Download - Corion Express TX Clearfork Formation - Canamera Coring · Additional Coring Technologies Canamera Wireline Retrievable System Achieves 100% Recovery in the Clearfork Formation, 6

Transcript
Page 1: Corion Express TX Clearfork Formation - Canamera Coring · Additional Coring Technologies Canamera Wireline Retrievable System Achieves 100% Recovery in the Clearfork Formation, 6

Performance Summary

•  Velocity Wireline Retrievable •  3.5” diameter wireline retrievable in 6” hole and larger

•  Jam Mitigation System (JMS) •  4” core mitigates two jams

•  Full Closure •  Slick entry and complete closure

•  Velocity Conventional •  Industry’s largest core in the slimmest hole

•  Slick start •  Hidden catcher, disposable shoe and flow-thru

piston for the best start to coring

Additional Coring Technologies

Canamera Wireline Retrievable System Achieves 100% Recovery in the Clearfork Formation, 6 Days & 2 Trips Saved.

Challenge: •  Wireline Core 493’ of Clearfork Formation •  Canamera’s offset experienced indicated the potential

for natural fractures •  Minimize trips caused by fractured formation •  Excellent recovery and quality of 3 ½” OD core

sample

Equipment & Personnel: •  Deployed a 6 ½” x 3 ½” x 90’ Coring/Drilling BHA •  8 ¾” x 3 ½” Impact Resistant Seven Blade 13mm PDC •  Provision of Coring Technicians with “Wireline Coring and

Caney Formation Experience.

Canamera Results: •  6 Days Saved (vs. 90ft Conventional Core Barrels) •  100% Recovery •  13.6’/Hr ROP

6 ½” x 3 ½” x 90’ Andrews County, TX – April 2014

[email protected]