Alaska Electric and Energy Cooperative, Inc.Nikiski Combined Cycle Conversion
22770Nikiski, AK PIPE SUPPORT SCHEDULE
EXHIBIT C.5
SUPPORT ID:
SERVICE:
VERTICAL LOAD:
OPERATING LOAD:
HORIZONTAL LOADS:
N-S LOAD:
E-W LOAD:
DEFLECTIONS:
VERT:
HYDRO LOAD:
P&ID NUMBER:
REMARKS:
E-W COORDINATE:
E-W:
N-S COORDINATE:
OCCASIONAL LOAD:
PIPE CL EL:
SUPPORT STEEL:
N-S:
ORGANIZATION
PIPE SUPPORT SCHEDULES PROVIDE THE SUPPORT DESCRIPTIONS, OPERATING,OCCASIONAL, AND HYDRO TEST LOADS, OPERATING DISPLACEMENTS, PIPE CENTERLINE LOCATION OF THE SUPPORT, SUPPORT STEEL, ISOMETRIC DRAWING WITH THE SUPPORT, AND OTHER SPECIAL FEATURES OF THE SUPPORT.
PIPE SUPPORT SCHEDULE DEFINITIONS
INCLUDED IN THE PIPE SUPPORT SCHEDULE IS THE FOLLOWING INFORMATION:
APPLICABLE SERVICE; SEE DRAWING NIG-IN-8000-01.
APPLICABLE P&ID NUMBER
SERVICE CODE-SUPPORT TYPE-SUPPORT NUMBER
VERTICAL FORCE TRANSMITTED BY SUPPORT FOR INDICATED LOAD CASE
LOAD CASE OF DEAD LOAD + THERMAL + FRICTION + PRESSURE + MOMENTUM, AS APPLICABLE
LOAD CASE OF OPERATING + SEISMIC OR WIND (WHICHEVER CONTROLS)
LOAD CASE OF DEADLOAD + WATER
LARGEST HORIZONTAL FORCE TRANSMITTED BY SUPPORT FROM OPERATING LOAD, HYDRO LOAD OR OCCASSIONAL LOAD CASES
INDICATES LOAD ACTS IN EITHER NORTH OR SOUTH DIRECTION
INDICATES LOAD ACTS IN EITHER EAST OR WEST DIRECTION
DISPLACEMENT OF THE PIPE AT THE SUPPORT LOCATION UNDER NORMAL OPERATING CONDITIONS
VERTICAL DISPLACEMENT AS INDICATED
HORIZONTAL DISPLACEMENT IN THE N-S PLANE AS INDICATED
HORIZONTAL DISPLACEMENT IN THE E-W PLANE AS INDICATED
N-S LOCATION OF THE SUPPORT AT PIPE CENTERLINE
APPLICABLE STRUCTURAL SUPPORT STEEL FOR PIPE SUPPORT, AS FOLLOWS:
COMMENT SECTION
BOTTOM OF STEEL ELEVATION FOR PIPE SUPPORT CONNECTION. SEE STRUCTURAL STEEL DRAWINGS.
BOS EL.:
REV: REVISION NUMBER OF LAST MODIFICATION. THE PIPE SUPPORT REVISION NUMBER CORRESPONDS TO THE PIPE SUPPORT SYSTEM REVISION NUMBER
TYPE (REVISION): TYPE OF REVISIONA- ADDITIOND- DELETIONR- REVISION
ISO DWG NO.:
E-W LOCATION OF THE SUPPORT AT PIPE CENTERLINE
ELEVATION OF THE PIPE CENTERLINE AT THE SUPPORT LOCATION
ISOMETRIC DRAWING NUMBER WITH SUPPORT
GENERAL COMMENT: FOR PIPE SUPPORT DETAIL DRAWINGS AND STRUCTURAL ATTACHMENT DETAILS SEE DRAWINGS NIG-PI-4022-01 THRU -05.
EX ST: INDICATES THAT SUPPORT CONNECTS DIRECTLY TO EXISTING BUILDING STEEL. NEW ST: INDICATES PIPE SUPPORT SUPPLEMENTARY STEEL WILL BE ADDITIONAL.
GL - GRID LINE
PAGE 1 OF 2
PRINT DATE:ISSUE DATE: 05-SEP-12 PIPE SUPPORT SCHEDULEREVISION: 4
05-SEP-12
Alaska Electric and Energy Cooperative, Inc.Nikiski Combined Cycle Conversion
22770Nikiski, AK PIPE SUPPORT SCHEDULE
EXHIBIT C.5
PAGE 2 OF 2
PRINT DATE:ISSUE DATE: 05-SEP-12 PIPE SUPPORT SCHEDULEREVISION: 4
05-SEP-12
Alaska Electric and Energy Cooperative, Inc.Nikiski Combined Cycle Conversion
PIPE SUPPORT SCHEDULE
SUPPORT IDHYDRO
N-SE-WVERT REMARKS
PIPE CL ELSUPPORT STEEL BOS EL
DEFLECTIONS
ISO DWG NO.SYS -TYP - NO.
VERTICAL LOADSOPERATINGOCCASIONAL
HORIZONTAL LOADS
N-S LOADE-W LOAD E-W COORDINATE
N-S COORDINATE
SERVICE: FGS
REVTYPE
Nikiski, AK
P&ID DWG NO.
22770
EXHIBIT C.5
0.00 IN. E0.00 IN. UP
0.00 IN. S 128' 7 1/16"
700
PIPE: 4" NPSINSUL: NONE
0NIG-PI-FGS-004FGS-PS03-001 450600
00 1149' 10 7/16"
185' 11 3/8"
LB.LB.LB.
LB.LB.
PS03NIG-IN-8006-04
0.06 IN. W0.00 IN. UP
0.06 IN. S 138' 6"
625
PIPE: 6" NPSINSUL: NONE
0NIG-PI-FGS-004FGS-AN02-002 425500
300200 1134' 4 7/16"
185' 11 3/8"
LB.LB.LB.
LB.LB.
AN02NIG-IN-8006-04
0.04 IN. W0.00 IN. UP
0.13 IN. S 138' 6"
200
PIPE: 6" NPSINSUL: NONE
0NIG-PI-FGS-004FGS-RH01-003 200200
00 1133' 0"
196' 2"
LB.LB.LB.
LB.LB.
RH01NIG-IN-8006-04
0.01 IN. W0.00 IN. UP
0.19 IN. S 138' 6"
1,025
PIPE: 6" NPSINSUL: NONE
0NIG-PI-FGS-004FGS-RH01-004 750850
00 1133' 0"
208' 3"
LB.LB.LB.
LB.LB.
RH01NIG-IN-8006-04
0.06 IN. E0.00 IN. UP
0.19 IN. S 141' 9 5/16"
775
PIPE: 6" NPSINSUL: NONE
0NIG-PI-FGS-004FGS-GU03-005 550650
2000 1147' 0"
215' 7"
LB.LB.LB.
LB.LB.
GU03NIG-IN-8006-04
0.06 IN. E0.00 IN. UP
0.15 IN. S 141' 9 5/16"
350
PIPE: 6" NPSINSUL: NONENO U-BOLT
0NIG-PI-FGS-004FGS-GU03-006 275300
00 1159' 0"
215' 7"
LB.LB.LB.
LB.LB.
GU03NIG-IN-8006-04
0.05 IN. E0.00 IN. UP
0.11 IN. S 141' 9 5/16"
425
PIPE: 6" NPSINSUL: NONENO U-BOLT
0NIG-PI-FGS-004FGS-GU03-007 300350
00 1171' 0"
215' 7"
LB.LB.LB.
LB.LB.
GU03NIG-IN-8006-04
0.06 IN. E0.00 IN. UP
0.08 IN. S 141' 9 5/16"
625
PIPE: 6" NPSINSUL: NONENO U-BOLT
0NIG-PI-FGS-004FGS-GU03-008 475525
2250 1181' 0"
215' 7"
LB.LB.LB.
LB.LB.
GU03NIG-IN-8006-04
PRINT DATE: 05-SEP-12ISSUE DATE: 05-SEP-12 PIPE SUPPORT SCHEDULEREVISION: PAGE 1 OF 64
Alaska Electric and Energy Cooperative, Inc.Nikiski Combined Cycle Conversion
PIPE SUPPORT SCHEDULE
SUPPORT IDHYDRO
N-SE-WVERT REMARKS
PIPE CL ELSUPPORT STEEL BOS EL
DEFLECTIONS
ISO DWG NO.SYS -TYP - NO.
VERTICAL LOADSOPERATINGOCCASIONAL
HORIZONTAL LOADS
N-S LOADE-W LOAD E-W COORDINATE
N-S COORDINATE
SERVICE: FGS
REVTYPE
Nikiski, AK
P&ID DWG NO.
22770
EXHIBIT C.5
0.08 IN. E0.00 IN. UP
0.04 IN. S 140' 5 11/16"
775
PIPE: 6" NPSINSUL: NONE
0NIG-PI-FGS-004FGS-GU03-009 575625
0625 1197' 0"
212' 8"
LB.LB.LB.
LB.LB.
GU03NIG-IN-8006-04
0.02 IN. E0.00 IN. UP
0.06 IN. S 140' 5 11/16"
875
PIPE: 6" NPSINSUL: NONENO U-BOLT
0NIG-PI-FGS-004FGS-GU03-010 475700
050 1197' 0"
192' 8"
LB.LB.LB.
LB.LB.
GU03NIG-IN-8006-04
0.00 IN. W0.00 IN. UP
0.00 IN. S 127' 11 5/8"
375
PIPE: 4" NPSINSUL: 1"
0NIG-PI-FGS-005FGS-PS03-011 375475
00 1140' 1 1/4"
180' 2 7/8"
LB.LB.LB.
LB.LB.
PS03NIG-IN-8006-04
0.04 IN. W0.00 IN. UP
0.06 IN. S 138' 6"
650
PIPE: 6" NPSINSUL: 1"
0NIG-PI-FGS-005FGS-AN02-012 525625
350150 1134' 4 7/16"
180' 2 7/8"
LB.LB.LB.
LB.LB.
AN02NIG-IN-8006-04
0.01 IN. W0.00 IN. UP
0.15 IN. S 138' 6"
425
PIPE: 6" NPSINSUL: 1"
0NIG-PI-FGS-005FGS-RH02-013 350400
00 1132' 0"
196' 2"
LB.LB.LB.
LB.LB.
RH02NIG-IN-8006-04
0.03 IN. E0.00 IN. UP
0.19 IN. S 138' 6"
1,000
PIPE: 6" NPSINSUL: 1"
0NIG-PI-FGS-005FGS-RH02-014 825925
00 1132' 0"
208' 3"
LB.LB.LB.
LB.LB.
RH02NIG-IN-8006-04
0.06 IN. E0.00 IN. UP
0.16 IN. S 141' 10 13/16"
750
PIPE: 6" NPSINSUL: 1"
0NIG-PI-FGS-005FGS-GU03-015 600725
2000 1147' 0"
214' 8"
LB.LB.LB.
LB.LB.
GU03NIG-IN-8006-04
0.04 IN. E0.00 IN. UP
0.13 IN. S 141' 10 13/16"
375
PIPE: 6" NPSINSUL: 1"NO U-BOLT
0NIG-PI-FGS-005FGS-GU03-016 325350
00 1159' 0"
214' 8"
LB.LB.LB.
LB.LB.
GU03NIG-IN-8006-04
PRINT DATE: 05-SEP-12ISSUE DATE: 05-SEP-12 PIPE SUPPORT SCHEDULEREVISION: PAGE 2 OF 64
Alaska Electric and Energy Cooperative, Inc.Nikiski Combined Cycle Conversion
PIPE SUPPORT SCHEDULE
SUPPORT IDHYDRO
N-SE-WVERT REMARKS
PIPE CL ELSUPPORT STEEL BOS EL
DEFLECTIONS
ISO DWG NO.SYS -TYP - NO.
VERTICAL LOADSOPERATINGOCCASIONAL
HORIZONTAL LOADS
N-S LOADE-W LOAD E-W COORDINATE
N-S COORDINATE
SERVICE: FGS
REVTYPE
Nikiski, AK
P&ID DWG NO.
22770
EXHIBIT C.5
0.05 IN. E0.00 IN. UP
0.09 IN. S 141' 10 13/16"
425
PIPE: 6" NPSINSUL: 1"NO U-BOLT
0NIG-PI-FGS-005FGS-GU03-017 350400
00 1171' 0"
214' 8"
LB.LB.LB.
LB.LB.
GU03NIG-IN-8006-04
0.06 IN. E0.00 IN. UP
0.06 IN. S 141' 10 13/16"
625
PIPE: 6" NPSINSUL: 1"
0NIG-PI-FGS-005FGS-GU03-018 500600
2750 1181' 0"
214' 8"
LB.LB.LB.
LB.LB.
GU03NIG-IN-8006-04
0.10 IN. E0.00 IN. UP
0.01 IN. S 140' 7 3/16"
675
PIPE: 6" NPSINSUL: 1"
0NIG-PI-FGS-005FGS-GU03-019 575625
0750 1196' 0"
212' 8"
LB.LB.LB.
LB.LB.
GU03NIG-IN-8006-04
0.03 IN. E0.00 IN. UP
0.06 IN. S 140' 7 3/16"
900
PIPE: 6" NPSINSUL: 1"
0NIG-PI-FGS-005FGS-GU03-020 700825
0250 1196' 0"
192' 8"
LB.LB.LB.
LB.LB.
GU03NIG-IN-8006-04
0.00 IN. W0.00 IN. UP
0.00 IN. S 135' 6 3/8"
75
PIPE: 4" NPSINSUL: 1"
0NIG-PI-FGS-010FGS-PS03-021 25200
00 1139' 10 7/8"
156' 11 1/16"
LB.LB.LB.
LB.LB.
PS03NIG-IN-8006-03
0.03 IN. E0.00 IN. UP
0.01 IN. S 138' 6"
625
PIPE: 6" NPSINSUL: 1"
0NIG-PI-FGS-010FGS-PS02-022 525600
00 1139' 10 7/8"
167' 1"
LB.LB.LB.
LB.LB.
PS02NIG-IN-8006-03
0.03 IN. E0.00 IN. UP
0.06 IN. S 138' 6"
825
PIPE: 6" NPSINSUL: 1"
0NIG-PI-FGS-010FGS-AN02-023 700775
330275 1134' 4 7/16"
179' 2 7/8"
LB.LB.LB.
LB.LB.
AN02NIG-IN-8006-03
0.06 IN. E0.00 IN. UP
0.16 IN. S 138' 6"
475
PIPE: 6" NPSINSUL: 1"
0NIG-PI-FGS-010FGS-RH02-024 400450
00 1131' 0"
196' 2"
LB.LB.LB.
LB.LB.
RH02NIG-IN-8006-03
PRINT DATE: 05-SEP-12ISSUE DATE: 05-SEP-12 PIPE SUPPORT SCHEDULEREVISION: PAGE 3 OF 64
Alaska Electric and Energy Cooperative, Inc.Nikiski Combined Cycle Conversion
PIPE SUPPORT SCHEDULE
SUPPORT IDHYDRO
N-SE-WVERT REMARKS
PIPE CL ELSUPPORT STEEL BOS EL
DEFLECTIONS
ISO DWG NO.SYS -TYP - NO.
VERTICAL LOADSOPERATINGOCCASIONAL
HORIZONTAL LOADS
N-S LOADE-W LOAD E-W COORDINATE
N-S COORDINATE
SERVICE: FGS
REVTYPE
Nikiski, AK
P&ID DWG NO.
22770
EXHIBIT C.5
0.10 IN. E0.00 IN. UP
0.18 IN. S 138' 6"
950
PIPE: 6" NPSINSUL: 1"
0NIG-PI-FGS-010FGS-RH02-025 775900
00 1131' 0 "
208' 3"
LB.LB.LB.
LB.LB.
RH02NIG-IN-8006-03
0.06 IN. E0.00 IN. UP
0.12 IN. S 141' 10 13/16"
750
PIPE: 6" NPSINSUL: 1"
0NIG-PI-FGS-010FGS-GU03-026 600700
3250 1147' 0"
213' 8"
LB.LB.LB.
LB.LB.
GU03NIG-IN-8006-03
0.03 IN. E0.00 IN. UP
0.09 IN. S 141' 10 13/16"
375
PIPE: 6" NPSINSUL: 1"NO U-BOLT
0NIG-PI-FGS-010FGS-GU03-027 325375
00 1159' 0"
213' 8"
LB.LB.LB.
LB.LB.
GU03NIG-IN-8006-03
0.04 IN. E0.00 IN. UP
0.05 IN. S 141' 10 13/16"
450
PIPE: 6" NPSINSUL: 1"NO U-BOLT
0NIG-PI-FGS-010FGS-GU03-028 375425
00 1171' 0"
213' 8"
LB.LB.LB.
LB.LB.
GU03NIG-IN-8006-03
0.06 IN. E0.00 IN. UP
0.02 IN. S 141' 10 13/16"
450
PIPE: 6" NPSINSUL: 1"
0NIG-PI-FGS-010FGS-GU03-029 375425
3000 1181' 0"
213' 8"
LB.LB.LB.
LB.LB.
GU03NIG-IN-8006-03
0.08 IN. E0.00 IN. UP
0.02 IN. N 140' 7 3/16"
625
PIPE: 6" NPSINSUL: 1"
0NIG-PI-FGS-010FGS-GU03-030 525600
0675 1195' 0"
212' 8"
LB.LB.LB.
LB.LB.
GU03NIG-IN-8006-03
0.01 IN. E0.00 IN. UP
0.06 IN. S 140' 7 3/16"
1,000
PIPE: 6" NPSINSUL: 1"
0NIG-PI-FGS-010FGS-GU03-031 825950
0225 1195' 0"
192' 8"
LB.LB.LB.
LB.LB.
GU03NIG-IN-8006-03
0.04 IN. W0.00 IN. UP
0.20 IN. S 137' 6 13/16"
525
PIPE: 6" NPSINSUL: 1"
0NIG-PI-FGS-010FGS-RH02-032 425475
00 1195' 0"
172' 8"
LB.LB.LB.
LB.LB.
GU03NIG-IN-8006-03
PRINT DATE: 05-SEP-12ISSUE DATE: 05-SEP-12 PIPE SUPPORT SCHEDULEREVISION: PAGE 4 OF 64
Alaska Electric and Energy Cooperative, Inc.Nikiski Combined Cycle Conversion
PIPE SUPPORT SCHEDULE
SUPPORT IDHYDRO
N-SE-WVERT REMARKS
PIPE CL ELSUPPORT STEEL BOS EL
DEFLECTIONS
ISO DWG NO.SYS -TYP - NO.
VERTICAL LOADSOPERATINGOCCASIONAL
HORIZONTAL LOADS
N-S LOADE-W LOAD E-W COORDINATE
N-S COORDINATE
SERVICE: FGS
REVTYPE
Nikiski, AK
P&ID DWG NO.
22770
EXHIBIT C.5
0.06 IN. W0.00 IN. UP
0.18 IN. S 137' 6 13/16"
400
PIPE: 6" NPSINSUL: 1"
0NIG-PI-FGS-010FGS-GU03-033 325375
5000 1202' 11 7/8"
171' 11"
LB.LB.LB.
LB.LB.
GU03NIG-IN-8006-03
0.07 IN. W0.00 IN. UP
0.14 IN. S 137' 6 13/16"
575
PIPE: 6" NPSINSUL: 1"NO U-BOLT
0NIG-PI-FGS-010FGS-GU03-034 475500
00 1214' 11 7/8"
171' 11"
LB.LB.LB.
LB.LB.
GU03NIG-IN-8006-03
0.07 IN. W0.00 IN. UP
0.09 IN. S 137' 6 13/16"
600
PIPE: 6" NPSINSUL: 1"NO U-BOLT
0NIG-PI-FGS-010FGS-GU03-035 500575
00 1229' 11 7/8"
171' 11"
LB.LB.LB.
LB.LB.
GU03NIG-IN-8006-03
0.06 IN. W0.00 IN. UP
0.05 IN. S 137' 6 13/16"
550
PIPE: 6" NPSINSUL: 1"
0NIG-PI-FGS-010FGS-AN02-036 425525
350600 1243' 11 7/8"
171' 11"
LB.LB.LB.
LB.LB.
GU03NIG-IN-8006-03
0.03 IN. W0.00 IN. UP
0.05 IN. S 134' 6 13/16"
425
PIPE: 6" NPSINSUL: 1"
0NIG-PI-FGS-010FGS-RH02-037 325475
00 1246' 6"
174' 4"
LB.LB.LB.
LB.LB.
RH02NIG-IN-8006-03
0.01 IN. W0.00 IN. UP
0.05 IN. S 131' 0 7/8"
325
PIPE: 6" NPSINSUL: 1"
0NIG-PI-FGS-010FGS-PS01-038 300425
00 1248' 0"
178' 10 15/16"
LB.LB.LB.
LB.LB.
PS01NIG-IN-8006-03
0.05 IN. W0.00 IN. UP
0.01 IN. S 131' 0 7/8"
475
PIPE: 6" NPSINSUL: 1"
0NIG-PI-FGS-010FGS-PS03-039 450475
00 1260' 0"
178' 10 15/16"
LB.LB.LB.
LB.LB.
PS01NIG-IN-8006-03
0.03 IN. W0.00 IN. UP
0.00 IN. N 135' 0 7/8"
475
PIPE: 6" NPSINSUL: 1"
0NIG-PI-FGS-010FGS-PS01-040 350475
00 1262' 7 11/16"
185' 4 15/16"
LB.LB.LB.
LB.LB.
PS01NIG-IN-8006-03
PRINT DATE: 05-SEP-12ISSUE DATE: 05-SEP-12 PIPE SUPPORT SCHEDULEREVISION: PAGE 5 OF 64
Alaska Electric and Energy Cooperative, Inc.Nikiski Combined Cycle Conversion
PIPE SUPPORT SCHEDULE
SUPPORT IDHYDRO
N-SE-WVERT REMARKS
PIPE CL ELSUPPORT STEEL BOS EL
DEFLECTIONS
ISO DWG NO.SYS -TYP - NO.
VERTICAL LOADSOPERATINGOCCASIONAL
HORIZONTAL LOADS
N-S LOADE-W LOAD E-W COORDINATE
N-S COORDINATE
SERVICE: FGS
REVTYPE
Nikiski, AK
P&ID DWG NO.
22770
EXHIBIT C.5
0.00 IN. W0.00 IN. UP
0.00 IN. N 135' 0 7/8"
500
PIPE: 6" NPSINSUL: 1"
0NIG-PI-FGS-010FGS-PS01-041 425450
00 1262' 7 11/16"
194' 10 15/16"
LB.LB.LB.
LB.LB.
PS01NIG-IN-8006-03
PRINT DATE: 05-SEP-12ISSUE DATE: 05-SEP-12 PIPE SUPPORT SCHEDULEREVISION: PAGE 6 OF 64
Top Related