Page 1: Clean Rivers Project Northeast Boundary Tunnel Briefing for to Ryan Linehan... · David Gadis, Chief Executive Officer. March 18, 2020. Clean Rivers Project ... Tunnel System: Status.

0

District of Columbia Water and Sewer AuthorityDavid Gadis, Chief Executive Officer

March 18, 2020

Clean Rivers Project Northeast Boundary Tunnel

Briefing forCommissioner Ryan Linehan, 5D01

Page 2: Clean Rivers Project Northeast Boundary Tunnel Briefing for to Ryan Linehan... · David Gadis, Chief Executive Officer. March 18, 2020. Clean Rivers Project ... Tunnel System: Status.

1

Northeast Boundary Tunnel Construction Team

DC Water’s Clean Rivers Project

Salini Impregilo Healy Joint Venture

and

Page 3: Clean Rivers Project Northeast Boundary Tunnel Briefing for to Ryan Linehan... · David Gadis, Chief Executive Officer. March 18, 2020. Clean Rivers Project ... Tunnel System: Status.

2

Tunnel System Status OperationDate

First Street Tunnel

In Operation 2016

Blue Plains Tunnel

In Operation 2018

Anacostia River Tunnel

In Operation 2018

Northeast Boundary Tunnel

Construction 2023

Potomac River Tunnel

Planning 2030

• DC Clean Rivers Project: $2.7 Billion• Nitrogen Removal: $950 Million• Total > $ 3.5 Billion• 25 yr implementation (2005 – 2030)• 96% reduction in CSOs & flood relief in Northeast Boundary• Approx 1 million lbs/yr nitrogen reduction predicted

Clean Rivers Project and Nitrogen Removal Programs

Clean Rivers Project

Page 4: Clean Rivers Project Northeast Boundary Tunnel Briefing for to Ryan Linehan... · David Gadis, Chief Executive Officer. March 18, 2020. Clean Rivers Project ... Tunnel System: Status.

3

Anacostia River Tunnel System Performance to Date

Trash and debris removed from CSO captured by tunnel at ECF Fine Screens

April 2018 November 2018

Approximately 7.2 billion gallons captured to date

Nearly 3,300 tons of trash, debris, and other solids captured

Exceeding predicted capture rate (90%>80%)

First year in operation was the wettest year on record for the District of Columbia

Page 5: Clean Rivers Project Northeast Boundary Tunnel Briefing for to Ryan Linehan... · David Gadis, Chief Executive Officer. March 18, 2020. Clean Rivers Project ... Tunnel System: Status.

4

Northeast Boundary Tunnel – Problem

Before 1st St Tunnel

Chance of flood occurring in any given year

Page 6: Clean Rivers Project Northeast Boundary Tunnel Briefing for to Ryan Linehan... · David Gadis, Chief Executive Officer. March 18, 2020. Clean Rivers Project ... Tunnel System: Status.

5

4TH ST CONSTRUCTION

SITE

MICHIGAN AVE CONSTRUCTION

SITE

CHANNING ST CONSTRUCTION

SITE

PUMPING STATION AND T ST

CONSTRUCTION SITES

R ST CONSTRUCTION

SITE

RHODE ISLAND AVE CONSTRUCTION SITE

W ST CONSTRUCTION

SITE

MT OLIVET RD CONSTRUCTION

SITES

CSO 019 CONSTRUCTION

SITE

Construction site

Construction site with Diversion Facility

Chronic flood area

Northeast BoundaryTunnelFirst Street Tunnel

1

2

FLORIDA AVE CONSTRUCTION

SITE

3

46

Northeast Boundary TrunkSewer

On average, CSO events will be reduced to two per year.

NO

RTH

CAP

ITO

LST

MICHIGAN AVENE

7TH

STN

W

E CAPITOL STNE

E CAPITOL STNE

C ST NE

17TH

STN

E

INDEPENDENCE AVESE

19TH

STSE

R STNW

1ST

STN

W

T ST NE

4TH

STN

E

W STNE

6TH

STN

W

B R

M I

Construction of diversionfacility along First Street NW

Northeast Boundary Tunnel – Solution

Northeast Boundary Tunnel at a Glance 5 Miles in length Approximately 100 feet below ground Tunnel constructed using a Tunnel Boring Machine

(TBM) –• A TBM is an underground machine that cuts

through the soil and assembles a reinforced concrete liner as it moves forward

Tunnel Benefits

Significantly mitigate the frequency, magnitude and duration of sewer flooding and basement backups in the Northeast Boundary drainage area

Control CSO discharges to the Anacostia River, significantly improving water quality

Minimize the nuisance and economic costs associated with flooding

Reduce risks to human health

Page 7: Clean Rivers Project Northeast Boundary Tunnel Briefing for to Ryan Linehan... · David Gadis, Chief Executive Officer. March 18, 2020. Clean Rivers Project ... Tunnel System: Status.

6

What Are We Building?

Page 8: Clean Rivers Project Northeast Boundary Tunnel Briefing for to Ryan Linehan... · David Gadis, Chief Executive Officer. March 18, 2020. Clean Rivers Project ... Tunnel System: Status.

7

Mount Olivet Road NE Construction Site

Schedule* Work HoursStart Finish Start FinishApril2019

Fall2022 7:00 AM 7:00 PM

Dates are approximate and subject to change as construction progresses

There are two construction staging areas on Mount Olivet Road NE: Department of Public Works (DPW) parking lot on Mount Olivet Road; and the intersection of Mount Olivet Road and Capitol Avenue NE

In order to relieve chronic sewer flooding, DC Water will construct a diversion facility which will include a diversion chamber, a 25-foot diameter drop shaft and other structures to convey flow from the existing sewer to the tunnel.

Page 9: Clean Rivers Project Northeast Boundary Tunnel Briefing for to Ryan Linehan... · David Gadis, Chief Executive Officer. March 18, 2020. Clean Rivers Project ... Tunnel System: Status.

8

Mount Olivet Road NE Construction SiteTraffic Patterns and Pedestrian Detour

MOUNT OLIVET ROAD NE

IMPACTS: Pedestrian detour between Trinidad Avenue NE & Montello Avenue NE

DURATION: Anticipated through end of construction

Dates are approximate and subject to change as construction progresses

Page 10: Clean Rivers Project Northeast Boundary Tunnel Briefing for to Ryan Linehan... · David Gadis, Chief Executive Officer. March 18, 2020. Clean Rivers Project ... Tunnel System: Status.

9

Contact Us

Email: [email protected] 24/7 Hotline: 800-988-6151 Northeast Boundary Tunnel Project webpage: