WSDOT/AGC/ACEC Design- Build Subcommittee Annual Report

8
WSDOT/AGC/ACEC Design- Build Subcommittee Annual Report Derek Case / Paul Mayo WSDOT / AGC Co-Chairs WSDOT / ACEC Annual Meeting Bellevue, WA June 14, 2016 Roger Millar Acting Secretary of Transportation Jeff Carpenter / Lindsay Yamane WSDOT / ACEC Executive Co-Chairs

Transcript of WSDOT/AGC/ACEC Design- Build Subcommittee Annual Report

WSDOT/AGC/ACEC Design-

Build Subcommittee Annual Report

Derek Case / Paul MayoWSDOT / AGC Co-Chairs

WSDOT / ACEC Annual Meeting

Bellevue, WA

June 14, 2016

Roger MillarActing Secretary of Transportation

Jeff Carpenter / Lindsay YamaneWSDOT / ACEC Executive Co-Chairs

2015 Annual Report

Who we are

2015 Accomplishments

Team’s Purpose and

Function

2

2016 Focus Areas

WSDOT / AGC / ACEC-WA sub-committee team consisting of

approximately 25 members (+\-)

• WSDOT is represented by State Construction Office, State

Design Office, State Materials Lab, NWR, OR, SR 520 Program, I-

405 Program, AWV Program and FHWA

• AGC is currently represented by Max J. Kuney Co., Kiewit,

Atkinson, Granite, PCL, Flatiron, and Graham.

• ACEC is currently represented by COWI, Parsons, AECOM,

Rohila Consulting Services, and GeoEngineers.

Who we are

3

• Vision - A nationally recognized Design-Build Program that

consistently delivers quality projects through positive coordination

with Design-Builders, executed through competitive contracts that

appropriately allocate risk, promote innovation and collaboration

that ultimately benefits the citizens of Washington.

• Mission - Founded on strong WSDOT and Design-Builder

relationships, further develop and maintain WSDOT’s Design-Build

Program based on the values of collaboration, innovation and

continuous improvement that result in industry best practices.

• Purpose - To serve as a resource for establishing Design-Build

policy, procedures and process improvement.

Team’s Purpose and Function

4

Team’s Purpose and Function (continued)

5

• Meet approximately every six weeks

• Provide specific expertise to support Design-Build project delivery

• Review, comment and collectively discuss high priority RFP sections

focused on establishing consistency and appropriate risk allocation.

• Discuss specific Design-Build related topics as they relate to project

delivery.

2015 Accomplishments

• Established the Team’s Charter and Goals

• Standardized Hi-Priority RFP Documents

• Supported the development and Finalization of WSDOT’s Small

Design-Build Pilot Projects Report

• Developed and deployed the Project Delivery Method Selection

Guidance

• Unfortunately HQ Construction lost both Scotty Ireland and Teresa

Eckard, big shoes to fill!

6

2016 Focus Areas

• Transition to new HQ Design Build Program Manager Art McCluskey

and Design Build Engineer Jolena Missildine

• Further refinement of DBE requirements as they apply to DB delivery

• Formalize WSDOT DB administration processes and policy for

consistent statewide application

• Support upcoming major DB delivery through Connecting Washington

• Continue to engage and participate in national forums through FHWA

and the DBIA

• Status upcoming DB projects and other opportunities as identified by

the subcommittee

7

Thank you

8

WSDOTDerek Case, PE

State Construction Office

Assistant State Construction Engineer

(360) 705-7826

AGCPaul MayoFlatiron Corp.

Northwest Area Manager

(425) 508-7713

ACEC - WA

Richard Patterson, PE SEBuckland & Taylor / COWI

Washington Practice Lead

(206) 321-6655