1 | P a g e
CURRICULUM VITAE
2016
CERTIFICATION
IMCA AIR DIVING SUPERVISOR Cert. No. 6002 Sept 2004
IMCA SURFACE SUPPLIED DIVER Cert.No.SS/DASSESS/072 5/12/2001 ASSISTANT AIR DIVING SUPERVISOR Cert. No.(2002/53) 21 Dec. 2002 CSWIP 3.1U - NDT INSPECTION DIVER Cert. No.(754075/622650) 10 Aug. 2011 IMO 1 OIL SPILL RESPONSE TRAINING. 28
th Apr. to the 2
nd May 2014
IUCN Marine Biodiversity Management Training Workshop 19 to 20 October 2014
Safety Certificate:
BOSIET (OPITO) Certificate No.: 058550103021561091
Included “HUET with EBS” ( OPITO Approved ) Valid until 02 / 02 / 2019
H2S & BREATHING APARATUS ( OPITO Approved ) Valid until 02 / 02 / 2017
SAFE LIFTING OPERATION. Valid until 03 / 02 / 2018
PIRMT TO WORK (PTW) 04 / 02 / 2015
RISK ASSESSMENT 04 / 02 / 2015
MANAGEMENT OF CHANGE 04 / 02 / 2015
HAZARD IDENTIFICATION 04 / 02 / 2015
ACCIDENT / INCIDENT INVESTIGATION 04 / 02 / 2015
ADMA/OPCO & ZADCO SAFETY INDUCTION COURSE.
All the jobs has been done on vessels: DP2 V, DSV and D.L.B BARGES most of the sizes.
Nationality : Egyptian
Place of birth Egypt
SIAM RAMADAN AHMED SAYED Date of Birth : 01-02-1964
Tel : 002-03-5622240
Mobile :
002-01227378580 &
00971-506495306
Email: [email protected]
Passport Number: A09925045 Valid until 16/06/2020
Sea man book Number: 198113 Valid until 30/01/2021
Marital status: married
2 | P a g e
CURRICULUM VITAE
2016
EXPERIENCE – WORK HISTORY
DATE CONTRACTOR TASK POSITION VESSEL CLIENT
04 May - 06 Sep. 2016
MUTAWA Marine
ANCHOR HANDLING & MOORING MAINTENANCE
Mooring Maintenance &
Positioning (Including laying & recovery of Gravity anchors)
Monitoring during Jacking Down barges / Rigs.
Minor repairs of ship’s hull, cleaning intakes etc.
Video record & photograph work on sea bed structures
Anomaly reporting Scour and debris survey Seabed survey and pipeline
marking for rig approach Recovery of dropped items Provide support for
conductor guide Inspection of seabed
mooring, base plate and anchor pile
Collection of soil samples Sand bagging Provide support in running
anchor wire
Diving Supervisor
MUT-305 DSV
ADMA / OPCO
Fields: ZAKUM
UMM ALSHAIF
DAS ISLAND
HAIR DELMA
NASR FIELD
SATAH
TOTAL ABK
UMM AL DALAKH
UMM LULU
ZIRKU
Abu Dhabi
Aug. - 31Des. 2015 MUTAWA
Marine
8'' J-TUBE & ANODES Installation Old Anodes Removal (Hot
Cutting). Clamps and 8'' J-tube
installation 8'',12'',16'' Riser Clamp
Installation Impact, Torque wrench
tightens. Butterfly, Sled and Single
anodes installation CP Measure pre and post
electrical continuity bolts connecting.
GVI and Still photo As Built video survey
Diving Supervisor
MUT-13 DSV
ADMA / OPCO / NPCC
Zakum and Umm Elshaiff
fields Abu Dhabi
3 | P a g e
CURRICULUM VITAE
2016
May - July 2015 MUTAWA
Marine
Pre-Engineering Survey for Boat Landing & Riser Finder Replacement & 8'' J-TUBE & Anodes Installation
Boat landing and riser finder members marine growth removal using HP.W Jet and hand tools
Measurements & GVI & CVI Anodes Replacement. J-tube clamps installation Impact and torque wrench
spanner tighten. CP Measure pre and post
electrical continuity bolts connecting.
8'' J-tube Installation GVI and Still photo As Built video survey
Diving Supervisor
DSV MUTAWA
13
ADMA / OPCO / NPCC
Zakum and Umm Elshaiff
fields Abu Dhabi
April - May 2015 MUTAWA
Marine
8'' J-TUBE & ANODES Installation Old Anodes Removal. J-tube clamps installation Impact, Torque wrench
tighten. Butterfly, Sled and Single
anodes installation CP Measure pre and post
electrical continuity bolts connecting.
8'' J-tube Installation GVI and Still photo As Built video survey
Diving Supervisor
DSV MUTAWA
13
ADMA / OPCO / NPCC
Zakum and Umm Elshaiff
fields Abu Dhabi
Jul 2014 – Oct 2014 MUTAWA
Marine
(IRM) Inspection, Repair and Maintenance
UT of the Loading Jetty P/Fs Anodes Replacement & CP
Reading GVI /Maintenance of
flowing Buoys: 16 Maritime Exclusion Zone
(MEZ), 6 cardinals, 2 laterals, and 7
coral GVI of the Hull Tug Boats,
Navy Boats and Patrol Boats Current Sensor Inspection,
Cleaning
Diving Supervisor
SRP YLNG Company
4 | P a g e
CURRICULUM VITAE
2016
Feb2014–Mar 2014 I.N.W 24'' Riser Repairing Cold Cutting using Hydraulic
Wax Cutter Machine 24'' Riser Cleaning using
hydraulic grandeur Smart Flange Plus
Connector installation Installation new Riser
Portion Tighten using 100% Hydra
tight Subsea Bolts tensioners,
Leak Test Post installation video
survey.
Diving Supervisor
M/V 55 GUPCO/BP
Sep 2011 –Oct 2012 CCC Inspection Job for P/Fs P/Fs: IS-30 & IS-19 & PS-1W & PS-1Q & IS-15 & IS-12 All job using Underwater Positioning Nodes and Members:
General Visual Inspection (GVI)
Grit blast Cleaning SA 2.5 level
Cathode Potential(CP) Ultrasonic Thickness (UT) Alternating Current Field
measurement (ACFM) Flooded Member Detection
(FMD)
Inspection.
Diving
Supervisor
DP2 Vessel ZAKHER PILECAN
OXY QATAR
June 2012 I.N.W Inspection Job Drilling Rig UWILD for Drilling Rig:
Grit Blast cleaning SA 2.5 level.
GVI of the spud cans welds Area
MPI for the cleaned welds. UT for the ABS required
area Still Photo Survey. Post installation video
survey for Inspected welds areas
Inspection.
Diving
Supervisor
DSV PEGASUS11
TRANS OCEAN/BP
5 | P a g e
CURRICULUM VITAE
2016
Apr 2010 – Jul 2010 Mutawa Marine
Various jobs 14” Pipelines and Risers # Project # 8053For: IGD HAP pipeline campaign # Project # 7079 For: WHT US-251 Pipe laying Campaign # Project # 9068For: 8” Pipe laying of Pipelines & Risers at Mubarraz Field 14'' & 3'' Pipe laying – (2 P/L’s)
Connect hold back cable to P/F legs.
Connect hold back cable to 14''P/Lpuling head.
Stinger installation in the Barge.
Stinger check and 14'' P/L Profile.
Surveying on the P/Ls Cross over’s.
Pre Laying temporary concrete sleeper's installation.
Floating buoys on the P/Ls and removal.
Disconnect lay down head. 14''Riser installation
Cutting of D.M.A wire between P/F leg and 14'' P/L puling head.
Old Riser fender removal (Using U.W Cutting Torch).
Riser & Spool Metrology Measure.
Barge Davits connect to 14''P/L.
Attaching Air Bags Removal and break the old
grouting spillage from the spool piece route using hydraulic jack hammer.
Tie in riser/ Spool Piece installation @ 14''Riser clamps.
Excavate under the spool piece using Air Lift.
New P/F Boat Landing installation. Disconnect davits from 14''P/L. Spool Piece Knee brace removal. Post construction video survey.
Diving Supervisor
NPCC DLP 750 Barge
For 24 Hours
Operation
ADMA/OPCO
6 | P a g e
CURRICULUM VITAE
2016
Nov 2009–Feb 2010 Mutawa Marine
Installation 30''Sleeves(Protection Clamps) between30''P/L and concrete Sleepers at crossing Area. # Project #6021 Das Island & Raas Al Qilla Scope of work includes24 Hours Operation for:
Marking the Sleeves locations on the 30'' P/L on the concrete Sleepers.
Lifting 30'' P/L 2m using Air Bags.
Sleeves/Sleepers Installation.
Air Bags disconnect, recovery surface
Bolts tighten using Turk spanner.
30'' P/L Sleeves/Sleepers post installation survey
Diving Supervisor
NPCC DLP 750 Barge
For 24 Hours
Operation
GASCO
7 | P a g e
CURRICULUM VITAE
2016
Feb2009– Sep 2009 Mutawa Marine
14'' Riser Clamps Installation for the flowing ( 9 ) Plat forms:
ZK 172 P/F &ZK 129 P/F &ZK 39 P/F &ZK 149 P/F &ZK 116 P/F &ZK 246 P/F &U.SH 82 P/F
14'' Riser Clamps measurement and marking location.
Riser Clamps Installation and tighten using hydraulic impact wrench
Riser Clamps Alignment checks.
18'' steel Pipe Temporary sleeper replacement by Grouting bags sleeper installation
Grout Bag install, Grouting under P/L
Removal 18'' steel Pipe Temporary sleeper from under 14'' P/L Using U.W Hot Cutting Torch and Recovery to surface following for (8) Crossings :
CL4PX13 &CL4PX 8 &CL4PX10 &CL4PX16 CL4PX11 &CL4PX 9
&CL5PX19 &CL5PX18
Diving Supervisor
DSV MARCAP-II
ADMA/OPCO Zakum field &
Umm shaif field
8 | P a g e
CURRICULUM VITAE
2016
Oct 2008–Dec 2008 Mutawa Marine
Various jobs 14” Pipelines and Risers 14'' P/L Tie in Spools and Risers installation for following : 9 tie in ZK119-ZK135 & ZK288-ZK135 & ZK255-ZK135
ZK256-ZK113 & ZK113-ZK255 & ZK255-ZK113
ZK255-ZK120 & ZK120-ZK255 & ZK120-ZK151
Cutting of D.M.A wire between P/F leg and 14'' P/L puling head.
Old Riser fender removal (Using U.W Cutting Torch).
Riser & Spool Measurements using U.W Spool Piece Metrology.
Barge Davits connect to 14''P/L and side walk
Attaching Air Lift Bags to 14''P/L.
Removal and break the old grouting spillage from the spool piece route using hydraulic jack hammer.
Tie in riser/ Spool Piece installation @ 14''Riser clamps.
Excavate under the spool piece using Air Lift.
New P/F Boat Landing installation.
Disconnect davits from 14''P/L.
Spool Piece Knee brace removal.
Diving Supervisor
NPCC DLP 750 Barge
For 24 Hours
Operation
ADMA/OPCO Zakum field
Jul 2008 – Sep 2008 Mutawa Marine
14'' Riser Clamps Installation 14'' Riser Clamps
measurement and marking location.
Riser Clamps Installation and tighten using hydraulic impact wrench
Riser Clamps Alignment checks.
Diving Supervisor
DSV MARCAP-II
ADMA/OPCO Zakum field &
Umm shaif field
9 | P a g e
CURRICULUM VITAE
2016
Apr2008– May2008
PMS Petroleum
Marine Services
Old Plat Form Supporting (Helal P/F)
supporting clams installing Two bracing panels Three conductors
Installation 12'' P/L Demolition
Using Cold cutting hydraulic cutter machine.
Removal the 12'' P/L pieces and lifting to the surface.
Assistant Diving
Operation Manager
Tim Barge GUPCO(BP)
Feb. – Mar. 2008
PMS Petroleum
Marine
Services
Various jobs 24” Pipeline, Crossing and J-TUBs 24'' P/L from SFNY 900 to TP-17
(60 Tons) Gravity anchor survey to located and marking
Pipe laying including sea bed survey
Stinger check, pipe line profile
Pre Laying temporary sleeper in crossing location installation
Alignment frame deployment using Underwater Positioning Transponder Beacon survey
Disconnecting lay down cable
Gravity anchor removal and lifting to the surface.
Wet store for 24'' spools on seabed.
6'' J-TUBs No. of 18 Riser electric cable guide wire installation
Diving Supervisor
DLP Barge PMS 12For 24 Hours Operation
Saudi ARAMCO SFNY Field
10 | P a g e
CURRICULUM VITAE
2016
Dec2007 – Jan 2008 PMS Petroleum
Marine Services
22''Gas P/L Repairing
Repair at 22'' P/L using MORGRIP mechanical connectors.
Excavating under P/L Cutting 22'' P/L using
hydraulic cold wrench cutter 22'' P/L Concrete removal
using hydraulic cutting disk and hydraulic jack hammer
polyethylene removal and Chamfering P/L end
Grit blast Cleaning SA3 level, Grind seam weld
4 MORGRIP mechanical connectors installation
Miso-tech sonar support for P/L survey at bad visibility and during deployment of A-frame and spool piece
Installation for 2 spool pieces using air lift bags and A-frame and Tighten Flanges bolts using impact wrench and hydra tight equipment.
Diving Supervisor
DP2Barge PMS 17For 24 Hours Operation
NOSPCO
Sep2007 – Oct 2007
PMS Petroleum
Marine Services
Laying 30'' P/L F/L ZULF 370 to ZULF TP
Survey and marking to the existing 30"P/L pipelines at assigned location
Marking crossing at assigned location
30'' riser clamps location at the P/F measuring and marking
30'' Spool piece measurement using U.W Spool Piece Metrology.
Diving Supervisor
DLP Barge PMS 12For 24 Hours Operation
Saudi
ARAMCO ZULF Field
11 | P a g e
CURRICULUM VITAE
2016
Feb – Jun 2007
PMS Petroleum
Marine Services
Free Span Correction 20" Trunk P/L from
P/F Morgan 36 to MWF P/F
Free Span Correction: Using grout bags and Sand cement bags support Post installation video survey
Assistant Diving
Operation Manager
Tim Barge GUPCO(BP)
Aug–Sep 20067
PMS Petroleum
Marine Services
22" P/L laying
Pre laying Pitch hull survey 3'' wire for 22'' P/L pulling
head transferring to the shore.
Connect hold back cable to 22'' P/L pulling head.
Stinger installation in the Barge.
Stinger check and 22'' P/L Profile.
Cross over’s installation of temporary concrete sleepers.
Floating buoys removal and. Disconnects lay down head.
Offshore Platform Structure Installation(North Siena). Notes : (new plat form installation)
Installing plat form including sea bed survey.
Debris Removal. Sand bags at legs mud
mate's installation. 22'' Spool Piece Tie in
installation. Barge Pampers Installation Boat landing installation Stabbing guide clamp
installation. Disconnect 6'' wire it lifting
Platform. After P/F installation: Post installation video
survey Recording
Diving Supervisor
DLP Barge PMS 12For 24 Hours Operation
NOSPCO
12 | P a g e
CURRICULUM VITAE
2016
Apr 2006 – Jul 2006
PMS Petroleum
Marine
Services
Laying 16" Pipeline and PLEM & SPM Maintenance Laying 16" Pipeline from the pitch to the PLEM.SPM
Pre laying Pitch hull survey 3'' wire for 16'' P/L pulling
head transferring to the shore.
Connect hold back cable to 16'' P/L pulling head.
Stinger installation in the Barge.
Stinger check and 16'' P/L Profile.
Video survey for the crossing P/Ls and the SPM anchor chains.
Inspection and fixation of all under water PLEM flanges.
Configuration check for 8" hoses
Replacement of 8" hoses.
Diving Supervisor
DLP Barge PMS 12For 24 Hours Operation
SUCO
Sues
13 | P a g e
CURRICULUM VITAE
2016
Mar – Apr 2006
PMS Petroleum
Marine Services
Tow Crossings Repairing
Pipe Lines Repairing:
M36–M160 12" & 22'' P/Ls: Tow Crossings Repairing using PLEDCO Clamp and Hydra tight Connector
12'' P/L concrete and bully Ethylene removal by hydraulic grinder.
12'' P/L Grit blast Cleaning SA3 level
12'' PLEDCO Clamp installation at two sides.
12'' spool piece measurement and installation.
Tighten with hydra bolt tensional
12'' P/L pressure test. 22'' P/L concrete and bully
Ethylene removal by hydraulic grinder.
22'' P/L Grit blast Cleaning SA3 level.
22'' Hydra tight connector installation at two sides.
22'' spool piece measurement and installation.
Tighten with hydra bolt tensional
22'' P/L pressure test. Post installation video
survey Recording. Laying 20" pipeline Offshore Loading Jetty Platform Structure Installation
20" P/L Pre- Laing Survey Mattress installation. 60 t Concrete Sleeper
installation. Concrete blocks installation
using U.W position system.
Diving Supervisor
DLP Barge PMS 12For 24 Hours Operation
GUPCO(BP) Morgan Field
14 | P a g e
CURRICULUM VITAE
2016
Sep 2005 –Oct 2005
PMS Petroleum
Marine Services
Offshore Loading Jetty Platform Structure Installation
DUBA Offshore Loading Jetty Platform Structure Installation
J. Type riser installation. No of 3 Impressed Current
Anode installations. Painting platform piles using
splash zone. Trenching Impressed
Current Anode cable covering by sand cement bags.
Post installation As Built Video survey.
Diving Supervisor
DLP Barge PMS 12For 24 Hours Operation
Saudi ARAMCO
DUBA Offshore
Feb – Jun 2005
PMS Petroleum
Marine Services
Various jobs 18” Pipeline MORGAN 55 P/F
Cutting 18" Riser using cold cutting machine
Conductor clamp installation
18" Riser clamp and riser installation
18" Spool piece installation
Diving Supervisor
DLP Barge PMS 12For 24 Hours Operation
GUPCO(BP) Morgan Field
15 | P a g e
CURRICULUM VITAE
2016
July 2004 – Jan 2005
PMS Petroleum
Marine
Services
Various jobs Laying, Free span Correction and P/F Structure Installation Laying 22"P/L Simian , 22"P/L Sappier
Notes: Pipe laying including sea bed survey for the pre lay supports, pre lay supports, beach pull, buoyancy tanks removal, stinger check, pipe line profile, disconnecting lay down cable, video survey for the P/L and Free Spans.
Offshore Platform Structure Installation
(ROSITA) New plat form installation
Installation of the: barge pampers, boat landing stabbing guide clamp and boat landing.
Platform 6'' lifting wire disconnecting
Platform GVI and video survey after P/F installation.
Ass. Diving Supervisor IMCA Air
Diver
DLP Barge PMS 12For 24 Hours Operation
Technip
Jan – May 2004
PMS Petroleum
Marine Services
Laying 4.5" Cold Coil Pipeline
Laying 160' water depth free spans
crossings and tie-ins Risers clamps installation Two risers installation
6No. of the Spool Pieces
installation.
Ass. Diving Supervisor IMCA Air
Diver
Barge PMS 17For 24
Hours Operation
AGIBA
16 | P a g e
CURRICULUM VITAE
2016
Nov 2003 – Dec 2003
PMS Petroleum
Marine Services
Various Jobs: Decks installation, piles injection, 26", 12" , 3" P/L Laying, Risers, Spools, Free span
Decks installation, piles
injections 26", 12" , 3" Risers and
Spools (No. of 15 spools + No. of 6 risers) installations at platforms of PORT FOUAD RPP, NOURAS-A,NOURAS-B and DARFEEL p/fs
26",12",3" Pipelines hydro test, radius jacket injection
18" pipeline VCR for all Mattresses installation
while laying
Ass. Diving Supervisor IMCA Air
Diver
DLP Barge PMS 12For 24 Hours Operation
PETROBEL
Aug 2003 – Nov 2003
PMS Petroleum
Marine Services
Riser Clamps Tie In Spool Submerged Stinger
12" Riser Clamps
Installation. 12'' Riser Installation. 12'' Tie In Spool Piece
Installation. Floating the Submerged
Stinger@ 35 meter W/D using Air bags.
Ass. Diving Supervisor IMCA Air
Diver
DLP Barge PMS 12For 24 Hours Operation
GUPCO(BP) Morgan Field
17 | P a g e
CURRICULUM VITAE
2016
May 2002 – Apr 2003
PMS Petroleum
Marine Services
Lot of the Various Jobs: Carry out the following duties:-
Two 8" Risers installations 8" KESMA P/L (piggy back)
laying, free spans, crossings &riser tie ins
Submerged Fishing Boat lifting up from 44 meter W/D using air bags and Barge Big Rig
July 59P/F (24"-18" & 12") P/Ls Repairing using PLEDCO Clamp, HYDRO TEC &SMART FLANGES
R1-R4 8" pipeline free span corrections and crossings
HAPPY P/F centralization conductors clamp installations
Repairing 18" Morgan P/L leakage
Offshore Platform (EDFOU) Structure Installation
Ass. Diving Supervisor IMCA Air
Diver
DLP Barge PMS 12For 24 Hours Operation
GUPCO(BP) Morgan Field Morgan-8 & Morgan-36
Mar 2002 – Apr 2002
PMS Petroleum
Marine Services
24'' & 36'' P/L and Spool Piece Flanges installation
24'' Burullus P/L Shifting and
alignment using air Lift, Air Bags & Barge Davits.
24'' Spool Piece Flanges installation, Hydra tight
36" burullus P/L lifting up (was buried 60:90 cun.) using Air Lift, Air Bags & Barge Davits.
IMCA Air Diver
DLP Barge PMS 12For 24 Hours Operation
STOLT
Sep 2001
PMS Petroleum
Marine
Services
8" P/L Laying, Risers, Spools, Free span crossing.
R1 – R4 P/F 8" riser clamps installation
Morgan-36 8''pipeline laying
8''Riserinstallation, tie in Free spans correction and
crossings
IMCA Air Diver
DLP Barge PMS 12For 24 Hours Operation
GUPCO(BP) Morgan Field
18 | P a g e
CURRICULUM VITAE
2016
Apr 2001 – august 2001
PMS Petroleum
Marine Services
12'' & 9'' & 3'' P/L Spool Piece Flanges installation
12" & 3" PORT FOUAD P/F
pipelines hydro test 12" & 3" PORT FOUAD
(S.W1-S.W2) P/Fs Riser's installation, No of (2
risers 12"and3" Riser). Spool Pieces installation, No
of(3 spools 12'' & 9 &3"spools).
6" & 4" TEMSAH P/F Risers replacement, By Air diving & Sat. diving teams
IMCA Air Diver
DLP Barge PMS 12For 24 Hours Operation
PETROBEL
Aug 2000 – Mar 2001
PMS Petroleum
Marine Services
Visual inspection for sea
lines and anchor chains Inspect fixation of all under
water Fangs. Hoses configuration checks Replacement of 8" hose and
hose string (GVI) & Video survey
Air Diver
DLP Barge PMS 12For 24 Hours Operation
Sues S.P.O.CO
Feb1995– Aug 2000
PETROLEUM PROJECT & TECHNICAL
SUPPORT CO.
(PETROJET)
Various Jobs.
All kinds of underwater installation i.e.
Plat forms, riser clamps, anodes, risers, spool pieces, jackets. PLEMS, valves, grout bags support etc.
PLEDCO clamps, smart flanges, mess alignment & hydro Tech flanges.
Boat landing & riser guard. PLEM installations with all
of its facilities base PLEM-Guiro-Piles-Manifold-PLEM- cover protection installation, etc)
Marine growth cleaning, Sand blasting, Painting splash zone area
Air Diver PETROJET 11, 12, 17
Barges
PETROBEL & GUPCO & AGYBA
19 | P a g e
CURRICULUM VITAE
2016
Apr 1994 – Jan 1995
MARIDIVEOIL &
SERVICES
COMPANY
Marine growth cleaning, sand blasting, painting splash zone area
Cutting & welding Under water clamps,
conductors, anodes etc installations
Grouting operations Sea bed survey Drilling Rigs Leg
penetration.
Air Diver
PETROBEL &GUPCO
Jun 1993– Apr 1994
Free-lance
diver at
different
jobs with
RED SEA Marine Works
Company
Marine growth cleaning, sand blasting, painting splash zone area
Cutting & welding Under water clamps,
conductors, anodes etc installations
Grouting operations Sea bed survey Drilling Rigs Leg penetration.
Air Diver
PETROBEL &GUPCO
Top Related