Delay of the circuit is defined as the longest delay among all possible paths from primary inputs to primary outputs.
Interconnection delay becomes more and more important in deep sub-micron regime.
Critical Path
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Timing Analysis
How do we get the delay numbers on the gate/interconnect?
5 5 5
4 4 4
2
LATCH
LATCH
3 2 1 1
2 1 3 2
1
2222
1919
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Approaches
BudgetingIn accurate informationFast
Path AnalysisMost accurate informationVery slow
Path analysis with infrequent path substitutionSomewhere in between
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Timing Metrics
How do we assess the change in a delay due to a potential move during physical design?
Whether it is channel routing or area routing, the problem is the same
translate geometrical change into delay change
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Other costs: Coupling Cost
Hard to model during placement
Can run a global router in the middle of placement
Even at the global routing level it is hard to model it
Avoid it
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Coupling Solutions
Once we have some metrics for coupling, we can calculate sensitivities, and optimize the physical design...
Spacing
Extra space
Segregation
Noisy region
Quiet region
Shielding
Grounded Shields
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Other Performance Costs
Power usage of the chip.Weighted netsDual voltages (severe constraint on placement)
Very little known about these cost functions and their interaction with other cost functions
Fundamental research is needed to shed some light on the structure of them
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Placement ReferencesC. J. Alpert, T. Chan, D. J.-H. Huang, I. Markov, and K. Yan, Quadratic Placement Revisited,Proc. 34th IEEE/ACM Design Automation Conference, 1997, pp. 752-757
C. J. Alpert, J.-H Huang, and A. B. Kahng, Multilevel Circuit Partitioning, Proc. 34th IEEE/ACM Design Automation Conference, 1997, pp. 530-533
U. Brenner, and A. Rohe, An Effective Congestion Driven Placement Framework, International Symposium on Physical Design 2002, pp. 6-11
A. E. Caldwell, A. B. Kahng, and I.L. Markov, Can Recursive Bisection Alone Produce Routable Placements,Proc. 37th IEEE/ACM Design Automation Conference, 2000, pp 477-482
M.A. Breuer, Min-Cut Placement, J. Design Automation and Fault Tolerant Computing, I(4), 1997, pp 343-362
J. Vygen, Algorithms for Large-Scale Flat Placement, Proc. 34th IEEE/ACM Design Automation Conference, 1988,pp 746-751
H. Eisenmann and F. M. Johannes, Generic Global Placement and Floorplanning, Proc. 35th IEEE/ACM Design Automation Conference, 1998, pp. 269-274
S.-L. Ou and M. Pedram, Timing Driven Placement Based on Partitioning with Dynamic Cut-Net Control, Proc. 37th IEEE/ACM Design Automation Conference, 2000, pp. 472-476
C.M. Fiduccia and R.M. Mattheyses, A linear time heuristic for improving network partitions, Proc. ACM/IEEE Design Automation Conference. (1982) pp. 175 - 181.
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Reading Assignment (Posted on the web)
C.M. Fiduccia and R.M. Mattheyses, A linear time heuristic for improving network partitions, Proc. ACM/IEEE Design Automation Conference. (1982) pp. 175 - 181.
A. E. Caldwell, A. B. Kahng and I. L. Markov. Design and Implementation of the Fiduccia-Mattheyses Heuristic for VLSI Netlist Partitioning. Proc. Workshop on Algorithm Engineering and Experimentation (ALENEX), January, 1999
(Optional): C. J. Alpert and A. B. Kahng, "Recent Directions in Netlist Partitioning: A Survey, Integration: The VLSI Journal 19 (1995), pp. 1-81.
ECE 260B CSE 241A Floorplanning, Partitioning and Placement Andrew B. Kahng, UCSD
Homework Friday 1/19
If I model one wire segment with R, C = Rw, Cw by two segments in series, each with R, C = Rw/2, Cw/2, how does Elmore delay change?
What are the differences between Kernighan-Lin and Fiduccia-Mattheyses?
ECE260B CSE241AWinter 2007Floorplanning, Partitioning and PlacementECE260B CSE241AWinter 2007FloorplanningFloorplanning InputFloorplanning OutputFloorplanning OutputFloorplanSize EstimationChannelsChannel Intersection GraphSlicing Floorplan Represented by Binary TreeO-TreeSequence PairECE260B CSE241AWinter 2007PartitioningHypergraphs in VLSI CADHypergraph Partitioning in VLSIHypergraph Partitioning in VLSIExample: Partitioning of a CircuitHierarchical PartitioningDelay at Different Levels of PartitionsDelay at Different Levels of PartitionsDelay at Different Levels of PartitionsContext: Top-Down PlacementFiduccia-Mattheyses (FM) ApproachCut During One Pass (Bipartitioning)Multilevel PartitioningECE260B CSE241AWinter 2007PlacementVLSI Design Flow and Physical Design StagePlacement ProblemOptimal Relative Order:To spread ..... or not to spreadPlace to the left or to the rightOptimal Relative Order:Placement ProblemGlobal and Detailed PlacementPlacement Footprints:Placement Footprints:Placement Footprints:Placement objectives are subject to user constraints / design styleStandard CellsStandard CellsTraditional Placement AlgorithmsQuadratic PlacementAnalytical PlacementPros and Cons of QPSimulated Annealing PlacementPros and Cons of SABi-Partitioning / QuadrisectionPros and Cons of Partitioning Based PlacementCost Functions of PlacementNet-cut Cost for Global PlacementLinear Wirelength CostQuadratic Wirelength CostTiming CostTiming AnalysisApproachesTiming MetricsOther costs: Coupling CostCoupling SolutionsOther Performance CostsPlacement ReferencesReading Assignment (Posted on the web)Homework Friday 1/19