XSEED Summative Assessment Test 2 - AMM...
Transcript of XSEED Summative Assessment Test 2 - AMM...
XSEED Summative Assessment – Test 2
© XSEED Education Maths | Grade 4 1
4
Maths, Test 2
XSEED Summative Assessment – Test 2
© XSEED Education Maths | Grade 4 2
PART I – Short Answer Questions 30 Marks
1. Assign 1 mark for the correct answer.
600
2. Assign 2 marks for correctly solving the problem.
2 0 6
4 8 2 4
– 8
0 2
– 0
2 4
– 2 4
0 0
3. Assign 1 mark for each correctly drawn hand.
Representations may vary.
4. Assign marks as per the given criteria.
CRITERIA MARKS
Correctly shows the working 1.5
Correctly writes the answer 0.5
TOTAL (2 Marks) 2
1 × 2 = 2
1 × 1 = 1
1 × 2 = 2
1 × 2 = 2
XSEED Summative Assessment – Test 2
© XSEED Education Maths | Grade 4 3
Working may vary.
61 × 14 = 60 × 14 + 14
= 840 + 14
= 854
5. Assign 0.5 marks for each correct number.
6. Assign marks as per the given criteria.
CRITERIA MARKS
A. Correctly completes the multiplication sentence 0.5
B. Correctly writes the multiplication sentence
Correctly draws the picture
1
1.5
TOTAL (3 Marks) 3
A. 6
B. Representations may vary.
Multiplication Sentence Picture
2 × 3 = 6
1 × 2 = 2
0.5 + 2.5 = 3
XSEED Summative Assessment – Test 2
© XSEED Education Maths | Grade 4 4
7. Assign marks as per the given criteria.
CRITERIA MARKS
Correctly solves both multiplication sentences (0.5 marks each) 1
Correctly writes the addition sentence 2
TOTAL (3 Marks) 3
4 × 10 = 40
4 × 4 = 16
4 × 14 = 40 + 16 = 56
8. Assign marks as per the given criteria.
CRITERIA MARKS
Correctly identifies the operation 0.5
Correctly shows the working 1.5
Correctly writes the final answer 1
TOTAL (3 Marks) 3
Working may vary.
Number of days in 1 week = 7 days
Number of days in 324 weeks = 324 × 7
324 weeks have 2,268 days.
+1 +2
3 2 4
× 7
2 2 6 8
1 × 3 = 3
1 × 3 = 3
XSEED Summative Assessment – Test 2
© XSEED Education Maths | Grade 4 5
9. Assign marks as per the given criteria.
CRITERIA MARKS
A. Correctly shows the division
Correctly writes the quotient and the remainder (0.5 marks each)
1
1
B. Correctly shows the working
Correctly writes the answer
1
1
TOTAL (4 Marks) 4
A. Working may vary.
78 = 70 + 8
70 ÷ 7 = 10
8 ÷ 7 = 1 Remainder 1
So, 78 ÷ 7 = 11 Remainder 1
Quotient = 11
Remainder = 1
B. Dividend = Quotient × Divisor + Remainder
78 = 7 × 11 + 1
= 77 + 1 = 78
Hence, verified.
10. Assign marks as per the given criteria.
CRITERIA MARKS
A, B. Correctly applies the relation (1 mark each)
Correctly finds the answer (1 mark each)
2
2
TOTAL (4 Marks) 4
Working may vary.
A. 9 hours × 60 minutes = 540 minutes
B. 480 minutes ÷ 60 minutes = 8 hours
2 × 2 = 4
2 × 2 = 4
XSEED Summative Assessment – Test 2
© XSEED Education Maths | Grade 4 6
11. Assign marks as per the given criteria.
CRITERIA MARKS
A. Correctly represents the multiplication using blocks
Correctly adds the blocks to find the answer
1.5
1.5
B. Correctly writes the multiplication sentence 1
TOTAL (4 Marks) 4
A. Representations may vary.
4 tens = 40, 12 ones = 12
40 + 12 = 52
B. 4 × 13 = 52
3 + 1 = 4
XSEED Summative Assessment – Test 2
© XSEED Education Maths | Grade 4 7
PART II – Long Answer Questions 30 Marks
12. Assign marks as per the given criteria.
CRITERIA MARKS
A, B. Correctly divides (2.5 marks each)
Correctly writes whether true or false (0.5 marks each)
5
1
TOTAL (6 Marks) 6
Problem True or False
A.
0 8
5 4 3
– 0
4 3
– 4 0
3
43 ÷ 5 = 8 Remainder 3
B.
1 1
7 7 9
– 7
0 9
– 7
2
79 ÷ 7 = 10 Remainder 9
False
True
2 × 3 = 6
XSEED Summative Assessment – Test 2
© XSEED Education Maths | Grade 4 8
13. Assign marks as per the given criteria.
CRITERIA MARKS
A. Correctly draws the picture 2
B. Correctly frames the story problem 3
C. Correctly finds the answer 1
TOTAL (6 Marks) 6
A. Representations may vary.
Answers may vary. Sample answer:
B. There are 4 boxes of mangoes. Each box has 7 mangoes in it. How many mangoes are
there in all?
C. 4 × 7 = 28; There are 28 mangoes in all.
14. Assign marks as per the given criteria.
CRITERIA MARKS
A. Correctly writes the answer (0.5 marks each) 4
B. Correctly identifies the start time and end time
Correctly subtracts the start time from the end time
1
1
TOTAL (6 Marks) 6
2 + 3 + 1 = 6
4 + 2 = 6
XSEED Summative Assessment – Test 2
© XSEED Education Maths | Grade 4 9
A.
Anand’s Sunday Routine
Activity Time Time in the
12-hour format Time in the
24-hour format
a. Have breakfast 8 o’clock in the morning
8:00 AM 08:00
b. Play tennis Half past ten in the morning
10:30 AM 10:30
c. Go for a walk 6 o’clock in the evening
6:00 PM 18:00
d. Go shopping Half past seven in the evening
7:30 PM 19:30
B. Working may vary.
End time 1 1 : 4 0
Start time – 9 : 2 5
Elapsed time 2 : 1 5
The class took 2 hours 15 minutes at the museum.
15. Assign marks as per the given criteria.
CRITERIA MARKS
A. Correctly identifies the operation
Correctly divides the number
Correctly writes the answer (0.5 marks each)
0.5
2
1
B. Correctly identifies the operation
Correctly multiplies the numbers
Correctly writes the answer
0.5
1.5
0.5
TOTAL (6 Marks) 6
3.5 + 2.5 = 6
XSEED Summative Assessment – Test 2
© XSEED Education Maths | Grade 4 10
Working may vary.
A. Total number of marbles = 926
Number of students = 8
Number of marbles each student gets = 926 ÷ 8
1 1 5
8 9 2 6
– 8
1 2
– 8
4 6
– 4 0
0 6
Each child gets 115 marbles. 6 marbles are left over.
B. Length of Kajal’s rope = 24 cm
Length of Sudha’s rope = 13 times the length of Kajal’s rope
Length of Sudha’s rope = 13 × 24 cm
× 20 4
10 200 40
3 60 12
200 + 40 + 60 + 12 = 312
Length of Sudha’s rope = 312 cm
XSEED Summative Assessment – Test 2
© XSEED Education Maths | Grade 4 11
16. Assign marks as per the given criteria.
CRITERIA MARKS
A, B. Correctly identifies the operation (0.5 marks each)
Correctly shows the working (2 marks each)
Correctly writes the answer (0.5 marks each)
1
4
1
TOTAL (6 Marks) 6
Working may vary.
A. Number of countries = 77
Number of players from each country = 48
Total number of players = 77 × 48
7 7
× 4 8
6 1 6
3 0 8 0
3 6 9 6
Thus, a total of 3,696 players took part in the event.
B. Number of days = 368
Number of hours Anish worked each day = 9
Total number of hours worked = 368 × 9
× 300 60 8
9 2,700 540 72
2,700 + 540 + 72 = 3,312
368 × 9 = 3,312
Thus, Anish worked for a total of 3,312 hours.
2 × 3 = 6
XSEED Summative Assessment – Test 2
© XSEED Education Maths | Grade 4 12
END OF QUESTIONS IN TEST PAPER