1/16/2013
1
Madison Water Utility
Public Information Meeting No. 2 - January 16, 2013
Meeting Overview:
PresentationP j t Project scope recap
Progress to date
Construction impacts
Proposed facility
Parks Department
Next steps
Discuss Facility Exhibits
Q&A / Feedback
1/16/2013
2
Introductions: Madison Water Utility
Adam Wiederhoeft, PE Al Larson PE BCEE Al Larson, PE, BCEE
Citizens Advisory Panel David Liebl Jurgen Patau
Strand Associates, Inc. Andy Mullendore, PE
M k Ol i ik PE PH Mark Oleinik, PE, PH Potter Lawson
Doug Hursh, AIA, LEED City of Madison Parks
Sarah Lerner, LEED AP
Existing Facility:
Operating since 1926 – oldest in system
Single 1,500 GPM booster pump
Undersized, deteriorating, site issues
1/16/2013
3
Project Scope Recap:
Replace existing pump house
L f ilit d d ll t f t Larger facility needed, allocate future space
Upgrade pumps
Install two 2,100 GPM variable speed pumps
Allow reverse operation
Replace existing vent/hatch structuresp g
Improve drainage on top of buried reservoir
Install tank mixing system inside reservoir
Improve landscaping and site safety
Progress to Date:
September 2012 Engineering Services Contract w/ Strand Discuss scope with Alders/Parks Dept
October 2012 Public meeting on-site to introduce project Develop design criteria
November – December 2012W k ith CAP it i l t Work with CAP on site issues, early concepts
Explore design alternatives, develop concepts
January 2013 Finalize proposed replacement plan Public Info Meeting 2 / Public Hearing 1
1/16/2013
4
Traffic Impacts: Issues:
SB detour route
Project is at top of hillProject is at top of hill
Winter/snow clearing
Ideas discussed: Divert to Franklin
Temporary light at Franklin/SpeedwayFranklin/Speedway
One-way southbound with one lane closed
Close block between Zwerg Dr and Ridge Rd
Glenway St. Block Closure:
Discussing block/lane closure with Traffic Engineering (between Ridge Rd and Zwerg Dr)
1/16/2013
5
Existing Site Layout/Site Issues:
Site Impacts: Slope / foundation
excavation
Tree removal
Protect existing stone wall
Remove existing wooden stairway
Power pole Power pole
New railings
Landscaping / slope stabilization
Materials/Equip.
1/16/2013
6
Site Plan (overall):
Floor Plan:
1/16/2013
7
Landscaping Plan: Divert traffic
away from top of new facilityy
Align stairs with existing path
Parks Dept Slope
stabilization Prairie
concept Upcoming
2013 Reservoir Park Project
Landscaping Plan:
1/16/2013
8
Elevation Concept 1:
Elevation Concept 2:
1/16/2013
9
Elevation Concept 2:
Next Steps:
Continue to gather feedback
Refine/finalize proposed replacement plan
PUBLIC HEARING BEFORE MWU BOARD Tuesday, January 29, 2013 – 4:30 p.m.
Water Utility Office – 119 E Olin Ave Water Utility Office 119 E Olin Ave
Complete preliminary design phase
1/16/2013
10
Project Schedule: January 2013
Finalize proposed plan
Public Hearing before MWU Board
February-March 2013 Final design phase
Project approvals
April-June 2013 April June 2013 Bidding / Preconstruction
July 2013 – Spring 2014 Construction phase
For More Information/Feedback:
Adam Wiederhoeft:i d h ft@ di t [email protected]
(608) 266-9121
General [email protected]
(608) 266-4651
Project Website: http://www.cityofmadison.com/water/plans/BPS106.cfm
1/16/2013
11
Exhibits Discussion / Q&A