Andhika PrastawaChairman
Indonesia Solar Energy AssociationSeptember 3, 2020
Indonesia Solar Energy Association
Established
Vision
Objective
Members
Activities
Jakarta, January 9, 2018
Developing sustainable solar energy industry
Build a communication forum and networking among members toAchieve a development in solar energy system
More than 200 individuals, academicians, solar industries, suppliers,EPC contractors, and other companies active in solar energy business
Solar energy advocacy, socialization in term of regulation, knowledge,capacity building through Workshop, seminar, training, exhibition, Gathering, etc
Indonesia Solar Energy AssociationFRAMEWORKS
GOVERNMENT
MEMBERS
- As a government partner in advocating Regulation and Government Policies
- Mediation of solar energy stakeholders and government
- Provide Database of PV Industries, Installer Contractors, & Energy policy
- Business matching & opportunities
- Knowledge Sharing
3,929.1 MW
23,7581,691.0
993.5500.3242.6 17,105
10,302
2019 2020
PLTA/PLTM/MH
2021
PLTS
2022 2023
EBT lain
2024
Pasar Energi
2025
RUPTLPLTP PLT Bio PLT Bayu
Renewable Energy Based Electricity2,243.9
13,99512,91511,48610,743 PLN + Non PLN
New Initiative
Renewable Energy in National Energy Mix 2025
Source: Green Economy recovery: Akselerasi Pengembangan Energi Surya Sebagai Strategi pemulihan Ekonomi Indonesia Paca Covid 19Director General for Renewable Energy and Energy Conservation, MEMR, 2020
Kapasitas
K/L Lain (MW)
Keterangan :1) Target Sinergi BUMN berdasarkan hasil kajian PT LEN (MoU LEN dengan BUMN lainnya 24 Juli 2019, HoA LEN dengan Pertamina dan PLN 3 Oktober 2019)2) Kebutuhan Kementerian/Lembaga Lain untuk Pembangunan PLTS Atap dipenuhi oleh anggaran APBN K/L sendiri3) Ditambahkan dengan Kapasitas Terpasang saat ini 148,0 MW (IPP, PLN dan APBN) termasuk PLT Hybrid4) Kemenkeu dan KLHK
Tahun
RUPTLTarget
Penambahan Sinergi BUMN
dan Pengadaan Pemerintah 1)
Solar PV Rooftop
Swasta
(termasuk
dengan
dukungan
Pemda/
Industri)
APBN2)
TOTAL
Tambahan per
Tahun
Kumulatif
KapasitasTarget
Penambahan
(MW)
Target
Kapasitas
Terpasang MW)
Target Penambahan (MW) Target
Terpasang (MW)
APBNKESDM (MW) 4)
2019 148,03) 0 0 0 148,03) 0 148,0
2020 0 148,0 88,2 25,0 19,4 2,0 282,6 134,6 282,6
2021 162,9 310,9 105,9 38,0 20,0 2,0 115,4 328,8 611,4
2022 11,1 322,0 263,0 43,0 20,0 2,0 137,4 339,1 950,5
2023 315,2 637,2 256,0 50,0 20,0 2,0 159,4 643,2 1593,7
2024 315,7 952,9 245,0 61,0 20,0 2,0 181,4 643,7 2237,4
TOTAL 804,9 958,11 217 99,4 10 2.089
Solar Energy Roadmap:A Market Opportunity
Source: Green Economy recovery: Akselerasi Pengembangan Energi Surya Sebagai Strategi pemulihan Ekonomi Indonesia Paca Covid 19Director General for Renewable Energy and Energy Conservation, MEMR, 2020
i
Large Scale Solar PV Plant Floating Solar PV Plant, 857 MW
1.2.
3.
4.
5.
6.
7.
Waduk Wonogiri di Jawa TengahWaduk Sutami di Karangkates, Jawa Timur
Waduk Jatiluhur di Jawa Barat
Waduk Mrica di Banjarnegara, Jawa Tengah
Waduk Saguling di Jawa Barat
Waduk Wonorejo di Tulung Agung, Jawa Timur
Danau Singkarak di Sumatera Barat
For reducing local electricity generation cost
Abandoned Mining Field Solar PV Plant
1. Bangka Belitung sebesar 1.250 MW
2. Kutai Barat sebesar 1.000 MW
3. Kutai Kartanegara sebesar 53 MW
Solar PV for Under developed, Isolated or Outer islands, and Hybrid System for small islands
Eastern Indonesia, for stimulating new center of ecomony
Solar PV ROOFTOP
Million Solar Rooftop Initiative
Cooperation with Local Government, business develepor for eco-tourism program, new economy cluster, and
Program Surya Nusantara
Indonesian Solar Energy Development Strategy
Government program for green growth economy,
low-carbon development scenario
Source: Green Economy recovery: Akselerasi Pengembangan Energi Surya Sebagai Strategi pemulihan Ekonomi Indonesia Paca Covid 19Director General for Renewable Energy and Energy Conservation, MEMR, 2020
Program Surya Nusantara gigawatt-peak/year
Initiative of AESI and
Partner Institution
• National Program Solar PV Rooftop
• Government funded program as an economic recovery stimulus due to COVID19
• Target group of low income and economically vulnerable people
• Proposed by IESR as AESI strategic partner
Local industry available for Solar Module and
Inverter
Modular, flexible in size, simple and quick
installation
Extreme Price drop for Cell and Module,
Low CAPEX
Medium expertise Technician
Why Solar Rooftop
Program Sejuta RumahProvinsi with high subsidized electricity
customer
Provinsi with high electricity generation
cost
Target mandatori RUEN
(Million Houses Program(Public and government building)
Sector Target
Involving institution,
including local government, utility
company
AmandementPermen
ESDM No. 49/2018
Accomodating larger
building for solar rooftop
Identification of building owner willingness to
participate
Technical Criteria of Houses to be
installed with solar rooftop
*Berat PLTS Atap 1,5 kWp dengan mounting adalah 115 kg dan memerlukan area 10 meter persegi
Important Supporting Factors
400 - 10
People
20.000 -
500 kWp 22.000Number of employment
absorbed/year for
1 GWp
Minimum installed capacity
/company/year
Retained manpower (langsung)
per tahun
*perhitungan IESR dengan skenario konservatif. Studi NREL menunjukkan untuk 1 GWp PLTS Atap dapat menyerap
~29.000 pekerja langsung/tahun dan total hingga~78.000 untuk pekerja langsung, tidak langsung, induced
Projected Benefit
GHG reduction up to 1,05 juta ton/GWp,
for the NDC contribution
Reduce electricity
subsidy
Providing,
78.000 employment
/GWp, and green
industry development
Helping to achieve national target of Solar
PV 6.5 GW by 2025
Further Benefit
*perhitungan IESR dengan skenario konservatif. Studi NREL menunjukkan untuk 1 GWp PLTS Atap dapat menyerap
~29.000 pekerja langsung/tahun dan total hingga~78.000 untuk pekerja langsung, tidak langsung, induced
AESIAsosiasi Energi Surya Indonesia2020
Top Related