07 Exhibit C.5 Pipe Support Schedule Rev04(2)

8
Alaska Electric and Energy Cooperative, Inc. Nikiski Combined Cycle Conversion 22770 Nikiski, AK PIPE SUPPORT SCHEDULE EXHIBIT C.5 SUPPORT ID: SERVICE: VERTICAL LOAD: OPERATING LOAD: HORIZONTAL LOADS: N-S LOAD: E-W LOAD: DEFLECTIONS: VERT: HYDRO LOAD: P&ID NUMBER: REMARKS: E-W COORDINATE: E-W: N-S COORDINATE: OCCASIONAL LOAD: PIPE CL EL: SUPPORT STEEL: N-S: ORGANIZATION PIPE SUPPORT SCHEDULES PROVIDE THE SUPPORT DESCRIPTIONS, OPERATING,OCCASIONAL, AND HYDRO TEST LOADS, OPERATING DISPLACEMENTS, PIPE CENTERLINE LOCATION OF THE SUPPORT, SUPPORT STEEL, ISOMETRIC DRAWING WITH THE SUPPORT, AND OTHER SPECIAL FEATURES OF THE SUPPORT. PIPE SUPPORT SCHEDULE DEFINITIONS INCLUDED IN THE PIPE SUPPORT SCHEDULE IS THE FOLLOWING INFORMATION: APPLICABLE SERVICE; SEE DRAWING NIG-IN-8000-01. APPLICABLE P&ID NUMBER SERVICE CODE-SUPPORT TYPE-SUPPORT NUMBER VERTICAL FORCE TRANSMITTED BY SUPPORT FOR INDICATED LOAD CASE LOAD CASE OF DEAD LOAD + THERMAL + FRICTION + PRESSURE + MOMENTUM, AS APPLICABLE LOAD CASE OF OPERATING + SEISMIC OR WIND (WHICHEVER CONTROLS) LOAD CASE OF DEADLOAD + WATER LARGEST HORIZONTAL FORCE TRANSMITTED BY SUPPORT FROM OPERATING LOAD, HYDRO LOAD OR OCCASSIONAL LOAD CASES INDICATES LOAD ACTS IN EITHER NORTH OR SOUTH DIRECTION INDICATES LOAD ACTS IN EITHER EAST OR WEST DIRECTION DISPLACEMENT OF THE PIPE AT THE SUPPORT LOCATION UNDER NORMAL OPERATING CONDITIONS VERTICAL DISPLACEMENT AS INDICATED HORIZONTAL DISPLACEMENT IN THE N-S PLANE AS INDICATED HORIZONTAL DISPLACEMENT IN THE E-W PLANE AS INDICATED N-S LOCATION OF THE SUPPORT AT PIPE CENTERLINE APPLICABLE STRUCTURAL SUPPORT STEEL FOR PIPE SUPPORT, AS FOLLOWS: COMMENT SECTION BOTTOM OF STEEL ELEVATION FOR PIPE SUPPORT CONNECTION. SEE STRUCTURAL STEEL DRAWINGS. BOS EL.: REV: REVISION NUMBER OF LAST MODIFICATION. THE PIPE SUPPORT REVISION NUMBER CORRESPONDS TO THE PIPE SUPPORT SYSTEM REVISION NUMBER TYPE (REVISION): TYPE OF REVISION A- ADDITION D- DELETION R- REVISION ISO DWG NO.: E-W LOCATION OF THE SUPPORT AT PIPE CENTERLINE ELEVATION OF THE PIPE CENTERLINE AT THE SUPPORT LOCATION ISOMETRIC DRAWING NUMBER WITH SUPPORT GENERAL COMMENT: FOR PIPE SUPPORT DETAIL DRAWINGS AND STRUCTURAL ATTACHMENT DETAILS SEE DRAWINGS NIG-PI-4022-01 THRU -05. EX ST: INDICATES THAT SUPPORT CONNECTS DIRECTLY TO EXISTING BUILDING STEEL. NEW ST: INDICATES PIPE SUPPORT SUPPLEMENTARY STEEL WILL BE ADDITIONAL. GL - GRID LINE PAGE 1 OF 2 PRINT DATE: ISSUE DATE: 05-SEP-12 PIPE SUPPORT SCHEDULE REVISION: 4 05-SEP-12

description

Pipe Support Schedule

Transcript of 07 Exhibit C.5 Pipe Support Schedule Rev04(2)

  • Alaska Electric and Energy Cooperative, Inc.Nikiski Combined Cycle Conversion

    22770Nikiski, AK PIPE SUPPORT SCHEDULE

    EXHIBIT C.5

    SUPPORT ID:

    SERVICE:

    VERTICAL LOAD:

    OPERATING LOAD:

    HORIZONTAL LOADS:

    N-S LOAD:

    E-W LOAD:

    DEFLECTIONS:

    VERT:

    HYDRO LOAD:

    P&ID NUMBER:

    REMARKS:

    E-W COORDINATE:

    E-W:

    N-S COORDINATE:

    OCCASIONAL LOAD:

    PIPE CL EL:

    SUPPORT STEEL:

    N-S:

    ORGANIZATION

    PIPE SUPPORT SCHEDULES PROVIDE THE SUPPORT DESCRIPTIONS, OPERATING,OCCASIONAL, AND HYDRO TEST LOADS, OPERATING DISPLACEMENTS, PIPE CENTERLINE LOCATION OF THE SUPPORT, SUPPORT STEEL, ISOMETRIC DRAWING WITH THE SUPPORT, AND OTHER SPECIAL FEATURES OF THE SUPPORT.

    PIPE SUPPORT SCHEDULE DEFINITIONS

    INCLUDED IN THE PIPE SUPPORT SCHEDULE IS THE FOLLOWING INFORMATION:

    APPLICABLE SERVICE; SEE DRAWING NIG-IN-8000-01.

    APPLICABLE P&ID NUMBER

    SERVICE CODE-SUPPORT TYPE-SUPPORT NUMBER

    VERTICAL FORCE TRANSMITTED BY SUPPORT FOR INDICATED LOAD CASE

    LOAD CASE OF DEAD LOAD + THERMAL + FRICTION + PRESSURE + MOMENTUM, AS APPLICABLE

    LOAD CASE OF OPERATING + SEISMIC OR WIND (WHICHEVER CONTROLS)

    LOAD CASE OF DEADLOAD + WATER

    LARGEST HORIZONTAL FORCE TRANSMITTED BY SUPPORT FROM OPERATING LOAD, HYDRO LOAD OR OCCASSIONAL LOAD CASES

    INDICATES LOAD ACTS IN EITHER NORTH OR SOUTH DIRECTION

    INDICATES LOAD ACTS IN EITHER EAST OR WEST DIRECTION

    DISPLACEMENT OF THE PIPE AT THE SUPPORT LOCATION UNDER NORMAL OPERATING CONDITIONS

    VERTICAL DISPLACEMENT AS INDICATED

    HORIZONTAL DISPLACEMENT IN THE N-S PLANE AS INDICATED

    HORIZONTAL DISPLACEMENT IN THE E-W PLANE AS INDICATED

    N-S LOCATION OF THE SUPPORT AT PIPE CENTERLINE

    APPLICABLE STRUCTURAL SUPPORT STEEL FOR PIPE SUPPORT, AS FOLLOWS:

    COMMENT SECTION

    BOTTOM OF STEEL ELEVATION FOR PIPE SUPPORT CONNECTION. SEE STRUCTURAL STEEL DRAWINGS.

    BOS EL.:

    REV: REVISION NUMBER OF LAST MODIFICATION. THE PIPE SUPPORT REVISION NUMBER CORRESPONDS TO THE PIPE SUPPORT SYSTEM REVISION NUMBER

    TYPE (REVISION): TYPE OF REVISIONA- ADDITIOND- DELETIONR- REVISION

    ISO DWG NO.:

    E-W LOCATION OF THE SUPPORT AT PIPE CENTERLINE

    ELEVATION OF THE PIPE CENTERLINE AT THE SUPPORT LOCATION

    ISOMETRIC DRAWING NUMBER WITH SUPPORT

    GENERAL COMMENT: FOR PIPE SUPPORT DETAIL DRAWINGS AND STRUCTURAL ATTACHMENT DETAILS SEE DRAWINGS NIG-PI-4022-01 THRU -05.

    EX ST: INDICATES THAT SUPPORT CONNECTS DIRECTLY TO EXISTING BUILDING STEEL. NEW ST: INDICATES PIPE SUPPORT SUPPLEMENTARY STEEL WILL BE ADDITIONAL.

    GL - GRID LINE

    PAGE 1 OF 2

    PRINT DATE:ISSUE DATE: 05-SEP-12 PIPE SUPPORT SCHEDULEREVISION: 4

    05-SEP-12

  • Alaska Electric and Energy Cooperative, Inc.Nikiski Combined Cycle Conversion

    22770Nikiski, AK PIPE SUPPORT SCHEDULE

    EXHIBIT C.5

    PAGE 2 OF 2

    PRINT DATE:ISSUE DATE: 05-SEP-12 PIPE SUPPORT SCHEDULEREVISION: 4

    05-SEP-12

  • Alaska Electric and Energy Cooperative, Inc.Nikiski Combined Cycle Conversion

    PIPE SUPPORT SCHEDULE

    SUPPORT IDHYDRO

    N-SE-WVERT REMARKS

    PIPE CL ELSUPPORT STEEL BOS EL

    DEFLECTIONS

    ISO DWG NO.SYS -TYP - NO.

    VERTICAL LOADSOPERATINGOCCASIONAL

    HORIZONTAL LOADS

    N-S LOADE-W LOAD E-W COORDINATE

    N-S COORDINATE

    SERVICE: FGS

    REVTYPE

    Nikiski, AK

    P&ID DWG NO.

    22770

    EXHIBIT C.5

    0.00 IN. E0.00 IN. UP

    0.00 IN. S 128' 7 1/16"

    700

    PIPE: 4" NPSINSUL: NONE

    0NIG-PI-FGS-004FGS-PS03-001 450600

    00 1149' 10 7/16"

    185' 11 3/8"

    LB.LB.LB.

    LB.LB.

    PS03NIG-IN-8006-04

    0.06 IN. W0.00 IN. UP

    0.06 IN. S 138' 6"

    625

    PIPE: 6" NPSINSUL: NONE

    0NIG-PI-FGS-004FGS-AN02-002 425500

    300200 1134' 4 7/16"

    185' 11 3/8"

    LB.LB.LB.

    LB.LB.

    AN02NIG-IN-8006-04

    0.04 IN. W0.00 IN. UP

    0.13 IN. S 138' 6"

    200

    PIPE: 6" NPSINSUL: NONE

    0NIG-PI-FGS-004FGS-RH01-003 200200

    00 1133' 0"

    196' 2"

    LB.LB.LB.

    LB.LB.

    RH01NIG-IN-8006-04

    0.01 IN. W0.00 IN. UP

    0.19 IN. S 138' 6"

    1,025

    PIPE: 6" NPSINSUL: NONE

    0NIG-PI-FGS-004FGS-RH01-004 750850

    00 1133' 0"

    208' 3"

    LB.LB.LB.

    LB.LB.

    RH01NIG-IN-8006-04

    0.06 IN. E0.00 IN. UP

    0.19 IN. S 141' 9 5/16"

    775

    PIPE: 6" NPSINSUL: NONE

    0NIG-PI-FGS-004FGS-GU03-005 550650

    2000 1147' 0"

    215' 7"

    LB.LB.LB.

    LB.LB.

    GU03NIG-IN-8006-04

    0.06 IN. E0.00 IN. UP

    0.15 IN. S 141' 9 5/16"

    350

    PIPE: 6" NPSINSUL: NONENO U-BOLT

    0NIG-PI-FGS-004FGS-GU03-006 275300

    00 1159' 0"

    215' 7"

    LB.LB.LB.

    LB.LB.

    GU03NIG-IN-8006-04

    0.05 IN. E0.00 IN. UP

    0.11 IN. S 141' 9 5/16"

    425

    PIPE: 6" NPSINSUL: NONENO U-BOLT

    0NIG-PI-FGS-004FGS-GU03-007 300350

    00 1171' 0"

    215' 7"

    LB.LB.LB.

    LB.LB.

    GU03NIG-IN-8006-04

    0.06 IN. E0.00 IN. UP

    0.08 IN. S 141' 9 5/16"

    625

    PIPE: 6" NPSINSUL: NONENO U-BOLT

    0NIG-PI-FGS-004FGS-GU03-008 475525

    2250 1181' 0"

    215' 7"

    LB.LB.LB.

    LB.LB.

    GU03NIG-IN-8006-04

    PRINT DATE: 05-SEP-12ISSUE DATE: 05-SEP-12 PIPE SUPPORT SCHEDULEREVISION: PAGE 1 OF 64

  • Alaska Electric and Energy Cooperative, Inc.Nikiski Combined Cycle Conversion

    PIPE SUPPORT SCHEDULE

    SUPPORT IDHYDRO

    N-SE-WVERT REMARKS

    PIPE CL ELSUPPORT STEEL BOS EL

    DEFLECTIONS

    ISO DWG NO.SYS -TYP - NO.

    VERTICAL LOADSOPERATINGOCCASIONAL

    HORIZONTAL LOADS

    N-S LOADE-W LOAD E-W COORDINATE

    N-S COORDINATE

    SERVICE: FGS

    REVTYPE

    Nikiski, AK

    P&ID DWG NO.

    22770

    EXHIBIT C.5

    0.08 IN. E0.00 IN. UP

    0.04 IN. S 140' 5 11/16"

    775

    PIPE: 6" NPSINSUL: NONE

    0NIG-PI-FGS-004FGS-GU03-009 575625

    0625 1197' 0"

    212' 8"

    LB.LB.LB.

    LB.LB.

    GU03NIG-IN-8006-04

    0.02 IN. E0.00 IN. UP

    0.06 IN. S 140' 5 11/16"

    875

    PIPE: 6" NPSINSUL: NONENO U-BOLT

    0NIG-PI-FGS-004FGS-GU03-010 475700

    050 1197' 0"

    192' 8"

    LB.LB.LB.

    LB.LB.

    GU03NIG-IN-8006-04

    0.00 IN. W0.00 IN. UP

    0.00 IN. S 127' 11 5/8"

    375

    PIPE: 4" NPSINSUL: 1"

    0NIG-PI-FGS-005FGS-PS03-011 375475

    00 1140' 1 1/4"

    180' 2 7/8"

    LB.LB.LB.

    LB.LB.

    PS03NIG-IN-8006-04

    0.04 IN. W0.00 IN. UP

    0.06 IN. S 138' 6"

    650

    PIPE: 6" NPSINSUL: 1"

    0NIG-PI-FGS-005FGS-AN02-012 525625

    350150 1134' 4 7/16"

    180' 2 7/8"

    LB.LB.LB.

    LB.LB.

    AN02NIG-IN-8006-04

    0.01 IN. W0.00 IN. UP

    0.15 IN. S 138' 6"

    425

    PIPE: 6" NPSINSUL: 1"

    0NIG-PI-FGS-005FGS-RH02-013 350400

    00 1132' 0"

    196' 2"

    LB.LB.LB.

    LB.LB.

    RH02NIG-IN-8006-04

    0.03 IN. E0.00 IN. UP

    0.19 IN. S 138' 6"

    1,000

    PIPE: 6" NPSINSUL: 1"

    0NIG-PI-FGS-005FGS-RH02-014 825925

    00 1132' 0"

    208' 3"

    LB.LB.LB.

    LB.LB.

    RH02NIG-IN-8006-04

    0.06 IN. E0.00 IN. UP

    0.16 IN. S 141' 10 13/16"

    750

    PIPE: 6" NPSINSUL: 1"

    0NIG-PI-FGS-005FGS-GU03-015 600725

    2000 1147' 0"

    214' 8"

    LB.LB.LB.

    LB.LB.

    GU03NIG-IN-8006-04

    0.04 IN. E0.00 IN. UP

    0.13 IN. S 141' 10 13/16"

    375

    PIPE: 6" NPSINSUL: 1"NO U-BOLT

    0NIG-PI-FGS-005FGS-GU03-016 325350

    00 1159' 0"

    214' 8"

    LB.LB.LB.

    LB.LB.

    GU03NIG-IN-8006-04

    PRINT DATE: 05-SEP-12ISSUE DATE: 05-SEP-12 PIPE SUPPORT SCHEDULEREVISION: PAGE 2 OF 64

  • Alaska Electric and Energy Cooperative, Inc.Nikiski Combined Cycle Conversion

    PIPE SUPPORT SCHEDULE

    SUPPORT IDHYDRO

    N-SE-WVERT REMARKS

    PIPE CL ELSUPPORT STEEL BOS EL

    DEFLECTIONS

    ISO DWG NO.SYS -TYP - NO.

    VERTICAL LOADSOPERATINGOCCASIONAL

    HORIZONTAL LOADS

    N-S LOADE-W LOAD E-W COORDINATE

    N-S COORDINATE

    SERVICE: FGS

    REVTYPE

    Nikiski, AK

    P&ID DWG NO.

    22770

    EXHIBIT C.5

    0.05 IN. E0.00 IN. UP

    0.09 IN. S 141' 10 13/16"

    425

    PIPE: 6" NPSINSUL: 1"NO U-BOLT

    0NIG-PI-FGS-005FGS-GU03-017 350400

    00 1171' 0"

    214' 8"

    LB.LB.LB.

    LB.LB.

    GU03NIG-IN-8006-04

    0.06 IN. E0.00 IN. UP

    0.06 IN. S 141' 10 13/16"

    625

    PIPE: 6" NPSINSUL: 1"

    0NIG-PI-FGS-005FGS-GU03-018 500600

    2750 1181' 0"

    214' 8"

    LB.LB.LB.

    LB.LB.

    GU03NIG-IN-8006-04

    0.10 IN. E0.00 IN. UP

    0.01 IN. S 140' 7 3/16"

    675

    PIPE: 6" NPSINSUL: 1"

    0NIG-PI-FGS-005FGS-GU03-019 575625

    0750 1196' 0"

    212' 8"

    LB.LB.LB.

    LB.LB.

    GU03NIG-IN-8006-04

    0.03 IN. E0.00 IN. UP

    0.06 IN. S 140' 7 3/16"

    900

    PIPE: 6" NPSINSUL: 1"

    0NIG-PI-FGS-005FGS-GU03-020 700825

    0250 1196' 0"

    192' 8"

    LB.LB.LB.

    LB.LB.

    GU03NIG-IN-8006-04

    0.00 IN. W0.00 IN. UP

    0.00 IN. S 135' 6 3/8"

    75

    PIPE: 4" NPSINSUL: 1"

    0NIG-PI-FGS-010FGS-PS03-021 25200

    00 1139' 10 7/8"

    156' 11 1/16"

    LB.LB.LB.

    LB.LB.

    PS03NIG-IN-8006-03

    0.03 IN. E0.00 IN. UP

    0.01 IN. S 138' 6"

    625

    PIPE: 6" NPSINSUL: 1"

    0NIG-PI-FGS-010FGS-PS02-022 525600

    00 1139' 10 7/8"

    167' 1"

    LB.LB.LB.

    LB.LB.

    PS02NIG-IN-8006-03

    0.03 IN. E0.00 IN. UP

    0.06 IN. S 138' 6"

    825

    PIPE: 6" NPSINSUL: 1"

    0NIG-PI-FGS-010FGS-AN02-023 700775

    330275 1134' 4 7/16"

    179' 2 7/8"

    LB.LB.LB.

    LB.LB.

    AN02NIG-IN-8006-03

    0.06 IN. E0.00 IN. UP

    0.16 IN. S 138' 6"

    475

    PIPE: 6" NPSINSUL: 1"

    0NIG-PI-FGS-010FGS-RH02-024 400450

    00 1131' 0"

    196' 2"

    LB.LB.LB.

    LB.LB.

    RH02NIG-IN-8006-03

    PRINT DATE: 05-SEP-12ISSUE DATE: 05-SEP-12 PIPE SUPPORT SCHEDULEREVISION: PAGE 3 OF 64

  • Alaska Electric and Energy Cooperative, Inc.Nikiski Combined Cycle Conversion

    PIPE SUPPORT SCHEDULE

    SUPPORT IDHYDRO

    N-SE-WVERT REMARKS

    PIPE CL ELSUPPORT STEEL BOS EL

    DEFLECTIONS

    ISO DWG NO.SYS -TYP - NO.

    VERTICAL LOADSOPERATINGOCCASIONAL

    HORIZONTAL LOADS

    N-S LOADE-W LOAD E-W COORDINATE

    N-S COORDINATE

    SERVICE: FGS

    REVTYPE

    Nikiski, AK

    P&ID DWG NO.

    22770

    EXHIBIT C.5

    0.10 IN. E0.00 IN. UP

    0.18 IN. S 138' 6"

    950

    PIPE: 6" NPSINSUL: 1"

    0NIG-PI-FGS-010FGS-RH02-025 775900

    00 1131' 0 "

    208' 3"

    LB.LB.LB.

    LB.LB.

    RH02NIG-IN-8006-03

    0.06 IN. E0.00 IN. UP

    0.12 IN. S 141' 10 13/16"

    750

    PIPE: 6" NPSINSUL: 1"

    0NIG-PI-FGS-010FGS-GU03-026 600700

    3250 1147' 0"

    213' 8"

    LB.LB.LB.

    LB.LB.

    GU03NIG-IN-8006-03

    0.03 IN. E0.00 IN. UP

    0.09 IN. S 141' 10 13/16"

    375

    PIPE: 6" NPSINSUL: 1"NO U-BOLT

    0NIG-PI-FGS-010FGS-GU03-027 325375

    00 1159' 0"

    213' 8"

    LB.LB.LB.

    LB.LB.

    GU03NIG-IN-8006-03

    0.04 IN. E0.00 IN. UP

    0.05 IN. S 141' 10 13/16"

    450

    PIPE: 6" NPSINSUL: 1"NO U-BOLT

    0NIG-PI-FGS-010FGS-GU03-028 375425

    00 1171' 0"

    213' 8"

    LB.LB.LB.

    LB.LB.

    GU03NIG-IN-8006-03

    0.06 IN. E0.00 IN. UP

    0.02 IN. S 141' 10 13/16"

    450

    PIPE: 6" NPSINSUL: 1"

    0NIG-PI-FGS-010FGS-GU03-029 375425

    3000 1181' 0"

    213' 8"

    LB.LB.LB.

    LB.LB.

    GU03NIG-IN-8006-03

    0.08 IN. E0.00 IN. UP

    0.02 IN. N 140' 7 3/16"

    625

    PIPE: 6" NPSINSUL: 1"

    0NIG-PI-FGS-010FGS-GU03-030 525600

    0675 1195' 0"

    212' 8"

    LB.LB.LB.

    LB.LB.

    GU03NIG-IN-8006-03

    0.01 IN. E0.00 IN. UP

    0.06 IN. S 140' 7 3/16"

    1,000

    PIPE: 6" NPSINSUL: 1"

    0NIG-PI-FGS-010FGS-GU03-031 825950

    0225 1195' 0"

    192' 8"

    LB.LB.LB.

    LB.LB.

    GU03NIG-IN-8006-03

    0.04 IN. W0.00 IN. UP

    0.20 IN. S 137' 6 13/16"

    525

    PIPE: 6" NPSINSUL: 1"

    0NIG-PI-FGS-010FGS-RH02-032 425475

    00 1195' 0"

    172' 8"

    LB.LB.LB.

    LB.LB.

    GU03NIG-IN-8006-03

    PRINT DATE: 05-SEP-12ISSUE DATE: 05-SEP-12 PIPE SUPPORT SCHEDULEREVISION: PAGE 4 OF 64

  • Alaska Electric and Energy Cooperative, Inc.Nikiski Combined Cycle Conversion

    PIPE SUPPORT SCHEDULE

    SUPPORT IDHYDRO

    N-SE-WVERT REMARKS

    PIPE CL ELSUPPORT STEEL BOS EL

    DEFLECTIONS

    ISO DWG NO.SYS -TYP - NO.

    VERTICAL LOADSOPERATINGOCCASIONAL

    HORIZONTAL LOADS

    N-S LOADE-W LOAD E-W COORDINATE

    N-S COORDINATE

    SERVICE: FGS

    REVTYPE

    Nikiski, AK

    P&ID DWG NO.

    22770

    EXHIBIT C.5

    0.06 IN. W0.00 IN. UP

    0.18 IN. S 137' 6 13/16"

    400

    PIPE: 6" NPSINSUL: 1"

    0NIG-PI-FGS-010FGS-GU03-033 325375

    5000 1202' 11 7/8"

    171' 11"

    LB.LB.LB.

    LB.LB.

    GU03NIG-IN-8006-03

    0.07 IN. W0.00 IN. UP

    0.14 IN. S 137' 6 13/16"

    575

    PIPE: 6" NPSINSUL: 1"NO U-BOLT

    0NIG-PI-FGS-010FGS-GU03-034 475500

    00 1214' 11 7/8"

    171' 11"

    LB.LB.LB.

    LB.LB.

    GU03NIG-IN-8006-03

    0.07 IN. W0.00 IN. UP

    0.09 IN. S 137' 6 13/16"

    600

    PIPE: 6" NPSINSUL: 1"NO U-BOLT

    0NIG-PI-FGS-010FGS-GU03-035 500575

    00 1229' 11 7/8"

    171' 11"

    LB.LB.LB.

    LB.LB.

    GU03NIG-IN-8006-03

    0.06 IN. W0.00 IN. UP

    0.05 IN. S 137' 6 13/16"

    550

    PIPE: 6" NPSINSUL: 1"

    0NIG-PI-FGS-010FGS-AN02-036 425525

    350600 1243' 11 7/8"

    171' 11"

    LB.LB.LB.

    LB.LB.

    GU03NIG-IN-8006-03

    0.03 IN. W0.00 IN. UP

    0.05 IN. S 134' 6 13/16"

    425

    PIPE: 6" NPSINSUL: 1"

    0NIG-PI-FGS-010FGS-RH02-037 325475

    00 1246' 6"

    174' 4"

    LB.LB.LB.

    LB.LB.

    RH02NIG-IN-8006-03

    0.01 IN. W0.00 IN. UP

    0.05 IN. S 131' 0 7/8"

    325

    PIPE: 6" NPSINSUL: 1"

    0NIG-PI-FGS-010FGS-PS01-038 300425

    00 1248' 0"

    178' 10 15/16"

    LB.LB.LB.

    LB.LB.

    PS01NIG-IN-8006-03

    0.05 IN. W0.00 IN. UP

    0.01 IN. S 131' 0 7/8"

    475

    PIPE: 6" NPSINSUL: 1"

    0NIG-PI-FGS-010FGS-PS03-039 450475

    00 1260' 0"

    178' 10 15/16"

    LB.LB.LB.

    LB.LB.

    PS01NIG-IN-8006-03

    0.03 IN. W0.00 IN. UP

    0.00 IN. N 135' 0 7/8"

    475

    PIPE: 6" NPSINSUL: 1"

    0NIG-PI-FGS-010FGS-PS01-040 350475

    00 1262' 7 11/16"

    185' 4 15/16"

    LB.LB.LB.

    LB.LB.

    PS01NIG-IN-8006-03

    PRINT DATE: 05-SEP-12ISSUE DATE: 05-SEP-12 PIPE SUPPORT SCHEDULEREVISION: PAGE 5 OF 64

  • Alaska Electric and Energy Cooperative, Inc.Nikiski Combined Cycle Conversion

    PIPE SUPPORT SCHEDULE

    SUPPORT IDHYDRO

    N-SE-WVERT REMARKS

    PIPE CL ELSUPPORT STEEL BOS EL

    DEFLECTIONS

    ISO DWG NO.SYS -TYP - NO.

    VERTICAL LOADSOPERATINGOCCASIONAL

    HORIZONTAL LOADS

    N-S LOADE-W LOAD E-W COORDINATE

    N-S COORDINATE

    SERVICE: FGS

    REVTYPE

    Nikiski, AK

    P&ID DWG NO.

    22770

    EXHIBIT C.5

    0.00 IN. W0.00 IN. UP

    0.00 IN. N 135' 0 7/8"

    500

    PIPE: 6" NPSINSUL: 1"

    0NIG-PI-FGS-010FGS-PS01-041 425450

    00 1262' 7 11/16"

    194' 10 15/16"

    LB.LB.LB.

    LB.LB.

    PS01NIG-IN-8006-03

    PRINT DATE: 05-SEP-12ISSUE DATE: 05-SEP-12 PIPE SUPPORT SCHEDULEREVISION: PAGE 6 OF 64