DATE SUPERVISOR MANPOWER WORKPLACE
01.09.2010 Azommi 1 Assistant Unit 2
(WEDNESDAY) 3 Chainman
Unit 3
Office
02.09.2010 Azommi 2 Assistant Unit 2
3 Chainman Unit 4
03.09.2010 Azommi 2 Assistant Unit 2
3 Chainman
Unit 2
Office
04.09.2010 Azommi 2 Assistant Unit 1
3 Chainman
05.09.2010 Azommi 1 Assistant Unit 1
( Sunday ) 3 Chainman
06.09.2010 Azommi 1 Assistant Unit 4
3 Chainman
Unit 1
Unit 2
07.09.2010 Azommi 1 Assistant Unit 4
3 Chainman
Unit 2
Unit 4
08.09.2010 Azommi 1 Assistant Assembly Bay
3 ChainmanWorkshop
09.09.2010
10.09.2010
11.09.2010
12.09.2010 ( SUNDAY )
ACTIVITY
Prepare survey beam for Draft Tube
Cone flange grinding monitoring work.
Checking length between Bottom Ring
plate ( before grout ).
and Head Cover facing plate for
adjustment work.Prepare as built drawing for Stator
Frame and Lower Bracket foundation
inspection for welding work.
Checking elevation top of Stator Frame
Checking elevation Servomotor plate
and Servomotor Regulating Ring.
Checking levelness of Draft Tube Cone
for adjustment and grinding work.
Checking diameter of Stator Frame
before welding work.Prepare RFI for Stator Frame Visual
Joint inspection Stator Frame fit up
(visual)
Taking as built elevation of Stator
Frame foundation plate after grout.
Taking as built position of Stator Frame
foundation plate after grout.
Fabrication of Staff Tripod.
HARI RAYA
Checking height of Stator Core before
pressing work 2nd stage.
Taking as-built position and elevation
of Lower Bracket foundation plate.
Checking height of Stator Core during
pressing 2nd lift.
Checking diameter and elevation of
OFF DAY
Stator Frame during welding work.
Checking roundness of Stator Core
after 2nd pressing.
Checking roundness of Rotor for
Unit 4
HARI RAYA( PUBLIC HOLIDAY )
( PUBLIC HOLIDAY )
7/28/2019 Daily Site Activity September for hydroelectric
2/4
DATE SUPERVISOR MANPOWER WORKPLACE
13.09.2010 Azommi 1 Assistant Unit 3
2 Chainman
14.09.2010 Azommi 1 Assistant Unit 3
2 ChainmanUnit 3
Unit 3
Unit 2
15.09.2010 Azommi 1 Assistant Unit 2
2 Chainman
Office
16.09.2010 ( PUBLIC HOLIDAY )
17.09.2010 Azommi 2 Chainman Unit 2
Unit 2
18.09.2010 Azommi 1 Assistant Unit 2
2 Chainman
19.09.2010 Azommi 1 Assistant Unit 2
2 Chainman
20.09.2010 Azommi 2 Assistant Unit 2
2 Chainman
21.09.2010 Azommi 2 Assistant Unit 2
2 Chainman
Unit 4
22.09.2010 Azommi 1 Assistant Unit 2
1 Chainman
23.09.2010 Azommi 2 Assistant Unit 2
2 Chainman
Unit 2
Checking levelness at Bottom Ring.
Monitoring levelness of Draft Tube
ACTIVITY
Checking levelness of Stator Frame.
Checking length between Bottom Ring
Cone.
Cone for grinding work.
Monitoring levelness of Draft Tube
Cone for grinding work.
Preparing as built drawing for Stator
Frame foundation Unit 1
Checking levelness of Draft Tube
Cone for grinding work.
Readjust the levelness of Draft Tube
and Head Cover facing plate.Checking gap Wicket Gate Guide Vane.
Part).
Monitoring and assisting Draft Tube
Cone levelness during grinding work
(Lower Part).
Monitoring and assisting Draft Tube
Cone levelness during grinding work
(Lower Part).
Monitoring and assisting Draft Tube
Cone flange for grinding work (Upper
Part).
Checking diameter and elevation of
Monitoring and assisting Draft Tube
Cone flange for grinding work.
Checking roundness of Stator Core
3rd lift (before pressing).
Monitoring and assisting Draft Tube
Cone for grinding work.
Monitoring and assisting Draft Tube
Cone flange for grinding work (Upper
Stator Frame after finished welding
work.
MALAYSIA DAY
7/28/2019 Daily Site Activity September for hydroelectric
3/4
DATE SUPERVISOR MANPOWER WORKPLACE
24.09.2010 Azommi 2 Assistant Unit 2
3 Chainman
Unit 4
Unit 4
25.09.2010 Azommi 2 Assistant Unit 2
3 Chainman
Unit 3
Assembly Bay
26.09.2010 ( SUNDAY ) OFF DAY
27.09.2010 Azommi 2 Assistant Unit 3
2 Chainman
Unit 3
Assembly Bay
Unit 2
28.09.2010 Azommi 2 Assistant Unit 2
3 Chainman
Unit 3
Unit 4
29.09.2010 Azommi 2 Assistant Unit 2
3 Chainman
Unit 2
Unit 3
30.09.2010 Azommi 2 Assistant Unit 4
(THURSDAY) 3 Chainman
Unit 2
Unit 2
ACTIVITY
Checking levelness of Draft Tube
Cone flange after grind.
Checking height of Stator Core (3rd
Monitoring and assisting Draft Tube
Cone flange for grinding work (Upper
Part).
Checking height of Stator Core (3rd
Checking roundness of Rotor for
Unit 3
Checking length between Bottom Ring
and Head Cover facing plate and gap
between Wicket Gate and Guide Vane.
Preparation for checking roundness of
Rotor for Unit 3.
Checking length between Bottom Ring
and Head Cover facing plate.
Marking reference for dilatation piece
at el.45.500.
Checking levelness of Draft Tube Cone
flange.
Monitoring levelness of Draft Tube
Cone flange during touch-up grinding
work.
Monitoring Draft Tube Cone flange
grinding touch-up work.
Checking gap between Wicket Gate
and Guide Vane.
Checking radius of Stator Core.
Checking radius and roundness of
Stator Core.
Monitoring Draft Tube Cone flange
grinding touch-up work.
Prepare survey beam to measure
levelness and radius of Bottom Ring
for Unit 2 at El: 52.9.
Checking gap between Wicket Gate
and Guide Vane.
Checking levelness and radius of
Bottom Ring for Unit 2 at El: 52.9.
lift) before pressing work.
lift) during pressing work.