Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
1
Creative Engineers & Consultants
FEASIBILITY REPORT
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
2
Creative Engineers & Consultants
CONTENTS
CHAPTER NO. PARTICULARS PAGE NO.
FEASIBILITY REPORT
I EXECUTIVE SUMMARY 4
II INTRODUCTION OF THE PROJECT / BACKGROUND INFORMATION
11
III PROJECT DESCRIPTION 18
IV SITE ANALYSIS 36
V PLANNING BRIEF 40
VI PROPOSED INFRASTRUCTURE 42
VII REHABILITATION & RESETTLEMENT (R&R) PLAN 42
VIII PROJECT SCHEDULE & COST ESTIMATES 43
IX ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS) 44
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
3
Creative Engineers & Consultants
LIST OF FIGURES
FIGURE NO.
PARTICULARS PAGE NO.
1. LOCATION MAP 14
2. LEASE PLAN 15
3. GEOLOGICAL PLAN 22
4. GEOLOGICAL CROSS SECTION 23
5. SURFACE PLAN 28
6. MINE POSITION AT THE END OF PLAN PEROID 29
7. CONCEPTUAL PLAN 30
8. CONCEPTUAL CROSS SECTION 31
9. STUDY AREA WITHIN 10 KM RADIUS (INDEX PLAN) 39
LIST OF TABLES
TABLE NO.
PARTICULARS PAGE NO.
1. CATEGORY OF RESERVE/RESOURCE 24
2. QUANTITY OF WASTE TO BE DISPOSED OFF DURING PLAN PERIOD
25
3. ULTIMATE EXTENT AND SIZE OF THE PIT 26
4. YEAR-WISE EXCAVATION PROGRAM UP TO CONCEPTUAL PERIOD
32
5. AFFORESTATION PROGRAM 40
LIST OF ANNEXURES
ANNEXURE NO.
PARTICULARS PAGE NO.
1
COPY OF PROCEEDINGS OF THE COMMISSIONER OF GEOLOGY AND MINING, GUINDY, CHENNAI. Rc.No.13035/MM1/1999, DATED.10.01.2017.
45
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
4
Creative Engineers & Consultants
CHAPTER - I
EXECUTIVE SUMMARY
1.0 INTRODUCTION OF THE PROJECT / BACKGROUND INFORMATION
The India Cements Ltd (ICL) was established in 1946 and the first plant was setup
at Sankarnagar in Tamilnadu in 1948. Since then it has grown in stature to many plants
spread over Tamilnadu, Andhra Pradesh,Telangana, Maharashtra & Rajasthan.
ICL is one of the market leader in cement technology, cement manufacture and
marketing and because of its high quality standards of final product, it has attained a reputed
brand acceptability in southern India as well as all over the country.
The company has existing cement plants / grinding units at the following locations in
Tamil Nadu:
i. At Dalavoi, Ariyalur District – 2.16 MTPA
ii. At Sankarnagar, Tirunelveli District - 2.05 MTPA
iii. At Sankari, Salem District – 0.86 MTPA
iv. Grinding unit at Ponneri, Tiruvallur District, Chennai - 1.1 MTPA
The company has proposed to expand its existing cement plant in Ariyalur district
from 2.16 MTPA to 4.71 MTPA of cement capacity and has already obtained Environmental
Clearance from MoEF&CC vide F.No.J-11011/79/2012/IA-II(I) dated: 27.09.2013 for
Expansion. Besides operating the existing limestone mining leases, to meet the limestone
requirement of their existing cement plants and to meet additional Limestone requirements
of the proposed expansion, company has purchased limestone bearing lands and obtained a
fresh mining lease in Periyathirukonam area.
1.1 IDENTIFICATION OF PROJECT AND PROJECT PROPONENT:
The India Cements Limited, were granted a Mining Lease namely Periyathirukonam
Limestone Deposit over an Extent of 74.81.0 Ha of Patta-dry lands in Periyathirukonam,
Reddipalayam and Edaiyattankudi Villages of Ariyalur Taluk and District, Tamil Nadu, by the
Commissioner of Geology and Mining, Chennai, vide letter Rc.No. 13035/MM1/1999
dated10.01.2017 (Refer Annexure No - 1).
MOEF&CC notification stipulates that, any new project requires environmental
clearance. Under the above circumstances ICL has initiated action towards obtaining
environmental clearance for this project.
Prior to obtaining environmental clearance, as per MOEF&CC notification of
September 2006, Form I and Feasibility report have to be submitted along with proposed
Terms of reference (TOR) for the project for stipulating the TOR for the project by
MOEF&CC, Govt. of India.
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
5
Creative Engineers & Consultants
This project falls under category A as per MoEF&CC notification in this respect,
because of mining lease being more than 50 Ha. Hence, Form – 1, proposed TOR and
feasibility report have to be submitted to MoEF&CC, New Delhi for their approval and
prescribing TOR and according EC after submission of EIA/EMP report to them.
Mining plan for this proposed lease over an extent of 74.81.0 Ha is already prepared
and is submitted for approval.
This feasibility report for Periyathirukonam Limestone Deposit of M/s. The India
Cements Limited is prepared in line with the guidelines issued by MoEF&CC, vide their
letter dated 30th September 2010 for the lease area of 74.81.0 Ha towards a peak
production capacity of 2.34 MTPA of ROM for obtaining TOR from MoEF&CC towards
getting environmental clearance.
This feasibility report is prepared based on the Draft mining plan submitted for
approval to IBM.
1.2 LOCATION DETAILS OF PROJECT:
Periyathirukonam mining lease area is located in the part of revenue villages of
Periyathirukonam, Reddipalayam and Edaiyattankudi, Ariyalur Taluk and District, Tamil
Nadu State. Periyathirukonam limestone deposit is located about 19 Km South East of
Ariyalur, the District Head Quarters. The nearest rail head is at Ariyalur on Madurai-Chennai
section of the Southern Railways. The nearest Airport is at Trichy, about 75 kms SSW of the
deposit area. Cuddalore is a nearest port located on the coast of Bay of Bengal, about
130 Kms NNE of the deposit.
This area is accessible from V.Kaikatti, which is located at a distance of 11 Km. from
Ariyalur on Ariyalur – Jayankondam State Highway. The area is accessible through the metal
/tar road branching off from V.Kaikatti situated about 8 km from the site.
The applied mining lease area falls in Survey of India Toposheet No. 58 M/4 located
between Latitude - 11° 03'39.45"N - 11° 04'18.54"N and Longitude - 79° 09'01.03"E - 79°
09'56.38"E.
2.0 PROJECT DESCRIPTION:
2.1 BRIEF PROJECT PROFILE:
1 Name of the project : Periyathirukonam Limestone Deposit of
M/s. The India Cements Limited
2 Project proponent : M/s. The India Cements Limited
3 Extent : 74.81.0 Ha
4 Type of Land : Patta-dry land owned by the company
5 Location : Periyathirukonam, Reddipalayam and Edaiyattankudi
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
6
Creative Engineers & Consultants
villages, Ariyalur taluk and district, Tamil Nadu.
6 Topography : Sloping from West to East in western side and East
to West in Eastern side with elevation ranging from
35 to 40m AMSL.
7 Production capacity : Peak production capacity of 2.34 MTPA of ROM of
limestone
8 Total mineable Reserves : 13.36 million tons
9 Total Waste : Top soil – 2.59 million tons
OB/ IB – 4.97 million tons
Mineral Reject – 1.48 million tons
Total – 9.04 million tons
10 Limestone to OB /
waste Ratio (T:T basis)
: 1:0.67
11 Method of Mining : Mechanized open cast mining method
12 Bench parameters : Height – 5 m
Width – 5 m
Bench slope - 70°
13 Ultimate mine depth : 44 m
14 Ore end use : Entire shell limestone production from this lease will
be used captively in the ICL’s cement plants located
in the state of Tamil Nadu.
15 Waste management : Top soil will be removed separately and utilized for
tree plantation. Initially top soil will be spread out over
the protective/Peripheral bund. Subsequently top soil
generation will be concurrently used to spread over
on the top of back filling area.
During initial period overburden, waste and reject will
be used for formation of protective and peripheral
bunds. Subsequently, the waste will be dumped in
the already excavated area as a part of backfilling
concurrently on the south western side. The height of
refilling area will be maintained to original ground
profile.
16 Life of mine : 10-12 Years. However the life of mine may change
based on achieving the targeted production.
17 Nearest villages : Vellippirangiyam- 0.5KM- NW Periyatirukkonam - <0.5KM – E Munayankurichi - <0.5KM – NE Edaiyattankudi – 0.6KM – SW ChettiTriukkonam – 1.8KM - E
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
7
Creative Engineers & Consultants
18 Notified Archaeologically
important places, Monuments
: Nil within 10km radius
19 Local Places of Historical
and Tourism Interest
: Nil within 10km radius
20 Environmental sensitive
areas, Protected areas as per
Wildlife Protection Act, 1972
(Tiger reserve, Elephant
reserve, Biospheres, National
parks, Wildlife sanctuaries,
community reserves and
conservation reserves)
: Nil within 10km radius. Karaivetti Bird Sancuary is
located at 13.5 km (aerial) SW of the mine lease
area.
21 Defence Installations Nil within 10km radius
22 Seismic Zone Area falls in Zone – II (Least Active)
23 Other industries in the area : Various working mines of Ultratech Cements, Dalmia
Cements, India Cements Limited, Ramco Cements
and Chettinad Cement Corporation, TANCEM,
TAMIN, J.P.R mines, Sriram Chemical Mines and
Ganeshan Moopanar mines.
Cement Plant of Ultratech Cements Limited and
Chettinad Cement Corporation Limited.
24 Manpower : Direct - 18 persons
Indirect - more than 100 persons
25 Water
Requirement & source : For domestic activities – 1.5 KLD, For dust
suppression/green belt – 38.5 KLD, For Workshop –
5.0 KLD. Total – 45.0 KLD.
For drinking & industrial purpose, bore well water
will be initially used. Later, on creation of mine floor
sump, harvested rain water, seepage if any in the
sump can be used for industrial purpose.
26 Site services : Infrastructure facilities like work shop, office, first aid
room, rest room and canteen cum rest shed and site
service will be provided at mining site.
27 Mineral Transport : Limestone mined from this ML area will be
transported directly to different ICL’s cement plants in
Tamil Nadu by road.
28 CSR activities : For CSR activities Rs. 10 lakhs per annum is
allocated for this lease.
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
8
Creative Engineers & Consultants
2.2 LAND USE PATTERN:
The present land use pattern, at the end of plan period and the post mining land use
pattern is shown below.
S.No Activities Present land use pattern (Ha)
At the end of fifth year (Ha.)
At the end of mine life.(Ha)
1 Area under mining --- 38.04.0 54.52.0 2 Storage of top soil --- --- --- 3 Waste dump site --- --- --- 4 Mineral storage --- --- --- 5 Infrastructure, Workshop,
administrative buildings etc. --- 0.10.0 0.10.0
6 Roads --- 1.99.5 1.99.5 7 Railways --- --- --- 8 Tailing Pond --- --- --- 9 Effluent Treatment Plant --- --- ---
10 Mineral separation Plant --- --- --- 11 Township area --- --- --- 12 Others (Protective bund) --- 3.47.0 3.47.0
Total 43.60.5 60.08.5
Undisturbed area 31.20.5 14.72.5
Grand Total 74.81.0 74.81.0
3.0 PROJECT LAYOUT IN RELATION TO IMPORTANT NATURAL FEATURES:
The mining lease area and the 10 km buffer zone is devoid of declared ecologically
sensitive features like national parks, biospheres, sanctuaries, etc. No forest land is involved
in the lease area. The area also does not come under CRZ category.
In the 10 km buffer zone, the following features are observed:
S.No Particulars Details
1. Nearest villages Vellippirangiyam- 0.5 KM- NW Periyatirukkonam - <0.5KM – E Munayankurichi - <0.5KM – NE Edaiyattankudi – 0.6KM – SW ChettiTriukkonam – 1.8KM - E
2. Nearest Major water bodies Uppu Odai – in between the lease area
Marudaiyar River – more than 130m – S
Kallar River – 3.7km- SW
Vilangudi Odai – 7.4km – NE
Ottan Odai – 3.4km- SW
Sukra Eri – 6.6km – SE
Chempan Odai – 9.2km- W
Pullambadi Canal – 9.2km - S Marudaiyar River passing South of the lease area
is almost dry throughout the year except during
the North–East monsoon. Uppu odai passing in
between the lease area is dry throughout the year
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
9
Creative Engineers & Consultants
except during the rainy season. Water flows from
north to south and join in Marudaiyar River
ultimately.
3. Notified Archaeologically important
places, Monuments Nil within 10km radius
4. Local Places of Historical and Tourism
Interest Nil within 10km radius
5. Environmental sensitive areas,
Protected areas as per Wildlife
Protection Act, 1972 (Tiger reserve,
Elephant reserve, Biospheres, National
parks, Wildlife sanctuaries, community
reserves and conservation reserves)
Nil within 10km radius. Karaivetti Bird Sancuary is
located at 13.5 km (aerial) SW of the mine lease
area.
6. Reserved / Protected Forests Vilangudi Reserve Forest - 3.8 KM - NE
Ulliyakkudi Reserve Forest – 5.4 KM - NE
Ambapur Reserve Forest – 6.4 KM – NE
Alvay Reserve Forest- 9.0 KM - E
Suttamalli Reserve Forest – 9.4 KM - E
Sundaresvarapuram Reserve Forest – 6.5 KM -
NE
Manageri Reserve Forest – 7.7 KM – NE
Kallankadu Reserve Forest – 9.9 KM – NE
7. Defence Installations Nil within 10km radius
8. Seismic Zone Area falls in Zone – II (Least Active)
9. Other Industries in the area Various working mines of Ultratech Cements,
Dalmia Cements, India Cements Limited, Ramco
Cements and Chettinad Cement Corporation,
TANCEM, TAMIN, J.P.R mines, Sriram Chemical
Mines and Ganeshan Moopanar mines.
Cement Plant of Ultratech Cements Limited and
Chettinad Cement Corporation Limited.
4.0 GREEN BELT PROPOSALS:
Green belt/Afforestation will be carried out over an area of 18.98.0 Ha in all possible
areas like along road, in the safety zone, on the protective bund, backfilled area, etc.
5.0 REHABILITATION AND RESETTLEMENT PLAN (R&R PLAN)
The entire lease area is non-forest Patta-dry land owned by ICL. As such, the
question of (R&R) plan formulation does not arise.
6.0 PROJECT SCHEDULE AND COST ESTIMATES.
In this lease area mining operations will be carried after obtaining all the statutory
approvals. The project cost is estimated to be Rs. 450 lakhs which includes Land,
exploration, departmental mining machineries, utility, infrastructure etc. ICL is financially
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
10
Creative Engineers & Consultants
sound to meet this capital requirement. The operating cost is estimated to be Rs.100/ Tonne
of limestone excluding Royalty, DMF, NMET & Transport.
7.0 ANALYSIS OF PROPOSAL:
The entire limestone output from this lease will be captively consumed in various
cement plants of ICL in Tamil Nadu. Cement, being an infrastructural core industry, enabling
infrastructural development in the country and the Region, for which sector Government of
India has earmarked project financial outlays to the tune of US dollars one Trillion, in the 12th
five year plan, this project contributes to GDP growth of the country, in a big way.
As limestone from the project will be used for cement manufacture, the project will
own its minor role in making contribution to infrastructural betterment of the country.
To enhance the life style, income generation opportunities and educational levels of
the local community in a big way, M/s. The India Cements Ltd has decided to spend
Rs. 10 lakhs per annum from this lease area for various CSR activities. The main focus will
be in developing health, education, skill development, environment and spiritual development
of the society.
Financially, the local community will have benefits like increased income levels, better
life styles etc. Besides, the local panchayats, State and Central Governments will also benefit
due to receipt of taxes, cess, royalty, DMF and NMET etc., from the project proponent.
In the context of accrual of tangible benefits on all fronts arising from project
operations, the project is worthy of approval for improving the infrastructural, social and
financial status of the region, the State and the country, as a whole.
* * * * * * * *
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
11
Creative Engineers & Consultants
CHAPTER - II
INTRODUCTION OF THE PROJECT / BACKGROUND INFORMATION
2.0 GENERAL:
The India Cements Ltd (ICL) was established in 1946 and the first plant was setup
at Sankarnagar in Tamilnadu in 1948. Since then it has grown in stature to many plants
spread over Tamilnadu, Andhra Pradesh,Telangana, Maharashtra & Rajasthan.
The company has existing cement plants / grinding units at the following locations in
Tamil Nadu:
i. At Dalavoi, Ariyalur District – 2.16 MTPA
ii. At Sankarnagar, Tirunelveli District -2.05 MTPA
iii. At Sankari, Salem District – 0.86 MTPA
iv. Grinding unit at Ponneri, Tiruvallur District, Chennai - 1.1 MTPA
The company has proposed to expand its existing cement plant in Ariyalur district
from 2.16 MTPA to 4.71 MTPA of cement capacity and has already obtained Environmental
Clearance from MoEF&CC vide F.No.J-11011/79/2012/IA-II(I) dated: 27.09.2013 for
Expansion. Besides operating the existing limestone mining leases, to meet the limestone
requirement of their existing cement plants and to meet additional Limestone requirements
of the proposed expansion, company has purchased limestone bearing lands and obtained a
fresh mining lease in Periyathirukonam area.
2.1 IDENTIFICATION OF PROJECT AND PROJECT PROPONENT:
The India Cements Limited, were granted a Mining Lease namely Periyathirukonam
Limestone Deposit of over an Extent of 74.81.0 Ha of Patta-dry lands in Periyathirukonam,
Reddipalayam and Edaiyattankudi Villages of Ariyalur Taluk and District, Tamil Nadu, by the
Commissioner of Geology and Mining, Chennai, vide letter Rc.No. 13035/MM1/1999 dated
10.01.2017 (Refer Annexure No - 1).
MOEF&CC notification stipulates that, any new project requires environmental
clearance. Under the above circumstances ICL has initiated action towards obtaining
environmental clearance for this project.
Prior to obtaining environmental clearance, as per MOEF&CC notification of
September 2006, Form I and Feasibility report have to be submitted along with proposed
Terms of reference (TOR) for the project for stipulating the TOR for the project by
MOEF&CC, Govt. of India.
This project falls under category A as per MoEF&CC notification in this respect,
because of mining lease being more than 50 Ha. Hence, Form – 1, proposed TOR and
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
12
Creative Engineers & Consultants
feasibility report have to be submitted to MoEF&CC, New Delhi for their approval and
prescribing TOR and according EC after submission of EIA/EMP report to them.
Mining plan for this proposed lease over an extent of 74.81.0 Ha is already prepared
and is submitted for approval.
This feasibility report for Periyathirukonam Limestone Deposit of M/s. The India
Cements Limited is prepared in line with the guidelines issued by MoEF&CC, vide their
letter dated 30th September 2010 for the lease area of 74.81.0 Ha towards a peak
production capacity of 2.34 MTPA of ROM for obtaining TOR from MoEF&CC towards
getting environmental clearance.
This feasibility report is prepared based on the mining plan submitted for approval to
IBM.
ICL is one of the market leader in cement technology, cement manufacture and
marketing and because of its high quality standards of final product, it has attained a reputed
brand acceptability in southern India as well as all over the country.
The Company is the market leader with a market share of 28% in the South. It aims
to achieve 35% market share in the near future. The Company has access to huge
limestone resources and plans to expand its capacity by putting additional capacity of
2.55 MTPA in Dalavoi, Ariyalur district and also de-bottlenecking, optimization of existing
plants.
ICL is having more than 7 decades of experience in mining and cement plant
operations successfully in various part of the country.
2.2 LOCATION DETAILS OF THE PROJECT:
Periyathirukonam mining lease area is located in the part of revenue villages of
Periyathirukonam, Reddipalayam and Edaiyattankudi, Ariyalur Taluk and District, Tamil
Nadu State. Periyathirukonam limestone deposit is located about 19 Km South East of
Ariyalur, the District Head Quarters. The nearest rail head is at Ariyalur on Madurai-Chennai
section of the Southern Railways. The nearest Airport is at Trichy, about 75 kms SSW of the
deposit area. Cuddalore is a nearest port located on the coast of Bay of Bengal, about
130 Kms NNE of the deposit.
This area is accessible from V.Kaikatti, which is located at a distance of 11 Km. from
Ariyalur on Ariyalur – Jayankondam State Highway. The area is accessible through the
metal /tar road branching off from V.Kaikatti situated about 8 km from the site.
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
13
Creative Engineers & Consultants
The applied mining lease area falls in Survey of India Toposheet No. 58/M/4. The
latitude and longitude of the mine lease area are as follows:
Location Latitude Longitude
North end 11° 04'18.54"N 79° 09'53.23"E
East end 11° 04'09.77"N 79° 09'56.38"E
South end 11° 03'39.45"N 79° 09'24.81"E
west end 11° 03'55.08"N 79° 09'01.03"E
The location details are shown in Figure No - 1.
2.3 Mining lease details:
The India Cements Limited, were granted a Mining Lease namely Periyathirukonam
Limestone Deposit of over an Extent of 74.81.0 Ha in Periyathirukonam, Reddipalayam and
Edaiyattankudi Villages of Ariyalur Taluk and District, Tamil Nadu, by the Commissioner of
Geology and Mining, Chennai, vide letter Rc.No. 13035/MM1/1999 dated 10.01.2017 (Refer
Annexure No - 1).
Village wise land details are given below:
VILLAGE EXTENT (Ha)
Periyathirukkonam 61.10.0
Reddipalayam 10.55.0
Edaiyattankudi 3.16.0
Total 74.81.0
The entire lands are dry private patta lands owned by ICL.
Lease plan of the area is given as Figure No - 2.
K ALLA NKURICHI
Has tinapuram
P oyyur
K ovilankudikkadu
K adugur
K airalabad
Rangasamudram
K uric hc hinattam
S IRUV ALUR
V el lipp irangiyam
A rugal
K allakkudi
E sanai
K ARUPPUR
V alajanagaram
K attupi rang iyam
K atuvadachcheri
ChinnaP attakk adu
P eriyaP attakk adu
OTTAN ODAI
V eppam
E DAIYATTANKUDI
Mal lur
K rishnapuram
MARU DAIYAR RIVER
K il li yamangalam
A kkiyali
V alarak kurichchi
A mbappur
K ola iyanur
Chandirapalaiyam
Telur
K udis ainattam
K attank udikkadu
K avanur
Mannuli
REDDIPPALAIYAM
S elattank ottai
Orattur
Nachchiyarpettai
V env ank onaan
Managedi
NadukkottaiK ilakkottai
A dic hchanur
S undaresv arapuram
Nattaveli
K ula ikk ottai
P uttur
Munayankurichchi
K ula ikk ottai
NAGAMANGALAM
Ulliyakkudi
A mbappur
K ti Nattam
A mbalav arkattalai
Udaiy arvartiy yanur
Gunamangalam
A rakk attalai
K adambur
K ovi lch imai
Malav aray anallur
A danurOttakkovil
S undakkudi
V allkku lam
P unkunkuli
A ndipattak kadu
S UKRA ERI
S iluppanur
V alaikkuliP anangur
A LANDURAIY ARK ATTALAI
K il Kangiy anurMel K angiyanur
E lleri
K aruppi lakk ottalai
Nerin jikk oraiNayakkarpa laiyam
11°00' N
11° 05' N
11°10' N
11°00' N
11°05' N
11°10' N
79°05' E 79°10' E 79°15' E
79°05' E 79°10' E79°15' E
11°03'39.4 '' N
11°04'18.5 '' N
79°0
9'5
6.4
''E
79°0
9'0
1.0
''E
VIL AN GU DI ODAI
KAL
LAR
R
To Ud aiyarp alaiyam
To Tric hy
To
Sendurai
To Muttuv ancheri
MINING LEASE AREA
STATE HIGHWAYS
OTHER ROAD
RIVER / ODAI
VILLAGE
POND
INDEX
P UDUPA LAYAM
UP
PU
OD
AI
P ERIY ANAGALUR
Chinna Nagalur
P ull ikk ulam
V ILANGUDI
(585)
(1480)
PERIYATIRUKKONAM
CHE TTINAD CEMENTPLANT
V aranasi
A thur
A mmak ulam
ARIYALUR
To
Perm
balur
K il Paluvur
To
Ti r u
manu
r
Nelavannam
Melattank ulam
P uttur
18.0
Km
by
Ro
ad
19
. 0K
mb
yRo
ad
SCALE:- 1: 50000
APPROACH ROAD
ULTRA TE CH CEMENTPLANT
A R I Y A L U R
ARIYALUR DISTRICT
TAMIL NADU
(Ariyalur to Periyathirukonam Block)
THE INDIA CEMENTS LIMITEDDALAVOI-621 730
DRG.NO:-ICL/DAL/PTK/0 1/18
SCALE :- 1:50 ,000
DATE :- 2 8.11 .2016
ARIYALUR DISTRICT,TAMILNADU.
PLATE - 1
LOCATION PLAN
PERIYATHIRUKONNAM LIMESTONE DEPOSITEXTENT-74.81.0 Hec.
FIGURE NO- 1
14
I NDEX
MINING LEASE AREA - 74.81 .0 Hec.
ODAI
P OND
VI LLAGE BOUNDARY
BOUNDARY PI LLAR
SCALE:- 1: 2000
C ertified that all p lans and sections are p repared b ased on thelease map authenticated by the State g overnment and information
furnish ed in th is p lan is correct to th e best o f my knowledge.
P.R AMASAMY, M. Sc.,RQP/MAS/060/88/A
THE INDIA CEMENTS LIMITEDD ALA VOI-621730
PERIYATHIRUKONAM LIMESTONE DEPOSITEXTENT- 7 4. 81 .0 Hec.
DRG.NO:-ICL/DAL/PTK/03/18
SCALE:-1:2 000
DATE :- 18 .01 .2017
LEASE PLAN
A RIY ALU RD ISTRICT, TAMILN ADU
PLATE NO-3
SURVEY FI ELD NUMBERS
FIGURE NO- 2
15
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
16
Creative Engineers & Consultants
2. 4 BRIEF PROJECT PROFILE:
1 Name of the project : Periyathirukonam Limestone Deposit of
M/s. The India Cements Limited
2 Project proponent : M/s. The India Cements Limited
3 Extent : 74.81.0 Ha
4 Type of Land : Patta-dry land owned by the company
5 Location : Periyathirukonam, Reddipalayam and Edaiyattankudi
villages, Ariyalur taluk and district, Tamil Nadu.
6 Topography : Sloping from West to East in western side and East
to West in Eastern side with elevation ranging from
35 to 40m AMSL.
7 Production capacity : Peak production capacity of 2.34 MTPA of ROM of
limestone
8 Total mineable Reserves : 13.36 million tons
9 Total Waste : Top soil – 2.59 million tons
OB/IB – 4.97 million tons
Mineral Reject – 1.48 million tons
Total – 9.04million tons
10 Limestone to OB /
waste Ratio (T:T basis)
: 1:0.67
11 Method of Mining : Mechanized open cast mining method.
12 Bench parameters : Height – 5 m
Width – 5 m
Bench slope - 70°
13 Ultimate mine depth : 44 m
14 Ore end use : Entire limestone production from this Mining Lease
will be used captively in the various ICL’s cement
plants located in the State of Tamil Nadu.
15 Waste management : Top soil will be removed separately and utilized for
tree plantation. Initially top soil will be spread out over
the protective/Peripheral bund. Subsequently top soil
generated will be concurrently used to spread over
on the top of back filling area.
During initial period overburden, waste and reject will
be used for formation of protective and peripheral
bunds. Subsequently, the waste will be dumped in
the already excavated area as a part of backfilling
concurrently on the south western side. The height of
refilling area will be maintained to original ground
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
17
Creative Engineers & Consultants
profile.
16 Life of mine : 10-12 Years. However the life of mine may change
based on achieving the targeted production.
17 CSR activities : For CSR activities Rs. 10 lakhs per annum is
allocated.
2.5 Need for the project and its importance to the country and / or to the Region:
The company requires necessary raw material to run their existing cement plants
being operated in Tamil Nadu and also for the expansion of Dalavoi plant for which there
must be an assured supply of limestone of acceptable quality. At present the requirement of
limestone is being met by various departmental mines as well as from other outside sources
and imported Limestone.
The limestone produced from this Mining Lease will be used for manufacture of
cement in company’s factories in Tamil Nadu initially and can also cater to the need of the
Dalavoi Cement plant expansion under consideration.
The existing mining & cement plant operations by ICL in Ariyalur area have brought
improvement in social, infrastructural and employment sectors in the area. Besides above
benefits, financial accruals will be derived by Central, State governments and Local
Panchayats on account of royalty, cess, duties, DMF and NMET, etc., from project output.
Cement being a core infrastructural sector component, limestone supplies for cement
manufacture also assumes great importance.
In view of above aspects, it can be seen that the project is a prime need for growth of
backward area of the region and for GDP growth in state/central areas. The project will also
improve the Human Development Index (HDI) of the area.
* * * * * * * *
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
18
Creative Engineers & Consultants
CHAPTER - III
PROJECT DESCRIPTION
3.1 TYPE OF PROJECT:
This project pertains to mining of limestone to the Peak production capacity of
2.34 MTPA of ROM of limestone by Mechanized open cast mining method.
3.2 LOCATION:
Periyathirukonam mining lease area is located in the part of revenue villages of
Periyathirukonam, Reddipalayam and Edaiyattankudi, Ariyalur Taluk and District, Tamil
Nadu State. The nearest rail head is at Ariyalur on Madurai-Chennai section of the Southern
Railways. The applied mining lease area falls in Survey of India Toposheet No. 58/M/4.
Since the mineral deposits are site specific, alternate site considerations do not warrant
analysis.
3.3 PROJECT DESCRIPTION:
3.3.1 GEOLOGY:
3.3.1.1 REGIONAL GEOLOGY:
The sedimentary limestone deposits of Trichy, Ariyalur and Permabalur Districts
belonging to Cretaceous age of Indian Stratigraphy covers an area of over 400 Sq.Kms
between Coleroon in the South and Vellar in the North. The entire sedimentary sequence
rests unconformably over a basement of granitic gneiss and charnokites.
The rock formations of Trichy and Ariyalur of marine sedimentary origin and consist
of limestone, shell limestone, arenaceous limestone, sandstone Clay & marl.
The cretaceous sedimentary formations of Trichy are broadly divided into four
stages, VizUttathur, Trichy, Ariyalur&Niniyur stages. The oldest group – Uttathur – is in the
west and is successively overlain by the younger ones, which occurs to the East.
The regional stratigraphy is as follows:
Age Group Formation Litho Stratigraphy
Miopliocene Cuddalore Ferruginous sandstone laterite and clay
~~~~~~~~~~Unconformity ~~~~~~~~~~~
Palaeocene Ariyalur Niniyur Kallamedu Kallankurichi
Predominantly limestone with Sandstone and marl parting White sandstone and Fossilliferous Limestone. Calcareous shale marl and sandstone
Upper Cretaceous
~~~~~~~~ Unconformity ~~~~~~~
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
19
Creative Engineers & Consultants
Sillakudi Upper member-sandstone dominant Lower member-limestone / calc. Sandstone domiant
~~~~~~~~~~Unconformity~~~~~~~~~~
Upper Cretaceous
Tiruchirappalli Anaipadi Upper-sandstone Lower-shale
Kulakkanatham Shale,Clay
~~~~~~~~~~~Unconformity ~~~~~~~~~~~~
Upper Cretaceous
Uttattur KaraiMaruvattur Coral limestone, shally limestone sandstone & marl
~~~~~~~~~~~ Unconformity ~~~~~~~~~~~
Upper Jurassic to Lower Cretaceous
Upper Gondwana Thappai Brownish, micaceous&silty ferruginous sandstone
~~~~~~~~~~ Unconformity ~~~~~~~~~~~~
Archean Crystalline Charnockite& Gneisses
In Tiruchirapalli the limestone formations occur in three distinct band namely:
1. Uttathur Band Western Band
2. Kallankurichi Band Middle Band
3. Niniyur Band Eastern Band
Uttatur Formation:
The limestone of Uttatur Formation occurs in the western extremity of the Tertiary
basin in the Olaipadi – Asur – Maruvattur – Karai area and extends over a strike length of
about 16km. Archean Rocks, mainly charnockite, forms the basement of this limestone
band.
Kallankurichi Formation:
The Kallankurichi Formation of Ariyalur stage forms the middle limestone band
extending from the Marudaiyar River in the south to the Vellar River in the north over a strike
length of about 30 km.
Niniyur Formation:
The youngest limestone band belonging to the Niniyur Formation and also known as
the Eastern band extends from south of Anandavadi to Alathiyur in the North, for a length of
17.7 km. The contact of Niniyur Formation with the underlying Ariyalur stage is mostly
concealed by Recent Alluvium, but is exposed east of Niniyur and southeast of Anandavadi.
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
20
Creative Engineers & Consultants
3.3.1.2 LOCAL GEOLOGY:
The general trend of the limestone deposit in this study area is North – South
direction, with dipping towards East with 2 to 3 degrees. The limestone deposits occurring in
the area are grouped under Kallankurichi formation of Ariyalur stage of upper cretaceous
sedimentary formations. The area is covered with black cotton soil and followed by sandy
clay. The limestone is not exposed on the surface but it is seen in the adjacent mine works
and well sections. The Shell limestone is buff, yellowish brown in colour with prominent and
well preserved shells of lamellibranches, gastropods and microscopic identified fossils and
algae are found in Limestones.
The deposit is covered by 1.0 to 6.0 mts of top soil, followed by Sandy clay and
followed by Shell limestone , Conglomeratic Limestone, sandstone/Sand.
. Order of Succession:
Top soil (Black cotton) - 0.50 to 6.00 m
Sandy Clay - 1.50 to 21.50 m
Shell Limestone - 3.5 to 27.0 m
Conglomeratic Limestone - 0.20 to 1.20 m
Sandstone / Sand
Top Soil:
The top surface of the area covered with black cotton soil. The thickness of the black
cotton soil varies from 0.5 m– 6.0m.
Sandy Clay:
Top soil is followed by sandy clay, which is of Buff and grey in colour. Sandy clay is
soft, sticky, and fine to medium grained sand with clayee matrix. The thickness of sandy clay
is ranging from 1.50-21.50m.
Shell limestone:
Underlined by topsoil and sandy clay is shell limestone., Which is of buff, yellow to
pale brown in colour, fine to medium grained, medium hard to hard, with abundance of shell
fragments such as gastropods, Lamellibranhes and Foraminifera fossils. The thickness of
the shell limestone ranges from 3.50 m to 27 m. Generally ferruginous and calcareous clay
contents in shell limestone horizons occurs in various proportions and sometimes it causes
lowering of the purity percentage of CaO in shell limestone with increased iron and silica
content. Occasional presence of chert is found in two boreholes within shell limestone and
sandy clay.
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
21
Creative Engineers & Consultants
Conglomeratic Limestone:
Underlies the Shell limestone is Conglomeratic limestone, which is of buff colour and
embedded with conglomerate bubbles.
Sandstone /Sand:
Bottom most layer is sandstone and sand. The bottom sandstone is grayish white in colour,
fine to medium grained and friable to medium hard.
Geological plan and cross sections are given as Figure No - 3 & 4.
3.3.1.3 EXPLORATION:
Department of Geology and Mining, Guindy, Chennai – 32, Government of
Tamilnadu conducted prospecting study as per the G.O.(Ms) No.217 Industries (MMA1)
Department dated 11.09.2015 and subsequent proceedings vide RC.No.6301/MM1/2014
dated 16.09.2015 of the Commissioner of Geology and Mining, to establish the occurrence
of minerals contents of limestone and assessment of reserves, resource, quality were
carried out for Periyathirukonam block covering an extent of 74.81.0 Hectares in parts of
Periyathirukonam, Reddipalayam and Edaiyattankudi villages, Ariyalur Taluk and District to
bring out a pragmatic and limestone reserve inventory.
Prospecting work and estimation of Reserves / Resource were carried out as per
United Nations Framework of Classification (UNFC) guidelines to comply with Detailed
Exploration (G1) stage of exploration and Minerals (Evidence of mineral contents) Rules,
2015. Totally 29 vertical core boreholes with a total meterage of 907.30 m were drilled in this
area. Boreholes were drilled at a grid interval of 200 m X 200 m and 150 m X 100 m.
Maximum depth of the borehole is 45.0 m (PTK-25) and the minimum depth of the borehole
is 16.0m (PTK-5).
INDEX
MINING LEASE AREA - 74.81 .0 Hec.
ODAI
E .B P OWERLINE
DRI LLED BOREHOLES
CREMATI ON Y ARD
SCALE:- 1: 2000
T OP OGRAP HI CCONTOUR
BENCH MARK
STRIKE &DIP2°
AREA COVERED BY T OP SOIL
2°
2°
2°
SECTI ON LINE
THE INDIA CEMENTS LIMITEDD ALA VOI-621730
PERIYATHIRUKONAM LIMESTONE DEPOSIT
EXTENT -7 4. 81 .0 Hec.
DRG.NO:-ICL/DAL/PTK/05/18
SCALE:-1:2 000
DATE :- 18 .01 .2017
GEOLOGICAL PLAN
A RIY ALU RD ISTRICT, TAMILN ADU
PLATE NO-5
ULTI MAT EP IT LIMIT
C ertified that all p lans and sections are p repared b ased on thelease map authenticated by the State g overnment and informationfurnish ed in th is p lan is correct to th e best o f my knowledge.
P.R AMASAMY, M. Sc.,RQP/MAS/060/88/A
FIGURE NO- 3
22
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
24
Creative Engineers & Consultants
3.3.1.4 RESERVES & WASTE:
As per the prospecting report by the Department of Geology and Mining, State
Government of Tamilnadu estimated reserves/resource as per UNFC are given below:
Proved mineral reserves (111) - 13.36 million tons
Pre-feasibility mineral resource (221&222) - 8.88 million tons
The limestone reserves (having chemical analysis <18 SiO2% &>35 CaO%) under
proved category is estimated upto the depth of limestone formation (44m).
The limestone reserves/ resource and quantity of waste rocks were estimated by
adopting well-known geological cross sectional area method. Cross sectional area in square
meters were measured on each geological section for different litho units. This was followed
converting into volume by multiplying with area of influence on both sides. Volume thus
computed is then converted into tonnage by applying tonnage conversion factor. Tonnage
conversion factor for shell limestone is considered as 2.0 T/m3 and for topsoil 1.6 T/m3 and
for sandy clay 2.5 T/m3. The recovery factor for shell limestone is 90 %.
Proved Mineral reserves (111) have been estimated considering the safety distance
to be provided from the peripheral boundary, odai, etc., of the study area. Depth considered
for reserve calculation was limited to the depth up to which direct evidence of mineralization
was established by core drilling. The Lateral extension was considered as 50 % i.e. (100m)
of the grid spacing of the proved points (Borehole). Tonnage is estimated on the basis of
natural moisture. Reserves locked up for safety distance in benches, safety distance for
Uppu odai, pond and mine boundaries is considered as Pre-feasibility Mineral resources
(221 & 222).Mineral recourses and reserves are given in the Table No - 1.
Table No - 1
CATEGORY OF RESERVE/RESOURCE
UNFC
Code
Quantity in
million tonne
Grade
Total Mineral Reserve
Proved Mineral Reserve 111 13.36 CaCO3 : 82.19 %
MgCO3 : 1.24 %
SiO2 : 11.67%
Al2O3 : 1.95 %
Fe2O3 : 2.58 %
Probable Mineral Reserve 121 and
122
--- ---
Total Remaining Resources
Feasibility Mineral Resource 211 --- ---
Prefeasibility Mineral Resource 221 and
222
8.88
CaCO3 : 82.19 %
MgCO3 : 1.24 %
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
25
Creative Engineers & Consultants
SiO2 : 11.67%
Al2O3 : 1.95 %
Fe2O3 : 2.58 %
Measured Mineral Resource 331 --- ---
Indicated Mineral Resource 332 --- ---
Inferred Mineral Resource 333 --- ---
Reconnaissance Mineral Resource 334 --- ---
Total Reserves +Resources 22.24
Waste
In this deposit, there are two types of overburden i.e. Topsoil and Sandy clay. Topsoil
is black cotton soil and it is sticky nature. Sandy clay is of Buff and grey in colour. Sandy clay
is soft, sticky, and fine to medium grained sand with clayee matrix. Mineral reject of 10 % of
ROM is considered as waste. The sandy clay and mineral rejects are below cut-off grade.
The total waste quantity to be generated from this lease is given below:
Period
Waste quantity in tonnes
Top soil OB/IB Mineral reject Total
Plan period 1809674 2779281 900901 5489856
Conceptual period 784664 2185645 583868 3554177
Total 2594338 4964926 1484769 9044033
The year wise generation of top soil, overburden (Sandy clay) and mineral rejects to
be disposed off in first-five year period are given in Table No - 2. During the first year, Sandy
clay and mineral reject will be used for formation of protective/peripheral bund. Subsequently
all waste will be dumped in the already excavated area as a part of backfilling concurrently
on the south western side. Topsoil will be used to spreading over protective/peripheral bunds
and back filled area for green belt development.
Table No - 2
QUANTITY OF WASTE TO BE DISPOSED OFF DURING PLAN PERIOD
Year Top Soil ( Ts) OB/IB & Mineral reject (Ts)
Reuse/
Spreading Storage Backfilling Storage Blending Beneficiation
I 319053 --- --- 247089 --- ---
II 323798 --- 551011 --- --- ---
III 340870 --- 575304 --- --- ---
IV 541438 --- 1714330 --- --- ---
V 284514 --- 592447 --- --- ---
Total 1809674 --- 3433092 247089 --- ---
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
26
Creative Engineers & Consultants
3.3.2 MINING METHOD:
Proposed mining method is mechanized opencast mine by using heavy earth moving
equipments in combination with deep hole drilling, blasting and adaptation of non-
conventional mining method of Ripper dozer/Rock breaker/Xcentric breaker. The primary
holes of 115 mm dia will be drilled by DTH drills and are loaded with cap sensitive primary
explosives in combination with NONEL.
No blasting is required as the top soil and overburden is soft and friable. The Top soil
and overburden will be removed by excavator and load onto the Tippers.
The Shell limestone will be mined by a combination of deep hole drilling and blasting
and adaptation of non-conventional mining method of Ripper dozer/Rock breaker/Xcentric
breaker to break the shell limestone. The primary holes of 115 mm dia will be drilled by DTH
drills and are loaded with cap sensitive primary explosives in combination with NONEL. The
broken/ripped /blasted materials will be removed by hydraulic shovels with tipper
combinations.
The first year, mining operation will be commenced from northwestern side of mining
lease area. Second year onwards mining operation will be progressed towards eastern,
south side and further western side. During the first five year mining plan period about
38.04.0 hectares of area will be opened up and about 16.23.0 hectares will be backfilled.
The mine haul road inside the mine will be laid with a gradient of 1:16. Overburden, waste
and reject will be dumped/ backfilled in earmarked area within mining lease area. During the
first year, over burden/waste will be used for formation of protective bund on both sides of
odai and second year onwards backfilling will be started on southwestern side of mining
lease area. The height of backfilling area will be maintained to initial ground profile.
The Surface plan showing the present mine position & mine position at the end of
present plan period are given as Figure No - 5 & 6.
Ultimately there will be three mining pits and extent and size of the pits are given in
Table No – 3.
Table No - 3 ULTIMATE EXTENT AND SIZE OF THE PIT
Pit Extent (Ha) Size (m) (Avg.L X W X D)
Pit-1 47.91.5 850 X 880 X 33
Pit-2 2.86.5 118 X 405 X 42
Pit-3 3.74.0 230 X 175 X 44
Total 54.52.0
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
27
Creative Engineers & Consultants
At the end of mine life about 54.52.0 hectares of area will be opened up and an area
of 26.15.5 hectares will be backfilled with mine waste and remaining area of
28.36.5 hectares will be left and converted as water body. The ultimate pit limit has been
drawn to mine the shell limestone for a maximum depth of 44 m.
The conceptual plan and cross section are given as Figure No - 7 & 8.
INDEX
AREA RECOMMENDED FOR GRANT OF MINING LEASE
ODAI
POND
E.B POWERLINE
DRILLED BORE HOLES
CREMATION YARD
SCALE:- 1: 2000
TOPOGRAPHIC CONTOUR
BENCH MARK
CART TRACK
C erti fi ed tha t al l pl ans and se ct ions a re pre pa re d ba se d onthe lease mapa uthe nt ic at ed by the Stat e gove rnme nt a nd informa tion furni shedinthispla n is c orre ct t o the be st of my knowledge.
K.B HASKAR ,M.Sc.,R QP/MAS/181/2003/A
P.R AMASAMY, M. Sc.,RQP/MAS/060/88/A
J. PR IE ST LY MAC AULAY,B.E.,R QP/MAS/180/2003/A
THE INDIA CEMENTS LIMITEDD ALA VOI-621730
PERIYATHIRUKONAM LIMESTONE DEPOSITEXTENT- 7 4. 81 .0 Hec.
DRG.NO:-ICL/DAL/PTK/04/16
SCALE:-1:2 000
DATE :- 06 .04 .2016
SURFACE PLAN
A RIY ALU RD ISTRICT, TAMILN ADU
PLA TE N O -4
K.MANI, M. Sc ., M. Phil.,R QP/MAS/165/2001/A
ULTIMATE PIT LIMIT
PROPOSED MINE OFFICE & SITE SERVICE
FIGURE NO- 5
28
INDEX
SCALE :- 1 :2000
+ + +
39m
39m
38m
38m
37m
37m
36m35m
35m36m
37m
36m
35m
35m36m37m
BM
Uppu Odai
A A'
B
C
E
F
B'
C'
E'
F'
D'D
G'G
37m
36m
35m
35m
36m
37m
THE INDIA CEMENTS LIMITEDD ALA VOI-621730
PERIYATHIRUKONAM LIMESTONE DEPOSIT
EXTENT- 7 4. 81 .0 Hec.
DRG.NO:-ICL/DAL/PTK/12/18
SCALE:-1:2 000
DATE :- 18 .01 .2017
FACE POSITION AT THE END OF FIFTH YEAR
A RIY ALU RD ISTRICT, TAMILN ADU
PLATE NO -12
11.50
111
221
Pro
tect
ive
bund
37.0
Pro
tect
ive
bund
30.0
37.0
37.0
Dir
ecti
ono
ffa
cem
ovem
ent
A'
25.0
11.20
37.037.0
20.0 8.0
11.20
37.0
37.0
36.0
15.0
10.0
10.0
C ertified that all p lans and sections are p repared b ased on thelease map authenticated by the State g overnment and informationfurnish ed in th is p lan is correct to th e best o f my knowledge.
P.R AMASAMY, M. Sc.,RQP/MAS/060/88/A
37.0
37m
10.0
FIGURE NO- 6
29
INDEX
SCALE :- 1 :2000
THE INDIA CEMENTS LIMITEDD ALA VOI-621730
PERIYATHIRUKONAM LIMESTONE DEPOSITEXTENT- 7 4. 81 .0 Hec.
DRG.NO:-ICL/DAL/PTK/16/18
SCALE:-1:2 000
DATE :- 18 .01 .2017
CONCEPTUAL MINE PLAN
A RIY ALU RD ISTRICT, TAMILN ADU
PLA TE N O -16
11.50
37.0
30.0
37.0
37.0
25.0
11.20
37.0
20.0 8.0
11.20
37.0
37.0
10.0
10.01.0
2.630.0
25.0
20.0
15.0
10.0
27.0 27.0
17.017.0
17.0
C erti fied that all p la ns a nd se c t ions a re pre pa red based on the
l ease map a uthent ica ted by the State government a nd informa tionfurni shed in this pla n is c orre ct t o the be st of my knowledge.
P.R AMASAMY, M. Sc.,RQP/MAS/060/88/A
37.0
36.0
37.0
5.0
0.0PIT-1 PIT-3
PIT-2
37.0
36.0
FIGURE NO-7
30
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
32
Creative Engineers & Consultants
3.3.2.1 PRODUCTION RATE:
Year-wise excavations of limestone, top soil, and over burden up to conceptual period are given in Table No - 4.
Table No - 4
YEAR-WISE EXCAVATION PROGRAM UP TO CONCEPTUAL PERIOD
Year Pit No. Total Excavation
(Tons)
(4+5+6+7)
Topsoil
(Tons)
OB/SB
(Tons)
ROM Limestone (Tons) Waste (Tons)
(5+7)
Waste ratio *
Limestone
Rec. 90%
Mineral Reject
10%
(1) (2) (3) (4) (5) (6) (7) (8) (9)
I Pit-1 1766364 319053 113731 1200222 133358 247089 1:0.19
II Pit-1 2075237 323798 417631 1200427 133381 551011 1:0.41
III Pit-1 2417075 340870 408537 1500901 166767 575304 1:0.34
IV Pit-1 4355927 541438 1480979 2100159 233351 1714330 1:0.73
V Pit-1 2983357 284514 358403 2106396 234044 592447 1:0.25
Total 13597961 1809674 2779281 8108105 900901 3680182 1:0.41
6TH – End
of mine life
Pit-1,2
&3
8808991 784664 2185645 5254814 583868 2769513 1:0.52
Grand
Total
22406952 2594338 4964926 13362919 1484769 6449695 1:0.48
* Waste ratio is excluding top soil
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
33
Creative Engineers & Consultants
3.3.2.2 EXTENT OF MECHANIZATION:
The details of machineries to be deployed departmentally and on hiring basis for this
mining lease are shown below:
LIST OF MINING MACHINERY
S.No. Name of the equipment Nos.
1 Rock Breaker-PC 300 2
2 Excavator PC-300 3
3 Dozer with Ripper 1
4 Drilling machine 1
5 Compressor 1
6 Tipper 5
7 Water Tanker 1
8 Jeep 1
9 Dewatering pump 1
10 Mobile lighting tower 1
3.3.2.3 LIFE OF MINE:
The life of the mine will be about 10-12 Years. However the life of mine may change
based on achieving the targeted production.
3.3.2.4 DISPOSAL OF WASTE:
Top soil will be removed separately and utilized for tree plantation. Initially top soil will
be spread out over the protective/Peripheral bund. Subsequently top soil generation will be
concurrently used to spread over on the top of back filling area.
During initial period overburden, waste and reject will be used for formation of
protective and peripheral bunds. Subsequently, the waste will be dumped in the already
excavated area as a part of backfilling concurrently on the south western side. The height of
refilling area will be maintained to original ground profile. As such there will not be any
external waste dump.
3.4 USE OF LIMESTONE OUTPUT FROM MINE:
Entire shell limestone production from this lease will be used captively in the ICL’s
various cement plants located in the state of Tamil Nadu.
3.5 MINERAL BENEFICIATION:
The limestone mined from this mine will be directly consumed by the captive ICL’s
cement factory and no beneficiation method will be adopted.
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
34
Creative Engineers & Consultants
3.6 LAND USE PATTERN:
The present land use pattern, at the end of plan period and the post mining land use
pattern is shown below.
S.No Activities Present land use pattern
(Ha)
At the end of fifth year (Ha.)
At the end of mine life.(Ha)
1 Area under mining --- 38.04.0 54.52.0 2 Storage of top soil --- --- --- 3 Waste dump site --- --- --- 4 Mineral storage --- --- --- 5 Infrastructure, Workshop,
administrative buildings etc. --- 0.10.0 0.10.0
6 Roads --- 1.99.5 1.99.5 7 Railways --- --- --- 8 Tailing Pond --- --- --- 9 Effluent Treatment Plant --- --- ---
10 Mineral separation Plant --- --- --- 11 Township area --- --- --- 12 Others (Protective bund) --- 3.47.0 3.47.0 Total 43.60.5 60.08.5
Undisturbed area 31.20.5 14.72.5
Grand Total 74.81.0 74.81.0
3.7 MANPOWER:
The direct manpower strength will be around 18 and indirectly more than 100 persons
will benefit due to employment prospects in allied services like logistical operations, trading
activities, casual labour needs, green belt creation etc.
3.8 WATER AVAILABILITY AND WATER NEEDS:
Total water requirements for the ML operations will be as follows:
Domestic activities - 1.5 Cu.M/day
Water sprinkling / dust suppression
& Green belt - 38.5 Cu.M/day
Workshop - 5.0 Cu.M/day
- - - - -
45.0 Cu.M/day - - - - - - -
For drinking & industrial purpose, bore well water will be initially used. Later, on
creation of mine floor sump, harvested rain water, seepage if any in the sump can be used
for industrial purpose.
3.9 SITE SERVICES:
Infrastructure facilities like work shop, office, first aid room, rest room and canteen
cum rest shed and site service will be provided at mining site.
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
35
Creative Engineers & Consultants
3.10 ELECTRICITY REQUIREMENTS:
All the main mining equipment’s will be diesel operated. The electricity requirement of
1200 units per day for lighting purpose and pumping water from Mine Pit, will be sourced
from TNEB.
DG Set of 50 KVA will also be provided as an alternate source to meet the power
requirement.
3.11 EFFLUENT SYSTEMS:
The only effluents arising from the mine lease will be domestic waste water to the
tune of about 0.6 KLD. This will be suitably discharged into the septic tank with soak pits.
Effluent from work shop containing oil & grease will be treated in ETP / Oil separation tank
and treated water will be reused in the workshop. As such there will not be any liquid waste
disposal.
3.12 FINAL PRODUCT MARKETING :
The entire limestone output from this lease will be captively consumed in various
cement plants of ICL in Tamil Nadu.
3.13 LINEAR SCHEMATIC SYSTEM FOR PRODUCT USE:
Entire limestone output is being supplied to the crusher in the cement plant of
M/s The India cements Ltd. After physical sizing of products in the crusher, the crushed
limestone is passed through vertical roller mills for grinding. Along with the limestone, some
additives are being added to maintain proper qualitative standards of raw meal. Raw meal
will be sent through kiln for Clinkerization and the clinker will be ground to fine cement with
gypsum to maintain the proper standards for cement setting times by way of retardation, etc.
* * * * * * * *
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
36
Creative Engineers & Consultants
CHAPTER - IV
SITE ANALYSIS
4.1 CONNECTIVITY:
This area is accessible from V.Kaikatti, which is located at a distance of 11 Km. from
Ariyalur on Ariyalur – Jayankondam State Highway. The area is accessible through the metal
/tar road branching off from V.Kaikatti situated about 8 km from the site.
4.2 LAND FORM, LAND USE AND LAND OWNERSHIP:
The entire lease area is non-forest Patta-dry land owned by the company.
4.3 TOPOGRAPHY AND DRAINAGE:
The topography is almost gentle sloping from West to East in western side and East
to West in Eastern side. Maximum elevation is 40 m and minimum elevation is 35 m above
Mean Sea Level. The Marudaiyar River passing South of the lease area is almost dry
throughout the year except during the North–East monsoon. Uppu odai passing in between
the lease area is dry throughout the year except during the rainy season. Water flows from
north to south and join in Marudaiyar River ultimately.
4.4 PROJECT LAYOUT IN RELATION TO IMPORTANT NATURAL FEATURES:
The mining lease area and the 10 km buffer zone is devoid of declared ecologically
sensitive features like national parks, biospheres, sanctuaries, etc., as mentioned earlier. No
forest land is involved in the lease area. The area also does not come under CRZ category.
The feature in 10 km radius is shown in Index Plan. (Refer Figure No - 9)
In the 10km buffer zone, the following features are observed:
S.No Particulars Details
1. Nearest villages Vellippirangiyam- 0.5KM- NW Periyatirukkonam - <0.5KM – E Munayankurichi - <0.5KM – NE Edaiyattankudi – 0.6KM – SW ChettiTriukkonam – 1.8KM - E
2. Nearest Major water bodies Uppu Odai – in between the lease area
Marudaiyar River – more than 130m – S
Kallar River – 3.7km- SW
Vilangudi Odai – 7.4km – NE
Ottan Odai – 3.4km- SW
Sukra Eri – 6.6km – SE
Chempan Odai – 9.2km- W
Pullambadi Canal – 9.2km - S Marudaiyar River passing South of the lease area
is almost dry throughout the year except during
the North–East monsoon. Uppu odai passing in
between the lease area is dry throughout the year
except during the rainy season. Water flows from
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
37
Creative Engineers & Consultants
north to south and join in Marudaiyar River
ultimately.
3. Notified Archaeologically important
places, Monuments Nil within 10km radius
4. Local Places of Historical and Tourism
Interest Nil within 10km radius
5. Environmental sensitive areas,
Protected areas as per Wildlife
Protection Act, 1972 (Tiger reserve,
Elephant reserve, Biospheres, National
parks, Wildlife sanctuaries, community
reserves and conservation reserves)
Nil within 10km radius. Karaivetti Bird Sancuary is
located at 13.5 km (aerial) SW of the mine lease
area.
6. Reserved / Protected Forests Vilangudi Reserve Forest - 3.8 KM - NE
Ulliyakkudi Reserve Forest – 5.4 KM - NE
Ambapur Reserve Forest – 6.4 KM – NE
Alvay Reserve Forest- 9.0 KM - E
Suttamalli Reserve Forest – 9.4 KM - E
Sundaresvarapuram Reserve Forest – 6.5 KM -
NE
Manageri Reserve Forest – 7.7 KM – NE
Kallankadu Reserve Forest – 9.9 KM – NE
7. Defence Installations Nil within 10km radius
8. Seismic Zone Area falls in Zone – II (Least Active)
9. Other Industries in the area Various working mines of Ultratech Cements,
Dalmia Cements, India Cements Limited, Ramco
Cements and Chettinad Cement Corporation,
TANCEM, TAMIN, J.P.R mines, Sriram Chemical
Mines and Ganeshan Moopanar mines.
Cement Plant of Ultratech Cements Limited and
Chettinad Cement Corporation Limited.
4.5 CLIMATIC SCENARIO:
The climate of this region is warm climatic belt with moderate humidity and is devoid
of hills. This area receives moderate rainfall averaging about 800 mm per year. The mean
monthly temperature ranges between 22.5ºC and 41ºC and it is maximum during the months
of May and June. The relative humidity varies between 33 and 94% and it is highest during
the months of December and January and it is lowest during the month of June. There is only
one rain gauge station in the Ariyalur town. The region receives rainfall from both the
monsoons with annual rainfall spread over a period of 6 months. The South west monsoon
precipitation occurring from June to September accounts for 30% of the annual rainfall and
the northeast monsoon rainfall occurring during October to December constitutes 70% of the
annual. Normal wind direction is NW.
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
38
Creative Engineers & Consultants
4.6 SOIL STATUS:
The area is covered with black cotton soil and followed by sandy clay. The limestone
is not exposed on the surface but it is seen in the adjacent mine works and well sections. The
Shell limestone is buff, yellowish brown in colour with prominent and well preserved shells of
lamellibranches, gastropods and microscopic identified fossils and algae are found in
Limestones.
4.7 SOCIAL INFRASTRUCTURE:
The following villages are situated near the project site, whose details are given
below:
NAME DISTANCE (Km) AND
DIRECTION
POPULATION
(As per Census of India 2011)
Periyatirukkonam <0.5 KM – E 2708
Edaiyattankudi 0.6 KM – SW 2191
Nagamangalam 2.8 KM – NE 3360
Reddipalayam 4.0 KM - N 4126
Karuppilakattalai 3.3 KM – S 4125
4.7.1 SOCIAL INFRASTRUCTURE IMPROVEMENTS ARISING OUT OF MINING
OPERATIONS:
To enhance the life style, income generation opportunities and educational levels of
the local community in a big way, M/S. The India Cements Ltd has decided to spend
Rs. 10 Lakhs per annum from this lease area for various CSR activities. The main focus will
be in developing health, education, skill development, environment and spiritual development
of the society.
Financially, the local community will have benefits like increased income levels, better
life styles etc. Besides, the local panchayats, State and Central Governments will also benefit
due to receipt of taxes, cess, royalty, DMF and NMET etc., from the project proponent.
In the context of accrual of tangible benefits on all fronts arising from project
operations, the project is worthy of approval for improving the infrastructural, social and
financial status of the region, the State and the country, as a whole.
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
39
Creative Engineers & Consultants
STUDY AREA WITHIN 10 KM RADIUS (INDEX PLAN) Figure No – 9
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
40
Creative Engineers & Consultants
CHAPTER - V
PLANNING BRIEF
5.1 PLANNING CONCEPT:
As detailed in earlier chapters, this project pertains to mining of limestone to the Peak
production capacity of 2.34 MTPA of ROM of limestone by Mechanized open cast mining
method.
5.2 POPULATION PROJECTIONS:
The mines will provide direct employment to about 18 persons and indirectly more
than 100 people will benefit through allied services like trading, logistics, casual labours etc.
Because of local employment prospects, as above, influx of people from the nearby villages
is minimized.
As mentioned earlier on paras 4.7.1, in chapter - IV, the project proponent will carry
out various social welfare measures under their well-formulated “CSR” scheme.
Because of above proposed employment opportunities and social welfare measures
by ICL to local community, there will be improvement in life styles, income levels and
educational statuses of local population. As a result, the Human Development Index (HDI) of
the area will also improve.
5.3 LAND USE PLANNING:
The details of land use planning for the project have been furnished in para 3.6 in
chapter - III.
5.4 GREEN BELT PROPOSALS:
The plantation will be carried out in all possible areas like along road, in the safety
zone, on the protective bund, backfilled area, etc. Its details are given below:
Table No - 5
AFFORESTATION PROGRAM
Year No. of Trees
Area (Hec) Survival % Name of the
species Location
I 1600 0.80.0 >90 Eucalyptus, Teak, Rain tree, Ponnavarai, Konnai, Mango tree etc.
Protective bund
II 2900 1.47.0 >90 Protective bund
III 2300 1.16.0 >90 Pit-1,Back filled area
IV 3000 1.53.0 >90 Pit-1,Back filled area
V 3000 1.52.0 >90 Pit-1,Back filled area
Total 12800 6.48.0 >90
6TH –End of mine life
25000 12.50.0 >90 Pit-1& 2,Back filled area
Grand total 37800 18.98.0
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
41
Creative Engineers & Consultants
5.5 ASSESSMENT OF INFRASTRUCTURE DEMAND:
Since this is a proposed project, services like work shop, site office, drinking water,
first aid station, rest shelter, drinking water, sanitation facilities and other necessary
amenities will be provided.
5.6 AMENITIES AND FACILITIES:
Pure water for drinking will be provided at the rest shelter for the workers. Workers
and staff accommodation facility will be provided near the mine site. Water for drinking and
domestic consumption at the ML area will be supplied from the bore well. Other facilities like
Public addressing system, Telephones/ Mobile handsets, Emergency alarm, Firefighting
equipment & accessories with trained manpower, Training centre, Fire tender, Ambulance
will be provided.
* * * * * * * *
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
42
Creative Engineers & Consultants
CHAPTER - VI
PROPOSED INFRASTRUCTURE
In this proposed project, services like site office, work shop, drinking water, first aid
station, rest shelter, sanitation facilities and other necessary amenities will be provided.
CHAPTER - VII
REHABILITATION AND RESETTLEMENT PLAN (R&R PLAN)
The entire lease area is non-forest Patta-dry land owned by ICL.As such, the
question of (R&R) plan formulation does not arise.
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
43
Creative Engineers & Consultants
CHAPTER - VIII
PROJECT SCHEDULE AND COST ESTIMATES
In this applied lease area mining operations will be carried after obtaining all the
statutory approvals and lease execution.
The project cost is estimated to be Rs. 450 lakhs which includes Land, exploration,
departmental mining machineries, utility, infrastructure etc. ICL is financially sound to meet
this capital requirement.
The operating cost is estimated to be Rs.100/ Tonne of limestone excluding Royalty,
DMF, NMET & Transport.
M/s The India Cements Limited is having rich experience in the field of limestone
mining and cement manufacture for more than 7 decades. This proposed project is Techno
economically viable due to the following reasons:
Will be using the proven open-cast method of mining with Shovel-Tipper combination
Extensive exploration is carried out and the reserves are mostly in the proved
category.
The limestone is used for captive consumption in ICL’s Cement plants.
The lease area is easily approachable from the nearby road and is also well
connected to the cement plant.
The production cost of limestone is within the economic limit considering the present
selling price of cement.
* * * * * * * *
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
44
Creative Engineers & Consultants
CHAPTER - IX
ANALYSIS OF PROPOSAL
(FINAL RECOMMENDATIONS)
9.1 ANALYSIS OF INFRASTRUCTURAL, SOCIAL AND FINANCIAL BENEFITS OF
THE PROJECT
9.1.1 Infrastructural growth analysis:
The entire limestone output from this lease will be captively consumed in various
cement plants of ICL in Tamil Nadu. Cement, being an infrastructural core industry, enabling
infrastructural development in the country and the Region, for which sector Government of
India has earmarked project financial outlays to the tune of US dollars one Trillion, in the 12th
five year plan, this project contributes to GDP growth of the country, in a big way.
As limestone from the project will be used for cement manufacture, the project will
own its minor role in making contribution to infrastructural betterment of the country.
9.1.2 Social benefits:
The direct manpower strength will be around 18 and indirectly more than 100
persons will benefit due to employment prospects in allied services like logistical operations,
trading activities, casual labour needs, green belt creation etc.
To enhance the life style, income generation opportunities and educational levels of
the local community in a big way, M/S. The India Cements Ltd has decided to spend
Rs. 10 Lakhs per annum from this lease area for various CSR activities. The main focus will
be in developing health, education, skill development, environment development etc.
9.1.3 Analysis of Financial benefits:
Financially, the local community will have benefits like increased income levels,
better life styles etc. Besides, the local panchayats, State and Central Governments will also
benefit due to receipt of taxes, cess, royalty, DMF and NMET etc., from the project
proponent.
9.1.4 Conclusion:
In the context of accrual of tangible benefits on all fronts arising from project
operations, the project is worthy of approval for improving the infrastructural, social and
financial status of the region, the State and the country, as a whole.
* * * * * * * *
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
45
Creative Engineers & Consultants
ANNEXURE – 1
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
46
Creative Engineers & Consultants
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
47
Creative Engineers & Consultants
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
48
Creative Engineers & Consultants
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
49
Creative Engineers & Consultants
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
50
Creative Engineers & Consultants
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
51
Creative Engineers & Consultants
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
52
Creative Engineers & Consultants
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
53
Creative Engineers & Consultants
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
54
Creative Engineers & Consultants
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
55
Creative Engineers & Consultants
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
56
Creative Engineers & Consultants
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
57
Creative Engineers & Consultants
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
58
Creative Engineers & Consultants
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
59
Creative Engineers & Consultants
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
60
Creative Engineers & Consultants
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
61
Creative Engineers & Consultants
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
62
Creative Engineers & Consultants
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
63
Creative Engineers & Consultants
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
64
Creative Engineers & Consultants
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
65
Creative Engineers & Consultants
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
66
Creative Engineers & Consultants
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
67
Creative Engineers & Consultants
Feasibility Report For Periyathirukonam Limestone Deposit over an Extent of 74.81.0 Ha of M/s. The India Cements Limited, Ariyalur Taluk and District, Tamil Nadu.
68
Creative Engineers & Consultants