Yap Renewable Energy Development Project (YREDP) · 1 YREDP Overview Photovoltaic Plants: 508,5kWp...
Transcript of Yap Renewable Energy Development Project (YREDP) · 1 YREDP Overview Photovoltaic Plants: 508,5kWp...
![Page 1: Yap Renewable Energy Development Project (YREDP) · 1 YREDP Overview Photovoltaic Plants: 508,5kWp Water treatment: 13 kWp Public Safety: 25 kWp Public Works: 26 kWp ECE: 50 kWp Sports](https://reader033.fdocuments.in/reader033/viewer/2022051812/602f9fab89323704ac0c38fc/html5/thumbnails/1.jpg)
Yap Renewable Energy Development Project (YREDP)A Pacific island success story
PPA Rarotonga, 05/07/2019 Istvan PONSOT Head Business Development - Pacific – [email protected]
![Page 2: Yap Renewable Energy Development Project (YREDP) · 1 YREDP Overview Photovoltaic Plants: 508,5kWp Water treatment: 13 kWp Public Safety: 25 kWp Public Works: 26 kWp ECE: 50 kWp Sports](https://reader033.fdocuments.in/reader033/viewer/2022051812/602f9fab89323704ac0c38fc/html5/thumbnails/2.jpg)
1 • YREDP Overview
2 • RE Power System Performance: PV only
3 • PV + Wind complementarity
4 • Maximizing RE Penetration
5 • Grid Stability
6 • Design vs Reality
7 • What Next?
SOMMAIRE
PPA Rarotonga, 05/07/2019
![Page 3: Yap Renewable Energy Development Project (YREDP) · 1 YREDP Overview Photovoltaic Plants: 508,5kWp Water treatment: 13 kWp Public Safety: 25 kWp Public Works: 26 kWp ECE: 50 kWp Sports](https://reader033.fdocuments.in/reader033/viewer/2022051812/602f9fab89323704ac0c38fc/html5/thumbnails/3.jpg)
YREDP Overview1
An Island-wide fully integrated hybrid power system
PPA Rarotonga, 05/07/2019
to address Yap State Power Corporation ambitious objectives:
• 30% RE by 2020• 50% RE by 2030
YREDP Overview
PV + Wind
PV
Maximizing RE
Grid Stability
Design vs Reality
What Next?
![Page 4: Yap Renewable Energy Development Project (YREDP) · 1 YREDP Overview Photovoltaic Plants: 508,5kWp Water treatment: 13 kWp Public Safety: 25 kWp Public Works: 26 kWp ECE: 50 kWp Sports](https://reader033.fdocuments.in/reader033/viewer/2022051812/602f9fab89323704ac0c38fc/html5/thumbnails/4.jpg)
YREDP Overview1
High Speed Diesels: 4550kW
2x 1860 kW1x 830kW
Automated & Real-time control of the high speed generators
PPA Rarotonga, 05/07/2019
YREDP Overview
PV + Wind
PV
Maximizing RE
Grid Stability
Design vs Reality
What Next?
![Page 5: Yap Renewable Energy Development Project (YREDP) · 1 YREDP Overview Photovoltaic Plants: 508,5kWp Water treatment: 13 kWp Public Safety: 25 kWp Public Works: 26 kWp ECE: 50 kWp Sports](https://reader033.fdocuments.in/reader033/viewer/2022051812/602f9fab89323704ac0c38fc/html5/thumbnails/5.jpg)
YREDP Overview1
Photovoltaic Plants: 508,5kWp
Water treatment: 13 kWpPublic Safety: 25 kWpPublic Works: 26 kWpECE: 50 kWpSports Complex: 194.5 kWpPEC: 200 kWp Sports Complex
PPA Rarotonga, 05/07/2019
YREDP Overview
PV + Wind
PV
Maximizing RE
Grid Stability
Design vs Reality
What Next?
![Page 6: Yap Renewable Energy Development Project (YREDP) · 1 YREDP Overview Photovoltaic Plants: 508,5kWp Water treatment: 13 kWp Public Safety: 25 kWp Public Works: 26 kWp ECE: 50 kWp Sports](https://reader033.fdocuments.in/reader033/viewer/2022051812/602f9fab89323704ac0c38fc/html5/thumbnails/6.jpg)
6
YREDP Overview1
Wind Farm: 825kW
VERGNET GEV MP-C : 275kWTiltable design (1 hour up/down)
Light logistics, ground-level maintenance
Unmatched resistance to cyclones
+500 in operation worldwide (150 in the Pacific)
PPA Rarotonga, 05/07/2019
YREDP Overview
PV + Wind
PV
Maximizing RE
Grid Stability
Design vs Reality
What Next?
![Page 7: Yap Renewable Energy Development Project (YREDP) · 1 YREDP Overview Photovoltaic Plants: 508,5kWp Water treatment: 13 kWp Public Safety: 25 kWp Public Works: 26 kWp ECE: 50 kWp Sports](https://reader033.fdocuments.in/reader033/viewer/2022051812/602f9fab89323704ac0c38fc/html5/thumbnails/7.jpg)
1
PPA Rarotonga, 05/07/2019
Integration & Control:
Hybrid Wizard©Automated controller
Algorithm and parameters incorporating a complete modelizing of Yap’s Electrical grid
Final settings and thresholds validated and improved during commissioning
Island-wide communication network:
Optic Fiber between YSPSC Power plant and the Wind farm
Radio connection to all PV sites
3 local Scadas (Diesel, PV, Wind)
1 showcase system: yspsc-sc.com
YREDP Overview
PV + Wind
PV
Maximizing RE
Grid Stability
Design vs Reality
What Next?
YREDP Overview
![Page 8: Yap Renewable Energy Development Project (YREDP) · 1 YREDP Overview Photovoltaic Plants: 508,5kWp Water treatment: 13 kWp Public Safety: 25 kWp Public Works: 26 kWp ECE: 50 kWp Sports](https://reader033.fdocuments.in/reader033/viewer/2022051812/602f9fab89323704ac0c38fc/html5/thumbnails/8.jpg)
RE Power System Performance: PV only2
Low wind or no wind periods
30%
20%
PPA Rarotonga, 05/07/2019
YREDP Overview
PV + Wind
PV
Maximizing RE
Grid Stability
Design vs Reality
What Next?
![Page 9: Yap Renewable Energy Development Project (YREDP) · 1 YREDP Overview Photovoltaic Plants: 508,5kWp Water treatment: 13 kWp Public Safety: 25 kWp Public Works: 26 kWp ECE: 50 kWp Sports](https://reader033.fdocuments.in/reader033/viewer/2022051812/602f9fab89323704ac0c38fc/html5/thumbnails/9.jpg)
3
Sunshine & Trade Winds
PV + Wind complementarity
25%
PV + Low Wind60%
PV + Good Wind
PPA Rarotonga, 05/07/2019
YREDP Overview
PV + Wind
PV
Maximizing RE
Grid Stability
Design vs Reality
What Next?
![Page 10: Yap Renewable Energy Development Project (YREDP) · 1 YREDP Overview Photovoltaic Plants: 508,5kWp Water treatment: 13 kWp Public Safety: 25 kWp Public Works: 26 kWp ECE: 50 kWp Sports](https://reader033.fdocuments.in/reader033/viewer/2022051812/602f9fab89323704ac0c38fc/html5/thumbnails/10.jpg)
4 Maximizing RE penetration
Pushing RE into the Grid to the maximum
80%
55%
11:30am to 2:00pm 9:00am to 5:00pm
PPA Rarotonga, 05/07/2019
YREDP Overview
PV + Wind
PV
Maximizing RE
Grid Stability
Design vs Reality
What Next?
![Page 11: Yap Renewable Energy Development Project (YREDP) · 1 YREDP Overview Photovoltaic Plants: 508,5kWp Water treatment: 13 kWp Public Safety: 25 kWp Public Works: 26 kWp ECE: 50 kWp Sports](https://reader033.fdocuments.in/reader033/viewer/2022051812/602f9fab89323704ac0c38fc/html5/thumbnails/11.jpg)
6 Grid Stability
PPA Rarotonga, 05/07/2019
YREDP Overview
PV + Wind
PV
Maximizing RE
Grid Stability
Design vs Reality
What Next?
Reverse Power on Gensets
2
Software adjustment:
Dynamic regulation limit
windows
IssueNber of
occurencesCorrective
actionProblem Solved?
YES
Robust System: No other issue caused by PV or Wind since commissioning
23/02/19 16/03/2019
![Page 12: Yap Renewable Energy Development Project (YREDP) · 1 YREDP Overview Photovoltaic Plants: 508,5kWp Water treatment: 13 kWp Public Safety: 25 kWp Public Works: 26 kWp ECE: 50 kWp Sports](https://reader033.fdocuments.in/reader033/viewer/2022051812/602f9fab89323704ac0c38fc/html5/thumbnails/12.jpg)
up to 70%
6 Design Vs Reality
Design vs Reality
PPA Rarotonga, 05/07/2019
YREDP Overview
PV + Wind
PV
Maximizing RE
Grid Stability
Design vs Reality
What Next?
Instant RE share
17%Average RE share
Diesel Displacement(US Gallons/year) 113,600
up to 80%
up to 38%
139,374
38% averageRE in Jan-Feb2019
![Page 13: Yap Renewable Energy Development Project (YREDP) · 1 YREDP Overview Photovoltaic Plants: 508,5kWp Water treatment: 13 kWp Public Safety: 25 kWp Public Works: 26 kWp ECE: 50 kWp Sports](https://reader033.fdocuments.in/reader033/viewer/2022051812/602f9fab89323704ac0c38fc/html5/thumbnails/13.jpg)
13
What Next?7
Increasing RE Capacity:Solar
Wind
Introducing Battery StorageMaintaining a high and stable level of RE Penetration
Reduce sollicitation on the high speed diesels for Dynamic Spinning Reserve
Further improving the robustness and efficiency of the system:Replacing radio link by optic fiber
Select future equipment compatible with Hybrid controls requirements for maximum efficiency (communication & time response)
Hybrid Wizard PLC controler is ready for future extensionSeamless scaling up (additional RE capacity, storage, weather prediction…)
Achieving and exceeding Yap’s 2030 RE objective:
PPA Rarotonga, 05/07/2019
YREDP Overview
PV + Wind
PV
Maximizing RE
Grid Stability
Design vs Reality
What Next?
![Page 14: Yap Renewable Energy Development Project (YREDP) · 1 YREDP Overview Photovoltaic Plants: 508,5kWp Water treatment: 13 kWp Public Safety: 25 kWp Public Works: 26 kWp ECE: 50 kWp Sports](https://reader033.fdocuments.in/reader033/viewer/2022051812/602f9fab89323704ac0c38fc/html5/thumbnails/14.jpg)
What Next?7
PPA Rarotonga, 05/07/2019
YREDP Overview
PV + Wind
PV
Maximizing RE
Grid Stability
Design vs Reality
What Next?
Istvan PONSOT Head Business Development - Pacific – [email protected]
Towards 100% Renewable…
Thank you for yourattention
100 % RE plant Wind + Battery – Tchad