Zero Emissions Building Tools (ZEBtools) · Zero Emissions Building Tools (ZEBtools) 2 In this...

12
UDI Breakfast, October 10, 2018 Sabina FooFat, MCIP, Senior Green Buildings Planner Zero Emissions Building Tools (ZEBtools)

Transcript of Zero Emissions Building Tools (ZEBtools) · Zero Emissions Building Tools (ZEBtools) 2 In this...

Page 1: Zero Emissions Building Tools (ZEBtools) · Zero Emissions Building Tools (ZEBtools) 2 In this presentation 1.ZEBtoolsgoals 2.The tools: a.5% floor space increase b.Passive House

UDI Breakfast, October 10, 2018Sabina FooFat, MCIP, Senior Green Buildings Planner

Zero Emissions Building Tools (ZEBtools)

Page 2: Zero Emissions Building Tools (ZEBtools) · Zero Emissions Building Tools (ZEBtools) 2 In this presentation 1.ZEBtoolsgoals 2.The tools: a.5% floor space increase b.Passive House

2

In this presentation

1. ZEBtools goals2. The tools:

a. 5% floor space increaseb. Passive House cost

premium in rezoningsc. Director of Planning

Discretion3. Contact information

Page 3: Zero Emissions Building Tools (ZEBtools) · Zero Emissions Building Tools (ZEBtools) 2 In this presentation 1.ZEBtoolsgoals 2.The tools: a.5% floor space increase b.Passive House

3

ZEBtools – Goal

• Support voluntary leaders • Build capacity • Advance supply chain

We want Industry to leverage this opportunity!

2018ZEBtools

2025VBBL req’sfor MURBS

Page 4: Zero Emissions Building Tools (ZEBtools) · Zero Emissions Building Tools (ZEBtools) 2 In this presentation 1.ZEBtoolsgoals 2.The tools: a.5% floor space increase b.Passive House

4

Eligible Projects

Projects pursuing enabling tools must be:

• Projects with 6+ units

• Passive House certified

or

• ILFI Zero Energy certified

Photo credit: Jimmy Shoots Photography

Page 5: Zero Emissions Building Tools (ZEBtools) · Zero Emissions Building Tools (ZEBtools) 2 In this presentation 1.ZEBtoolsgoals 2.The tools: a.5% floor space increase b.Passive House

5

Development Permit projects

In a District Schedule area:• Up to a 5% floor space increase to offset ZEB cost

premiums

District Sample Lot Size (sq ft)

Density Built floor area (sq ft)

5% additional floor area (sq ft)

RM-5 12,000 Conditional 2.2 26,400Plus 5% ZEB FSR

2.31 27,720 1,320

C-2 14,400 Conditional 2.5 36,000Plus 5% ZEB FSR

2.63 37,782 1,872

C5-A 18,000 Conditional 7.0 126,000Plus 5% ZEB FSR

7.35 132,300 6,300

Page 6: Zero Emissions Building Tools (ZEBtools) · Zero Emissions Building Tools (ZEBtools) 2 In this presentation 1.ZEBtoolsgoals 2.The tools: a.5% floor space increase b.Passive House

1. Scenario:Zone: C-2 (Westside)Lot Size: 15,800 sq ftBase Floor Area: 39,500 sq ft+ 5% Floor Area: 1,975 sq ft

2. Illustration – Hard construction costs**Base density 39,500 sq ft @ $450/ sq ft: $17,775,000+5% density 1,975 sq ft @ $450/sq ft : $888,750Total: $18,663,750

* This is not a detailed pro-forma**Construction cost estimates provided by CoV Real Estate Team

6

Example*: + 5% FSR

Page 7: Zero Emissions Building Tools (ZEBtools) · Zero Emissions Building Tools (ZEBtools) 2 In this presentation 1.ZEBtoolsgoals 2.The tools: a.5% floor space increase b.Passive House

3. Passive House Construction Cost PremiumTotal hard construction costs: $18,663,750

a. Project A @ 8% cost premium $ 1,493,100b. Project B @ 6% cost premium $ 1,119,825c. Project C @ 4% cost premium $ 746,550

4. Current Westside Sale Value1,975 sq ft @ ~$1,500*/sq ft: $ 2,962,500

* Approximate sale value provided by CoV Real Estate Team for this exercise only.

7

Example + 5% FSR

Page 8: Zero Emissions Building Tools (ZEBtools) · Zero Emissions Building Tools (ZEBtools) 2 In this presentation 1.ZEBtoolsgoals 2.The tools: a.5% floor space increase b.Passive House

8

ZEB and Negotiated Rezonings

• Collaborative City of Vancouver approach– Integrated staff support (Real Estate, Planning, Green

Buildings)

• ZEB cost premium included in pro-forma evaluations– Provide a detailed ZEB breakdown as part of RZ pro-forma

• High-rise Passive House cost premium study – early 2019

Page 9: Zero Emissions Building Tools (ZEBtools) · Zero Emissions Building Tools (ZEBtools) 2 In this presentation 1.ZEBtoolsgoals 2.The tools: a.5% floor space increase b.Passive House

9

Example of Negotiated PH Rezoning

• Integrated collaborative processbetween Planning, Real Estateand Sustainability.

• Rezoning Approved Sept. 19– Commits to PH construction– Global zero-emissions leadership in

the high-rise form

Image courtesy of Asia Standard Americas and Landa Global

Page 10: Zero Emissions Building Tools (ZEBtools) · Zero Emissions Building Tools (ZEBtools) 2 In this presentation 1.ZEBtoolsgoals 2.The tools: a.5% floor space increase b.Passive House

10

Development Permits and Rezonings

Director of Planning discretion to relax zoning and policy requirements.

Frontage

Plate

Outdoor Space

Page 11: Zero Emissions Building Tools (ZEBtools) · Zero Emissions Building Tools (ZEBtools) 2 In this presentation 1.ZEBtoolsgoals 2.The tools: a.5% floor space increase b.Passive House

11

Your Project!

• Visit our website: vancouver.ca/zebtools

• Work with your RZ Planner or Project Facilitator

– Green Buildings Staff are integrated to support eligible projects

• Use ZEBx as a resource: zebx.org

Tools are available until Dec. 2025

Page 12: Zero Emissions Building Tools (ZEBtools) · Zero Emissions Building Tools (ZEBtools) 2 In this presentation 1.ZEBtoolsgoals 2.The tools: a.5% floor space increase b.Passive House

vancouver.ca/zebtools

Questions?