Hendawy ragabb cv update 21 6 2015

11
Hendawy ragab Mohammed 00966556024484 [email protected] Seeking employment in a creative solutions company to build my career, looking for challenge position that gives me the opportunity to utilize my educational background and experiences of life to achieve the highest goals, Depending on my high skills, quick learning and problem solving. A flexible, self-motivating with good communication skills and the ability to work under pressure. Committed to quality in all individual or team oriented tasks with strong sense responsibility, team leader and player, mature, dynamic, hard work and responsible Jan 2015 up to date CONSULTANT OFFICE Employer Saudi consolidated engineering co ksa-hail Position SENIOR ENGINEER Project description obstetrics/gynecology & pediatric hospital-200 beds Hail hospital-ksa (over100 million us$) The project consists of 1- General layout (150.000m2) Includes roads, walk way, parking area, sewage & storm lines, lighting, fence landscaping, etc. 2- Main hospital building :the total built up area is 64500m2 at six floors( basement- ground-4floors) 3- Utilities area :-consists of A- Technical service building: total built up area is 2615 m2 in two floors (basement- ground). B- Chiller yard: total area is 750m2. C- Under ground water tank with RO plant, LPG tank, STP plant. D- Sceco room E- Service building. F- Medical store G- Female flats: two buildings total built up area for one floor is 700m2, three floors (ground-1 st @2nd). H- Mosque: total area is 540m2. I- Guard rooms: 4 guard rooms, total area for each room is 30m2.. OBJECTIVE PROFILE EMPLOYMENT HISTORY

Transcript of Hendawy ragabb cv update 21 6 2015

Page 1: Hendawy ragabb cv update 21   6   2015

Hendawy ragab Mohammed

00966556024484

[email protected]

Seeking employment in a creative solutions company to build my career, looking for challenge position that gives me theopportunity to utilize my educational background and experiences of life to achieve the highest goals, Depending on myhigh skills, quick learning and problem solving.

A flexible, self-motivating with good communication skills and the ability to work under pressure. Committed to quality inall individual or team oriented tasks with strong sense responsibility, team leader and player, mature, dynamic, hard workand responsible

Jan 2015 up to date CONSULTANT OFFICE

Employer Saudi consolidated engineering co – ksa-hail

Position SENIOR ENGINEER

Project description obstetrics/gynecology & pediatric hospital-200 bedsHail hospital-ksa (over100 million us$)

The project consists of

1- General layout (150.000m2)Includes roads, walk way, parking area, sewage & storm lines, lighting, fencelandscaping, etc.

2- Main hospital building :the total built up area is 64500m2 at six floors( basement-ground-4floors)

3- Utilities area :-consists ofA- Technical service building: total built up area is 2615 m2 in two floors (basement-

ground).B- Chiller yard: total area is 750m2.C- Under ground water tank with RO plant, LPG tank, STP plant.D- Sceco roomE- Service building.F- Medical storeG- Female flats: two buildings total built up area for one floor is 700m2, three floors

(ground-1st@2nd).H- Mosque: total area is 540m2.I- Guard rooms: 4 guard rooms, total area for each room is 30m2..

OBJECTIVE

PROFILE

EMPLOYMENT HISTORY

Page 2: Hendawy ragabb cv update 21   6   2015

Jan 2012 to Jan 2015 CONSULTANT OFFICE

Employer zuhair Fayez partnership – ksa-hailPOSITION SENIOR ENGINEERProject description university hospital – hail.

(66000 square meter total built up area. This area divided to 38 parts. Each part about1400m2

The structure system for substructure is isolated footing and raft foundationThe structure system for all roofs are flat slab and paneled beamsThe project designed to serve about 550 beds

THE PROJECT CONSISTS OF 5 ZONES

ZONE 1: six parts .each one ground floor only.

ZONE 2: eight parts each one consists of (ground floor - first floor).

Zone 3: thirteen parts only each one consists of (ground floor – first floor).

ZONE 4 ten parts only each one consists of (basement floor- ground floor-5 typical floor-roofs).ZONE 5:- two parts only each part consists of (basement floor- ground floor-5 typical floor-roofs).

Chiller yard – water tank- electric rooms –service room- boiler rooms-tunnel

Main contractor nahdate Elemaar CompanyClient ministry of high educationalContract value 32877100.0SR first stage up to 600MILIONS SR (total value)Duration 3 years

Principal duties

Following up and managing all structural submittal (shop drawings, materials, technical submittals,method statements,…etc) as per project program plan

Monitoring and review all civil works all over the project Attending the technical and progress meeting with client and contractor Resolving technical problems and NCRs when and where required.

Page 3: Hendawy ragabb cv update 21   6   2015

AUGUST 2010 to December 2011 project mangerEmployer biout Makah company- MakahProject description project ( medad 2- medad 3) each one consists of (bedroom, water tank, ground floor,3typical

floor. Penthouses) each project area about 1300m2 and serve about 190 pilgrims

Client medad Makah (nageb abd allatif alesay)Project consultant bin jobair officeContract value 7millions SRDURATION 12 Months

Principal duties

Following up of various construction & finishing activities for residential buildings (medad 2-medad 3). Structural engineering issues & Material take-off Prepare the invoices for contractors Monitoring the work progress according to approved time schedule. Coordinating between different prates sharing in the project. preparing tender and contract documents, including bills of quantities with the architect and/or the client;

April, 2008 to July, 2010 SITE ENGINEEREmployer SOLIMAN ABD ALAZIZ ALRAJHI COMPANY.PROJECT The Project Classified As High Project Which Contains Villas & Buildings & Mosques &

Marketing Center And Schools.Area: 600,000 M2- 435 Villas “8 Types”- 96 Residential Building “18 Types”- One Shopping CenterAnd Hotel - One Girl’s School & One Boy’s School- Marketing & Sales Building- 4 Mosques -Commercial Areas- Green Areas..

There are a lot Of Services Such As:-Sewer System Network- Communication Networks -Road Networks-Green Areas -Water Supply- Electric Networks-Parking Places.

PROJECT DESCRIPTIONClient alrajhi for contractingProject manager alrajhi developmentConsultant Civil alsaloom officeDesigner cote officeProject value about 2 milliard SR.

Principal duties

Following up of civil and finishing works; building no (b4-b5-b6-b7) each consists of bedroom-plaza-6 typicalfloors. Average area of floor about 1200m2

Following up of civil and finishing works ;building no(b9)each consists of bedroom-plaza-6 typical floors-Average area of typical floor 900m2

Following up of civil and finishing works; building no (b1-b2) each consists of bedroom-plaza-6 typicalfloors. Average area of typical floor 2500

Page 4: Hendawy ragabb cv update 21   6   2015

sep, 2006 to December, 2007 SITE ENGINEEREmployer bin shujaa establishmentProject asphalt – pavement-lighting for (alkhorma- zalm- turba) cities

Client albaladeiaProject manager and consultant buladieaContract value about 5millions SR

Principal duties Following up the road preparation Following up testing materials such as sieve analysis-sand cone-modified proctor.

December, 2004 to August, 2006 SITE ENGINEEREmployer concrete companyProject typical hospital at almansoura city

Project description Client wady AlNil Company

Consultant wady AlNil Company

Project value 2 million Egyptian liverPrincipal duties

Following up the civil works of building (scheduled time) Following up the wet works (block works ,plaster, flooring(ceramic, marble and granite),Toilet water proofing,

Roof water and heat proofing,……………..etc

Language skillsArabic NativeEnglish V.good (written & spoken)

Computer skillsMS OfficePrimavera P3MS projectAuto CADSap2000

B.Sc. civil engineering in 2004 almansoura university (5 years) in 2004 Project grade excellent(the economic use of high strength concrete at residential buildings)

Professional certification in Primavera P3 (44 hours) in 2006.

D.O.B Sep 6th, 1981P.O.B Mansoura, EgyptMarital status MarriedVisa Status Employment visa

SKILLS

EDUCATIONAL PROFESSIONAL

PERSONAL DATA

Page 5: Hendawy ragabb cv update 21   6   2015
Page 6: Hendawy ragabb cv update 21   6   2015
Page 7: Hendawy ragabb cv update 21   6   2015
Page 8: Hendawy ragabb cv update 21   6   2015
Page 9: Hendawy ragabb cv update 21   6   2015
Page 10: Hendawy ragabb cv update 21   6   2015
Page 11: Hendawy ragabb cv update 21   6   2015

المستشفى التعلیمى بحائل مشروع الراجحى ببریدة

مشروع الراجحى ببریدة مشروع مداد مكة