    What is a wagon

    tippler?

    For what purpose

    it is used ?

  • 8/8/2019 WT Mukesh Final

    3/19

    WAGON TIPPLERIt is a deep underground structure which is subjected to direct load from

    loaded wagon/loco due to the rake movement over it, in addition to load

    due to coal filled hopper and lateral earth pressure. The earth pressure to

    be considered here for design shall be due to earth pressure at rest (K0).

    For calculation of coal load on moving conveyor, a multiplication factor 1.6

    shall be used to take care of inertia force, casual overburden and impact

    factor etc.

    Thus, coal load per unit length of each moving conveyor

    = 1.6*(Cr/Vcb )*(1100/800).

    Where, Cr = rated capacity of conveyor system,

    Vcb = conveyor belt speed.

    Unit weight of coal shall be assumed as 1100 Kg/m3 instead of 800 Kg/

  • 8/8/2019 WT Mukesh Final

    4/19

  • 8/8/2019 WT Mukesh Final

    5/19

  • 8/8/2019 WT Mukesh Final

    6/19

    THE WT PACKAGESYSTEM CONSISTS OF

  • 8/8/2019 WT Mukesh Final

    7/19

    1. Two(02) numbers of WT complex

    Two(02)-numbers of Side Arm Charger,

    One(01) number WT control room for both WT.

    2. Two(02) numbers of Apron Feeder,

    Two(02) numbers of dribble conveyor- discharge

    to Conv.25A/B

  • 8/8/2019 WT Mukesh Final

    8/19

    3. Stream (A) WT#01-Apron Feeder-Dribble

    conveyor-Conv.25B-Conv26A/B-Conv.27A/B-

    Conv.2A/B-Crusher

    (B) WT#02-Apron Feeder-Dribble

    conveyor-Conv.25A-Conv26A/B-Conv.27A/B-

    Conv.2A/B-Crusher4. Conveyor contains two(02) numbers of ILMS

    at the discharge point of Conv.25A/B.

    5. System contains two (02) numbers ofsuspended magnet at Pent-House-IV of

    Conv26A/B.

  • 8/8/2019 WT Mukesh Final

    9/19

    6. System contains 02 numbers of belt

    weigher/scale on Conv.25A/B.

    7. 02 numbers of Metal Detector in Conv.26A/B.

    8. Conv25A/B (132 KW) is LT power driven.

    9. Conv.26A/B (350KW ,6.6 KV) and Conv.27A/B

    (220 KW, 6.6 KV) are HT power driven.

    10. Except WT operation from local WT control

    room , all other control of conveyors and

    accessories will be from CHP control room ofStage-I.

  • 8/8/2019 WT Mukesh Final

    10/19

    SALIENT FEATURES OF WAGON TIPPLER

    Wagon Tippler Type : Rota side type for BOXN Wagons

    Wagon Tippler Tipping Angle : At least 150 degree.Wagon Tippler Tips/ Hour: 24 Nos. per hour

    Side Arm Charger haulage/hrs : 30 Fully loaded Wagons per hour

    Rated Capacity of Apron Feeder: 1600 TPH.

    Wagon Tippler Hopper Capacity (Volume) : Min. 02 Number 8 wheeled

    Wagon.Conveyor Rated Capacity : 1600 TPH, (1760 TPH-Designed)

    Conveyor Belt Width : Min. 1400 MM

    Conveyor Belt Speed : 3.0 M/Sec.

    Tippler Hopper Opening Grid Size : 350MM X 350MM

    Side arm Charger:- Hydraulic drivenSide arm charger function: Placement of wagon on tippler table and

    removal of empty wagon from the tippler table after tippling.

    Wagon tippler:- 04 numbers hydraulic clamp for holding wagon along

    with rail table for tippling the wagons.

  • 8/8/2019 WT Mukesh Final

    11/19

    1170.0S

    Plant

    Canteen

    Crushe

    r

    House

    (Stage-

    I)

    TRACK

    WAGO

    N

    TIPPLER-I

    TP 20

    Conv

    .25A

    Conv.26A

    Conv.26B

    TRACK

    PENT

    H

    OUSE

    TP 21

    TP 22

    Conv.26A

    Conv.26BConv.27A

    Conv

    .27

    B

    2905.25E

    1462.0S

    2905.25

    E

    3014.2E

    1060.05S

    Co

    nv

    .1

    B

    Co

    nv

    .1

    A

    Conv.2A

    Conv.2B

    TP 1Conv.3A

    Conv.3B

    Conv

    .7

    TP 2

    TP 4

    Conv 4A

    Conv.4B

    Wagon

    Tippler

    Control

    Room

    TPs for Wagon Tippler

    TPs for Stage-I Conv.

    Galleries.

    Conv. Gallery for wagonTippler

    LEGEND:-

    Conv. Gallery of Stage-I

    System Inside tunnel

    OverbridgeNegat

    ive

    Line

    (propos

    ed)

    Negative

    Line

    (Existing)

    ToTrack

    hopp

    er

    I

    ToT

    rackhoppe

    rII

    Stablin

    gLine.

    Conv

    .25B

    WAGON

    TIPPLE

    R-II

    Temp.L

    ine

    Negative Line restored

    on 30.04.10, Loco trial

    done

  • 8/8/2019 WT Mukesh Final

    12/19

    P/P

    House

    Pent

    House

    TR-8 TR-1TR-9 TR-3 TR-2TR-4TR-5TR-6TR-7 TP 21

    TP 22

    TR-4

    TR-3

    TR-2

    TR-1

    TP 20

    WT # 2

    ROB

    PILE CAP & PEDESTALS Schematic Drg.

    TUNNEL

    RailTra

    ck

    Pile Cap Done

    Pedestal Done

    Conv.2

    6A/B

    Conv.2

    7A/B

    Conv. 25A/B

    WAGON TIPPLER: TPs, TRESTLES, PILES

  • 8/8/2019 WT Mukesh Final

    13/19

    OPERATION PHILOSOPHY

  • 8/8/2019 WT Mukesh Final

    14/19

    Step1-Loco should have to brought

    fully loaded 58 numbers wagons (BoxN type), nearer to rail table i.e. with in

    the reach of Side Arm Charger

    (SAC).

    Step2- Engine have to removed

    through loop line, by- passing railtable (consisting load cells for

    weighing).

  • 8/8/2019 WT Mukesh Final

    15/19

    Step3- Side arm charger arm will

    automatically (hydraulic operated) clamp

    with wagon rakes, and will drag full racknearer to rail table. Long travel of SAC took

    by Hydraulic driven rack-pinion system.

    Step4- One number wagon will be manually

    de-clamped from rake and side arm charger

    will slowly placed the loaded rake on-to therail table and the 04 i.e. two pair photo cell

    will verify the perfect positioning of wagon

    on the rail table.

  • 8/8/2019 WT Mukesh Final

    16/19

    Step5-As soon as photo cell permits, the four number

    hydraulic operated clamps , moves down and hold the

    entire wagon along with rail table from bottom, in meantime side arm charger de-clamped from the wagon.

    Step6- The wagon tippler drive start the tippling

    operation and on the end-arm by side type tippling

    system, whole rail table along with loaded wagon tilting

    started. As soon as the tippling angle reaches up-to

    110 degree, after getting clearance with rail table, the

    horizontal arm of side arm charger lifted up (i.e. 90 O).The side arm charger will start to move back towards

    rack, and the tippler will continue the tippling activity for

    up-to 150 degree.

  • 8/8/2019 WT Mukesh Final

    17/19

    Step7- The tippler will complete the tippling of wagon

    i.e. unloading of coal into WT hopper (Capacity -02

    fully loaded wagon), in the same time frame the side

    arm charger , reaches nearer to the loaded wagon

    rakes.

    Step8- Side arm charger again started the same

    sequences of Step1 to step-7, by holding the entirerakes, dragging nearer to rail table, manual de-

    clamping of one wagon and then placing of wagon

    up-on rail table. In the same time frame the rail table

    will return back to its original position , clamps will beremoved from empty wagon.

  • 8/8/2019 WT Mukesh Final

    18/19

    Step9- While placing loaded wagon from IN-

    HAUL track on to rail table, the side arm charger

    (SAC) slowly push empty wagon ahead in OUT-

    HAUL track, and at last SAC, will imparts a quit

    higher force on empty rack , in order to moving

    farther from rail table or automatically clampingwith any existing wagon.

    Step10- From the hopper ,through apron feeder,

    coal cutting will took place and by conveyingsystem , coal will be feed in to crusher house.

  • 8/8/2019 WT Mukesh Final

    19/19

    THANK YOU