REPUBLIC OF THE PHILIPPINES
PROJECT MANAGEMENT OFFICE - BUREAU OF DESIGN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
VARIOUS DPWH PROPOSED PROJECTS
OIC, BUILDINGS DIVISION, BOD
REVIEWED: RECOMMENDING APPROVAL: APPROVED :
MANILA, PHILIPPINES
(DETAILED ENGINEERING DESIGN AND/OR SPECIAL STUDIES)
STANDARD THREE-STOREY
SCHOOL BUILDING
(3 & 6 - CLASSROOMS)
MARIANO C. DEL CASTILLO
DIRECTOR IV, BOD
GILBERTO S. REYES
UNDERSECRETARY
RAUL C. ASIS
SECRETARY
ROGELIO L. SINGSON
CONCURRED :
SECRETARY
ARMIN A. LUISTRO
DEPARTMENT OF EDUCATION
-
STANDARD THREE-STOREY
VARIOUS DPWH PROPOSED PROJECTS
(DETAILED ENGINEERING DESIGN AND/OR SPECIAL STUDIES)
SCHOOL BUILDING
(3 & 6 - CLASSROOMS)
JOINT VENTURE OF
-
I.
SIX-CLASSROOMS
Mobilization / Demobilization
A.
II. Temporary Facilities
III. Safety and Health
IV. Earthworks
V. Termite Control Works
VI. Concrete Works
VII. Masonry Works
B I L L O F Q U A N T I T I E S
VIII. Fabricated Materials and Hardwares
SECRETARYDIRECTOR IV, BOD
GILBERTO S. REYES ROGELIO L. SINGSON
UNDERSECRETARY
RAUL C. ASIS
G-1
BOD
1
36
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
STANDARD THREE-STOREY
SCHOOL BUILDING
( 6-CLASSROOMS )
VARIOUS DPWH
PROPOSED PROJECTS
BILL OF QUANTITIES
OIC, BUILDINGS DIVISIONCOST ENGINEER
JOVEN T. SANTOS
PROJECT MANAGER
DOMICIANO B. LUSICA
QUANTITY ENGINEER
-
IX. Finishing Works
X. Carpentry Works
XI. Roof and Framing Works
XII. Painting Works
B I L L O F Q U A N T I T I E S
XIII. Electrical Works
XIV. Plumbing / Sanitary Works
SECRETARYDIRECTOR IV, BOD
GILBERTO S. REYES ROGELIO L. SINGSON
UNDERSECRETARY
RAUL C. ASIS
G-2
BOD
2
36
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
BILL OF QUANTITIES
OIC, BUILDINGS DIVISION
STANDARD THREE-STOREY
SCHOOL BUILDING
( 6-CLASSROOMS )
VARIOUS DPWH
PROPOSED PROJECTS
COST ENGINEER
JOVEN T. SANTOS
PROJECT MANAGER
DOMICIANO B. LUSICA
QUANTITY ENGINEER
-
I.
THREE-CLASSROOMS
Mobilization / Demobilization
A.
II. Temporary Facilities
III. Safety and Health
IV. Earthworks
V. Termite Control Works
VI. Concrete Works
VII. Masonry Works
VIII. Fabricated Materials and Hardwares
B I L L O F Q U A N T I T I E S
SECRETARYDIRECTOR IV, BOD
GILBERTO S. REYES ROGELIO L. SINGSON
UNDERSECRETARY
RAUL C. ASIS
G-3
BOD
3
36
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
STANDARD THREE-STOREY
SCHOOL BUILDING
( 3-CLASSROOMS )
VARIOUS DPWH
PROPOSED PROJECTS
BILL OF QUANTITIES
OIC, BUILDINGS DIVISIONQUANTITY ENGINEER COST ENGINEER
JOVEN T. SANTOS
PROJECT MANAGER
DOMICIANO B. LUSICA
-
IX. Finishing Works
X. Carpentry Works
XI. Roof and Framing Works
XII. Painting Works
B I L L O F Q U A N T I T I E S
XIII. Electrical Works
XIV. Plumbing / Sanitary Works
SECRETARYDIRECTOR IV, BOD
GILBERTO S. REYES ROGELIO L. SINGSON
UNDERSECRETARY
RAUL C. ASIS
G-4
BOD
4
36
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
BILL OF QUANTITIES
OIC, BUILDINGS DIVISION
STANDARD THREE-STOREY
SCHOOL BUILDING
( 3-CLASSROOMS )
VARIOUS DPWH
PROPOSED PROJECTS
COST ENGINEER
JOVEN T. SANTOS
PROJECT MANAGER
DOMICIANO B. LUSICA
QUANTITY ENGINEER
-
SECRETARYDIRECTOR IV, BOD
GILBERTO S. REYES ROGELIO L. SINGSON
UNDERSECRETARY
RAUL C. ASIS
A-1
BOD
5
36
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
STANDARD THREE-STOREY
SCHOOL BUILDING
( 6-CLASSROOMS )
VARIOUS DPWH
PROPOSED PROJECTS
T A B L E O F C O N T E N T S
OIC, BUILDINGS DIVISION
G - 1 BILL OF QUANTITIESS - 1 GENERAL NOTES
S - 2 GENERAL NOTES
S - 3 FOUNDATION PLAN, 2nd & 3rd FLOOR FRAMING PLAN
S - 4 COLUMN SCHEDULE, SCHEDULE OF FOOTING,
SCHEDULE FOOTING BEAMS, TYPICAL FOOTING
DETAIL, ELEVATION OF COLUMN & DETAIL OF WALL
FOOTINGS
S - 5 PLAN FOOTING F-3, ELEVATION FOOTING F-3,
PLAN FOOTING CF-1 & TYPICAL ELEVATION OF
MICRO-PILE
S - 6 SCHEDULE MAIN BEAMS, SCHEDULE OF SECONDARY
BEAMS, SCHEDULE OF SLABS, TYPICAL SLAB
ELEVATION, TYPICAL BEAM ELEVATION &
TYPE OF STIRRUPS
S - 7 DETAIL OF STAIR, RAMP DETAIL,
DETAIL OF DC-1, DETAIL OF STAIR ON GRADE &
DETAIL OF WALL ON FTB
S - 8 ROOF FRAMING PLAN
S - 9 ELEVATION OF END WALL FRAME,
DETAIL SECTION OF PC-1,
CONNECTION OF PURLINS TO RG-4,
CONCRETE SUN BREAKER DETAIL
S - 10 TRUSS DETAILS & CONNECTION DETAILS
S - 11 BASE PLATE DETAILS, ANCHOR BOLT DETAIL, ROOF
PANEL SIDE LAP DETAIL, J-BOLT TO PURLIN CONN.
DETAIL, J-BOLT SPACING, PURLIN CONN. DETAIL,
SECTION, TRUSS DETAIL AT GUTTER END
S - 12 FIRE ESCAPE ELEVATION
S - 13 FIRE ESCAPE DETAILS
EE - 1 GENERAL NOTES, LEGEND,
FLUORESCENT LIGHT FIXTURE MOUNTING
DETAIL, LOAD SCHEDULE, PANEL BOARD
DIAGRAM AND ELECTRICAL RISER DIAGRAM ( 3-CL )
EE - 2 POWER LAYOUT AND LIGHTING LAYOUT ( 3-CL )
EE - 1 GENERAL NOTES, LEGEND FLUORESCENT LIGHT
FIXTURE MOUNTING DETAIL, LOAD SCHEDULE,
PANEL BOARD DIAGRAM AND ELECTRICAL
RISER DIAGRAM ( 6-CL )
EE - 2 POWER LAYOUT AND LIGHTING LAYOUT ( 6-CL )
TABLE OF CONTENTS
G - 2 BILL OF QUANTITIES
NOTE :
G - 3 BILL OF QUANTITIES
G - 4 BILL OF QUANTITIES
A - 1 PERSPECTIVE, TABLE OF CONTENTS
A - 2 KEY PLAN
A - 3 GROUND FLOOR PLAN, SECOND FLOOR & THIRD FLOOR PLAN,
FRONT ELEVATION, SCHEDULE OF FINISH
A - 4 REAR ELEVATION, LEFT & RIGHT ELEVATION,
LONGITUDINAL SECTION & CROSS SECTION
A - 5 GROUND FLOOR, SECOND FLOOR & THIRD FLOOR REFLECTED
CEILING PLAN, ROOF PLAN
A - 6 SCHEDULE OF DOORS & WINDOWS, DETAIL PLAN,
ELEVATIONS & SECTION OF RAMP, SPOT DETAILS
A - 7 SECTION DETAIL OF EAVES, SPOT DETAIL CORNER CEILING,
CONCRETE SUN BREAKER DETAIL, PERSPECTIVE, SECTION &
SPOT DETAIL OF CEILING, PLAN & SECTION OF VENTILATION
A - 8 STAIR DETAILS
A - 9 BAY SECTIONS, DOOR FRAME TYPICAL PLAN &
SECTION, JALOUSIE DETAILS & FIRE ESCAPE DETAILS
A - 10 DETAIL PLAN OF TOILET & SECTION,
DETAIL OF COUNTER SINK, URINAL SECTION & DETAIL
A - 11 DETAILS OF BLACKBOARD
P - 1 GROUND FLOOR, TYPICAL SECOND & THIRD
FLOOR PLUMBING LAYOUT,
GROUND FLOOR, TYPICAL SECOND & THIRD
FLOOR WATER LINE LAYOUT
P - 2 ISOMETRIC DRAINAGE LINE LAYOUT,
ROOF DRAINAGE LAYOUT,
DETAIL SECTION OF DRAIN PIPE
AND SPOT DETAIL
P - 3 ISOMETRIC WATER LINE LAYOUT
AND SEWER LINE LAYOUT
P - 4 PLAN OF SEPTIC TANK, LONGITUDINAL
SECTION, CROSS SECTION DETAIL,
MANHOLE COVER DETAIL, CATCH BASIN
DETAIL, LEGEND AND PLUMBING NOTES
STRUCTURAL ELECTRICALARCHITECTURALGENERAL PLUMBING
-
SECRETARYDIRECTOR IV, BOD
GILBERTO S. REYES ROGELIO L. SINGSON
UNDERSECRETARY
RAUL C. ASIS
A-2
BOD
6
36
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
STANDARD THREE-STOREY
SCHOOL BUILDING
( 3-CLASSROOMS )
VARIOUS DPWH
PROPOSED PROJECTS
OIC, BUILDINGS DIVISION
KEY PLANNOTE :
( 3-CLASSROOMS )
GROUND FLOOR PLAN
K E Y P L A N
( 3-CLASSROOMS )
SECOND FLOOR PLAN
( 3-CLASSROOMS )
THIRD FLOOR PLAN
-
SECRETARYDIRECTOR IV, BOD
GILBERTO S. REYES ROGELIO L. SINGSON
UNDERSECRETARY
RAUL C. ASIS
A-3
BOD
7
36
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
STANDARD THREE-STOREY
SCHOOL BUILDING
( 6-CLASSROOMS )
VARIOUS DPWH
PROPOSED PROJECTS
OIC, BUILDINGS DIVISION
GROUND FLOOR PLAN,
SECOND FLOOR & THIRD FLOOR PLAN,
FRONT ELEVATION,
SCHEDULE OF FINISH
NOTE :
GROUND FLOOR PLAN
SECOND FLOOR PLAN
THIRD FLOOR PLAN
FRONT ELEVATION
SCHEDULE OF FINISH
-
SECRETARYDIRECTOR IV, BOD
GILBERTO S. REYES ROGELIO L. SINGSON
UNDERSECRETARY
RAUL C. ASIS
A-4
BOD
8
36
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
STANDARD THREE-STOREY
SCHOOL BUILDING
( 6-CLASSROOMS )
VARIOUS DPWH
PROPOSED PROJECTS
OIC, BUILDINGS DIVISION
REAR ELEVATION, LEFT & RIGHT
ELEVATION, LONGITUDINAL SECTION
& CROSS SECTION
NOTE :
RIGHT SIDE ELEVATION
REAR ELEVATION
LEFT SIDE ELEVATION CROSS SECTION
LONGITUDINAL SECTION
-
SECRETARYDIRECTOR IV, BOD
GILBERTO S. REYES ROGELIO L. SINGSON
UNDERSECRETARY
RAUL C. ASIS
A-5
BOD
9
36
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
STANDARD THREE-STOREY
SCHOOL BUILDING
( 6-CLASSROOMS )
VARIOUS DPWH
PROPOSED PROJECTS
OIC, BUILDINGS DIVISION
GROUND FLOOR, SECOND FLOOR &
THIRD FLOOR REFLECTED CEILING
PLAN, ROOF PLAN
NOTE :
THIRD FLOOR REFLECTED CEILING PLAN
SECOND FLOOR REFLECTED CEILING PLAN R O O F P L A N
GROUND FLOOR REFLECTED CEILING PLAN
-
SECRETARYDIRECTOR IV, BOD
GILBERTO S. REYES ROGELIO L. SINGSON
UNDERSECRETARY
RAUL C. ASIS
A-6
BOD
10
36
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
STANDARD THREE-STOREY
SCHOOL BUILDING
( 6-CLASSROOMS )
VARIOUS DPWH
PROPOSED PROJECTS
OIC, BUILDINGS DIVISION
NOTE :
SCHEDULE OF DOORS AND WINDOWS DETAIL PLAN OF RAMP
DETAIL ELEVATION OF RAMP
DETAIL SECTION
SPOT DETAIL
SPOT DETAIL
SCHEDULE OF DOORS & WINDOWS,
DETAIL PLAN, DETAIL PLAN, ELEVATION
& SECTION OF RAMP, SPOT DETAILS
DETAIL SECTION OF RAMP
-
SECRETARYDIRECTOR IV, BOD
GILBERTO S. REYES ROGELIO L. SINGSON
UNDERSECRETARY
RAUL C. ASIS
A-7
BOD
11
36
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
STANDARD THREE-STOREY
SCHOOL BUILDING
( 6-CLASSROOMS )
VARIOUS DPWH
PROPOSED PROJECTS
OIC, BUILDINGS DIVISION
NOTE :
DETAIL PLAN (VENT.)
SECTION DETAIL (VENT.)
PERSPECTIVE ( CEILING )
SECTION ( CEILING )
SPOT DETAIL
SECTION DETAIL (EAVES) SPOT DETAIL (EAVES)
SPOT DETAIL (CORNER CLG.)
CONCRETE
SUNBREAKER DETAIL
SECTION DETAIL OF EAVES,
SPOT DETAIL CORNER CEILING,
CONCRETE SUNBREAKER DETAIL,
PERSPECTIVE, SECTION &
SPOT DETAIL OF CEILING,
PLAN & SECTION OF VENTILATION
FRONT PAGE WITH SIGNATORIESFRONT PAGEG-1G-2G-3G-4A-1A-2A-3A-4A-5A-6A-7