Procurement Plan-Goods Country/Organisation: Nigeria, Enugu State Ministry of Works and Infrastructure
Project/Programme: Enugu State Rural Access and Mobility Project (RAMP)
Loan #:
Description*Package
Number
Lot
Number
Estimated
Amount in US $
Procurement
Method
Pre-or Post
Qualification
Prior or Post
Review
If Prequalification
add 7-13 wks
List of Contracts
EN/RAMP/GDS/NS/01/2015 1112,500
NS Post P0st
EN/RAMP/GDS/NS/02/2015 1 12,200 NS post post
EN/RAMP/GDS/NS/03/2015 1 69,025.00 NS P0st Post
BASIC DATA
Norm Duration of Proc Steps
Project Vehicles 3 Nos
Modem/V-Sat Equipment for Internet
Office Equipment&Furniture (Public Address
system, Office Furniture Replacement,
Projector, Digital Camera, Total Station &
Engineering leveling, Measuring Tape, Safety
Boots, Helmets, Project Magt Softwares,
Server for Softwares, Anti-Virus)
947440PROP0Box0ed0Procurement0Plan.xlsx 1 of 22 3/6/2015 1:40 PM
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Procurement Plan-Goods
Total Cost 568,850.00
Fill gray cells only!
947440PROP0Box0ed0Procurement0Plan.xlsx 2 of 22 3/6/2015 1:40 PM
Procurement Plan-Goods Country/Organisation: Nigeria, Enugu State Ministry of Works and Infrastructure
Project/Programme: Enugu State Rural Access and Mobility Project (RAMP)
Loan #:
Description*
List of Contracts
Norm Duration of Proc Steps
Project Vehicles 3 Nos
Modem/V-Sat Equipment for Internet
Office Equipment&Furniture (Public Address
system, Office Furniture Replacement,
Projector, Digital Camera, Total Station &
Engineering leveling, Measuring Tape, Safety
Boots, Helmets, Project Magt Softwares,
Server for Softwares, Anti-Virus)
If Post-Review, No-objection Dates are not needed
Spec Proc Notice
Advert
Plan
vs.
Actual
Prep &
Submission
by Ex Agency
No-objection
Date
On-line UNDB
Gateway
Nat Press
Bid Invitation
Date
Bid Closing-
Opening
Submission
Bid Eval Rpt
No-objection
Date
Plan 4 - 7 wks 1 - 1.5 wks 1.5 - 2 wks 6 to 12 wks 1.5 - 3 wks 1 - 1.5 wks
Actual
Plan NA NA NA 15/01/15 21/01/15 28/01/15 7/02/15
Actual
Plan NA NA NA 20/02/15 27/02/15 NA NA
Actual
Plan
Actual NA NA NA 15/03/2015 21/03/2015 NA NA
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Bid EvaluationBidding Period
Draft Bid Documents, including
specs and quantities, draft SPN
947440PROP0Box0ed0Procurement0Plan.xlsx 3 of 22 3/6/2015 1:40 PM
Procurement Plan-Goods
Total Cost
Fill gray cells only!
Plan
Actual
Plan
Actual
947440PROP0Box0ed0Procurement0Plan.xlsx 4 of 22 3/6/2015 1:40 PM
Procurement Plan-Goods Country/Organisation: Nigeria, Enugu State Ministry of Works and Infrastructure
Project/Programme: Enugu State Rural Access and Mobility Project (RAMP)
Loan #:
Description*
List of Contracts
Norm Duration of Proc Steps
Project Vehicles 3 Nos
Modem/V-Sat Equipment for Internet
Office Equipment&Furniture (Public Address
system, Office Furniture Replacement,
Projector, Digital Camera, Total Station &
Engineering leveling, Measuring Tape, Safety
Boots, Helmets, Project Magt Softwares,
Server for Softwares, Anti-Virus)
Contract Implementation
Plan
vs.
Actual
Contract Amount
in US$'000
Date
Contract
Award
Date
Contract
Advert
Date
Contract
Signature
Opening
of
Let of Credit
Arrival
of
Goods
Inspection
Final
Acceptance
Plan 1 wk 1.5-3 wks
Actual
112,50014/02/15 14/03/15 NA 28/03/15 03/03/15
Actual NAdate
Plan 12,200.00 30/02/15 NA 04/04/15 NA 27/04/54 20/07/15
Actual
Actual 69,025.00 21/04/2015 NA 27/04/2015 NA 05/05/2015 07/04/2015
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Contract Finalization
947440PROP0Box0ed0Procurement0Plan.xlsx 5 of 22 3/6/2015 1:40 PM
Procurement Plan-Goods
Total Cost
Fill gray cells only!
Plan
Actual
Plan
Actual
947440PROP0Box0ed0Procurement0Plan.xlsx 6 of 22 3/6/2015 1:40 PM
Procurement Plan-Works Country/Organisation: Nigeria, Enugu State Ministry of Works and Infrastructure
Project/Programme: Enugu State Rural Access and Mobility Project (RAMP)
Loan #:
Description*Package
Number
Lot
Number
Lumpsum or
Bill of
Quantities
Procurement
Method
Estimated
Amount in
US $
Pre-or Post
Qualification
Prior or Post
Review
If Prequalification
add 7-13 wks
List of Contracts
EN/RAMP//WORKS/NCB/001/14 4 Lumpsum NCB 18,190,090.50 Post Prior
EN/RAMP//WORKS/NCB/01/15 5 Lumpsum NCB 1,350,000.00 Post post
EN/RAMP/WORKS/DC/02/2015 1 lumpsum DC 161,375.00 NA prior
EN/RAMP/WORKS/DC/03/2015 1 iumpsum NS 375,000.00 NA prior
Total Cost 20,076,465.50
0.00
Fill gray cells only!
Annual Maintenance of Pilot Road
Projects (50km)
Norm Duration of Proc Steps
Rehabilitation of 159KM road in Enugu
construction of 16 Nos River Crossings
Routing Maintenance of Pilot Projects
(50km)
Basic Data
947440PROP0Box0ed0Procurement0Plan.xlsx 7 of 22 3/6/2015 1:40 PM
Procurement Plan-Works Country/Organisation: Nigeria, Enugu State Ministry of Works and Infrastructure
Project/Programme: Enugu State Rural Access and Mobility Project (RAMP)
Loan #:
Description*
List of Contracts
Total Cost
Fill gray cells only!
Annual Maintenance of Pilot Road
Projects (50km)
Norm Duration of Proc Steps
Rehabilitation of 159KM road in Enugu
construction of 16 Nos River Crossings
Routing Maintenance of Pilot Projects
(50km)
If Post-Review, No-objection Dates are not needed
Spec Proc Notice
Advert
Plan
vs.
Actual
Prep &
Submission
by Ex Agency
No-objection
Date
On-line UNDB
Gateway
Nat Press
Bid Invitation
Date
Bid Closing-
Opening
Submission
Bid Eval Rpt
No-objection
Date
Plan 4 - 7 wks 1 - 1.5 wks 1.5 - 2 wks 1.5 - 2 wks 6 to 12 wks 1.5 - 3 wks
Actual
Plan 04/02/2014 10/02/14 22/02/14 24/04/2014 25/05/2014 26/06/2014 23/01/15
Actual 26/04/2014 06/04/2014 26/02/2014 28/04/2014 26/05/14 15/09/15
Plan NA NA NA 02/04/15 03/05/15 NA NA
Actual
Plan NA NA NA 30/03/2015 30/03/2015 NA NA
Actual
Plan NA NA NA 15/03/2015 21/03/2015 NA NA
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Bid EvaluationBidding Period
Draft Bid Documents, including specs
and quantities, draft SPN
947440PROP0Box0ed0Procurement0Plan.xlsx 8 of 22 3/6/2015 1:40 PM
Procurement Plan-Works Country/Organisation: Nigeria, Enugu State Ministry of Works and Infrastructure
Project/Programme: Enugu State Rural Access and Mobility Project (RAMP)
Loan #:
Description*
List of Contracts
Total Cost
Fill gray cells only!
Annual Maintenance of Pilot Road
Projects (50km)
Norm Duration of Proc Steps
Rehabilitation of 159KM road in Enugu
construction of 16 Nos River Crossings
Routing Maintenance of Pilot Projects
(50km)
Plan
vs.
Actual
Contract Amount
in US$ '000
Date
Contract
Award
Date
Contract
Advert
Date
Contract
Signature
Mobilization
Advance
Payment
Substantial
Completion
Plan 1 wk 1.5-3 wks
Actual
Plan 18,190.090.50 30/01/15 29/02/15 10/02/15 20/02/015 12/12/15
Actual
Plan 1,350,000.00 11/05/15 26/05/15 30/05/15 10/06/2015 26/12/16
Actual
Plan 161,375.00 05/05/2015 NA 07/05/2015 NA 15/07/2015
Actual
Plan 375,000.00 30/03/2015 NA 02/04/2015 NA 25/03/2015
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan #VALUE!
Actual 0.00
Contract ImplementationContract Finalization
947440PROP0Box0ed0Procurement0Plan.xlsx 9 of 22 3/6/2015 1:40 PM
Procurement Plan-Works Country/Organisation: Nigeria, Enugu State Ministry of Works and Infrastructure
Project/Programme: Enugu State Rural Access and Mobility Project (RAMP)
Loan #:
Description*
List of Contracts
Total Cost
Fill gray cells only!
Annual Maintenance of Pilot Road
Projects (50km)
Norm Duration of Proc Steps
Rehabilitation of 159KM road in Enugu
construction of 16 Nos River Crossings
Routing Maintenance of Pilot Projects
(50km)
Final
Acceptance
Final
Cost
29/05/16 18,190,090.50
26/12/17 1,350,000.00
15/08/2015 161,375.00
30/03/2015 30/03/2015
#VALUE!
0.00
Contract Implementation
947440PROP0Box0ed0Procurement0Plan.xlsx 10 of 22 3/6/2015 1:40 PM
Procurement Plan-consultancy
Country/Organisation: Nigeria, Enugu State Ministry of Works and Infrastructure
Project/Programme: Enugu State Rural Access and Mobility Project (RAMP)
Loan #:Contract
Type
Description*Selection
Method
Lumpsum
or
Time-Based
Estimated
Amount
in US$ '000
Prior/Post
Review
Plan
vs.
Actual
Prep &
Submission
by Ex Ag
No-objection
Date
On-line UNDB
Gateway
Nat Press
Lead-time
before
shortlist
Plan 3 - 6 wks 1 - 2 wks 1 - 1.5 wks 2 wks
Actual
List of Contracts
QCBS Time Based 909,504.53 Prior Plan 04/01/2014 16/01/2014 23/01/2014 30/01/2014
Actual 02/02/14 09/02/14 15/02/14 15/02/14
CQS lumbsum 260,000.00 prior plan NA NA 15/03/14 22/03/14
Actual
QCBS Lumpsum 637,500.00 Prior Plan 02/3/15 09/03/15 16/03/15 27/03/15
Actual
CQS Lumpsum 419,375.00 Prior Plan NA NA 16/03/14 23/03/14
Actual NA NA 15/04/14 29/04/14
Detailed Assessment, , Engineering Design,
Preparation of Bidding Document,., Environmental
Management Plan of 341km of Rural Roads in
Enugu State(2nd phase).
Preparation
Request for Proposals
Norm Duration of Proc Steps
Supervision of Rural Roads Rehabilitation(1st
phase)
Request for EOI
(where required)
Detailed Assessment, Prioritization, Engineering
Design, Preparation of Bidding Document,
Environmental Management Plan for
reinstating/constructing damaged washed away and
missing river crossings on Rural Roads in Enugu
State.
Revalidation and Priotisation of 341km of Rural Roads to be Rehabilitated in Enugu State
947440PROP0Box0ed0Procurement0Plan.xlsx 11 of 22 3/6/2015 1:40 PM
Procurement Plan-consultancy
CQS Lumpsum 200,000.00 Post Plan NA NA 05/06/15 24/06/15
Actual
IC Lumpsum 30,000.00 Post Plan NA NA NA NA
Actual
CQS Lumpsum 62,500.00 Post Plan NA NA 10/05/15 24/05/15
Actual
CQS Lumpsum 100,000.00 Post Plan NA NA 10/04/15 24/04/15
Actual
CQS Lumpsum 150,000.00 Post Plan NA NA 05/09/15 19/09/15
Actual
CQS Time Based 150,000.00 Post Plan NA NA 05/01/15 27/01/15
Actual
IC Lumpsum 56,250.00 Post Plan NA NA NA NA
Actual
IC lumbsum 25,000.00 post Plan NA NA NA NA
Actual
Actual
Total Cost 81,250.00 Plan
#REF! Actual
GIS Based bridge and Road Inventory
Hiring of Technical Assistant on Procurement.
Audit of Accounts
Road Asset Management and Reclassification
studies
Hiring of Operational Consultants (Technical,
financial and safeguards)
M & E Activities
Hiring of Technical Assistance on M&E.
Study for Economic Road Surfacing options and
alternatives
947440PROP0Box0ed0Procurement0Plan.xlsx 12 of 22 3/6/2015 1:40 PM
Procurement Plan-consultancy
Fill gray cells only!
947440PROP0Box0ed0Procurement0Plan.xlsx 13 of 22 3/6/2015 1:40 PM
Procurement Plan-consultancy
Country/Organisation: Nigeria, Enugu State Ministry of Works and Infrastructure
Project/Programme: Enugu State Rural Access and Mobility Project (RAMP)
Loan #:
Description*
List of Contracts
Detailed Assessment, , Engineering Design,
Preparation of Bidding Document,., Environmental
Management Plan of 341km of Rural Roads in
Enugu State(2nd phase).
Norm Duration of Proc Steps
Supervision of Rural Roads Rehabilitation(1st
phase)
Detailed Assessment, Prioritization, Engineering
Design, Preparation of Bidding Document,
Environmental Management Plan for
reinstating/constructing damaged washed away and
missing river crossings on Rural Roads in Enugu
State.
Revalidation and Priotisation of 341km of Rural Roads to be Rehabilitated in Enugu State
Submission
Date
No-objection
Date
Plan
vs.
Actual
Invitation
Date
Submission/
Opening
Date
Submission
Evaluation
Report (T)
No-objection
Evaluation
Report (T)
1 - 2 wks Plan 4 to 12 wks 2 - 3 wks 0.5 - 2 wks
Actual
05/02/2014 14/02/2014 plan 22/04/2014 27/01/15 08/02/15 15/02/15
29/02/14 02/01/15 Actual 07/01/15
NA NA 30/03/14 30/04/14 NA NA
04/04/15 10/04/15 Plan 27/04/15 10/05/15 24/05/15 30/05/15
Actual
NA NA Plan NA NA
NA NA Actual 14/06/14 04/11/14 NA NA
Short
List
Consultant
Proposals
Proposal Evaluation and Negotiation for Projects after May 2002
Technical (T) & Financial (F) and Negotions (N)
947440PROP0Box0ed0Procurement0Plan.xlsx 14 of 22 3/6/2015 1:40 PM
Procurement Plan-consultancy
Total Cost
GIS Based bridge and Road Inventory
Hiring of Technical Assistant on Procurement.
Audit of Accounts
Road Asset Management and Reclassification
studies
Hiring of Operational Consultants (Technical,
financial and safeguards)
M & E Activities
Hiring of Technical Assistance on M&E.
Study for Economic Road Surfacing options and
alternatives
NA NA Plan 07/07/15 14/08/15 NA NA
Actual
NA NA Plan NA NA NA NA
Actual
NA NA Plan 07/06/15 14/07/15 NA NA
Actual
NA NA Plan 07/05/15 14/05/15 NA NA
Actual
NA NA Plan 03/10/15 17/10/15 NA NA
Actual
NA NA Plan 03/02/15 17/02/15 NA NA
Actual
NA NA Plan NA NA NA NA
Actual
NA NA Plan NA NA NA NA
Actual
Actual
Plan
Actual
947440PROP0Box0ed0Procurement0Plan.xlsx 15 of 22 3/6/2015 1:40 PM
Procurement Plan-consultancy
Fill gray cells only!
947440PROP0Box0ed0Procurement0Plan.xlsx 16 of 22 3/6/2015 1:40 PM
Procurement Plan-consultancy
Country/Organisation: Nigeria, Enugu State Ministry of Works and Infrastructure
Project/Programme: Enugu State Rural Access and Mobility Project (RAMP)
Loan #:
Description*
List of Contracts
Detailed Assessment, , Engineering Design,
Preparation of Bidding Document,., Environmental
Management Plan of 341km of Rural Roads in
Enugu State(2nd phase).
Norm Duration of Proc Steps
Supervision of Rural Roads Rehabilitation(1st
phase)
Detailed Assessment, Prioritization, Engineering
Design, Preparation of Bidding Document,
Environmental Management Plan for
reinstating/constructing damaged washed away and
missing river crossings on Rural Roads in Enugu
State.
Revalidation and Priotisation of 341km of Rural Roads to be Rehabilitated in Enugu State
Opening
Financial
Proposals
Preparation
Eval Report
(T) (F)
Negotiations (N)
Plan
vs.
Actual
Submission DateNo-objection
Date
Contract
Amount in
US$ '000
Contract Award
2 wks 1 - 2 wks 2 wks Plan 1 - 2 wks 1 - 2 wks 1 wk
Actual
20/02/15 27/02/15 30/02/15 Plan 02/03/15 10/03/15 909,504.53 15/03/15
Actual
NA 4/05/14 10/04/14 NA NA 260,000.00 17/04/14
12/06/15 28/06/15 30/06/15 Plan 07/07/15 14/07/15 637,500.00 17/07/15
Actual
NA 30/02/15 Plan NA NA 419,375.00 30/03/15
NA 14/11/14 NA Actual NA
Contract FinalizationProposal Evaluation and Negotiation for Projects after May 2002
Technical (T) & Financial (F) and Negotions (N)Draft Contract
947440PROP0Box0ed0Procurement0Plan.xlsx 17 of 22 3/6/2015 1:40 PM
Procurement Plan-consultancy
Total Cost
GIS Based bridge and Road Inventory
Hiring of Technical Assistant on Procurement.
Audit of Accounts
Road Asset Management and Reclassification
studies
Hiring of Operational Consultants (Technical,
financial and safeguards)
M & E Activities
Hiring of Technical Assistance on M&E.
Study for Economic Road Surfacing options and
alternatives
NA 14/08/15 04/09/15 Plan NA NA 200,000.00 12/09/15
Actual
NA NA 10/03/15 Plan 17/03/15 21/03/15 30,000.00 28/03/15
Actual
NA 28/07/15 05/08/15 Plan NA NA 100,000.00 12/08/15
Actual
NA 28/05/15 05/06/15 Plan NA NA 100,000.00 12/06/15
Actual
NA 31/10/15 07/11/15 Plan NA NA 150,000.00 14/11/15
Actual
NA 31/02/15 03/03/15 Plan NA NA 150,000.00 07/03/15
Actual
NA NA 10/08/15 Plan 17/08/15 21/08/15 30,000.00 28/08/14
Actual
NA NA 15/08/15 Plan 21/08/15 27/08/15 25,000.00 03/09/15
Actual
Actual
Plan #REF!
Actual #REF!
947440PROP0Box0ed0Procurement0Plan.xlsx 18 of 22 3/6/2015 1:40 PM
Procurement Plan-consultancy
Fill gray cells only!
947440PROP0Box0ed0Procurement0Plan.xlsx 19 of 22 3/6/2015 1:40 PM
Procurement Plan-consultancy
Country/Organisation: Nigeria, Enugu State Ministry of Works and Infrastructure
Project/Programme: Enugu State Rural Access and Mobility Project (RAMP)
Loan #:
Description*
List of Contracts
Detailed Assessment, , Engineering Design,
Preparation of Bidding Document,., Environmental
Management Plan of 341km of Rural Roads in
Enugu State(2nd phase).
Norm Duration of Proc Steps
Supervision of Rural Roads Rehabilitation(1st
phase)
Detailed Assessment, Prioritization, Engineering
Design, Preparation of Bidding Document,
Environmental Management Plan for
reinstating/constructing damaged washed away and
missing river crossings on Rural Roads in Enugu
State.
Revalidation and Priotisation of 341km of Rural Roads to be Rehabilitated in Enugu State
Date
Contract
Advert
Contract
Signature
Plan
vs.
Actual
Mobilization
Advance
Payment
Draft
Report
Final
Report
Final
Cost
1 - 3 wks Plan
Actual
30/04/15 15/03/15 15/03/15 30/04/15 18/12/16 909,504.53
Actual
15/05/14 21/04/14 30/04/14 28/04/14 16/06/14 260,000.00
10/08/15 21/07/15 Plan 27/07/15 14/08/15 30/09/15 637,500
Actual
30/05/15 02/6/15 Plan 15/6/15 13/07/15 30/07/15 419,375.00
Actual
Contract ImplementationContract Finalization
947440PROP0Box0ed0Procurement0Plan.xlsx 20 of 22 3/6/2015 1:40 PM
Procurement Plan-consultancy
Total Cost
GIS Based bridge and Road Inventory
Hiring of Technical Assistant on Procurement.
Audit of Accounts
Road Asset Management and Reclassification
studies
Hiring of Operational Consultants (Technical,
financial and safeguards)
M & E Activities
Hiring of Technical Assistance on M&E.
Study for Economic Road Surfacing options and
alternatives
NA 17/09/15 Plan 31/09/15 21/10/15 30/10/15 200,000
Actual
NA 30/03/15 Plan 14/04/15 04/05/15 18/06/15 30,000
Actual
NA 17/08/15 Plan 31/08/15 21/09/15 04/09/15 100,000
Actual
NA 17/06/15 Plan 31/06/15 21/07/15 04/07/15 100,000
Actual
NA 17/11/15 Plan 02/12/15 23/12/15 07/01/15 150,000
Actual
NA 10/03/15 Plan 15/03/15 23/03/15 07/05/15 150,000
Actual
NA 30/08/14 Plan 14/09/15 04/10/15 18/10/14 30,000
Actual
NA 10/09/15 Plan 20/09/15 30/09/15 30/10/15 25,000
Actual
Actual
Plan #REF!
Actual #REF!
947440PROP0Box0ed0Procurement0Plan.xlsx 21 of 22 3/6/2015 1:40 PM
Procurement Plan-consultancy
Fill gray cells only!
947440PROP0Box0ed0Procurement0Plan.xlsx 22 of 22 3/6/2015 1:40 PM