REPUBLIC OF THE PHILIPPINES
PROJECT MANAGEMENT OFFICE - BUREAU OF DESIGN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
VARIOUS DPWH PROPOSED PROJECTS
OIC, BUILDINGS DIVISION, BOD
REVIEWED: RECOMMENDING APPROVAL: APPROVED :
MANILA, PHILIPPINES
(DETAILED ENGINEERING DESIGN AND/OR SPECIAL STUDIES)
STANDARD THREE-STOREY
SCHOOL BUILDING
(3 & 6 - CLASSROOMS)
MARIANO C. DEL CASTILLO
DIRECTOR IV, BOD
GILBERTO S. REYES
UNDERSECRETARY
RAUL C. ASIS
SECRETARY
ROGELIO L. SINGSON
CONCURRED :
SECRETARY
ARMIN A. LUISTRO
DEPARTMENT OF EDUCATION
STANDARD THREE-STOREY
VARIOUS DPWH PROPOSED PROJECTS
(DETAILED ENGINEERING DESIGN AND/OR SPECIAL STUDIES)
SCHOOL BUILDING
(3 & 6 - CLASSROOMS)
JOINT VENTURE OF
I.
SIX-CLASSROOMS
Mobilization / Demobilization
A.
II. Temporary Facilities
III. Safety and Health
IV. Earthworks
V. Termite Control Works
VI. Concrete Works
VII. Masonry Works
B I L L O F Q U A N T I T I E S
VIII. Fabricated Materials and Hardwares
SECRETARYDIRECTOR IV, BOD
GILBERTO S. REYES ROGELIO L. SINGSON
UNDERSECRETARY
RAUL C. ASIS
G-1
BOD
1
36
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
STANDARD THREE-STOREY
SCHOOL BUILDING
( 6-CLASSROOMS )
VARIOUS DPWH
PROPOSED PROJECTS
BILL OF QUANTITIES
OIC, BUILDINGS DIVISIONCOST ENGINEER
JOVEN T. SANTOS
PROJECT MANAGER
DOMICIANO B. LUSICA
QUANTITY ENGINEER
IX. Finishing Works
X. Carpentry Works
XI. Roof and Framing Works
XII. Painting Works
B I L L O F Q U A N T I T I E S
XIII. Electrical Works
XIV. Plumbing / Sanitary Works
SECRETARYDIRECTOR IV, BOD
GILBERTO S. REYES ROGELIO L. SINGSON
UNDERSECRETARY
RAUL C. ASIS
G-2
BOD
2
36
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
BILL OF QUANTITIES
OIC, BUILDINGS DIVISION
STANDARD THREE-STOREY
SCHOOL BUILDING
( 6-CLASSROOMS )
VARIOUS DPWH
PROPOSED PROJECTS
COST ENGINEER
JOVEN T. SANTOS
PROJECT MANAGER
DOMICIANO B. LUSICA
QUANTITY ENGINEER
I.
THREE-CLASSROOMS
Mobilization / Demobilization
A.
II. Temporary Facilities
III. Safety and Health
IV. Earthworks
V. Termite Control Works
VI. Concrete Works
VII. Masonry Works
VIII. Fabricated Materials and Hardwares
B I L L O F Q U A N T I T I E S
SECRETARYDIRECTOR IV, BOD
GILBERTO S. REYES ROGELIO L. SINGSON
UNDERSECRETARY
RAUL C. ASIS
G-3
BOD
3
36
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
STANDARD THREE-STOREY
SCHOOL BUILDING
( 3-CLASSROOMS )
VARIOUS DPWH
PROPOSED PROJECTS
BILL OF QUANTITIES
OIC, BUILDINGS DIVISIONQUANTITY ENGINEER COST ENGINEER
JOVEN T. SANTOS
PROJECT MANAGER
DOMICIANO B. LUSICA
IX. Finishing Works
X. Carpentry Works
XI. Roof and Framing Works
XII. Painting Works
B I L L O F Q U A N T I T I E S
XIII. Electrical Works
XIV. Plumbing / Sanitary Works
SECRETARYDIRECTOR IV, BOD
GILBERTO S. REYES ROGELIO L. SINGSON
UNDERSECRETARY
RAUL C. ASIS
G-4
BOD
4
36
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
BILL OF QUANTITIES
OIC, BUILDINGS DIVISION
STANDARD THREE-STOREY
SCHOOL BUILDING
( 3-CLASSROOMS )
VARIOUS DPWH
PROPOSED PROJECTS
COST ENGINEER
JOVEN T. SANTOS
PROJECT MANAGER
DOMICIANO B. LUSICA
QUANTITY ENGINEER
SECRETARYDIRECTOR IV, BOD
GILBERTO S. REYES ROGELIO L. SINGSON
UNDERSECRETARY
RAUL C. ASIS
A-1
BOD
5
36
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
STANDARD THREE-STOREY
SCHOOL BUILDING
( 6-CLASSROOMS )
VARIOUS DPWH
PROPOSED PROJECTS
T A B L E O F C O N T E N T S
OIC, BUILDINGS DIVISION
G - 1 BILL OF QUANTITIESS - 1 GENERAL NOTES
S - 2 GENERAL NOTES
S - 3 FOUNDATION PLAN, 2nd & 3rd FLOOR FRAMING PLAN
S - 4 COLUMN SCHEDULE, SCHEDULE OF FOOTING,
SCHEDULE FOOTING BEAMS, TYPICAL FOOTING
DETAIL, ELEVATION OF COLUMN & DETAIL OF WALL
FOOTINGS
S - 5 PLAN FOOTING F-3, ELEVATION FOOTING F-3,
PLAN FOOTING CF-1 & TYPICAL ELEVATION OF
MICRO-PILE
S - 6 SCHEDULE MAIN BEAMS, SCHEDULE OF SECONDARY
BEAMS, SCHEDULE OF SLABS, TYPICAL SLAB
ELEVATION, TYPICAL BEAM ELEVATION &
TYPE OF STIRRUPS
S - 7 DETAIL OF STAIR, RAMP DETAIL,
DETAIL OF DC-1, DETAIL OF STAIR ON GRADE &
DETAIL OF WALL ON FTB
S - 8 ROOF FRAMING PLAN
S - 9 ELEVATION OF END WALL FRAME,
DETAIL SECTION OF PC-1,
CONNECTION OF PURLINS TO RG-4,
CONCRETE SUN BREAKER DETAIL
S - 10 TRUSS DETAILS & CONNECTION DETAILS
S - 11 BASE PLATE DETAILS, ANCHOR BOLT DETAIL, ROOF
PANEL SIDE LAP DETAIL, J-BOLT TO PURLIN CONN.
DETAIL, J-BOLT SPACING, PURLIN CONN. DETAIL,
SECTION, TRUSS DETAIL AT GUTTER END
S - 12 FIRE ESCAPE ELEVATION
S - 13 FIRE ESCAPE DETAILS
EE - 1 GENERAL NOTES, LEGEND,
FLUORESCENT LIGHT FIXTURE MOUNTING
DETAIL, LOAD SCHEDULE, PANEL BOARD
DIAGRAM AND ELECTRICAL RISER DIAGRAM ( 3-CL )
EE - 2 POWER LAYOUT AND LIGHTING LAYOUT ( 3-CL )
EE - 1 GENERAL NOTES, LEGEND FLUORESCENT LIGHT
FIXTURE MOUNTING DETAIL, LOAD SCHEDULE,
PANEL BOARD DIAGRAM AND ELECTRICAL
RISER DIAGRAM ( 6-CL )
EE - 2 POWER LAYOUT AND LIGHTING LAYOUT ( 6-CL )
TABLE OF CONTENTS
G - 2 BILL OF QUANTITIES
NOTE :
G - 3 BILL OF QUANTITIES
G - 4 BILL OF QUANTITIES
A - 1 PERSPECTIVE, TABLE OF CONTENTS
A - 2 KEY PLAN
A - 3 GROUND FLOOR PLAN, SECOND FLOOR & THIRD FLOOR PLAN,
FRONT ELEVATION, SCHEDULE OF FINISH
A - 4 REAR ELEVATION, LEFT & RIGHT ELEVATION,
LONGITUDINAL SECTION & CROSS SECTION
A - 5 GROUND FLOOR, SECOND FLOOR & THIRD FLOOR REFLECTED
CEILING PLAN, ROOF PLAN
A - 6 SCHEDULE OF DOORS & WINDOWS, DETAIL PLAN,
ELEVATIONS & SECTION OF RAMP, SPOT DETAILS
A - 7 SECTION DETAIL OF EAVES, SPOT DETAIL CORNER CEILING,
CONCRETE SUN BREAKER DETAIL, PERSPECTIVE, SECTION &
SPOT DETAIL OF CEILING, PLAN & SECTION OF VENTILATION
A - 8 STAIR DETAILS
A - 9 BAY SECTIONS, DOOR FRAME TYPICAL PLAN &
SECTION, JALOUSIE DETAILS & FIRE ESCAPE DETAILS
A - 10 DETAIL PLAN OF TOILET & SECTION,
DETAIL OF COUNTER SINK, URINAL SECTION & DETAIL
A - 11 DETAILS OF BLACKBOARD
P - 1 GROUND FLOOR, TYPICAL SECOND & THIRD
FLOOR PLUMBING LAYOUT,
GROUND FLOOR, TYPICAL SECOND & THIRD
FLOOR WATER LINE LAYOUT
P - 2 ISOMETRIC DRAINAGE LINE LAYOUT,
ROOF DRAINAGE LAYOUT,
DETAIL SECTION OF DRAIN PIPE
AND SPOT DETAIL
P - 3 ISOMETRIC WATER LINE LAYOUT
AND SEWER LINE LAYOUT
P - 4 PLAN OF SEPTIC TANK, LONGITUDINAL
SECTION, CROSS SECTION DETAIL,
MANHOLE COVER DETAIL, CATCH BASIN
DETAIL, LEGEND AND PLUMBING NOTES
STRUCTURAL ELECTRICALARCHITECTURALGENERAL PLUMBING
SECRETARYDIRECTOR IV, BOD
GILBERTO S. REYES ROGELIO L. SINGSON
UNDERSECRETARY
RAUL C. ASIS
A-2
BOD
6
36
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
STANDARD THREE-STOREY
SCHOOL BUILDING
( 3-CLASSROOMS )
VARIOUS DPWH
PROPOSED PROJECTS
OIC, BUILDINGS DIVISION
KEY PLANNOTE :
( 3-CLASSROOMS )
GROUND FLOOR PLAN
K E Y P L A N
( 3-CLASSROOMS )
SECOND FLOOR PLAN
( 3-CLASSROOMS )
THIRD FLOOR PLAN
SECRETARYDIRECTOR IV, BOD
GILBERTO S. REYES ROGELIO L. SINGSON
UNDERSECRETARY
RAUL C. ASIS
A-3
BOD
7
36
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
STANDARD THREE-STOREY
SCHOOL BUILDING
( 6-CLASSROOMS )
VARIOUS DPWH
PROPOSED PROJECTS
OIC, BUILDINGS DIVISION
GROUND FLOOR PLAN,
SECOND FLOOR & THIRD FLOOR PLAN,
FRONT ELEVATION,
SCHEDULE OF FINISH
NOTE :
GROUND FLOOR PLAN
SECOND FLOOR PLAN
THIRD FLOOR PLAN
FRONT ELEVATION
SCHEDULE OF FINISH
SECRETARYDIRECTOR IV, BOD
GILBERTO S. REYES ROGELIO L. SINGSON
UNDERSECRETARY
RAUL C. ASIS
A-4
BOD
8
36
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
STANDARD THREE-STOREY
SCHOOL BUILDING
( 6-CLASSROOMS )
VARIOUS DPWH
PROPOSED PROJECTS
OIC, BUILDINGS DIVISION
REAR ELEVATION, LEFT & RIGHT
ELEVATION, LONGITUDINAL SECTION
& CROSS SECTION
NOTE :
RIGHT SIDE ELEVATION
REAR ELEVATION
LEFT SIDE ELEVATION CROSS SECTION
LONGITUDINAL SECTION
SECRETARYDIRECTOR IV, BOD
GILBERTO S. REYES ROGELIO L. SINGSON
UNDERSECRETARY
RAUL C. ASIS
A-5
BOD
9
36
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
STANDARD THREE-STOREY
SCHOOL BUILDING
( 6-CLASSROOMS )
VARIOUS DPWH
PROPOSED PROJECTS
OIC, BUILDINGS DIVISION
GROUND FLOOR, SECOND FLOOR &
THIRD FLOOR REFLECTED CEILING
PLAN, ROOF PLAN
NOTE :
THIRD FLOOR REFLECTED CEILING PLAN
SECOND FLOOR REFLECTED CEILING PLAN R O O F P L A N
GROUND FLOOR REFLECTED CEILING PLAN
SECRETARYDIRECTOR IV, BOD
GILBERTO S. REYES ROGELIO L. SINGSON
UNDERSECRETARY
RAUL C. ASIS
A-6
BOD
10
36
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
STANDARD THREE-STOREY
SCHOOL BUILDING
( 6-CLASSROOMS )
VARIOUS DPWH
PROPOSED PROJECTS
OIC, BUILDINGS DIVISION
NOTE :
SCHEDULE OF DOORS AND WINDOWS DETAIL PLAN OF RAMP
DETAIL ELEVATION OF RAMP
DETAIL SECTION
SPOT DETAIL
SPOT DETAIL
SCHEDULE OF DOORS & WINDOWS,
DETAIL PLAN, DETAIL PLAN, ELEVATION
& SECTION OF RAMP, SPOT DETAILS
DETAIL SECTION OF RAMP
SECRETARYDIRECTOR IV, BOD
GILBERTO S. REYES ROGELIO L. SINGSON
UNDERSECRETARY
RAUL C. ASIS
A-7
BOD
11
36
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
STANDARD THREE-STOREY
SCHOOL BUILDING
( 6-CLASSROOMS )
VARIOUS DPWH
PROPOSED PROJECTS
OIC, BUILDINGS DIVISION
NOTE :
DETAIL PLAN (VENT.)
SECTION DETAIL (VENT.)
PERSPECTIVE ( CEILING )
SECTION ( CEILING )
SPOT DETAIL
SECTION DETAIL (EAVES) SPOT DETAIL (EAVES)
SPOT DETAIL (CORNER CLG.)
CONCRETE
SUNBREAKER DETAIL
SECTION DETAIL OF EAVES,
SPOT DETAIL CORNER CEILING,
CONCRETE SUNBREAKER DETAIL,
PERSPECTIVE, SECTION &
SPOT DETAIL OF CEILING,
PLAN & SECTION OF VENTILATION
FRONT PAGE WITH SIGNATORIESFRONT PAGEG-1G-2G-3G-4A-1A-2A-3A-4A-5A-6A-7