1
Constantza Port -Constantza Port -
Your Hub @ Black SeaYour Hub @ Black Sea
CONSTANTIN MATEIGENERAL MANAGER
National Company “Maritime Ports Administration” Constantza
ROMANIA 4 October 2007
2
Constantza Port -Your Hub @ Black Sea
General General InformationInformation
Dedicated Terminals
Hinterland Connections
River Transport – The Danube
Future Projects
Traffic
3
Constantza Port Constantza Port A World Class Maritime PortA World Class Maritime Port
Largest and deepest port in the Black Sea Largest and deepest port in the Black Sea
•Total surface: 3,926 ha
•156 berths (out of which 140 operational berths)
•Quay length - almost 30 km
•Length of breakwaters (north + south) – 14 km
•Total handling capacity – over 120 million tons/year
•Natural water depths between 8 and 18.5 m
•Safe port
•Port complying with the ISPS Code and the EU security regulation in force
•Friendly environmentally management
•Free port status starting with January 2007
General Information
4
General Information
Dedicated Dedicated TerminalsTerminals
Hinterland Connections
River Transport – The Danube
Future Projects
Traffic
Constantza Port -Your Hub @ Black Sea
5
4 Container terminals operated by:
DP World, SOCEP, UMEX and APM Terminal
Total container traffic 2006 – 1,037,077 TEU’s
Constantza Port Constantza Port The container hub at the Black SeaThe container hub at the Black Sea
Dedicated Terminals
Functioning as container hub, Constantza Port has direct calls from MSC, CMA CGM, Norasia, ZIM, China Shipping.
Since May 2007 - Maersk direct service.
Since June 2007 - Grand Alliance direct service
Since September 2007 - ABX (CSCL, Yang Ming Line, K-Line, ZIM ) Since September 2007 - ABX (CSCL, Yang Ming Line, K-Line, ZIM ) direct servicedirect service
6
Chemical productsChemical products•9 berths, water depths between 9 berths, water depths between 88..6 6 andand 10 10..5 m5 m •covered storage capacity: 100,000 tonscovered storage capacity: 100,000 tons
Oil productsOil products•9 9 berths,berths, water depths between water depths between 1111..3 m 3 m andand 1919 m m •annual handling capacity annual handling capacity 24 mil24 mil.. ton tonss maximum storage capacity for oil products: maximum storage capacity for oil products: 11..7 7 milmil.. ton tonss•33 coupling installations for loading/unloading 33 coupling installations for loading/unloading tankers and/or river bargestankers and/or river barges
Ore, coal, cokeOre, coal, coke•13 berths, water depths up to 19 m13 berths, water depths up to 19 m•Direct transshipment Direct transshipment from sea-going vessels to bargesfrom sea-going vessels to barges•Storage capacity: 3.5 milion tonsStorage capacity: 3.5 milion tons•Handling capacity: 25 milion tons /yearHandling capacity: 25 milion tons /year
Grains Grains 14 berths, water depths between 7m and 13 mStorage capacity:North part of the port: 90,000 tonsSouth part of the port: 100,000 tonsHandling capacity: 4 milion tons/year
Constantza Port Constantza Port Bulk CargoBulk Cargo
Dedicated Terminals
7
Important private Important private investments in cereals investments in cereals facilities of facilities of about eur 40 mil.about eur 40 mil.United Shipping AgencyUnited Shipping AgencyNorth Star ShippingNorth Star ShippingSoya PlusSoya PlusMinmetalMinmetal
Constantza Port Constantza Port Regional cereals hubRegional cereals hub
Dedicated Terminals
8
General CargoGeneral Cargo Ro-Ro and Ferry BoatRo-Ro and Ferry Boat
General cargoGeneral cargo50 berths, water depths up to 13. 8 m50 berths, water depths up to 13. 8 m
Ro-Ro / FerryRo-Ro / FerryFacilities for: Facilities for: North parking area: 4,800 North parking area: 4,800 vehiculesvehiculesSouth parking area: 1,800 South parking area: 1,800 vehiculesvehiculesDirect line with Derince, TurciaDirect line with Derince, TurciaDistance
Ferryboat lines nM km
Time (hours)
Constantza - Derince 230 414 23
Constantza Port Constantza Port General cargo, RO-RO/FerryGeneral cargo, RO-RO/Ferry
Dedicated Terminals
9
Constantza Port Constantza Port The Passengers TerminalThe Passengers Terminal
Dedicated Terminals
located in an area of great touristic interest, Constantza and it's satellite resorts offerall kinds of transport, accommodation and leisure facilities and services
supports transit for 100,000 passengers/year
Constantza city center is within 2 kilometers or a 15 minutes walk from the terminal
FacilitiesFacilities
• customs and Immigration Office• distinct spaces for arrivals and departures• separate lanes for UE and non-UE residents • info corner • exchange office• generous parking spaces • duty-free shop and other commercial stands• two bar areas • elevator and facilities for the disabled
10
General Information
Dedicated Terminals
Hinterland Connections
River Transport – The Danube
Future Projects
TrafficTraffic
Constantza Port -Your Hub @ Black Sea
11
Total traffic(thousand
tonnes) 57,138
Transit 12,846
Import 20,466
Export 15,820
Cabotage 8,006
transit
import
export
cabotage
2006
Total traffic(thousand tonnes) 37,086
Transit 10,090
Import 13,852
Export 8,370
Cabotage 4,774
First 8 months of 2007
transit
import
export
cabotage
Constantza Port Constantza Port Total Traffic (tonnes)Total Traffic (tonnes)
Traffic
12
Unloaded 525,211
- full 372,802
- empty 152,409
Loaded 511,857
- full 316,995
- empty 194,862
TOTAL 1,037,068
505000
510000
515000
520000
525000
530000
unloaded loaded
unloaded
loaded
2006 (TEU)
Unloaded 462,280
- full 331,949
- empty 130,331
Loaded 445,931
- full 285,410
- empty 160,521
TOTAL 908,211
First 8 months of 2007 (TEU)
435000
440000
445000
450000
455000
460000
465000
unloaded loaded
unloaded
loaded
Constantza Port Constantza Port Container Traffic (TEU)Container Traffic (TEU)
Traffic
13
Constantza Port – HungaryConstantza Port – HungaryTrafficTraffic
MaritimeTraffic
(tonnes)
RiverTraffic
(tonnes)
Import 0 0
Export 3,864 0
Transit 1,255,845 1,634,938
Total 1,259,709 1,634,938
2006 = 2,894,647 tonnes2006 = 2,894,647 tonnes
MaritimeTraffic
(tonnes)
RiverTraffic
(tonnes)
Import 0 0
Export 2,864 0
Transit 920,486 1,067,352
Total 923,350 1,067,352
8 months 2007 = 1,990,702 tonnes8 months 2007 = 1,990,702 tonnes
Traffic
14
General Information
Dedicated Terminals
Hinterland Connections
River Transport – The Danube
Future Projects
Traffic
Constantza Port -Your Hub @ Black Sea
15
Corridor no. VII - Danube-
Corridor no. IX - Road -
Corridor no. IV - Rail and road-
Constantza Port linked to:
Pan European Transport Corridor no. VII – Danube
Pan European Transport Corridor no. IV (railroad) Pan European Transport Corridor no. IX (road)
TRACECA Corridor
Constantza Port – Constantza Port – Main Transport CorridorsMain Transport Corridors
Hinterland Connection
s
16
Last decade, Constantza Port has efficiently served cargo flows going to or coming from Central and Eastern European countries including: Austria, Bulgaria, Hungary, Moldavia, Slovenia, Germany, Czech Republic, Slovakia, Ukraine, SerbiaSerbia and Croatia.
Constantza Port – Constantza Port – Hinterland ConnectionsHinterland Connections
Hinterland Connection
s
17
General Information
Dedicated Terminals
Hinterland Connections
River Transport -
Danube
Future Projects
Traffic
Constantza Port -Your Hub @ Black Sea
18
Romanian River TransportRomanian River Transport
River Transport – The Danube
• intermodalism intermodalism • main Romanian river ports: Giurgiu, Oltenita, Tulcea, Braila, Galati, Orsovamain Romanian river ports: Giurgiu, Oltenita, Tulcea, Braila, Galati, Orsova• projects under Romanian Ministry of Transport: projects under Romanian Ministry of Transport:
- Danube – Black Sea Channel- Danube – Black Sea Channel (estimated at the amount of 334.25 million Euro), - Poarta Alba – Midia – Navodari Channel- Poarta Alba – Midia – Navodari Channel (estimated at the amount of 309.22 million Euro),- Improvement of the navigation conditions on the common Romanian – - Improvement of the navigation conditions on the common Romanian –
Bulgarian sectorBulgarian sector (estimated value of 74 million Euro)
19
•Project COLD Project COLD (Container (Container Liniendienst Donau)-Liniendienst Donau)-feasibility study feasibility study promoting a container promoting a container service line between service line between Constantza port and Constantza port and the Austrian inland the Austrian inland waterways portswaterways ports
Container line Constantza - Krems
The container service will be assured by three convoys with fixed departure days
Sailings: every Friday from Krems, every Saturday from Constantza
Constantza Port – Constantza Port – Hinterland ConnectionsHinterland Connections
River Transport – The Danube
20
General Information
Dedicated Terminals
Hinterland Connections
River Transport – The Danube
Future Projects
Traffic
Constantza Port -Your Hub @ Black Sea
21
Development projectsDevelopment projectsOn progressOn progress
The barge terminalStage I
The barge terminalStage II
1. The barge terminal, phase I
-67% of the investment (phase I) is ensured by a loan without state guarantee from European Bank of Reconstruction and Development.
-the works are on progress and we expect it to be finished in the first quarter of 2008.
2. Development of the railway capacity in the south part of the port, in the connection to the existent container terminal on pier II South and the existent operators in the area
22
FutureFutureDevelopment projectsDevelopment projects
3. Road Bridge over the Danube-Black Sea Canal km 0+540
Future Projects
1. Consolidation, stabilization and arrangement of Constantza Port`s Shore
3. Extension of railway system in the river-maritime area of Constantza Port
2. Road Bridge over the link canal
4. Road Bridge over the Danube-Black Sea Canal km 0+540
5. Extension by 1 km of the North Breakwater
6. Construction of Pier III South
Top Related