Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system...

33
Workshop: Preventive Maintenance June 20, 2006

Transcript of Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system...

Page 1: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials.

Workshop: Preventive Maintenance

June 20, 2006

Page 2: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials.

Project Goals

Implement SAP Plant Maintenance system

Provide integration with Financials, HR, and Materials Allow enhanced scheduling and planning for work assignments Provide work scheduling as well as management reporting tools Accommodate the use of mobile technology to reduce paperwork Accommodate the use of GIS with SAP Improve automated updates to customers about the status of work Implement a Preventive Maintenance system for buildings, areas, and

equipment Utilize standard SAP functionality to collect utility usage and cost

information for recharge calculations

Page 3: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials.

Agenda

Introduction

Discussion of Task Lists

Discussion of Maintenance Plans

Discussion of Plan Scheduling

Preview of Next Blueprinting Session

Other Discussion

Page 4: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials.

What is a Task List?

A task list is a maintenance procedure.

It includes planned labor and materials.

There are three types of task lists:

General Task Lists

Functional Location Task Lists

Equipment Task Lists

A task list looks very much like a planned order, without dates!

Page 5: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials.

What is a Task List?

Why 3 Types?

The General Task List is used as a “model” maintenance procedure. The work goes into the procedure planning and then this is copied to specific Functional Location (building, room) and Equipment task lists.

A Functional Location task list may ONLY be used for preventive maintenance for that specific functional location.

An Equipment Task list may ONLY be used for preventive maintenance for that specific piece of equipment.

STOCK materials and labor may be planned on any task list type.NON-STOCK materials, services, and text items from the Equipment or

Functional Location BOM may be planned on Equipment or Functional Location Task Lists.

Page 6: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials.

Naming a Task List

Functional Location and Equipment task lists have sequentially assigned numbers. The task lists are found using the Equipment or Functional Locations.

General Task lists may have either numbers assigned by SAP or may have alphanumeric names. The length of the name field is 8 characters. (This may be useful for Medical Center WHUPOS).

Page 7: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials.

Creating a General Task List

There are separate transactions for Functional Location, Equipment, and General Task Lists.

Page 8: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials.

Creating a General Task List

This task list is being given the name “TEST0613,” rather than allowing SAP to assign a name.

Page 9: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials.

Creating a General Task List

The task list is given a description and default work center.

Page 10: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials.

Creating a General Task List

A short description, labor estimate, number of workers is entered.

Page 11: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials.

Creating a General Task List

As much long text as is required may be added. This is copied to the work order when it is created.

Page 12: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials.

Creating a General Task List

A stock part is added and the task list is saved.

Page 13: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials.

Creating an Equipment Task List

Page 14: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials.

Creating an Equipment Task List

The equipment number is the “name” of the task list.

Page 15: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials.

Creating an Equipment Task List

A task list already exists for this equipment. Select “+” to add another.

Page 16: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials.

Creating an Equipment Task List

A description and default work center are entered.

Page 17: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials.

Creating an Equipment Task List

A description for the operation, the labor, and number of workers is entered.

Page 18: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials.

Creating an Equipment Task List

From the component screen, the Component Selection button is chosen to select parts from the Bill of Material.

Page 19: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials.

Creating an Equipment Task List

As many parts as are appropriate are selected.

Page 20: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials.

Creating an Equipment Task List

Notice that stock, non-stock, and text items may be chosen from the BOM.

The Functional Location Task List is similar to the Equipment Task List.

Page 21: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials.

What is a Maintenance Plan?

A maintenance plan associates:

A Task List

An object to be maintained

Functional Location

Task List

A maintenance cycle

Some parameters around order creation

Page 22: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials.

Creating a Maintenance Plan

This example will create a simple “single-cycle” maintenance plan based on the calendar (rather than a measurement point).

Page 23: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials.

Creating a Maintenance Plan

There are also “strategy” and “multiple counter” maintenance plans.

Page 24: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials.

Creating a Maintenance Plan

SAP may assign a number or one may be entered. This is a 12 character alphanumeric field.

Page 25: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials.

Creating a Maintenance Plan

Page 26: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials.

Creating a Maintenance Plan

Page 27: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials.

Creating a Maintenance Plan

The “Call Horizon” determines how far into the maintenance cycle the order should be generated. This is a monthly plan, so 90% will generate the order 3 days before it is due.

The “Time-Key Date” tells SAP to generate the order on the same day each month (rather than every 30 days).

Page 28: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials.

Scheduling a Maintenance Plan

Creating the Maintenance Plan assigns a cycle and some order parameters.

Scheduling start this plan running to create orders.

Page 29: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials.

Scheduling a Maintenance Plan

Enter the plan number.

Page 30: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials.

Scheduling a Maintenance Plan

Notice that no scheduling has been done.

Page 31: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials.

Scheduling a Maintenance Plan

Click “Start”. SAP suggests the current date to start the plan.

Note: The first order is created at the END of the cycle. (If you want an order from a monthly plan tomorrow, start it 29 days in the past.)

Page 32: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials.

Scheduling a Maintenance Plan

The first order will be created with a start date of 6/14/2006.

Page 33: Workshop: Preventive Maintenance June 20, 2006. Project Goals Implement SAP Plant Maintenance system Provide integration with Financials, HR, and Materials.

Topics For Next Blueprinting Session

Determine High Level Reporting Requirements

Please bring your thoughts on current reports which are used frequently in your area.