    DATE SUPERVISOR MANPOWER WORKPLACE

    01.09.2010 Azommi 1 Assistant Unit 2

    (WEDNESDAY) 3 Chainman

    Unit 3

    Office

    02.09.2010 Azommi 2 Assistant Unit 2

    3 Chainman Unit 4

    03.09.2010 Azommi 2 Assistant Unit 2

    3 Chainman

    Unit 2

    Office

    04.09.2010 Azommi 2 Assistant Unit 1

    3 Chainman

    05.09.2010 Azommi 1 Assistant Unit 1

    ( Sunday ) 3 Chainman

    06.09.2010 Azommi 1 Assistant Unit 4

    3 Chainman

    Unit 1

    Unit 2

    07.09.2010 Azommi 1 Assistant Unit 4

    3 Chainman

    Unit 2

    Unit 4

    08.09.2010 Azommi 1 Assistant Assembly Bay

    3 ChainmanWorkshop

    09.09.2010

    10.09.2010

    11.09.2010

    12.09.2010 ( SUNDAY )

    ACTIVITY

    Prepare survey beam for Draft Tube

    Cone flange grinding monitoring work.

    Checking length between Bottom Ring

    plate ( before grout ).

    and Head Cover facing plate for

    adjustment work.Prepare as built drawing for Stator

    Frame and Lower Bracket foundation

    inspection for welding work.

    Checking elevation top of Stator Frame

    Checking elevation Servomotor plate

    and Servomotor Regulating Ring.

    Checking levelness of Draft Tube Cone

    for adjustment and grinding work.

    Checking diameter of Stator Frame

    before welding work.Prepare RFI for Stator Frame Visual

    Joint inspection Stator Frame fit up

    (visual)

    Taking as built elevation of Stator

    Frame foundation plate after grout.

    Taking as built position of Stator Frame

    foundation plate after grout.

    Fabrication of Staff Tripod.

    HARI RAYA

    Checking height of Stator Core before

    pressing work 2nd stage.

    Taking as-built position and elevation

    of Lower Bracket foundation plate.

    Checking height of Stator Core during

    pressing 2nd lift.

    Checking diameter and elevation of

    OFF DAY

    Stator Frame during welding work.

    Checking roundness of Stator Core

    after 2nd pressing.

    Checking roundness of Rotor for

    Unit 4

    HARI RAYA( PUBLIC HOLIDAY )

    ( PUBLIC HOLIDAY )

  • 7/28/2019 Daily Site Activity September for hydroelectric

    2/4

    DATE SUPERVISOR MANPOWER WORKPLACE

    13.09.2010 Azommi 1 Assistant Unit 3

    2 Chainman

    14.09.2010 Azommi 1 Assistant Unit 3

    2 ChainmanUnit 3

    Unit 3

    Unit 2

    15.09.2010 Azommi 1 Assistant Unit 2

    2 Chainman

    Office

    16.09.2010 ( PUBLIC HOLIDAY )

    17.09.2010 Azommi 2 Chainman Unit 2

    Unit 2

    18.09.2010 Azommi 1 Assistant Unit 2

    2 Chainman

    19.09.2010 Azommi 1 Assistant Unit 2

    2 Chainman

    20.09.2010 Azommi 2 Assistant Unit 2

    2 Chainman

    21.09.2010 Azommi 2 Assistant Unit 2

    2 Chainman

    Unit 4

    22.09.2010 Azommi 1 Assistant Unit 2

    1 Chainman

    23.09.2010 Azommi 2 Assistant Unit 2

    2 Chainman

    Unit 2

    Checking levelness at Bottom Ring.

    Monitoring levelness of Draft Tube

    ACTIVITY

    Checking levelness of Stator Frame.

    Checking length between Bottom Ring

    Cone.

    Cone for grinding work.

    Monitoring levelness of Draft Tube

    Cone for grinding work.

    Preparing as built drawing for Stator

    Frame foundation Unit 1

    Checking levelness of Draft Tube

    Cone for grinding work.

    Readjust the levelness of Draft Tube

    and Head Cover facing plate.Checking gap Wicket Gate Guide Vane.

    Part).

    Monitoring and assisting Draft Tube

    Cone levelness during grinding work

    (Lower Part).

    Monitoring and assisting Draft Tube

    Cone levelness during grinding work

    (Lower Part).

    Monitoring and assisting Draft Tube

    Cone flange for grinding work (Upper

    Part).

    Checking diameter and elevation of

    Monitoring and assisting Draft Tube

    Cone flange for grinding work.

    Checking roundness of Stator Core

    3rd lift (before pressing).

    Monitoring and assisting Draft Tube

    Cone for grinding work.

    Monitoring and assisting Draft Tube

    Cone flange for grinding work (Upper

    Stator Frame after finished welding

    work.

    MALAYSIA DAY

  • 7/28/2019 Daily Site Activity September for hydroelectric

    3/4

    DATE SUPERVISOR MANPOWER WORKPLACE

    24.09.2010 Azommi 2 Assistant Unit 2

    3 Chainman

    Unit 4

    Unit 4

    25.09.2010 Azommi 2 Assistant Unit 2

    3 Chainman

    Unit 3

    Assembly Bay

    26.09.2010 ( SUNDAY ) OFF DAY

    27.09.2010 Azommi 2 Assistant Unit 3

    2 Chainman

    Unit 3

    Assembly Bay

    Unit 2

    28.09.2010 Azommi 2 Assistant Unit 2

    3 Chainman

    Unit 3

    Unit 4

    29.09.2010 Azommi 2 Assistant Unit 2

    3 Chainman

    Unit 2

    Unit 3

    30.09.2010 Azommi 2 Assistant Unit 4

    (THURSDAY) 3 Chainman

    Unit 2

    Unit 2

    ACTIVITY

    Checking levelness of Draft Tube

    Cone flange after grind.

    Checking height of Stator Core (3rd

    Monitoring and assisting Draft Tube

    Cone flange for grinding work (Upper

    Part).

    Checking height of Stator Core (3rd

    Checking roundness of Rotor for

    Unit 3

    Checking length between Bottom Ring

    and Head Cover facing plate and gap

    between Wicket Gate and Guide Vane.

    Preparation for checking roundness of

    Rotor for Unit 3.

    Checking length between Bottom Ring

    and Head Cover facing plate.

    Marking reference for dilatation piece

    at el.45.500.

    Checking levelness of Draft Tube Cone

    flange.

    Monitoring levelness of Draft Tube

    Cone flange during touch-up grinding

    work.

    Monitoring Draft Tube Cone flange

    grinding touch-up work.

    Checking gap between Wicket Gate

    and Guide Vane.

    Checking radius of Stator Core.

    Checking radius and roundness of

    Stator Core.

    Monitoring Draft Tube Cone flange

    grinding touch-up work.

    Prepare survey beam to measure

    levelness and radius of Bottom Ring

    for Unit 2 at El: 52.9.

    Checking gap between Wicket Gate

    and Guide Vane.

    Checking levelness and radius of

    Bottom Ring for Unit 2 at El: 52.9.

    lift) before pressing work.

    lift) during pressing work.

  • 7/28/2019 Daily Site Activity September for hydroelectric

    4/4