Download - CONCEPTUAL MASTER PLAN for the SAVANNAH GATEWAY … · 2016. 6. 6. · B2 E2 E1-D E1-C F1 F9 F8 F7 F6-A F6-E F4 F5 F3 F6-F F6-G F6-H F6-B F6-C F6-D E1-B E1-A D1 A2-C A1 C1 300’

Transcript
Page 1: CONCEPTUAL MASTER PLAN for the SAVANNAH GATEWAY … · 2016. 6. 6. · B2 E2 E1-D E1-C F1 F9 F8 F7 F6-A F6-E F4 F5 F3 F6-F F6-G F6-H F6-B F6-C F6-D E1-B E1-A D1 A2-C A1 C1 300’

DEVELOPED BY

HO

DG

EVILLE RD

EFFING

HA

M PK

WY

NO

RFO

LK S

OU

THER

N

CSX

MCCALL RD

C2

A2-C

A2-B

B1

B2

E2

E1-DE1-C

F1

F9F8

F7

F6-A

F6-E

F4

F5

F3

F6-F F6-GF6-H

F6-B F6-CF6-D

E1-B

E1-A

D1

A2-C

A1

C1

300’ BUFFER TO ADJACENCY

WETLANDS

D2

GATEWAY PKWY

BLUE JAY RD

CONCEPTUAL MASTER PLAN for the SAVANNAH GATEWAY INDUSTRIAL HUB

MIKE MARTINP: 770.645.7241EMAIL: [email protected]

0’ 1000’’500’ 2000’

PHASE 4 PHASE 3 PHASE 2 PHASE 1

Tract Building SF Lot AcreageF3 1,000,000               73.4F4 1,000,000               67.2F5 280,000                  91.4F6‐A 250,000                  32.5F6‐B 500,000                  38.8 Tract Building SFF6‐C 500,000                  31.6 Tract Building SF Lot Acreage A1 350,000                 F6‐D 250,000                  31.9 D1 725,000                  107.4 A2‐A 250,000                 F6‐E 250,000                  35.0    D2 to D1/ WETLANDS A2‐B 200,000                 F6‐F 350,000                  36.5 Tract F1/F2/F9 Building SF Lot Acreage E1‐A 1,000,000               30.5 A2‐C 525,000                 F6‐G 350,000                  33.9 F1/F2 ‐BLDG 1 3,200,000                                540.8 E1‐B 500,000                  41.9 B1 400,000                 F6‐H 250,000                  37.0 F1/F2 ‐BLDG 2 900,000                                    E1‐C 750,000                  55.6 B2 500,000                 F7 700,000                  146.0 F9 650,000                                    345.2 E1‐D 750,000                  67.8 C1 250,000                 F8 450,000                  139.6 E2 12,500                    27.2 C2 400,000                 TOTAL 6,130,000               794.7 TOTAL 4,750,000                               886.1 TOTAL 3,737,500               300                   TOTAL 2,875,000              