Application of Southern California Gas Company for authority to update its gas revenue requirement and base rates effective on January 1, 2012. (U904G) Application No. 10-12-___ Exhibit No.: (SCG-17-WP) WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A. FOLKMANN ON BEHALF OF SOUTHERN CALIFORNIA GAS COMPANY BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA DECEMBER 2010

Transcript of WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year...

Page 1: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Application of Southern California Gas Company for authority to update its gas revenue requirement and base rates effective on January 1, 2012. (U904G)

Application No. 10-12-___ Exhibit No.: (SCG-17-WP)

WORKPAPERS TO

PREPARED DIRECT TESTIMONY

OF BRUCE A. FOLKMANN

ON BEHALF OF SOUTHERN CALIFORNIA GAS COMPANY

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

DECEMBER 2010

Page 2: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Application of Southern California Gas Company for authority to update its gas revenue requirement and base rates effective on January 1, 2012. (U904G)

Application No. 10-12-___ Exhibit No.: (SCG-17-WP)

WORKPAPERS TO

PREPARED DIRECT TESTIMONY

OF BRUCE A. FOLKMANN

ON BEHALF OF SOUTHERN CALIFORNIA GAS COMPANY

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

DECEMBER 2010

Page 3: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Index Division / Department / Cost Center Workpaper Page

A Finance Division Summary 17A Recon Finance Reconciliation 18A-Alloc change Finance Sum of Change in Allocation 19A Esc Recon Finance Reconciliation 21A Esc Finance Escalation 22A-1.1 CFO Department Summary 23A-1.1 Recon CFO Reconciliation 24A-1.1Esc CFO Escalation 25A-2 Accounting Services Department Summary 26A-2 Recon Accounting Services Reconciliation 27A-2Esc Accounting Services Escalation 28A-2.1 SVP - Controller Cost Center Summary 29A-2.1 Recon SVP - Controller Reconciliation 30A-2.1Esc SVP - Controller Escalation 31A-2.2 Assistant Controller - Corp Cost Center Summary 32A-2.2 Recon Assistant Controller - Corp Reconciliation 33A-2.2Esc Assistant Controller - Corp Escalation 34A-2.3 Assistant Controller Cost Center Summary 35A-2.3 Recon Assistant Controller Reconciliation 36A-2.3Esc Assistant Controller Escalation 37A-2.4 Corporate Acct Special Projects Cost Center Summary 38A-2.4 Recon Corporate Acct Special Projects Reconciliation 39A-2.4Esc Corporate Acct Special Projects Escalation 40A-2.5 Dir of Corp Finl Acctg Cost Center Summary 41A-2.5 Recon Dir of Corp Finl Acctg Reconciliation 42A-2.5Esc Dir of Corp Finl Acctg Escalation 43A-2.6 Corporate Center Accounting Cost Center Summary 44A-2.6 Recon Corporate Center Accounting Reconciliation 45A-2.6Esc Corporate Center Accounting Escalation 46A-2.7 Corporate & Global Acctg Cost Center Summary 47A-2.7 Recon Corporate & Global Acctg Reconciliation 48A-2.7Esc Corporate & Global Acctg Escalation 49A-2.8 Sempra Financial Staff Cost Center Summary 50A-2.8 Recon Sempra Financial Staff Reconciliation 51

Witness: Bruce Folkmann

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Workpaper Index

SDG&E-17-WP BAF-WP-1 GRC APPLICATION - December 2010

Page 4: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Index Division / Department / Cost Center Workpaper Page

Witness: Bruce Folkmann

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Workpaper Index

A-2.8Esc Sempra Financial Staff Escalation 52A-2.9 Bank Rec & Escheatment Cost Center Summary 53A-2.9 Recon Bank Rec & Escheatment Reconciliation 54A-2.9Esc Bank Rec & Escheatment Escalation 55A-2.10 Sox Compliance Cost Center Summary 56A-2.10 Recon Sox Compliance Reconciliation 57A-2.10Esc Sox Compliance Escalation 58A-2.11 Accounting Research Cost Center Summary 59A-2.11 Recon Accounting Research Reconciliation 60A-2.11Esc Accounting Research Escalation 61A-2.12 Financial Reporting Direc Cost Center Summary 62A-2.12 Recon Financial Reporting Direc Reconciliation 63A-2.12Esc Financial Reporting Direc Escalation 64A-2.13 Financial Reporting Cost Center Summary 65A-2.13 Recon Financial Reporting Reconciliation 66A-2.13Esc Financial Reporting Escalation 67A-2.14 Financial Reporting D&T Fees Cost Center Summary 68A-2.14 Recon Financial Reporting D&T Fees Reconciliation 69A-2.14Esc Financial Reporting D&T Fees Escalation 70A-3 Tax Services Department Summary 71A-3 Recon Tax Services Reconciliation 72A-3Esc Tax Services Escalation 73A-3.1 VP of Corporate Tax Cost Center Summary 74A-3.1 Recon VP of Corporate Tax Reconciliation 75A-3.1Esc VP of Corporate Tax Escalation 76A-3.2 Corporate Tax Acctg & Systems Cost Center Summary 77A-3.2 Recon Corporate Tax Acctg & Systems Reconciliation 78A-3.2Esc Corporate Tax Acctg & Systems Escalation 79A-3.3 Domestic Tax Compliance Cost Center Summary 80A-3.3 Recon Domestic Tax Compliance Reconciliation 81A-3.3Esc Domestic Tax Compliance Escalation 82A-3.4 Intl Tax Cost Center Summary 83A-3.4 Recon Intl Tax Reconciliation 84A-3.4Esc Intl Tax Escalation 85

SDG&E-17-WP BAF-WP-2 GRC APPLICATION - December 2010

Page 5: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Index Division / Department / Cost Center Workpaper Page

Witness: Bruce Folkmann

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Workpaper Index

A-3.5 Transactional Tax Cost Center Summary 86A-3.5 Recon Transactional Tax Reconciliation 87A-3.5Esc Transactional Tax Escalation 88A-3.6 Tax Law Group Cost Center Summary 89A-3.6 Recon Tax Law Group Reconciliation 90A-3.6Esc Tax Law Group Escalation 91A-4 Treasury Department Summary 92A-4 Recon Treasury Reconciliation 93A-4Esc Treasury Escalation 94A-4.1 SVP Treasurer & Staff Cost Center Summary 95A-4.1 Recon SVP Treasurer & Staff Reconciliation 96A-4.1Esc SVP Treasurer & Staff Escalation 97A-4.2 Cash Management Cost Center Summary 98A-4.2 Recon Cash Management Reconciliation 99A-4.2Esc Cash Management Escalation 100A-4.3 Finance Director Cost Center Summary 101A-4.3 Recon Finance Director Reconciliation 102A-4.3Esc Finance Director Escalation 103A-4.4 Pens & Trust Inv Dir Cost Center Summary 104A-4.4 Recon Pens & Trust Inv Dir Reconciliation 105A-4.4Esc Pens & Trust Inv Dir Escalation 106A-4.5 Corporate - Cash Mgmt Cost Center Summary 107A-4.5 Recon Corporate - Cash Mgmt Reconciliation 108A-4.5Esc Corporate - Cash Mgmt Escalation 109A-4.6 Corp - Ttee & Rate Agncy Cost Center Summary 110A-4.6 Recon Corp - Ttee & Rate Agncy Reconciliation 111A-4.6Esc Corp - Ttee & Rate Agncy Escalation 112A-4.7 Corp Economic Analysis Cost Center Summary 113A-4.7 Recon Corp Economic Analysis Reconciliation 114A-4.7Esc Corp Economic Analysis Escalation 115A-4.8 VP - Mergers & Acquisitions Cost Center Summary 116A-4.8 Recon VP - Mergers & Acquisitions Reconciliation 117A-4.8Esc VP - Mergers & Acquisitions Escalation 118A-4.9 Corporate Development Cost Center Summary 119A-4.9 Recon Corporate Development Reconciliation 120A-4.9Esc Corporate Development Escalation 121

SDG&E-17-WP BAF-WP-3 GRC APPLICATION - December 2010

Page 6: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Index Division / Department / Cost Center Workpaper Page

Witness: Bruce Folkmann

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Workpaper Index

A-4.10 Development - Reed Cost Center Summary 122A-4.10 Recon Development - Reed Reconciliation 123A-4.10Esc Development - Reed Escalation 124A-4.11 Development - Sahagian Cost Center Summary 125A-4.11 Recon Development - Sahagian Reconciliation 126A-4.11Esc Development - Sahagian Escalation 127A-5 Investor Relations Department Summary 128A-5 Recon Investor Relations Reconciliation 129A-5Esc Investor Relations Escalation 130A-5.1 VP - Investor Relations Cost Center Summary 131A-5.1 Recon VP - Investor Relations Reconciliation 132A-5.1Esc VP - Investor Relations Escalation 133A-5.2 Investor Relations Cost Center Summary 134A-5.2 Recon Investor Relations Reconciliation 135A-5.2Esc Investor Relations Escalation 136A-5.3 Executive Projects Cost Center Summary 137A-5.3Esc Executive Projects Escalation 138A-6 Corporate Planning Department Summary 139A-6 Recon Corporate Planning Reconciliation 140A-6Esc Corporate Planning Escalation 141A-6.1 VP - Corporate Planning Cost Center Summary 142A-6.1 Recon VP - Corporate Planning Reconciliation 143A-6.1Esc VP - Corporate Planning Escalation 144A-6.2 Five-Year Business Planning Cost Center Summary 145A-6.2 Recon Five-Year Business Planning Reconciliation 146A-6.2Esc Five-Year Business Planning Escalation 147A-6.3 One-Year Business Planning Cost Center Summary 148A-6.3 Recon One-Year Business Planning Reconciliation 149A-6.3Esc One-Year Business Planning Escalation 150A-6.4 Corp Budgets & Reporting Cost Center Summary 151A-6.4 Recon Corp Budgets & Reporting Reconciliation 152A-6.4Esc Corp Budgets & Reporting Escalation 153A-6.5 Finl Systems Cost Center Summary 154A-6.5 Recon Finl Systems Reconciliation 155A-6.5Esc Finl Systems Escalation 156

SDG&E-17-WP BAF-WP-4 GRC APPLICATION - December 2010

Page 7: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Index Division / Department / Cost Center Workpaper Page

Witness: Bruce Folkmann

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Workpaper Index

A-7 Risk Management Department Summary 157A-7 Recon Risk Management Reconciliation 158A-7Esc Risk Management Escalation 159A-7.1 VP Risk Analysis & Mgmt Cost Center Summary 160A-7.1 Recon VP Risk Analysis & Mgmt Reconciliation 161A-7.1Esc VP Risk Analysis & Mgmt Escalation 162A-7.2 Risk Management Cost Center Summary 163A-7.2 Recon Risk Management Reconciliation 164A-7.2Esc Risk Management Escalation 165A-7.3 Energy Risk Mgmt VP Cost Center Summary 166A-7.3Esc Energy Risk Mgmt VP Escalation 167A-8 Financial Leadership Program Department Summary 168A-8 Recon Financial Leadership Program Reconciliation 169A-8Esc Financial Leadership Program Escalation 170A-8.1 Acctg & Finance Rotation Cost Center Summary 171A-8.1 Recon Acctg & Finance Rotation Reconciliation 172A-8.1Esc Acctg & Finance Rotation Escalation 173A-8.2 Acctg & Fin Internship Cost Center Summary 174A-8.2 Recon Acctg & Fin Internship Reconciliation 175A-8.2Esc Acctg & Fin Internship Escalation 176

B Governance Division Summary 177B Recon Governance Reconciliation 178B-Alloc change Governance Sum of Change in Allocation 179B Esc Recon Governance Reconciliation 180B Esc Governance Escalation 181B-1 Internal Audit Department Summary 182B-1 Recon Internal Audit Reconciliation 183B-1Esc Internal Audit Escalation 184B-1.1 VP Audit Services Cost Center Summary 185B-1.1 Recon VP Audit Services Reconciliation 186B-1.1Esc VP Audit Services Escalation 187B-1.2 Audit - Fin & Ops Cost Center Summary 188B-1.2 Recon Audit - Fin & Ops Reconciliation 189B-1.2Esc Audit - Fin & Ops Escalation 190

SDG&E-17-WP BAF-WP-5 GRC APPLICATION - December 2010

Page 8: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Index Division / Department / Cost Center Workpaper Page

Witness: Bruce Folkmann

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Workpaper Index

B-1.3 Audit - Fin & Ops II Cost Center Summary 191B-1.3 Recon Audit - Fin & Ops II Reconciliation 192B-1.3Esc Audit - Fin & Ops II Escalation 193B-1.4 Audit - Info Tech Cost Center Summary 194B-1.4 Recon Audit - Info Tech Reconciliation 195B-1.4Esc Audit - Info Tech Escalation 196B-1.5 Environmental Compliance Cost Center Summary 197B-1.5 Recon Environmental Compliance Reconciliation 198B-1.5Esc Environmental Compliance Escalation 199B-1.6 Audit Quality Assurance Cost Center Summary 200B-1.6 Recon Audit Quality Assurance Reconciliation 201B-1.6Esc Audit Quality Assurance Escalation 202B-2.1 Corporate Secretary Department Summary 203B-2.1 Recon Corporate Secretary Reconciliation 204B-2.1Esc Corporate Secretary Escalation 205B-3.1 Board of Directors Department Summary 206B-3.1 Recon Board of Directors Reconciliation 207B-3.1Esc Board of Directors Escalation 208B-4 Executive Department Summary 209B-4 Recon Executive Reconciliation 210B-4Esc Executive Escalation 211B-4.1 Chairman & CEO Cost Center Summary 212B-4.1 Recon Chairman & CEO Reconciliation 213B-4.1Esc Chairman & CEO Escalation 214B-4.2 President & COO Cost Center Summary 215B-4.2 Recon President & COO Reconciliation 216B-4.2Esc President & COO Escalation 217B-4.3 Executive Vice President Cost Center Summary 218B-4.3 Recon Executive Vice President Reconciliation 219B-4.3Esc Executive Vice President Escalation 220B-4.4 Retained Executive Costs Cost Center Summary 221B-4.4 Recon Retained Executive Costs Reconciliation 222B-4.4Esc Retained Executive Costs Escalation 223B-4.5 Retired Chairman Cost Center Summary 224B-4.5 Recon Retired Chairman Reconciliation 225B-4.5Esc Retired Chairman Escalation 226

SDG&E-17-WP BAF-WP-6 GRC APPLICATION - December 2010

Page 9: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Index Division / Department / Cost Center Workpaper Page

Witness: Bruce Folkmann

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Workpaper Index

B-4.6 Group President For Regulated Cost Center Summary 227B-4.6 Recon Group President For Regulated Reconciliation 228B-4.6Esc Group President For Regulated Escalation 229B-4.7 Group President For Unreg Cost Center Summary 230B-4.7Esc Group President For Unreg Escalation 231

C Legal Division Summary 232C Recon Legal Reconciliation 233C-Alloc change Legal Sum of Change in Allocation 234C Esc Recon Legal Reconciliation 235C Esc Legal Escalation 236C-1.1 Executive VP & General Counsel Department Summary 237C-1.1 Recon Executive VP & General Counsel Reconciliation 238C-1.1Esc Executive VP & General Counsel Escalation 239C-2 Law Department Department Summary 240C-2Esc Law Department Escalation 241C-2.1 Legal Cost Center Summary 242C-2.1 Recon Legal Reconciliation 243C-2.1Esc Legal Escalation 244C-2.2 Legal Retained - Corp Ctr Cost Center Summary 245C-2.2Esc Legal Retained - Corp Ctr Escalation 246C-3.1 Outside Legal Cost Center Summary 247C-3.1 Recon Outside Legal Reconciliation 248C-3.1Esc Outside Legal Escalation 249

D Human Resources Division Summary 250D Recon Human Resources Reconciliation 251D-Alloc change Human Resources Sum of Change in Allocation 252D Esc Recon Human Resources Reconciliation 253D Esc Human Resources Escalation 254D-1.1 HR SVP & Staff Department Summary 255D-1.1 Recon HR SVP & Staff Reconciliation 256D-1.1Esc HR SVP & Staff Escalation 257D-2 Compensation & Benefits Department Summary 258D-2 Recon Compensation & Benefits Reconciliation 259

SDG&E-17-WP BAF-WP-7 GRC APPLICATION - December 2010

Page 10: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Index Division / Department / Cost Center Workpaper Page

Witness: Bruce Folkmann

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Workpaper Index

D-2Esc Compensation & Benefits Escalation 260D-2.1 Comp & Benefits Dir Cost Center Summary 261D-2.1 Recon Comp & Benefits Dir Reconciliation 262D-2.1Esc Comp & Benefits Dir Escalation 263D-2.2 Compensation Cost Center Summary 264D-2.2 Recon Compensation Reconciliation 265D-2.2Esc Compensation Escalation 266D-2.3 Executive Compensation Cost Center Summary 267D-2.3 Recon Executive Compensation Reconciliation 268D-2.3Esc Executive Compensation Escalation 269D-2.4 HR Acctg & Budgets Cost Center Summary 270D-2.4 Recon HR Acctg & Budgets Reconciliation 271D-2.4Esc HR Acctg & Budgets Escalation 272D-2.5 Employee Benefits Service Cost Center Summary 273D-2.5Esc Employee Benefits Service Escalation 274D-2.6 Corporate Compliance VP Cost Center Summary 275D-2.6Esc Corporate Compliance VP Escalation 276D-3.1 Myinfo Services Department Summary 277D-3.1 Recon Myinfo Services Reconciliation 278D-3.1Esc Myinfo Services Escalation 279D-4 Employee Development Department Summary 280D-4 Recon Employee Development Reconciliation 281D-4Esc Employee Development Escalation 282D-4.1 HR Business Partner Cost Center Summary 283D-4.1 Recon HR Business Partner Reconciliation 284D-4.1Esc HR Business Partner Escalation 285D-4.2 Employee Development Cost Center Summary 286D-4.2 Recon Employee Development Reconciliation 287D-4.2Esc Employee Development Escalation 288D-4.3 Executive Development Cost Center Summary 289D-4.3 Recon Executive Development Reconciliation 290D-4.3Esc Executive Development Escalation 291D-4.4 Business Conduct Director Cost Center Summary 292D-4.4 Recon Business Conduct Director Reconciliation 293D-4.4Esc Business Conduct Director Escalation 294

SDG&E-17-WP BAF-WP-8 GRC APPLICATION - December 2010

Page 11: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Index Division / Department / Cost Center Workpaper Page

Witness: Bruce Folkmann

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Workpaper Index

D-4.5 Corp Diversity Affairs Cost Center Summary 295D-4.5 Recon Corp Diversity Affairs Reconciliation 296D-4.5Esc Corp Diversity Affairs Escalation 297D-5 Employee Programs Department Summary 298D-5 Recon Employee Programs Reconciliation 299D-5Esc Employee Programs Escalation 300D-5.1 Corp Comm Partnerships Cost Center Summary 301D-5.1 Recon Corp Comm Partnerships Reconciliation 302D-5.1Esc Corp Comm Partnerships Escalation 303D-5.2 Contributions & Memberships Cost Center Summary 304D-5.2 Recon Contributions & Memberships Reconciliation 305D-5.2Esc Contributions & Memberships Escalation 306D-5.3 Internal Communications Cost Center Summary 307D-5.3 Recon Internal Communications Reconciliation 308D-5.3Esc Internal Communications Escalation 309

E External Affairs Division Summary 310E Recon External Affairs Reconciliation 311E-Alloc change External Affairs Sum of Change in Allocation 312E Esc Recon External Affairs Reconciliation 313E Esc External Affairs Escalation 314E-1 Communications Department Summary 315E-1 Recon Communications Reconciliation 316E-1Esc Communications Escalation 317E-1.1 Corporate Communications Cost Center Summary 318E-1.1 Recon Corporate Communications Reconciliation 319E-1.1Esc Corporate Communications Escalation 320E-1.2 Corp Responsibility Report Cost Center Summary 321E-1.2 Recon Corp Responsibility Report Reconciliation 322E-1.2Esc Corp Responsibility Report Escalation 323E-1.3 Digital/Print Communications Cost Center Summary 324E-1.3 Recon Digital/Print Communications Reconciliation 325E-1.3Esc Digital/Print Communications Escalation 326E-1.4 Internet Communications Cost Center Summary 327E-1.4 Recon Internet Communications Reconciliation 328

SDG&E-17-WP BAF-WP-9 GRC APPLICATION - December 2010

Page 12: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Index Division / Department / Cost Center Workpaper Page

Witness: Bruce Folkmann

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Workpaper Index

E-1.4Esc Internet Communications Escalation 329E-1.5 Corporate Hospitality Cost Center Summary 330E-1.5 Recon Corporate Hospitality Reconciliation 331E-1.5Esc Corporate Hospitality Escalation 332E-1.6 Annual Report Cost Center Summary 333E-1.6 Recon Annual Report Reconciliation 334E-1.6Esc Annual Report Escalation 335E-2 Government Affairs Department Summary 336E-2 Recon Government Affairs Reconciliation 337E-2Esc Government Affairs Escalation 338E-2.1 VP - Corp Relations Cost Center Summary 339E-2.1 Recon VP - Corp Relations Reconciliation 340E-2.1Esc VP - Corp Relations Escalation 341E-2.2 Federal Government Affairs Cost Center Summary 342E-2.2 Recon Federal Government Affairs Reconciliation 343E-2.2Esc Federal Government Affairs Escalation 344E-2.3 Govt Programs & Corp Responsibility Cost Center Summary 345E-2.3 Recon Govt Programs & Corp Responsibility Reconciliation 346E-2.3Esc Govt Programs & Corp Responsibility Escalation 347E-2.4 Corporate Political Contr Cost Center Summary 348E-2.4 Recon Corporate Political Contr Reconciliation 349E-2.4Esc Corporate Political Contr Escalation 350E-2.5 Compliance / Reporting & Analysis Cost Center Summary 351E-2.5 Recon Compliance / Reporting & Analysis Reconciliation 352E-2.5Esc Compliance / Reporting & Analysis Escalation 353E-2.6 FERC Relations Cost Center Summary 354E-2.6 Recon FERC Relations Reconciliation 355E-2.6Esc FERC Relations Escalation 356E-3 External Affairs Department Summary 357E-3 Recon External Affairs Reconciliation 358E-3Esc External Affairs Escalation 359E-3.1 EVP - External Relations Cost Center Summary 360E-3.1 Recon EVP - External Relations Reconciliation 361E-3.1Esc EVP - External Relations Escalation 362E-3.2 VP - Regulatory Affairs Cost Center Summary 363E-3.2 Recon VP - Regulatory Affairs Reconciliation 364E-3.2Esc VP - Regulatory Affairs Escalation 365

SDG&E-17-WP BAF-WP-10 GRC APPLICATION - December 2010

Page 13: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Index Division / Department / Cost Center Workpaper Page

Witness: Bruce Folkmann

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Workpaper Index

E-3.3 Corporate Legislative Pol Cost Center Summary 366E-3.3 Recon Corporate Legislative Pol Reconciliation 367E-3.3Esc Corporate Legislative Pol Escalation 368E-3.4 Enviromental & Reg Affairs Cost Center Summary 369E-3.4 Recon Enviromental & Reg Affairs Reconciliation 370E-3.4Esc Enviromental & Reg Affairs Escalation 371E-3.5 Compliance Cost Center Summary 372E-3.5 Recon Compliance Reconciliation 373E-3.5Esc Compliance Escalation 374E-3.6 SVP Comms & Community Par Cost Center Summary 375E-3.6 Recon SVP Comms & Community Par Reconciliation 376E-3.6Esc SVP Comms & Community Par Escalation 377E-3.7 Community Rel - San Diego Cost Center Summary 378E-3.7 Recon Community Rel - San Diego Reconciliation 379E-3.7Esc Community Rel - San Diego Escalation 380E-3.8 Community Relations - Los Cost Center Summary 381E-3.8 Recon Community Relations - Los Reconciliation 382E-3.8Esc Community Relations - Los Escalation 383E-3.9 Corporate Events Cost Center Summary 384E-3.9 Recon Corporate Events Reconciliation 385E-3.9Esc Corporate Events Escalation 386E-3.10 State Government Affairs Cost Center Summary 387E-3.10 Recon State Government Affairs Reconciliation 388E-3.10Esc State Government Affairs Escalation 389E-3.11 State Regulatory Affairs Cost Center Summary 390E-3.11 Recon State Regulatory Affairs Reconciliation 391E-3.11Esc State Regulatory Affairs Escalation 392E-3.12 Corp Regulatory Policy Cost Center Summary 393E-3.12 Recon Corp Regulatory Policy Reconciliation 394E-3.12Esc Corp Regulatory Policy Escalation 395E-3.13 Director - Govt Affairs Cost Center Summary 396E-3.13 Recon Director - Govt Affairs Reconciliation 397E-3.13Esc Director - Govt Affairs Escalation 398E-3.14 Gas Research & Analysis Cost Center Summary 399E-3.14 Recon Gas Research & Analysis Reconciliation 400E-3.14Esc Gas Research & Analysis Escalation 401

SDG&E-17-WP BAF-WP-11 GRC APPLICATION - December 2010

Page 14: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Index Division / Department / Cost Center Workpaper Page

Witness: Bruce Folkmann

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Workpaper Index

E-3.15 Public Relations - Mexico Cost Center Summary 402E-3.15 Recon Public Relations - Mexico Reconciliation 403E-3.15Esc Public Relations - Mexico Escalation 404E-3.16 VP International Affairs Cost Center Summary 405E-3.16 Recon VP International Affairs Reconciliation 406E-3.16Esc VP International Affairs Escalation 407E-3.17 Staples Center Cost Center Summary 408E-3.17Esc Staples Center Escalation 409E-3.18 New Market Communications Cost Center Summary 410E-3.18Esc New Market Communications Escalation 411E-3.19 Policy Coordination & Adv Cost Center Summary 412E-3.19Esc Policy Coordination & Adv Escalation 413E-3.20 Employee Communications Cost Center Summary 414E-3.20Esc Employee Communications Escalation 415

F Facilities/Assets Division Summary 416F Recon Facilities/Assets Reconciliation 417F-Alloc change Facilities/Assets Sum of Change in Allocation 418F Esc Recon Facilities/Assets Reconciliation 419F Esc Facilities/Assets Escalation 420F-1.1 Depreciation & Amortization Department Summary 421F-1.1 Recon Depreciation & Amortization Reconciliation 422F-1.1Esc Depreciation & Amortization Escalation 423F-2.1 Property Taxes Department Summary 424F-2.1 Recon Property Taxes Reconciliation 425F-2.1Esc Property Taxes Escalation 426F-3 Other Facilities Department Summary 427F-3 Recon Other Facilities Reconciliation 428F-3Esc Other Facilities Escalation 429F-3.1 Aircraft Fractional Share Cost Center Summary 430F-3.1 Recon Aircraft Fractional Share Reconciliation 431F-3.1Esc Aircraft Fractional Share Escalation 432F-3.2 HQ Renew Building Project Cost Center Summary 433F-3.2 Recon HQ Renew Building Project Reconciliation 434F-3.2Esc HQ Renew Building Project Escalation 435F-3.3 Casa Azul Cost Center Summary 436F-3.3 Recon Casa Azul Reconciliation 437F-3.3Esc Casa Azul Escalation 438

SDG&E-17-WP BAF-WP-12 GRC APPLICATION - December 2010

Page 15: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Index Division / Department / Cost Center Workpaper Page

Witness: Bruce Folkmann

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Workpaper Index

F-3.4 Accounts Payable Cost Center Summary 439F-3.4 Recon Accounts Payable Reconciliation 440F-3.4Esc Accounts Payable Escalation 441F-3.5 Miscellaneous Revenue Cost Center Summary 442F-3.5 Recon Miscellaneous Revenue Reconciliation 443F-3.5Esc Miscellaneous Revenue Escalation 444F-4 Security Services Department Summary 445F-4 Recon Security Services Reconciliation 446F-4Esc Security Services Escalation 447F-4.1 Corporate Security Dir Cost Center Summary 448F-4.1 Recon Corporate Security Dir Reconciliation 449F-4.1Esc Corporate Security Dir Escalation 450F-4.2 Executive Security Cost Center Summary 451F-4.2 Recon Executive Security Reconciliation 452F-4.2Esc Executive Security Escalation 453F-4.3 Affiliate Security Services Cost Center Summary 454F-4.3 Recon Affiliate Security Services Reconciliation 455F-4.3Esc Affiliate Security Services Escalation 456F-4.4 Corporate Benefits Cost Center Summary 457F-4.4 Recon Corporate Benefits Reconciliation 458F-4.4Esc Corporate Benefits Escalation 459F-4.5 Affiliate Benefits - HR Cost Center Summary 460F-4.5 Recon Affiliate Benefits - HR Reconciliation 461F-4.5Esc Affiliate Benefits - HR Escalation 462

G Pension & Benefits Division Summary 463G Recon Pension & Benefits Reconciliation 464G-Alloc change Pension & Benefits Sum of Change in Allocation 465G Esc Recon Pension & Benefits Reconciliation 466G Esc Pension & Benefits Escalation 467G-1 Employee Benefits Department Summary 468G-1Esc Employee Benefits Escalation 469G-1.1 P&B Overhead Cost Center Summary 470G-1.1 Recon P&B Overhead Reconciliation 471G-1.1Esc P&B Overhead Escalation 472

SDG&E-17-WP BAF-WP-13 GRC APPLICATION - December 2010

Page 16: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Index Division / Department / Cost Center Workpaper Page

Witness: Bruce Folkmann

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Workpaper Index

G-1.2 BOD Pension (FAS87) Cost Center Summary 473G-1.2 Recon BOD Pension (FAS87) Reconciliation 474G-1.2Esc BOD Pension (FAS87) Escalation 475G-1.3 Pension (FAS87) Cost Center Summary 476G-1.3 Recon Pension (FAS87) Reconciliation 477G-1.3Esc Pension (FAS87) Escalation 478G-1.4 Life Insurance Cost Center Summary 479G-1.4 Recon Life Insurance Reconciliation 480G-1.4Esc Life Insurance Escalation 481G-2.1 Payroll Tax Department Summary 482G-2.1 Recon Payroll Tax Reconciliation 483G-2.1Esc Payroll Tax Escalation 484G-3 Incentive Compensation Department Summary 485G-3Esc Incentive Compensation Escalation 486G-3.1 Executive ICP Transferred Cost Center Summary 487G-3.1 Recon Executive ICP Transferred Reconciliation 488G-3.1Esc Executive ICP Transferred Escalation 489G-3.2 ICP Overhead Cost Center Summary 490G-3.2 Recon ICP Overhead Reconciliation 491G-3.2Esc ICP Overhead Escalation 492G-4 Long Term Incentives Department Summary 493G-4Esc Long Term Incentives Escalation 494G-4.1 Restricted Stock Cost Center Summary 495G-4.1 Recon Restricted Stock Reconciliation 496G-4.1Esc Restricted Stock Escalation 497G-4.2 Stock Options Cost Center Summary 498G-4.2 Recon Stock Options Reconciliation 499G-4.2Esc Stock Options Escalation 500G-4.3 Life Insurance Cost Center Summary 501G-4.3 Recon Life Insurance Reconciliation 502G-4.3Esc Life Insurance Escalation 503G-4.4 Executive Benefits Cost Center Summary 504G-4.4 Recon Executive Benefits Reconciliation 505G-4.4Esc Executive Benefits Escalation 506

SDG&E-17-WP BAF-WP-14 GRC APPLICATION - December 2010

Page 17: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Index Division / Department / Cost Center Workpaper Page

Witness: Bruce Folkmann

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Workpaper Index

G-4.5 Deferred Comp Insurance Cost Center Summary 507G-4.5Esc Deferred Comp Insurance Escalation 508G-4.6 SCG Executive Benefits Cost Center Summary 509G-4.6Esc SCG Executive Benefits Escalation 510G-4.7 SDG&E Executive Benefits Cost Center Summary 511G-4.7Esc SDG&E Executive Benefits Escalation 512G-5.1 SERP Department Summary 513G-5.1 Recon SERP Reconciliation 514G-5.1Esc SERP Escalation 515

H Restatement of 2006-2009H-2005 SCG Restatement Total Shared Services Restatement 516H-2005 SDGE Restatement Total Shared Services Restatement 517H-2006 SCG Restatement Total Shared Services Restatement 518H-2006 SDGE Restatement Total Shared Services Restatement 519H-2007 SCG Restatement Total Shared Services Restatement 520H-2007 SDGE Restatement Total Shared Services Restatement 521H-2008 SCG Restatement Total Shared Services Restatement 522H-2008 SDGE Restatement Total Shared Services Restatement 523H-2009 SCG Restatement Total Shared Services Restatement 524H-2009 SDGE Restatement Total Shared Services Restatement 525

I Corporate SummaryI Total Shared Services Summary 526I Esc Total Shared Services Summary Escalated 527I Esc Recon Total Shared Services Summary Reconciliation 528I-Esc Utility Allocations Sum Total Shared Services Summary of Utility Allocation 529I-Esc Index Total Shared Services Escalation Index and Calculation 530I-FERC Recon Total Shared Services Summary by FERC Account 531

SDG&E-17-WP BAF-WP-15 GRC APPLICATION - December 2010

Page 18: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Index Division / Department / Cost Center Workpaper Page

Witness: Bruce Folkmann

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Workpaper Index

J Allocation WorkpapersMulti-Factor Basic Allocation Calculation 532Multi-Factor Basic Support Allocation Calculation 533Multi-Factor Split Allocation Calculation 534Audit Plan Allocation Calculation 535Tax Services Allocation Calculation 536Economics Analysis Allocation Calculation 537Sempra LawPak Allocation Calculation 538Local Government Affairs Allocation Calculation 539Multi-Factor Variation - Political Allocation Calculation 540FTE's Allocation Calculation 541MyInfo Allocation Calculation 542Executives FTE's Allocation Calculation 543HQ Security Allocation Calculation 544Executive Security Allocation Calculation 545CFO Allocation Calculation 546Controller Allocation Calculation 547VP Corporate Relations Allocation Calculation 548HR SVP Allocation Calculation 549Treasury Allocation Calculation 550HQ Depreciation Allocation Calculation 551

SDG&E-17-WP BAF-WP-16 GRC APPLICATION - December 2010

Page 19: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: I CORPORATE CENTER SHARED SERVICES Witness: Bruce Folkmann

Cost Center: A Finance

Workpaper: A

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 141 160 161 178 178 169 176 176

Labor Costs 12,846$ 14,333$ 15,960$ 18,450$ 19,568$ 18,252$ 18,294$ 18,294$ Non-Labor Costs 33,033 28,448 29,453 31,216 28,378 35,679 39,668 39,605 Total Costs 45,879$ 42,781$ 45,413$ 49,666$ 47,946$ 53,931$ 57,961$ 57,899$

DIRECT ASSIGNMENTS SDG&E 2,383$ 1,686$ 1,390$ 1,578$ 3,067$ 3,133$ 3,855$ 2,862$ So Cal Gas 2,440 2,385 2,151 2,420 2,762 3,491 4,115 4,159

Subtotal - Utility 4,823 4,070 3,541 3,998 5,828 6,623 7,970 7,021

Global/Retained 14,651 10,982 10,135 15,248 10,495 15,696 18,184 18,832

Total Direct Assignments 19,474$ 15,053$ 13,676$ 19,246$ 16,323$ 22,319$ 26,154$ 25,853$

ALLOCATIONS SDG&E 7,321$ 7,379$ 7,938$ 8,648$ 8,498$ 9,473$ 10,089$ 9,696$ So Cal Gas 8,439 8,666 8,949 9,440 9,406 8,932 9,215 9,585

Subtotal - Utility 15,760 16,045 16,886 18,088 17,904 18,405 19,305 19,281

Global/Retained 10,645 11,683 14,850 12,332 13,718 13,206 12,503 12,765

Total Allocations 26,405$ 27,728$ 31,737$ 30,420$ 31,622$ 31,611$ 31,808$ 32,046$

BILLED COSTS SDG&E 9,704$ 9,065$ 9,328$ 10,227$ 11,565$ 12,606$ 13,944$ 12,559$ So Cal Gas 10,879 11,051 11,100 11,860 12,168 12,423 13,331 13,743

Subtotal - Utility 20,583 20,116 20,427 22,087 23,733 25,028 27,275 26,302

Global/Retained 25,296 22,665 24,986 27,580 24,213 28,902 30,687 31,597

Total Billed Costs 45,879$ 42,781$ 45,413$ 49,666$ 47,946$ 53,931$ 57,961$ 57,899$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-17 GRC APPLICATION - December 2010

Page 20: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 11,565$ 12,168$ 24,213$ 47,946$ 178

(136) (248) (1,872) (2,255) (9)

186 186 379 751 6

(120) 1,557 8,818 10,255

539 539 125 1,203

Change in Allocation 2009-2012 524 (458) (67) (1)

994$ 1,575$ 7,384$ 9,953$ (3)

2012 - TEST YEAR 12,559$ 13,743$ 31,597$ 57,899$ 175

9,696$ 9,585$ 12,766$ 32,047$

2,862 4,158 18,831 25,851

12,559$ 13,743$ 31,597$ 57,899$

A ReconA Finance

Allocations

Total Change from 2009

GRC TotalI CORPORATE CENTER SHARED SERVICES

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

TOTAL 2012 ALLOCATIONS

Net impact of reorganization transfers and filling vacancies, and other non-recurring costs.

External audit fee increases.

New cost center created to oversee Risk Management practices.

Bank, agency, and lines of credit renewal fees

Direct Assignments

SDG&E-17-WP BAF-WP-18 GRC APPLICATION - December 2010

Page 21: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Test Year 2012 General Rate CaseSummary of Allocation Change for Utilities

(2009 $000's)

Division: Finance Witness: Bruce A. Folkmann

SDG&E SOCALGAS Change

A-1.1 1100-0039-EXECUTIVE VP & CFO (52) (59) (111) A-1 CFO (52) (59) (111)

A-2.1 1100-0338-SVP - CONTROLLER 39 19 58 A-2.2 1100-0054-ASSISTANT CONTROLLER - CORP 7 (5) 3 A-2.3 1100-0044-ASSISTANT CONTROLLER - - - A-2.4 1100-0012-CORPORATE ACCT SPECIAL PROJECTS 8 (5) 3 A-2.5 1100-0345-DIR OF CORP FINL ACCTG - - - A-2.6 1100-0049-CORPORATE CENTER ACCOUNTING 21 (13) 8 A-2.7 1100-0051-CORPORATE & GLOBAL ACCTG 59 59 118 A-2.8 1100-0386-SEMPRA FINANCIAL STAFF - - - A-2.9 1100-1346-BANK REC & ESCHEATMENT - - - A-2.10 1100-0390-SOX COMPLIANCE 13 (8) 5 A-2.11 1100-0347-ACCOUNTING RESEARCH 14 (9) 5 A-2.12 1100-0047-FINANCIAL REPORTING DIREC 15 (10) 6 A-2.13 1100-0048-FINANCIAL REPORTING 26 (16) 10 A-2.14 1100-0219-FINANCIAL REPORTING D&T FEES 167 (105) 62 A-2 Accounting Services 369 (92) 277

A-3.1 1100-0046-VP OF CORPORATE TAX (9) (30) (39) A-3.2 1100-0045-CORPORATE TAX ACCTG & SYSTEMS (33) (64) (98) A-3.3 1100-0373-DOMESTIC TAX COMPLIANCE (38) (73) (111) A-3.4 1100-0374-INTL TAX (22) (42) (63) A-3.5 1100-0376-TRANSACTIONAL TAX (16) (30) (46) A-3.6 1100-0399-TAX LAW GROUP (26) (50) (76) A-3 Tax Services (144) (289) (433)

A-4.1 1100-0112-SVP TREASURER & STAFF 111 103 215 A-4.2 1100-0113-CASH MANAGEMENT 23 (14) 9 A-4.3 1100-0119-FINANCE DIRECTOR 24 (15) 9 A-4.4 1100-0120-PENS & TRUST INV DIR 20 (12) 7 A-4.5 1100-0224-CORPORATE - CASH MGMT 3 (2) 1 A-4.6 1100-0225-CORP - TTEE & RATE AGNCY - - - A-4.7 1100-0393-CORP ECONOMIC ANALYSIS 0 (0) 0 A-4.8 1100-0052-VP - MERGERS & ACQUISITIONS - - - A-4.9 1100-0392-CORPORATE DEVELOPMENT - - - A-4.10 1100-0059-DEVELOPMENT - REED - - - A-4.11 1100-0060-DEVELOPMENT - SAHAGIAN - - - A-4 Treasury 181 60 240

Department / Cost Center

Sempra Energy Corporate Center

SDG&E-17-WP BAF-WP-19 GRC APPLICATION - December 2010

Page 22: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Test Year 2012 General Rate CaseSummary of Allocation Change for Utilities

(2009 $000's)

Division: Finance Witness: Bruce A. Folkmann

SDG&E SOCALGAS Change Department / Cost Center

Sempra Energy Corporate Center

A-5.1 1100-0375-VP - INVESTOR RELATIONS 11 (7) 4 A-5.2 1100-0042-INVESTOR RELATIONS 45 (28) 17 A-5 Investor Relations 56 (35) 21

A-6.1 1100-0298-VP - CORPORATE PLANNING 29 23 52 A-6.2 1100-0299-FIVE-YEAR BUSINESS PLANNING 12 (12) 0 A-6.3 1100-0053-ONE-YEAR BUSINESS PLANNING 5 (5) (0) A-6.4 1100-0326-CORP BUDGETS & REPORTING 9 (9) 0 A-6.5 1100-0342-FINL SYSTEMS 6 (6) 0 A-6 Corporate Planning 60 (8) 52

A-7.1 1100-0010-VP RISK ANALYSIS & MGMT - - - A-7.2 1100-0114-RISK MANAGEMENT 19 (12) 7 A-7.3 1100-0121-ENERGY RISK MGMT VP NA NA - A-7 Risk Management 19 (12) 7

A-8.1 1100-0340-ACCTG & FINANCE ROTATION 36 (23) 13 A-8.2 1100-0344-ACCTG & FIN INTERNSHIP - - - A-8 Financial Leadership Program 36 (23) 13

Change in Allocation 2009-2012 524 (458) 66

SDG&E-17-WP BAF-WP-20 GRC APPLICATION - December 2010

Page 23: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division: A Finance Witness: Bruce Folkmann

Workpaper: A - Esc Recon

This workpaper details the methodology used to escalate the 2012 Forecast stated in 2009 $'s in Testimony and in Workpapers

Department Summaries, A-G, to the 2012 $'s as shown in Testimony and in Workpapers Escalated Department Summaries A-G

A B C D E FLabor/ Standard Total

Standard Non-Standard Total Non-labor Escalated EscalatedCosts Costs Costs Indexes 2012 $'s Costs

(A + B) (A X D) (B + E)A-1 CFO Labor 661$ -$ 661$ 1.0680 706$ 706$ Non-Labor 247 - 247 1.0727 265 265 Total 909 - 909 972 972

A-2 Accounting Services Labor 3,714 - 3,714 1.0680 3,966 3,966 Non-Labor 7,065 - 7,065 1.0727 7,578 7,578 Total 10,778 - 10,778 11,544 11,544

A-3 Tax Services Labor 5,556 - 5,556 1.0680 5,934 5,934 Non-Labor 2,567 - 2,567 1.0727 2,754 2,754 Total 8,123 - 8,123 8,687 8,687

A-4 Treasury Labor 3,162 - 3,162 1.0680 3,377 3,377 Non-Labor 1,879 25,797 27,676 1.0727 2,015 27,812 Total 5,041 25,797 30,838 5,393 31,190

A-5 Investor Relations Labor 1,009 - 1,009 1.0680 1,077 1,077 Non-Labor 760 518 1,278 1.0727 815 1,333 Total 1,769 518 2,287 1,893 2,411

A-6 Corporate Planning Labor 1,726 - 1,726 1.0680 1,843 1,843 Non-Labor 490 - 490 1.0727 526 526 Total 2,216 - 2,216 2,369 2,369

A-7 Risk Management Labor 1,235 - 1,235 1.0680 1,319 1,319 Non-Labor 121 - 121 1.0727 130 130 Total 1,356 - 1,356 1,449 1,449 A-8 Financial Leadership Program Labor 1,231 - 1,231 1.0680 1,315 1,315 Non-Labor 161 - 161 1.0727 172 172 Total 1,392 - 1,392 1,488 1,488

Total Finance Labor 18,294 - 18,294 1.0680 19,538 19,538 Non-Labor 13,290 26,315 39,605 1.0727 14,256 40,571 Total 31,584$ 26,315$ 57,899$ 33,794$ 60,109$

2012 Forecast (in 2009 $'s) 2012 Forecast Escalated

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Escalation Reconciliation($000's)

SDG&E-17-WP BAF-WP-21 GRC APPLICATION - December 2010

Page 24: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: I CORPORATE CENTER SHARED SERVICES Witness: Bruce Folkmann

Cost Center: A Finance

Workpaper: A Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 141 160 161 178 178 169 176 176

Labor Costs 12,846$ 14,333$ 15,960$ 18,450$ 19,568$ 18,569$ 19,080$ 19,538$ Non-Labor Costs 33,033 28,448 29,453 31,216 28,378 35,918 40,252 40,571 Total Costs 45,879$ 42,781$ 45,413$ 49,666$ 47,946$ 54,487$ 59,333$ 60,109$

DIRECT ASSIGNMENTS SDG&E 2,383$ 1,686$ 1,390$ 1,578$ 3,067$ 3,138$ 3,871$ 2,869$ So Cal Gas 2,440 2,385 2,151 2,420 2,762 3,494 4,126 4,176

Subtotal - Utility 4,823 4,070 3,541 3,998 5,828 6,632 7,997 7,046

Global/Retained 14,651 10,982 10,135 15,248 10,495 15,699 18,194 18,848

Total Direct Assignments 19,474$ 15,053$ 13,676$ 19,246$ 16,323$ 22,331$ 26,191$ 25,893$

ALLOCATIONS SDG&E 7,321$ 7,379$ 7,938$ 8,648$ 8,498$ 9,639$ 10,518$ 10,363$ So Cal Gas 8,439 8,666 8,949 9,440 9,406 9,089 9,607 10,243

Subtotal - Utility 15,760 16,045 16,886 18,088 17,904 18,728 20,125 20,606

Global/Retained 10,645 11,683 14,850 12,332 13,718 13,428 13,017 13,610

Total Allocations 26,405$ 27,728$ 31,737$ 30,420$ 31,622$ 32,156$ 33,142$ 34,216$

BILLED COSTS SDG&E 9,704$ 9,065$ 9,328$ 10,227$ 11,565$ 12,778$ 14,390$ 13,232$ So Cal Gas 10,879 11,051 11,100 11,860 12,168 12,582 13,733 14,419

Subtotal - Utility 20,583 20,116 20,427 22,087 23,733 25,360 28,122 27,652

Global/Retained 25,296 22,665 24,986 27,580 24,213 29,127 31,211 32,457

Total Billed Costs 45,879$ 42,781$ 45,413$ 49,666$ 47,946$ 54,487$ 59,333$ 60,109$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-22 GRC APPLICATION - December 2010

Page 25: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-1 CFO Witness: Bruce Folkmann

Cost Center: 1100-0039-EXECUTIVE VP & CFO

Workpaper: A-1.1

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 2 2 2 2 2 2 2 2

Labor Costs 730$ 632$ 610$ 644$ 664$ 661$ 661$ 661$ Non-Labor Costs 223 388 797 178 336 247 247 247 Total Costs 953$ 1,020$ 1,407$ 822$ 1,000$ 909$ 909$ 909$

DIRECT ASSIGNMENTS SDG&E -$ 63$ 6$ 0$ -$ -$ -$ -$ So Cal Gas - 78 7 0 - - - -

Subtotal - Utility - 141 13 0 - - - -

Global/Retained - 43 537 5 - - - -

Total Direct Assignments -$ 184$ 550$ 6$ -$ -$ -$ -$

ALLOCATIONS SDG&E 259$ 219$ 225$ 257$ 339$ 398$ 469$ 261$ So Cal Gas 319 266 270 287 344 210 187 259

Subtotal - Utility 579 486 495 543 683 608 656 520

Global/Retained 374 350 361 273 316 301 253 389

Total Allocations 953$ 835$ 857$ 816$ 1,000$ 909$ 909$ 909$

BILLED COSTS SDG&E 259$ 282$ 231$ 257$ 339$ 398$ 469$ 261$ So Cal Gas 319 344 277 287 344 210 187 259

Subtotal - Utility 579 627 508 544 683 608 656 520

Global/Retained 374 393 899 278 316 301 253 389

Total Billed Costs 953$ 1,020$ 1,407$ 822$ 1,000$ 909$ 909$ 909$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-23 GRC APPLICATION - December 2010

Page 26: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 339$ 344$ 316$ 1,000$ 2

(26) (26) (39) (91)

Change in Allocation 2009-2012 (52) (59) 111 -

(78)$ (85)$ 72$ (91)$ -

2012 - TEST YEAR 261$ 259$ 389$ 909$ 2

28.72% 28.50% 42.78% 100.00%

261$ 259$ 389$ 909$

(0) (0) (0) (0)

261$ 259$ 389$ 909$

A FinanceA-1 CFO

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0039-EXECUTIVE VP & CFOA-1.1 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Avg - CFO

Allocations

2009 included non-recurring Travel expenses.

SDG&E-17-WP BAF-WP-24 GRC APPLICATION - December 2010

Page 27: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-1 CFO Witness: Bruce Folkmann

Cost Center: 1100-0039-EXECUTIVE VP & CFO

Workpaper: A-1.1 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 2 2 2 2 2 2 2 2

Labor Costs 730$ 632$ 610$ 644$ 664$ 673$ 690$ 706$ Non-Labor Costs 223 388 797 178 336 252 258 265 Total Costs 953$ 1,020$ 1,407$ 822$ 1,000$ 925$ 948$ 972$

DIRECT ASSIGNMENTS SDG&E -$ 63$ 6$ 0$ -$ -$ -$ -$ So Cal Gas - 78 7 0 - - - -

Subtotal - Utility - 141 13 0 - - - -

Global/Retained 0 43 537 5 - - (0) 0

Total Direct Assignments 0$ 184$ 550$ 6$ -$ -$ (0)$ 0$

ALLOCATIONS SDG&E 259$ 219$ 225$ 257$ 339$ 405$ 489$ 279$ So Cal Gas 319 266 270 287 344 214 195 277

Subtotal - Utility 579 486 495 543 683 618 684 556

Global/Retained 374 350 361 273 316 307 264 416

Total Allocations 953$ 835$ 857$ 816$ 1,000$ 925$ 948$ 972$

BILLED COSTS SDG&E 259$ 282$ 231$ 257$ 339$ 405$ 489$ 279$ So Cal Gas 319 344 277 287 344 214 195 277

Subtotal - Utility 579 627 508 544 683 618 684 556

Global/Retained 374 393 899 278 316 307 264 416

Total Billed Costs 953$ 1,020$ 1,407$ 822$ 1,000$ 925$ 948$ 972$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-25 GRC APPLICATION - December 2010

Page 28: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A Finance Witness: Bruce Folkmann

Cost Center: A-2 Accounting Services

Workpaper: A-2

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 40 40 40 45 45 34 35 35

Labor Costs 3,262$ 3,344$ 3,770$ 4,162$ 4,439$ 3,807$ 3,714$ 3,714$ Non-Labor Costs 6,235 5,725 7,131 6,160 6,379 6,693 6,844 7,065 Total Costs 9,496$ 9,069$ 10,901$ 10,322$ 10,818$ 10,500$ 10,557$ 10,778$

DIRECT ASSIGNMENTS SDG&E 32$ 35$ 141$ 33$ 67$ -$ -$ -$ So Cal Gas 41 106 126 95 129 - - -

Subtotal - Utility 73 140 267 128 196 - - -

Global/Retained 63 (12) 491 873 454 - - -

Total Direct Assignments 137$ 128$ 758$ 1,001$ 649$ -$ -$ -$

ALLOCATIONS SDG&E 3,298$ 3,170$ 3,536$ 3,603$ 3,614$ 4,010$ 4,038$ 4,287$ So Cal Gas 3,547 3,483 3,730 3,853 4,094 4,023 4,175 4,279

Subtotal - Utility 6,845 6,653 7,266 7,457 7,708 8,032 8,212 8,566

Global/Retained 2,515 2,288 2,877 1,865 2,461 2,468 2,345 2,212

Total Allocations 9,360$ 8,941$ 10,143$ 9,322$ 10,169$ 10,500$ 10,557$ 10,778$

BILLED COSTS SDG&E 3,330$ 3,204$ 3,677$ 3,636$ 3,681$ 4,010$ 4,038$ 4,287$ So Cal Gas 3,588 3,589 3,856 3,948 4,223 4,023 4,175 4,279

Subtotal - Utility 6,918 6,793 7,534 7,584 7,904 8,032 8,212 8,566

Global/Retained 2,578 2,276 3,368 2,738 2,914 2,468 2,345 2,212

Total Billed Costs 9,496$ 9,069$ 10,901$ 10,322$ 10,818$ 10,500$ 10,557$ 10,778$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-26 GRC APPLICATION - December 2010

Page 29: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 3,681$ 4,223$ 2,914$ 10,818$ 45

(211) (299) (341) (850) (10)

(91) (92) (208) (391)

347 321 35 703

192 218 91 500

Change in Allocation 2009-2012 369 (92) (277) (0)

606$ 56$ (702)$ (40)$ (10)

2012 - TEST YEAR 4,287$ 4,279$ 2,212$ 10,778$ 35

4,287$ 4,279$ 2,213$ 10,778$

(0) (0) (0) (0)

4,287$ 4,279$ 2,212$ 10,778$

$500K non-recurring credit in 2009 by Deloitte for client retention and relief during the financial crisis.

Non-recurring expenses in 2009 for software implementation, unclaimed property and one-time salary expense.

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

Allocations

Labor staffing changes as a result of the reorganization and filling vacancies.

Deloitte external audit fees increase based on expanded business operations.

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

I CORPORATE CENTER SHARED SERVICESA FinanceA-2 Accounting ServicesA-2 Recon

SDG&E-17-WP BAF-WP-27 GRC APPLICATION - December 2010

Page 30: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A Finance Witness: Bruce Folkmann

Cost Center: A-2 Accounting Services

Workpaper: A-2 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 40 40 40 45 45 34 35 35

Labor Costs 3,262$ 3,344$ 3,770$ 4,162$ 4,439$ 3,873$ 3,873$ 3,966$ Non-Labor Costs 6,235 5,725 7,131 6,160 6,379 6,816 7,144 7,578 Total Costs 9,496$ 9,069$ 10,901$ 10,322$ 10,818$ 10,689$ 11,017$ 11,544$

DIRECT ASSIGNMENTS SDG&E 32$ 35$ 141$ 33$ 67$ -$ -$ -$ So Cal Gas 41 106 126 95 129 - - -

Subtotal - Utility 73 140 267 128 196 - - -

Global/Retained 63 (12) 491 873 454 (0) 0 -

Total Direct Assignments 137$ 128$ 758$ 1,001$ 649$ (0)$ 0$ -$

ALLOCATIONS SDG&E 3,298$ 3,170$ 3,536$ 3,603$ 3,614$ 4,082$ 4,213$ 4,592$ So Cal Gas 3,547 3,483 3,730 3,853 4,094 4,095 4,356 4,583

Subtotal - Utility 6,845 6,653 7,266 7,457 7,708 8,177 8,570 9,176

Global/Retained 2,515 2,288 2,877 1,865 2,461 2,512 2,447 2,369

Total Allocations 9,360$ 8,941$ 10,143$ 9,322$ 10,169$ 10,689$ 11,017$ 11,544$

BILLED COSTS SDG&E 3,330$ 3,204$ 3,677$ 3,636$ 3,681$ 4,082$ 4,213$ 4,592$ So Cal Gas 3,588 3,589 3,856 3,948 4,223 4,095 4,356 4,583

Subtotal - Utility 6,918 6,793 7,534 7,584 7,904 8,177 8,570 9,176

Global/Retained 2,578 2,276 3,368 2,738 2,914 2,512 2,447 2,369

Total Billed Costs 9,496$ 9,069$ 10,901$ 10,322$ 10,818$ 10,689$ 11,017$ 11,544$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-28 GRC APPLICATION - December 2010

Page 31: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-2 Accounting Services Witness: Bruce Folkmann

Cost Center: 1100-0338-SVP - CONTROLLER

Workpaper: A-2.1

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 2 2 2 2 2 2 2 2

Labor Costs 326$ 428$ 530$ 533$ 560$ 512$ 512$ 512$ Non-Labor Costs 311 498 108 213 156 214 214 214 Total Costs 637$ 925$ 638$ 746$ 716$ 726$ 726$ 726$

DIRECT ASSIGNMENTS SDG&E -$ -$ 1$ -$ -$ -$ -$ -$ So Cal Gas - - (1) - - - - -

Subtotal - Utility - - (0) - - - - -

Global/Retained - (5) 75 73 52 - - -

Total Direct Assignments -$ (5)$ 74$ 73$ 52$ -$ -$ -$

ALLOCATIONS SDG&E 141$ 219$ 95$ 153$ 150$ 187$ 191$ 196$ So Cal Gas 171 270 112 170 163 187 189 190

Subtotal - Utility 312 490 207 323 313 374 381 386

Global/Retained 325 441 357 349 352 352 345 340

Total Allocations 637$ 930$ 564$ 672$ 665$ 726$ 726$ 726$

BILLED COSTS SDG&E 141$ 219$ 96$ 153$ 150$ 187$ 191$ 196$ So Cal Gas 171 270 111 170 163 187 189 190

Subtotal - Utility 312 490 207 323 313 374 381 386

Global/Retained 325 436 431 422 403 352 345 340

Total Billed Costs 637$ 925$ 638$ 746$ 716$ 726$ 726$ 726$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-29 GRC APPLICATION - December 2010

Page 32: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 150$ 163$ 403$ 716$ 2

- - (23) (23)

(10) (11) (24) (45)

18 19 41 78

Change in Allocation 2009-2012 39 19 (58) (1)

46$ 27$ (64)$ 9$ -

2012 - TEST YEAR 196$ 190$ 340$ 726$ 2

27.02% 26.16% 46.81% 100.00%

196$ 190$ 340$ 726$

(0) (0) (0) (0)

196$ 190$ 340$ 726$

Non-recurring labor charge in 2009.

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

A FinanceA-2 Accounting Services1100-0338-SVP - CONTROLLERA-2.1 Recon

Employee salary charged to Global for specific project in 2009.

Non-recurring refund in 2009 for unclaimed property.

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Avg - Controller

Allocations

SDG&E-17-WP BAF-WP-30 GRC APPLICATION - December 2010

Page 33: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-2 Accounting Services Witness: Bruce Folkmann

Cost Center: 1100-0338-SVP - CONTROLLER

Workpaper: A-2.1 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 2 2 2 2 2 2 2 2

Labor Costs 326$ 428$ 530$ 533$ 560$ 521$ 534$ 546$ Non-Labor Costs 311 498 108 213 156 218 223 230 Total Costs 637$ 925$ 638$ 746$ 716$ 738$ 757$ 776$

DIRECT ASSIGNMENTS SDG&E -$ -$ 1$ -$ -$ -$ -$ -$ So Cal Gas - - (1) - - - - -

Subtotal - Utility - - (0) - - - - -

Global/Retained - (5) 75 73 52 - - -

Total Direct Assignments -$ (5)$ 74$ 73$ 52$ -$ -$ -$

ALLOCATIONS SDG&E 141$ 219$ 95$ 153$ 150$ 190$ 200$ 210$ So Cal Gas 171 270 112 170 163 190 198 203

Subtotal - Utility 312 490 207 323 313 380 397 413

Global/Retained 325 441 357 349 352 358 360 363

Total Allocations 637$ 930$ 564$ 672$ 665$ 738$ 757$ 776$

BILLED COSTS SDG&E 141$ 219$ 96$ 153$ 150$ 190$ 200$ 210$ So Cal Gas 171 270 111 170 163 190 198 203

Subtotal - Utility 312 490 207 323 313 380 397 413

Global/Retained 325 436 431 422 403 358 360 363

Total Billed Costs 637$ 925$ 638$ 746$ 716$ 738$ 757$ 776$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-31 GRC APPLICATION - December 2010

Page 34: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-2 Accounting Services Witness: Bruce Folkmann

Cost Center: 1100-0054-ASSISTANT CONTROLLER - CORP

Workpaper: A-2.2

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 2 2 2 2 2

Labor Costs -$ -$ -$ 113$ 214$ 244$ 244$ 244$ Non-Labor Costs - - - 7 12 12 12 12 Total Costs -$ -$ -$ 120$ 226$ 256$ 256$ 256$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ 47$ 86$ 100$ 102$ 106$ So Cal Gas - - - 55 98 105 106 106

Subtotal - Utility - - - 102 185 205 208 213

Global/Retained - - - 18 41 51 48 43

Total Allocations -$ -$ -$ 120$ 226$ 256$ 256$ 256$

BILLED COSTS SDG&E -$ -$ -$ 47$ 86$ 100$ 102$ 106$ So Cal Gas - - - 55 98 105 106 106

Subtotal - Utility - - - 102 185 205 208 213

Global/Retained - - - 18 41 51 48 43

Total Billed Costs -$ -$ -$ 120$ 226$ 256$ 256$ 256$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-32 GRC APPLICATION - December 2010

Page 35: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 86$ 98$ 41$ 226$ 2

13 13 5 31

Change in Allocation 2009-2012 7 (5) (3) 0

20$ 8$ 3$ 31$ -

2012 - TEST YEAR 106$ 106$ 43$ 256$ 2

41.54% 41.52% 16.94% 100.00%

106$ 106$ 43$ 256$

(0) (0) (0) (0)

106$ 106$ 43$ 256$

A FinanceA-2 Accounting Services

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0054-ASSISTANT CONTROLLER - CORPA-2.2 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Multi-Factor Basic

Allocations

Filled a partial year vacancy in 2009.

SDG&E-17-WP BAF-WP-33 GRC APPLICATION - December 2010

Page 36: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-2 Accounting Services Witness: Bruce Folkmann

Cost Center: 1100-0054-ASSISTANT CONTROLLER - CORP

Workpaper: A-2.2 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 2 2 2 2 2

Labor Costs -$ -$ -$ 113$ 214$ 248$ 255$ 261$ Non-Labor Costs - - - 7 12 12 13 13 Total Costs -$ -$ -$ 120$ 226$ 261$ 267$ 274$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ 47$ 86$ 101$ 107$ 114$ So Cal Gas - - - 55 98 107 111 114

Subtotal - Utility - - - 102 185 208 217 227

Global/Retained - - - 18 41 52 50 46

Total Allocations -$ -$ -$ 120$ 226$ 261$ 267$ 274$

BILLED COSTS SDG&E -$ -$ -$ 47$ 86$ 101$ 107$ 114$ So Cal Gas - - - 55 98 107 111 114

Subtotal - Utility - - - 102 185 208 217 227

Global/Retained - - - 18 41 52 50 46

Total Billed Costs -$ -$ -$ 120$ 226$ 261$ 267$ 274$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-34 GRC APPLICATION - December 2010

Page 37: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-2 Accounting Services Witness: Bruce Folkmann

Cost Center: 1100-0044-ASSISTANT CONTROLLER

Workpaper: A-2.3

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 1 1 1 1 1 0 0 0

Labor Costs 374$ 268$ 210$ 217$ 245$ 54$ -$ -$ Non-Labor Costs 36 26 9 46 43 5 - - Total Costs 410$ 294$ 220$ 263$ 288$ 59$ -$ -$

DIRECT ASSIGNMENTS SDG&E (12)$ (15)$ 2$ -$ 0$ -$ -$ -$ So Cal Gas (55) (14) - - - - - -

Subtotal - Utility (67) (28) 2 - 0 - - -

Global/Retained (7) (31) (0) 3 5 - - -

Total Direct Assignments (74)$ (60)$ 2$ 3$ 5$ -$ -$ -$

ALLOCATIONS SDG&E 168$ 122$ -$ -$ 20$ -$ -$ -$ So Cal Gas 204 152 - - 22 - - -

Subtotal - Utility 372 274 - - 42 - - -

Global/Retained 112 79 218 260 240 59 - -

Total Allocations 484$ 354$ 218$ 260$ 282$ 59$ -$ -$

BILLED COSTS SDG&E 156$ 108$ 2$ -$ 20$ -$ -$ -$ So Cal Gas 149 138 - - 22 - - -

Subtotal - Utility 305 246 2 - 43 - - -

Global/Retained 105 48 218 263 245 59 - -

Total Billed Costs 410$ 294$ 220$ 263$ 288$ 59$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-35 GRC APPLICATION - December 2010

Page 38: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 20$ 22$ 245$ 288$ 1

(20) (22) (245) (288) (1)

Change in Allocation 2009-2012 - - - -

(20)$ (22)$ (245)$ (288)$ (1)

2012 - TEST YEAR -$ -$ -$ -$ -

A-2.3 Recon

Total Change from 2009

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

Cost center eliminated in 2010. Responsibilities merged into cost center 1100-0012.(see Recon workpaper A-2.4)

A FinanceA-2 Accounting Services1100-0044-ASSISTANT CONTROLLER

SDG&E-17-WP BAF-WP-36 GRC APPLICATION - December 2010

Page 39: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-2 Accounting Services Witness: Bruce Folkmann

Cost Center: 1100-0044-ASSISTANT CONTROLLER

Workpaper: A-2.3 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 1 1 1 1 1 0 0 0

Labor Costs 374$ 268$ 210$ 217$ 245$ 55$ -$ -$ Non-Labor Costs 36 26 9 46 43 6 - - Total Costs 410$ 294$ 220$ 263$ 288$ 60$ -$ -$

DIRECT ASSIGNMENTS SDG&E (12)$ (15)$ 2$ -$ -$ -$ -$ -$ So Cal Gas (55) (14) - - - - - -

Subtotal - Utility (67) (28) 2 - - - - -

Global/Retained (7) (31) - 3 5 - - -

Total Direct Assignments (74)$ (60)$ 2$ 3$ 5$ -$ -$ -$

ALLOCATIONS SDG&E 168$ 122$ -$ -$ 20$ -$ -$ -$ So Cal Gas 204 152 - - 22 - - -

Subtotal - Utility 372 274 - - 42 - - -

Global/Retained 112 79 218 260 240 60 - -

Total Allocations 484$ 354$ 218$ 260$ 282$ 60$ -$ -$

BILLED COSTS SDG&E 156$ 108$ 2$ -$ 20$ -$ -$ -$ So Cal Gas 149 138 - - 22 - - -

Subtotal - Utility 305 246 2 - 43 - - -

Global/Retained 105 48 218 263 245 60 - -

Total Billed Costs 410$ 294$ 220$ 263$ 288$ 60$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-37 GRC APPLICATION - December 2010

Page 40: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-2 Accounting Services Witness: Bruce Folkmann

Cost Center: 1100-0012-CORPORATE ACCT SPECIAL PROJECTS

Workpaper: A-2.4

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 2 2 2

Labor Costs -$ -$ -$ -$ -$ 207$ 273$ 273$ Non-Labor Costs - - - - - 24 24 24 Total Costs -$ -$ -$ -$ -$ 231$ 296$ 296$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ 90$ 118$ 123$ So Cal Gas - - - - - 95 123 123

Subtotal - Utility - - - - - 185 241 246

Global/Retained - - - - - 46 55 50

Total Allocations -$ -$ -$ -$ -$ 231$ 296$ 296$

BILLED COSTS SDG&E -$ -$ -$ -$ -$ 90$ 118$ 123$ So Cal Gas - - - - - 95 123 123

Subtotal - Utility - - - - - 185 241 246

Global/Retained - - - - - 46 55 50

Total Billed Costs -$ -$ -$ -$ -$ 231$ 296$ 296$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-38 GRC APPLICATION - December 2010

Page 41: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR -$ -$ -$ -$ -

97 110 46 252 2

18 18 7 43

Change in Allocation 2009-2012 8 (5) (3) -

123$ 123$ 50$ 296$ 2

2012 - TEST YEAR 123$ 123$ 50$ 296$ 2

41.54% 41.52% 16.94% 100.00%

123$ 123$ 50$ 296$

(0) (0) (0) (0)

123$ 123$ 50$ 296$

A FinanceA-2 Accounting Services

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0012-CORPORATE ACCT SPECIAL PROJECTSA-2.4 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Multi-Factor Basic

Allocations

New cost center to replace cost center 1100-0345 (see Recon workpaper A-2.5)

Responsibilities merged from cost center 1100-0044. (see Recon workpaper A-2.3)

SDG&E-17-WP BAF-WP-39 GRC APPLICATION - December 2010

Page 42: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-2 Accounting Services Witness: Bruce Folkmann

Cost Center: 1100-0012-CORPORATE ACCT SPECIAL PROJECTS

Workpaper: A-2.4 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 2 2 2

Labor Costs -$ -$ -$ -$ -$ 211$ 284$ 291$ Non-Labor Costs - - - - - 24 25 25 Total Costs -$ -$ -$ -$ -$ 235$ 309$ 317$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ 91$ 123$ 131$ So Cal Gas - - - - - 97 128 131

Subtotal - Utility - - - - - 188 251 263

Global/Retained - - - - - 47 58 54

Total Allocations -$ -$ -$ -$ -$ 235$ 309$ 317$

BILLED COSTS SDG&E -$ -$ -$ -$ -$ 91$ 123$ 131$ So Cal Gas - - - - - 97 128 131

Subtotal - Utility - - - - - 188 251 263

Global/Retained - - - - - 47 58 54

Total Billed Costs -$ -$ -$ -$ -$ 235$ 309$ 317$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-40 GRC APPLICATION - December 2010

Page 43: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-2 Accounting Services Witness: Bruce Folkmann

Cost Center: 1100-0345-DIR OF CORP FINL ACCTG

Workpaper: A-2.5

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 2 2 2 2 2 0 0 0

Labor Costs 194$ 193$ 215$ 209$ 212$ 67$ -$ -$ Non-Labor Costs 39 46 49 49 40 13 - - Total Costs 233$ 239$ 264$ 258$ 252$ 80$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ 1$ -$ -$ -$ So Cal Gas - - - - 1 - - -

Subtotal - Utility - - - - 1 - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ 1$ -$ -$ -$

ALLOCATIONS SDG&E 81$ 83$ 93$ 102$ 96$ 31$ -$ -$ So Cal Gas 98 102 110 118 109 33 - -

Subtotal - Utility 179 185 203 219 205 64 - -

Global/Retained 54 54 61 39 45 16 - -

Total Allocations 233$ 239$ 264$ 258$ 251$ 80$ -$ -$

BILLED COSTS SDG&E 81$ 83$ 93$ 102$ 97$ 31$ -$ -$ So Cal Gas 98 102 110 118 110 33 - -

Subtotal - Utility 179 185 203 219 207 64 - -

Global/Retained 54 54 61 39 46 16 - -

Total Billed Costs 233$ 239$ 264$ 258$ 252$ 80$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-41 GRC APPLICATION - December 2010

Page 44: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 97$ 110$ 46$ 252$ 2

(97) (110) (46) (252) (2)

Change in Allocation 2009-2012 - - - -

(97)$ (110)$ (46)$ (252)$ (2)

2012 - TEST YEAR -$ -$ -$ -$ -

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

Total Change from 2009

Cost center replaced by new cost center 1100-0012 (see Recon workpaper A-2.4)

A FinanceA-2 Accounting Services1100-0345-DIR OF CORP FINL ACCTGA-2.5 Recon

SDG&E-17-WP BAF-WP-42 GRC APPLICATION - December 2010

Page 45: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-2 Accounting Services Witness: Bruce Folkmann

Cost Center: 1100-0345-DIR OF CORP FINL ACCTG

Workpaper: A-2.5 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 2 2 2 2 2 0 0 0

Labor Costs 194$ 193$ 215$ 209$ 212$ 68$ -$ -$ Non-Labor Costs 39 46 49 49 40 14 - - Total Costs 233$ 239$ 264$ 258$ 252$ 81$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ 1$ -$ -$ -$ So Cal Gas - - - - 1 - - -

Subtotal - Utility - - - - 1 - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ 1$ -$ -$ -$

ALLOCATIONS SDG&E 81$ 83$ 93$ 102$ 96$ 32$ -$ -$ So Cal Gas 98 102 110 118 109 33 - -

Subtotal - Utility 179 185 203 219 205 65 - -

Global/Retained 54 54 61 39 45 16 - -

Total Allocations 233$ 239$ 264$ 258$ 251$ 81$ -$ -$

BILLED COSTS SDG&E 81$ 83$ 93$ 102$ 97$ 32$ -$ -$ So Cal Gas 98 102 110 118 110 33 - -

Subtotal - Utility 179 185 203 219 207 65 - -

Global/Retained 54 54 61 39 46 16 - -

Total Billed Costs 233$ 239$ 264$ 258$ 252$ 81$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-43 GRC APPLICATION - December 2010

Page 46: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-2 Accounting Services Witness: Bruce Folkmann

Cost Center: 1100-0049-CORPORATE CENTER ACCOUNTING

Workpaper: A-2.6

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 10 10 12 11 6 6 6 6

Labor Costs 715$ 701$ 773$ 911$ 650$ 491$ 491$ 491$ Non-Labor Costs 57 69 19 24 23 16 16 16 Total Costs 772$ 770$ 793$ 935$ 673$ 507$ 507$ 507$

DIRECT ASSIGNMENTS SDG&E -$ 1$ 0$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - 1 0 - - - - -

Global/Retained 4 3 2 - - - - -

Total Direct Assignments 4$ 4$ 2$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 267$ 265$ 279$ 368$ 258$ 197$ 202$ 210$ So Cal Gas 324 329 329 427 293 208 210 210

Subtotal - Utility 591 594 607 795 551 405 412 421

Global/Retained 178 172 183 140 122 102 95 86

Total Allocations 769$ 765$ 790$ 935$ 673$ 507$ 507$ 507$

BILLED COSTS SDG&E 267$ 266$ 279$ 368$ 258$ 197$ 202$ 210$ So Cal Gas 324 329 329 427 293 208 210 210

Subtotal - Utility 591 594 608 795 551 405 412 421

Global/Retained 182 175 185 140 122 102 95 86

Total Billed Costs 772$ 770$ 793$ 935$ 673$ 507$ 507$ 507$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-44 GRC APPLICATION - December 2010

Page 47: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 258$ 293$ 122$ 673$ 6

(69) (69) (28) (166)

Change in Allocation 2009-2012 21 (13) (8) (0)

(47)$ (82)$ (36)$ (166)$ -

2012 - TEST YEAR 210$ 210$ 86$ 507$ 6

41.54% 41.52% 16.94% 100.00%

210$ 210$ 86$ 507$

(0) (0) (0) (0)

210$ 210$ 86$ 507$

A FinanceA-2 Accounting Services

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0049-CORPORATE CENTER ACCOUNTINGA-2.6 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Multi-Factor Basic

Allocations

Full year impact of 2009 staff transfers to new cost center 1100-0051 (see Recon workpaper A-2.7)

SDG&E-17-WP BAF-WP-45 GRC APPLICATION - December 2010

Page 48: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-2 Accounting Services Witness: Bruce Folkmann

Cost Center: 1100-0049-CORPORATE CENTER ACCOUNTING

Workpaper: A-2.6 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 10 10 12 11 6 6 6 6

Labor Costs 715$ 701$ 773$ 911$ 650$ 500$ 512$ 524$ Non-Labor Costs 57 69 19 24 23 16 16 17 Total Costs 772$ 770$ 793$ 935$ 673$ 515$ 528$ 541$

DIRECT ASSIGNMENTS SDG&E -$ 1$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - 1 - - - - - -

Global/Retained 4 3 2 - - - - -

Total Direct Assignments 4$ 4$ 2$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 267$ 265$ 279$ 368$ 258$ 200$ 211$ 225$ So Cal Gas 324 329 329 427 293 212 219 225

Subtotal - Utility 591 594 607 795 551 412 430 450

Global/Retained 178 172 183 140 122 103 99 92

Total Allocations 769$ 765$ 790$ 935$ 673$ 515$ 528$ 541$

BILLED COSTS SDG&E 267$ 266$ 279$ 368$ 258$ 200$ 211$ 225$ So Cal Gas 324 329 329 427 293 212 219 225

Subtotal - Utility 591 594 608 795 551 412 430 450

Global/Retained 182 175 185 140 122 103 99 92

Total Billed Costs 772$ 770$ 793$ 935$ 673$ 515$ 528$ 541$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-46 GRC APPLICATION - December 2010

Page 49: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-2 Accounting Services Witness: Bruce Folkmann

Cost Center: 1100-0051-CORPORATE & GLOBAL ACCTG

Workpaper: A-2.7

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 5 6 6 6

Labor Costs -$ -$ -$ -$ 230$ 477$ 499$ 499$ Non-Labor Costs - - - - 34 14 15 15 Total Costs -$ -$ -$ -$ 264$ 491$ 513$ 513$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - 27 - - -

Total Direct Assignments -$ -$ -$ -$ 27$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ 119$ 126$ 128$ So Cal Gas - - - - - 126 131 128

Subtotal - Utility - - - - - 245 257 257

Global/Retained - - - - 236 245 257 257

Total Allocations -$ -$ -$ -$ 236$ 491$ 513$ 513$

BILLED COSTS SDG&E -$ -$ -$ -$ -$ 119$ 126$ 128$ So Cal Gas - - - - - 126 131 128

Subtotal - Utility - - - - - 245 257 257

Global/Retained - - - - 264 245 257 257

Total Billed Costs -$ -$ -$ -$ 264$ 491$ 513$ 513$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-47 GRC APPLICATION - December 2010

Page 50: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR -$ -$ 264$ 264$ 5

69 69 28 166

0 0 83 84 1

Change in Allocation 2009-2012 59 59 (118) -

128$ 128$ (7)$ 250$ 1

2012 - TEST YEAR 128$ 128$ 257$ 513$ 6

25.01% 24.99% 50.00% 100.00%

128$ 128$ 257$ 513$

(0) (0) (0) (0)

128$ 128$ 257$ 513$

A FinanceA-2 Accounting Services

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0051-CORPORATE & GLOBAL ACCTGA-2.7 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Multi-Factor Split

Allocations

Full year impact of 2009 staff transfers from cost center 1100-0049 (see Recon workpaper A-2.6). Transferred staff member from Global to consolidate accounting

SDG&E-17-WP BAF-WP-48 GRC APPLICATION - December 2010

Page 51: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-2 Accounting Services Witness: Bruce Folkmann

Cost Center: 1100-0051-CORPORATE & GLOBAL ACCTG

Workpaper: A-2.7 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 5 6 6 6

Labor Costs -$ -$ -$ -$ 230$ 485$ 520$ 533$ Non-Labor Costs - - - - 34 14 15 16 Total Costs -$ -$ -$ -$ 264$ 499$ 535$ 548$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - 27 - - -

Total Direct Assignments -$ -$ -$ -$ 27$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ 121$ 131$ 137$ So Cal Gas - - - - - 128 136 137

Subtotal - Utility - - - - - 250 268 274

Global/Retained - - - - 236 250 268 274

Total Allocations -$ -$ -$ -$ 236$ 499$ 535$ 548$

BILLED COSTS SDG&E -$ -$ -$ -$ -$ 121$ 131$ 137$ So Cal Gas - - - - - 128 136 137

Subtotal - Utility - - - - - 250 268 274

Global/Retained - - - - 264 250 268 274

Total Billed Costs -$ -$ -$ -$ 264$ 499$ 535$ 548$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-49 GRC APPLICATION - December 2010

Page 52: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-2 Accounting Services Witness: Bruce Folkmann

Cost Center: 1100-0386-SEMPRA FINANCIAL STAFF

Workpaper: A-2.8

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 3 0 0 0 0 0 0 0

Labor Costs 171$ 135$ 36$ -$ -$ -$ -$ -$ Non-Labor Costs 50 1 - - - - - - Total Costs 221$ 136$ 36$ -$ -$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 221 136 36 - - - - -

Total Allocations 221$ 136$ 36$ -$ -$ -$ -$ -$

BILLED COSTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 221 136 36 - - - - -

Total Billed Costs 221$ 136$ 36$ -$ -$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-50 GRC APPLICATION - December 2010

Page 53: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR -$ -$ -$ -$ -

- - - -

Change in Allocation 2009-2012 - - - -

-$ -$ -$ -$ -

2012 - TEST YEAR -$ -$ -$ -$ -

0.00% 0.00% 100.00% 100.00%

-$ -$ -$ -$

- - - -

-$ -$ -$ -$

A FinanceA-2 Accounting Services

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0386-SEMPRA FINANCIAL STAFFA-2.8 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Retained

Allocations

Cost center eliminated. No data after 2008.

SDG&E-17-WP BAF-WP-51 GRC APPLICATION - December 2010

Page 54: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-2 Accounting Services Witness: Bruce Folkmann

Cost Center: 1100-0386-SEMPRA FINANCIAL STAFF

Workpaper: A-2.8 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 3 0 0 0 0 0 0 0

Labor Costs 171$ 135$ 36$ -$ -$ -$ -$ -$ Non-Labor Costs 50 1 - - - - - - Total Costs 221$ 136$ 36$ -$ -$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 221 136 36 - - - - -

Total Allocations 221$ 136$ 36$ -$ -$ -$ -$ -$

BILLED COSTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 221 136 36 - - - - -

Total Billed Costs 221$ 136$ 36$ -$ -$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-52 GRC APPLICATION - December 2010

Page 55: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-2 Accounting Services Witness: Bruce Folkmann

Cost Center: 1100-1346-BANK REC & ESCHEATMENT

Workpaper: A-2.9

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 8 9 9 9 10 0 0 0

Labor Costs 398$ 417$ 498$ 555$ 617$ 160$ -$ -$ Non-Labor Costs 32 39 28 94 122 35 - - Total Costs 430$ 457$ 526$ 648$ 738$ 195$ -$ -$

DIRECT ASSIGNMENTS SDG&E 44$ 48$ 55$ 33$ 42$ -$ -$ -$ So Cal Gas 96 120 127 95 102 - - -

Subtotal - Utility 140 168 182 128 144 - - -

Global/Retained 46 21 3 4 102 - - -

Total Direct Assignments 187$ 189$ 185$ 131$ 246$ -$ -$ -$

ALLOCATIONS SDG&E 84$ 93$ 120$ 203$ 187$ 195$ -$ -$ So Cal Gas 102 115 142 236 212 - - -

Subtotal - Utility 187 208 262 439 400 195 - -

Global/Retained 56 60 79 77 93 - - -

Total Allocations 243$ 268$ 341$ 517$ 493$ 195$ -$ -$

BILLED COSTS SDG&E 129$ 141$ 175$ 236$ 229$ 195$ -$ -$ So Cal Gas 198 235 269 331 315 - - -

Subtotal - Utility 327 376 444 567 544 195 - -

Global/Retained 103 81 82 81 195 - - -

Total Billed Costs 430$ 457$ 526$ 648$ 738$ 195$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-53 GRC APPLICATION - December 2010

Page 56: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 229$ 315$ 195$ 738$ 10

(229) (315) (195) (738) (10)

Change in Allocation 2009-2012 - - - -

(229)$ (315)$ (195)$ (738)$ (10)

2012 - TEST YEAR -$ -$ -$ -$ -

Total Change from 2009

A FinanceA-2 Accounting Services

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

Cost center eliminated in 2010. Responsibilities transferred to the Utilities.

1100-1346-BANK REC & ESCHEATMENTA-2.9 Recon

SDG&E-17-WP BAF-WP-54 GRC APPLICATION - December 2010

Page 57: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-2 Accounting Services Witness: Bruce Folkmann

Cost Center: 1100-1346-BANK REC & ESCHEATMENT

Workpaper: A-2.9 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 8 9 9 9 10 0 0 0

Labor Costs 398$ 417$ 498$ 555$ 617$ 162$ -$ -$ Non-Labor Costs 32 39 28 94 122 36 - - Total Costs 430$ 457$ 526$ 648$ 738$ 198$ -$ -$

DIRECT ASSIGNMENTS SDG&E 44$ 48$ 55$ 33$ 42$ -$ -$ -$ So Cal Gas 96 120 127 95 102 - - -

Subtotal - Utility 140 168 182 128 144 - - -

Global/Retained 46 21 3 4 102 - - -

Total Direct Assignments 187$ 189$ 185$ 131$ 246$ -$ -$ -$

ALLOCATIONS SDG&E 84$ 93$ 120$ 203$ 187$ 198$ -$ -$ So Cal Gas 102 115 142 236 212 - - -

Subtotal - Utility 187 208 262 439 400 198 - -

Global/Retained 56 60 79 77 93 - - -

Total Allocations 243$ 268$ 341$ 517$ 493$ 198$ -$ -$

BILLED COSTS SDG&E 129$ 141$ 175$ 236$ 229$ 198$ -$ -$ So Cal Gas 198 235 269 331 315 - - -

Subtotal - Utility 327 376 444 567 544 198 - -

Global/Retained 103 81 82 81 195 - - -

Total Billed Costs 430$ 457$ 526$ 648$ 738$ 198$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-55 GRC APPLICATION - December 2010

Page 58: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-2 Accounting Services Witness: Bruce Folkmann

Cost Center: 1100-0390-SOX COMPLIANCE

Workpaper: A-2.10

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 1 1 3 3 3 3 3

Labor Costs 62$ 107$ 109$ 196$ 334$ 334$ 334$ 334$ Non-Labor Costs 5 7 11 81 281 66 66 66 Total Costs 67$ 113$ 120$ 277$ 615$ 400$ 400$ 400$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ 23$ -$ -$ -$ So Cal Gas - - - - 26 - - -

Subtotal - Utility - - - - 49 - - -

Global/Retained - - - - 173 - - -

Total Direct Assignments -$ -$ -$ -$ 221$ -$ -$ -$

ALLOCATIONS SDG&E 23$ 39$ 42$ 109$ 151$ 155$ 160$ 166$ So Cal Gas 28 49 50 126 171 164 165 166

Subtotal - Utility 52 88 92 235 322 320 325 332

Global/Retained 16 25 28 41 71 80 75 68

Total Allocations 67$ 113$ 120$ 277$ 393$ 400$ 400$ 400$

BILLED COSTS SDG&E 23$ 39$ 42$ 109$ 174$ 155$ 160$ 166$ So Cal Gas 28 49 50 126 197 164 165 166

Subtotal - Utility 52 88 92 235 371 320 325 332

Global/Retained 16 25 28 41 244 80 75 68

Total Billed Costs 67$ 113$ 120$ 277$ 615$ 400$ 400$ 400$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-56 GRC APPLICATION - December 2010

Page 59: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 174$ 197$ 244$ 615$ 3

(20) (23) (171) (215)

Change in Allocation 2009-2012 13 (8) (5) (0)

(8)$ (31)$ (176)$ (215)$ -

2012 - TEST YEAR 166$ 166$ 68$ 400$ 3

41.54% 41.52% 16.94% 100.00%

166$ 166$ 68$ 400$

(0) (0) (0) (0)

166$ 166$ 68$ 400$

A FinanceA-2 Accounting Services

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0390-SOX COMPLIANCEA-2.10 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Multi-Factor Basic

Allocations

Non-recurring computer software implementation in 2009.

SDG&E-17-WP BAF-WP-57 GRC APPLICATION - December 2010

Page 60: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-2 Accounting Services Witness: Bruce Folkmann

Cost Center: 1100-0390-SOX COMPLIANCE

Workpaper: A-2.10 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 1 1 3 3 3 3 3

Labor Costs 62$ 107$ 109$ 196$ 334$ 340$ 348$ 357$ Non-Labor Costs 5 7 11 81 281 67 69 71 Total Costs 67$ 113$ 120$ 277$ 615$ 407$ 417$ 428$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ 23$ -$ -$ -$ So Cal Gas - - - - 26 - - -

Subtotal - Utility - - - - 49 - - -

Global/Retained - - - - 173 - - -

Total Direct Assignments -$ -$ -$ -$ 221$ -$ -$ -$

ALLOCATIONS SDG&E 23$ 39$ 42$ 109$ 151$ 158$ 167$ 178$ So Cal Gas 28 49 50 126 171 167 173 178

Subtotal - Utility 52 88 92 235 322 325 339 355

Global/Retained 16 25 28 41 71 82 78 72

Total Allocations 67$ 113$ 120$ 277$ 393$ 407$ 417$ 428$

BILLED COSTS SDG&E 23$ 39$ 42$ 109$ 174$ 158$ 167$ 178$ So Cal Gas 28 49 50 126 197 167 173 178

Subtotal - Utility 52 88 92 235 371 325 339 355

Global/Retained 16 25 28 41 244 82 78 72

Total Billed Costs 67$ 113$ 120$ 277$ 615$ 407$ 417$ 428$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-58 GRC APPLICATION - December 2010

Page 61: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-2 Accounting Services Witness: Bruce Folkmann

Cost Center: 1100-0347-ACCOUNTING RESEARCH

Workpaper: A-2.11

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 3 3 3 4 3 2 3 3

Labor Costs 221$ 208$ 357$ 512$ 389$ 264$ 363$ 363$ Non-Labor Costs 11 10 47 40 46 41 36 36 Total Costs 232$ 218$ 405$ 552$ 435$ 305$ 398$ 398$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 81$ 76$ 143$ 217$ 167$ 119$ 159$ 165$ So Cal Gas 98 94 168 252 189 125 165 165

Subtotal - Utility 178 169 311 469 356 244 324 331

Global/Retained 54 49 94 83 79 61 74 67

Total Allocations 232$ 218$ 404$ 552$ 435$ 305$ 398$ 398$

BILLED COSTS SDG&E 81$ 76$ 143$ 217$ 167$ 119$ 159$ 165$ So Cal Gas 98 94 168 252 189 125 165 165

Subtotal - Utility 178 169 311 469 356 244 324 331

Global/Retained 54 49 94 83 79 61 74 67

Total Billed Costs 232$ 218$ 405$ 552$ 435$ 305$ 398$ 398$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-59 GRC APPLICATION - December 2010

Page 62: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 167$ 189$ 79$ 435$ 3

(15) (15) (6) (37)

Change in Allocation 2009-2012 14 (9) (5) (0)

(1)$ (24)$ (11)$ (37)$ -

2012 - TEST YEAR 165$ 165$ 67$ 398$ 3

41.54% 41.52% 16.94% 100.00%

165$ 165$ 67$ 398$

(0) (0) (0) (0)

165$ 165$ 67$ 398$

A FinanceA-2 Accounting Services

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0347-ACCOUNTING RESEARCHA-2.11 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Multi-Factor Basic

Allocations

Full year impact of staff reduction mid-year 2009.

SDG&E-17-WP BAF-WP-60 GRC APPLICATION - December 2010

Page 63: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-2 Accounting Services Witness: Bruce Folkmann

Cost Center: 1100-0347-ACCOUNTING RESEARCH

Workpaper: A-2.11 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 3 3 3 4 3 2 3 3

Labor Costs 221$ 208$ 357$ 512$ 389$ 268$ 378$ 387$ Non-Labor Costs 11 10 47 40 46 42 37 38 Total Costs 232$ 218$ 405$ 552$ 435$ 310$ 415$ 425$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 81$ 76$ 143$ 217$ 167$ 121$ 166$ 177$ So Cal Gas 98 94 168 252 189 128 172 177

Subtotal - Utility 178 169 311 469 356 248 338 353

Global/Retained 54 49 94 83 79 62 78 72

Total Allocations 232$ 218$ 404$ 552$ 435$ 310$ 415$ 425$

BILLED COSTS SDG&E 81$ 76$ 143$ 217$ 167$ 121$ 166$ 177$ So Cal Gas 98 94 168 252 189 128 172 177

Subtotal - Utility 178 169 311 469 356 248 338 353

Global/Retained 54 49 94 83 79 62 78 72

Total Billed Costs 232$ 218$ 405$ 552$ 435$ 310$ 415$ 425$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-61 GRC APPLICATION - December 2010

Page 64: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-2 Accounting Services Witness: Bruce Folkmann

Cost Center: 1100-0047-FINANCIAL REPORTING DIREC

Workpaper: A-2.12

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 2 3 2 2 2 2 2 2

Labor Costs 214$ 242$ 339$ 202$ 209$ 212$ 212$ 212$ Non-Labor Costs 25 32 42 42 269 80 80 80 Total Costs 240$ 274$ 381$ 243$ 478$ 291$ 291$ 291$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ 1$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - 1 - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ 1$ -$ -$ -$

ALLOCATIONS SDG&E 83$ 95$ 134$ 96$ 183$ 113$ 116$ 121$ So Cal Gas 101 118 158 111 207 120 120 121

Subtotal - Utility 184 213 293 207 390 233 237 242

Global/Retained 55 61 88 36 86 58 54 49

Total Allocations 240$ 274$ 381$ 243$ 476$ 291$ 291$ 291$

BILLED COSTS SDG&E 83$ 95$ 134$ 96$ 184$ 113$ 116$ 121$ So Cal Gas 101 118 158 111 207 120 120 121

Subtotal - Utility 184 213 293 207 391 233 237 242

Global/Retained 55 61 88 36 86 58 54 49

Total Billed Costs 240$ 274$ 381$ 243$ 478$ 291$ 291$ 291$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-62 GRC APPLICATION - December 2010

Page 65: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 184$ 207$ 86$ 478$ 2

(78) (77) (31) (187)

Change in Allocation 2009-2012 15 (10) (6) (0)

(63)$ (86)$ (37)$ (187)$ -

2012 - TEST YEAR 121$ 121$ 49$ 291$ 2

41.54% 41.52% 16.94% 100.00%

121$ 121$ 49$ 291$

(0) (0) (0) (0)

121$ 121$ 49$ 291$

A FinanceA-2 Accounting Services

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0047-FINANCIAL REPORTING DIRECA-2.12 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Multi-Factor Basic

Allocations

Non-recurring computer software implementation in 2009.

SDG&E-17-WP BAF-WP-63 GRC APPLICATION - December 2010

Page 66: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-2 Accounting Services Witness: Bruce Folkmann

Cost Center: 1100-0047-FINANCIAL REPORTING DIREC

Workpaper: A-2.12 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 2 3 2 2 2 2 2 2

Labor Costs 214$ 242$ 339$ 202$ 209$ 215$ 221$ 226$ Non-Labor Costs 25 32 42 42 269 81 83 85 Total Costs 240$ 274$ 381$ 243$ 478$ 296$ 304$ 311$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ 1$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - 1 - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ 1$ -$ -$ -$

ALLOCATIONS SDG&E 83$ 95$ 134$ 96$ 183$ 115$ 121$ 129$ So Cal Gas 101 118 158 111 207 122 126 129

Subtotal - Utility 184 213 293 207 390 237 247 259

Global/Retained 55 61 88 36 86 59 57 53

Total Allocations 240$ 274$ 381$ 243$ 476$ 296$ 304$ 311$

BILLED COSTS SDG&E 83$ 95$ 134$ 96$ 184$ 115$ 121$ 129$ So Cal Gas 101 118 158 111 207 122 126 129

Subtotal - Utility 184 213 293 207 391 237 247 259

Global/Retained 55 61 88 36 86 59 57 53

Total Billed Costs 240$ 274$ 381$ 243$ 478$ 296$ 304$ 311$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-64 GRC APPLICATION - December 2010

Page 67: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-2 Accounting Services Witness: Bruce Folkmann

Cost Center: 1100-0048-FINANCIAL REPORTING

Workpaper: A-2.13

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 9 9 8 9 9 9 9 9

Labor Costs 585$ 646$ 704$ 715$ 779$ 787$ 787$ 787$ Non-Labor Costs 83 53 76 67 33 82 79 80 Total Costs 668$ 699$ 781$ 782$ 813$ 869$ 867$ 867$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 232$ 242$ 275$ 308$ 312$ 338$ 346$ 360$ So Cal Gas 281 300 324 357 354 357 359 360

Subtotal - Utility 513 542 600 665 665 695 705 720

Global/Retained 155 157 181 117 147 174 162 147

Total Allocations 668$ 699$ 781$ 782$ 813$ 869$ 867$ 867$

BILLED COSTS SDG&E 232$ 242$ 275$ 308$ 312$ 338$ 346$ 360$ So Cal Gas 281 300 324 357 354 357 359 360

Subtotal - Utility 513 542 600 665 665 695 705 720

Global/Retained 155 157 181 117 147 174 162 147

Total Billed Costs 668$ 699$ 781$ 782$ 813$ 869$ 867$ 867$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-65 GRC APPLICATION - December 2010

Page 68: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 312$ 354$ 147$ 813$ 9

23 23 9 54

Change in Allocation 2009-2012 26 (16) (10) -

48$ 6$ (0)$ 54$ -

2012 - TEST YEAR 360$ 360$ 147$ 867$ 9

41.54% 41.52% 16.94% 100.00%

360$ 360$ 147$ 867$

(0) (0) (0) (0)

360$ 360$ 147$ 867$

A FinanceA-2 Accounting Services

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0048-FINANCIAL REPORTINGA-2.13 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Multi-Factor Basic

Allocations

Contract labor to manage seasonal workload and expected vacancies.

SDG&E-17-WP BAF-WP-66 GRC APPLICATION - December 2010

Page 69: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-2 Accounting Services Witness: Bruce Folkmann

Cost Center: 1100-0048-FINANCIAL REPORTING

Workpaper: A-2.13 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 9 9 8 9 9 9 9 9

Labor Costs 585$ 646$ 704$ 715$ 779$ 800$ 821$ 841$ Non-Labor Costs 83 53 76 67 33 84 83 85 Total Costs 668$ 699$ 781$ 782$ 813$ 884$ 904$ 926$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 232$ 242$ 275$ 308$ 312$ 344$ 361$ 385$ So Cal Gas 281 300 324 357 354 363 374 385

Subtotal - Utility 513 542 600 665 665 707 735 769

Global/Retained 155 157 181 117 147 177 169 157

Total Allocations 668$ 699$ 781$ 782$ 813$ 884$ 904$ 926$

BILLED COSTS SDG&E 232$ 242$ 275$ 308$ 312$ 344$ 361$ 385$ So Cal Gas 281 300 324 357 354 363 374 385

Subtotal - Utility 513 542 600 665 665 707 735 769

Global/Retained 155 157 181 117 147 177 169 157

Total Billed Costs 668$ 699$ 781$ 782$ 813$ 884$ 904$ 926$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-67 GRC APPLICATION - December 2010

Page 70: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-2 Accounting Services Witness: Bruce Folkmann

Cost Center: 1100-0219-FINANCIAL REPORTING D&T FEES

Workpaper: A-2.14

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ -$ -$ -$ -$ Non-Labor Costs 5,586 4,944 6,739 5,498 5,321 6,090 6,303 6,524 Total Costs 5,586$ 4,944$ 6,739$ 5,498$ 5,321$ 6,090$ 6,303$ 6,524$

DIRECT ASSIGNMENTS SDG&E -$ -$ 83$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - 83 - - - - -

Global/Retained 21 - 411 793 95 - - -

Total Direct Assignments 21$ -$ 495$ 793$ 95$ -$ -$ -$

ALLOCATIONS SDG&E 2,138$ 1,936$ 2,355$ 2,001$ 2,004$ 2,367$ 2,516$ 2,710$ So Cal Gas 2,139 1,954 2,338 2,000 2,275 2,502 2,607 2,709

Subtotal - Utility 4,277 3,890 4,693 4,001 4,279 4,869 5,124 5,419

Global/Retained 1,288 1,054 1,552 704 948 1,221 1,179 1,105

Total Allocations 5,565$ 4,944$ 6,244$ 4,705$ 5,227$ 6,090$ 6,303$ 6,524$

BILLED COSTS SDG&E 2,138$ 1,936$ 2,439$ 2,001$ 2,004$ 2,367$ 2,516$ 2,710$ So Cal Gas 2,139 1,954 2,338 2,000 2,275 2,502 2,607 2,709

Subtotal - Utility 4,277 3,890 4,776 4,001 4,279 4,869 5,124 5,419

Global/Retained 1,309 1,054 1,963 1,497 1,042 1,221 1,179 1,105

Total Billed Costs 5,586$ 4,944$ 6,739$ 5,498$ 5,321$ 6,090$ 6,303$ 6,524$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-68 GRC APPLICATION - December 2010

Page 71: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 2,004$ 2,275$ 1,042$ 5,321$ -

347 321 35 703

192 218 91 500

Change in Allocation 2009-2012 167 (105) (62) 0

706$ 434$ 63$ 1,203$ -

2012 - TEST YEAR 2,710$ 2,709$ 1,105$ 6,524$ -

41.54% 41.52% 16.94% 100.00%

2,710$ 2,709$ 1,105$ 6,524$

- - - -

2,710$ 2,709$ 1,105$ 6,524$

A FinanceA-2 Accounting Services

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0219-FINANCIAL REPORTING D&T FEESA-2.14 Recon

Direct Assignments

Deloitte external audit fees increase based on expanded business operations.

$500K non-recurring credit in 2009 by Deloitte for client retention and relief during the financial crisis.

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Multi-Factor Basic

Allocations

SDG&E-17-WP BAF-WP-69 GRC APPLICATION - December 2010

Page 72: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-2 Accounting Services Witness: Bruce Folkmann

Cost Center: 1100-0219-FINANCIAL REPORTING D&T FEES

Workpaper: A-2.14 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ -$ -$ -$ -$ Non-Labor Costs 5,586 4,944 6,739 5,498 5,321 6,202 6,579 6,998 Total Costs 5,586$ 4,944$ 6,739$ 5,498$ 5,321$ 6,202$ 6,579$ 6,998$

DIRECT ASSIGNMENTS SDG&E -$ -$ 83$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - 83 - - - - -

Global/Retained 21 - 411 793 95 - - -

Total Direct Assignments 21$ -$ 495$ 793$ 95$ -$ -$ -$

ALLOCATIONS SDG&E 2,138$ 1,936$ 2,355$ 2,001$ 2,004$ 2,410$ 2,627$ 2,907$ So Cal Gas 2,139 1,954 2,338 2,000 2,275 2,548 2,721 2,906

Subtotal - Utility 4,277 3,890 4,693 4,001 4,279 4,958 5,348 5,813

Global/Retained 1,288 1,054 1,552 704 948 1,244 1,231 1,185

Total Allocations 5,565$ 4,944$ 6,244$ 4,705$ 5,227$ 6,202$ 6,579$ 6,998$

BILLED COSTS SDG&E 2,138$ 1,936$ 2,439$ 2,001$ 2,004$ 2,410$ 2,627$ 2,907$ So Cal Gas 2,139 1,954 2,338 2,000 2,275 2,548 2,721 2,906

Subtotal - Utility 4,277 3,890 4,776 4,001 4,279 4,958 5,348 5,813

Global/Retained 1,309 1,054 1,963 1,497 1,042 1,244 1,231 1,185

Total Billed Costs 5,586$ 4,944$ 6,739$ 5,498$ 5,321$ 6,202$ 6,579$ 6,998$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-70 GRC APPLICATION - December 2010

Page 73: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A Finance Witness: Bruce Folkmann

Cost Center: A-3 Tax Services

Workpaper: A-3

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 46 53 49 55 54 54 54 54

Labor Costs 4,171$ 4,447$ 4,629$ 5,539$ 5,871$ 5,610$ 5,556$ 5,556$ Non-Labor Costs 3,817 4,336 5,348 4,490 2,177 2,581 2,567 2,567 Total Costs 7,988$ 8,783$ 9,977$ 10,030$ 8,048$ 8,191$ 8,123$ 8,123$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas -$ -$ -$ 33$ 3$ -$ -$ -$

Subtotal - Utility - - - 33 3 - - -

Global/Retained 166$ 747$ 340$ 1,429$ 332$ -$ -$ -$

Total Direct Assignments 166$ 747$ 340$ 1,462$ 335$ -$ -$ -$

ALLOCATIONS SDG&E 1,710$ 1,902$ 1,953$ 2,218$ 1,738$ 1,659$ 1,658$ 1,678$ So Cal Gas 2,084 2,338 2,331 2,316 1,788 1,586 1,577 1,579

Subtotal - Utility 3,794 4,239 4,283 4,534 3,526 3,245 3,235 3,257

Global/Retained 4,028 3,797 5,354 4,034 4,188 4,946 4,888 4,866

Total Allocations 7,822$ 8,036$ 9,637$ 8,568$ 7,713$ 8,191$ 8,123$ 8,123$

BILLED COSTS SDG&E 1,710$ 1,902$ 1,953$ 2,218$ 1,738$ 1,659$ 1,658$ 1,678$ So Cal Gas 2,084 2,338 2,331 2,349 1,791 1,586 1,577 1,579

Subtotal - Utility 3,794 4,239 4,283 4,567 3,529 3,245 3,235 3,257

Global/Retained 4,194 4,544 5,694 5,463 4,519 4,946 4,888 4,866

Total Billed Costs 7,988$ 8,783$ 9,977$ 10,030$ 8,048$ 8,191$ 8,123$ 8,123$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-71 GRC APPLICATION - December 2010

Page 74: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 1,738$ 1,791$ 4,519$ 8,048$ 54

(1) (3) (57) (60)

(18) (17) (284) (318)

17 16 49 82

86 80 205 370

Change in Allocation 2009-2012 (144) (289) 433 -

(60)$ (212)$ 347$ 75$ -

2012 - TEST YEAR 1,678$ 1,579$ 4,866$ 8,123$ 54

1,678$ 1,579$ 4,866$ 8,123$

(0) (0) (0) (1)

1,678$ 1,579$ 4,866$ 8,123$

Software maintenance fees on new tax system planned in 2012. Contract labor to manage seasonal workload peaks and expected vacancies.

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

Allocations

Impact of staff transfers within Tax Services; no overall increase in FTE's. Non-recurring direct charged Consulting and Labor costs in 2009.

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

I CORPORATE CENTER SHARED SERVICESA FinanceA-3 Tax ServicesA-3 Recon

SDG&E-17-WP BAF-WP-72 GRC APPLICATION - December 2010

Page 75: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A Finance Witness: Bruce Folkmann

Cost Center: A-3 Tax Services

Workpaper: A-3 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 46 53 49 55 54 54 54 54

Labor Costs 4,171$ 4,447$ 4,629$ 5,539$ 5,871$ 5,707$ 5,795$ 5,934$ Non-Labor Costs 3,817 4,336 5,348 4,490 2,177 2,629 2,679 2,754 Total Costs 7,988$ 8,783$ 9,977$ 10,030$ 8,048$ 8,336$ 8,474$ 8,687$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - 33 3 - - -

Subtotal - Utility - - - 33 3 - - -

Global/Retained 166 747 340 1,429 332 - - -

Total Direct Assignments 166$ 747$ 340$ 1,462$ 335$ -$ -$ -$

ALLOCATIONS SDG&E 1,710$ 1,902$ 1,953$ 2,218$ 1,738$ 1,688$ 1,730$ 1,795$ So Cal Gas 2,084 2,338 2,331 2,316 1,788 1,614 1,645 1,688

Subtotal - Utility 3,794 4,239 4,283 4,534 3,526 3,302 3,375 3,483

Global/Retained 4,028 3,797 5,354 4,034 4,188 5,034 5,100 5,204

Total Allocations 7,822$ 8,036$ 9,637$ 8,568$ 7,713$ 8,336$ 8,474$ 8,687$

BILLED COSTS SDG&E 1,710$ 1,902$ 1,953$ 2,218$ 1,738$ 1,688$ 1,730$ 1,795$ So Cal Gas 2,084 2,338 2,331 2,349 1,791 1,614 1,645 1,688

Subtotal - Utility 3,794 4,239 4,283 4,567 3,529 3,302 3,375 3,483

Global/Retained 4,194 4,544 5,694 5,463 4,519 5,034 5,100 5,204

Total Billed Costs 7,988$ 8,783$ 9,977$ 10,030$ 8,048$ 8,336$ 8,474$ 8,687$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-73 GRC APPLICATION - December 2010

Page 76: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-3 Tax Services Witness: Bruce Folkmann

Cost Center: 1100-0046-VP OF CORPORATE TAX

Workpaper: A-3.1

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 4 1 4 4 4

Labor Costs -$ -$ -$ 763$ 650$ 535$ 589$ 589$ Non-Labor Costs - - - 292 138 239 239 239 Total Costs -$ -$ -$ 1,054$ 788$ 773$ 827$ 827$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - 19 - - - -

Total Direct Assignments -$ -$ -$ 19$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ 268$ 172$ 157$ 169$ 171$ So Cal Gas - - - 280 183 150 161 161

Subtotal - Utility - - - 548 355 306 329 332

Global/Retained - - - 488 433 467 498 496

Total Allocations -$ -$ -$ 1,036$ 788$ 773$ 827$ 827$

BILLED COSTS SDG&E -$ -$ -$ 268$ 172$ 157$ 169$ 171$ So Cal Gas - - - 280 183 150 161 161

Subtotal - Utility - - - 548 355 306 329 332

Global/Retained - - - 506 433 467 498 496

Total Billed Costs -$ -$ -$ 1,054$ 788$ 773$ 827$ 827$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-74 GRC APPLICATION - December 2010

Page 77: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 172$ 183$ 433$ 788$ 1

8 8 24 40 3

Change in Allocation 2009-2012 (9) (30) 39 (0)

(1)$ (22)$ 63$ 40$ 3

2012 - TEST YEAR 171$ 161$ 496$ 827$ 4

(0)$ (0)$ (0)$ 20.66% 19.43% 59.90% 100.00%

171$ 161$ 496$ 827$

(0) (0) (0) (0)

171$ 161$ 496$ 827$

A FinanceA-3 Tax Services

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0046-VP OF CORPORATE TAXA-3.1 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Causal - Tax Services

Allocations

Impact of staff transfers within Tax Services; no overall increase in FTE's. (see Recon workpaper Dept A-3)

SDG&E-17-WP BAF-WP-75 GRC APPLICATION - December 2010

Page 78: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-3 Tax Services Witness: Bruce Folkmann

Cost Center: 1100-0046-VP OF CORPORATE TAX

Workpaper: A-3.1 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 4 1 4 4 4

Labor Costs -$ -$ -$ 763$ 650$ 544$ 614$ 629$ Non-Labor Costs - - - 292 138 243 249 256 Total Costs -$ -$ -$ 1,054$ 788$ 787$ 863$ 885$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - 19 - - - -

Total Direct Assignments -$ -$ -$ 19$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ 268$ 172$ 159$ 176$ 183$ So Cal Gas - - - 280 183 152 168 172

Subtotal - Utility - - - 548 355 312 344 355

Global/Retained - - - 488 433 475 519 530

Total Allocations -$ -$ -$ 1,036$ 788$ 787$ 863$ 885$

BILLED COSTS SDG&E -$ -$ -$ 268$ 172$ 159$ 176$ 183$ So Cal Gas - - - 280 183 152 168 172

Subtotal - Utility - - - 548 355 312 344 355

Global/Retained - - - 506 433 475 519 530

Total Billed Costs -$ -$ -$ 1,054$ 788$ 787$ 863$ 885$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-76 GRC APPLICATION - December 2010

Page 79: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-3 Tax Services Witness: Bruce Folkmann

Cost Center: 1100-0045-CORPORATE TAX ACCTG & SYSTEMS

Workpaper: A-3.2

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 13 18 8 15 16 11 11 11

Labor Costs 1,200$ 1,406$ 1,087$ 1,107$ 1,335$ 1,025$ 950$ 950$ Non-Labor Costs 517 983 1,083 805 380 305 299 299 Total Costs 1,718$ 2,390$ 2,171$ 1,912$ 1,715$ 1,330$ 1,249$ 1,249$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - 33 - - - -

Subtotal - Utility - - - 33 - - - -

Global/Retained 25 54 234 9 - - - -

Total Direct Assignments 25$ 54$ 234$ 42$ -$ -$ -$ -$

ALLOCATIONS SDG&E 374$ 820$ 450$ 484$ 388$ 269$ 255$ 258$ So Cal Gas 455 1,012 531 505 398 258 242 243

Subtotal - Utility 829 1,832 982 990 785 527 497 501

Global/Retained 864 504 955 880 930 803 752 748

Total Allocations 1,693$ 2,335$ 1,937$ 1,870$ 1,715$ 1,330$ 1,249$ 1,249$

BILLED COSTS SDG&E 374$ 820$ 450$ 484$ 388$ 269$ 255$ 258$ So Cal Gas 455 1,012 531 538 398 258 242 243

Subtotal - Utility 829 1,832 982 1,022 785 527 497 501

Global/Retained 889 558 1,189 889 930 803 752 748

Total Billed Costs 1,718$ 2,390$ 2,171$ 1,912$ 1,715$ 1,330$ 1,249$ 1,249$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-77 GRC APPLICATION - December 2010

Page 80: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 388$ 398$ 930$ 1,715$ 16

(96) (91) (279) (466) (5)

Change in Allocation 2009-2012 (33) (64) 98 -

(130)$ (155)$ (181)$ (466)$ (5)

2012 - TEST YEAR 258$ 243$ 748$ 1,249$ 11

(0)$ (0)$ (0)$ 20.66% 19.43% 59.90% 100.00%

258$ 243$ 748$ 1,249$

(0) (0) (0) (0)

258$ 243$ 748$ 1,249$

A FinanceA-3 Tax Services

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0045-CORPORATE TAX ACCTG & SYSTEMSA-3.2 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Causal - Tax Services

Allocations

Impact of staff transfers within Tax Services; no overall increase in FTE's. (see Recon workpaper Dept A-3)

SDG&E-17-WP BAF-WP-78 GRC APPLICATION - December 2010

Page 81: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-3 Tax Services Witness: Bruce Folkmann

Cost Center: 1100-0045-CORPORATE TAX ACCTG & SYSTEMS

Workpaper: A-3.2 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 13 18 8 15 16 11 11 11

Labor Costs 1,200$ 1,406$ 1,087$ 1,107$ 1,335$ 1,043$ 991$ 1,014$ Non-Labor Costs 517 983 1,083 805 380 310 313 321 Total Costs 1,718$ 2,390$ 2,171$ 1,912$ 1,715$ 1,354$ 1,303$ 1,336$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - 33 - - - -

Subtotal - Utility - - - 33 - - - -

Global/Retained 25 54 234 9 - - - -

Total Direct Assignments 25$ 54$ 234$ 42$ -$ -$ -$ -$

ALLOCATIONS SDG&E 374$ 820$ 450$ 484$ 388$ 274$ 266$ 276$ So Cal Gas 455 1,012 531 505 398 262 253 260

Subtotal - Utility 829 1,832 982 990 785 536 519 536

Global/Retained 864 504 955 880 930 817 784 800

Total Allocations 1,693$ 2,335$ 1,937$ 1,870$ 1,715$ 1,354$ 1,303$ 1,336$

BILLED COSTS SDG&E 374$ 820$ 450$ 484$ 388$ 274$ 266$ 276$ So Cal Gas 455 1,012 531 538 398 262 253 260

Subtotal - Utility 829 1,832 982 1,022 785 536 519 536

Global/Retained 889 558 1,189 889 930 817 784 800

Total Billed Costs 1,718$ 2,390$ 2,171$ 1,912$ 1,715$ 1,354$ 1,303$ 1,336$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-79 GRC APPLICATION - December 2010

Page 82: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-3 Tax Services Witness: Bruce Folkmann

Cost Center: 1100-0373-DOMESTIC TAX COMPLIANCE

Workpaper: A-3.3

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 11 12 20 14 19 19 19 19

Labor Costs 929$ 986$ 1,369$ 1,286$ 1,448$ 1,779$ 1,779$ 1,779$ Non-Labor Costs 1,446 763 295 380 499 564 558 558 Total Costs 2,375$ 1,748$ 1,664$ 1,666$ 1,947$ 2,344$ 2,338$ 2,338$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - 10 - - - -

Total Direct Assignments -$ -$ -$ 10$ -$ -$ -$ -$

ALLOCATIONS SDG&E 1,070$ 735$ 750$ 429$ 440$ 475$ 477$ 483$ So Cal Gas 1,304 899 914 447 451 454 454 454

Subtotal - Utility 2,375 1,634 1,664 876 892 928 931 937

Global/Retained - 114 - 779 1,056 1,415 1,407 1,400

Total Allocations 2,375$ 1,748$ 1,664$ 1,656$ 1,947$ 2,344$ 2,338$ 2,338$

BILLED COSTS SDG&E 1,070$ 735$ 750$ 429$ 440$ 475$ 477$ 483$ So Cal Gas 1,304 899 914 447 451 454 454 454

Subtotal - Utility 2,375 1,634 1,664 876 892 928 931 937

Global/Retained - 114 - 790 1,056 1,415 1,407 1,400

Total Billed Costs 2,375$ 1,748$ 1,664$ 1,666$ 1,947$ 2,344$ 2,338$ 2,338$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-80 GRC APPLICATION - December 2010

Page 83: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 440$ 451$ 1,056$ 1,947$ 19

64 60 185 308

17 16 49 82

Change in Allocation 2009-2012 (38) (73) 111 (0)

43$ 3$ 345$ 390$ -

2012 - TEST YEAR 483$ 454$ 1,400$ 2,338$ 19

(0)$ (0)$ (0)$

20.66% 19.43% 59.90% 100.00%

483$ 454$ 1,401$ 2,338$

(0) (0) (0) (0)

483$ 454$ 1,400$ 2,338$

A FinanceA-3 Tax Services

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0373-DOMESTIC TAX COMPLIANCEA-3.3 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Causal - Tax Services

Allocations

Full year impact of 2009 transfers of staff within Tax Services. (see Recon workpaper Dept A-3).Software maintenance fees on new tax system planned in 2012.

SDG&E-17-WP BAF-WP-81 GRC APPLICATION - December 2010

Page 84: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-3 Tax Services Witness: Bruce Folkmann

Cost Center: 1100-0373-DOMESTIC TAX COMPLIANCE

Workpaper: A-3.3 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 11 12 20 14 19 19 19 19

Labor Costs 929$ 986$ 1,369$ 1,286$ 1,448$ 1,810$ 1,856$ 1,900$ Non-Labor Costs 1,446 763 295 380 499 575 583 599 Total Costs 2,375$ 1,748$ 1,664$ 1,666$ 1,947$ 2,385$ 2,439$ 2,499$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - 10 - - - -

Total Direct Assignments -$ -$ -$ 10$ -$ -$ -$ -$

ALLOCATIONS SDG&E 1,070$ 735$ 750$ 429$ 440$ 483$ 498$ 516$ So Cal Gas 1,304 899 914 447 451 462 473 486

Subtotal - Utility 2,375 1,634 1,664 876 892 945 971 1,002

Global/Retained - 114 - 779 1,056 1,440 1,468 1,497

Total Allocations 2,375$ 1,748$ 1,664$ 1,656$ 1,947$ 2,385$ 2,439$ 2,499$

BILLED COSTS SDG&E 1,070$ 735$ 750$ 429$ 440$ 483$ 498$ 516$ So Cal Gas 1,304 899 914 447 451 462 473 486

Subtotal - Utility 2,375 1,634 1,664 876 892 945 971 1,002

Global/Retained 0 114 - 790 1,056 1,440 1,468 1,497

Total Billed Costs 2,375$ 1,748$ 1,664$ 1,666$ 1,947$ 2,385$ 2,439$ 2,499$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-82 GRC APPLICATION - December 2010

Page 85: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-3 Tax Services Witness: Bruce Folkmann

Cost Center: 1100-0374-INTL TAX

Workpaper: A-3.4

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 14 13 7 5 6 7 7 7

Labor Costs 1,375$ 1,307$ 843$ 791$ 799$ 802$ 770$ 770$ Non-Labor Costs 1,309 2,406 2,555 1,711 572 957 957 957 Total Costs 2,684$ 3,712$ 3,398$ 2,502$ 1,371$ 1,759$ 1,727$ 1,727$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - 2 - - -

Subtotal - Utility - - - - 2 - - -

Global/Retained 111 663 (260) 1,016 259 - - -

Total Direct Assignments 111$ 663$ (260)$ 1,016$ 261$ -$ -$ -$

ALLOCATIONS SDG&E -$ 162$ 198$ 385$ 251$ 356$ 353$ 357$ So Cal Gas - 201 233 402 257 341 335 336

Subtotal - Utility - 362 431 787 508 697 688 693

Global/Retained 2,572 2,687 3,227 700 602 1,062 1,039 1,035

Total Allocations 2,572$ 3,050$ 3,658$ 1,486$ 1,110$ 1,759$ 1,727$ 1,727$

BILLED COSTS SDG&E -$ 162$ 198$ 385$ 251$ 356$ 353$ 357$ So Cal Gas - 201 233 402 259 341 335 336

Subtotal - Utility - 362 431 787 510 697 688 693

Global/Retained 2,684 3,350 2,967 1,715 861 1,062 1,039 1,035

Total Billed Costs 2,684$ 3,712$ 3,398$ 2,502$ 1,371$ 1,759$ 1,727$ 1,727$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-83 GRC APPLICATION - December 2010

Page 86: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 251$ 259$ 861$ 1,371$ 6

86 80 205 370 -

(213) (213)

41 39 119 199 1

Change in Allocation 2009-2012 (22) (42) 63 -

106$ 77$ 174$ 356$ 1

2012 - TEST YEAR 357$ 336$ 1,035$ 1,727$ 7 -0.054 -0.054 -0.432

20.66% 19.43% 59.90% 100.00%

357$ 336$ 1,035$ 1,727$

(0) (0) (0) (0)

357$ 336$ 1,035$ 1,727$

Non-recurring consulting costs in 2009 related to Global projects.

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

A FinanceA-3 Tax Services1100-0374-INTL TAXA-3.4 Recon

Contract labor to manage seasonal workload peaks and expected vacancies.

Impact of staff transfers within Tax Services; no overall increase in FTE's. (see Recon workpaper Dept A-3)

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Causal - Tax Services

Allocations

SDG&E-17-WP BAF-WP-84 GRC APPLICATION - December 2010

Page 87: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-3 Tax Services Witness: Bruce Folkmann

Cost Center: 1100-0374-INTL TAX

Workpaper: A-3.4 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 14 13 7 5 6 7 7 7

Labor Costs 1,375$ 1,307$ 843$ 791$ 799$ 816$ 803$ 822$ Non-Labor Costs 1,309 2,406 2,555 1,711 572 975 999 1,027 Total Costs 2,684$ 3,712$ 3,398$ 2,502$ 1,371$ 1,791$ 1,802$ 1,849$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - 2 - - -

Subtotal - Utility - - - - 2 - - -

Global/Retained 111 663 (260) 1,016 259 - - -

Total Direct Assignments 111$ 663$ (260)$ 1,016$ 261$ -$ -$ -$

ALLOCATIONS SDG&E -$ 162$ 198$ 385$ 251$ 363$ 368$ 382$ So Cal Gas - 201 233 402 257 347 350 359

Subtotal - Utility - 362 431 787 508 709 718 741

Global/Retained 2,572 2,687 3,227 700 602 1,081 1,085 1,108

Total Allocations 2,572$ 3,050$ 3,658$ 1,486$ 1,110$ 1,791$ 1,802$ 1,849$

BILLED COSTS SDG&E -$ 162$ 198$ 385$ 251$ 363$ 368$ 382$ So Cal Gas - 201 233 402 259 347 350 359

Subtotal - Utility - 362 431 787 510 709 718 741

Global/Retained 2,684 3,350 2,967 1,715 861 1,081 1,085 1,108

Total Billed Costs 2,684$ 3,712$ 3,398$ 2,502$ 1,371$ 1,791$ 1,802$ 1,849$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-85 GRC APPLICATION - December 2010

Page 88: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-3 Tax Services Witness: Bruce Folkmann

Cost Center: 1100-0376-TRANSACTIONAL TAX

Workpaper: A-3.5

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 8 10 7 9 8 8 8 8

Labor Costs 668$ 749$ 756$ 793$ 750$ 762$ 762$ 762$ Non-Labor Costs 545 184 160 371 90 116 116 116 Total Costs 1,213$ 933$ 916$ 1,163$ 840$ 878$ 878$ 878$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - 2 - - -

Subtotal - Utility - - - - 2 - - -

Global/Retained 30 30 - 139 28 - - -

Total Direct Assignments 30$ 30$ -$ 139$ 29$ -$ -$ -$

ALLOCATIONS SDG&E 267$ 185$ 213$ 265$ 183$ 178$ 179$ 181$ So Cal Gas 325 226 252 277 188 170 170 171

Subtotal - Utility 591 411 465 542 371 348 350 352

Global/Retained 592 492 451 482 440 530 528 526

Total Allocations 1,183$ 903$ 916$ 1,025$ 811$ 878$ 878$ 878$

BILLED COSTS SDG&E 267$ 185$ 213$ 265$ 183$ 178$ 179$ 181$ So Cal Gas 325 226 252 277 190 170 170 171

Subtotal - Utility 591 411 465 542 373 348 350 352

Global/Retained 621 522 451 621 467 530 528 526

Total Billed Costs 1,213$ 933$ 916$ 1,163$ 840$ 878$ 878$ 878$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-86 GRC APPLICATION - December 2010

Page 89: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 183$ 190$ 467$ 840$ 8

14 11 32 57

(19) (19)

Change in Allocation 2009-2012 (16) (30) 46 (0)

(2)$ (19)$ 58$ 38$ -

2012 - TEST YEAR 181$ 171$ 526$ 878$ 8

(0)$ (0)$ (0)$

20.66% 19.43% 59.90% 100.00%

181$ 171$ 526$ 878$

(0) (0) (0) (0)

181$ 171$ 526$ 878$

A FinanceA-3 Tax Services

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0376-TRANSACTIONAL TAXA-3.5 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Causal - Tax Services

Allocations

Full year impact of 2009 staff transfers within Tax Services. (see Recon workpaper Dept A-3)Non-recurring labor expenses related to the RBS JV within Sempra Global.

SDG&E-17-WP BAF-WP-87 GRC APPLICATION - December 2010

Page 90: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-3 Tax Services Witness: Bruce Folkmann

Cost Center: 1100-0376-TRANSACTIONAL TAX

Workpaper: A-3.5 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 8 10 7 9 8 8 8 8

Labor Costs 668$ 749$ 756$ 793$ 750$ 775$ 794$ 813$ Non-Labor Costs 545 184 160 371 90 118 121 124 Total Costs 1,213$ 933$ 916$ 1,163$ 840$ 893$ 916$ 938$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - 2 - - -

Subtotal - Utility - - - - 2 - - -

Global/Retained 30 30 - 139 28 - - -

Total Direct Assignments 30$ 30$ -$ 139$ 29$ -$ -$ -$

ALLOCATIONS SDG&E 267$ 185$ 213$ 265$ 183$ 181$ 187$ 194$ So Cal Gas 325 226 252 277 188 173 178 182

Subtotal - Utility 591 411 465 542 371 354 365 376

Global/Retained 592 492 451 482 440 539 551 562

Total Allocations 1,183$ 903$ 916$ 1,025$ 811$ 893$ 916$ 938$

BILLED COSTS SDG&E 267$ 185$ 213$ 265$ 183$ 181$ 187$ 194$ So Cal Gas 325 226 252 277 190 173 178 182

Subtotal - Utility 591 411 465 542 373 354 365 376

Global/Retained 621 522 451 621 467 539 551 562

Total Billed Costs 1,213$ 933$ 916$ 1,163$ 840$ 893$ 916$ 938$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-88 GRC APPLICATION - December 2010

Page 91: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-3 Tax Services Witness: Bruce Folkmann

Cost Center: 1100-0399-TAX LAW GROUP

Workpaper: A-3.6

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 7 8 4 5 5 5

Labor Costs -$ -$ 574$ 801$ 889$ 706$ 706$ 706$ Non-Labor Costs - - 1,255 931 499 400 397 397 Total Costs -$ -$ 1,829$ 1,732$ 1,387$ 1,107$ 1,104$ 1,104$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - 366 237 45 - - -

Total Direct Assignments -$ -$ 366$ 237$ 45$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ 340$ 387$ 304$ 224$ 225$ 228$ So Cal Gas - - 402 404 311 214 214 214

Subtotal - Utility - - 742 791 615 438 439 442

Global/Retained - - 720 704 728 668 664 661

Total Allocations -$ -$ 1,462$ 1,496$ 1,342$ 1,107$ 1,104$ 1,104$

BILLED COSTS SDG&E -$ -$ 340$ 387$ 304$ 224$ 225$ 228$ So Cal Gas - - 402 404 311 214 214 214

Subtotal - Utility - - 742 791 615 438 439 442

Global/Retained - - 1,087 941 773 668 664 661

Total Billed Costs -$ -$ 1,829$ 1,732$ 1,387$ 1,107$ 1,104$ 1,104$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-89 GRC APPLICATION - December 2010

Page 92: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 304$ 311$ 773$ 1,387$ 4

(32) (30) (137) (199) 1

(18) (17) (51) (85)

Change in Allocation 2009-2012 (26) (50) 76 -

(76)$ (97)$ (112)$ (284)$ 1

2012 - TEST YEAR 228$ 214$ 661$ 1,104$ 5

(0)$ (0)$ (0)$

20.66% 19.43% 59.90% 100.00%

228$ 214$ 661$ 1,104$

(0) (0) (0) (0)

228$ 214$ 661$ 1,104$

A FinanceA-3 Tax Services

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0399-TAX LAW GROUPA-3.6 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Causal - Tax Services

Allocations

Full year impact of 2009 staff transfers within Tax Services (see Recon workpaper Dept A-3)

Non-recurring consulting expenses in 2009.

SDG&E-17-WP BAF-WP-90 GRC APPLICATION - December 2010

Page 93: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-3 Tax Services Witness: Bruce Folkmann

Cost Center: 1100-0399-TAX LAW GROUP

Workpaper: A-3.6 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 7 8 4 5 5 5

Labor Costs -$ -$ 574$ 801$ 889$ 719$ 737$ 754$ Non-Labor Costs - - 1,255 931 499 408 415 426 Total Costs -$ -$ 1,829$ 1,732$ 1,387$ 1,126$ 1,151$ 1,180$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - 366 237 45 - - -

Total Direct Assignments -$ -$ 366$ 237$ 45$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ 340$ 387$ 304$ 228$ 235$ 244$ So Cal Gas - - 402 404 311 218 223 229

Subtotal - Utility - - 742 791 615 446 458 473

Global/Retained - - 720 704 728 680 693 707

Total Allocations -$ -$ 1,462$ 1,496$ 1,342$ 1,126$ 1,151$ 1,180$

BILLED COSTS SDG&E -$ -$ 340$ 387$ 304$ 228$ 235$ 244$ So Cal Gas - - 402 404 311 218 223 229

Subtotal - Utility - - 742 791 615 446 458 473

Global/Retained - - 1,087 941 773 680 693 707

Total Billed Costs -$ -$ 1,829$ 1,732$ 1,387$ 1,126$ 1,151$ 1,180$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-91 GRC APPLICATION - December 2010

Page 94: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A Finance Witness: Bruce Folkmann

Cost Center: A-4 Treasury

Workpaper: A-4

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 16 29 31 33 31 28 29 29

Labor Costs 1,547$ 2,898$ 3,665$ 4,109$ 4,503$ 3,541$ 3,162$ 3,162$ Non-Labor Costs 19,989 15,598 14,365 18,460 17,258 24,309 27,959 27,676 Total Costs 21,536$ 18,496$ 18,030$ 22,569$ 21,761$ 27,850$ 31,122$ 30,838$

DIRECT ASSIGNMENTS SDG&E 2,251$ 1,438$ 1,131$ 1,348$ 2,814$ 3,010$ 3,731$ 2,737$ So Cal Gas 2,324 2,086 1,919 2,112 2,456 3,388 4,012 4,056

Subtotal - Utility 4,575 3,524 3,050 3,460 5,270 6,398 7,743 6,793

Global/Retained 13,525 9,661 8,584 12,735 9,559 15,498 17,987 18,637

Total Direct Assignments 18,099$ 13,184$ 11,634$ 16,195$ 14,830$ 21,896$ 25,730$ 25,429$

ALLOCATIONS SDG&E 737$ 775$ 731$ 790$ 936$ 1,033$ 1,062$ 1,104$ So Cal Gas 894 962 867 918 1,056 1,091 1,099 1,103

Subtotal - Utility 1,630 1,738 1,598 1,708 1,992 2,124 2,161 2,207

Global/Retained 1,806 3,575 4,799 4,667 4,939 3,831 3,230 3,202

Total Allocations 3,437$ 5,312$ 6,397$ 6,375$ 6,931$ 5,955$ 5,391$ 5,409$

BILLED COSTS SDG&E 2,987$ 2,213$ 1,862$ 2,138$ 3,750$ 4,043$ 4,793$ 3,841$ So Cal Gas 3,218 3,048 2,786 3,029 3,512 4,479 5,111 5,159

Subtotal - Utility 6,205 5,261 4,648 5,168 7,262 8,522 9,904 8,999

Global/Retained 15,331 13,235 13,383 17,402 14,498 19,328 21,217 21,839

Total Billed Costs 21,536$ 18,496$ 18,030$ 22,569$ 21,761$ 27,850$ 31,122$ 30,838$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-92 GRC APPLICATION - December 2010

Page 95: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 3,750$ 3,512$ 14,498$ 21,761$ 31

62 63 13,443 13,568 (2)

(32) (34) (182) (247)

1,070 1,076 8,127 10,273

(1,190) 481 691 (17)

Change in Allocation 2009-2012 181 60 (240) (0)

91$ 1,646$ 21,839$ 23,576$ (2)

2012 - TEST YEAR 3,841$ 5,159$ 21,839$ 30,838$ 29

1,104$ 1,103$ 3,202$ 5,409$

2,737 4,056 18,636 25,429

3,841$ 5,159$ 21,839$ 30,838$

Direct Assignments

TOTAL 2012 ALLOCATIONS

A-4 TreasuryA-4 Recon

Total Change from 2009

Allocations

Labor staffing changes as a result of the reorganization, retirements and filling vacancies.

Fees for renewing lines of credit.

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

Bank and agency fees associated with other debt. (see direct charges in Recon workpapers A-4.5 and A-4.6)

I CORPORATE CENTER SHARED SERVICES

Non-recurring expenses in 2009 for software and employee relocation.

A Finance

SDG&E-17-WP BAF-WP-93 GRC APPLICATION - December 2010

Page 96: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A Finance Witness: Bruce Folkmann

Cost Center: A-4 Treasury

Workpaper: A-4 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 16 29 31 33 31 28 29 29

Labor Costs 1,547$ 2,898$ 3,665$ 4,109$ 4,503$ 3,603$ 3,298$ 3,377$ Non-Labor Costs 19,989 15,598 14,365 18,460 17,258 24,347 28,054 27,812 Total Costs 21,536$ 18,496$ 18,030$ 22,569$ 21,761$ 27,950$ 31,352$ 31,190$

DIRECT ASSIGNMENTS SDG&E 2,251$ 1,438$ 1,131$ 1,348$ 2,814$ 3,014$ 3,743$ 2,737$ So Cal Gas 2,324 2,086 1,919 2,112 2,456 3,390 4,019 4,066

Subtotal - Utility 4,575 3,524 3,050 3,460 5,270 6,403 7,762 6,803

Global/Retained 13,525 9,661 8,584 12,735 9,559 15,498 17,989 18,640

Total Direct Assignments 18,099$ 13,184$ 11,634$ 16,195$ 14,830$ 21,901$ 25,751$ 25,443$

ALLOCATIONS SDG&E 737$ 775$ 731$ 790$ 936$ 1,052$ 1,108$ 1,180$ So Cal Gas 894 962 867 918 1,056 1,110 1,147 1,180

Subtotal - Utility 1,630 1,738 1,598 1,708 1,992 2,161 2,254 2,360

Global/Retained 1,806 3,575 4,799 4,667 4,939 3,887 3,347 3,387

Total Allocations 3,437$ 5,312$ 6,397$ 6,375$ 6,931$ 6,049$ 5,601$ 5,747$

BILLED COSTS SDG&E 2,987$ 2,213$ 1,862$ 2,138$ 3,750$ 4,065$ 4,851$ 3,917$ So Cal Gas 3,218 3,048 2,786 3,029 3,512 4,499 5,165 5,245

Subtotal - Utility 6,205 5,261 4,648 5,168 7,262 8,565 10,016 9,163

Global/Retained 15,331 13,235 13,383 17,402 14,498 19,385 21,336 22,027

Total Billed Costs 21,536$ 18,496$ 18,030$ 22,569$ 21,761$ 27,950$ 31,352$ 31,190$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-94 GRC APPLICATION - December 2010

Page 97: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-4 Treasury Witness: Bruce Folkmann

Cost Center: 1100-0112-SVP TREASURER & STAFF

Workpaper: A-4.1

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 2 2 2 2 2 2 2 2

Labor Costs 402$ 552$ 439$ 413$ 422$ 412$ 404$ 404$ Non-Labor Costs 152 183 166 86 142 86 86 86 Total Costs 554$ 734$ 605$ 499$ 564$ 498$ 490$ 490$

DIRECT ASSIGNMENTS SDG&E -$ -$ 2$ -$ -$ -$ -$ -$ So Cal Gas - - 2 - - - - -

Subtotal - Utility - - 4 - - - - -

Global/Retained - 180 37 - - - - -

Total Direct Assignments -$ 180$ 41$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 192$ 191$ 48$ 41$ 58$ 136$ 142$ 147$ So Cal Gas 233 237 61 48 65 143 147 147

Subtotal - Utility 425 429 108 89 123 279 288 294

Global/Retained 128 126 457 410 441 220 201 195

Total Allocations 554$ 554$ 565$ 499$ 564$ 498$ 490$ 490$

BILLED COSTS SDG&E 192$ 191$ 49$ 41$ 58$ 136$ 142$ 147$ So Cal Gas 233 237 63 48 65 143 147 147

Subtotal - Utility 425 429 112 89 123 279 288 294

Global/Retained 128 306 493 410 441 220 201 195

Total Billed Costs 554$ 734$ 605$ 499$ 564$ 498$ 490$ 490$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-95 GRC APPLICATION - December 2010

Page 98: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 58$ 65$ 441$ 564$ 2

(21) (21) (31) (74)

Change in Allocation 2009-2012 111 103 (215) (0)

90$ 82$ (246)$ (74)$ -

2012 - TEST YEAR 147$ 147$ 195$ 490$ 2

30.08% 30.07% 39.85% 100.00%

147$ 147$ 195$ 490$

(0) (0) (0) (0)

147$ 147$ 195$ 490$

A FinanceA-4 Treasury

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0112-SVP TREASURER & STAFFA-4.1 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Avg - Treasurer

Allocations

Costs for annual banker's conference to be reduced in future years.

SDG&E-17-WP BAF-WP-96 GRC APPLICATION - December 2010

Page 99: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-4 Treasury Witness: Bruce Folkmann

Cost Center: 1100-0112-SVP TREASURER & STAFF

Workpaper: A-4.1 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 2 2 2 2 2 2 2 2

Labor Costs 402$ 552$ 439$ 413$ 422$ 420$ 421$ 431$ Non-Labor Costs 152 183 166 86 142 88 90 92 Total Costs 554$ 734$ 605$ 499$ 564$ 507$ 511$ 523$

DIRECT ASSIGNMENTS SDG&E -$ -$ 2$ -$ -$ -$ -$ -$ So Cal Gas - - 2 - - - - -

Subtotal - Utility - - 4 - - - - -

Global/Retained - 180 37 - - - - -

Total Direct Assignments -$ 180$ 41$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 192$ 191$ 48$ 41$ 58$ 138$ 148$ 157$ So Cal Gas 233 237 61 48 65 146 153 157

Subtotal - Utility 425 429 108 89 123 284 301 315

Global/Retained 128 126 457 410 441 223 210 209

Total Allocations 554$ 554$ 565$ 499$ 564$ 507$ 511$ 523$

BILLED COSTS SDG&E 192$ 191$ 49$ 41$ 58$ 138$ 148$ 157$ So Cal Gas 233 237 63 48 65 146 153 157

Subtotal - Utility 425 429 112 89 123 284 301 315

Global/Retained 128 306 493 410 441 223 210 209

Total Billed Costs 554$ 734$ 605$ 499$ 564$ 507$ 511$ 523$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-97 GRC APPLICATION - December 2010

Page 100: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-4 Treasury Witness: Bruce Folkmann

Cost Center: 1100-0113-CASH MANAGEMENT

Workpaper: A-4.2

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 6 6 6 7 8 8 8 8

Labor Costs 393$ 435$ 425$ 499$ 551$ 618$ 618$ 618$ Non-Labor Costs 160 53 106 71 177 155 155 155 Total Costs 553$ 488$ 531$ 571$ 729$ 773$ 773$ 773$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ 1$ -$ -$ -$ So Cal Gas - - - - 1 - - -

Subtotal - Utility - - - - 2 - - -

Global/Retained - - - - 8 - - -

Total Direct Assignments -$ -$ -$ -$ 11$ -$ -$ -$

ALLOCATIONS SDG&E 192$ 169$ 187$ 225$ 275$ 300$ 309$ 321$ So Cal Gas 233 210 221 261 312 318 320 321

Subtotal - Utility 425 379 408 485 588 618 629 642

Global/Retained 128 110 123 85 130 155 145 131

Total Allocations 553$ 488$ 531$ 571$ 718$ 773$ 773$ 773$

BILLED COSTS SDG&E 192$ 169$ 187$ 225$ 277$ 300$ 309$ 321$ So Cal Gas 233 210 221 261 314 318 320 321

Subtotal - Utility 425 379 408 485 590 618 629 642

Global/Retained 128 110 123 85 138 155 145 131

Total Billed Costs 553$ 488$ 531$ 571$ 729$ 773$ 773$ 773$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-98 GRC APPLICATION - December 2010

Page 101: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 277$ 314$ 138$ 729$ 8

36 38 8 82

(14) (16) (7) (37)

Change in Allocation 2009-2012 23 (14) (9) 0

45$ 7$ (8)$ 45$ -

2012 - TEST YEAR 321$ 321$ 131$ 773$ 8

41.54% 41.52% 16.94% 100.00%

321$ 321$ 131$ 773$

(0) (0) (0) (0)

321$ 321$ 131$ 773$

A FinanceA-4 Treasury

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0113-CASH MANAGEMENTA-4.2 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Multi-Factor Basic

Allocations

Full year impact of vacancy filled in mid-2009.Non-recurring software implementation fees in 2009.

SDG&E-17-WP BAF-WP-99 GRC APPLICATION - December 2010

Page 102: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-4 Treasury Witness: Bruce Folkmann

Cost Center: 1100-0113-CASH MANAGEMENT

Workpaper: A-4.2 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 6 6 6 7 8 8 8 8

Labor Costs 393$ 435$ 425$ 499$ 551$ 629$ 645$ 660$ Non-Labor Costs 160 53 106 71 177 158 162 166 Total Costs 553$ 488$ 531$ 571$ 729$ 787$ 807$ 826$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ 1$ -$ -$ -$ So Cal Gas - - - - 1 - - -

Subtotal - Utility - - - - 2 - - -

Global/Retained - - - - 8 - - -

Total Direct Assignments -$ -$ -$ -$ 11$ -$ -$ -$

ALLOCATIONS SDG&E 192$ 169$ 187$ 225$ 275$ 306$ 322$ 343$ So Cal Gas 233 210 221 261 312 323 334 343

Subtotal - Utility 425 379 408 485 588 629 656 686

Global/Retained 128 110 123 85 130 158 151 140

Total Allocations 553$ 488$ 531$ 571$ 718$ 787$ 807$ 826$

BILLED COSTS SDG&E 192$ 169$ 187$ 225$ 277$ 306$ 322$ 343$ So Cal Gas 233 210 221 261 314 323 334 343

Subtotal - Utility 425 379 408 485 590 629 656 686

Global/Retained 128 110 123 85 138 158 151 140

Total Billed Costs 553$ 488$ 531$ 571$ 729$ 787$ 807$ 826$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-100 GRC APPLICATION - December 2010

Page 103: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-4 Treasury Witness: Bruce Folkmann

Cost Center: 1100-0119-FINANCE DIRECTOR

Workpaper: A-4.3

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 5 6 5 5 5 6 6 6

Labor Costs 488$ 483$ 545$ 524$ 620$ 628$ 633$ 633$ Non-Labor Costs 195 95 145 77 121 152 152 152 Total Costs 683$ 579$ 689$ 602$ 741$ 779$ 785$ 785$

DIRECT ASSIGNMENTS SDG&E -$ -$ 1$ -$ -$ -$ -$ -$ So Cal Gas - - 1 - - - - -

Subtotal - Utility - - 1 - - - - -

Global/Retained - - 25 - - - - -

Total Direct Assignments -$ -$ 26$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 237$ 200$ 234$ 237$ 284$ 303$ 313$ 326$ So Cal Gas 288 249 276 275 323 320 325 326

Subtotal - Utility 525 449 509 511 607 623 638 652

Global/Retained 158 130 154 90 134 156 147 133

Total Allocations 683$ 579$ 663$ 602$ 741$ 779$ 785$ 785$

BILLED COSTS SDG&E 237$ 200$ 234$ 237$ 284$ 303$ 313$ 326$ So Cal Gas 288 249 276 275 323 320 325 326

Subtotal - Utility 525 449 511 511 607 623 638 652

Global/Retained 158 130 179 90 134 156 147 133

Total Billed Costs 683$ 579$ 689$ 602$ 741$ 779$ 785$ 785$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-101 GRC APPLICATION - December 2010

Page 104: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 284$ 323$ 134$ 741$ 5

18 18 7 43 1

Change in Allocation 2009-2012 24 (15) (9) 0

42$ 3$ (1)$ 43$ 1

2012 - TEST YEAR 326$ 326$ 133$ 785$ 6

41.54% 41.52% 16.94% 100.00%

326$ 326$ 133$ 785$

(0) (0) (0) (0)

326$ 326$ 133$ 785$

A FinanceA-4 Treasury

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0119-FINANCE DIRECTORA-4.3 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Multi-Factor Basic

Allocations

Partial year vacancy filled in 2010.

SDG&E-17-WP BAF-WP-102 GRC APPLICATION - December 2010

Page 105: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-4 Treasury Witness: Bruce Folkmann

Cost Center: 1100-0119-FINANCE DIRECTOR

Workpaper: A-4.3 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 5 6 5 5 5 6 6 6

Labor Costs 488$ 483$ 545$ 524$ 620$ 638$ 660$ 676$ Non-Labor Costs 195 95 145 77 121 154 158 163 Total Costs 683$ 579$ 689$ 602$ 741$ 793$ 818$ 839$

DIRECT ASSIGNMENTS SDG&E -$ -$ 1$ -$ -$ -$ -$ -$ So Cal Gas - - 1 - - - - -

Subtotal - Utility - - 1 - - - - -

Global/Retained - - 25 - - - - -

Total Direct Assignments -$ -$ 26$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 237$ 200$ 234$ 237$ 284$ 308$ 327$ 348$ So Cal Gas 288 249 276 275 323 326 339 348

Subtotal - Utility 525 449 509 511 607 634 665 697

Global/Retained 158 130 154 90 134 159 153 142

Total Allocations 683$ 579$ 663$ 602$ 741$ 793$ 818$ 839$

BILLED COSTS SDG&E 237$ 200$ 234$ 237$ 284$ 308$ 327$ 348$ So Cal Gas 288 249 276 275 323 326 339 348

Subtotal - Utility 525 449 511 511 607 634 665 697

Global/Retained 158 130 179 90 134 159 153 142

Total Billed Costs 683$ 579$ 689$ 602$ 741$ 793$ 818$ 839$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-103 GRC APPLICATION - December 2010

Page 106: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-4 Treasury Witness: Bruce Folkmann

Cost Center: 1100-0120-PENS & TRUST INV DIR

Workpaper: A-4.4

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 3 3 3 3 2 3 3 3

Labor Costs 264$ 209$ 207$ 280$ 289$ 296$ 296$ 296$ Non-Labor Costs 20 184 232 249 324 377 377 377 Total Costs 284$ 392$ 439$ 529$ 612$ 674$ 674$ 674$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - 21 - - - - - -

Total Direct Assignments -$ 21$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 98$ 129$ 155$ 186$ 235$ 262$ 269$ 280$ So Cal Gas 119 160 183 219 267 277 279 280

Subtotal - Utility 218 288 338 404 501 539 548 560

Global/Retained 66 83 102 125 111 135 126 114

Total Allocations 284$ 371$ 439$ 529$ 612$ 674$ 674$ 674$

BILLED COSTS SDG&E 98$ 129$ 155$ 186$ 235$ 262$ 269$ 280$ So Cal Gas 119 160 183 219 267 277 279 280

Subtotal - Utility 218 288 338 404 501 539 548 560

Global/Retained 66 104 102 125 111 135 126 114

Total Billed Costs 284$ 392$ 439$ 529$ 612$ 674$ 674$ 674$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-104 GRC APPLICATION - December 2010

Page 107: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 235$ 267$ 111$ 612$ 2

12 12 5 30

13 13 5 31 1

Change in Allocation 2009-2012 20 (12) (7) (0)

45$ 13$ 3$ 61$ 1

2012 - TEST YEAR 280$ 280$ 114$ 674$ 3

41.54% 41.52% 16.94% 100.00%

280$ 280$ 114$ 674$

(0) (0) (0) (0)

280$ 280$ 114$ 674$

Partial year vacancy filled in 2010.

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

A FinanceA-4 Treasury1100-0120-PENS & TRUST INV DIRA-4.4 Recon

Enhancement and ongoing maintenance of risk management software.

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Multi-Factor Basic

Allocations

SDG&E-17-WP BAF-WP-105 GRC APPLICATION - December 2010

Page 108: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-4 Treasury Witness: Bruce Folkmann

Cost Center: 1100-0120-PENS & TRUST INV DIR

Workpaper: A-4.4 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 3 3 3 3 2 3 3 3

Labor Costs 264$ 209$ 207$ 280$ 289$ 301$ 309$ 316$ Non-Labor Costs 20 184 232 249 324 384 394 405 Total Costs 284$ 392$ 439$ 529$ 612$ 686$ 703$ 721$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - 21 - - - - - -

Total Direct Assignments -$ 21$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 98$ 129$ 155$ 186$ 235$ 267$ 281$ 300$ So Cal Gas 119 160 183 219 267 282 291 299

Subtotal - Utility 218 288 338 404 501 548 571 599

Global/Retained 66 83 102 125 111 138 132 122

Total Allocations 284$ 371$ 439$ 529$ 612$ 686$ 703$ 721$

BILLED COSTS SDG&E 98$ 129$ 155$ 186$ 235$ 267$ 281$ 300$ So Cal Gas 119 160 183 219 267 282 291 299

Subtotal - Utility 218 288 338 404 501 548 571 599

Global/Retained 66 104 102 125 111 138 132 122

Total Billed Costs 284$ 392$ 439$ 529$ 612$ 686$ 703$ 721$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-106 GRC APPLICATION - December 2010

Page 109: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-4 Treasury Witness: Bruce Folkmann

Cost Center: 1100-0224-CORPORATE - CASH MGMT

Workpaper: A-4.5

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ -$ -$ -$ -$ Non-Labor Costs 14,027 8,743 8,402 14,295 10,018 16,738 19,626 19,626 Total Costs 14,027$ 8,743$ 8,402$ 14,295$ 10,018$ 16,738$ 19,626$ 19,626$

DIRECT ASSIGNMENTS SDG&E 1,029$ 622$ 613$ 944$ 1,956$ 1,891$ 2,308$ 2,308$ So Cal Gas 2,118 1,782 1,709 1,867 2,050 2,841 3,258 3,258

Subtotal - Utility 3,147 2,404 2,322 2,811 4,006 4,733 5,566 5,566

Global/Retained 10,832 6,152 6,138 11,274 5,906 12,006 14,060 14,060

Total Direct Assignments 13,979$ 8,556$ 8,460$ 14,085$ 9,912$ 16,738$ 19,626$ 19,626$

ALLOCATIONS SDG&E 17$ 65$ (21)$ 82$ 41$ -$ -$ -$ So Cal Gas 20 81 (25) 96 46 - - -

Subtotal - Utility 37 146 (46) 178 87 - - -

Global/Retained 11 42 (12) 31 19 - - -

Total Allocations 49$ 188$ (58)$ 210$ 106$ -$ -$ -$

BILLED COSTS SDG&E 1,046$ 687$ 592$ 1,026$ 1,997$ 1,891$ 2,308$ 2,308$ So Cal Gas 2,139 1,863 1,685 1,963 2,096 2,841 3,258 3,258

Subtotal - Utility 3,184 2,549 2,277 2,989 4,093 4,733 5,566 5,566

Global/Retained 10,843 6,194 6,126 11,306 5,925 12,006 14,060 14,060

Total Billed Costs 14,027$ 8,743$ 8,402$ 14,295$ 10,018$ 16,738$ 19,626$ 19,626$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-107 GRC APPLICATION - December 2010

Page 110: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 1,997$ 2,096$ 5,925$ 10,018$ -

1,070 1,076 0 2,146

(725) - - (725)

(37) 88 9 60

- - 8,127 8,127

Change in Allocation 2009-2012 3 (2) (1) (0)

311$ 1,162$ 8,135$ 9,608$ -

2012 - TEST YEAR 2,308$ 3,258$ 14,060$ 19,626$ -

41.54% 41.52% 16.94% 100.00%

-$ -$ -$ -$

2,308 3,258 14,060 19,626

2,308$ 3,258$ 14,060$ 19,626$

Direct Assignment DetailsBank Services Charges 450$ 1,400$ 150$ 2,000$ Line of Credit Fees 1,858 1,858 13,910 17,626

2,308$ 3,258$ 14,060$ 19,626$

1100-0224-CORPORATE - CASH MGMTA-4.5 Recon

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

A FinanceA-4 Treasury

Fees for renewal of line of credit at the Utilities, including expansion of line from $600 million to $800 million.

Change in bank service charges from 2009 actuals.

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Multi-Factor Basic

Allocations

Fees for renewal of lines of credit totaling $3.0 billion for Global.

One time facility fee for Letter of Credit in 2009.

SDG&E-17-WP BAF-WP-108 GRC APPLICATION - December 2010

Page 111: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-4 Treasury Witness: Bruce Folkmann

Cost Center: 1100-0224-CORPORATE - CASH MGMT

Workpaper: A-4.5 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ -$ -$ -$ -$ Non-Labor Costs 14,027 8,743 8,402 14,295 10,018 16,738 19,626 19,626 Total Costs 14,027$ 8,743$ 8,402$ 14,295$ 10,018$ 16,738$ 19,626$ 19,626$

DIRECT ASSIGNMENTS SDG&E 1,029$ 622$ 613$ 944$ 1,956$ 1,891$ 2,308$ 2,308$ So Cal Gas 2,118 1,782 1,709 1,867 2,050 2,841 3,258 3,258

Subtotal - Utility 3,147 2,404 2,322 2,811 4,006 4,733 5,566 5,566

Global/Retained 10,832 6,152 6,138 11,274 5,906 12,006 14,060 14,060

Total Direct Assignments 13,979$ 8,556$ 8,460$ 14,085$ 9,912$ 16,738$ 19,626$ 19,626$

ALLOCATIONS SDG&E 17$ 65$ (21)$ 82$ 41$ -$ -$ -$ So Cal Gas 20 81 (25) 96 46 - - -

Subtotal - Utility 37 146 (46) 178 87 - - -

Global/Retained 11 42 (12) 31 19 - - -

Total Allocations 49$ 188$ (58)$ 210$ 106$ -$ -$ -$

BILLED COSTS SDG&E 1,046$ 687$ 592$ 1,026$ 1,997$ 1,891$ 2,308$ 2,308$ So Cal Gas 2,139 1,863 1,685 1,963 2,096 2,841 3,258 3,258

Subtotal - Utility 3,184 2,549 2,277 2,989 4,093 4,733 5,566 5,566

Global/Retained 10,843 6,194 6,126 11,306 5,925 12,006 14,060 14,060

Total Billed Costs 14,027$ 8,743$ 8,402$ 14,295$ 10,018$ 16,738$ 19,626$ 19,626$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-109 GRC APPLICATION - December 2010

Page 112: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-4 Treasury Witness: Bruce Folkmann

Cost Center: 1100-0225-CORP - TTEE & RATE AGNCY

Workpaper: A-4.6

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ -$ -$ -$ -$ Non-Labor Costs 5,436 4,419 3,440 3,042 5,663 5,794 6,594 6,311 Total Costs 5,436$ 4,419$ 3,440$ 3,042$ 5,663$ 5,794$ 6,594$ 6,311$

DIRECT ASSIGNMENTS SDG&E 1,222$ 816$ 451$ 394$ 857$ 1,118$ 1,423$ 429$ So Cal Gas 206 304 143 245 405 547 754 798

Subtotal - Utility 1,428 1,120 594 639 1,261 1,665 2,177 1,227

Global/Retained 2,693 2,355 1,871 1,417 3,458 3,492 3,877 4,527

Total Direct Assignments 4,121$ 3,474$ 2,465$ 2,056$ 4,719$ 5,157$ 6,054$ 5,753$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 1,315 945 975 986 945 636 540 558

Total Allocations 1,315$ 945$ 975$ 986$ 945$ 636$ 540$ 558$

BILLED COSTS SDG&E 1,222$ 816$ 451$ 394$ 857$ 1,118$ 1,423$ 429$ So Cal Gas 206 304 143 245 405 547 754 798

Subtotal - Utility 1,428 1,120 594 639 1,261 1,665 2,177 1,227

Global/Retained 4,008 3,299 2,847 2,403 4,402 4,128 4,417 5,084

Total Billed Costs 5,436$ 4,419$ 3,440$ 3,042$ 5,663$ 5,794$ 6,594$ 6,311$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-110 GRC APPLICATION - December 2010

Page 113: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 857$ 405$ 4,402$ 5,663$ -

52 16 22 90

- 274 376 650

- 103 576 680

(310) - - (310)

(170) - - (170)

- - (27) (27)

- - (265) (265)

Change in Allocation 2009-2012 - - - -

(428)$ 393$ 682$ 648$ -

2012 - TEST YEAR 429$ 798$ 5,084$ 6,311$ -

0.00% 0.00% 100.00% 100.00%

-$ -$ 558$ 558$

429 798 4,527 5,753

429$ 798$ 5,084$ 6,311$

Direct Assignment DetailsRating Agency Fees 221$ 548$ 784$ 1,553$ Trustee Fees 208$ 109$ 56$ 374$ Financing/Debt Issuance Fees - 140 3,686 3,826

429$ 798$ 4,527$ 5,753$

A Finance

Increase in trustee fees based on balance of debt outstanding.

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

No debt issuance forecast at SDG&E in 2012 results in lower agency fees, printing and professional svcs related to debt issuance.

Increase in rating agency fees based on projected new debt issuances.

A-4 Treasury

Net change in Global bond amortization for existing debt.

One time underwriting costs in 2009 for IDB securities. One time remarketing/underwriting costs in 2009 for Global IDRB securities.

Issuance fees and related costs for new debt issuance.

1100-0225-CORP - TTEE & RATE AGNCYA-4.6 Recon

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Retained

Allocations

Direct Assignments

SDG&E-17-WP BAF-WP-111 GRC APPLICATION - December 2010

Page 114: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-4 Treasury Witness: Bruce Folkmann

Cost Center: 1100-0225-CORP - TTEE & RATE AGNCY

Workpaper: A-4.6 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ -$ -$ -$ -$ Non-Labor Costs 5,436 4,419 3,440 3,042 5,663 5,799 6,613 6,321 Total Costs 5,436$ 4,419$ 3,440$ 3,042$ 5,663$ 5,799$ 6,613$ 6,321$

DIRECT ASSIGNMENTS SDG&E 1,222$ 816$ 451$ 394$ 857$ 1,122$ 1,435$ 429$ So Cal Gas 206 304 143 245 405 548 761 808

Subtotal - Utility 1,428 1,120 594 639 1,261 1,670 2,196 1,237

Global/Retained 2,693 2,355 1,871 1,417 3,458 3,492 3,877 4,527

Total Direct Assignments 4,121$ 3,474$ 2,465$ 2,056$ 4,719$ 5,162$ 6,073$ 5,764$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 1,315 945 975 986 945 636 540 558

Total Allocations 1,315$ 945$ 975$ 986$ 945$ 636$ 540$ 558$

BILLED COSTS SDG&E 1,222$ 816$ 451$ 394$ 857$ 1,122$ 1,435$ 429$ So Cal Gas 206 304 143 245 405 548 761 808

Subtotal - Utility 1,428 1,120 594 639 1,261 1,670 2,196 1,237

Global/Retained 4,008 3,299 2,847 2,403 4,402 4,128 4,417 5,084

Total Billed Costs 5,436$ 4,419$ 3,440$ 3,042$ 5,663$ 5,799$ 6,613$ 6,321$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-112 GRC APPLICATION - December 2010

Page 115: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-4 Treasury Witness: Bruce Folkmann

Cost Center: 1100-0393-CORP ECONOMIC ANALYSIS

Workpaper: A-4.7

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 1 2 3 4 3 4 4

Labor Costs -$ 62$ 172$ 344$ 744$ 490$ 513$ 513$ Non-Labor Costs - 31 1,134 66 114 163 124 124 Total Costs -$ 93$ 1,306$ 409$ 859$ 653$ 638$ 638$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - 752 6 (4) - 50 50

Total Direct Assignments -$ -$ 752$ 6$ (4)$ -$ 50$ 50$

ALLOCATIONS SDG&E -$ 21$ 129$ 20$ 43$ 33$ 29$ 29$ So Cal Gas - 26 152 20 43 33 29 29

Subtotal - Utility - 47 280 40 86 65 59 59

Global/Retained - 46 274 363 777 587 529 529

Total Allocations -$ 93$ 554$ 404$ 863$ 653$ 588$ 588$

BILLED COSTS SDG&E -$ 21$ 129$ 20$ 43$ 33$ 29$ 29$ So Cal Gas - 26 152 20 43 33 29 29

Subtotal - Utility - 47 280 40 86 65 59 59

Global/Retained - 46 1,026 369 772 587 579 579

Total Billed Costs -$ 93$ 1,306$ 409$ 859$ 653$ 638$ 638$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-113 GRC APPLICATION - December 2010

Page 116: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 43$ 43$ 772$ 859$ 4

(5) (5) (44) (55)

(8) (8) (149) (166)

Change in Allocation 2009-2012 0 (0) (0) 0

(14)$ (14)$ (193)$ (221)$ -

2012 - TEST YEAR 29$ 29$ 579$ 638$ 4

5.00% 5.00% 90.00% 100.00%

29$ 29$ 529$ 588$

(0) (0) 50 50

29$ 29$ 579$ 638$

Direct Assignment DetailsTravel- Global Projects - - 50 50

-$ -$ 50$ 50$

A FinanceA-4 Treasury

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0393-CORP ECONOMIC ANALYSISA-4.7 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Causal - Economic Analysis

Allocations

Replaced analyst with associate at lower salary.One time employee relocation expense in 2009.

SDG&E-17-WP BAF-WP-114 GRC APPLICATION - December 2010

Page 117: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-4 Treasury Witness: Bruce Folkmann

Cost Center: 1100-0393-CORP ECONOMIC ANALYSIS

Workpaper: A-4.7 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 1 2 3 4 3 4 4

Labor Costs -$ 62$ 172$ 344$ 744$ 498$ 535$ 548$ Non-Labor Costs - 31 1,134 66 114 166 130 133 Total Costs -$ 93$ 1,306$ 409$ 859$ 664$ 665$ 682$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - 752 6 (4) - 52 54

Total Direct Assignments -$ -$ 752$ 6$ (4)$ -$ 52$ 54$

ALLOCATIONS SDG&E -$ 21$ 129$ 20$ 43$ 33$ 31$ 31$ So Cal Gas - 26 152 20 43 33 31 31

Subtotal - Utility - 47 280 40 86 66 61 63

Global/Retained - 46 274 363 777 598 552 565

Total Allocations -$ 93$ 554$ 404$ 863$ 664$ 613$ 628$

BILLED COSTS SDG&E -$ 21$ 129$ 20$ 43$ 33$ 31$ 31$ So Cal Gas - 26 152 20 43 33 31 31

Subtotal - Utility - 47 280 40 86 66 61 63

Global/Retained - 46 1,026 369 772 598 604 619

Total Billed Costs -$ 93$ 1,306$ 409$ 859$ 664$ 665$ 682$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-115 GRC APPLICATION - December 2010

Page 118: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-4 Treasury Witness: Bruce Folkmann

Cost Center: 1100-0052-VP - MERGERS & ACQUISITIONS

Workpaper: A-4.8

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 2 1 1 1

Labor Costs -$ -$ -$ -$ 389$ 405$ 77$ 77$ Non-Labor Costs - - - - 129 107 107 107 Total Costs -$ -$ -$ -$ 518$ 512$ 184$ 184$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - 518 512 184 184

Total Allocations -$ -$ -$ -$ 518$ 512$ 184$ 184$

BILLED COSTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - 518 512 184 184

Total Billed Costs -$ -$ -$ -$ 518$ 512$ 184$ 184$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-116 GRC APPLICATION - December 2010

Page 119: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR -$ -$ 518$ 518$ 2

- - (334) (334) (1)

Change in Allocation 2009-2012 - - - -

-$ -$ (334)$ (334)$ (1)

2012 - TEST YEAR -$ -$ 184$ 184$ 1

0.00% 0.00% 100.00% 100.00%

0$ 0$ 184$ 184$

(0) (0) (0) (0)

-$ -$ 184$ 184$

A FinanceA-4 Treasury

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0052-VP - MERGERS & ACQUISITIONSA-4.8 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Retained

Allocations

Eliminated one executive position.

SDG&E-17-WP BAF-WP-117 GRC APPLICATION - December 2010

Page 120: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-4 Treasury Witness: Bruce Folkmann

Cost Center: 1100-0052-VP - MERGERS & ACQUISITIONS

Workpaper: A-4.8 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 2 1 1 1

Labor Costs -$ -$ -$ -$ 389$ 412$ 81$ 82$ Non-Labor Costs - - - - 129 109 112 115 Total Costs -$ -$ -$ -$ 518$ 521$ 192$ 197$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - 518 521 192 197

Total Allocations -$ -$ -$ -$ 518$ 521$ 192$ 197$

BILLED COSTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - 518 521 192 197

Total Billed Costs -$ -$ -$ -$ 518$ 521$ 192$ 197$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-118 GRC APPLICATION - December 2010

Page 121: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-4 Treasury Witness: Bruce Folkmann

Cost Center: 1100-0392-CORPORATE DEVELOPMENT

Workpaper: A-4.9

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 8 10 10 8 5 5 5

Labor Costs -$ 1,157$ 1,121$ 1,450$ 1,387$ 692$ 621$ 621$ Non-Labor Costs - 1,890 588 421 547 737 737 737 Total Costs -$ 3,047$ 1,708$ 1,871$ 1,934$ 1,429$ 1,358$ 1,358$

DIRECT ASSIGNMENTS SDG&E -$ -$ 64$ -$ -$ -$ -$ -$ So Cal Gas - - 64 - - - - -

Subtotal - Utility - - 129 - - - - -

Global/Retained - 953 (240) 28 192 - - -

Total Direct Assignments -$ 953$ (111)$ 28$ 192$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - 2,093 1,819 1,843 1,742 1,429 1,358 1,358

Total Allocations -$ 2,093$ 1,819$ 1,843$ 1,742$ 1,429$ 1,358$ 1,358$

BILLED COSTS SDG&E -$ -$ 64$ -$ -$ -$ -$ -$ So Cal Gas - - 64 - - - - -

Subtotal - Utility - - 129 - - - - -

Global/Retained - 3,047 1,580 1,871 1,934 1,429 1,358 1,358

Total Billed Costs -$ 3,047$ 1,708$ 1,871$ 1,934$ 1,429$ 1,358$ 1,358$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-119 GRC APPLICATION - December 2010

Page 122: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR -$ -$ 1,934$ 1,934$ 8

- - (576) (576) (3)

Change in Allocation 2009-2012 - - - -

-$ -$ (576)$ (576)$ (3)

2012 - TEST YEAR -$ -$ 1,358$ 1,358$ 5

0.00% 0.00% 100.00% 100.00%

0$ 0$ 1,358$ 1,358$

(0) (0) (0) (0)

-$ -$ 1,358$ 1,358$

1100-0392-CORPORATE DEVELOPMENTA-4.9 Recon

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

A FinanceA-4 Treasury

Reduced staff in 2010.

TOTAL 2012 ALLOCATIONS

Direct Assignments

Allocations

Retained

2012 ALLOCATION METHOD

Total Change from 2009

SDG&E-17-WP BAF-WP-120 GRC APPLICATION - December 2010

Page 123: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-4 Treasury Witness: Bruce Folkmann

Cost Center: 1100-0392-CORPORATE DEVELOPMENT

Workpaper: A-4.9 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 8 10 10 8 5 5 5

Labor Costs -$ 1,157$ 1,121$ 1,450$ 1,387$ 704$ 648$ 663$ Non-Labor Costs - 1,890 588 421 547 751 770 791 Total Costs -$ 3,047$ 1,708$ 1,871$ 1,934$ 1,455$ 1,417$ 1,454$

DIRECT ASSIGNMENTS SDG&E -$ -$ 64$ -$ -$ -$ -$ -$ So Cal Gas - - 64 - - - - -

Subtotal - Utility - - 129 - - - - -

Global/Retained - 953 (240) 28 192 - - -

Total Direct Assignments -$ 953$ (111)$ 28$ 192$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - 2,093 1,819 1,843 1,742 1,455 1,417 1,454

Total Allocations -$ 2,093$ 1,819$ 1,843$ 1,742$ 1,455$ 1,417$ 1,454$

BILLED COSTS SDG&E -$ -$ 64$ -$ -$ -$ -$ -$ So Cal Gas - - 64 - - - - -

Subtotal - Utility - - 129 - - - - -

Global/Retained - 3,047 1,580 1,871 1,934 1,455 1,417 1,454

Total Billed Costs -$ 3,047$ 1,708$ 1,871$ 1,934$ 1,455$ 1,417$ 1,454$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-121 GRC APPLICATION - December 2010

Page 124: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-4 Treasury Witness: Bruce Folkmann

Cost Center: 1100-0059-DEVELOPMENT - REED

Workpaper: A-4.10

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 2 2 2 0 0 0 0

Labor Costs -$ -$ 518$ 364$ 64$ -$ -$ -$ Non-Labor Costs - 0 87 62 6 - - - Total Costs -$ 0$ 605$ 425$ 70$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - 0 605 425 70 - - -

Total Allocations -$ 0$ 605$ 425$ 70$ -$ -$ -$

BILLED COSTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - 0 605 425 70 - - -

Total Billed Costs -$ 0$ 605$ 425$ 70$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-122 GRC APPLICATION - December 2010

Page 125: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR -$ -$ 70$ 70$ -

- - (70) (70)

Change in Allocation 2009-2012 - - - -

-$ -$ (70)$ (70)$ -

2012 - TEST YEAR -$ -$ -$ -$ -

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

Total Change from 2009

VP retired in 2009 and cost center was closed.

A FinanceA-4 Treasury1100-0059-DEVELOPMENT - REEDA-4.10 Recon

SDG&E-17-WP BAF-WP-123 GRC APPLICATION - December 2010

Page 126: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-4 Treasury Witness: Bruce Folkmann

Cost Center: 1100-0059-DEVELOPMENT - REED

Workpaper: A-4.10 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 2 2 2 0 0 0 0

Labor Costs -$ -$ 518$ 364$ 64$ -$ -$ -$ Non-Labor Costs - 0 87 62 6 - - - Total Costs -$ 0$ 605$ 425$ 70$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - 1 - - - - -

Total Direct Assignments -$ -$ 1$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - 0 605 425 70 - - -

Total Allocations -$ 0$ 605$ 425$ 70$ -$ -$ -$

BILLED COSTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - 0 605 425 70 - - -

Total Billed Costs -$ 0$ 605$ 425$ 70$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-124 GRC APPLICATION - December 2010

Page 127: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-4 Treasury Witness: Bruce Folkmann

Cost Center: 1100-0060-DEVELOPMENT - SAHAGIAN

Workpaper: A-4.11

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 1 1 1 0 0 0 0

Labor Costs -$ -$ 238$ 236$ 36$ -$ -$ -$ Non-Labor Costs - - 64 90 16 - - - Total Costs -$ -$ 302$ 326$ 52$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ 10$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - 10 - - - -

Global/Retained - - - 10 - - - -

Total Direct Assignments -$ -$ -$ 20$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - 302 307 52 - - -

Total Allocations -$ -$ 302$ 307$ 52$ -$ -$ -$

BILLED COSTS SDG&E -$ -$ -$ 10$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - 10 - - - -

Global/Retained - - 302 316 52 - - -

Total Billed Costs -$ -$ 302$ 326$ 52$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-125 GRC APPLICATION - December 2010

Page 128: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR -$ -$ 52$ 52$ -

- - (52) (52)

Change in Allocation 2009-2012 - - - -

-$ -$ (52)$ (52)$ -

2012 - TEST YEAR -$ -$ -$ -$ -

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

Total Change from 2009

VP transferred to Global in 2009 and cost center was closed.

A FinanceA-4 Treasury1100-0060-DEVELOPMENT - SAHAGIANA-4.11 Recon

SDG&E-17-WP BAF-WP-126 GRC APPLICATION - December 2010

Page 129: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-4 Treasury Witness: Bruce Folkmann

Cost Center: 1100-0060-DEVELOPMENT - SAHAGIAN

Workpaper: A-4.11 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 1 1 1 0 0 0 0

Labor Costs -$ -$ 238$ 236$ 36$ -$ -$ -$ Non-Labor Costs - - 64 90 16 - - - Total Costs -$ -$ 302$ 326$ 52$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ 10$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - 10 - - - -

Global/Retained - - - 10 - - - -

Total Direct Assignments -$ -$ -$ 20$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - 302 307 52 - - -

Total Allocations -$ -$ 302$ 307$ 52$ -$ -$ -$

BILLED COSTS SDG&E -$ -$ -$ 10$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - 10 - - - -

Global/Retained - - 302 316 52 - - -

Total Billed Costs -$ -$ 302$ 326$ 52$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-127 GRC APPLICATION - December 2010

Page 130: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A Finance Witness: Bruce Folkmann

Cost Center: A-5 Investor Relations

Workpaper: A-5

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 8 7 7 7 7 8 8 8

Labor Costs 884$ 909$ 723$ 803$ 846$ 963$ 1,009$ 1,009$ Non-Labor Costs 1,559 1,358 1,298 1,233 1,088 1,157 1,278 1,278 Total Costs 2,442$ 2,266$ 2,021$ 2,036$ 1,934$ 2,120$ 2,287$ 2,287$

DIRECT ASSIGNMENTS SDG&E 123$ 75$ 47$ 98$ 73$ 75$ 75$ 75$ So Cal Gas 129$ 71$ 37$ 76$ 51$ 53$ 53$ 53$

Subtotal - Utility 252 146 84 174 124 129 129 129

Global/Retained 98$ 86$ 82$ 108$ 50$ 159$ 159$ 159$

Total Direct Assignments 350$ 232$ 166$ 283$ 174$ 287$ 287$ 287$

ALLOCATIONS SDG&E 674$ 645$ 651$ 690$ 675$ 712$ 798$ 831$ So Cal Gas 820 802 767 801 766 753 827 830

Subtotal - Utility 1,494 1,448 1,418 1,490 1,440 1,465 1,625 1,661

Global/Retained 599 586 437 262 319 367 374 339

Total Allocations 2,092$ 2,034$ 1,855$ 1,753$ 1,759$ 1,832$ 1,999$ 1,999$

BILLED COSTS SDG&E 797$ 721$ 698$ 788$ 748$ 788$ 874$ 906$ So Cal Gas 949 873 804 877 817 806 880 883

Subtotal - Utility 1,746 1,594 1,502 1,665 1,565 1,594 1,754 1,789

Global/Retained 697 672 519 371 369 526 533 497

Total Billed Costs 2,442$ 2,266$ 2,021$ 2,036$ 1,934$ 2,120$ 2,287$ 2,287$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-128 GRC APPLICATION - December 2010

Page 131: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 748$ 817$ 369$ 1,934$ 7

66 65 26 157 1

37 37 123 196

Change in Allocation 2009-2012 56 (35) (21) (0)

158$ 66$ 128$ 353$ 1

2012 - TEST YEAR 906$ 883$ 497$ 2,287$ 8

831$ 830$ 339$ 2,000$

75 53 159 287

906$ 883$ 497$ 2,287$

Direct Assignments

TOTAL 2012 ALLOCATIONS

A-5 Investor RelationsA-5 Recon

Total Change from 2009

Allocations

In 2010 reorganization, outgoing VP was replaced by a more senior officer. Also added an administrative assistant. Transfer agent fees, printing, and mailing costs due to expected increase in the number of shareholders.

I CORPORATE CENTER SHARED SERVICESA Finance

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

SDG&E-17-WP BAF-WP-129 GRC APPLICATION - December 2010

Page 132: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A Finance Witness: Bruce Folkmann

Cost Center: A-5 Investor Relations

Workpaper: A-5 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 8 7 7 7 7 9 9 9

Labor Costs 884$ 909$ 723$ 803$ 846$ 979$ 1,052$ 1,077$ Non-Labor Costs 1,559 1,358 1,298 1,233 1,088 1,170 1,311 1,333 Total Costs 2,442$ 2,266$ 2,021$ 2,036$ 1,934$ 2,150$ 2,363$ 2,411$

DIRECT ASSIGNMENTS SDG&E 123$ 75$ 47$ 98$ 73$ 76$ 78$ 79$ So Cal Gas 129 71 37 76 51 54 56 57

Subtotal - Utility 252 146 84 174 124 131 133 136

Global/Retained 98 86 82 108 50 161 164 168

Total Direct Assignments 350$ 232$ 166$ 283$ 174$ 291$ 297$ 304$

ALLOCATIONS SDG&E 674$ 645$ 651$ 690$ 675$ 722$ 825$ 875$ So Cal Gas 820 802 767 801 766 763 855 875

Subtotal - Utility 1,494 1,448 1,418 1,490 1,440 1,486 1,679 1,750

Global/Retained 599 586 437 262 319 373 387 357

Total Allocations 2,092$ 2,034$ 1,855$ 1,753$ 1,759$ 1,858$ 2,066$ 2,107$

BILLED COSTS SDG&E 797$ 721$ 698$ 788$ 748$ 799$ 902$ 954$ So Cal Gas 949 873 804 877 817 818 910 932

Subtotal - Utility 1,746 1,594 1,502 1,665 1,565 1,616 1,813 1,886

Global/Retained 697 672 519 371 369 534 551 525

Total Billed Costs 2,442$ 2,266$ 2,021$ 2,036$ 1,934$ 2,150$ 2,363$ 2,411$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-130 GRC APPLICATION - December 2010

Page 133: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-5 Investor Relations Witness: Bruce Folkmann

Cost Center: 1100-0375-VP - INVESTOR RELATIONS

Workpaper: A-5.1

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 1 1 1 1 1 2 2 2

Labor Costs 321$ 299$ 259$ 268$ 259$ 368$ 411$ 411$ Non-Labor Costs 208 142 113 126 93 93 98 98 Total Costs 529$ 442$ 372$ 394$ 352$ 461$ 509$ 509$

DIRECT ASSIGNMENTS SDG&E 36$ 19$ 7$ 8$ 6$ -$ -$ -$ So Cal Gas 44 24 8 9 7 - - -

Subtotal - Utility 80 43 15 17 12 - - -

Global/Retained 24 12 8 3 3 - - -

Total Direct Assignments 104$ 56$ 23$ 20$ 15$ -$ -$ -$

ALLOCATIONS SDG&E 110$ 94$ 123$ 147$ 129$ 179$ 203$ 212$ So Cal Gas 135 118 145 171 147 190 211 211

Subtotal - Utility 245 212 268 318 276 369 414 423

Global/Retained 180 174 81 56 61 93 95 86

Total Allocations 425$ 386$ 349$ 374$ 337$ 461$ 509$ 509$

BILLED COSTS SDG&E 146$ 113$ 130$ 155$ 135$ 179$ 203$ 212$ So Cal Gas 179 142 153 180 153 190 211 211

Subtotal - Utility 325 255 283 335 288 369 414 423

Global/Retained 204 186 89 59 64 93 95 86

Total Billed Costs 529$ 442$ 372$ 394$ 352$ 461$ 509$ 509$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-131 GRC APPLICATION - December 2010

Page 134: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 135$ 153$ 64$ 352$ 1

66 65 26 157 1

Change in Allocation 2009-2012 11 (7) (4) -

77$ 58$ 22$ 157$ 1

2012 - TEST YEAR 212$ 211$ 86$ 509$ 2

41.54% 41.52% 16.94% 100.00%

212$ 211$ 86$ 509$

(0) (0) (0) (0)

212$ 211$ 86$ 509$

A FinanceA-5 Investor Relations

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0375-VP - INVESTOR RELATIONSA-5.1 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Multi-Factor Basic

Allocations

In 2010 reorganization, outgoing VP was replaced by a more senior officer. Also added an administrative assistant.

SDG&E-17-WP BAF-WP-132 GRC APPLICATION - December 2010

Page 135: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-5 Investor Relations Witness: Bruce Folkmann

Cost Center: 1100-0375-VP - INVESTOR RELATIONS

Workpaper: A-5.1 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 1 1 1 1 1 2 2 2

Labor Costs 321$ 299$ 259$ 268$ 259$ 375$ 429$ 439$ Non-Labor Costs 208 142 113 126 93 95 102 105 Total Costs 529$ 442$ 372$ 394$ 352$ 470$ 531$ 544$

DIRECT ASSIGNMENTS SDG&E 36$ 19$ 7$ 8$ 6$ -$ -$ -$ So Cal Gas 44 24 8 9 7 - - -

Subtotal - Utility 80 43 15 17 12 - - -

Global/Retained 24 12 8 3 3 - - -

Total Direct Assignments 104$ 56$ 23$ 20$ 15$ -$ -$ -$

ALLOCATIONS SDG&E 110$ 94$ 123$ 147$ 129$ 182$ 212$ 226$ So Cal Gas 135 118 145 171 147 193 220 226

Subtotal - Utility 245 212 268 318 276 375 432 452

Global/Retained 180 174 81 56 61 94 99 92

Total Allocations 425$ 386$ 349$ 374$ 337$ 470$ 531$ 544$

BILLED COSTS SDG&E 146$ 113$ 130$ 155$ 135$ 182$ 212$ 226$ So Cal Gas 179 142 153 180 153 193 220 226

Subtotal - Utility 325 255 283 335 288 375 432 452

Global/Retained 204 186 89 59 64 94 99 92

Total Billed Costs 529$ 442$ 372$ 394$ 352$ 470$ 531$ 544$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-133 GRC APPLICATION - December 2010

Page 136: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-5 Investor Relations Witness: Bruce Folkmann

Cost Center: 1100-0042-INVESTOR RELATIONS

Workpaper: A-5.2

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 6 6 6 6 6 6 6 6

Labor Costs 457$ 465$ 440$ 535$ 587$ 594$ 598$ 598$ Non-Labor Costs 1,322 1,170 1,181 1,107 994 1,064 1,180 1,180 Total Costs 1,779$ 1,635$ 1,621$ 1,642$ 1,582$ 1,658$ 1,778$ 1,778$

DIRECT ASSIGNMENTS SDG&E 86$ 56$ 40$ 90$ 67$ 75$ 75$ 75$ So Cal Gas 85 47 29 67 45 53 53 53

Subtotal - Utility 171 103 69 157 112 129 129 129

Global/Retained 62 44 74 105 47 159 159 159

Total Direct Assignments 233$ 147$ 143$ 262$ 159$ 287$ 287$ 287$

ALLOCATIONS SDG&E 537$ 515$ 521$ 543$ 545$ 533$ 595$ 619$ So Cal Gas 651 639 614 630 619 563 616 619

Subtotal - Utility 1,188 1,154 1,135 1,173 1,165 1,096 1,211 1,238

Global/Retained 358 334 343 206 258 275 279 252

Total Allocations 1,546$ 1,487$ 1,478$ 1,379$ 1,422$ 1,371$ 1,490$ 1,490$

BILLED COSTS SDG&E 623$ 571$ 561$ 633$ 613$ 608$ 670$ 695$ So Cal Gas 736 686 643 697 664 616 670 672

Subtotal - Utility 1,359 1,257 1,204 1,330 1,277 1,225 1,340 1,366

Global/Retained 420 378 417 312 305 433 437 411

Total Billed Costs 1,779$ 1,635$ 1,621$ 1,642$ 1,582$ 1,658$ 1,778$ 1,778$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-134 GRC APPLICATION - December 2010

Page 137: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 613$ 664$ 305$ 1,582$ 6

22 20 116 158

15 16 7 38

Change in Allocation 2009-2012 45 (28) (17) (0)

82$ 8$ 106$ 196$ (0)

2012 - TEST YEAR 695$ 672$ 411$ 1,778$ 6

41.54% 41.52% 16.94% 100.00%

619$ 619$ 252$ 1,490$

75 53 159 287

695$ 672$ 411$ 1,778$

Direct Assignment DetailsSpecial Projects Mgr -$ -$ 107$ 107$ Preferred stock listing fees 28$ -$ 28$ 55$ SRE analyst conference 48 53 24 125

75$ 53$ 159$ 287$

Additional fees for listing on Mexican stock exchange.

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

A FinanceA-5 Investor Relations1100-0042-INVESTOR RELATIONSA-5.2 Recon

Transfer agent fees, printing, and mailing costs due to expected increase in the number of shareholders.

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Multi-Factor Basic

Allocations

SDG&E-17-WP BAF-WP-135 GRC APPLICATION - December 2010

Page 138: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-5 Investor Relations Witness: Bruce Folkmann

Cost Center: 1100-0042-INVESTOR RELATIONS

Workpaper: A-5.2 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 6 6 6 6 6 7 7 7

Labor Costs 457$ 465$ 440$ 535$ 587$ 605$ 623$ 638$ Non-Labor Costs 1,322 1,170 1,181 1,107 994 1,076 1,209 1,228 Total Costs 1,779$ 1,635$ 1,621$ 1,642$ 1,582$ 1,680$ 1,832$ 1,866$

DIRECT ASSIGNMENTS SDG&E 86$ 56$ 40$ 90$ 67$ 76$ 78$ 79$ So Cal Gas 85 47 29 67 45 54 56 57

Subtotal - Utility 171 103 69 157 112 131 133 136

Global/Retained 62 44 74 105 47 161 164 168

Total Direct Assignments 233$ 147$ 143$ 262$ 159$ 291$ 297$ 304$

ALLOCATIONS SDG&E 537$ 515$ 521$ 543$ 545$ 540$ 613$ 649$ So Cal Gas 651 639 614 630 619 571 635 649

Subtotal - Utility 1,188 1,154 1,135 1,173 1,165 1,110 1,248 1,298

Global/Retained 358 334 343 206 258 278 287 265

Total Allocations 1,546$ 1,487$ 1,478$ 1,379$ 1,422$ 1,389$ 1,535$ 1,563$

BILLED COSTS SDG&E 623$ 571$ 561$ 633$ 613$ 616$ 690$ 728$ So Cal Gas 736 686 643 697 664 625 690 706

Subtotal - Utility 1,359 1,257 1,204 1,330 1,277 1,241 1,381 1,434

Global/Retained 420 378 417 312 305 439 451 432

Total Billed Costs 1,779$ 1,635$ 1,621$ 1,642$ 1,582$ 1,680$ 1,832$ 1,866$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-136 GRC APPLICATION - December 2010

Page 139: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-5 Investor Relations Witness: Bruce Folkmann

Cost Center: 1100-0382-EXECUTIVE PROJECTS

Workpaper: A-5.3

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 1 0 0 0 0 0 0 0

Labor Costs 105$ 144$ 24$ -$ -$ -$ -$ -$ Non-Labor Costs 29 46 4 - - - - - Total Costs 134$ 190$ 28$ -$ -$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 13 29 - - - - - -

Total Direct Assignments 13$ 29$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 27$ 36$ 7$ -$ -$ -$ -$ -$ So Cal Gas 33 45 8 - - - - -

Subtotal - Utility 60 82 14 - - - - -

Global/Retained 60 79 14 - - - - -

Total Allocations 121$ 161$ 28$ -$ -$ -$ -$ -$

BILLED COSTS SDG&E 28$ 36$ 7$ -$ -$ -$ -$ -$ So Cal Gas 34 45 8 - - - - -

Subtotal - Utility 61 82 14 - - - - -

Global/Retained 73 109 14 - - - - -

Total Billed Costs 134$ 190$ 28$ -$ -$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-137 GRC APPLICATION - December 2010

Page 140: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-5 Investor Relations Witness: Bruce Folkmann

Cost Center: 1100-0382-EXECUTIVE PROJECTS

Workpaper: A-5.3 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 1 0 0 0 0 0 0 0

Labor Costs 105$ 144$ 24$ -$ -$ -$ -$ -$ Non-Labor Costs 29 46 4 - - - - - Total Costs 134$ 190$ 28$ -$ -$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 13 29 - - - - - -

Total Direct Assignments 13$ 29$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 27$ 36$ 7$ -$ -$ -$ -$ -$ So Cal Gas 33 45 8 - - - - -

Subtotal - Utility 60 82 14 - - - - -

Global/Retained 60 79 14 - - - - -

Total Allocations 121$ 161$ 28$ -$ -$ -$ -$ -$

BILLED COSTS SDG&E 28$ 36$ 7$ -$ -$ -$ -$ -$ So Cal Gas 34 45 8 - - - - -

Subtotal - Utility 61 82 14 - - - - -

Global/Retained 73 109 14 - - - - -

Total Billed Costs 134$ 190$ 28$ -$ -$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-138 GRC APPLICATION - December 2010

Page 141: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A Finance Witness: Bruce Folkmann

Cost Center: A-6 Corporate Planning

Workpaper: A-6

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 14 14 15 16 16 14 16 16

Labor Costs 1,131$ 1,195$ 1,440$ 1,634$ 1,645$ 1,524$ 1,726$ 1,726$ Non-Labor Costs 258 537 337 454 888 409 490 490 Total Costs 1,389$ 1,733$ 1,777$ 2,087$ 2,533$ 1,934$ 2,216$ 2,216$

DIRECT ASSIGNMENTS SDG&E 32$ 75$ 65$ 84$ 102$ 47$ 48$ 50$ So Cal Gas 6$ 44$ 62$ 89$ 112$ 49$ 50$ 50$

Subtotal - Utility 38 119 127 174 215 97 98 99

Global/Retained 26$ 97$ 101$ 84$ 92$ 40$ 39$ 37$

Total Direct Assignments 64$ 216$ 228$ 257$ 307$ 137$ 136$ 136$

ALLOCATIONS SDG&E 299$ 348$ 384$ 399$ 497$ 437$ 511$ 520$ So Cal Gas 364 430 445 463 564 462 529 520

Subtotal - Utility 662 778 828 862 1,061 899 1,040 1,040

Global/Retained 663 739 721 968 1,165 899 1,040 1,040

Total Allocations 1,325$ 1,517$ 1,549$ 1,830$ 2,226$ 1,797$ 2,079$ 2,079$

BILLED COSTS SDG&E 331$ 423$ 449$ 483$ 599$ 484$ 559$ 570$ So Cal Gas 369 474 506 552 676 511 579 569

Subtotal - Utility 700 897 955 1,036 1,276 995 1,137 1,139

Global/Retained 689 836 822 1,052 1,257 939 1,078 1,077

Total Billed Costs 1,389$ 1,733$ 1,777$ 2,087$ 2,533$ 1,934$ 2,216$ 2,216$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-139 GRC APPLICATION - December 2010

Page 142: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 599$ 676$ 1,257$ 2,533$ 16

4 7 13 24

(94) (106) (141) (341)

Change in Allocation 2009-2012 60 (8) (52) -

(30)$ (107)$ (180)$ (317)$ -

2012 - TEST YEAR 570$ 569$ 1,077$ 2,216$ 16

520$ 520$ 1,040$ 2,079$

50 50 37 136

570$ 569$ 1,077$ 2,216$

Direct Assignments

TOTAL 2012 ALLOCATIONS

A-6 Corporate PlanningA-6 Recon

Total Change from 2009

Allocations

Labor staffing changes as a result of the reorganization and filling vacancies.

Net lower computer expenses in 2012.

I CORPORATE CENTER SHARED SERVICESA Finance

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

SDG&E-17-WP BAF-WP-140 GRC APPLICATION - December 2010

Page 143: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A Finance Witness: Bruce Folkmann

Cost Center: A-6 Corporate Planning

Workpaper: A-6 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 14 14 15 16 16 14 16 16

Labor Costs 1,131$ 1,195$ 1,440$ 1,634$ 1,645$ 1,551$ 1,800$ 1,843$ Non-Labor Costs 258 537 337 454 888 417 512 526 Total Costs 1,389$ 1,733$ 1,777$ 2,087$ 2,533$ 1,968$ 2,311$ 2,369$

DIRECT ASSIGNMENTS SDG&E 32$ 75$ 65$ 84$ 102$ 48$ 50$ 53$ So Cal Gas 6 44 62 89 112 50 52 53

Subtotal - Utility 38 119 127 174 215 98 102 107

Global/Retained 26 97 101 84 92 41 40 40

Total Direct Assignments 64$ 216$ 228$ 257$ 307$ 139$ 142$ 146$

ALLOCATIONS SDG&E 299$ 348$ 384$ 399$ 497$ 444$ 533$ 556$ So Cal Gas 364 430 445 463 564 470 552 555

Subtotal - Utility 662 778 828 862 1,061 914 1,084 1,111

Global/Retained 663 739 721 968 1,165 914 1,084 1,111

Total Allocations 1,325$ 1,517$ 1,549$ 1,830$ 2,226$ 1,829$ 2,169$ 2,222$

BILLED COSTS SDG&E 331$ 423$ 449$ 483$ 599$ 493$ 583$ 609$ So Cal Gas 369 474 506 552 676 520 604 609

Subtotal - Utility 700 897 955 1,036 1,276 1,013 1,187 1,218

Global/Retained 689 836 822 1,052 1,257 955 1,125 1,151

Total Billed Costs 1,389$ 1,733$ 1,777$ 2,087$ 2,533$ 1,968$ 2,311$ 2,369$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-141 GRC APPLICATION - December 2010

Page 144: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-6 Corporate Planning Witness: Bruce Folkmann

Cost Center: 1100-0298-VP - CORPORATE PLANNING

Workpaper: A-6.1

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 2 1 3 2 2 2 2 2

Labor Costs 174$ 177$ 277$ 250$ 254$ 256$ 282$ 282$ Non-Labor Costs 50 56 52 37 22 28 28 28 Total Costs 224$ 232$ 329$ 287$ 276$ 284$ 310$ 310$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - 5 - - - -

Total Direct Assignments -$ -$ -$ 5$ -$ -$ -$ -$

ALLOCATIONS SDG&E 50$ 53$ 76$ 41$ 40$ 69$ 76$ 77$ So Cal Gas 61 65 90 47 46 73 79 77

Subtotal - Utility 112 118 166 88 86 142 155 155

Global/Retained 112 114 163 194 190 142 155 155

Total Allocations 224$ 232$ 329$ 283$ 276$ 284$ 310$ 310$

BILLED COSTS SDG&E 50$ 53$ 76$ 41$ 40$ 69$ 76$ 77$ So Cal Gas 61 65 90 47 46 73 79 77

Subtotal - Utility 112 118 166 88 86 142 155 155

Global/Retained 112 114 163 199 190 142 155 155

Total Billed Costs 224$ 232$ 329$ 287$ 276$ 284$ 310$ 310$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-142 GRC APPLICATION - December 2010

Page 145: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 40$ 46$ 190$ 276$ 2

8 8 17 33

Change in Allocation 2009-2012 29 23 (52) -

37$ 32$ (35)$ 33$ -

2012 - TEST YEAR 77$ 77$ 155$ 310$ 2

25.01% 24.99% 50.00% 100.00%

77$ 77$ 155$ 310$

(0) (0) (0) (0)

77$ 77$ 155$ 310$

A FinanceA-6 Corporate Planning

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0298-VP - CORPORATE PLANNINGA-6.1 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Multi-Factor Split

Allocations

Full time impact of administrative assistant that was shared prior to the 2010 reorganization.

SDG&E-17-WP BAF-WP-143 GRC APPLICATION - December 2010

Page 146: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-6 Corporate Planning Witness: Bruce Folkmann

Cost Center: 1100-0298-VP - CORPORATE PLANNING

Workpaper: A-6.1 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 2 1 3 2 2 2 2 2

Labor Costs 174$ 177$ 277$ 250$ 254$ 260$ 294$ 301$ Non-Labor Costs 50 56 52 37 22 29 29 30 Total Costs 224$ 232$ 329$ 287$ 276$ 289$ 323$ 331$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - 5 - - - -

Total Direct Assignments -$ -$ -$ 5$ -$ -$ -$ -$

ALLOCATIONS SDG&E 50$ 53$ 76$ 41$ 40$ 70$ 79$ 83$ So Cal Gas 61 65 90 47 46 74 82 83

Subtotal - Utility 112 118 166 88 86 144 162 166

Global/Retained 112 114 163 194 190 144 162 166

Total Allocations 224$ 232$ 329$ 283$ 276$ 289$ 323$ 331$

BILLED COSTS SDG&E 50$ 53$ 76$ 41$ 40$ 70$ 79$ 83$ So Cal Gas 61 65 90 47 46 74 82 83

Subtotal - Utility 112 118 166 88 86 144 162 166

Global/Retained 112 114 163 199 190 144 162 166

Total Billed Costs 224$ 232$ 329$ 287$ 276$ 289$ 323$ 331$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-144 GRC APPLICATION - December 2010

Page 147: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-6 Corporate Planning Witness: Bruce Folkmann

Cost Center: 1100-0299-FIVE-YEAR BUSINESS PLANNING

Workpaper: A-6.2

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 3 5 4 7 6 4 6 6

Labor Costs 287$ 330$ 467$ 658$ 638$ 478$ 653$ 653$ Non-Labor Costs (23) 216 51 171 146 75 75 75 Total Costs 264$ 546$ 518$ 829$ 784$ 554$ 729$ 729$

DIRECT ASSIGNMENTS SDG&E -$ -$ 8$ 43$ 10$ -$ -$ -$ So Cal Gas - - 8 43 10 - - -

Subtotal - Utility - - 17 85 21 - - -

Global/Retained - 37 94 - 8 - - -

Total Direct Assignments -$ 37$ 111$ 85$ 29$ -$ -$ -$

ALLOCATIONS SDG&E 60$ 115$ 95$ 172$ 177$ 135$ 179$ 182$ So Cal Gas 72 143 112 200 201 142 185 182

Subtotal - Utility 132 259 207 372 377 277 364 364

Global/Retained 132 251 201 372 377 277 364 364

Total Allocations 264$ 510$ 407$ 744$ 755$ 554$ 729$ 729$

BILLED COSTS SDG&E 60$ 115$ 103$ 215$ 187$ 135$ 179$ 182$ So Cal Gas 72 143 120 242 211 142 185 182

Subtotal - Utility 132 259 224 457 398 277 364 364

Global/Retained 132 288 295 372 385 277 364 364

Total Billed Costs 264$ 546$ 518$ 829$ 784$ 554$ 729$ 729$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-145 GRC APPLICATION - December 2010

Page 148: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 187$ 211$ 385$ 784$ 6

(17) (17) (21) (55)

Change in Allocation 2009-2012 12 (12) (0) 0

(5)$ (29)$ (21)$ (55)$ -

2012 - TEST YEAR 182$ 182$ 364$ 729$ 6

25.01% 24.99% 50.00% 100.00%

182$ 182$ 364$ 729$

(0) (0) (0) (0)

182$ 182$ 364$ 729$

A FinanceA-6 Corporate Planning

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0299-FIVE-YEAR BUSINESS PLANNINGA-6.2 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Multi-Factor Split

Allocations

Non-recurring computer licensing fees in 2009.

SDG&E-17-WP BAF-WP-146 GRC APPLICATION - December 2010

Page 149: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-6 Corporate Planning Witness: Bruce Folkmann

Cost Center: 1100-0299-FIVE-YEAR BUSINESS PLANNING

Workpaper: A-6.2 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 3 5 4 7 6 4 6 6

Labor Costs 287$ 330$ 467$ 658$ 638$ 487$ 682$ 698$ Non-Labor Costs (23) 216 51 171 146 77 79 81 Total Costs 264$ 546$ 518$ 829$ 784$ 563$ 760$ 779$

DIRECT ASSIGNMENTS SDG&E -$ -$ 8$ 43$ 10$ -$ -$ -$ So Cal Gas - - 8 43 10 - - -

Subtotal - Utility - - 17 85 21 - - -

Global/Retained - 37 94 - 8 - - -

Total Direct Assignments -$ 37$ 111$ 85$ 29$ -$ -$ -$

ALLOCATIONS SDG&E 60$ 115$ 95$ 172$ 177$ 137$ 187$ 195$ So Cal Gas 72 143 112 200 201 145 193 195

Subtotal - Utility 132 259 207 372 377 282 380 389

Global/Retained 132 251 201 372 377 282 380 389

Total Allocations 264$ 510$ 407$ 744$ 755$ 563$ 760$ 779$

BILLED COSTS SDG&E 60$ 115$ 103$ 215$ 187$ 137$ 187$ 195$ So Cal Gas 72 143 120 242 211 145 193 195

Subtotal - Utility 132 259 224 457 398 282 380 389

Global/Retained 132 288 295 372 385 282 380 389

Total Billed Costs 264$ 546$ 518$ 829$ 784$ 563$ 760$ 779$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-147 GRC APPLICATION - December 2010

Page 150: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-6 Corporate Planning Witness: Bruce Folkmann

Cost Center: 1100-0053-ONE-YEAR BUSINESS PLANNING

Workpaper: A-6.3

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 3 5 6 3 2 2 2 2

Labor Costs 301$ 303$ 231$ 297$ 283$ 225$ 225$ 225$ Non-Labor Costs 8 23 15 7 25 8 8 8 Total Costs 309$ 326$ 246$ 304$ 308$ 233$ 233$ 233$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ 1$ -$ -$ -$ So Cal Gas - - - - 1 - - -

Subtotal - Utility - - - - 3 - - -

Global/Retained - - - - 1 - - -

Total Direct Assignments -$ -$ -$ -$ 3$ -$ -$ -$

ALLOCATIONS SDG&E 70$ 74$ 57$ 70$ 71$ 57$ 57$ 58$ So Cal Gas 85 92 68 82 81 60 59 58

Subtotal - Utility 154 165 125 152 152 117 117 117

Global/Retained 154 160 121 152 152 117 117 117

Total Allocations 309$ 326$ 246$ 304$ 304$ 233$ 233$ 233$

BILLED COSTS SDG&E 70$ 74$ 57$ 70$ 73$ 57$ 57$ 58$ So Cal Gas 85 92 68 82 82 60 59 58

Subtotal - Utility 154 165 125 152 155 117 117 117

Global/Retained 154 160 121 152 153 117 117 117

Total Billed Costs 309$ 326$ 246$ 304$ 308$ 233$ 233$ 233$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-148 GRC APPLICATION - December 2010

Page 151: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 73$ 82$ 153$ 308$ 2

(19) (19) (36) (74)

Change in Allocation 2009-2012 5 (5) 0 (0)

(14)$ (24)$ (36)$ (74)$ -

2012 - TEST YEAR 58$ 58$ 117$ 233$ 2

25.01% 24.99% 50.00% 100.00%

58$ 58$ 117$ 233$

(0) (0) (0) (0)

58$ 58$ 117$ 233$

A FinanceA-6 Corporate Planning

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0053-ONE-YEAR BUSINESS PLANNINGA-6.3 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Multi-Factor Split

Allocations

Full year impact of staff transfer in 2009 to 1100-0326. (see Recon workpaper A-6.4)

SDG&E-17-WP BAF-WP-149 GRC APPLICATION - December 2010

Page 152: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-6 Corporate Planning Witness: Bruce Folkmann

Cost Center: 1100-0053-ONE-YEAR BUSINESS PLANNING

Workpaper: A-6.3 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 3 5 6 3 2 2 2 2

Labor Costs 301$ 303$ 231$ 297$ 283$ 229$ 235$ 241$ Non-Labor Costs 8 23 15 7 25 8 8 8 Total Costs 309$ 326$ 246$ 304$ 308$ 237$ 243$ 249$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ 1$ -$ -$ -$ So Cal Gas - - - - 1 - - -

Subtotal - Utility - - - - 3 - - -

Global/Retained - - - - 1 - - -

Total Direct Assignments -$ -$ -$ -$ 3$ -$ -$ -$

ALLOCATIONS SDG&E 70$ 74$ 57$ 70$ 71$ 58$ 60$ 62$ So Cal Gas 85 92 68 82 81 61 62 62

Subtotal - Utility 154 165 125 152 152 119 122 125

Global/Retained 154 160 121 152 152 119 122 125

Total Allocations 309$ 326$ 246$ 304$ 304$ 237$ 243$ 249$

BILLED COSTS SDG&E 70$ 74$ 57$ 70$ 73$ 58$ 60$ 62$ So Cal Gas 85 92 68 82 82 61 62 62

Subtotal - Utility 154 165 125 152 155 119 122 125

Global/Retained 154 160 121 152 153 119 122 125

Total Billed Costs 309$ 326$ 246$ 304$ 308$ 237$ 243$ 249$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-150 GRC APPLICATION - December 2010

Page 153: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-6 Corporate Planning Witness: Bruce Folkmann

Cost Center: 1100-0326-CORP BUDGETS & REPORTING

Workpaper: A-6.4

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 2 0 0 2 3 3 3 3

Labor Costs 84$ 130$ 207$ 219$ 214$ 279$ 279$ 279$ Non-Labor Costs 0 1 0 23 329 7 7 7 Total Costs 84$ 131$ 208$ 242$ 543$ 286$ 286$ 286$

DIRECT ASSIGNMENTS SDG&E 9$ 57$ 53$ -$ -$ -$ -$ -$ So Cal Gas - 28 53 - - - - -

Subtotal - Utility 9 85 106 - - - - -

Global/Retained - - 11 34 1 - - -

Total Direct Assignments 9$ 85$ 117$ 34$ 1$ -$ -$ -$

ALLOCATIONS SDG&E 17$ 15$ 45$ 48$ 127$ 70$ 70$ 72$ So Cal Gas 21 16 45 56 144 73 73 71

Subtotal - Utility 38 31 91 104 271 143 143 143

Global/Retained 38 15 - 104 271 143 143 143

Total Allocations 75$ 46$ 91$ 208$ 542$ 286$ 286$ 286$

BILLED COSTS SDG&E 26$ 72$ 98$ 48$ 127$ 70$ 70$ 72$ So Cal Gas 21 44 98 56 144 73 73 71

Subtotal - Utility 46 116 197 104 271 143 143 143

Global/Retained 38 15 11 138 272 143 143 143

Total Billed Costs 84$ 131$ 208$ 242$ 543$ 286$ 286$ 286$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-151 GRC APPLICATION - December 2010

Page 154: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 127$ 144$ 272$ 543$ 3

(79) (81) (162) (322)

15 17 33 65

Change in Allocation 2009-2012 9 (9) (0) (0)

(55)$ (73)$ (129)$ (257)$ -

2012 - TEST YEAR 72$ 71$ 143$ 286$ 3

25.01% 24.99% 50.00% 100.00%

72$ 71$ 143$ 286$

(0) (0) (0) (0)

72$ 71$ 143$ 286$

Full year impact of staf transfer in 2009 from 1100-0053. (See Recon workpaper A-6.3)

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

A FinanceA-6 Corporate Planning1100-0326-CORP BUDGETS & REPORTINGA-6.4 Recon

Non-recurring computer software implementation in 2009.

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Multi-Factor Split

Allocations

SDG&E-17-WP BAF-WP-152 GRC APPLICATION - December 2010

Page 155: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-6 Corporate Planning Witness: Bruce Folkmann

Cost Center: 1100-0326-CORP BUDGETS & REPORTING

Workpaper: A-6.4 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 2 0 0 2 3 3 3 3

Labor Costs 84$ 130$ 207$ 219$ 214$ 284$ 291$ 298$ Non-Labor Costs 0 1 0 23 329 7 7 8 Total Costs 84$ 131$ 208$ 242$ 543$ 291$ 298$ 305$

DIRECT ASSIGNMENTS SDG&E 9$ 57$ 53$ -$ -$ -$ -$ -$ So Cal Gas - 28 53 - - - - -

Subtotal - Utility 9 85 106 - - - - -

Global/Retained - - 11 34 1 - - -

Total Direct Assignments 9$ 85$ 117$ 34$ 1$ -$ -$ -$

ALLOCATIONS SDG&E 17$ 15$ 45$ 48$ 127$ 71$ 73$ 76$ So Cal Gas 21 16 45 56 144 75 76 76

Subtotal - Utility 38 31 91 104 271 146 149 153

Global/Retained 38 15 - 104 271 146 149 153

Total Allocations 75$ 46$ 91$ 208$ 542$ 291$ 298$ 305$

BILLED COSTS SDG&E 26$ 72$ 98$ 48$ 127$ 71$ 73$ 76$ So Cal Gas 21 44 98 56 144 75 76 76

Subtotal - Utility 46 116 197 104 271 146 149 153

Global/Retained 38 15 11 138 272 146 149 153

Total Billed Costs 84$ 131$ 208$ 242$ 543$ 291$ 298$ 305$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-153 GRC APPLICATION - December 2010

Page 156: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-6 Corporate Planning Witness: Bruce Folkmann

Cost Center: 1100-0342-FINL SYSTEMS

Workpaper: A-6.5

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 4 3 2 2 3 3 3 3

Labor Costs 285$ 255$ 257$ 209$ 256$ 286$ 286$ 286$ Non-Labor Costs 224 242 219 216 366 291 372 372 Total Costs 509$ 497$ 476$ 425$ 622$ 577$ 658$ 658$

DIRECT ASSIGNMENTS SDG&E 23$ 18$ 4$ 42$ 91$ 47$ 48$ 50$ So Cal Gas 6 16 (0) 47 101 49 50 50

Subtotal - Utility 29 34 4 88 191 97 98 99

Global/Retained 26 60 (4) 46 82 40 39 37

Total Direct Assignments 55$ 94$ 0$ 134$ 274$ 137$ 137$ 137$

ALLOCATIONS SDG&E 102$ 91$ 110$ 67$ 82$ 107$ 128$ 130$ So Cal Gas 124 113 130 78 93 113 133 130

Subtotal - Utility 227 205 240 146 174 220 261 261

Global/Retained 227 199 236 146 174 220 261 261

Total Allocations 454$ 403$ 476$ 291$ 348$ 440$ 521$ 521$

BILLED COSTS SDG&E 126$ 109$ 114$ 109$ 172$ 154$ 176$ 180$ So Cal Gas 130 130 130 125 193 162 182 180

Subtotal - Utility 256 238 244 234 365 317 358 360

Global/Retained 253 259 233 191 256 260 299 298

Total Billed Costs 509$ 497$ 476$ 425$ 622$ 577$ 658$ 658$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-154 GRC APPLICATION - December 2010

Page 157: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 172$ 193$ 256$ 622$ 3

24 17 74 114

(22) (24) (32) (78)

Change in Allocation 2009-2012 6 (6) (0) 0

8$ (13)$ 41$ 36$ -

2012 - TEST YEAR 180$ 180$ 298$ 658$ 3

25.01% 24.99% 50.00% 100.00%

130$ 130$ 261$ 521$

50 50 37 136

180$ 180$ 298$ 658$

Direct Assignment DetailsHyperion license expenses based on 50 50 37 136 actual users. 50$ 50$ 37$ 136$

A FinanceA-6 Corporate Planning

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0342-FINL SYSTEMSA-6.5 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Multi-Factor Split

Allocations

Recurring maintenance fees for systems implemented in 2009.Non-recurring computer software implementation in 2009.

SDG&E-17-WP BAF-WP-155 GRC APPLICATION - December 2010

Page 158: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-6 Corporate Planning Witness: Bruce Folkmann

Cost Center: 1100-0342-FINL SYSTEMS

Workpaper: A-6.5 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 4 3 2 2 3 3 3 3

Labor Costs 285$ 255$ 257$ 209$ 256$ 291$ 298$ 305$ Non-Labor Costs 224 242 219 216 366 296 388 399 Total Costs 509$ 497$ 476$ 425$ 622$ 587$ 686$ 704$

DIRECT ASSIGNMENTS SDG&E 23$ 18$ 4$ 42$ 91$ 48$ 50$ 53$ So Cal Gas 6 16 (0) 47 101 50 52 53

Subtotal - Utility 29 34 4 88 191 98 102 107

Global/Retained 26 60 (4) 46 82 41 40 40

Total Direct Assignments 55$ 94$ 0$ 134$ 274$ 139$ 142$ 146$

ALLOCATIONS SDG&E 102$ 91$ 110$ 67$ 82$ 109$ 134$ 140$ So Cal Gas 124 113 130 78 93 115 138 139

Subtotal - Utility 227 205 240 146 174 224 272 279

Global/Retained 227 199 236 146 174 224 272 279

Total Allocations 454$ 403$ 476$ 291$ 348$ 448$ 544$ 558$

BILLED COSTS SDG&E 126$ 109$ 114$ 109$ 172$ 157$ 184$ 193$ So Cal Gas 130 130 130 125 193 165 190 193

Subtotal - Utility 256 238 244 234 365 322 374 386

Global/Retained 253 259 233 191 256 265 312 319

Total Billed Costs 509$ 497$ 476$ 425$ 622$ 587$ 686$ 704$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-156 GRC APPLICATION - December 2010

Page 159: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A Finance Witness: Bruce Folkmann

Cost Center: A-7 Risk Management

Workpaper: A-7

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 6 4 5 5 5 8 11 11

Labor Costs 677$ 522$ 459$ 503$ 523$ 955$ 1,235$ 1,235$ Non-Labor Costs 912 455 57 46 82 121 121 121 Total Costs 1,589$ 977$ 516$ 549$ 605$ 1,076$ 1,356$ 1,356$

DIRECT ASSIGNMENTS SDG&E (55)$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas (60) - - - - - - -

Subtotal - Utility (114) - - - - - - -

Global/Retained 772 360 - - - - - -

Total Direct Assignments 658$ 360$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 175$ 169$ 182$ 216$ 232$ 700$ 999$ 437$ So Cal Gas 208 197 214 251 263 253 246 437

Subtotal - Utility 383 366 396 467 495 953 1,245 875

Global/Retained 548 250 120 82 110 123 111 481

Total Allocations 931$ 616$ 516$ 549$ 605$ 1,076$ 1,356$ 1,356$

BILLED COSTS SDG&E 120$ 169$ 182$ 216$ 232$ 700$ 999$ 437$ So Cal Gas 148 198 214 251 263 253 246 437

Subtotal - Utility 269 367 396 467 495 953 1,245 875

Global/Retained 1,321 611 120 82 110 123 111 481

Total Billed Costs 1,589$ 977$ 516$ 549$ 605$ 1,076$ 1,356$ 1,356$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-157 GRC APPLICATION - December 2010

Page 160: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 232$ 263$ 110$ 605$ 5

186 186 379 751 6

Change in Allocation 2009-2012 19 (12) (7) (0)

205$ 174$ 372$ 751$ 6

2012 - TEST YEAR 437$ 437$ 481$ 1,356$ 11

438$ 437$ 481$ 1,356$

(0) (0) (0) (0)

437$ 437$ 481$ 1,356$ TOTAL 2012 ALLOCATIONS

A-7 Risk ManagementA-7 Recon

Total Change from 2009

Allocations

New cost center created to oversee Risk Management practices.

I CORPORATE CENTER SHARED SERVICESA Finance

Direct Assignments

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

SDG&E-17-WP BAF-WP-158 GRC APPLICATION - December 2010

Page 161: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A Finance Witness: Bruce Folkmann

Cost Center: A-7 Risk Management

Workpaper: A-7 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 6 4 5 5 5 8 11 11

Labor Costs 677$ 522$ 459$ 503$ 523$ 971$ 1,288$ 1,319$ Non-Labor Costs 912 455 57 46 82 124 127 130 Total Costs 1,589$ 977$ 516$ 549$ 605$ 1,095$ 1,414$ 1,449$

DIRECT ASSIGNMENTS SDG&E (55)$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas (60) - - - - - - -

Subtotal - Utility (114) - - - - - - -

Global/Retained 772 360 - - - - - -

Total Direct Assignments 658$ 360$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 175$ 169$ 182$ 216$ 232$ 712$ 1,042$ 467$ So Cal Gas 208 197 214 251 263 257 257 467

Subtotal - Utility 383 366 396 467 495 969 1,298 935

Global/Retained 548 250 120 82 110 126 116 514

Total Allocations 931$ 616$ 516$ 549$ 605$ 1,095$ 1,414$ 1,449$

BILLED COSTS SDG&E 120$ 169$ 182$ 216$ 232$ 712$ 1,042$ 467$ So Cal Gas 148 198 214 251 263 257 257 467

Subtotal - Utility 269 367 396 467 495 969 1,298 935

Global/Retained 1,321 611 120 82 110 126 116 514

Total Billed Costs 1,589$ 977$ 516$ 549$ 605$ 1,095$ 1,414$ 1,449$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-159 GRC APPLICATION - December 2010

Page 162: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-7 Risk Management Witness: Bruce Folkmann

Cost Center: 1100-0010-VP RISK ANALYSIS & MGMT

Workpaper: A-7.1

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 3 6 6

Labor Costs -$ -$ -$ -$ -$ 421$ 721$ 720$ Non-Labor Costs - - - - - 40 40 40 Total Costs -$ -$ -$ -$ -$ 461$ 761$ 761$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ 461$ 761$ 190$ So Cal Gas - - - - - - - 190

Subtotal - Utility - - - - - 461 761 380

Global/Retained - - - - - - - 380

Total Allocations -$ -$ -$ -$ -$ 461$ 761$ 761$

BILLED COSTS SDG&E -$ -$ -$ -$ -$ 461$ 761$ 190$ So Cal Gas - - - - - - - 190

Subtotal - Utility - - - - - 461 761 380

Global/Retained - - - - - - - 380

Total Billed Costs -$ -$ -$ -$ -$ 461$ 761$ 761$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-160 GRC APPLICATION - December 2010

Page 163: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR -$ -$ -$ -$ -

190 190 380 761 6

Change in Allocation 2009-2012 - - - -

190$ 190$ 380$ 761$ 6

2012 - TEST YEAR 190$ 190$ 380$ 761$ 6

25.01% 24.99% 50.00% 100.00%

190$ 190$ 380$ 761$

(0) (0) (0) (0)

190$ 190$ 380$ 761$

A FinanceA-7 Risk Management

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0010-VP RISK ANALYSIS & MGMTA-7.1 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Multi-Factor Split

Allocations

New cost center created to oversee Risk Management practices.

SDG&E-17-WP BAF-WP-161 GRC APPLICATION - December 2010

Page 164: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-7 Risk Management Witness: Bruce Folkmann

Cost Center: 1100-0010-VP RISK ANALYSIS & MGMT

Workpaper: A-7.1 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 3 6 6

Labor Costs -$ -$ -$ -$ -$ 428$ 751$ 769$ Non-Labor Costs - - - - - 41 42 43 Total Costs -$ -$ -$ -$ -$ 469$ 794$ 813$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ 469$ 794$ 203$ So Cal Gas - - - - - - - 203

Subtotal - Utility - - - - - 469 794 406

Global/Retained - - - - - - - 406

Total Allocations -$ -$ -$ -$ -$ 469$ 794$ 813$

BILLED COSTS SDG&E -$ -$ -$ -$ -$ 469$ 794$ 203$ So Cal Gas - - - - - - - 203

Subtotal - Utility - - - - - 469 794 406

Global/Retained - - - - - - 0 406

Total Billed Costs -$ -$ -$ -$ -$ 469$ 794$ 813$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-162 GRC APPLICATION - December 2010

Page 165: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-7 Risk Management Witness: Bruce Folkmann

Cost Center: 1100-0114-INSURANCE MANAGEMENT

Workpaper: A-7.2

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 4 4 5 5 5 5 5 5

Labor Costs 369$ 415$ 459$ 503$ 523$ 534$ 514$ 514$ Non-Labor Costs 42 45 57 46 82 81 81 81 Total Costs 411$ 460$ 516$ 549$ 605$ 615$ 595$ 595$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 142$ 159$ 182$ 216$ 232$ 239$ 238$ 247$ So Cal Gas 173 197 214 251 263 253 246 247

Subtotal - Utility 315 356 396 467 495 492 484 494

Global/Retained 95 103 120 82 110 123 111 101

Total Allocations 410$ 459$ 516$ 549$ 605$ 615$ 595$ 595$

BILLED COSTS SDG&E 143$ 159$ 182$ 216$ 232$ 239$ 238$ 247$ So Cal Gas 173 198 214 251 263 253 246 247

Subtotal - Utility 316 357 396 467 495 492 484 494

Global/Retained 95 103 120 82 110 123 111 101

Total Billed Costs 411$ 460$ 516$ 549$ 605$ 615$ 595$ 595$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-163 GRC APPLICATION - December 2010

Page 166: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 232$ 263$ 110$ 605$ 5

(4) (4) (2) (10)

Change in Allocation 2009-2012 19 (12) (7) (0)

15$ (16)$ (9)$ (10)$ -

2012 - TEST YEAR 247$ 247$ 101$ 595$ 5

41.54% 41.52% 16.94% 100.00%

247$ 247$ 101$ 595$

(0) (0) (0) (0)

247$ 247$ 101$ 595$

A FinanceA-7 Risk Management

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0114-RISK MANAGEMENTA-7.2 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Multi-Factor Basic

Allocations

Labor Impact of staff succession after Director's retirement.

SDG&E-17-WP BAF-WP-164 GRC APPLICATION - December 2010

Page 167: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-7 Risk Management Witness: Bruce Folkmann

Cost Center: 1100-0114-INSURANCE MANAGEMENT

Workpaper: A-7.2 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 4 4 5 5 5 5 5 5

Labor Costs 369$ 415$ 459$ 503$ 523$ 543$ 536$ 549$ Non-Labor Costs 42 45 57 46 82 82 85 87 Total Costs 411$ 460$ 516$ 549$ 605$ 626$ 621$ 636$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 142$ 159$ 182$ 216$ 232$ 243$ 248$ 264$ So Cal Gas 173 197 214 251 263 257 257 264

Subtotal - Utility 315 356 396 467 495 500 505 528

Global/Retained 95 103 120 82 110 126 116 108

Total Allocations 410$ 459$ 516$ 549$ 605$ 626$ 621$ 636$

BILLED COSTS SDG&E 143$ 159$ 182$ 216$ 232$ 243$ 248$ 264$ So Cal Gas 173 198 214 251 263 257 257 264

Subtotal - Utility 316 357 396 467 495 500 505 528

Global/Retained 95 103 120 82 110 126 116 108

Total Billed Costs 411$ 460$ 516$ 549$ 605$ 626$ 621$ 636$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-165 GRC APPLICATION - December 2010

Page 168: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-7 Risk Management Witness: Bruce Folkmann

Cost Center: 1100-0121-ENERGY RISK MGMT VP

Workpaper: A-7.3

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 2 0 0 0 0 0 0 0

Labor Costs 309$ 107$ -$ -$ -$ -$ -$ -$ Non-Labor Costs 870 411 0 - - - - - Total Costs 1,178$ 517$ 0$ -$ -$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E (55)$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas (60) - - - - - - -

Subtotal - Utility (115) - - - - - - -

Global/Retained 772 360 - - - - - -

Total Direct Assignments 658$ 360$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 32$ 10$ -$ -$ -$ -$ -$ -$ So Cal Gas 35 - - - - - - -

Subtotal - Utility 68 10 - - - - - -

Global/Retained 453 147 0 - - - - -

Total Allocations 521$ 157$ 0$ -$ -$ -$ -$ -$

BILLED COSTS SDG&E (22)$ 10$ -$ -$ -$ -$ -$ -$ So Cal Gas (25) - - - - - - -

Subtotal - Utility (47) 10 - - - - - -

Global/Retained 1,225 508 0 - - - - -

Total Billed Costs 1,178$ 517$ 0$ -$ -$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-166 GRC APPLICATION - December 2010

Page 169: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-7 Risk Management Witness: Bruce Folkmann

Cost Center: 1100-0121-ENERGY RISK MGMT

Workpaper: A-7.3 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 2 0 0 0 0 0 0 0

Labor Costs 309$ 107$ -$ -$ -$ -$ -$ -$ Non-Labor Costs 870 411 0 - - - - - Total Costs 1,178$ 517$ 0$ -$ -$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E (55)$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas (60) - - - - - - -

Subtotal - Utility (115) - - - - - - -

Global/Retained 772 360 - - - - - -

Total Direct Assignments 658$ 360$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 32$ 10$ -$ -$ -$ -$ -$ -$ So Cal Gas 35 - - - - - - -

Subtotal - Utility 68 10 - - - - - -

Global/Retained 453 147 - - - - - -

Total Allocations 521$ 157$ -$ -$ -$ -$ -$ -$

BILLED COSTS SDG&E (22)$ 10$ -$ -$ -$ -$ -$ -$ So Cal Gas (25) - - - - - - -

Subtotal - Utility (47) 10 - - - - - -

Global/Retained 1,225 508 0 - - - - -

Total Billed Costs 1,178$ 517$ 0$ -$ -$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-167 GRC APPLICATION - December 2010

Page 170: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A Finance Witness: Bruce Folkmann

Cost Center: A-8 Financial Leadership Program

Workpaper: A-8

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 9 11 12 15 18 20 20 20

Labor Costs 443$ 386$ 664$ 1,056$ 1,077$ 1,191$ 1,231$ 1,231$ Non-Labor Costs 41 50 120 194 171 161 161 161 Total Costs 484$ 436$ 783$ 1,251$ 1,248$ 1,352$ 1,392$ 1,392$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ 15$ 10$ -$ -$ -$ So Cal Gas -$ -$ -$ 15$ 10$ -$ -$ -$

Subtotal - Utility - - - 30 20 - - -

Global/Retained -$ -$ -$ 13$ 8$ -$ -$ -$

Total Direct Assignments -$ -$ -$ 43$ 28$ -$ -$ -$

ALLOCATIONS SDG&E 168$ 151$ 276$ 475$ 468$ 525$ 556$ 578$ So Cal Gas 204 187 325 552 531 555 576 578

Subtotal - Utility 372 338 601 1,027 999 1,081 1,132 1,156

Global/Retained 112 98 181 181 221 271 261 236

Total Allocations 484$ 436$ 783$ 1,208$ 1,220$ 1,352$ 1,392$ 1,392$

BILLED COSTS SDG&E 168$ 151$ 276$ 490$ 478$ 525$ 556$ 578$ So Cal Gas 204 187 325 567 541 555 576 578

Subtotal - Utility 372 338 601 1,057 1,019 1,081 1,132 1,156

Global/Retained 112 98 182 194 229 271 261 236

Total Billed Costs 484$ 436$ 783$ 1,251$ 1,248$ 1,352$ 1,392$ 1,392$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-168 GRC APPLICATION - December 2010

Page 171: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 478$ 541$ 229$ 1,248$ 18

26 16 2 45

38 44 18 100 2

Change in Allocation 2009-2012 36 (23) (13) (0)

101$ 37$ 7$ 145$ 2

2012 - TEST YEAR 578$ 578$ 236$ 1,392$ 20

578$ 578$ 236$ 1,392$

- - - -

578$ 578$ 236$ 1,392$

A-8 Financial Leadership ProgramA-8 Recon

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

I CORPORATE CENTER SHARED SERVICESA Finance

Direct Assignments

TOTAL 2012 ALLOCATIONS

Full year impact of 2009 candidate turnover and internship program.

Two additional vacancies filled in 2010.

Allocations

Total Change from 2009

SDG&E-17-WP BAF-WP-169 GRC APPLICATION - December 2010

Page 172: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A Finance Witness: Bruce Folkmann

Cost Center: A-8 Financial Leadership Program

Workpaper: A-8 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 9 11 12 15 18 20 20 20

Labor Costs 443$ 386$ 664$ 1,056$ 1,077$ 1,212$ 1,284$ 1,315$ Non-Labor Costs 41 50 120 194 171 164 168 172 Total Costs 484$ 436$ 783$ 1,251$ 1,248$ 1,375$ 1,452$ 1,488$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ 15$ 10$ -$ -$ -$ So Cal Gas - - - 15 10 - - -

Subtotal - Utility - - - 30 20 - - -

Global/Retained - - - 13 8 - - -

Total Direct Assignments -$ -$ -$ 43$ 28$ -$ -$ -$

ALLOCATIONS SDG&E 168$ 151$ 276$ 475$ 468$ 534$ 580$ 618$ So Cal Gas 204 187 325 552 531 565 601 618

Subtotal - Utility 372 338 601 1,027 999 1,099 1,180 1,236

Global/Retained 112 98 181 181 221 276 272 252

Total Allocations 484$ 436$ 783$ 1,208$ 1,220$ 1,375$ 1,452$ 1,488$

BILLED COSTS SDG&E 168$ 151$ 276$ 490$ 478$ 534$ 580$ 618$ So Cal Gas 204 187 325 567 541 565 601 618

Subtotal - Utility 372 338 601 1,057 1,019 1,099 1,180 1,236

Global/Retained 112 98 182 194 229 276 272 252

Total Billed Costs 484$ 436$ 783$ 1,251$ 1,248$ 1,375$ 1,452$ 1,488$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-170 GRC APPLICATION - December 2010

Page 173: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-8 Financial Leadership Program Witness: Bruce Folkmann

Cost Center: 1100-0340-ACCTG & FINANCE ROTATION

Workpaper: A-8.1

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 9 11 12 15 18 20 20 20

Labor Costs 261$ 261$ 597$ 939$ 1,010$ 1,191$ 1,231$ 1,231$ Non-Labor Costs 30 49 94 191 149 161 161 161 Total Costs 291$ 309$ 690$ 1,130$ 1,159$ 1,352$ 1,392$ 1,392$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ 13$ 10$ -$ -$ -$ So Cal Gas - - - 14 10 - - -

Subtotal - Utility - - - 27 20 - - -

Global/Retained - - - 12 8 - - -

Total Direct Assignments -$ -$ -$ 39$ 28$ -$ -$ -$

ALLOCATIONS SDG&E 101$ 107$ 243$ 429$ 434$ 525$ 556$ 578$ So Cal Gas 123 133 287 498 492 555 576 578

Subtotal - Utility 224 240 530 927 926 1,081 1,132 1,156

Global/Retained 67 69 160 163 205 271 261 236

Total Allocations 291$ 309$ 690$ 1,090$ 1,131$ 1,352$ 1,392$ 1,392$

BILLED COSTS SDG&E 101$ 107$ 243$ 443$ 444$ 525$ 556$ 578$ So Cal Gas 123 133 287 512 502 555 576 578

Subtotal - Utility 224 240 530 954 946 1,081 1,132 1,156

Global/Retained 67 69 160 176 213 271 261 236

Total Billed Costs 291$ 309$ 690$ 1,130$ 1,159$ 1,352$ 1,392$ 1,392$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-171 GRC APPLICATION - December 2010

Page 174: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 444$ 502$ 213$ 1,159$ 18

60 55 18 133

38 44 18 100 2

Change in Allocation 2009-2012 36 (23) (13) (0)

135$ 76$ 23$ 233$ 2

2012 - TEST YEAR 578$ 578$ 236$ 1,392$ 20

41.54% 41.52% 16.94% 100.00%

578$ 578$ 236$ 1,392$

(0) (0) (0) (0)

578$ 578$ 236$ 1,392$

A FinanceA-8 Financial Leadership Program

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0340-ACCTG & FINANCE ROTATIONA-8.1 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Multi-Factor Basic

Allocations

Full year impact of 2009 candidate turnover and inclusion of internship program. (see Recon workpaper A-8.2).

Two additional vacancies filled in 2010.

SDG&E-17-WP BAF-WP-172 GRC APPLICATION - December 2010

Page 175: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-8 Financial Leadership Program Witness: Bruce Folkmann

Cost Center: 1100-0340-ACCTG & FINANCE ROTATION

Workpaper: A-8.1 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 9 11 12 15 18 20 20 20

Labor Costs 261$ 261$ 597$ 939$ 1,010$ 1,212$ 1,284$ 1,315$ Non-Labor Costs 30 49 94 191 149 164 168 172 Total Costs 291$ 309$ 690$ 1,130$ 1,159$ 1,375$ 1,452$ 1,488$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ 13$ 10$ -$ -$ -$ So Cal Gas - - - 14 10 - - -

Subtotal - Utility - - - 27 20 - - -

Global/Retained - - - 12 8 - - -

Total Direct Assignments -$ -$ -$ 39$ 28$ -$ -$ -$

ALLOCATIONS SDG&E 101$ 107$ 243$ 429$ 434$ 534$ 580$ 618$ So Cal Gas 123 133 287 498 492 565 601 618

Subtotal - Utility 224 240 530 927 926 1,099 1,180 1,236

Global/Retained 67 69 160 163 205 276 272 252

Total Allocations 291$ 309$ 690$ 1,090$ 1,131$ 1,375$ 1,452$ 1,488$

BILLED COSTS SDG&E 101$ 107$ 243$ 443$ 444$ 534$ 580$ 618$ So Cal Gas 123 133 287 512 502 565 601 618

Subtotal - Utility 224 240 530 954 946 1,099 1,180 1,236

Global/Retained 67 69 160 176 213 276 272 252

Total Billed Costs 291$ 309$ 690$ 1,130$ 1,159$ 1,375$ 1,452$ 1,488$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-173 GRC APPLICATION - December 2010

Page 176: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-8 Financial Leadership Program Witness: Bruce Folkmann

Cost Center: 1100-0344-ACCTG & FIN INTERNSHIP

Workpaper: A-8.2

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs 182$ 125$ 67$ 117$ 66$ -$ -$ -$ Non-Labor Costs 11 2 26 4 22 - - - Total Costs 193$ 127$ 93$ 121$ 89$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ 1$ -$ -$ -$ -$ So Cal Gas - - - 1 - - - -

Subtotal - Utility - - - 3 - - - -

Global/Retained - - - 1 - - - -

Total Direct Assignments -$ -$ -$ 3$ -$ -$ -$ -$

ALLOCATIONS SDG&E 67$ 44$ 33$ 46$ 34$ -$ -$ -$ So Cal Gas 81 54 39 54 39 - - -

Subtotal - Utility 148 98 71 100 73 - - -

Global/Retained 45 28 22 18 16 - - -

Total Allocations 193$ 127$ 93$ 118$ 89$ -$ -$ -$

BILLED COSTS SDG&E 67$ 44$ 33$ 48$ 34$ -$ -$ -$ So Cal Gas 81 54 39 55 39 - - -

Subtotal - Utility 148 98 71 103 73 - - -

Global/Retained 45 28 22 19 16 - - -

Total Billed Costs 193$ 127$ 93$ 121$ 89$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-174 GRC APPLICATION - December 2010

Page 177: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 34$ 39$ 16$ 89$ -

(34) (39) (16) (89)

Change in Allocation 2009-2012 - - - -

(34)$ (39)$ (16)$ (89)$ -

2012 - TEST YEAR -$ -$ -$ -$ -

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

Total Change from 2009

Program merged into cost center 1100-0340. (see Recon workpaper A-8.1).

A FinanceA-8 Financial Leadership Program1100-0344-ACCTG & FIN INTERNSHIPA-8.2 Recon

SDG&E-17-WP BAF-WP-175 GRC APPLICATION - December 2010

Page 178: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: A-8 Financial Leadership Program Witness: Bruce Folkmann

Cost Center: 1100-0344-ACCTG & FIN INTERNSHIP

Workpaper: A-8.2 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs 182$ 125$ 67$ 117$ 66$ -$ -$ -$ Non-Labor Costs 11 2 26 4 22 - - - Total Costs 193$ 127$ 93$ 121$ 89$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ 1$ -$ -$ -$ -$ So Cal Gas - - - 1 - - - -

Subtotal - Utility - - - 3 - - - -

Global/Retained - - - 1 - - - -

Total Direct Assignments -$ -$ -$ 3$ -$ -$ -$ -$

ALLOCATIONS SDG&E 67$ 44$ 33$ 46$ 34$ -$ -$ -$ So Cal Gas 81 54 39 54 39 - - -

Subtotal - Utility 148 98 71 100 73 - - -

Global/Retained 45 28 22 18 16 - - -

Total Allocations 193$ 127$ 93$ 118$ 89$ -$ -$ -$

BILLED COSTS SDG&E 67$ 44$ 33$ 48$ 34$ -$ -$ -$ So Cal Gas 81 54 39 55 39 - - -

Subtotal - Utility 148 98 71 103 73 - - -

Global/Retained 45 28 22 19 16 - - -

Total Billed Costs 193$ 127$ 93$ 121$ 89$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-176 GRC APPLICATION - December 2010

Page 179: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: I CORPORATE CENTER SHARED SERVICES Witness: Bruce Folkmann

Cost Center: B Governance

Workpaper: B

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 39 42 37 41 38 44 46 48

Labor Costs 6,563$ 6,298$ 6,326$ 6,457$ 6,014$ 6,424$ 6,444$ 6,594$ Non-Labor Costs 4,942 5,573 4,696 4,684 3,533 3,518 3,517 3,517 Total Costs 11,505$ 11,871$ 11,022$ 11,141$ 9,547$ 9,942$ 9,961$ 10,111$

DIRECT ASSIGNMENTS SDG&E 9$ (122)$ 36$ 29$ 44$ -$ -$ -$ So Cal Gas 10$ 538$ 197$ (27)$ 140$ -$ -$ -$

Subtotal - Utility 19 416 233 1 185 - - -

Global/Retained 103$ (330)$ 93$ 55$ 8$ 50$ 50$ 50$

Total Direct Assignments 123$ 86$ 326$ 56$ 193$ 50$ 50$ 50$

ALLOCATIONS SDG&E 2,416$ 2,557$ 1,878$ 2,598$ 2,373$ 2,698$ 2,794$ 2,914$ So Cal Gas 2,580 2,883 2,144 2,772 2,382 2,615 2,681 2,740

Subtotal - Utility 4,996 5,440 4,022 5,370 4,755 5,312 5,476 5,654

Global/Retained 6,386 6,345 6,674 5,715 4,599 4,580 4,436 4,408

Total Allocations 11,382$ 11,785$ 10,696$ 11,085$ 9,354$ 9,892$ 9,911$ 10,061$

BILLED COSTS SDG&E 2,425$ 2,435$ 1,914$ 2,626$ 2,417$ 2,698$ 2,794$ 2,914$ So Cal Gas 2,590 3,421 2,341 2,745 2,523 2,615 2,681 2,740

Subtotal - Utility 5,015 5,856 4,255 5,371 4,939 5,312 5,476 5,654

Global/Retained 6,490 6,015 6,767 5,770 4,608 4,630 4,486 4,458

Total Billed Costs 11,505$ 11,871$ 11,022$ 11,141$ 9,547$ 9,942$ 9,961$ 10,111$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-177 GRC APPLICATION - December 2010

Page 180: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 2,417$ 2,523$ 4,608$ 9,547$ 38

292 278 113 683 10

- - (168) (168)

- - 50 50

Change in Allocation 2009-2012 206 (60) (145) -

497$ 217$ (150)$ 564$ 10

2012 - TEST YEAR 2,914$ 2,740$ 4,458$ 10,111$ 48

2,914$ 2,740$ 4,408$ 10,062$

(0) (0) 50 50

2,914$ 2,740$ 4,458$ 10,111$

Non-recurring expenses in 2009

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

GRC TotalI CORPORATE CENTER SHARED SERVICES

Retained travel related to international board meetings.

Direct Assignments

TOTAL 2012 ALLOCATIONS

B GovernanceB Recon

Total Change from 2009

Allocations

Full year impact of staffing changes and filling vacancies.

SDG&E-17-WP BAF-WP-178 GRC APPLICATION - December 2010

Page 181: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Allocation Change for Utilities(2009 $000's)

Division: Governance Witness: Bruce A. Folkmann

SDG&E SOCALGAS Change

B-1.1 1100-0349-VP AUDIT SERVICES 14 (3) 11 B-1.2 1100-0041-AUDIT - FIN & OPS 35 (7) 29 B-1.3 1100-0453-AUDIT - FIN & OPS II 40 (4) 36 B-1.4 1100-0454-AUDIT - INFO TECH 32 (6) 26 B-1.5 1100-0380-ENVIRONMENTAL COMPLIANCE 17 (1) 16 B-1.6 1100-0050-AUDIT QUALITY ASSUR 6 (1) 5 B-1 Internal Audit 144 (22) 123

B-2.1 1100-0143-CORPORATE SECRETARY 21 (13) 8 B-2 Corporate Secretary 21 (13) 8

B-3.1 1100-0004-BOARD OF DIRECTORS 40 (25) 15 B-3 Board of Directors 40 (25) 15

B-4.1 1100-0003-CHAIRMAN & CEO - - 15 B-4.2 1100-0002-PRESIDENT & COO - - - B-4.3 1100-0011-EXECUTIVE VICE PRESIDENT - - - B-4.4 1100-0040-RETAINED EXECUTIVE COSTS - - - B-4.5 1100-0001-RETIRED CHAIRMAN - - - B-4.6 1100-0185-GROUP PRESIDENT FOR REGULATED - - - B-4 Executive - - -

Change in Allocation 2009-2012 206 (60) 145

Department / Cost Center

SDG&E-17-WP BAF-WP-179 GRC APPLICATION - December 2010

Page 182: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division: B Governance Witness: Bruce Folkmann

Workpaper: B - Esc Recon

This workpaper details the methodology used to escalate the 2012 Forecast stated in 2009 $'s in Testimony and in Workpapers

Department Summaries, A-G, to the 2012 $'s as shown in Testimony and in Workpapers Escalated Department Summaries A-G

A B C D E FLabor/ Standard Total

Standard Non-Standard Total Non-labor Escalated EscalatedCosts Costs Costs Indexes 2012 $'s Costs

(A + B) (A X D) (B + E)B-1 Internal Audit Labor 3,502$ -$ 3,502$ 1.0680 3,741$ 3,741$ Non-Labor 1,091 - 1,091 1.0727 1,171 1,171 Total 4,594 - 4,594 4,911 4,911

B-2 Corporate Secretary Labor 482 - 482 1.0680 515 515 Non-Labor 316 - 316 1.0727 339 339 Total 798 - 798 854 854

B-3 Board of Directors Labor - - - - - - Non-Labor 1,445 5 1,450 1.0727 1,550 1,555 Total 1,445 5 1,450 1,550 1,555

B-4 Executive Labor 2,609 - 2,609 1.0680 2,787 2,787 Non-Labor 660 - 660 1.0727 708 708 Total 3,269 - 3,269 3,495 3,495

Total Governance Labor 6,594 - 6,594 1.0680 7,042 7,042 Non-Labor 3,512 5 3,517 1.0727 3,768 3,773 Total 10,106$ 5$ 10,111$ 10,810$ 10,815$

2012 Forecast (in 2009 $'s) 2012 Forecast Escalated

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Escalation Reconciliation($000's)

SDG&E-17-WP BAF-WP-180 GRC APPLICATION - December 2010

Page 183: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: I CORPORATE CENTER SHARED SERVICES Witness: Bruce Folkmann

Cost Center: B Governance

Workpaper: B Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 39 42 37 41 38 44 46 48

Labor Costs 6,563$ 6,298$ 6,326$ 6,457$ 6,014$ 6,536$ 6,721$ 7,042$ Non-Labor Costs 4,942 5,573 4,696 4,684 3,533 3,583 3,671 3,773 Total Costs 11,505$ 11,871$ 11,022$ 11,141$ 9,547$ 10,119$ 10,392$ 10,815$

DIRECT ASSIGNMENTS SDG&E 9$ (122)$ 36$ 28$ 44$ -$ -$ -$ So Cal Gas 10 538 197 (27) 140 - - -

Subtotal - Utility 19 416 233 1 185 - - -

Global/Retained 103 (330) 93 55 8 51 52 54

Total Direct Assignments 123$ 86$ 326$ 56$ 193$ 51$ 52$ 54$

ALLOCATIONS SDG&E 2,416$ 2,557$ 1,878$ 2,598$ 2,373$ 2,746$ 2,915$ 3,118$ So Cal Gas 2,580 2,883 2,144 2,772 2,382 2,661 2,798 2,931

Subtotal - Utility 4,996 5,440 4,022 5,370 4,755 5,407 5,713 6,049

Global/Retained 6,386 6,345 6,674 5,715 4,599 4,661 4,627 4,713

Total Allocations 11,382$ 11,785$ 10,696$ 11,085$ 9,354$ 10,068$ 10,340$ 10,762$

BILLED COSTS SDG&E 2,425$ 2,435$ 1,914$ 2,626$ 2,417$ 2,746$ 2,915$ 3,118$ So Cal Gas 2,590 3,421 2,341 2,745 2,523 2,661 2,798 2,931

Subtotal - Utility 5,015 5,856 4,255 5,371 4,939 5,407 5,713 6,049

Global/Retained 6,490 6,015 6,767 5,770 4,608 4,712 4,679 4,766

Total Billed Costs 11,505$ 11,871$ 11,022$ 11,141$ 9,547$ 10,119$ 10,392$ 10,815$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-181 GRC APPLICATION - December 2010

Page 184: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: B Governance Witness: Bruce Folkmann

Cost Center: B-1 Internal Audit

Workpaper: B-1

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 28 34 29 32 31 35 37 39

Labor Costs 2,784$ 3,166$ 3,180$ 3,269$ 3,129$ 3,202$ 3,352$ 3,502$ Non-Labor Costs 1,398 2,534 1,338 1,798 1,056 1,092 1,091 1,091 Total Costs 4,182$ 5,700$ 4,518$ 5,068$ 4,185$ 4,294$ 4,444$ 4,594$

DIRECT ASSIGNMENTS SDG&E -$ (124)$ 32$ 44$ 43$ -$ -$ -$ So Cal Gas -$ 537$ 196$ (10)$ 139$ -$ -$ -$

Subtotal - Utility - 413 228 34 182 - - -

Global/Retained -$ (413)$ (225)$ (3)$ (174)$ -$ -$ -$

Total Direct Assignments -$ -$ 3$ 31$ 8$ -$ -$ -$

ALLOCATIONS SDG&E 1,267$ 1,693$ 1,317$ 1,883$ 1,636$ 1,843$ 1,917$ 2,001$ So Cal Gas 1,274 1,881 1,482 1,943 1,546 1,711 1,772 1,827

Subtotal - Utility 2,541 3,574 2,800 3,826 3,182 3,555 3,689 3,828

Global/Retained 1,641 2,126 1,716 1,210 995 740 755 766

Total Allocations 4,182$ 5,700$ 4,516$ 5,037$ 4,177$ 4,294$ 4,444$ 4,594$

BILLED COSTS SDG&E 1,267$ 1,569$ 1,350$ 1,927$ 1,679$ 1,843$ 1,917$ 2,001$ So Cal Gas 1,274 2,418 1,679 1,933 1,686 1,711 1,772 1,827

Subtotal - Utility 2,541 3,987 3,028 3,860 3,364 3,555 3,689 3,828

Global/Retained 1,641 1,713 1,490 1,207 821 740 755 766

Total Billed Costs 4,182$ 5,700$ 4,518$ 5,068$ 4,185$ 4,294$ 4,444$ 4,594$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-182 GRC APPLICATION - December 2010

Page 185: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 1,679$ 1,686$ 821$ 4,185$ 31

19 18 6 43 3

159 145 61 365 5

Change in Allocation 2009-2012 144 (22) (123) -

322$ 141$ (55)$ 408$ 8

2012 - TEST YEAR 2,001$ 1,827$ 766$ 4,594$ 39

2,001$ 1,827$ 766$ 4,594$

(0) (0) (0) (0)

2,001$ 1,827$ 766$ 4,594$

Direct Assignments

I CORPORATE CENTER SHARED SERVICESB Governance

TOTAL 2012 ALLOCATIONS

B-1 Internal AuditB-1 Recon

Total Change from 2009

Allocations

5 new hires in 2010-2012 to handle increased audit volume.

Full year impact of staff transfers and filling vacancies.

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

SDG&E-17-WP BAF-WP-183 GRC APPLICATION - December 2010

Page 186: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: B Governance Witness: Bruce Folkmann

Cost Center: B-1 Internal Audit

Workpaper: B-1 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 28 34 29 32 31 35 37 39

Labor Costs 2,784$ 3,166$ 3,180$ 3,269$ 3,129$ 3,258$ 3,497$ 3,741$ Non-Labor Costs 1,398 2,534 1,338 1,798 1,056 1,112 1,139 1,171 Total Costs 4,182$ 5,700$ 4,518$ 5,068$ 4,185$ 4,370$ 4,636$ 4,911$

DIRECT ASSIGNMENTS SDG&E -$ (124)$ 32$ 44$ 43$ -$ -$ -$ So Cal Gas - 537 196 (10) 139 - - -

Subtotal - Utility - 413 228 34 182 - - -

Global/Retained - (413) (225) (3) (174) - - -

Total Direct Assignments -$ -$ 3$ 31$ 8$ -$ -$ -$

ALLOCATIONS SDG&E 1,267$ 1,693$ 1,317$ 1,883$ 1,636$ 1,876$ 1,999$ 2,139$ So Cal Gas 1,274 1,881 1,482 1,943 1,546 1,742 1,849 1,953

Subtotal - Utility 2,541 3,574 2,800 3,826 3,182 3,617 3,848 4,092

Global/Retained 1,641 2,126 1,716 1,210 995 753 787 819

Total Allocations 4,182$ 5,700$ 4,516$ 5,037$ 4,177$ 4,370$ 4,636$ 4,911$

BILLED COSTS SDG&E 1,267$ 1,569$ 1,350$ 1,927$ 1,679$ 1,876$ 1,999$ 2,139$ So Cal Gas 1,274 2,418 1,679 1,933 1,686 1,742 1,849 1,953

Subtotal - Utility 2,541 3,987 3,028 3,860 3,364 3,617 3,848 4,092

Global/Retained 1,641 1,713 1,490 1,207 821 753 787 819

Total Billed Costs 4,182$ 5,700$ 4,518$ 5,068$ 4,185$ 4,370$ 4,636$ 4,911$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-184 GRC APPLICATION - December 2010

Page 187: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: B-1 Internal Audit Witness: Bruce Folkmann

Cost Center: 1100-0349-VP AUDIT SERVICES

Workpaper: B-1.1

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 2 3 2 3 2 2 2 2

Labor Costs 285$ 356$ 265$ 320$ 290$ 315$ 315$ 315$ Non-Labor Costs 73 103 99 225 133 121 121 121 Total Costs 357$ 458$ 364$ 545$ 424$ 436$ 436$ 436$

DIRECT ASSIGNMENTS SDG&E -$ (14)$ 6$ 2$ 3$ -$ -$ -$ So Cal Gas - 67 23 (4) 13 - - -

Subtotal - Utility - 53 29 (2) 17 - - -

Global/Retained - (53) (28) 2 (17) - - -

Total Direct Assignments -$ (0)$ 1$ 0$ 0$ -$ -$ -$

ALLOCATIONS SDG&E 105$ 133$ 100$ 213$ 167$ 187$ 188$ 190$ So Cal Gas 101 145 114 214 158 174 174 173

Subtotal - Utility 207 278 213 426 325 361 362 363

Global/Retained 151 181 150 118 99 75 74 73

Total Allocations 357$ 458$ 363$ 545$ 424$ 436$ 436$ 436$

BILLED COSTS SDG&E 105$ 119$ 106$ 215$ 170$ 187$ 188$ 190$ So Cal Gas 101 212 137 209 171 174 174 173

Subtotal - Utility 207 331 243 425 342 361 362 363

Global/Retained 151 128 122 121 82 75 74 73

Total Billed Costs 357$ 458$ 364$ 545$ 424$ 436$ 436$ 436$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-185 GRC APPLICATION - December 2010

Page 188: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 170$ 171$ 82$ 424$ 2

5 5 2 12

Change in Allocation 2009-2012 14 (3) (11) -

19$ 2$ (9)$ 12$ -

2012 - TEST YEAR 190$ 173$ 73$ 436$ 2

43.56% 39.77% 16.67% 100.00%

190$ 173$ 73$ 436$

(0) (0) (0) (0)

190$ 173$ 73$ 436$

B GovernanceB-1 Internal Audit

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0349-VP AUDIT SERVICESB-1.1 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Causal - Audit Plan

Allocations

Impact of staff succession in 2010 reorganization.

SDG&E-17-WP BAF-WP-186 GRC APPLICATION - December 2010

Page 189: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: B-1 Internal Audit Witness: Bruce Folkmann

Cost Center: 1100-0349-VP AUDIT SERVICES

Workpaper: B-1.1 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 2 3 2 3 2 2 2 2

Labor Costs 285$ 356$ 265$ 320$ 290$ 320$ 328$ 336$ Non-Labor Costs 73 103 99 225 133 123 126 130 Total Costs 357$ 458$ 364$ 545$ 424$ 443$ 454$ 466$

DIRECT ASSIGNMENTS SDG&E -$ (14)$ 6$ 2$ 3$ -$ -$ -$ So Cal Gas - 67 23 (4) 13 - - -

Subtotal - Utility - 53 29 (2) 17 - - -

Global/Retained - (53) (28) 2 (17) - - -

Total Direct Assignments -$ (0)$ 1$ 0$ 0$ -$ -$ -$

ALLOCATIONS SDG&E 105$ 133$ 100$ 213$ 167$ 190$ 196$ 203$ So Cal Gas 101 145 114 214 158 177 181 185

Subtotal - Utility 207 278 213 426 325 367 377 388

Global/Retained 151 181 150 118 99 76 77 78

Total Allocations 357$ 458$ 363$ 545$ 424$ 443$ 454$ 466$

BILLED COSTS SDG&E 105$ 119$ 106$ 215$ 170$ 190$ 196$ 203$ So Cal Gas 101 212 137 209 171 177 181 185

Subtotal - Utility 207 331 243 425 342 367 377 388

Global/Retained 151 128 122 121 82 76 77 78

Total Billed Costs 357$ 458$ 364$ 545$ 424$ 443$ 454$ 466$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-187 GRC APPLICATION - December 2010

Page 190: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: B-1 Internal Audit Witness: Bruce Folkmann

Cost Center: 1100-0041-AUDIT - FIN & OPS

Workpaper: B-1.2

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 23 26 22 8 6 9 11 13

Labor Costs 1,916$ 2,295$ 2,464$ 650$ 725$ 808$ 958$ 1,108$ Non-Labor Costs 1,271 2,238 927 373 338 346 346 346 Total Costs 3,187$ 4,534$ 3,391$ 1,022$ 1,063$ 1,154$ 1,304$ 1,454$

DIRECT ASSIGNMENTS SDG&E -$ (110)$ 26$ 55$ 10$ -$ -$ -$ So Cal Gas - 470 173 34 34 - - -

Subtotal - Utility - 360 199 89 44 - - -

Global/Retained - (360) (198) (89) (47) - - -

Total Direct Assignments -$ 0$ 2$ -$ (3)$ -$ -$ -$

ALLOCATIONS SDG&E 940$ 1,315$ 949$ 399$ 418$ 495$ 562$ 633$ So Cal Gas 904 1,432 1,051 401 395 460 520 578

Subtotal - Utility 1,844 2,747 2,000 800 813 955 1,082 1,211

Global/Retained 1,343 1,787 1,389 222 252 199 221 242

Total Allocations 3,187$ 4,534$ 3,389$ 1,022$ 1,066$ 1,154$ 1,304$ 1,454$

BILLED COSTS SDG&E 940$ 1,205$ 975$ 455$ 428$ 495$ 562$ 633$ So Cal Gas 904 1,902 1,224 435 429 460 520 578

Subtotal - Utility 1,844 3,107 2,199 890 857 955 1,082 1,211

Global/Retained 1,343 1,427 1,192 133 206 199 221 242

Total Billed Costs 3,187$ 4,534$ 3,391$ 1,022$ 1,063$ 1,154$ 1,304$ 1,454$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-188 GRC APPLICATION - December 2010

Page 191: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 428$ 429$ 206$ 1,063$ 6

159 145 61 365 5

11 11 4 26 2

Change in Allocation 2009-2012 35 (7) (29) -

205$ 149$ 36$ 391$ 7

2012 - TEST YEAR 633$ 578$ 242$ 1,454$ 13

43.56% 39.77% 16.67% 100.00%

633$ 578$ 242$ 1,454$

(0) (0) (0) (0)

633$ 578$ 242$ 1,454$

2 replacement positions in 2012 to fill positions vacated in late 2009.

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

B GovernanceB-1 Internal Audit1100-0041-AUDIT - FIN & OPSB-1.2 Recon

5 new hires in 2010-2012 to handle increased audit volume.

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Causal - Audit Plan

Allocations

SDG&E-17-WP BAF-WP-189 GRC APPLICATION - December 2010

Page 192: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: B-1 Internal Audit Witness: Bruce Folkmann

Cost Center: 1100-0041-AUDIT - FIN & OPS

Workpaper: B-1.2 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 23 26 22 8 6 9 11 13

Labor Costs 1,916$ 2,295$ 2,464$ 650$ 725$ 822$ 999$ 1,183$ Non-Labor Costs 1,271 2,238 927 373 338 353 361 371 Total Costs 3,187$ 4,534$ 3,391$ 1,022$ 1,063$ 1,174$ 1,360$ 1,554$

DIRECT ASSIGNMENTS SDG&E -$ (110)$ 26$ 55$ 10$ -$ -$ -$ So Cal Gas - 470 173 34 34 - - -

Subtotal - Utility - 360 199 89 44 - - -

Global/Retained - (360) (198) (89) (47) - - -

Total Direct Assignments -$ 0$ 2$ -$ (3)$ -$ -$ -$

ALLOCATIONS SDG&E 940$ 1,315$ 949$ 399$ 418$ 504$ 587$ 677$ So Cal Gas 904 1,432 1,051 401 395 468 542 618

Subtotal - Utility 1,844 2,747 2,000 800 813 972 1,129 1,295

Global/Retained 1,343 1,787 1,389 222 252 202 231 259

Total Allocations 3,187$ 4,534$ 3,389$ 1,022$ 1,066$ 1,174$ 1,360$ 1,554$

BILLED COSTS SDG&E 940$ 1,205$ 975$ 455$ 428$ 504$ 587$ 677$ So Cal Gas 904 1,902 1,224 435 429 468 542 618

Subtotal - Utility 1,844 3,107 2,199 890 857 972 1,129 1,295

Global/Retained 1,343 1,427 1,192 133 206 202 231 259

Total Billed Costs 3,187$ 4,534$ 3,391$ 1,022$ 1,063$ 1,174$ 1,360$ 1,554$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-190 GRC APPLICATION - December 2010

Page 193: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: B-1 Internal Audit Witness: Bruce Folkmann

Cost Center: 1100-0453-AUDIT - FIN & OPS II

Workpaper: B-1.3

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 8 8 9 9 9

Labor Costs -$ -$ -$ 668$ 846$ 743$ 743$ 743$ Non-Labor Costs - - - 424 282 331 331 331 Total Costs -$ -$ -$ 1,092$ 1,128$ 1,074$ 1,074$ 1,074$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ (7)$ 12$ -$ -$ -$ So Cal Gas - - - (18) 38 - - -

Subtotal - Utility - - - (25) 49 - - -

Global/Retained - - - 44 (42) - - -

Total Direct Assignments -$ -$ -$ 19$ 7$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ 419$ 439$ 461$ 463$ 468$ So Cal Gas - - - 421 415 428 428 427

Subtotal - Utility - - - 840 854 889 891 895

Global/Retained - - - 233 267 185 182 179

Total Allocations -$ -$ -$ 1,073$ 1,121$ 1,074$ 1,074$ 1,074$

BILLED COSTS SDG&E -$ -$ -$ 412$ 451$ 461$ 463$ 468$ So Cal Gas - - - 403 452 428 428 427

Subtotal - Utility - - - 814 903 889 891 895

Global/Retained - - - 277 225 185 182 179

Total Billed Costs -$ -$ -$ 1,092$ 1,128$ 1,074$ 1,074$ 1,074$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-191 GRC APPLICATION - December 2010

Page 194: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 451$ 452$ 225$ 1,128$ 8

(23) (21) (10) (54) 1

Change in Allocation 2009-2012 40 (4) (36) -

17$ (25)$ (46)$ (54)$ 1

2012 - TEST YEAR 468$ 427$ 179$ 1,074$ 9

43.56% 39.77% 16.67% 100.00%

468$ 427$ 179$ 1,074$

(0) (0) (0) (0)

468$ 427$ 179$ 1,074$

B GovernanceB-1 Internal Audit

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0453-AUDIT - FIN & OPS IIB-1.3 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Causal - Audit Plan

Allocations

Full year impact of staff transfer in 2009. (see Recon workpaper B-1.4).

SDG&E-17-WP BAF-WP-192 GRC APPLICATION - December 2010

Page 195: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: B-1 Internal Audit Witness: Bruce Folkmann

Cost Center: 1100-0453-AUDIT - FIN & OPS II

Workpaper: B-1.3 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 8 8 9 9 9

Labor Costs -$ -$ -$ 668$ 846$ 756$ 775$ 793$ Non-Labor Costs - - - 424 282 337 345 355 Total Costs -$ -$ -$ 1,092$ 1,128$ 1,093$ 1,120$ 1,148$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ (7)$ 12$ -$ -$ -$ So Cal Gas - - - (18) 38 - - -

Subtotal - Utility - - - (25) 49 - - -

Global/Retained - - - 44 (42) - - -

Total Direct Assignments -$ -$ -$ 19$ 7$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ 419$ 439$ 469$ 483$ 500$ So Cal Gas - - - 421 415 435 447 457

Subtotal - Utility - - - 840 854 904 930 957

Global/Retained - - - 233 267 188 190 191

Total Allocations -$ -$ -$ 1,073$ 1,121$ 1,093$ 1,120$ 1,148$

BILLED COSTS SDG&E -$ -$ -$ 412$ 451$ 469$ 483$ 500$ So Cal Gas - - - 403 452 435 447 457

Subtotal - Utility - - - 814 903 904 930 957

Global/Retained - - - 277 225 188 190 191

Total Billed Costs -$ -$ -$ 1,092$ 1,128$ 1,093$ 1,120$ 1,148$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-193 GRC APPLICATION - December 2010

Page 196: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: B-1 Internal Audit Witness: Bruce Folkmann

Cost Center: 1100-0454-AUDIT - INFO TECH

Workpaper: B-1.4

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 8 7 7 7 7

Labor Costs -$ -$ -$ 919$ 769$ 777$ 777$ 777$ Non-Labor Costs - - - 371 155 208 208 208 Total Costs -$ -$ -$ 1,290$ 924$ 985$ 985$ 985$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ (9)$ 9$ -$ -$ -$ So Cal Gas - - - (22) 32 - - -

Subtotal - Utility - - - (31) 41 - - -

Global/Retained - - - 40 (41) - - -

Total Direct Assignments -$ -$ -$ 9$ (0)$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ 477$ 361$ 423$ 425$ 429$ So Cal Gas - - - 479 342 392 393 392

Subtotal - Utility - - - 956 703 815 817 820

Global/Retained - - - 326 221 170 167 164

Total Allocations -$ -$ -$ 1,281$ 924$ 985$ 985$ 985$

BILLED COSTS SDG&E -$ -$ -$ 468$ 371$ 423$ 425$ 429$ So Cal Gas - - - 457 373 392 393 392

Subtotal - Utility - - - 925 744 815 817 820

Global/Retained - - - 365 180 170 167 164

Total Billed Costs -$ -$ -$ 1,290$ 924$ 985$ 985$ 985$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-194 GRC APPLICATION - December 2010

Page 197: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 371$ 373$ 180$ 924$ 7

26 24 10 61

Change in Allocation 2009-2012 32 (6) (26) -

58$ 18$ (16)$ 61$ -

2012 - TEST YEAR 429$ 392$ 164$ 985$ 7

43.56% 39.77% 16.67% 100.00%

429$ 392$ 164$ 985$

(0) (0) (0) (0)

429$ 392$ 164$ 985$

B GovernanceB-1 Internal Audit

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0454-AUDIT - INFO TECHB-1.4 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Causal - Audit Plan

Allocations

Full year impact of staff transfer in 2009. (see Recon workpaper B-1.3).

SDG&E-17-WP BAF-WP-195 GRC APPLICATION - December 2010

Page 198: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: B-1 Internal Audit Witness: Bruce Folkmann

Cost Center: 1100-0454-AUDIT - INFO TECH

Workpaper: B-1.4 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 8 7 7 7 7

Labor Costs -$ -$ -$ 919$ 769$ 790$ 810$ 830$ Non-Labor Costs - - - 371 155 212 217 223 Total Costs -$ -$ -$ 1,290$ 924$ 1,002$ 1,027$ 1,053$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ (9)$ 9$ -$ -$ -$ So Cal Gas - - - (22) 32 - - -

Subtotal - Utility - - - (31) 41 - - -

Global/Retained - - - 40 (41) - - -

Total Direct Assignments -$ -$ -$ 9$ (0)$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ 477$ 361$ 430$ 443$ 458$ So Cal Gas - - - 479 342 399 410 419

Subtotal - Utility - - - 956 703 830 853 877

Global/Retained - - - 326 221 173 174 175

Total Allocations -$ -$ -$ 1,281$ 924$ 1,002$ 1,027$ 1,053$

BILLED COSTS SDG&E -$ -$ -$ 468$ 371$ 430$ 443$ 458$ So Cal Gas - - - 457 373 399 410 419

Subtotal - Utility - - - 925 744 830 853 877

Global/Retained - - - 365 180 173 174 175

Total Billed Costs -$ -$ -$ 1,290$ 924$ 1,002$ 1,027$ 1,053$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-196 GRC APPLICATION - December 2010

Page 199: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: B-1 Internal Audit Witness: Bruce Folkmann

Cost Center: 1100-0380-ENVIRONMENTAL COMPLIANCE

Workpaper: B-1.5

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 3 5 5 5 5 5 5 5

Labor Costs 584$ 515$ 451$ 712$ 352$ 410$ 410$ 410$ Non-Labor Costs 54 193 312 406 129 59 59 59 Total Costs 638$ 708$ 763$ 1,118$ 480$ 469$ 469$ 469$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ 3$ 6$ -$ -$ -$ So Cal Gas - - - - 17 - - -

Subtotal - Utility - - - 3 23 - - -

Global/Retained - - - - (20) - - -

Total Direct Assignments -$ -$ -$ 3$ 3$ -$ -$ -$

ALLOCATIONS SDG&E 221$ 245$ 269$ 375$ 186$ 201$ 202$ 204$ So Cal Gas 269 304 317 429 175 187 187 186

Subtotal - Utility 490 549 586 804 361 388 389 391

Global/Retained 148 159 177 311 116 81 80 78

Total Allocations 638$ 708$ 763$ 1,115$ 477$ 469$ 469$ 469$

BILLED COSTS SDG&E 221$ 245$ 269$ 378$ 192$ 201$ 202$ 204$ So Cal Gas 269 304 317 429 193 187 187 186

Subtotal - Utility 490 549 586 807 384 388 389 391

Global/Retained 148 159 177 311 96 81 80 78

Total Billed Costs 638$ 708$ 763$ 1,118$ 480$ 469$ 469$ 469$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-197 GRC APPLICATION - December 2010

Page 200: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 192$ 193$ 96$ 480$ 5

(5) (5) (2) (12)

Change in Allocation 2009-2012 17 (1) (16) -

12$ (6)$ (18)$ (12)$ -

2012 - TEST YEAR 204$ 186$ 78$ 469$ 5

43.56% 39.77% 16.67% 100.00%

204$ 186$ 78$ 469$

(0) (0) (0) (0)

204$ 186$ 78$ 469$

B GovernanceB-1 Internal Audit

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0380-ENVIRONMENTAL COMPLIANCEB-1.5 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Causal - Audit Plan

Allocations

Shift contract labor to cost center 1100-0050. (see Recon workpaper B-1.6)

SDG&E-17-WP BAF-WP-198 GRC APPLICATION - December 2010

Page 201: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: B-1 Internal Audit Witness: Bruce Folkmann

Cost Center: 1100-0380-ENVIRONMENTAL COMPLIANCE

Workpaper: B-1.5 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 3 5 5 5 5 5 5 5

Labor Costs 584$ 515$ 451$ 712$ 352$ 417$ 428$ 438$ Non-Labor Costs 54 193 312 406 129 60 61 63 Total Costs 638$ 708$ 763$ 1,118$ 480$ 477$ 489$ 501$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ 3$ 6$ -$ -$ -$ So Cal Gas - - - - 17 - - -

Subtotal - Utility - - - 3 23 - - -

Global/Retained - - - - (20) - - -

Total Direct Assignments -$ -$ -$ 3$ 3$ -$ -$ -$

ALLOCATIONS SDG&E 221$ 245$ 269$ 375$ 186$ 205$ 211$ 218$ So Cal Gas 269 304 317 429 175 190 195 199

Subtotal - Utility 490 549 586 804 361 395 406 417

Global/Retained 148 159 177 311 116 82 83 84

Total Allocations 638$ 708$ 763$ 1,115$ 477$ 477$ 489$ 501$

BILLED COSTS SDG&E 221$ 245$ 269$ 378$ 192$ 205$ 211$ 218$ So Cal Gas 269 304 317 429 193 190 195 199

Subtotal - Utility 490 549 586 807 384 395 406 417

Global/Retained 148 159 177 311 96 82 83 84

Total Billed Costs 638$ 708$ 763$ 1,118$ 480$ 477$ 489$ 501$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-199 GRC APPLICATION - December 2010

Page 202: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: B-1 Internal Audit Witness: Bruce Folkmann

Cost Center: 1100-0050-AUDIT QUALITY ASSUR

Workpaper: B-1.6

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 3 3 3 3

Labor Costs -$ -$ -$ -$ 147$ 150$ 150$ 150$ Non-Labor Costs - - - - 19 27 27 27 Total Costs -$ -$ -$ -$ 167$ 177$ 177$ 177$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ 2$ -$ -$ -$ So Cal Gas - - - - 6 - - -

Subtotal - Utility - - - - 8 - - -

Global/Retained - - - - (7) - - -

Total Direct Assignments -$ -$ -$ -$ 1$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ 65$ 76$ 76$ 77$ So Cal Gas - - - - 61 71 71 71

Subtotal - Utility - - - - 126 147 147 148

Global/Retained - - - - 39 31 30 30

Total Allocations -$ -$ -$ -$ 166$ 177$ 177$ 177$

BILLED COSTS SDG&E -$ -$ -$ -$ 67$ 76$ 76$ 77$ So Cal Gas - - - - 67 71 71 71

Subtotal - Utility - - - - 134 147 147 148

Global/Retained - - - - 33 31 30 30

Total Billed Costs -$ -$ -$ -$ 167$ 177$ 177$ 177$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-200 GRC APPLICATION - December 2010

Page 203: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 67$ 67$ 33$ 167$ 3

4 4 2 10

Change in Allocation 2009-2012 6 (1) (5) -

10$ 3$ (3)$ 10$ -

2012 - TEST YEAR 77$ 71$ 30$ 177$ 3

43.56% 39.77% 16.67% 100.00%

77$ 71$ 30$ 177$

(0) (0) (0) (0)

77$ 71$ 30$ 177$

B GovernanceB-1 Internal Audit

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0050-AUDIT QUALITY ASSURB-1.6 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Causal - Audit Plan

Allocations

Contract labor realigned from cost center 1100-0380. (see Recon workpaper B-1.5)

SDG&E-17-WP BAF-WP-201 GRC APPLICATION - December 2010

Page 204: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: B-1 Internal Audit Witness: Bruce Folkmann

Cost Center: 1100-0050-AUDIT QUALITY ASSUR

Workpaper: B-1.6 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 3 3 3 3

Labor Costs -$ -$ -$ -$ 147$ 153$ 157$ 160$ Non-Labor Costs - - - - 19 28 28 29 Total Costs -$ -$ -$ -$ 167$ 180$ 185$ 190$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ 2$ -$ -$ -$ So Cal Gas - - - - 6 - - -

Subtotal - Utility - - - - 8 - - -

Global/Retained - - - - (7) - - -

Total Direct Assignments -$ -$ -$ -$ 1$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ 65$ 77$ 80$ 83$ So Cal Gas - - - - 61 72 74 75

Subtotal - Utility - - - - 126 149 154 158

Global/Retained - - - - 39 31 31 32

Total Allocations -$ -$ -$ -$ 166$ 180$ 185$ 190$

BILLED COSTS SDG&E -$ -$ -$ -$ 67$ 77$ 80$ 83$ So Cal Gas - - - - 67 72 74 75

Subtotal - Utility - - - - 134 149 154 158

Global/Retained - - - - 33 31 31 32

Total Billed Costs -$ -$ -$ -$ 167$ 180$ 185$ 190$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-202 GRC APPLICATION - December 2010

Page 205: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: B-2 Corporate Secretary Witness: Bruce Folkmann

Cost Center: 1100-0143-CORPORATE SECRETARY

Workpaper: B-2.1

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 3 2 2 3 3 3 3 3

Labor Costs 173$ 189$ 231$ 189$ 481$ 482$ 482$ 482$ Non-Labor Costs 195 238 208 245 269 316 316 316 Total Costs 368$ 427$ 438$ 434$ 749$ 798$ 798$ 798$

DIRECT ASSIGNMENTS SDG&E 1$ 2$ 3$ 3$ 2$ -$ -$ -$ So Cal Gas 1 1 1 2 1 - - -

Subtotal - Utility 2 3 4 5 3 - - -

Global/Retained 95 83 69 109 90 (0) - -

Total Direct Assignments 97$ 86$ 72$ 113$ 93$ (0)$ -$ -$

ALLOCATIONS SDG&E 94$ 118$ 129$ 126$ 252$ 310$ 319$ 332$ So Cal Gas 114 146 152 147 286 328 330 332

Subtotal - Utility 208 264 281 273 537 638 649 663

Global/Retained 63 76 85 48 119 160 149 135

Total Allocations 271$ 341$ 366$ 321$ 656$ 798$ 798$ 798$

BILLED COSTS SDG&E 96$ 120$ 132$ 129$ 253$ 310$ 319$ 332$ So Cal Gas 115 148 153 149 287 328 330 332

Subtotal - Utility 211 268 285 277 540 638 649 663

Global/Retained 158 159 154 157 209 160 149 135

Total Billed Costs 368$ 427$ 438$ 434$ 749$ 798$ 798$ 798$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-203 GRC APPLICATION - December 2010

Page 206: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 253$ 287$ 209$ 749$ 3

57 58 23 139

- - (89) (89)

Change in Allocation 2009-2012 21 (13) (8) 0

78$ 45$ (74)$ 49$ -

2012 - TEST YEAR 332$ 332$ 135$ 798$ 3

41.54% 41.52% 16.94% 100.00%

332$ 332$ 135$ 798$

- - - -

332$ 332$ 135$ 798$

B GovernanceB-2 Corporate Secretary

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0143-CORPORATE SECRETARYB-2.1 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Multi-Factor Basic

Allocations

Increased direct administrative responsibilities as a result of the 2010 reorganization.

Net change in direct charges.

SDG&E-17-WP BAF-WP-204 GRC APPLICATION - December 2010

Page 207: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: B-2 Corporate Secretary Witness: Bruce Folkmann

Cost Center: 1100-0143-CORPORATE SECRETARY

Workpaper: B-2.1 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 3 2 2 3 3 3 3 3

Labor Costs 173$ 189$ 231$ 189$ 481$ 491$ 503$ 515$ Non-Labor Costs 195 238 208 245 269 322 330 339 Total Costs 368$ 427$ 438$ 434$ 749$ 813$ 833$ 854$

DIRECT ASSIGNMENTS SDG&E 1$ 2$ 3$ 3$ 2$ -$ -$ -$ So Cal Gas 1 1 1 2 1 - - -

Subtotal - Utility 2 3 4 5 3 - - -

Global/Retained 95 83 69 109 90 - - -

Total Direct Assignments 97$ 86$ 72$ 113$ 93$ -$ -$ -$

ALLOCATIONS SDG&E 94$ 118$ 129$ 126$ 252$ 316$ 333$ 355$ So Cal Gas 114 146 152 147 286 334 345 355

Subtotal - Utility 208 264 281 273 537 650 677 710

Global/Retained 63 76 85 48 119 163 156 145

Total Allocations 271$ 341$ 366$ 321$ 656$ 813$ 833$ 854$

BILLED COSTS SDG&E 96$ 120$ 132$ 129$ 253$ 316$ 333$ 355$ So Cal Gas 115 148 153 149 287 334 345 355

Subtotal - Utility 211 268 285 277 540 650 677 710

Global/Retained 158 159 154 157 209 163 156 145

Total Billed Costs 368$ 427$ 438$ 434$ 749$ 813$ 833$ 854$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-205 GRC APPLICATION - December 2010

Page 208: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: B-3 Board of Directors Witness: Bruce Folkmann

Cost Center: 1100-0004-BOARD OF DIRECTORS

Workpaper: B-3.1

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ 51$ -$ -$ -$ -$ -$ Non-Labor Costs 1,852 1,325 1,245 1,495 1,264 1,450 1,450 1,450 Total Costs 1,852$ 1,325$ 1,296$ 1,495$ 1,264$ 1,450$ 1,450$ 1,450$

DIRECT ASSIGNMENTS SDG&E 2$ -$ 0$ -$ -$ -$ -$ -$ So Cal Gas 3 - 0 - - - - -

Subtotal - Utility 5 - 1 - - - - -

Global/Retained 1 - 69 - - 50 50 50

Total Direct Assignments 6$ -$ 69$ -$ -$ 50$ 50$ 50$

ALLOCATIONS SDG&E 641$ 459$ 432$ 588$ 485$ 544$ 559$ 582$ So Cal Gas 777 569 509 683 550 575 579 581

Subtotal - Utility 1,418 1,028 941 1,271 1,035 1,119 1,138 1,163

Global/Retained 428 297 286 224 229 281 262 237

Total Allocations 1,846$ 1,325$ 1,227$ 1,495$ 1,264$ 1,400$ 1,400$ 1,400$

BILLED COSTS SDG&E 643$ 459$ 432$ 588$ 485$ 544$ 559$ 582$ So Cal Gas 780 569 509 683 550 575 579 581

Subtotal - Utility 1,423 1,028 941 1,271 1,035 1,119 1,138 1,163

Global/Retained 429 297 355 224 229 331 312 287

Total Billed Costs 1,852$ 1,325$ 1,296$ 1,495$ 1,264$ 1,450$ 1,450$ 1,450$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-206 GRC APPLICATION - December 2010

Page 209: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 485$ 550$ 229$ 1,264$ -

56 56 23 136

- - 50 50

Change in Allocation 2009-2012 40 (25) (15) 0

97$ 31$ 58$ 186$ -

2012 - TEST YEAR 582$ 581$ 287$ 1,450$ -

41.54% 41.52% 16.94% 100.00%

582$ 581$ 237$ 1,400$

- - 50 50

582$ 581$ 287$ 1,450$

Direct Assignment DetailsInternational travel related to board - - 50 50 meetings. -$ -$ 50$ 50$

Retained travel related to international board meetings.

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

B GovernanceB-3 Board of Directors1100-0004-BOARD OF DIRECTORSB-3.1 Recon

Increased direct administrative responsibilities as a result of the 2010 reorganization.

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Multi-Factor Basic

Allocations

SDG&E-17-WP BAF-WP-207 GRC APPLICATION - December 2010

Page 210: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: B-3 Board of Directors Witness: Bruce Folkmann

Cost Center: 1100-0004-BOARD OF DIRECTORS

Workpaper: B-3.1 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ 51$ -$ -$ -$ -$ -$ Non-Labor Costs 1,852 1,325 1,245 1,495 1,264 1,477 1,513 1,555 Total Costs 1,852$ 1,325$ 1,296$ 1,495$ 1,264$ 1,477$ 1,513$ 1,555$

DIRECT ASSIGNMENTS SDG&E 2$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas 3 - - - - - - -

Subtotal - Utility 5 - - - - - - -

Global/Retained 1 - 69 - - 51 52 54

Total Direct Assignments 6$ -$ 69$ -$ -$ 51$ 52$ 54$

ALLOCATIONS SDG&E 641$ 459$ 432$ 588$ 485$ 554$ 583$ 624$ So Cal Gas 777 569 509 683 550 586 604 623

Subtotal - Utility 1,418 1,028 941 1,271 1,035 1,140 1,188 1,247

Global/Retained 428 297 286 224 229 286 273 254

Total Allocations 1,846$ 1,325$ 1,227$ 1,495$ 1,264$ 1,426$ 1,461$ 1,501$

BILLED COSTS SDG&E 643$ 459$ 432$ 588$ 485$ 554$ 583$ 624$ So Cal Gas 780 569 509 683 550 586 604 623

Subtotal - Utility 1,423 1,028 941 1,271 1,035 1,140 1,188 1,247

Global/Retained 429 297 355 224 229 337 326 308

Total Billed Costs 1,852$ 1,325$ 1,296$ 1,495$ 1,264$ 1,477$ 1,513$ 1,555$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-208 GRC APPLICATION - December 2010

Page 211: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: B Governance Witness: Bruce Folkmann

Cost Center: B-4 Executive

Workpaper: B-4

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 8 6 6 6 4 6 6 6

Labor Costs 3,605$ 2,944$ 2,864$ 2,999$ 2,404$ 2,740$ 2,609$ 2,609$ Non-Labor Costs 1,497 1,475 1,905 1,146 944 660 660 660 Total Costs 5,102$ 4,419$ 4,769$ 4,145$ 3,348$ 3,400$ 3,269$ 3,269$

DIRECT ASSIGNMENTS SDG&E 6$ -$ -$ (18)$ -$ -$ -$ -$ So Cal Gas 7$ -$ -$ (20)$ -$ -$ -$ -$

Subtotal - Utility 12 - - (38) - - - -

Global/Retained 7$ -$ 181$ (50)$ 92$ -$ -$ -$

Total Direct Assignments 20$ -$ 181$ (88)$ 92$ -$ -$ -$

ALLOCATIONS SDG&E 414$ 287$ -$ -$ -$ -$ -$ -$ So Cal Gas 414 287 - - - - - -

Subtotal - Utility 828 574 - - - - - -

Global/Retained 4,255 3,845 4,588 4,233 3,256 3,400 3,269 3,269

Total Allocations 5,083$ 4,419$ 4,588$ 4,233$ 3,256$ 3,400$ 3,269$ 3,269$

BILLED COSTS SDG&E 420$ 287$ 0$ (18)$ -$ -$ -$ -$ So Cal Gas 421 287 0 (20) - - - -

Subtotal - Utility 840 574 0 (38) - - - -

Global/Retained 4,262 3,845 4,769 4,182 3,348 3,400 3,269 3,269

Total Billed Costs 5,102$ 4,419$ 4,769$ 4,145$ 3,348$ 3,400$ 3,269$ 3,269$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-209 GRC APPLICATION - December 2010

Page 212: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR -$ -$ 3,348$ 3,348$ 4

- - (79) (79) 2

Change in Allocation 2009-2012 - - - -

-$ -$ (79)$ (79)$ 2

2012 - TEST YEAR -$ -$ 3,269$ 3,269$ 6

0$ 0$ 3,269$ 3,269$

(0) (0) (0) (0)

-$ -$ 3,269$ 3,269$ TOTAL 2012 ALLOCATIONS

B-4 ExecutiveB-4 Recon

Total Change from 2009

Allocations

Non-recurring expenses in 2009, net of addition of Executive Vice President.

I CORPORATE CENTER SHARED SERVICESB Governance

Direct Assignments

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

SDG&E-17-WP BAF-WP-210 GRC APPLICATION - December 2010

Page 213: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: B Governance Witness: Bruce Folkmann

Cost Center: B-4 Executive

Workpaper: B-4 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 8 6 6 6 4 6 6 6

Labor Costs 3,605$ 2,944$ 2,864$ 2,999$ 2,404$ 2,787$ 2,721$ 2,787$ Non-Labor Costs 1,497 1,475 1,905 1,146 944 672 689 708 Total Costs 5,102$ 4,419$ 4,769$ 4,145$ 3,348$ 3,459$ 3,410$ 3,495$

DIRECT ASSIGNMENTS SDG&E 6$ -$ -$ (18)$ -$ -$ -$ -$ So Cal Gas 7 - - (20) - - - -

Subtotal - Utility 12 - - (38) - - - -

Global/Retained 7 - 181 (50) 92 - - -

Total Direct Assignments 20$ -$ 181$ (88)$ 92$ -$ -$ -$

ALLOCATIONS SDG&E 414$ 287$ -$ -$ -$ -$ -$ -$ So Cal Gas 414 287 - - - - - -

Subtotal - Utility 828 574 - - - - - -

Global/Retained 4,255 3,845 4,588 4,233 3,256 3,459 3,410 3,495

Total Allocations 5,083$ 4,419$ 4,588$ 4,233$ 3,256$ 3,459$ 3,410$ 3,495$

BILLED COSTS SDG&E 420$ 287$ 0$ (18)$ -$ -$ -$ -$ So Cal Gas 421 287 0 (20) - - - -

Subtotal - Utility 840 574 0 (38) - - - -

Global/Retained 4,262 3,845 4,769 4,182 3,348 3,459 3,410 3,495

Total Billed Costs 5,102$ 4,419$ 4,769$ 4,145$ 3,348$ 3,459$ 3,410$ 3,495$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-211 GRC APPLICATION - December 2010

Page 214: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: B-4 Executive Witness: Bruce Folkmann

Cost Center: 1100-0003-CHAIRMAN & CEO

Workpaper: B-4.1

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 2 2 2 2 2 2 2 2

Labor Costs 1,497$ 1,336$ 1,137$ 1,379$ 1,279$ 1,445$ 1,195$ 1,195$ Non-Labor Costs 918 1,073 1,222 422 312 299 299 299 Total Costs 2,415$ 2,409$ 2,359$ 1,800$ 1,591$ 1,744$ 1,494$ 1,494$

DIRECT ASSIGNMENTS SDG&E 2$ -$ -$ (18)$ -$ -$ -$ -$ So Cal Gas 2 - - (20) - - - -

Subtotal - Utility 4 - - (38) - - - -

Global/Retained 1 - 85 (39) - - - -

Total Direct Assignments 6$ -$ 85$ (77)$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 2,409 2,409 2,274 1,877 1,591 1,744 1,494 1,494

Total Allocations 2,409$ 2,409$ 2,274$ 1,877$ 1,591$ 1,744$ 1,494$ 1,494$

BILLED COSTS SDG&E 2$ -$ -$ (18)$ -$ -$ -$ -$ So Cal Gas 2 - - (20) - - - -

Subtotal - Utility 4 - - (38) - - - -

Global/Retained 2,411 2,409 2,359 1,838 1,591 1,744 1,494 1,494

Total Billed Costs 2,415$ 2,409$ 2,359$ 1,800$ 1,591$ 1,744$ 1,494$ 1,494$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-212 GRC APPLICATION - December 2010

Page 215: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR -$ -$ 1,591$ 1,591$ 2

- - (97) (97)

Change in Allocation 2009-2012 - - - -

-$ -$ (97)$ (97)$ -

2012 - TEST YEAR -$ -$ 1,494$ 1,494$ 2

0.00% 0.00% 100.00% 100.00%

0$ 0$ 1,494$ 1,494$

(0) (0) (0) (0)

-$ -$ 1,494$ 1,494$

B GovernanceB-4 Executive

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0003-CHAIRMAN & CEOB-4.1 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Retained

Allocations

Non-recurring expenses in 2009

SDG&E-17-WP BAF-WP-213 GRC APPLICATION - December 2010

Page 216: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: B-4 Executive Witness: Bruce Folkmann

Cost Center: 1100-0003-CHAIRMAN & CEO

Workpaper: B-4.1 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 2 2 2 2 2 2 2 2

Labor Costs 1,497$ 1,336$ 1,137$ 1,379$ 1,279$ 1,470$ 1,246$ 1,276$ Non-Labor Costs 918 1,073 1,222 422 312 305 312 321 Total Costs 2,415$ 2,409$ 2,359$ 1,800$ 1,591$ 1,774$ 1,558$ 1,597$

DIRECT ASSIGNMENTS SDG&E 2$ -$ -$ (18)$ -$ -$ -$ -$ So Cal Gas 2 - - (20) - - - -

Subtotal - Utility 4 - - (38) - - - -

Global/Retained 1 - 85 (39) - - - -

Total Direct Assignments 6$ -$ 85$ (77)$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 2,409 2,409 2,274 1,877 1,591 1,774 1,558 1,597

Total Allocations 2,409$ 2,409$ 2,274$ 1,877$ 1,591$ 1,774$ 1,558$ 1,597$

BILLED COSTS SDG&E 2$ -$ -$ (18)$ -$ -$ -$ -$ So Cal Gas 2 - - (20) - - - -

Subtotal - Utility 4 - - (38) - - - -

Global/Retained 2,411 2,409 2,359 1,838 1,591 1,774 1,558 1,597

Total Billed Costs 2,415$ 2,409$ 2,359$ 1,800$ 1,591$ 1,774$ 1,558$ 1,597$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-214 GRC APPLICATION - December 2010

Page 217: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: B-4 Executive Witness: Bruce Folkmann

Cost Center: 1100-0002-PRESIDENT & COO

Workpaper: B-4.2

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 2 2 2 2 2 2 2 2

Labor Costs 1,308$ 900$ 959$ 898$ 923$ 916$ 916$ 916$ Non-Labor Costs 299 337 151 176 224 167 167 167 Total Costs 1,607$ 1,237$ 1,111$ 1,073$ 1,147$ 1,083$ 1,083$ 1,083$

DIRECT ASSIGNMENTS SDG&E 2$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas 2 - - - - - - -

Subtotal - Utility 4 - - - - - - -

Global/Retained 1 - 20 - - - - -

Total Direct Assignments 6$ -$ 20$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 1,601 1,237 1,090 1,073 1,147 1,083 1,083 1,083

Total Allocations 1,601$ 1,237$ 1,090$ 1,073$ 1,147$ 1,083$ 1,083$ 1,083$

BILLED COSTS SDG&E 2$ -$ 0$ -$ -$ -$ -$ -$ So Cal Gas 2 - 0 - - - - -

Subtotal - Utility 4 - 0 - - - - -

Global/Retained 1,603 1,237 1,110 1,073 1,147 1,083 1,083 1,083

Total Billed Costs 1,607$ 1,237$ 1,111$ 1,073$ 1,147$ 1,083$ 1,083$ 1,083$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-215 GRC APPLICATION - December 2010

Page 218: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR -$ -$ 1,147$ 1,147$ 2

- - (64) (64)

Change in Allocation 2009-2012 - - - -

-$ -$ (64)$ (64)$ -

2012 - TEST YEAR -$ -$ 1,083$ 1,083$ 2

0.00% 0.00% 100.00% 100.00%

0$ 0$ 1,083$ 1,083$

(0) (0) (0) (0)

-$ -$ 1,083$ 1,083$

B GovernanceB-4 Executive

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0002-PRESIDENT & COOB-4.2 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Retained

Allocations

Non-recurring expenses in 2009

SDG&E-17-WP BAF-WP-216 GRC APPLICATION - December 2010

Page 219: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: B-4 Executive Witness: Bruce Folkmann

Cost Center: 1100-0002-PRESIDENT & COO

Workpaper: B-4.2 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 2 2 2 2 2 2 2 2

Labor Costs 1,308$ 900$ 959$ 898$ 923$ 931$ 955$ 978$ Non-Labor Costs 299 337 151 176 224 170 174 179 Total Costs 1,607$ 1,237$ 1,111$ 1,073$ 1,147$ 1,102$ 1,129$ 1,157$

DIRECT ASSIGNMENTS SDG&E 2$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas 2 - - - - - - -

Subtotal - Utility 4 - - - - - - -

Global/Retained 1 - 20 - - - - -

Total Direct Assignments 6$ -$ 20$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 1,601 1,237 1,090 1,073 1,147 1,102 1,129 1,157

Total Allocations 1,601$ 1,237$ 1,090$ 1,073$ 1,147$ 1,102$ 1,129$ 1,157$

BILLED COSTS SDG&E 2$ -$ 0$ -$ -$ -$ -$ -$ So Cal Gas 2 - 0 - - - - -

Subtotal - Utility 4 - 0 - - - - -

Global/Retained 1,603 1,237 1,110 1,073 1,147 1,102 1,129 1,157

Total Billed Costs 1,607$ 1,237$ 1,111$ 1,073$ 1,147$ 1,102$ 1,129$ 1,157$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-217 GRC APPLICATION - December 2010

Page 220: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: B-4 Executive Witness: Bruce Folkmann

Cost Center: 1100-0011-EXECUTIVE VICE PRESIDENT

Workpaper: B-4.3

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 2 2 2

Labor Costs -$ -$ -$ -$ -$ 379$ 499$ 499$ Non-Labor Costs - - - - - - - - Total Costs -$ -$ -$ -$ -$ 379$ 499$ 499$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - 379 499 499

Total Allocations -$ -$ -$ -$ -$ 379$ 499$ 499$

BILLED COSTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - 379 499 499

Total Billed Costs -$ -$ -$ -$ -$ 379$ 499$ 499$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-218 GRC APPLICATION - December 2010

Page 221: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR -$ -$ -$ -$ -

- - 499 499 2

Change in Allocation 2009-2012 - - - -

-$ -$ 499$ 499$ 2

2012 - TEST YEAR -$ -$ 499$ 499$ 2

0.00% 0.00% 100.00% 100.00%

0$ 0$ 499$ 499$

(0) (0) (0) (0)

-$ -$ 499$ 499$

B GovernanceB-4 Executive

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0011-EXECUTIVE VICE PRESIDENTB-4.3 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Retained

Allocations

New position created in 2010 Reorganization

SDG&E-17-WP BAF-WP-219 GRC APPLICATION - December 2010

Page 222: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: B-4 Executive Witness: Bruce Folkmann

Cost Center: 1100-0011-EXECUTIVE VICE PRESIDENT

Workpaper: B-4.3 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 2 2 2

Labor Costs -$ -$ -$ -$ -$ 386$ 520$ 533$ Non-Labor Costs - - - - - - - - Total Costs -$ -$ -$ -$ -$ 386$ 520$ 533$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - 386 520 533

Total Allocations -$ -$ -$ -$ -$ 386$ 520$ 533$

BILLED COSTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - 386 520 533

Total Billed Costs -$ -$ -$ -$ -$ 386$ 520$ 533$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-220 GRC APPLICATION - December 2010

Page 223: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: B-4 Executive Witness: Bruce Folkmann

Cost Center: 1100-0040-RETAINED EXECUTIVE COSTS

Workpaper: B-4.4

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ -$ -$ -$ -$ Non-Labor Costs - - 232 379 285 194 194 194 Total Costs -$ -$ 232$ 379$ 285$ 194$ 194$ 194$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - 92 - - -

Total Direct Assignments -$ -$ -$ -$ 92$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - 232 379 194 194 194 194

Total Allocations -$ -$ 232$ 379$ 194$ 194$ 194$ 194$

BILLED COSTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - 232 379 285 194 194 194

Total Billed Costs -$ -$ 232$ 379$ 285$ 194$ 194$ 194$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-221 GRC APPLICATION - December 2010

Page 224: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR -$ -$ 285$ 285$ -

- - (91) (91)

Change in Allocation 2009-2012 - - - -

-$ -$ (91)$ (91)$ -

2012 - TEST YEAR -$ -$ 194$ 194$ -

0.00% 0.00% 100.00% 100.00%

-$ -$ 194$ 194$

- - - -

-$ -$ 194$ 194$

B GovernanceB-4 Executive

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0040-RETAINED EXECUTIVE COSTSB-4.4 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Retained

Allocations

Non-recurring expenses in 2009

SDG&E-17-WP BAF-WP-222 GRC APPLICATION - December 2010

Page 225: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: B-4 Executive Witness: Bruce Folkmann

Cost Center: 1100-0040-RETAINED EXECUTIVE COSTS

Workpaper: B-4.4 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ -$ -$ -$ -$ Non-Labor Costs - - 232 379 285 198 202 208 Total Costs -$ -$ 232$ 379$ 285$ 198$ 202$ 208$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - 92 - - -

Total Direct Assignments -$ -$ -$ -$ 92$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - 232 379 194 198 202 208

Total Allocations -$ -$ 232$ 379$ 194$ 198$ 202$ 208$

BILLED COSTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - 232 379 285 198 202 208

Total Billed Costs -$ -$ 232$ 379$ 285$ 198$ 202$ 208$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-223 GRC APPLICATION - December 2010

Page 226: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: B-4 Executive Witness: Bruce Folkmann

Cost Center: 1100-0001-RETIRED CHAIRMAN

Workpaper: B-4.5

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs 20$ 19$ 42$ 5$ 4$ -$ -$ -$ Non-Labor Costs 12 0 86 26 56 - - - Total Costs 31$ 19$ 129$ 31$ 60$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - 59 - - - - -

Total Direct Assignments -$ -$ 59$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 31 19 69 31 60 - - -

Total Allocations 31$ 19$ 69$ 31$ 60$ -$ -$ -$

BILLED COSTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 31 19 129 31 60 - - -

Total Billed Costs 31$ 19$ 129$ 31$ 60$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-224 GRC APPLICATION - December 2010

Page 227: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR -$ -$ 60$ 60$ -

- - (60) (60)

Change in Allocation 2009-2012 - - - -

-$ -$ (60)$ (60)$ -

2012 - TEST YEAR -$ -$ -$ -$ -

0.00% 0.00% 100.00% 100.00%

-$ -$ -$ -$

- - - -

-$ -$ -$ -$

B GovernanceB-4 Executive

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0001-RETIRED CHAIRMANB-4.5 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Retained

Allocations

Non-recurring expenses in 2009

SDG&E-17-WP BAF-WP-225 GRC APPLICATION - December 2010

Page 228: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: B-4 Executive Witness: Bruce Folkmann

Cost Center: 1100-0001-RETIRED CHAIRMAN

Workpaper: B-4.5 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs 20$ 19$ 42$ 5$ 4$ -$ -$ -$ Non-Labor Costs 12 0 86 26 56 - - - Total Costs 31$ 19$ 129$ 31$ 60$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - 59 - - - - -

Total Direct Assignments -$ -$ 59$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 31 19 69 31 60 - - -

Total Allocations 31$ 19$ 69$ 31$ 60$ -$ -$ -$

BILLED COSTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 31 19 129 31 60 - - -

Total Billed Costs 31$ 19$ 129$ 31$ 60$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-226 GRC APPLICATION - December 2010

Page 229: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: B-4 Executive Witness: Bruce Folkmann

Cost Center: 1100-0185-GROUP PRESIDENT FOR REGULATED

Workpaper: B-4.6

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 2 2 2 2 0 0 0 0

Labor Costs 680$ 689$ 725$ 718$ 198$ -$ -$ -$ Non-Labor Costs 153 82 213 144 67 - - - Total Costs 833$ 771$ 938$ 862$ 265$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E 2$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas 2 - - - - - - -

Subtotal - Utility 4 - - - - - - -

Global/Retained 1 - 16 (11) - - - -

Total Direct Assignments 5$ -$ 16$ (11)$ -$ -$ -$ -$

ALLOCATIONS SDG&E 414$ 287$ -$ -$ -$ -$ -$ -$ So Cal Gas 414 287 - - - - - -

Subtotal - Utility 828 574 - - - - - -

Global/Retained - 197 922 873 265 - - -

Total Allocations 828$ 771$ 922$ 873$ 265$ -$ -$ -$

BILLED COSTS SDG&E 416$ 287$ -$ -$ -$ -$ -$ -$ So Cal Gas 416 287 - - - - - -

Subtotal - Utility 832 574 - - - - - -

Global/Retained 1 197 938 862 265 - - -

Total Billed Costs 833$ 771$ 938$ 862$ 265$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-227 GRC APPLICATION - December 2010

Page 230: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR -$ -$ 265$ 265$ -

- - (265) (265)

Change in Allocation 2009-2012 - - - -

-$ -$ (265)$ (265)$ -

2012 - TEST YEAR -$ -$ -$ -$ -

0.00% 0.00% 100.00% 100.00%

-$ -$ -$ -$

- - - -

-$ -$ -$ -$

B GovernanceB-4 Executive

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0185-GROUP PRESIDENT FOR REGULATEDB-4.6 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Retained

Allocations

Cost center closed in 2009

SDG&E-17-WP BAF-WP-228 GRC APPLICATION - December 2010

Page 231: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: B-4 Executive Witness: Bruce Folkmann

Cost Center: 1100-0185-GROUP PRESIDENT FOR REGULATED

Workpaper: B-4.6 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 2 2 2 2 0 0 0 0

Labor Costs 680$ 689$ 725$ 718$ 198$ -$ -$ -$ Non-Labor Costs 153 82 213 144 67 - - - Total Costs 833$ 771$ 938$ 862$ 265$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E 2$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas 2 - - - - - - -

Subtotal - Utility 4 - - - - - - -

Global/Retained 1 - 16 (11) (0) - - -

Total Direct Assignments 5$ -$ 16$ (11)$ (0)$ -$ -$ -$

ALLOCATIONS SDG&E 414$ 287$ -$ -$ -$ -$ -$ -$ So Cal Gas 414 287 - - - - - -

Subtotal - Utility 828 574 - - - - - -

Global/Retained - 197 922 873 265 - - -

Total Allocations 828$ 771$ 922$ 873$ 265$ -$ -$ -$

BILLED COSTS SDG&E 416$ 287$ -$ -$ -$ -$ -$ -$ So Cal Gas 416 287 - - - - - -

Subtotal - Utility 832 574 - - - - - -

Global/Retained 1 197 938 862 265 - - -

Total Billed Costs 833$ 771$ 938$ 862$ 265$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-229 GRC APPLICATION - December 2010

Page 232: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: B-4 Executive Witness: Bruce Folkmann

Cost Center: 1100-0186-GROUP PRESIDENT FOR UNREG

Workpaper: B-4.7

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 2 0 0 0 0 0 0 0

Labor Costs 101$ (0)$ -$ -$ -$ -$ -$ -$ Non-Labor Costs 116 (17) - - - - - - Total Costs 216$ (17)$ -$ -$ -$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 4 - - - - - - -

Total Direct Assignments 4$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ (0)$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - (0) - - - - - -

Global/Retained 213 (17) - - - - - -

Total Allocations 213$ (17)$ -$ -$ -$ -$ -$ -$

BILLED COSTS SDG&E -$ (0)$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - (0) - - - - - -

Global/Retained 216 (17) - - - - - -

Total Billed Costs 216$ (17)$ -$ -$ -$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-230 GRC APPLICATION - December 2010

Page 233: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: B-4 Executive Witness: Bruce Folkmann

Cost Center: 1100-0186-GROUP PRESIDENT FOR UNREG

Workpaper: B-4.7 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 2 0 0 0 0 0 0 0

Labor Costs 101$ (0)$ -$ -$ -$ -$ -$ -$ Non-Labor Costs 116 (17) - - - - - - Total Costs 216$ (17)$ -$ -$ -$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 4 - - - - - - -

Total Direct Assignments 4$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ (0)$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - (0) - - - - - -

Global/Retained 213 (17) - - - - - -

Total Allocations 213$ (17)$ -$ -$ -$ -$ -$ -$

BILLED COSTS SDG&E -$ (0)$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - (0) - - - - - -

Global/Retained 216 (17) - - - - - -

Total Billed Costs 216$ (17)$ -$ -$ -$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-231 GRC APPLICATION - December 2010

Page 234: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: I CORPORATE CENTER SHARED SERVICES Witness: Bruce Folkmann

Cost Center: C Legal

Workpaper: C

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 122 112 117 121 121 40 41 42

Labor Costs 14,837$ 15,047$ 16,265$ 17,451$ 18,282$ 8,718$ 5,887$ 6,071$ Non-Labor Costs 60,101 47,699 35,261 44,317 55,285 35,911 31,592 31,092 Total Costs 74,938$ 62,746$ 51,526$ 61,767$ 73,567$ 44,630$ 37,479$ 37,163$

DIRECT ASSIGNMENTS SDG&E 15,612$ 13,253$ 12,483$ 15,497$ 27,091$ 10,372$ 11,144$ 11,736$ So Cal Gas 21,202 6,746 4,806 6,409 5,387 6,100 6,744 7,256

Subtotal - Utility 36,814 19,999 17,289 21,905 32,477 16,472 17,888 18,992

Global/Retained 20,342 25,189 14,355 18,428 18,831 16,806 11,577 9,973

Total Direct Assignments 57,155$ 45,187$ 31,645$ 40,333$ 51,309$ 33,278$ 29,465$ 28,965$

ALLOCATIONS SDG&E 6,717$ 7,070$ 9,335$ 9,371$ 10,106$ 4,976$ 3,562$ 3,647$ So Cal Gas 4,682 5,004 5,589 6,649 6,572 3,647 2,552 2,643

Subtotal - Utility 11,399 12,075 14,924 16,021 16,678 8,622 6,114 6,290

Global/Retained 6,383 5,484 4,958 5,413 5,580 2,729 1,900 1,908

Total Allocations 17,782$ 17,558$ 19,882$ 21,434$ 22,258$ 11,351$ 8,014$ 8,198$

BILLED COSTS SDG&E 22,329$ 20,323$ 21,818$ 24,868$ 37,197$ 15,348$ 14,706$ 15,383$ So Cal Gas 25,884 11,750 10,395 13,058 11,959 9,747 9,296 9,899

Subtotal - Utility 48,213 32,073 32,213 37,926 49,156 25,094 24,002 25,282

Global/Retained 26,725 30,672 19,313 23,841 24,411 19,535 13,478 11,881

Total Billed Costs 74,938$ 62,746$ 51,526$ 61,767$ 73,567$ 44,630$ 37,479$ 37,163$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-232 GRC APPLICATION - December 2010

Page 235: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 37,197$ 11,959$ 24,411$ 73,567$ 121

(6,107) (4,154) (3,138) (13,400) (81)

178 129 93 400 2

(15,680) 1,361 (9,085) (23,404)

Change in Allocation 2009-2012 (205) 604 (399) 0

(21,814)$ (2,060)$ (12,530)$ (36,403)$ (79)

2012 - TEST YEAR 15,383$ 9,899$ 11,881$ 37,163$ 42

3,647$ 2,643$ 1,909$ 8,199$

11,736 7,256 9,973 28,965

15,383$ 9,899$ 11,881$ 37,163$

Direct Assignments

TOTAL 2012 ALLOCATIONS

C LegalC Recon

Total Change from 2009

Allocations

Impact of transfers in the 2010 reorganization.

Two additional FTEs for anticipated growth.

Declining outside legal fees related to significant cases; exclusion of wildfire-related fees in 2012 test year.

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

GRC TotalI CORPORATE CENTER SHARED SERVICES

SDG&E-17-WP BAF-WP-233 GRC APPLICATION - December 2010

Page 236: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Allocation Change for Utilities(2009 $000's)

Division: Legal Witness: Bruce A. Folkmann

SDG&E SOCALGAS Change

C-1.1 1100-0141-EXECUTIVE VP & GENERAL CO 3 (8) (5) C-1 General Counsel 3 (8) (5)

C-2.1 1100-0144-LEGAL (193) 552 359 C-2 Law Department (193) 552 359

C-3.1 1100-0145-OUTSIDE LEGAL (15) 60 45 C-3 Outside Legal (15) 60 45

Change in Allocation 2009-2012 (205) 604 399

Department / Cost Center

SDG&E-17-WP BAF-WP-234 GRC APPLICATION - December 2010

Page 237: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division: C Legal Witness: Bruce Folkmann

Workpaper: C - Esc Recon

This workpaper details the methodology used to escalate the 2012 Forecast stated in 2009 $'s in Testimony and in Workpapers

Department Summaries, A-G, to the 2012 $'s as shown in Testimony and in Workpapers Escalated Department Summaries A-G

A B C D E FLabor/ Standard Total

Standard Non-Standard Total Non-labor Escalated EscalatedCosts Costs Costs Indexes 2012 $'s Costs

(A + B) (A X D) (B + E)C-1 General Counsel Labor 607$ -$ 607$ 1.0680 648$ 648$ Non-Labor 194 - 194 1.0727 208 208 Total 801 - 801 856 856

C-2 Law Department Labor 5,464 - 5,464 1.0680 5,836 5,836 Non-Labor 3,302 - 3,302 1.0727 3,543 3,543 Total 8,767 - 8,767 9,379 9,379

C-3 Outside Legal Labor - - - - - - Non-Labor 2,497 25,099 27,596 1.0727 2,679 27,778 Total 2,497 25,099 27,596 2,679 27,778

Total Legal Labor 6,071 - 6,071 1.0680 6,484 6,484 Non-Labor 5,993 25,099 31,092 1.0727 6,429 31,528 Total 12,064$ 25,099$ 37,163$ 12,913$ 38,012$

2012 Forecast (in 2009 $'s) 2012 Forecast Escalated

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Escalation Reconciliation($000's)

SDG&E-17-WP BAF-WP-235 GRC APPLICATION - December 2010

Page 238: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: I CORPORATE CENTER SHARED SERVICES Witness: Bruce Folkmann

Cost Center: C Legal

Workpaper: C Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 122 112 117 121 121 40 41 42

Labor Costs 14,837$ 15,047$ 16,265$ 17,451$ 18,282$ 8,870$ 6,140$ 6,484$ Non-Labor Costs 60,101 47,699 35,261 44,317 55,285 35,978 31,848 31,528 Total Costs 74,938$ 62,746$ 51,526$ 61,767$ 73,567$ 44,848$ 37,988$ 38,012$

DIRECT ASSIGNMENTS SDG&E 15,612$ 13,253$ 12,483$ 15,497$ 27,091$ 10,386$ 11,179$ 11,794$ So Cal Gas 21,202 6,746 4,806 6,409 5,387 6,110 6,766 7,293

Subtotal - Utility 36,814 19,999 17,289 21,905 32,477 16,496 17,945 19,087

Global/Retained 20,342 25,189 14,355 18,428 18,831 16,808 11,683 10,159

Total Direct Assignments 57,155$ 45,187$ 31,645$ 40,333$ 51,309$ 33,304$ 29,628$ 29,246$

ALLOCATIONS SDG&E 6,717$ 7,070$ 9,335$ 9,371$ 10,106$ 5,060$ 3,715$ 3,899$ So Cal Gas 4,682 5,004 5,589 6,649 6,572 3,709 2,662 2,826

Subtotal - Utility 11,399 12,075 14,924 16,021 16,678 8,769 6,378 6,725

Global/Retained 6,383 5,484 4,958 5,413 5,580 2,775 1,982 2,040

Total Allocations 17,782$ 17,558$ 19,882$ 21,434$ 22,258$ 11,544$ 8,360$ 8,766$

BILLED COSTS SDG&E 22,329$ 20,323$ 21,818$ 24,868$ 37,197$ 15,446$ 14,894$ 15,693$ So Cal Gas 25,884 11,750 10,395 13,058 11,959 9,818 9,429 10,119

Subtotal - Utility 48,213 32,073 32,213 37,926 49,156 25,265 24,323 25,812

Global/Retained 26,725 30,672 19,313 23,841 24,411 19,583 13,665 12,200

Total Billed Costs 74,938$ 62,746$ 51,526$ 61,767$ 73,567$ 44,848$ 37,988$ 38,012$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-236 GRC APPLICATION - December 2010

Page 239: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: C-1 General Counsel Witness: Bruce Folkmann

Cost Center: 1100-0141-EXECUTIVE VP & GENERAL CO

Workpaper: C-1.1

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 2 2 2 2 2 2 2 2

Labor Costs 548$ 606$ 611$ 581$ 617$ 607$ 607$ 607$ Non-Labor Costs 173 198 177 101 131 193 193 194 Total Costs 721$ 803$ 788$ 682$ 747$ 801$ 801$ 801$

DIRECT ASSIGNMENTS SDG&E -$ -$ 11$ -$ -$ -$ -$ -$ So Cal Gas - - 10 - - - - -

Subtotal - Utility - - 21 - - - - -

Global/Retained - - 13 - - - - -

Total Direct Assignments -$ -$ 34$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 182$ 270$ 266$ 259$ 329$ 351$ 356$ 356$ So Cal Gas 148 244 237 206 249 257 255 258

Subtotal - Utility 330 514 503 465 578 608 611 614

Global/Retained 391 289 251 217 169 192 190 186

Total Allocations 721$ 803$ 754$ 682$ 747$ 801$ 801$ 801$

BILLED COSTS SDG&E 182$ 270$ 277$ 259$ 329$ 351$ 356$ 356$ So Cal Gas 148 244 247 206 249 257 255 258

Subtotal - Utility 330 515 524 465 578 608 611 614

Global/Retained 391 289 264 217 169 192 190 186

Total Billed Costs 721$ 803$ 788$ 682$ 747$ 801$ 801$ 801$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-237 GRC APPLICATION - December 2010

Page 240: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 329$ 249$ 169$ 747$ 2

24 17 12 53

Change in Allocation 2009-2012 3 (8) 5 (0)

27$ 9$ 17$ 53$ -

2012 - TEST YEAR 356$ 258$ 186$ 801$ 2

44.48% 32.24% 23.28% 100.00%

356$ 258$ 186$ 801$

(0) (0) (0) (0)

356$ 258$ 186$ 801$

C LegalC-1 General Counsel

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0141-EXECUTIVE VP & GENERAL COC-1.1 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Direct - Sempra LawPak

Allocations

Increased direct administrative responsibilities as a result of the 2010 reorganization.

SDG&E-17-WP BAF-WP-238 GRC APPLICATION - December 2010

Page 241: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: C-1 General Counsel Witness: Bruce Folkmann

Cost Center: 1100-0141-EXECUTIVE VP & GENERAL CO

Workpaper: C-1.1 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 2 2 2 2 2 2 2 2

Labor Costs 548$ 606$ 611$ 581$ 617$ 618$ 633$ 648$ Non-Labor Costs 173 198 177 101 131 197 202 208 Total Costs 721$ 803$ 788$ 682$ 747$ 815$ 835$ 856$

DIRECT ASSIGNMENTS SDG&E -$ -$ 11$ -$ -$ -$ -$ -$ So Cal Gas - - 10 - - - - -

Subtotal - Utility - - 21 - - - - -

Global/Retained - - 13 - - - - -

Total Direct Assignments -$ -$ 34$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 182$ 270$ 266$ 259$ 329$ 357$ 371$ 381$ So Cal Gas 148 244 237 206 249 262 266 276

Subtotal - Utility 330 514 503 465 578 619 637 657

Global/Retained 391 289 251 217 169 196 198 199

Total Allocations 721$ 803$ 754$ 682$ 747$ 815$ 835$ 856$

BILLED COSTS SDG&E 182$ 270$ 277$ 259$ 329$ 357$ 371$ 381$ So Cal Gas 148 244 247 206 249 262 266 276

Subtotal - Utility 330 515 524 465 578 619 637 657

Global/Retained 391 289 264 217 169 196 198 199

Total Billed Costs 721$ 803$ 788$ 682$ 747$ 815$ 835$ 856$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-239 GRC APPLICATION - December 2010

Page 242: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: C Legal Witness: Bruce Folkmann

Cost Center: C-2 Law Department

Workpaper: C-2

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 120 110 115 119 119 38 39 40

Labor Costs 14,289$ 14,438$ 15,648$ 16,864$ 17,665$ 8,111$ 5,280$ 5,464$ Non-Labor Costs 4,986 4,173 3,748 4,039 4,155 4,423 3,302 3,302 Total Costs 19,275$ 18,611$ 19,396$ 20,903$ 21,820$ 12,534$ 8,583$ 8,767$

DIRECT ASSIGNMENTS SDG&E 982$ 940$ 815$ 903$ 1,376$ 787$ 787$ 787$ So Cal Gas 1,049 629 679 921 674 519 519 519

Subtotal - Utility 2,030 1,570 1,494 1,824 2,050 1,306 1,306 1,306

Global/Retained 947 921 382 263 314 1,089 63 63

Total Direct Assignments 2,978$ 2,490$ 1,876$ 2,087$ 2,364$ 2,395$ 1,369$ 1,369$

ALLOCATIONS SDG&E 6,239$ 6,539$ 8,307$ 8,228$ 8,848$ 4,444$ 3,206$ 3,291$ So Cal Gas 4,331 4,584 4,903 5,867 5,720 3,257 2,297 2,385

Subtotal - Utility 10,570 11,122 13,210 14,095 14,568 7,701 5,503 5,676

Global/Retained 5,728 4,998 4,309 4,721 4,888 2,437 1,710 1,722

Total Allocations 16,298$ 16,120$ 17,519$ 18,816$ 19,456$ 10,139$ 7,213$ 7,398$

BILLED COSTS SDG&E 7,221$ 7,479$ 9,122$ 9,131$ 10,224$ 5,232$ 3,993$ 4,078$ So Cal Gas 5,379 5,213 5,582 6,788 6,394 3,776 2,816 2,904

Subtotal - Utility 12,600 12,692 14,704 15,919 16,618 9,007 6,809 6,982

Global/Retained 6,675 5,919 4,692 4,984 5,202 3,527 1,774 1,785

Total Billed Costs 19,275$ 18,611$ 19,396$ 20,903$ 21,820$ 12,534$ 8,583$ 8,767$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-240 GRC APPLICATION - December 2010

Page 243: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: C Legal Witness: Bruce Folkmann

Cost Center: C-2 Law Department

Workpaper: C-2 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 120 110 115 119 119 38 39 40

Labor Costs 14,289$ 14,438$ 15,648$ 16,864$ 17,665$ 8,252$ 5,507$ 5,836$ Non-Labor Costs 4,986 4,173 3,748 4,039 4,155 4,486 3,447 3,543 Total Costs 19,275$ 18,611$ 19,396$ 20,903$ 21,820$ 12,738$ 8,954$ 9,379$

DIRECT ASSIGNMENTS SDG&E 982$ 940$ 815$ 903$ 1,376$ 802$ 822$ 845$ So Cal Gas 1,049 629 679 921 674 528 541 556

Subtotal - Utility 2,030 1,570 1,494 1,824 2,050 1,330 1,363 1,401

Global/Retained 947 921 382 263 314 1,091 66 68

Total Direct Assignments 2,978$ 2,490$ 1,876$ 2,087$ 2,364$ 2,421$ 1,429$ 1,469$

ALLOCATIONS SDG&E 6,239$ 6,539$ 8,307$ 8,228$ 8,848$ 4,522$ 3,344$ 3,519$ So Cal Gas 4,331 4,584 4,903 5,867 5,720 3,314 2,396 2,550

Subtotal - Utility 10,570 11,122 13,210 14,095 14,568 7,837 5,741 6,069

Global/Retained 5,728 4,998 4,309 4,721 4,888 2,480 1,784 1,841

Total Allocations 16,298$ 16,120$ 17,519$ 18,816$ 19,456$ 10,317$ 7,525$ 7,910$

BILLED COSTS SDG&E 7,221$ 7,479$ 9,122$ 9,131$ 10,224$ 5,324$ 4,166$ 4,363$ So Cal Gas 5,379 5,213 5,582 6,788 6,394 3,843 2,938 3,106

Subtotal - Utility 12,600 12,692 14,704 15,919 16,618 9,167 7,104 7,470

Global/Retained 6,675 5,919 4,692 4,984 5,202 3,571 1,850 1,909

Total Billed Costs 19,275$ 18,611$ 19,396$ 20,903$ 21,820$ 12,738$ 8,954$ 9,379$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-241 GRC APPLICATION - December 2010

Page 244: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: C-2 Law Department Witness: Bruce Folkmann

Cost Center: 1100-0144-LEGAL

Workpaper: C-2.1

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 120 110 115 119 119 38 39 40

Labor Costs 14,289$ 14,438$ 15,648$ 16,864$ 17,665$ 8,111$ 5,280$ 5,464$ Non-Labor Costs 4,838 4,157 3,748 4,039 4,155 4,423 3,302 3,302 Total Costs 19,127$ 18,594$ 19,396$ 20,903$ 21,820$ 12,534$ 8,583$ 8,767$

DIRECT ASSIGNMENTS SDG&E 982$ 940$ 815$ 903$ 1,376$ 787$ 787$ 787$ So Cal Gas 1,049 629 679 921 674 519 519 519

Subtotal - Utility 2,030 1,570 1,494 1,824 2,050 1,306 1,306 1,306

Global/Retained 947 921 382 263 314 1,089 63 63

Total Direct Assignments 2,978$ 2,490$ 1,876$ 2,087$ 2,364$ 2,395$ 1,369$ 1,369$

ALLOCATIONS SDG&E 6,239$ 6,539$ 8,307$ 8,228$ 8,848$ 4,444$ 3,206$ 3,291$ So Cal Gas 4,331 4,584 4,903 5,867 5,720 3,257 2,297 2,385

Subtotal - Utility 10,570 11,122 13,210 14,095 14,568 7,701 5,503 5,676

Global/Retained 5,580 4,982 4,309 4,721 4,888 2,437 1,710 1,722

Total Allocations 16,149$ 16,104$ 17,519$ 18,816$ 19,456$ 10,139$ 7,213$ 7,398$

BILLED COSTS SDG&E 7,221$ 7,479$ 9,122$ 9,131$ 10,224$ 5,232$ 3,993$ 4,078$ So Cal Gas 5,379 5,213 5,582 6,788 6,394 3,776 2,816 2,904

Subtotal - Utility 12,600 12,692 14,704 15,919 16,618 9,007 6,809 6,982

Global/Retained 6,527 5,903 4,692 4,984 5,202 3,527 1,774 1,785

Total Billed Costs 19,127$ 18,594$ 19,396$ 20,903$ 21,820$ 12,534$ 8,583$ 8,767$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-242 GRC APPLICATION - December 2010

Page 245: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 10,224$ 6,394$ 5,202$ 21,820$ 119

(6,131) (4,172) (3,151) (13,453) (81)

178 129 93 400 2

Change in Allocation 2009-2012 (193) 552 (359) 0

(6,146)$ (3,490)$ (3,417)$ (13,053)$ (79)

2012 - TEST YEAR 4,078$ 2,904$ 1,785$ 8,767$ 40

44.48% 32.24% 23.28% 100.00%

3,291$ 2,385$ 1,722$ 7,398$

787 519 63 1,369

4,078$ 2,904$ 1,785$ 8,767$

Direct Assignment Details Bill Inserts 300$ 150$ 450$ Arbitration Fees 75 25 10 110 Court Fees 18 36 6 60 Legal/Regulatory Transcripts 204 106 30 340 Trial Exhibit Costs 24 18 4 46 Statutory Notice Publication 114 106 220 Courier Fees/Subpoenas 52 78 13 143

787$ 519$ 63$ 1,369$

C LegalC-2 Law Department

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0144-LEGALC-2.1 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Direct - Sempra LawPak

Allocations

Transferred staff to business units in the 2010 Reorganization.

Two additional FTEs for anticipated growth.

SDG&E-17-WP BAF-WP-243 GRC APPLICATION - December 2010

Page 246: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: C-2 Law Department Witness: Bruce Folkmann

Cost Center: 1100-0144-LEGAL

Workpaper: C-2.1 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 120 110 115 119 119 38 39 40

Labor Costs 14,289$ 14,438$ 15,648$ 16,864$ 17,665$ 8,252$ 5,507$ 5,836$ Non-Labor Costs 4,838 4,157 3,748 4,039 4,155 4,486 3,447 3,543 Total Costs 19,127$ 18,594$ 19,396$ 20,903$ 21,820$ 12,738$ 8,954$ 9,379$

DIRECT ASSIGNMENTS SDG&E 982$ 940$ 815$ 903$ 1,376$ 802$ 822$ 845$ So Cal Gas 1,049 629 679 921 674 528 541 556

Subtotal - Utility 2,030 1,570 1,494 1,824 2,050 1,330 1,363 1,401

Global/Retained 947 921 382 263 314 1,091 66 68

Total Direct Assignments 2,978$ 2,490$ 1,876$ 2,087$ 2,364$ 2,421$ 1,429$ 1,469$

ALLOCATIONS SDG&E 6,239$ 6,539$ 8,307$ 8,228$ 8,848$ 4,522$ 3,344$ 3,519$ So Cal Gas 4,331 4,584 4,903 5,867 5,720 3,314 2,396 2,550

Subtotal - Utility 10,570 11,122 13,210 14,095 14,568 7,837 5,741 6,069

Global/Retained 5,580 4,982 4,309 4,721 4,888 2,480 1,784 1,841

Total Allocations 16,149$ 16,104$ 17,519$ 18,816$ 19,456$ 10,317$ 7,525$ 7,910$

BILLED COSTS SDG&E 7,221$ 7,479$ 9,122$ 9,131$ 10,224$ 5,324$ 4,166$ 4,363$ So Cal Gas 5,379 5,213 5,582 6,788 6,394 3,843 2,938 3,106

Subtotal - Utility 12,600 12,692 14,704 15,919 16,618 9,167 7,104 7,470

Global/Retained 6,527 5,903 4,692 4,984 5,202 3,571 1,850 1,909

Total Billed Costs 19,127$ 18,594$ 19,396$ 20,903$ 21,820$ 12,738$ 8,954$ 9,379$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-244 GRC APPLICATION - December 2010

Page 247: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: C-2 Law Department Witness: Bruce Folkmann

Cost Center: 1100-0278-LEGAL RETAINED - CORP CTR

Workpaper: C-2.2

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ -$ -$ -$ -$ Non-Labor Costs 148 16 - - - - - - Total Costs 148$ 16$ -$ -$ -$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 148 16 - - - - - -

Total Allocations 148$ 16$ -$ -$ -$ -$ -$ -$

BILLED COSTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 148 16 - - - - - -

Total Billed Costs 148$ 16$ -$ -$ -$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-245 GRC APPLICATION - December 2010

Page 248: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: C-2 Law Department Witness: Bruce Folkmann

Cost Center: 1100-0278-LEGAL RETAINED - CORP CTR

Workpaper: C-2.2 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ -$ -$ -$ -$ Non-Labor Costs 148 16 - - - - - - Total Costs 148$ 16$ -$ -$ -$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 148 16 - - - - - -

Total Allocations 148$ 16$ -$ -$ -$ -$ -$ -$

BILLED COSTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 148 16 - - - - - -

Total Billed Costs 148$ 16$ -$ -$ -$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-246 GRC APPLICATION - December 2010

Page 249: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: C Legal Witness: Bruce Folkmann

Cost Center: 1100-0145-OUTSIDE LEGAL

Workpaper: C-3.1 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ 3$ 7$ 5$ -$ -$ -$ -$ Non-Labor Costs 54,941 43,328 31,336 40,177 51,000 31,295 28,096 27,596 Total Costs 54,941$ 43,331$ 31,343$ 40,182$ 51,000$ 31,295$ 28,096$ 27,596$

DIRECT ASSIGNMENTS SDG&E 14,630$ 12,312$ 11,657$ 14,594$ 25,714$ 9,584$ 10,357$ 10,949$ So Cal Gas 20,153$ 6,116$ 4,117$ 5,487$ 4,713$ 5,582$ 6,225$ 6,737$

Subtotal - Utility 34,783 18,428 15,774 20,081 30,427 15,166 16,582 17,686

Global/Retained 19,394$ 24,267$ 13,960$ 18,166$ 18,517$ 15,717$ 11,514$ 9,910$

Total Direct Assignments 54,177$ 42,695$ 29,734$ 38,247$ 48,944$ 30,883$ 28,096$ 27,596$

ALLOCATIONS SDG&E 296$ 262$ 762$ 884$ 930$ 181$ -$ -$ So Cal Gas 204 177 449 576 603 132 - -

Subtotal - Utility 500 439 1,211 1,460 1,533 313 - -

Global/Retained 264 197 398 475 523 99 - -

Total Allocations 764$ 636$ 1,609$ 1,935$ 2,056$ 412$ -$ -$

BILLED COSTS SDG&E 14,926$ 12,574$ 12,419$ 15,478$ 26,644$ 9,765$ 10,357$ 10,949$ So Cal Gas 20,357 6,293 4,566 6,063 5,316 5,714 6,225 6,737

Subtotal - Utility 35,283 18,867 16,985 21,541 31,960 15,479 16,582 17,686

Global/Retained 19,658 24,464 14,358 18,641 19,040 15,816 11,514 9,910

Total Billed Costs 54,941$ 43,331$ 31,343$ 40,182$ 51,000$ 31,295$ 28,096$ 27,596$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-247 GRC APPLICATION - December 2010

Page 250: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 26,644$ 5,316$ 19,040$ 51,000$ -

(15,680) 1,361 (9,085) (23,404)

Change in Allocation 2009-2012 (15) 60 (45) 0

(15,695)$ 1,421$ (9,130)$ (23,404)$ -

2012 - TEST YEAR 10,949$ 6,737$ 9,910$ 27,596$ -

44.48% 32.24% 23.28% 100.00%

-$ -$ -$ -$

10,949 6,737 9,910 27,596

10,949$ 6,737$ 9,910$ 27,596$

Direct Assignment Details Outside legal fees directly assigned by matter 10,949$ 6,737$ 9,910$ 27,596$

C LegalC-3 Outside Legal

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0145-OUTSIDE LEGALC-3.1 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Direct - Sempra LawPak

Allocations

Declining outside legal fees related to significant cases; exclusion of wildfire-related fees in 2012 request.

SDG&E-17-WP BAF-WP-248 GRC APPLICATION - December 2010

Page 251: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: C-3 Outside Legal Witness: Bruce Folkmann

Cost Center: 1100-0145-OUTSIDE LEGAL

Workpaper: C-3.1 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ 3$ 7$ 5$ -$ -$ -$ -$ Non-Labor Costs 54,941 43,328 31,336 40,177 51,000 31,295 28,199 27,778 Total Costs 54,941$ 43,332$ 31,343$ 40,182$ 51,000$ 31,295$ 28,199$ 27,778$

DIRECT ASSIGNMENTS SDG&E 14,630$ 12,313$ 11,657$ 14,594$ 25,714$ 9,584$ 10,357$ 10,949$ So Cal Gas 20,153 6,116 4,117 5,487 4,713 5,582 6,225 6,737

Subtotal - Utility 34,783 18,429 15,775 20,081 30,428 15,166 16,582 17,686

Global/Retained 19,394 24,268 13,960 18,165 18,517 15,717 11,617 10,092

Total Direct Assignments 54,178$ 42,697$ 29,734$ 38,246$ 48,945$ 30,883$ 28,199$ 27,778$

ALLOCATIONS SDG&E 296$ 262$ 762$ 884$ 930$ 181$ -$ -$ So Cal Gas 204 177 449 576 603 132 - -

Subtotal - Utility 500 438 1,210 1,460 1,532 313 - -

Global/Retained 264 197 398 475 523 99 - -

Total Allocations 764$ 635$ 1,608$ 1,935$ 2,055$ 412$ -$ -$

BILLED COSTS SDG&E 14,926$ 12,574$ 12,419$ 15,478$ 26,644$ 9,765$ 10,357$ 10,949$ So Cal Gas 20,357 6,293 4,566 6,063 5,316 5,714 6,225 6,737

Subtotal - Utility 35,283 18,867 16,985 21,541 31,960 15,479 16,582 17,686

Global/Retained 19,658 24,464 14,358 18,640 19,040 15,816 11,617 10,092

Total Billed Costs 54,941$ 43,332$ 31,343$ 40,182$ 51,000$ 31,295$ 28,199$ 27,778$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-249 GRC APPLICATION - December 2010

Page 252: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: I CORPORATE CENTER SHARED SERVICES Witness: Bruce Folkmann

Cost Center: D Human Resources

Workpaper: D

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 82 79 86 81 81 59 59 59

Labor Costs 7,089$ 7,707$ 7,942$ 7,785$ 7,802$ 6,266$ 5,730$ 5,730$ Non-Labor Costs 10,321 12,960 32,654 22,147 12,496 11,297 11,693 11,328 Total Costs 17,409$ 20,667$ 40,597$ 29,931$ 20,297$ 17,563$ 17,422$ 17,058$

DIRECT ASSIGNMENTS SDG&E 15$ 25$ 40$ 42$ 22$ 35$ 35$ 35$ So Cal Gas 17 48 57 1 23 35 35 35

Subtotal - Utility 32 73 97 43 44 69 69 69

Global/Retained 12 127 220 30,204 136 - - -

Total Direct Assignments 43$ 201$ 317$ 30,247$ 180$ 69$ 69$ 69$

ALLOCATIONS SDG&E 3,837$ 5,419$ 5,930$ 6,504$ 6,292$ 5,823$ 5,734$ 5,622$ So Cal Gas 5,410 7,688 8,050 8,761 8,708 7,411 7,496 7,294

Subtotal - Utility 9,246 13,107 13,980 15,265 14,999 13,234 13,230 12,916

Global/Retained 8,120 7,360 26,300 (15,581) 5,118 4,259 4,123 4,073

Total Allocations 17,366$ 20,467$ 40,280$ (316)$ 20,117$ 17,494$ 17,353$ 16,989$

BILLED COSTS SDG&E 3,851$ 5,445$ 5,970$ 6,546$ 6,313$ 5,858$ 5,768$ 5,656$ So Cal Gas 5,427 7,736 8,107 8,762 8,730 7,445 7,531 7,329

Subtotal - Utility 9,278 13,180 14,077 15,308 15,044 13,303 13,299 12,985

Global/Retained 8,131 7,487 26,520 14,623 5,254 4,259 4,123 4,073

Total Billed Costs 17,409$ 20,667$ 40,597$ 29,931$ 20,297$ 17,563$ 17,422$ 17,058$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-250 GRC APPLICATION - December 2010

Page 253: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division: GRC TotalDept: I CORPORATE CENTER SHARED SERVICESCost Center: D Human ResourcesWorkpaper: D Recon

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 6,313$ 8,730$ 5,254$ 20,297$ 81

(1,214) (1,545) (854) (3,614) (22)

195 268 16 479

- - (105) (105)

Change in Allocation 2009-2012 362 (124) (238) (0)

(657)$ (1,402)$ (1,181)$ (3,240)$ (22)

2012 - TEST YEAR 5,656$ 7,329$ 4,073$ 17,058$ 59

5,622$ 7,294$ 4,073$ 16,989$

34 34 (0) 68

5,656$ 7,329$ 4,073$ 17,058$ TOTAL 2012 ALLOCATIONS

Lower contributions forecasted.

Reduced staff and discontinued programs due to 2010 Reorganization. Maintenance for system and computer upgrades.

Total Change from 2009

Allocations

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

Direct Assignments

SDG&E-17-WP BAF-WP-251 GRC APPLICATION - December 2010

Page 254: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Allocation Change for Utilities(2009 $000's)

Division: Human Resources Witness: Bruce A. Folkmann

SDG&E SOCALGAS Change

D-1.1 1100-0122-HR SVP & STAFF 68 62 130 D-1 Human Resources SVP 68 62 130

D-2.1 1100-0134-COMP & BENEFITS DIR 34 (34) (0) D-2.2 1100-0135-COMPENSATION 15 (15) (0) D-2.3 1100-0136-EXECUTIVE COMPENSATION 97 (7) 89 D-2.4 1100-0137-HR ACCTG & BUDGETS 15 (15) (0) D-2 Compensation & Benefits 161 (72) 89

D-3.1 1100-0383-MYINFO SERVICES 93 (80) 12 D-3 Payroll/HRIS (MyInfo) 93 (80) 12

D-4.1 1100-0130-HR BUSINESS PARTNER 18 (11) 7 D-4.2 1100-1271-EMPLOYEE DEVELOPMENT - - - D-4.3 1100-0269-EXECUTIVE DEVELOPMENT - - - D-4.4 1100-0055-BUSINESS CONDUCT DIRECTOR - - - D-4.5 1100-0131-CORP DIVERSITY AFFAIRS - - - D-4 Employee Development 18 (11) 7

D-5.1 1100-0155-CORP COMM PARTNERSHIPS - - - D-5.2 1100-0156-CONTRIBUTIONS & MEMBERSHIPS - - - D-5.3 1100-0170-INTERNAL COMMUNICATIONS 23 (23) (0) D-5 Employee Programs 23 (23) (0)

Change in Allocation 2009-2012 362 (124) 238

Department / Cost Center

SDG&E-17-WP BAF-WP-252 GRC APPLICATION - December 2010

Page 255: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division: D Human Resources Witness: Bruce Folkmann

Workpaper: D - Esc Recon

This workpaper details the methodology used to escalate the 2012 Forecast stated in 2009 $'s in Testimony and in Workpapers

Department Summaries, A-G, to the 2012 $'s as shown in Testimony and in Workpapers Escalated Department Summaries A-G

A B C D E FLabor/ Standard Total

Standard Non-Standard Total Non-labor Escalated EscalatedCosts Costs Costs Indexes 2012 $'s Costs

(A + B) (A X D) (B + E)D-1 Human Resources SVP Labor 557$ -$ 557$ 1.0680 595$ 595$ Non-Labor 360 - 360 1.0727 386 386 Total 917 - 917 981 981

D-2 Compensation & Benefits Labor 2,237 - 2,237 1.0680 2,389 2,389 Non-Labor 1,360 - 1,360 1.0727 1,459 1,459 Total 3,597 - 3,597 3,848 3,848

D-3 Payroll/HRIS (MyInfo) Labor 2,136 - 2,136 1.0680 2,281 2,281 Non-Labor 6,090 - 6,090 1.0727 6,533 6,533 Total 8,226 - 8,226 8,814 8,814

D-4 Employee Development Labor 562 - 562 1.0680 600 600 Non-Labor 435 - 435 1.0727 467 467 Total 997 - 997 1,067 1,067

D-5 Employee Programs Labor 238 - 238 1.0680 254 254 Non-Labor 3,083 - 3,083 1.0727 3,307 3,307 Total 3,321 - 3,321 3,561 3,561

Total Human Resources Labor 5,730 - 5,730 1.0680 6,119 6,119 Non-Labor 11,328 - 11,328 1.0727 12,152 12,152 Total 17,058$ -$ 17,058$ 18,271$ 18,271$

2012 Forecast (in 2009 $'s) 2012 Forecast Escalated

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Escalation Reconciliation($000's)

SDG&E-17-WP BAF-WP-253 GRC APPLICATION - December 2010

Page 256: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: I CORPORATE CENTER SHARED SERVICES Witness: Bruce Folkmann

Cost Center: D Human Resources

Workpaper: D Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 82 79 86 81 81 59 59 59

Labor Costs 7,089$ 7,707$ 7,942$ 7,785$ 7,802$ 6,375$ 5,976$ 6,119$ Non-Labor Costs 10,321 12,960 32,654 22,147 12,496 11,504 12,205 12,152 Total Costs 17,409$ 20,667$ 40,597$ 29,931$ 20,297$ 17,880$ 18,181$ 18,271$

DIRECT ASSIGNMENTS SDG&E 15$ 25$ 40$ 42$ 22$ 35$ 36$ 37$ So Cal Gas 17 48 57 1 23 35 36 37

Subtotal - Utility 32 73 97 43 44 70 72 74

Global/Retained 12 127 220 30,204 136 (0) 0 (0)

Total Direct Assignments 43$ 201$ 317$ 30,247$ 180$ 70$ 72$ 74$

ALLOCATIONS SDG&E 3,837$ 5,419$ 5,930$ 6,504$ 6,292$ 5,928$ 5,983$ 6,020$ So Cal Gas 5,410 7,688 8,050 8,761 8,708 7,544 7,822 7,811

Subtotal - Utility 9,246 13,107 13,980 15,265 14,999 13,472 13,805 13,831

Global/Retained 8,120 7,360 26,300 (15,581) 5,118 4,337 4,304 4,366

Total Allocations 17,366$ 20,467$ 40,280$ (316)$ 20,117$ 17,809$ 18,109$ 18,197$

BILLED COSTS SDG&E 3,851$ 5,445$ 5,970$ 6,546$ 6,313$ 5,963$ 6,019$ 6,057$ So Cal Gas 5,427 7,736 8,107 8,762 8,730 7,579 7,858 7,848

Subtotal - Utility 9,278 13,180 14,077 15,308 15,044 13,542 13,877 13,905

Global/Retained 8,131 7,487 26,520 14,623 5,254 4,337 4,304 4,366

Total Billed Costs 17,409$ 20,667$ 40,597$ 29,931$ 20,297$ 17,880$ 18,181$ 18,271$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-254 GRC APPLICATION - December 2010

Page 257: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: D-1 Human Resources SVP Witness: Bruce Folkmann

Cost Center: 1100-0122-HR SVP & STAFF

Workpaper: D-1.1

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 2 2 2 2 2 2 2 2

Labor Costs 534$ 433$ 429$ 482$ 481$ 557$ 557$ 557$ Non-Labor Costs 317 295 422 335 375 360 360 360 Total Costs 851$ 728$ 852$ 817$ 856$ 917$ 917$ 917$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 283$ 244$ 273$ 257$ 276$ 352$ 366$ 369$ So Cal Gas 410 347 374 342 379 450 472 472

Subtotal - Utility 693 591 647 599 655 802 838 840

Global/Retained 158 137 204 218 201 114 79 76

Total Allocations 851$ 728$ 852$ 817$ 856$ 917$ 917$ 917$

BILLED COSTS SDG&E 283$ 244$ 273$ 257$ 276$ 352$ 366$ 369$ So Cal Gas 410 347 374 342 379 450 472 472

Subtotal - Utility 693 591 647 599 655 802 838 840

Global/Retained 158 137 204 218 201 114 79 76

Total Billed Costs 851$ 728$ 852$ 817$ 856$ 917$ 917$ 917$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-255 GRC APPLICATION - December 2010

Page 258: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 276$ 379$ 201$ 856$ 2

24 31 5 61

Change in Allocation 2009-2012 68 62 (130) (0)

92$ 93$ (125)$ 61$ -

2012 - TEST YEAR 369$ 472$ 76$ 917$ 2

40.22% 51.46% 8.32% 100.00%

369$ 472$ 76$ 917$

(0) (0) (0) (0)

369$ 472$ 76$ 917$

D Human ResourcesD-1 Human Resources SVP

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0122-HR SVP & STAFFD-1.1 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Avg - HR SVP

Allocations

Budgeted consulting incurred in MyInfo as noted in Recon workpaper D-3.1

SDG&E-17-WP BAF-WP-256 GRC APPLICATION - December 2010

Page 259: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: D-1 Human Resources SVP Witness: Bruce Folkmann

Cost Center: 1100-0122-HR SVP & STAFF

Workpaper: D-1.1 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 2 2 2 2 2 2 2 2

Labor Costs 534$ 433$ 429$ 482$ 481$ 567$ 581$ 595$ Non-Labor Costs 317 295 422 335 375 366 376 386 Total Costs 851$ 728$ 852$ 817$ 856$ 933$ 956$ 981$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 283$ 244$ 273$ 257$ 276$ 358$ 382$ 394$ So Cal Gas 410 347 374 342 379 458 492 505

Subtotal - Utility 693 591 647 599 655 817 874 899

Global/Retained 158 137 204 218 201 116 82 82

Total Allocations 851$ 728$ 852$ 817$ 856$ 933$ 956$ 981$

BILLED COSTS SDG&E 283$ 244$ 273$ 257$ 276$ 358$ 382$ 394$ So Cal Gas 410 347 374 342 379 458 492 505

Subtotal - Utility 693 591 647 599 655 817 874 899

Global/Retained 158 137 204 218 201 116 82 82

Total Billed Costs 851$ 728$ 852$ 817$ 856$ 933$ 956$ 981$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-257 GRC APPLICATION - December 2010

Page 260: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: D Human Resources Witness: Bruce Folkmann

Cost Center: D-2 Compensation & Benefits

Workpaper: D-2

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 23 25 27 24 24 26 25 25

Labor Costs 1,971$ 2,326$ 2,403$ 2,303$ 2,242$ 2,163$ 2,237$ 2,237$ Non-Labor Costs 1,016 1,113 1,235 1,308 1,386 1,210 1,260 1,360 Total Costs 2,987$ 3,439$ 3,639$ 3,611$ 3,628$ 3,373$ 3,497$ 3,597$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - 6 2 4 - - -

Total Direct Assignments -$ -$ 6$ 2$ 4$ -$ -$ -$

ALLOCATIONS SDG&E 1,054$ 1,235$ 1,426$ 1,452$ 1,318$ 1,368$ 1,422$ 1,468$ So Cal Gas 1,428 1,667 1,781 1,792 1,777 1,581 1,648 1,702

Subtotal - Utility 2,482 2,903 3,207 3,244 3,095 2,949 3,070 3,170

Global/Retained 505 536 425 365 529 424 427 428

Total Allocations 2,987$ 3,439$ 3,632$ 3,609$ 3,624$ 3,373$ 3,497$ 3,597$

BILLED COSTS SDG&E 1,054$ 1,235$ 1,426$ 1,452$ 1,318$ 1,368$ 1,422$ 1,468$ So Cal Gas 1,428 1,667 1,781 1,792 1,777 1,581 1,648 1,702

Subtotal - Utility 2,482 2,903 3,207 3,244 3,095 2,949 3,070 3,170

Global/Retained 505 536 431 367 533 424 427 428

Total Billed Costs 2,987$ 3,439$ 3,639$ 3,611$ 3,628$ 3,373$ 3,497$ 3,597$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-258 GRC APPLICATION - December 2010

Page 261: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division: I CORPORATE CENTER SHARED SERVICESDept: D Human ResourcesCost Center: D-2 Compensation & BenefitsWorkpaper: D-2 Recon

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 1,318$ 1,777$ 533$ 3,628$ 24

(10) (4) (17) (31) 1

Change in Allocation 2009-2012 161 (72) (89) (0)

150$ (76)$ (106)$ (31)$ 1

2012 - TEST YEAR 1,468$ 1,702$ 428$ 3,597$ 25

1,468$ 1,702$ 428$ 3,597$

(0) (0) (0) (0)

1,468$ 1,702$ 428$ 3,597$

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

Direct Assignments

TOTAL 2012 ALLOCATIONS

Non-recurring consulting in 2009.

Total Change from 2009

Allocations

SDG&E-17-WP BAF-WP-259 GRC APPLICATION - December 2010

Page 262: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: D Human Resources Witness: Bruce Folkmann

Cost Center: D-2 Compensation & Benefits

Workpaper: D-2 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 23 25 27 24 24 26 25 25

Labor Costs 1,971$ 2,326$ 2,403$ 2,303$ 2,242$ 2,200$ 2,333$ 2,389$ Non-Labor Costs 1,016 1,113 1,235 1,308 1,386 1,232 1,315 1,459 Total Costs 2,987$ 3,439$ 3,639$ 3,611$ 3,628$ 3,433$ 3,649$ 3,848$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - 6 2 4 - - -

Total Direct Assignments -$ -$ 6$ 2$ 4$ -$ -$ -$

ALLOCATIONS SDG&E 1,054$ 1,235$ 1,426$ 1,452$ 1,318$ 1,392$ 1,484$ 1,570$ So Cal Gas 1,428 1,667 1,781 1,792 1,777 1,609 1,719 1,820

Subtotal - Utility 2,482 2,903 3,207 3,244 3,095 3,002 3,203 3,391

Global/Retained 505 536 425 365 529 431 446 458

Total Allocations 2,987$ 3,439$ 3,632$ 3,609$ 3,624$ 3,433$ 3,649$ 3,848$

BILLED COSTS SDG&E 1,054$ 1,235$ 1,426$ 1,452$ 1,318$ 1,392$ 1,484$ 1,570$ So Cal Gas 1,428 1,667 1,781 1,792 1,777 1,609 1,719 1,820

Subtotal - Utility 2,482 2,903 3,207 3,244 3,095 3,002 3,203 3,391

Global/Retained 505 536 431 367 533 431 446 458

Total Billed Costs 2,987$ 3,439$ 3,639$ 3,611$ 3,628$ 3,433$ 3,649$ 3,848$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-260 GRC APPLICATION - December 2010

Page 263: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: D-2 Compensation & Benefits Witness: Bruce Folkmann

Cost Center: 1100-0134-COMP & BENEFITS DIR

Workpaper: D-2.1

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 10 8 8 9 9 10 9 9

Labor Costs 706$ 844$ 939$ 902$ 889$ 854$ 878$ 878$ Non-Labor Costs 352 257 373 488 537 397 447 547 Total Costs 1,057$ 1,101$ 1,313$ 1,390$ 1,426$ 1,251$ 1,325$ 1,425$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - 6 2 3 - - -

Total Direct Assignments -$ -$ 6$ 2$ 3$ -$ -$ -$

ALLOCATIONS SDG&E 379$ 411$ 505$ 559$ 546$ 508$ 539$ 581$ So Cal Gas 560 591 708 776 790 665 704 757

Subtotal - Utility 939 1,002 1,213 1,334 1,336 1,173 1,243 1,338

Global/Retained 118 99 93 54 87 78 82 87

Total Allocations 1,057$ 1,101$ 1,306$ 1,388$ 1,423$ 1,251$ 1,325$ 1,425$

BILLED COSTS SDG&E 379$ 411$ 505$ 559$ 546$ 508$ 539$ 581$ So Cal Gas 560 591 708 776 790 665 704 757

Subtotal - Utility 939 1,002 1,213 1,334 1,336 1,173 1,243 1,338

Global/Retained 118 99 100 56 90 78 82 87

Total Billed Costs 1,057$ 1,101$ 1,313$ 1,390$ 1,426$ 1,251$ 1,325$ 1,425$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-261 GRC APPLICATION - December 2010

Page 264: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 546$ 790$ 90$ 1,426$ 9

1 1 (3) (1) -

Change in Allocation 2009-2012 34 (34) 0 (0)

35$ (33)$ (3)$ (1)$ -

2012 - TEST YEAR 581$ 757$ 87$ 1,425$ 9

40.75% 53.15% 6.10% 100.00%

581$ 757$ 87$ 1,425$

(0) (0) (0) (0)

581$ 757$ 87$ 1,425$

D Human ResourcesD-2 Compensation & Benefits

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0134-COMP & BENEFITS DIRD-2.1 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Casual - FTE's

Allocations

No material change in expenses

SDG&E-17-WP BAF-WP-262 GRC APPLICATION - December 2010

Page 265: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: D-2 Compensation & Benefits Witness: Bruce Folkmann

Cost Center: 1100-0134-COMP & BENEFITS DIR

Workpaper: D-2.1 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 10 8 8 9 9 10 9 9

Labor Costs 706$ 844$ 939$ 902$ 889$ 869$ 916$ 938$ Non-Labor Costs 352 257 373 488 537 404 467 587 Total Costs 1,057$ 1,101$ 1,313$ 1,390$ 1,426$ 1,273$ 1,382$ 1,524$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - 6 2 3 - - -

Total Direct Assignments -$ -$ 6$ 2$ 3$ -$ -$ -$

ALLOCATIONS SDG&E 379$ 411$ 505$ 559$ 546$ 517$ 562$ 621$ So Cal Gas 560 591 708 776 790 676 735 810

Subtotal - Utility 939 1,002 1,213 1,334 1,336 1,194 1,297 1,431

Global/Retained 118 99 93 54 87 79 85 93

Total Allocations 1,057$ 1,101$ 1,306$ 1,388$ 1,423$ 1,273$ 1,382$ 1,524$

BILLED COSTS SDG&E 379$ 411$ 505$ 559$ 546$ 517$ 562$ 621$ So Cal Gas 560 591 708 776 790 676 735 810

Subtotal - Utility 939 1,002 1,213 1,334 1,336 1,194 1,297 1,431

Global/Retained 118 99 100 56 90 79 85 93

Total Billed Costs 1,057$ 1,101$ 1,313$ 1,390$ 1,426$ 1,273$ 1,382$ 1,524$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-263 GRC APPLICATION - December 2010

Page 266: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: D-2 Compensation & Benefits Witness: Bruce Folkmann

Cost Center: 1100-0135-COMPENSATION

Workpaper: D-2.2

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 5 4 4 4 6 7 7 7

Labor Costs 350$ 367$ 415$ 334$ 540$ 478$ 528$ 528$ Non-Labor Costs 130 315 92 112 102 127 127 127 Total Costs 479$ 682$ 507$ 446$ 642$ 605$ 655$ 655$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 172$ 254$ 196$ 179$ 246$ 246$ 266$ 267$ So Cal Gas 254 366 275 249 357 321 348 348

Subtotal - Utility 426 620 471 429 603 567 615 615

Global/Retained 53 61 36 17 39 38 40 40

Total Allocations 479$ 682$ 507$ 446$ 642$ 605$ 655$ 655$

BILLED COSTS SDG&E 172$ 254$ 196$ 179$ 246$ 246$ 266$ 267$ So Cal Gas 254 366 275 249 357 321 348 348

Subtotal - Utility 426 620 471 429 603 567 615 615

Global/Retained 53 61 36 17 39 38 40 40

Total Billed Costs 479$ 682$ 507$ 446$ 642$ 605$ 655$ 655$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-264 GRC APPLICATION - December 2010

Page 267: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 246$ 357$ 39$ 642$ 6

5 7 1 13 1

Change in Allocation 2009-2012 15 (15) 0 (0)

20$ (9)$ 1$ 13$ 1

2012 - TEST YEAR 267$ 348$ 40$ 655$ 7

40.75% 53.15% 6.10% 100.00%

267$ 348$ 40$ 655$

(0) (0) (0) (0)

267$ 348$ 40$ 655$

D Human ResourcesD-2 Compensation & Benefits

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0135-COMPENSATIOND-2.2 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Casual - FTE's

Allocations

Compensation studies deferred in 2009 expected to resume

SDG&E-17-WP BAF-WP-265 GRC APPLICATION - December 2010

Page 268: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: D-2 Compensation & Benefits Witness: Bruce Folkmann

Cost Center: 1100-0135-COMPENSATION

Workpaper: D-2.2 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 5 4 4 4 6 7 7 7

Labor Costs 350$ 367$ 415$ 334$ 540$ 487$ 551$ 564$ Non-Labor Costs 130 315 92 112 102 129 132 136 Total Costs 479$ 682$ 507$ 446$ 642$ 616$ 683$ 700$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 172$ 254$ 196$ 179$ 246$ 250$ 278$ 285$ So Cal Gas 254 366 275 249 357 327 363 372

Subtotal - Utility 426 620 471 429 603 577 641 657

Global/Retained 53 61 36 17 39 38 42 43

Total Allocations 479$ 682$ 507$ 446$ 642$ 616$ 683$ 700$

BILLED COSTS SDG&E 172$ 254$ 196$ 179$ 246$ 250$ 278$ 285$ So Cal Gas 254 366 275 249 357 327 363 372

Subtotal - Utility 426 620 471 429 603 577 641 657

Global/Retained 53 61 36 17 39 38 42 43

Total Billed Costs 479$ 682$ 507$ 446$ 642$ 616$ 683$ 700$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-266 GRC APPLICATION - December 2010

Page 269: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: D-2 Compensation & Benefits Witness: Bruce Folkmann

Cost Center: 1100-0136-EXECUTIVE COMPENSATION

Workpaper: D-2.3

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 2 3 3 2 2 2 2 2

Labor Costs 201$ 379$ 224$ 248$ 235$ 259$ 259$ 259$ Non-Labor Costs 272 269 611 613 704 637 637 637 Total Costs 473$ 647$ 834$ 861$ 939$ 896$ 896$ 896$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - 1 - - -

Total Direct Assignments -$ -$ -$ -$ 1$ -$ -$ -$

ALLOCATIONS SDG&E 156$ 202$ 355$ 350$ 287$ 362$ 364$ 367$ So Cal Gas 131 197 301 288 285 265 266 266

Subtotal - Utility 288 399 657 637 573 627 630 633

Global/Retained 185 248 178 224 366 269 266 263

Total Allocations 473$ 647$ 834$ 861$ 938$ 896$ 896$ 896$

BILLED COSTS SDG&E 156$ 202$ 355$ 350$ 287$ 362$ 364$ 367$ So Cal Gas 131 197 301 288 285 265 266 266

Subtotal - Utility 288 399 657 637 573 627 630 633

Global/Retained 185 248 178 224 366 269 266 263

Total Billed Costs 473$ 647$ 834$ 861$ 939$ 896$ 896$ 896$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-267 GRC APPLICATION - December 2010

Page 270: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 287$ 285$ 366$ 939$ 2

(16) (12) (14) (43)

Change in Allocation 2009-2012 97 (7) (89) (0)

80$ (19)$ (103)$ (43)$ -

2012 - TEST YEAR 367$ 266$ 263$ 896$ 2

40.98% 29.69% 29.32% 100.00%

367$ 266$ 263$ 896$

(0) (0) (0) (0)

367$ 266$ 263$ 896$

D Human ResourcesD-2 Compensation & Benefits

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0136-EXECUTIVE COMPENSATIOND-2.3 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Causal - Executives

Allocations

Non-recurring consulting in 2009

SDG&E-17-WP BAF-WP-268 GRC APPLICATION - December 2010

Page 271: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: D-2 Compensation & Benefits Witness: Bruce Folkmann

Cost Center: 1100-0136-EXECUTIVE COMPENSATION

Workpaper: D-2.3 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 2 3 3 2 2 2 2 2

Labor Costs 201$ 379$ 224$ 248$ 235$ 264$ 270$ 277$ Non-Labor Costs 272 269 611 613 704 649 665 683 Total Costs 473$ 647$ 834$ 861$ 939$ 912$ 935$ 960$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - 1 - - -

Total Direct Assignments -$ -$ -$ -$ 1$ -$ -$ -$

ALLOCATIONS SDG&E 156$ 202$ 355$ 350$ 287$ 368$ 380$ 393$ So Cal Gas 131 197 301 288 285 270 277 285

Subtotal - Utility 288 399 657 637 573 638 657 679

Global/Retained 185 248 178 224 366 274 278 282

Total Allocations 473$ 647$ 834$ 861$ 938$ 912$ 935$ 960$

BILLED COSTS SDG&E 156$ 202$ 355$ 350$ 287$ 368$ 380$ 393$ So Cal Gas 131 197 301 288 285 270 277 285

Subtotal - Utility 288 399 657 637 573 638 657 679

Global/Retained 185 248 178 224 366 274 278 282

Total Billed Costs 473$ 647$ 834$ 861$ 939$ 912$ 935$ 960$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-269 GRC APPLICATION - December 2010

Page 272: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: D-2 Compensation & Benefits Witness: Bruce Folkmann

Cost Center: 1100-0137-HR ACCTG & BUDGETS

Workpaper: D-2.4

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 5 7 9 7 7 7 7 7

Labor Costs 389$ 467$ 572$ 554$ 577$ 571$ 571$ 571$ Non-Labor Costs 261 245 108 51 44 50 50 50 Total Costs 650$ 712$ 679$ 606$ 621$ 621$ 621$ 621$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 233$ 266$ 263$ 244$ 238$ 252$ 253$ 253$ So Cal Gas 344 382 369 338 345 330 330 330

Subtotal - Utility 577 648 631 582 583 582 583 583

Global/Retained 72 64 48 24 38 39 38 38

Total Allocations 650$ 712$ 679$ 606$ 621$ 621$ 621$ 621$

BILLED COSTS SDG&E 233$ 266$ 263$ 244$ 238$ 252$ 253$ 253$ So Cal Gas 344 382 369 338 345 330 330 330

Subtotal - Utility 577 648 631 582 583 582 583 583

Global/Retained 72 64 48 24 38 39 38 38

Total Billed Costs 650$ 712$ 679$ 606$ 621$ 621$ 621$ 621$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-270 GRC APPLICATION - December 2010

Page 273: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 238$ 345$ 38$ 621$ 7

No material change in expenses (0) (0) (0) (0)

Change in Allocation 2009-2012 15 (15) 0 0

15$ (15)$ (0)$ (0)$ -

2012 - TEST YEAR 253$ 330$ 38$ 621$ 7

40.75% 53.15% 6.10% 100.00%

253$ 330$ 38$ 621$

(0) (0) (0) (0)

253$ 330$ 38$ 621$

D Human ResourcesD-2 Compensation & Benefits

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0137-HR ACCTG & BUDGETSD-2.4 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Casual - FTE's

Allocations

SDG&E-17-WP BAF-WP-271 GRC APPLICATION - December 2010

Page 274: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: D-2 Compensation & Benefits Witness: Bruce Folkmann

Cost Center: 1100-0137-HR ACCTG & BUDGETS

Workpaper: D-2.4 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 5 7 9 7 7 7 7 7

Labor Costs 389$ 467$ 572$ 554$ 577$ 581$ 596$ 610$ Non-Labor Costs 261 245 108 51 44 51 52 53 Total Costs 650$ 712$ 679$ 606$ 621$ 632$ 648$ 664$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 233$ 266$ 263$ 244$ 238$ 257$ 264$ 270$ So Cal Gas 344 382 369 338 345 336 344 353

Subtotal - Utility 577 648 631 582 583 593 608 623

Global/Retained 72 64 48 24 38 39 40 40

Total Allocations 650$ 712$ 679$ 606$ 621$ 632$ 648$ 664$

BILLED COSTS SDG&E 233$ 266$ 263$ 244$ 238$ 257$ 264$ 270$ So Cal Gas 344 382 369 338 345 336 344 353

Subtotal - Utility 577 648 631 582 583 593 608 623

Global/Retained 72 64 48 24 38 39 40 40

Total Billed Costs 650$ 712$ 679$ 606$ 621$ 632$ 648$ 664$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-272 GRC APPLICATION - December 2010

Page 275: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: D-2 Compensation & Benefits Witness: Bruce Folkmann

Cost Center: 1100-0276-EMPLOYEE BENEFITS SERVICE

Workpaper: D-2.5

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 2 2 1 0 0 0 0

Labor Costs 0$ 30$ 6$ (0)$ -$ -$ -$ -$ Non-Labor Costs - (1) - - - - - - Total Costs 0$ 30$ 6$ -$ -$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 0$ 11$ 2$ -$ -$ -$ -$ -$ So Cal Gas 0 16 3 (0) - - - -

Subtotal - Utility 0 27 6 - - - - -

Global/Retained 0 3 0 (0) - - - -

Total Allocations 0$ 30$ 6$ -$ -$ -$ -$ -$

BILLED COSTS SDG&E 0$ 11$ 2$ -$ -$ -$ -$ -$ So Cal Gas 0 16 3 (0) - - - -

Subtotal - Utility 0 27 6 - - - - -

Global/Retained 0 3 0 - - - - -

Total Billed Costs 0$ 30$ 6$ -$ -$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-273 GRC APPLICATION - December 2010

Page 276: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: D-2 Compensation & Benefits Witness: Bruce Folkmann

Cost Center: 1100-0276-EMPLOYEE BENEFITS SERVICE

Workpaper: D-2.5 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 2 2 1 0 0 0 0

Labor Costs 0$ 30$ 6$ (0)$ -$ -$ -$ -$ Non-Labor Costs - (1) - - - - - - Total Costs 0$ 30$ 6$ -$ -$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 0$ 11$ 2$ -$ -$ -$ -$ -$ So Cal Gas 0 16 3 (0) - - - -

Subtotal - Utility 0 27 6 - - - - -

Global/Retained 0 3 0 (0) - - - -

Total Allocations 0$ 30$ 6$ -$ -$ -$ -$ -$

BILLED COSTS SDG&E 0$ 11$ 2$ -$ -$ -$ -$ -$ So Cal Gas 0 16 3 (0) - - - -

Subtotal - Utility 0 27 6 - - - - -

Global/Retained 0 3 0 - - - - -

Total Billed Costs 0$ 30$ 6$ -$ -$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-274 GRC APPLICATION - December 2010

Page 277: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: D-2 Compensation & Benefits Witness: Bruce Folkmann

Cost Center: 1100-0348-CORPORATE COMPLIANCE VP

Workpaper: D-2.6

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 1 1 1 1 0 0 0 0

Labor Costs 326$ 238$ 248$ 264$ -$ -$ -$ -$ Non-Labor Costs 2 29 51 43 - - - - Total Costs 328$ 267$ 299$ 308$ -$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 114$ 92$ 105$ 121$ -$ -$ -$ -$ So Cal Gas 138 115 124 141 - - - -

Subtotal - Utility 252 207 230 262 - - - -

Global/Retained 76 60 69 46 - - - -

Total Allocations 328$ 267$ 299$ 308$ -$ -$ -$ -$

BILLED COSTS SDG&E 114$ 92$ 105$ 121$ -$ -$ -$ -$ So Cal Gas 138 115 124 141 - - - -

Subtotal - Utility 252 207 230 262 - - - -

Global/Retained 76 60 69 46 - - - -

Total Billed Costs 328$ 267$ 299$ 308$ -$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-275 GRC APPLICATION - December 2010

Page 278: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: D-2 Compensation & Benefits Witness: Bruce Folkmann

Cost Center: 1100-0348-CORPORATE COMPLIANCE VP

Workpaper: D-2.6 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 1 1 1 1 0 0 0 0

Labor Costs 326$ 238$ 248$ 264$ -$ -$ -$ -$ Non-Labor Costs 2 29 51 43 - - - - Total Costs 328$ 267$ 299$ 308$ -$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 114$ 92$ 105$ 121$ -$ -$ -$ -$ So Cal Gas 138 115 124 141 - - - -

Subtotal - Utility 252 207 230 262 - - - -

Global/Retained 76 60 69 46 - - - -

Total Allocations 328$ 267$ 299$ 308$ -$ -$ -$ -$

BILLED COSTS SDG&E 114$ 92$ 105$ 121$ -$ -$ -$ -$ So Cal Gas 138 115 124 141 - - - -

Subtotal - Utility 252 207 230 262 - - - -

Global/Retained 76 60 69 46 - - - -

Total Billed Costs 328$ 267$ 299$ 308$ -$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-276 GRC APPLICATION - December 2010

Page 279: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: D-3 Payroll/HRIS (MyInfo) Witness: Bruce Folkmann

Cost Center: 1100-0383-MYINFO SERVICES

Workpaper: D-3.1

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 18 19 22 23 23 23 23 23

Labor Costs 1,979$ 1,837$ 2,006$ 2,081$ 2,218$ 2,126$ 2,136$ 2,136$ Non-Labor Costs 2,037 5,528 5,036 5,435 5,591 5,856 6,575 6,090 Total Costs 4,016$ 7,365$ 7,042$ 7,516$ 7,808$ 7,981$ 8,711$ 8,226$

DIRECT ASSIGNMENTS SDG&E -$ 21$ 30$ 26$ 23$ 35$ 35$ 35$ So Cal Gas - 48 57 1 21 35 35 35

Subtotal - Utility - 69 87 27 44 69 69 69

Global/Retained - 58 132 1 13 - - -

Total Direct Assignments -$ 127$ 219$ 28$ 57$ 69$ 69$ 69$

ALLOCATIONS SDG&E 1,380$ 2,621$ 2,534$ 2,887$ 2,948$ 3,095$ 3,384$ 3,200$ So Cal Gas 2,188 3,994 3,828 4,323 4,340 4,347 4,749 4,483

Subtotal - Utility 3,568 6,615 6,362 7,209 7,288 7,442 8,133 7,683

Global/Retained 449 623 462 279 463 470 509 474

Total Allocations 4,016$ 7,238$ 6,823$ 7,488$ 7,751$ 7,912$ 8,642$ 8,157$

BILLED COSTS SDG&E 1,380$ 2,642$ 2,564$ 2,912$ 2,971$ 3,130$ 3,419$ 3,234$ So Cal Gas 2,188 4,042 3,885 4,324 4,362 4,382 4,783 4,518

Subtotal - Utility 3,568 6,684 6,449 7,236 7,333 7,511 8,202 7,752

Global/Retained 449 681 594 280 476 470 509 474

Total Billed Costs 4,016$ 7,365$ 7,042$ 7,516$ 7,808$ 7,981$ 8,711$ 8,226$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-277 GRC APPLICATION - December 2010

Page 280: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 2,971$ 4,362$ 476$ 7,808$ 23

137 188 11 336

55 76 4 135

(24) (31) (5) (61)

3 4 1 8

Change in Allocation 2009-2012 93 (80) (12) 0

263$ 156$ (2)$ 418$ -

2012 - TEST YEAR 3,234$ 4,518$ 474$ 8,226$ 23

39.23% 54.96% 5.81% 100.00%

3,200$ 4,483$ 474$ 8,157$

34 34 (0) 69

3,234$ 4,518$ 474$ 8,226$

Direct Assignment Detail:

Pre-employment testing 34 34 - 69

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0383-MYINFO SERVICESD-3.1 Recon

D Human ResourcesD-3 Payroll/HRIS (MyInfo)

ADP fees due to 2009 system upgradesAnnual fees for timekeeping system upgrade in 2012

Direct Assignments

TOTAL 2012 ALLOCATIONS

Consulting budgeted by HR SVP as noted in Recon workpaper D-1.1Projected increase in replacement of computers

Total Change from 2009

2012 ALLOCATION METHOD

Causal - MyInfo

Allocations

SDG&E-17-WP BAF-WP-278 GRC APPLICATION - December 2010

Page 281: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: D-3 Payroll/HRIS (MyInfo) Witness: Bruce Folkmann

Cost Center: 1100-0383-MYINFO SERVICES

Workpaper: D-3.1 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 18 19 22 23 23 23 23 23

Labor Costs 1,979$ 1,837$ 2,006$ 2,081$ 2,218$ 2,163$ 2,228$ 2,281$ Non-Labor Costs 2,037 5,528 5,036 5,435 5,591 5,964 6,863 6,533 Total Costs 4,016$ 7,365$ 7,042$ 7,516$ 7,808$ 8,126$ 9,091$ 8,814$

DIRECT ASSIGNMENTS SDG&E -$ 21$ 30$ 26$ 23$ 35$ 36$ 37$ So Cal Gas - 48 57 1 21 35 36 37

Subtotal - Utility - 69 87 27 44 70 72 74

Global/Retained - 58 132 1 13 - - -

Total Direct Assignments -$ 127$ 219$ 28$ 57$ 70$ 72$ 74$

ALLOCATIONS SDG&E 1,380$ 2,621$ 2,534$ 2,887$ 2,948$ 3,151$ 3,532$ 3,428$ So Cal Gas 2,188 3,994 3,828 4,323 4,340 4,426 4,956 4,804

Subtotal - Utility 3,568 6,615 6,362 7,209 7,288 7,577 8,488 8,232

Global/Retained 449 623 462 279 463 479 531 508

Total Allocations 4,016$ 7,238$ 6,823$ 7,488$ 7,751$ 8,056$ 9,018$ 8,740$

BILLED COSTS SDG&E 1,380$ 2,642$ 2,564$ 2,912$ 2,971$ 3,186$ 3,568$ 3,465$ So Cal Gas 2,188 4,042 3,885 4,324 4,362 4,461 4,992 4,841

Subtotal - Utility 3,568 6,684 6,449 7,236 7,333 7,648 8,560 8,306

Global/Retained 449 681 594 280 476 479 531 508

Total Billed Costs 4,016$ 7,365$ 7,042$ 7,516$ 7,808$ 8,126$ 9,091$ 8,814$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-279 GRC APPLICATION - December 2010

Page 282: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: D Human Resources Witness: Bruce Folkmann

Cost Center: D-4 Employee Development

Workpaper: D-4

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 22 21 20 20 20 5 6 6

Labor Costs 1,493$ 1,798$ 1,934$ 2,044$ 1,982$ 962$ 562$ 562$ Non-Labor Costs 978 1,273 1,236 1,191 1,289 694 415 435 Total Costs 2,471$ 3,072$ 3,170$ 3,235$ 3,270$ 1,656$ 977$ 997$

DIRECT ASSIGNMENTS SDG&E 15$ 5$ -$ 17$ 1$ -$ -$ -$ So Cal Gas 17 - - - 1 - - -

Subtotal - Utility 32 5 - 17 2 - - -

Global/Retained 9 (2) - - - - - -

Total Direct Assignments 40$ 3$ -$ 17$ 2$ -$ -$ -$

ALLOCATIONS SDG&E 846$ 1,072$ 1,201$ 1,286$ 1,181$ 709$ 390$ 414$ So Cal Gas 1,051 1,366 1,421 1,483 1,450 641 404 414

Subtotal - Utility 1,897 2,438 2,622 2,769 2,631 1,350 794 828

Global/Retained 534 632 548 449 637 306 183 169

Total Allocations 2,431$ 3,069$ 3,170$ 3,218$ 3,268$ 1,656$ 977$ 997$

BILLED COSTS SDG&E 860$ 1,077$ 1,201$ 1,303$ 1,182$ 709$ 390$ 414$ So Cal Gas 1,068 1,365 1,421 1,483 1,451 641 404 414

Subtotal - Utility 1,929 2,442 2,622 2,786 2,633 1,350 794 828

Global/Retained 542 630 548 449 637 306 183 169

Total Billed Costs 2,471$ 3,072$ 3,170$ 3,235$ 3,270$ 1,656$ 977$ 997$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-280 GRC APPLICATION - December 2010

Page 283: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division: I CORPORATE CENTER SHARED SERVICESDept: D Human ResourcesCost Center: D-4 Employee DevelopmentWorkpaper: D-4 Recon

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 1,182$ 1,451$ 637$ 3,270$ 20

(786) (1,026) (462) (2,273) (14)

Change in Allocation 2009-2012 18 (11) (7) (0)

(768)$ (1,037)$ (468)$ (0)$ (14)

2012 - TEST YEAR 414$ 414$ 169$ 997$ 6

414$ 414$ 169$ 997$

(0) (0) (0) (0)

414$ 414$ 169$ 997$ TOTAL 2012 ALLOCATIONS

Reduced staff and discontinued programs due to 2010 Reorganization.

Total Change from 2009

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

Allocations

Direct Assignments

SDG&E-17-WP BAF-WP-281 GRC APPLICATION - December 2010

Page 284: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: D Human Resources Witness: Bruce Folkmann

Cost Center: D-4 Employee Development

Workpaper: D-4 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 22 21 20 20 20 5 6 6

Labor Costs 1,493$ 1,798$ 1,934$ 2,044$ 1,982$ 979$ 586$ 600$ Non-Labor Costs 978 1,273 1,236 1,191 1,289 707 433 467 Total Costs 2,471$ 3,072$ 3,170$ 3,235$ 3,270$ 1,685$ 1,019$ 1,067$

DIRECT ASSIGNMENTS SDG&E 15$ 5$ -$ 17$ 1$ -$ -$ -$ So Cal Gas 17 - - - 1 - - -

Subtotal - Utility 32 5 - 17 2 - - -

Global/Retained 9 (2) - - - - - -

Total Direct Assignments 40$ 3$ -$ 17$ 2$ -$ -$ -$

ALLOCATIONS SDG&E 846$ 1,072$ 1,201$ 1,286$ 1,181$ 722$ 407$ 443$ So Cal Gas 1,051 1,366 1,421 1,483 1,450 652 422 443

Subtotal - Utility 1,897 2,438 2,622 2,769 2,631 1,374 829 886

Global/Retained 534 632 548 449 637 311 191 181

Total Allocations 2,431$ 3,069$ 3,170$ 3,218$ 3,268$ 1,685$ 1,019$ 1,067$

BILLED COSTS SDG&E 860$ 1,077$ 1,201$ 1,303$ 1,182$ 722$ 407$ 443$ So Cal Gas 1,068 1,365 1,421 1,483 1,451 652 422 443

Subtotal - Utility 1,929 2,442 2,622 2,786 2,633 1,374 829 886

Global/Retained 542 630 548 449 637 311 191 181

Total Billed Costs 2,471$ 3,072$ 3,170$ 3,235$ 3,270$ 1,685$ 1,019$ 1,067$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-282 GRC APPLICATION - December 2010

Page 285: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: D-4 Employee Development Witness: Bruce Folkmann

Cost Center: 1100-0130-HR BUSINESS PARTNER

Workpaper: D-4.1

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 4 5 5 5 5 5 6 6

Labor Costs 275$ 379$ 424$ 456$ 456$ 529$ 562$ 562$ Non-Labor Costs 96 136 154 121 103 450 415 435 Total Costs 371$ 515$ 578$ 578$ 560$ 979$ 977$ 997$

DIRECT ASSIGNMENTS SDG&E 3$ 1$ -$ 17$ 1$ -$ -$ -$ So Cal Gas 3 1 - - 1 - - -

Subtotal - Utility 5 1 - 17 2 - - -

Global/Retained - - - - - - - -

Total Direct Assignments 5$ 1$ -$ 17$ 2$ -$ -$ -$

ALLOCATIONS SDG&E 127$ 178$ 203$ 221$ 214$ 380$ 390$ 414$ So Cal Gas 154 221 240 256 242 402 404 414

Subtotal - Utility 281 399 443 477 456 782 794 828

Global/Retained 85 115 134 84 101 196 183 169

Total Allocations 366$ 514$ 578$ 561$ 557$ 979$ 977$ 997$

BILLED COSTS SDG&E 129$ 179$ 203$ 237$ 215$ 380$ 390$ 414$ So Cal Gas 157 221 240 256 244 402 404 414

Subtotal - Utility 286 400 443 494 458 782 794 828

Global/Retained 85 115 134 84 101 196 183 169

Total Billed Costs 371$ 515$ 578$ 578$ 560$ 979$ 977$ 997$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-283 GRC APPLICATION - December 2010

Page 286: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 215$ 244$ 101$ 560$ 5

43 43 17 103

88 88 36 212 1

62 63 25 150

(12) (12) (5) (28)

Change in Allocation 2009-2012 18 (11) (7) (0)

199$ 170$ 67$ (0)$ 1

2012 - TEST YEAR 414$ 414$ 169$ 997$ 6

41.54% 41.52% 16.94% 100.00%

414$ 414$ 169$ 997$

(0) (0) (0) (0)

414$ 414$ 169$ 997$

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0130-HR BUSINESS PARTNERD-4.1 Recon

D Human ResourcesD-4 Employee Development

Transfer function from Empl Development as noted in Recon workpaper D-4.2Transfer function from Exec Development as noted in Recon workpaper D-4.3

Direct Assignments

TOTAL 2012 ALLOCATIONS

Transfer function from Business Conduct as noted in Recon workpaper D-4.4Non recurring Consulting and Contract Labor Costs in 2009

Total Change from 2009

2012 ALLOCATION METHOD

Multi-Factor Basic

Allocations

SDG&E-17-WP BAF-WP-284 GRC APPLICATION - December 2010

Page 287: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: D-4 Employee Development Witness: Bruce Folkmann

Cost Center: 1100-0130-HR BUSINESS PARTNER

Workpaper: D-4.1 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 4 5 5 5 5 5 6 6

Labor Costs 275$ 379$ 424$ 456$ 456$ 538$ 586$ 600$ Non-Labor Costs 96 136 154 121 103 458 433 467 Total Costs 371$ 515$ 578$ 578$ 560$ 996$ 1,019$ 1,067$

DIRECT ASSIGNMENTS SDG&E 3$ 1$ -$ 17$ 1$ -$ -$ -$ So Cal Gas 3 1 - - 1 - - -

Subtotal - Utility 5 1 - 17 2 - - -

Global/Retained - - - - - - - -

Total Direct Assignments 5$ 1$ -$ 17$ 2$ -$ -$ -$

ALLOCATIONS SDG&E 127$ 178$ 203$ 221$ 214$ 387$ 407$ 443$ So Cal Gas 154 221 240 256 242 409 422 443

Subtotal - Utility 281 399 443 477 456 796 829 886

Global/Retained 85 115 134 84 101 200 191 181

Total Allocations 366$ 514$ 578$ 561$ 557$ 996$ 1,019$ 1,067$

BILLED COSTS SDG&E 129$ 179$ 203$ 237$ 215$ 387$ 407$ 443$ So Cal Gas 157 221 240 256 244 409 422 443

Subtotal - Utility 286 400 443 494 458 796 829 886

Global/Retained 85 115 134 84 101 200 191 181

Total Billed Costs 371$ 515$ 578$ 578$ 560$ 996$ 1,019$ 1,067$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-285 GRC APPLICATION - December 2010

Page 288: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: D-4 Employee Development Witness: Bruce Folkmann

Cost Center: 1100-1271-EMPLOYEE DEVELOPMENT

Workpaper: D-4.2

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 3 2 2 1 1 0 0 0

Labor Costs 203$ 183$ 163$ 141$ 124$ 45$ -$ -$ Non-Labor Costs 135 173 187 115 246 52 - - Total Costs 338$ 356$ 350$ 257$ 369$ 97$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 121$ 133$ 135$ 103$ 142$ 97$ -$ -$ So Cal Gas 179 191 190 143 205 - - -

Subtotal - Utility 300 324 325 247 347 97 - -

Global/Retained 38 32 25 10 23 - - -

Total Allocations 338$ 356$ 350$ 257$ 369$ 97$ -$ -$

BILLED COSTS SDG&E 121$ 133$ 135$ 103$ 142$ 97$ -$ -$ So Cal Gas 179 191 190 143 205 - - -

Subtotal - Utility 300 324 325 247 347 97 - -

Global/Retained 38 32 25 10 23 - - -

Total Billed Costs 338$ 356$ 350$ 257$ 369$ 97$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-286 GRC APPLICATION - December 2010

Page 289: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 142$ 205$ 23$ 369$ 1

(43) (43) (17) (103)

(34) (56) (2) (91) (1)

(65) (107) (3) (175)

Change in Allocation 2009-2012 - - - -

(142)$ (205)$ (23)$ (369)$ (1)

2012 - TEST YEAR -$ -$ -$ -$ -

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

D Human ResourcesD-4 Employee Development

Transfer function to HR Business Partner as noted in Recon workpaper D-4.1

Transfer staff to SDG&E in 2010 Reorganization

Discontinued programs due to 2010 Reorganization

1100-1271-EMPLOYEE DEVELOPMENTD-4.2 Recon

Total Change from 2009

SDG&E-17-WP BAF-WP-287 GRC APPLICATION - December 2010

Page 290: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: D-4 Employee Development Witness: Bruce Folkmann

Cost Center: 1100-1271-EMPLOYEE DEVELOPMENT

Workpaper: D-4.2 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 3 2 2 1 1 0 0 0

Labor Costs 203$ 183$ 163$ 141$ 124$ 46$ -$ -$ Non-Labor Costs 135 173 187 115 246 53 - - Total Costs 338$ 356$ 350$ 257$ 369$ 99$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 121$ 133$ 135$ 103$ 142$ 99$ -$ -$ So Cal Gas 179 191 190 143 205 - - -

Subtotal - Utility 300 324 325 247 347 99 - -

Global/Retained 38 32 25 10 23 - - -

Total Allocations 338$ 356$ 350$ 257$ 369$ 99$ -$ -$

BILLED COSTS SDG&E 121$ 133$ 135$ 103$ 142$ 99$ -$ -$ So Cal Gas 179 191 190 143 205 - - -

Subtotal - Utility 300 324 325 247 347 99 - -

Global/Retained 38 32 25 10 23 (0) - -

Total Billed Costs 338$ 356$ 350$ 257$ 369$ 99$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-288 GRC APPLICATION - December 2010

Page 291: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: D-4 Employee Development Witness: Bruce Folkmann

Cost Center: 1100-0269-EXECUTIVE DEVELOPMENT

Workpaper: D-4.3

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 3 3 3 5 6 0 0 0

Labor Costs 294$ 288$ 324$ 423$ 520$ 155$ -$ -$ Non-Labor Costs 292 303 310 386 415 43 - - Total Costs 587$ 591$ 634$ 809$ 935$ 198$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 194$ 184$ 270$ 328$ 286$ 80$ -$ -$ So Cal Gas 163 180 229 270 284 59 - -

Subtotal - Utility 357 364 499 599 571 138 - -

Global/Retained 230 227 135 210 364 59 - -

Total Allocations 587$ 591$ 634$ 809$ 935$ 198$ -$ -$

BILLED COSTS SDG&E 194$ 184$ 270$ 328$ 286$ 80$ -$ -$ So Cal Gas 163 180 229 270 284 59 - -

Subtotal - Utility 357 364 499 599 571 138 - -

Global/Retained 230 227 135 210 364 59 - -

Total Billed Costs 587$ 591$ 634$ 809$ 935$ 198$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-289 GRC APPLICATION - December 2010

Page 292: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 286$ 284$ 364$ 935$ 6

(162) (161) (206) (528) (4)

(37) (37) (48) (122) (1)

(65) (64) (83) (212) (1)

(22) (22) (28) (73)

Change in Allocation 2009-2012 - - - -

(286)$ (284)$ (364)$ (935)$ (6)

2012 - TEST YEAR -$ -$ -$ -$ -

D Human ResourcesD-4 Employee Development

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0269-EXECUTIVE DEVELOPMENTD-4.3 Recon

Transfer staff and programs to SDG&E in 2010 ReorganizationTransfer staff and programs to SoCalGas in 2010 Reorganization

Transfer function to HR Business Partner as noted in Recon workpaper D-4.1

Remaining costs discontinued due to 2010 Reorganization

Total Change from 2009

SDG&E-17-WP BAF-WP-290 GRC APPLICATION - December 2010

Page 293: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: D-4 Employee Development Witness: Bruce Folkmann

Cost Center: 1100-0269-EXECUTIVE DEVELOPMENT

Workpaper: D-4.3 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 3 3 3 5 6 0 0 0

Labor Costs 294$ 288$ 324$ 423$ 520$ 158$ -$ -$ Non-Labor Costs 292 303 310 386 415 43 - - Total Costs 587$ 591$ 634$ 809$ 935$ 201$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 194$ 184$ 270$ 328$ 286$ 81$ -$ -$ So Cal Gas 163 180 229 270 284 60 - -

Subtotal - Utility 357 364 499 599 571 141 - -

Global/Retained 230 227 135 210 364 60 - -

Total Allocations 587$ 591$ 634$ 809$ 935$ 201$ -$ -$

BILLED COSTS SDG&E 194$ 184$ 270$ 328$ 286$ 81$ -$ -$ So Cal Gas 163 180 229 270 284 60 - -

Subtotal - Utility 357 364 499 599 571 141 - -

Global/Retained 230 227 135 210 364 60 - -

Total Billed Costs 587$ 591$ 634$ 809$ 935$ 201$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-291 GRC APPLICATION - December 2010

Page 294: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: D-4 Employee Development Witness: Bruce Folkmann

Cost Center: 1100-0055-BUSINESS CONDUCT DIRECTOR

Workpaper: D-4.4

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 7 5 4 3 3 0 0 0

Labor Costs 263$ 470$ 509$ 458$ 291$ 94$ -$ -$ Non-Labor Costs 224 367 361 292 234 94 - - Total Costs 488$ 837$ 870$ 750$ 525$ 188$ -$ -$

DIRECT ASSIGNMENTS SDG&E 12$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas 15 - - - - - - -

Subtotal - Utility 27 - - - - - - -

Global/Retained 8 - - - - - - -

Total Direct Assignments 35$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 157$ 290$ 307$ 295$ 201$ 73$ -$ -$ So Cal Gas 191 359 362 343 228 77 - -

Subtotal - Utility 348 649 668 638 429 150 - -

Global/Retained 105 188 202 112 95 38 - -

Total Allocations 453$ 837$ 870$ 750$ 525$ 188$ -$ -$

BILLED COSTS SDG&E 169$ 290$ 307$ 295$ 201$ 73$ -$ -$ So Cal Gas 205 359 362 343 228 77 - -

Subtotal - Utility 375 649 668 638 429 150 - -

Global/Retained 113 188 202 112 95 38 - -

Total Billed Costs 488$ 837$ 870$ 750$ 525$ 188$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-292 GRC APPLICATION - December 2010

Page 295: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 201$ 228$ 95$ 525$ 3

(140) (165) (70) (375) (3)

(62) (63) (25) (150)

Change in Allocation 2009-2012 - - - -

(201)$ (228)$ (95)$ (525)$ (3)

2012 - TEST YEAR -$ -$ -$ -$ -

D Human ResourcesD-4 Employee Development

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

Total Change from 2009

1100-0055-BUSINESS CONDUCT DIRECTORD-4.4 Recon

Staff and program reduction due to 2010 Reorganization

Transfer function to HR Business Partner as noted in Recon workpaper D-4.1

SDG&E-17-WP BAF-WP-293 GRC APPLICATION - December 2010

Page 296: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: D-4 Employee Development Witness: Bruce Folkmann

Cost Center: 1100-0055-BUSINESS CONDUCT DIRECTOR

Workpaper: D-4.4 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 7 5 4 3 3 0 0 0

Labor Costs 263$ 470$ 509$ 458$ 291$ 96$ -$ -$ Non-Labor Costs 224 367 361 292 234 96 - - Total Costs 488$ 837$ 870$ 750$ 525$ 192$ -$ -$

DIRECT ASSIGNMENTS SDG&E 12$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas 15 - - - - - - -

Subtotal - Utility 27 - - - - - - -

Global/Retained 8 - - - - - - -

Total Direct Assignments 35$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 157$ 290$ 307$ 295$ 201$ 74$ -$ -$ So Cal Gas 191 359 362 343 228 79 - -

Subtotal - Utility 348 649 668 638 429 153 - -

Global/Retained 105 188 202 112 95 38 - -

Total Allocations 453$ 837$ 870$ 750$ 525$ 192$ -$ -$

BILLED COSTS SDG&E 169$ 290$ 307$ 295$ 201$ 74$ -$ -$ So Cal Gas 205 359 362 343 228 79 - -

Subtotal - Utility 375 649 668 638 429 153 - -

Global/Retained 113 188 202 112 95 38 - -

Total Billed Costs 488$ 837$ 870$ 750$ 525$ 192$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-294 GRC APPLICATION - December 2010

Page 297: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: D-4 Employee Development Witness: Bruce Folkmann

Cost Center: 1100-0131-CORP DIVERSITY AFFAIRS

Workpaper: D-4.5

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 5 6 6 6 5 0 0 0

Labor Costs 458$ 478$ 514$ 565$ 591$ 139$ -$ -$ Non-Labor Costs 230 294 225 276 291 55 - - Total Costs 689$ 772$ 738$ 842$ 881$ 194$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ 4$ -$ -$ -$ -$ -$ -$ So Cal Gas - (1) - - - - - -

Subtotal - Utility - 3 - - - - - -

Global/Retained 1 (2) - - - - - -

Total Direct Assignments 1$ 1$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 247$ 287$ 285$ 339$ 338$ 79$ -$ -$ So Cal Gas 365 414 401 470 490 103 - -

Subtotal - Utility 611 701 686 809 828 182 - -

Global/Retained 77 69 52 33 54 12 - -

Total Allocations 688$ 770$ 738$ 842$ 881$ 194$ -$ -$

BILLED COSTS SDG&E 247$ 291$ 285$ 339$ 338$ 79$ -$ -$ So Cal Gas 365 413 401 470 490 103 - -

Subtotal - Utility 611 704 686 809 828 182 - -

Global/Retained 77 67 52 33 54 12 - -

Total Billed Costs 689$ 772$ 738$ 842$ 881$ 194$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-295 GRC APPLICATION - December 2010

Page 298: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 338$ 490$ 54$ 881$ 5

(127) (183) (20) (330) (2)

(162) (235) (26) (423) (2)

(49) (71) (8) (128) (1)

Change in Allocation 2009-2012 - - - -

(338)$ (490)$ (54)$ (881)$ (5)

2012 - TEST YEAR -$ -$ -$ -$ -

D Human ResourcesD-4 Employee Development

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0131-CORP DIVERSITY AFFAIRSD-4.5 Recon

Total Change from 2009

Transfer staff and programs to SDG&E in 2010 Reorganization

Transfer staff and programs to SoCalGas in 2010 Reorganization

Reduced staff and discontinued programs due to 2010 Reorganization

SDG&E-17-WP BAF-WP-296 GRC APPLICATION - December 2010

Page 299: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: D-4 Employee Development Witness: Bruce Folkmann

Cost Center: 1100-0131-CORP DIVERSITY AFFAIRS

Workpaper: D-4.5 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 5 6 6 6 5 0 0 0

Labor Costs 458$ 478$ 514$ 565$ 591$ 141$ -$ -$ Non-Labor Costs 230 294 225 276 291 56 - - Total Costs 689$ 772$ 738$ 842$ 881$ 197$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ 4$ -$ -$ -$ -$ -$ -$ So Cal Gas - (1) - - - - - -

Subtotal - Utility - 3 - - - - - -

Global/Retained 1 (2) - - - - - -

Total Direct Assignments 1$ 1$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 247$ 287$ 285$ 339$ 338$ 80$ -$ -$ So Cal Gas 365 414 401 470 490 105 - -

Subtotal - Utility 611 701 686 809 828 185 - -

Global/Retained 77 69 52 33 54 12 - -

Total Allocations 688$ 770$ 738$ 842$ 881$ 197$ -$ -$

BILLED COSTS SDG&E 247$ 291$ 285$ 339$ 338$ 80$ -$ -$ So Cal Gas 365 413 401 470 490 105 - -

Subtotal - Utility 611 704 686 809 828 185 - -

Global/Retained 77 67 52 33 54 12 - -

Total Billed Costs 689$ 772$ 738$ 842$ 881$ 197$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-297 GRC APPLICATION - December 2010

Page 300: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: D Human Resources Witness: Bruce Folkmann

Cost Center: D-5 Employee Programs

Workpaper: D-5

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 17 12 15 12 12 3 3 3

Labor Costs 1,111$ 1,313$ 1,170$ 874$ 880$ 459$ 238$ 238$ Non-Labor Costs 5,972 4,751 24,724 13,878 3,855 3,177 3,083 3,083 Total Costs 7,084$ 6,064$ 25,894$ 14,753$ 4,734$ 3,636$ 3,321$ 3,321$

DIRECT ASSIGNMENTS SDG&E -$ -$ 10$ -$ (2)$ -$ -$ -$ So Cal Gas -$ -$ -$ -$ -$ -$ -$ -$

Subtotal - Utility - - 10 - (2) - - -

Global/Retained 3$ 71$ 81$ 30,201$ 119$ -$ -$ -$

Total Direct Assignments 3$ 71$ 91$ 30,201$ 116$ -$ -$ -$

ALLOCATIONS SDG&E 274$ 246$ 496$ 622$ 569$ 299$ 171$ 171$ So Cal Gas 333 314 646 822 762 391 224 224

Subtotal - Utility 607 560 1,142 1,444 1,331 690 395 395

Global/Retained 6,474 5,433 24,661 (16,891) 3,287 2,946 2,926 2,926

Total Allocations 7,081$ 5,993$ 25,803$ (15,447)$ 4,618$ 3,636$ 3,321$ 3,321$

BILLED COSTS SDG&E 274$ 246$ 506$ 621$ 567$ 299$ 171$ 171$ So Cal Gas 333 314 646 822 762 391 224 224

Subtotal - Utility 607 560 1,152 1,443 1,328 690 395 395

Global/Retained 6,477 5,504 24,743 13,310 3,406 2,946 2,926 2,926

Total Billed Costs 7,084$ 6,064$ 25,894$ 14,753$ 4,734$ 3,636$ 3,321$ 3,321$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-298 GRC APPLICATION - December 2010

Page 301: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division: I CORPORATE CENTER SHARED SERVICESDept: D Human ResourcesCost Center: D-5 Employee ProgramsWorkpaper: D-5 Recon

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 567$ 762$ 3,406$ 4,734$ 12

(418) (515) (376) (1,309) (9)

- - (105) (105)

Change in Allocation 2009-2012 23 (23) 0 0

(395)$ (538)$ (481)$ (1,414)$ (9)

2012 - TEST YEAR 171$ 224$ 2,926$ 3,321$ 3

171$ 224$ 2,926$ 3,321$

- - - -

171$ 224$ 2,926$ 3,321$

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

TOTAL 2012 ALLOCATIONS

Lower contributions forecasted.

Reduced staff and discontinued programs due to 2010 Reorganization.

Total Change from 2009

Allocations

Direct Assignments

SDG&E-17-WP BAF-WP-299 GRC APPLICATION - December 2010

Page 302: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: D Human Resources Witness: Bruce Folkmann

Cost Center: D-5 Employee Programs

Workpaper: D-5 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 17 12 15 12 12 3 3 3

Labor Costs 1,111$ 1,313$ 1,170$ 874$ 880$ 467$ 248$ 254$ Non-Labor Costs 5,972 4,751 24,724 13,878 3,855 3,235 3,218 3,307 Total Costs 7,084$ 6,064$ 25,894$ 14,753$ 4,734$ 3,702$ 3,466$ 3,561$

DIRECT ASSIGNMENTS SDG&E -$ -$ 10$ -$ (2)$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - 10 - (2) - - -

Global/Retained 3 71 81 30,201 119 - - -

Total Direct Assignments 3$ 71$ 91$ 30,201$ 116$ -$ -$ -$

ALLOCATIONS SDG&E 274$ 246$ 496$ 622$ 569$ 304$ 179$ 183$ So Cal Gas 333 314 646 822 762 398 233 239

Subtotal - Utility 607 560 1,142 1,444 1,331 702 412 423

Global/Retained 6,474 5,433 24,661 (16,891) 3,287 3,000 3,054 3,138

Total Allocations 7,081$ 5,993$ 25,803$ (15,447)$ 4,618$ 3,702$ 3,466$ 3,561$

BILLED COSTS SDG&E 274$ 246$ 506$ 621$ 567$ 304$ 179$ 183$ So Cal Gas 333 314 646 822 762 398 233 239

Subtotal - Utility 607 560 1,152 1,443 1,328 702 412 423

Global/Retained 6,477 5,504 24,743 13,310 3,406 3,000 3,054 3,138

Total Billed Costs 7,084$ 6,064$ 25,894$ 14,753$ 4,734$ 3,702$ 3,466$ 3,561$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-300 GRC APPLICATION - December 2010

Page 303: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: D-5 Employee Programs Witness: Bruce Folkmann

Cost Center: 1100-0155-CORP COMM PARTNERSHIPS

Workpaper: D-5.1

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 6 6 8 5 5 2 2 2

Labor Costs 449$ 558$ 513$ 409$ 450$ 226$ 139$ 139$ Non-Labor Costs 485 304 468 467 314 137 137 137 Total Costs 935$ 862$ 981$ 876$ 765$ 363$ 276$ 276$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ 4$ (2)$ -$ -$ -$ So Cal Gas - - - 4 - - - -

Subtotal - Utility - - - 8 (2) - - -

Global/Retained 3 - 5 147 86 - - -

Total Direct Assignments 3$ -$ 5$ 155$ 84$ -$ -$ -$

ALLOCATIONS SDG&E 112$ 118$ 221$ 182$ 199$ 148$ 112$ 112$ So Cal Gas 136 147 260 212 226 193 147 147

Subtotal - Utility 248 265 481 394 425 341 259 259

Global/Retained 683 597 495 326 256 23 17 17

Total Allocations 931$ 862$ 976$ 720$ 681$ 363$ 276$ 276$

BILLED COSTS SDG&E 112$ 118$ 221$ 186$ 197$ 148$ 112$ 112$ So Cal Gas 136 147 260 216 226 193 147 147

Subtotal - Utility 248 265 481 402 423 341 259 259

Global/Retained 686 597 500 473 342 23 17 17

Total Billed Costs 935$ 862$ 981$ 876$ 765$ 363$ 276$ 276$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-301 GRC APPLICATION - December 2010

Page 304: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 197$ 226$ 342$ 765$ 5

(60) (56) (231) (347) (1)

(24) (23) (94) (142) (2)

Change in Allocation 2009-2012 - - - -

(84)$ (79)$ (325)$ (489)$ (3)

2012 - TEST YEAR 112$ 147$ 17$ 276$ 2

40.75% 53.15% 6.10% 100.00%

112$ 147$ 17$ 276$

(0) (0) (0) (0)

112$ 147$ 17$ 276$

D Human ResourcesD-5 Employee Programs

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

Allocations

Direct Assignments

TOTAL 2012 ALLOCATIONS

1100-0155-CORP COMM PARTNERSHIPSD-5.1 Recon

Casual - FTE's

Total Change from 2009

2012 ALLOCATION METHOD

Transfer staff and programs to SDG&E in 2010 Reorganization

Reduced staff and discontinued programs due to 2010 Reorganization

SDG&E-17-WP BAF-WP-302 GRC APPLICATION - December 2010

Page 305: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: D-5 Employee Programs Witness: Bruce Folkmann

Cost Center: 1100-0155-CORP COMM PARTNERSHIPS

Workpaper: D-5.1 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 6 6 8 5 5 2 2 2

Labor Costs 449$ 558$ 513$ 409$ 450$ 230$ 145$ 148$ Non-Labor Costs 485 304 468 467 314 140 143 147 Total Costs 935$ 862$ 981$ 876$ 765$ 370$ 288$ 295$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ 4$ (2)$ -$ -$ -$ So Cal Gas - - - 4 - - - -

Subtotal - Utility - - - 8 (2) - - -

Global/Retained 3 - 5 147 86 - - -

Total Direct Assignments 3$ -$ 5$ 155$ 84$ -$ -$ -$

ALLOCATIONS SDG&E 112$ 118$ 221$ 182$ 199$ 150$ 117$ 120$ So Cal Gas 136 147 260 212 226 196 153 157

Subtotal - Utility 248 265 481 394 425 347 270 277

Global/Retained 683 597 495 326 256 23 18 18

Total Allocations 931$ 862$ 976$ 720$ 681$ 370$ 288$ 295$

BILLED COSTS SDG&E 112$ 118$ 221$ 186$ 197$ 150$ 117$ 120$ So Cal Gas 136 147 260 216 226 196 153 157

Subtotal - Utility 248 265 481 402 423 347 270 277

Global/Retained 686 597 500 473 342 23 18 18

Total Billed Costs 935$ 862$ 981$ 876$ 765$ 370$ 288$ 295$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-303 GRC APPLICATION - December 2010

Page 306: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: D-5 Employee Programs Witness: Bruce Folkmann

Cost Center: 1100-0156-CONTRIBUTIONS & MEMBERSHIPS

Workpaper: D-5.2

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs (18)$ -$ -$ (114)$ (208)$ -$ -$ -$ Non-Labor Costs 5,330 4,361 24,193 12,877 3,213 2,900 2,900 2,900 Total Costs 5,312$ 4,361$ 24,193$ 12,763$ 3,005$ 2,900$ 2,900$ 2,900$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ (4)$ -$ -$ -$ -$ So Cal Gas - - - (5) - - - -

Subtotal - Utility - - - (9) - - - -

Global/Retained - - 77 30,031 33 - - -

Total Direct Assignments -$ -$ 77$ 30,022$ 33$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 5,312 4,361 24,116 (17,260) 2,973 2,900 2,900 2,900

Total Allocations 5,312$ 4,361$ 24,116$ (17,260)$ 2,973$ 2,900$ 2,900$ 2,900$

BILLED COSTS SDG&E -$ -$ -$ (4)$ -$ -$ -$ -$ So Cal Gas - - - (5) - - - -

Subtotal - Utility - - - (9) - - - -

Global/Retained 5,312 4,361 24,193 12,772 3,005 2,900 2,900 2,900

Total Billed Costs 5,312$ 4,361$ 24,193$ 12,763$ 3,005$ 2,900$ 2,900$ 2,900$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-304 GRC APPLICATION - December 2010

Page 307: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR -$ -$ 3,005$ 3,005$ -

-$ -$ (105) (105)

Change in Allocation 2009-2012 - - - -

-$ -$ (105)$ (105)$ -

2012 - TEST YEAR -$ -$ 2,900$ 2,900$ -

0.00% 0.00% 100.00% 100.00%

-$ -$ 2,900$ 2,900$

- - - -

-$ -$ 2,900$ 2,900$

D Human ResourcesD-5 Employee Programs

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

Direct Assignments

TOTAL 2012 ALLOCATIONS

1100-0156-CONTRIBUTIONS & MEMBERSHIPSD-5.2 Recon

Allocations

2012 ALLOCATION METHOD

Retained

Lower contributions forecasted

Total Change from 2009

SDG&E-17-WP BAF-WP-305 GRC APPLICATION - December 2010

Page 308: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: D-5 Employee Programs Witness: Bruce Folkmann

Cost Center: 1100-0156-CONTRIBUTIONS & MEMBERSHIPS

Workpaper: D-5.2 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs (18)$ -$ -$ (114)$ (208)$ -$ -$ -$ Non-Labor Costs 5,330 4,361 24,193 12,877 3,213 2,953 3,027 3,111 Total Costs 5,312$ 4,361$ 24,193$ 12,763$ 3,005$ 2,953$ 3,027$ 3,111$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ (4)$ -$ -$ -$ -$ So Cal Gas - - - (5) - - - -

Subtotal - Utility - - - (9) - - - -

Global/Retained - - 77 30,031 33 - - -

Total Direct Assignments -$ -$ 77$ 30,022$ 33$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 5,312 4,361 24,116 (17,260) 2,973 2,953 3,027 3,111

Total Allocations 5,312$ 4,361$ 24,116$ (17,260)$ 2,973$ 2,953$ 3,027$ 3,111$

BILLED COSTS SDG&E -$ -$ -$ (4)$ -$ -$ -$ -$ So Cal Gas - - - (5) - - - -

Subtotal - Utility - - - (9) - - - -

Global/Retained 5,312 4,361 24,193 12,772 3,005 2,953 3,027 3,111

Total Billed Costs 5,312$ 4,361$ 24,193$ 12,763$ 3,005$ 2,953$ 3,027$ 3,111$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-306 GRC APPLICATION - December 2010

Page 309: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: D-5 Employee Programs Witness: Bruce Folkmann

Cost Center: 1100-0170-INTERNAL COMMUNICATIONS

Workpaper: D-5.3

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 11 6 7 7 7 1 1 1

Labor Costs 681$ 755$ 657$ 580$ 637$ 233$ 99$ 99$ Non-Labor Costs 157 86 64 535 327 140 46 46 Total Costs 837$ 842$ 720$ 1,115$ 964$ 373$ 145$ 145$

DIRECT ASSIGNMENTS SDG&E -$ -$ 10$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - 10 - - - - -

Global/Retained - 71 (1) 22 - - - -

Total Direct Assignments -$ 71$ 10$ 22$ -$ -$ -$ -$

ALLOCATIONS SDG&E 162$ 128$ 275$ 440$ 370$ 151$ 59$ 59$ So Cal Gas 197 167 386 610 536 198 77 77

Subtotal - Utility 359 295 661 1,050 905 349 136 136

Global/Retained 479 475 50 42 59 23 9 9

Total Allocations 837$ 771$ 711$ 1,092$ 964$ 373$ 145$ 145$

BILLED COSTS SDG&E 162$ 128$ 285$ 440$ 370$ 151$ 59$ 59$ So Cal Gas 197 167 386 610 536 198 77 77

Subtotal - Utility 359 295 671 1,050 905 349 136 136

Global/Retained 479 546 50 65 59 23 9 9

Total Billed Costs 837$ 842$ 720$ 1,115$ 964$ 373$ 145$ 145$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-307 GRC APPLICATION - December 2010

Page 310: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 370$ 536$ 59$ 964$ 7

(126) (164) (19) (309) (2)

(56) (73) (8) (138)

(152) (199) (23) (372) (4)

Change in Allocation 2009-2012 23 (23) 0 0

(311)$ (459)$ (50)$ (819)$ (6)

2012 - TEST YEAR 59$ 77$ 9$ 145$ 1

40.75% 53.15% 6.10% 100.00%

59$ 77$ 9$ 145$

(0) (0) (0) (0)

59$ 77$ 9$ 145$

Allocations

D Human ResourcesD-5 Employee Programs

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

Direct Assignments

TOTAL 2012 ALLOCATIONS

1100-0170-INTERNAL COMMUNICATIONSD-5.3 Recon

2012 ALLOCATION METHOD

Total Change from 2009

Transfer staff and programs to SDG&E in 2010 Reorganization

Transfer staff and programs to SoCalGas in 2010 Reorganization

Staff and program reductions due to 2010 Reorganization

Casual - FTE's

SDG&E-17-WP BAF-WP-308 GRC APPLICATION - December 2010

Page 311: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: D-5 Employee Programs Witness: Bruce Folkmann

Cost Center: 1100-0170-INTERNAL COMMUNICATIONS

Workpaper: D-5.3 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 11 6 7 7 7 1 1 1

Labor Costs 681$ 755$ 657$ 580$ 637$ 237$ 103$ 106$ Non-Labor Costs 157 86 64 535 327 142 48 49 Total Costs 837$ 842$ 720$ 1,115$ 964$ 379$ 151$ 155$

DIRECT ASSIGNMENTS SDG&E -$ -$ 10$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - 10 - - - - -

Global/Retained - 71 (1) 22 - - - -

Total Direct Assignments -$ 71$ 10$ 22$ -$ -$ -$ -$

ALLOCATIONS SDG&E 162$ 128$ 275$ 440$ 370$ 154$ 61$ 63$ So Cal Gas 197 167 386 610 536 201 80 82

Subtotal - Utility 359 295 661 1,050 905 356 142 145

Global/Retained 479 475 50 42 59 24 9 9

Total Allocations 837$ 771$ 711$ 1,092$ 964$ 379$ 151$ 155$

BILLED COSTS SDG&E 162$ 128$ 285$ 440$ 370$ 154$ 61$ 63$ So Cal Gas 197 167 386 610 536 201 80 82

Subtotal - Utility 359 295 671 1,050 905 356 142 145

Global/Retained 479 546 50 65 59 24 9 9

Total Billed Costs 837$ 842$ 720$ 1,115$ 964$ 379$ 151$ 155$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-309 GRC APPLICATION - December 2010

Page 312: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: I CORPORATE CENTER SHARED SERVICES Witness: Bruce Folkmann

Cost Center: E External Affairs

Workpaper: E

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 40 64 70 78 81 18 19 19

Labor Costs 4,403$ 4,142$ 7,501$ 8,758$ 9,223$ 3,916$ 2,122$ 2,122$ Non-Labor Costs 7,971 7,713 11,925 14,987 14,468 5,057 4,052 4,052 Total Costs 12,373$ 11,855$ 19,426$ 23,745$ 23,691$ 8,973$ 6,175$ 6,175$

DIRECT ASSIGNMENTS SDG&E 22$ 47$ 94$ 49$ 42$ 0$ -$ -$ So Cal Gas 37$ 14$ 34$ 29$ 42$ 0$ -$ -$

Subtotal - Utility 60 61 128 79 84 0 - -

Global/Retained 906$ 71$ 286$ 271$ 330$ 24$ 23$ 23$

Total Direct Assignments 966$ 132$ 413$ 349$ 414$ 24$ 23$ 23$

ALLOCATIONS SDG&E 840$ 920$ 2,092$ 2,517$ 2,686$ 2,051$ 965$ 992$ So Cal Gas 1,045 1,154 2,526 2,957 3,085 1,745 1,049 1,047

Subtotal - Utility 1,885 2,073 4,618 5,474 5,771 3,796 2,014 2,040

Global/Retained 9,522 9,649 14,395 17,921 17,506 5,153 4,138 4,112

Total Allocations 11,408$ 11,723$ 19,013$ 23,395$ 23,276$ 8,949$ 6,151$ 6,151$

BILLED COSTS SDG&E 862$ 967$ 2,186$ 2,566$ 2,728$ 2,051$ 965$ 992$ So Cal Gas 1,083 1,168 2,559 2,986 3,127 1,745 1,049 1,047

Subtotal - Utility 1,945 2,134 4,745 5,553 5,855 3,796 2,014 2,040

Global/Retained 10,429 9,720 14,681 18,192 17,836 5,176 4,161 4,135

Total Billed Costs 12,373$ 11,855$ 19,426$ 23,745$ 23,691$ 8,973$ 6,175$ 6,175$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-310 GRC APPLICATION - December 2010

Page 313: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 2,728$ 3,127$ 17,836$ 23,691$ 81

- - (7,335) (7,335)

(1,824) (1,999) (6,160) (9,983) (62)

(65) (64) (68) (197)

Change in Allocation 2009-2012 153 (16) (138) (0)

(1,736)$ (2,079)$ (13,701)$ (17,515)$ (62)

2012 - TEST YEAR 992$ 1,047$ 4,135$ 6,175$ 19

992$ 1,048$ 4,112$ 6,152$

(0) (0) 23 23

992$ 1,047$ 4,135$ 6,175$ TOTAL 2012 ALLOCATIONS

E External AffairsE Recon

Total Change from 2009

Allocations

Decreased advertising program.Eliminated or transferred departments as a result of the 2010 reorganization.Other reductions due to the 2010 Reorganization.

GRC TotalI CORPORATE CENTER SHARED SERVICES

Direct Assignments

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

SDG&E-17-WP BAF-WP-311 GRC APPLICATION - December 2010

Page 314: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Test Year 2012 General Rate CaseSummary of Allocation Change for Utilities

(2009 $000's)

Division: External Affairs Witness: Bruce A. Folkmann

SDG&E SOCALGAS Change

E-1.1 1100-0169-CORPORATE COMMUNICATIONS 23 (23) 0 E-1.2 1100-0456-CORP RESPONSIBILITY REPORT 10 (6) 4 E-1.3 1100-0168-DIGITAL/PRINT COMMUNICATIONS 32 (20) 12 E-1.4 1100-0208-INTERNET COMMUNICATIONS - - - E-1.5 1100-0294-CORPORATE HOSPITALITY - - - E-1.6 1100-0378-ANNUAL REPORT 15 (10) 6 E-1 Communications 80 (59) 21

E-2.1 1100-0150-VP - CORP RELATIONS 54 49 103 E-2.2 1100-0152-FEDERAL GOVERNMENT AFFAIRS - - - E-2.3 1100-0157-GOVT PROGRAMS & CORP RESPONSIBIL 2 (6) (4) E-2.4 1100-0151-CORPORATE POLITICAL CONTR - - - E-2.5 1100-0395-COMPLIANCE / REPORTING & ANALYSIS 5 (1) 3 E-2.6 1100-0163-FERC RELATIONS 13 1 14 E-2 Government Affairs 73 43 116

E-3.1 1100-0147-EVP - EXTERNAL RELATIONS - - - E-3.2 1100-0379-VP - REGULATORY AFFAIRS - - - E-3.3 1100-0400-CORPORATE LEGISLATIVE POL - - - E-3.4 1100-0148-ENVIROMENTAL & REG AFFAIRS - - - E-3.5 1100-0006-COMPLIANCE - - - E-3.6 1100-0164-SVP COMMS & COMMUNITY PAR - - - E-3.7 1100-1398-COMMUNITY REL - SAN DIEGO - - - E-3.8 1100-2451-COMMUNITY RELATIONS - LOS - - - E-3.9 1100-2149-CORPORATE EVENTS - - - E-3.10 1100-1153-STATE GOVERNMENT AFFAIRS - - - E-3.11 1100-1160-STATE REGULATORY AFFAIRS - - - E-3.12 1100-1159-CORP REGULATORY POLICY - - - E-3.13 1100-6381-DIRECTOR - GOVT AFFAIRS - - - E-3.14 1100-6452-GAS RESEARCH & ANALYSIS - - - E-3.15 1100-4397-PUBLIC RELATIONS - MEXICO - - - E-3.16 1100-4394-VP INTERNATIONAL AFFAIRS - - - E-3 External Affairs - - -

Change in Allocation 2009-2012 153 (16) 138

Department / Cost Center

Sempra Energy Corporate Center

SDG&E-17-WP BAF-WP-312 GRC APPLICATION - December 2010

Page 315: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division: E External Affairs Witness: Bruce Folkmann

Workpaper: E - Esc Recon

This workpaper details the methodology used to escalate the 2012 Forecast stated in 2009 $'s in Testimony and in Workpapers

Department Summaries, A-G, to the 2012 $'s as shown in Testimony and in Workpapers Escalated Department Summaries A-G

A B C D E FLabor/ Standard Total

Standard Non-Standard Total Non-labor Escalated EscalatedCosts Costs Costs Indexes 2012 $'s Costs

(A + B) (A X D) (B + E)E-1 Communications Labor 588$ -$ 588$ 1.0680 628$ 628$ Non-Labor 1,880 16 1,896 1.0727 2,017 2,033 Total 2,468 16 2,484 2,645 2,661

E-2 Government Affairs Labor 1,534 - 1,534 1.0680 1,638 1,638 Non-Labor 2,157 - 2,157 1.0727 2,313 2,313 Total 3,690 - 3,690 3,952 3,952

E-3 External Affairs Labor - - - - - - Non-Labor - - - - - - Total - - - - -

Total External Affairs Labor 2,122 - 2,122 1.0680 2,266 2,266 Non-Labor 4,036 16 4,052 1.0727 4,330 4,346 Total 6,159$ 16$ 6,175$ 6,596$ 6,612$

2012 Forecast (in 2009 $'s) 2012 Forecast Escalated

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Escalation Reconciliation($000's)

SDG&E-17-WP BAF-WP-313 GRC APPLICATION - December 2010

Page 316: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: I CORPORATE CENTER SHARED SERVICES Witness: Bruce Folkmann

Cost Center: E External Affairs

Workpaper: E Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 40 64 70 78 81 18 19 19

Labor Costs 4,403$ 4,142$ 7,501$ 8,758$ 9,223$ 3,984$ 2,213$ 2,266$ Non-Labor Costs 7,971 7,713 11,925 14,987 14,468 5,150 4,229 4,346 Total Costs 12,373$ 11,855$ 19,426$ 23,745$ 23,691$ 9,133$ 6,443$ 6,612$

DIRECT ASSIGNMENTS SDG&E 22$ 47$ 94$ 49$ 42$ -$ -$ -$ So Cal Gas 37 14 34 29 42 - - -

Subtotal - Utility 60 61 128 79 84 - - -

Global/Retained 906 71 286 271 330 24 24 25

Total Direct Assignments 966$ 132$ 413$ 349$ 414$ 24$ 24$ 25$

ALLOCATIONS SDG&E 840$ 920$ 2,092$ 2,517$ 2,686$ 2,088$ 1,006$ 1,061$ So Cal Gas 1,045 1,154 2,526 2,957 3,085 1,776 1,094 1,120

Subtotal - Utility 1,885 2,073 4,618 5,474 5,771 3,863 2,100 2,181

Global/Retained 9,522 9,649 14,395 17,921 17,506 5,246 4,318 4,406

Total Allocations 11,408$ 11,723$ 19,013$ 23,395$ 23,276$ 9,109$ 6,418$ 6,587$

BILLED COSTS SDG&E 862$ 967$ 2,186$ 2,566$ 2,728$ 2,088$ 1,006$ 1,061$ So Cal Gas 1,083 1,168 2,559 2,986 3,127 1,776 1,094 1,120

Subtotal - Utility 1,945 2,134 4,745 5,553 5,855 3,863 2,100 2,181

Global/Retained 10,429 9,720 14,681 18,192 17,836 5,270 4,342 4,431

Total Billed Costs 12,373$ 11,855$ 19,426$ 23,745$ 23,691$ 9,133$ 6,443$ 6,612$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-314 GRC APPLICATION - December 2010

Page 317: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E External Affairs Witness: Bruce Folkmann

Cost Center: E-1 Communications

Workpaper: E-1

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 4 16 22 23 24 6 6 6

Labor Costs 365$ 385$ 1,434$ 2,008$ 2,192$ 1,036$ 588$ 588$ Non-Labor Costs 2,872 2,576 4,686 6,728 9,627 2,059 1,896 1,896 Total Costs 3,237$ 2,962$ 6,120$ 8,736$ 11,819$ 3,096$ 2,484$ 2,484$

DIRECT ASSIGNMENTS SDG&E 8$ 28$ 64$ 17$ 11$ -$ -$ -$ So Cal Gas 37$ 14$ 14$ 10$ 9$ -$ -$ -$

Subtotal - Utility 45 42 78 27 20 - - -

Global/Retained 17$ 35$ 35$ 7$ 33$ 23$ 23$ 23$

Total Direct Assignments 62$ 78$ 113$ 34$ 53$ 23$ 23$ 23$

ALLOCATIONS SDG&E 369$ 408$ 733$ 1,018$ 1,027$ 649$ 468$ 485$ So Cal Gas 447 505 864 1,182 1,165 686 485 485

Subtotal - Utility 815 913 1,597 2,200 2,192 1,335 953 970

Global/Retained 2,359 1,971 4,409 6,502 9,574 1,737 1,508 1,491

Total Allocations 3,175$ 2,884$ 6,007$ 8,702$ 11,766$ 3,072$ 2,461$ 2,461$

BILLED COSTS SDG&E 376$ 436$ 798$ 1,035$ 1,038$ 649$ 468$ 485$ So Cal Gas 484 519 878 1,192 1,174 686 485 485

Subtotal - Utility 860 955 1,676 2,227 2,212 1,335 953 970

Global/Retained 2,376 2,006 4,444 6,508 9,607 1,760 1,531 1,514

Total Billed Costs 3,237$ 2,962$ 6,120$ 8,736$ 11,819$ 3,096$ 2,484$ 2,484$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-315 GRC APPLICATION - December 2010

Page 318: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 1,038$ 1,174$ 9,607$ 11,819$ 24

0 0 (7,335) (7,335)

(568) (565) (588) (1,721) (18)

(65) (65) (148) (278)

Change in Allocation 2009-2012 80 (59) (21) (0)

(553)$ (689)$ (8,093)$ (9,335)$ (18)

2012 - TEST YEAR 485$ 485$ 1,514$ 2,484$ 6

485$ 485$ 1,491$ 2,461$

(0) (0) 23 23

485$ 485$ 1,514$ 2,484$

Direct Assignments

TOTAL 2012 ALLOCATIONS

E-1 CommunicationsE-1 Recon

Total Change from 2009

Allocations

Decreased advertising program at Corporate. Labor changes as a result of the reorganization and filling vacancies. Lower consulting and other reductions due to the Reorganization.

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

I CORPORATE CENTER SHARED SERVICESE External Affairs

SDG&E-17-WP BAF-WP-316 GRC APPLICATION - December 2010

Page 319: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E External Affairs Witness: Bruce Folkmann

Cost Center: E-1 Communications

Workpaper: E-1 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 4 16 22 23 24 6 6 6

Labor Costs 365$ 385$ 1,434$ 2,008$ 2,192$ 1,054$ 613$ 628$ Non-Labor Costs 2,872 2,576 4,686 6,728 9,627 2,097 1,978 2,033 Total Costs 3,237$ 2,962$ 6,120$ 8,736$ 11,819$ 3,151$ 2,592$ 2,661$

DIRECT ASSIGNMENTS SDG&E 8$ 28$ 64$ 17$ 11$ -$ -$ -$ So Cal Gas 37 14 14 10 9 - - -

Subtotal - Utility 45 42 78 27 20 - - -

Global/Retained 17 35 35 7 33 24 24 25

Total Direct Assignments 62$ 78$ 113$ 34$ 53$ 24$ 24$ 25$

ALLOCATIONS SDG&E 369$ 408$ 733$ 1,018$ 1,027$ 661$ 488$ 519$ So Cal Gas 447 505 864 1,182 1,165 698 506 519

Subtotal - Utility 815 913 1,597 2,200 2,192 1,359 994 1,038

Global/Retained 2,359 1,971 4,409 6,502 9,574 1,769 1,574 1,598

Total Allocations 3,175$ 2,884$ 6,007$ 8,702$ 11,766$ 3,128$ 2,568$ 2,636$

BILLED COSTS SDG&E 376$ 436$ 798$ 1,035$ 1,038$ 661$ 488$ 519$ So Cal Gas 484 519 878 1,192 1,174 698 506 519

Subtotal - Utility 860 955 1,676 2,227 2,212 1,359 994 1,038

Global/Retained 2,376 2,006 4,444 6,508 9,607 1,792 1,598 1,623

Total Billed Costs 3,237$ 2,962$ 6,120$ 8,736$ 11,819$ 3,151$ 2,592$ 2,661$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-317 GRC APPLICATION - December 2010

Page 320: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-1 Communications Witness: Bruce Folkmann

Cost Center: 1100-0169-CORPORATE COMMUNICATIONS

Workpaper: E-1.1

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 4 5 11 11 11 2 2 2

Labor Costs 365$ 363$ 543$ 1,050$ 1,059$ 446$ 237$ 237$ Non-Labor Costs 402 515 356 377 392 169 67 67 Total Costs 767$ 878$ 899$ 1,427$ 1,451$ 615$ 304$ 304$

DIRECT ASSIGNMENTS SDG&E 3$ -$ 38$ (13)$ 1$ -$ -$ -$ So Cal Gas 7 - - - - - - -

Subtotal - Utility 10 - 38 (13) 1 - - -

Global/Retained 3 20 20 (10) - - - -

Total Direct Assignments 13$ 20$ 58$ (22)$ 1$ -$ -$ -$

ALLOCATIONS SDG&E 131$ 155$ 196$ 335$ 340$ 149$ 75$ 76$ So Cal Gas 159 191 231 389 386 158 77 76

Subtotal - Utility 290 346 427 725 725 307 152 152

Global/Retained 465 513 414 725 725 307 152 152

Total Allocations 754$ 859$ 841$ 1,449$ 1,450$ 615$ 304$ 304$

BILLED COSTS SDG&E 134$ 155$ 234$ 323$ 340$ 149$ 75$ 76$ So Cal Gas 165 191 231 389 386 158 77 76

Subtotal - Utility 300 346 464 712 726 307 152 152

Global/Retained 467 533 435 715 725 307 152 152

Total Billed Costs 767$ 878$ 899$ 1,427$ 1,451$ 615$ 304$ 304$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-318 GRC APPLICATION - December 2010

Page 321: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 340$ 386$ 725$ 1,451$ 11

(224) (224) (449) (897) (9)

(63) (62) (125) (250)

Change in Allocation 2009-2012 23 (23) (0) 0

(264)$ (309)$ (573)$ (1,147)$ (9)

2012 - TEST YEAR 76$ 76$ 152$ 304$ 2

25.01% 24.99% 50.00% 100.00%

76$ 76$ 152$ 304$

(0) (0) (0) (0)

1100-0169-CORPORATE COMMUNICATIONSE-1.1 Recon

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

E External AffairsE-1 Communications

Transferred 9 FTEs to SDG&E/SoCal Gas.

Lower consulting due to cancellation of media relations contract and transfer of certain public relations consulting to SDG&E.

Multi-Factor Split

Allocations

Direct Assignments

Total Change from 2009

2012 ALLOCATION METHOD

SDG&E-17-WP BAF-WP-319 GRC APPLICATION - December 2010

Page 322: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-1 Communications Witness: Bruce Folkmann

Cost Center: 1100-0169-CORPORATE COMMUNICATIONS

Workpaper: E-1.1 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 4 5 11 11 11 2 2 2

Labor Costs 365$ 363$ 543$ 1,050$ 1,059$ 454$ 247$ 253$ Non-Labor Costs 402 515 356 377 392 172 70 72 Total Costs 767$ 878$ 899$ 1,427$ 1,451$ 626$ 317$ 325$

DIRECT ASSIGNMENTS SDG&E 3$ -$ 38$ (13)$ 1$ -$ -$ -$ So Cal Gas 7 - - - - - - -

Subtotal - Utility 10 - 38 (13) 1 - - -

Global/Retained 3 20 20 (10) - - - -

Total Direct Assignments 13$ 20$ 58$ (22)$ 1$ -$ -$ -$

ALLOCATIONS SDG&E 131$ 155$ 196$ 335$ 340$ 152$ 78$ 81$ So Cal Gas 159 191 231 389 386 161 81 81

Subtotal - Utility 290 346 427 725 725 313 159 163

Global/Retained 465 513 414 725 725 313 159 163

Total Allocations 754$ 859$ 841$ 1,449$ 1,450$ 626$ 317$ 325$

BILLED COSTS SDG&E 134$ 155$ 234$ 323$ 340$ 152$ 78$ 81$ So Cal Gas 165 191 231 389 386 161 81 81

Subtotal - Utility 300 346 464 712 726 313 159 163

Global/Retained 467 533 435 715 725 313 159 163

Total Billed Costs 767$ 878$ 899$ 1,427$ 1,451$ 626$ 317$ 325$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-320 GRC APPLICATION - December 2010

Page 323: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-1 Communications Witness: Bruce Folkmann

Cost Center: 1100-0456-CORP RESPONSIBILITY REPORT

Workpaper: E-1.2

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 2 2 0 0 0

Labor Costs -$ -$ -$ 65$ 193$ 78$ -$ -$ Non-Labor Costs - - - 14 115 168 115 115 Total Costs -$ -$ -$ 78$ 309$ 246$ 115$ 115$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ 31$ 118$ 96$ 46$ 48$ So Cal Gas - - - 36 134 101 48 48

Subtotal - Utility - - - 67 253 196 94 96

Global/Retained - - - 12 56 49 22 20

Total Allocations -$ -$ -$ 78$ 309$ 246$ 115$ 115$

BILLED COSTS SDG&E -$ -$ -$ 31$ 118$ 96$ 46$ 48$ So Cal Gas - - - 36 134 101 48 48

Subtotal - Utility - - - 67 253 196 94 96

Global/Retained - - - 12 56 49 22 20

Total Billed Costs -$ -$ -$ 78$ 309$ 246$ 115$ 115$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-321 GRC APPLICATION - December 2010

Page 324: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 118$ 134$ 56$ 309$ 2

(39) (39) (16) (93) (1)

(42) (42) (17) (100) (1)

Change in Allocation 2009-2012 10 (6) (4) (0)

(70)$ (86)$ (36)$ (193)$ (2)

2012 - TEST YEAR 48$ 48$ 20$ 115$ -

41.54% 41.52% 16.94% 100.00%

48$ 48$ 20$ 115$

- - - -

48$ 48$ 20$ 115$

1100-0456-CORP RESPONSIBILITY REPORTE-1.2 Recon

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

E External AffairsE-1 Communications

Transferred FTE to cost center 1100-0157. See Recon workpaper E-2.3.

Transferred FTE to Sempra Generation.

Multi-Factor Basic

Allocations

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

SDG&E-17-WP BAF-WP-322 GRC APPLICATION - December 2010

Page 325: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-1 Communications Witness: Bruce Folkmann

Cost Center: 1100-0456-CORP RESPONSIBILITY REPORT

Workpaper: E-1.2 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 2 2 0 0 0

Labor Costs -$ -$ -$ 65$ 193$ 79$ -$ -$ Non-Labor Costs - - - 14 115 171 120 124 Total Costs -$ -$ -$ 78$ 309$ 250$ 120$ 124$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ 31$ 118$ 97$ 48$ 51$ So Cal Gas - - - 36 134 103 50 51

Subtotal - Utility - - - 67 253 200 98 103

Global/Retained - - - 12 56 50 23 21

Total Allocations -$ -$ -$ 78$ 309$ 250$ 120$ 124$

BILLED COSTS SDG&E -$ -$ -$ 31$ 118$ 97$ 48$ 51$ So Cal Gas - - - 36 134 103 50 51

Subtotal - Utility - - - 67 253 200 98 103

Global/Retained - - - 12 56 50 23 21

Total Billed Costs -$ -$ -$ 78$ 309$ 250$ 120$ 124$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-323 GRC APPLICATION - December 2010

Page 326: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-1 Communications Witness: Bruce Folkmann

Cost Center: 1100-0168-DIGITAL/PRINT COMMUNICATIONS

Workpaper: E-1.3

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 11 11 10 11 4 4 4

Labor Costs -$ 22$ 891$ 893$ 940$ 512$ 351$ 351$ Non-Labor Costs - 2 50 54 84 51 42 42 Total Costs -$ 24$ 940$ 947$ 1,024$ 563$ 393$ 393$

DIRECT ASSIGNMENTS SDG&E -$ -$ 4$ -$ 2$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - 4 - 2 - - -

Global/Retained - - - 4 24 23 23 23

Total Direct Assignments -$ -$ 4$ 4$ 26$ 23$ 23$ 23$

ALLOCATIONS SDG&E -$ 4$ 330$ 371$ 383$ 210$ 148$ 154$ So Cal Gas - 5 388 431 435 222 153 154

Subtotal - Utility - 9 718 802 817 432 301 307

Global/Retained - 15 219 141 181 108 69 63

Total Allocations -$ 24$ 937$ 944$ 998$ 540$ 370$ 370$

BILLED COSTS SDG&E -$ 4$ 333$ 371$ 385$ 210$ 148$ 154$ So Cal Gas - 5 388 431 435 222 153 154

Subtotal - Utility - 9 722 802 819 432 301 307

Global/Retained - 15 219 145 205 131 92 86

Total Billed Costs -$ 24$ 940$ 947$ 1,024$ 563$ 393$ 393$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-324 GRC APPLICATION - December 2010

Page 327: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 385$ 435$ 205$ 1,024$ 11

(263) (261) (107) (631) (7)

Change in Allocation 2009-2012 32 (20) (12) (0)

(231)$ (281)$ (119)$ (631)$ (7)

2012 - TEST YEAR 154$ 154$ 86$ 393$ 4

41.54% 41.52% 16.94% 100.00%

154$ 154$ 63$ 370$

(0) (0) 23 23

154$ 154$ 86$ 393$

Direct Assignment Details Contract labor charge to Global BU - - 23 23

E External AffairsE-1 Communications

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

Allocations

Direct Assignments

TOTAL 2012 ALLOCATIONS

1100-0168-DIGITAL/PRINT COMMUNICATIONSE-1.3 Recon

Decrease in labor and non-labor due to transfer of 7 FTES to SDG&E

Total Change from 2009

2012 ALLOCATION METHOD

Multi-Factor Basic

SDG&E-17-WP BAF-WP-325 GRC APPLICATION - December 2010

Page 328: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-1 Communications Witness: Bruce Folkmann

Cost Center: 1100-0168-DIGITAL/PRINT COMMUNICATIONS

Workpaper: E-1.3 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 11 11 10 11 4 4 4

Labor Costs -$ 22$ 891$ 893$ 940$ 521$ 366$ 375$ Non-Labor Costs - 2 50 54 84 52 44 45 Total Costs -$ 24$ 940$ 947$ 1,024$ 573$ 410$ 420$

DIRECT ASSIGNMENTS SDG&E -$ -$ 4$ -$ 2$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - 4 - 2 - - -

Global/Retained - - - 4 24 24 24 25

Total Direct Assignments -$ -$ 4$ 4$ 26$ 24$ 24$ 25$

ALLOCATIONS SDG&E -$ 4$ 330$ 371$ 383$ 214$ 154$ 164$ So Cal Gas - 5 388 431 435 226 160 164

Subtotal - Utility - 9 718 802 817 439 313 328

Global/Retained - 15 219 141 181 110 72 67

Total Allocations -$ 24$ 937$ 944$ 998$ 549$ 386$ 395$

BILLED COSTS SDG&E -$ 4$ 333$ 371$ 385$ 214$ 154$ 164$ So Cal Gas - 5 388 431 435 226 160 164

Subtotal - Utility - 9 722 802 819 439 313 328

Global/Retained - 15 219 145 205 134 96 92

Total Billed Costs -$ 24$ 940$ 947$ 1,024$ 573$ 410$ 420$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-326 GRC APPLICATION - December 2010

Page 329: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-1 Communications Witness: Bruce Folkmann

Cost Center: 1100-0208-INTERNET COMMUNICATIONS

Workpaper: E-1.4

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ 0$ -$ -$ -$ Non-Labor Costs 1,348 846 2,972 5,137 8,282 947 947 947 Total Costs 1,348$ 846$ 2,972$ 5,137$ 8,282$ 947$ 947$ 947$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 1,348 846 2,972 5,137 8,282 947 947 947

Total Allocations 1,348$ 846$ 2,972$ 5,137$ 8,282$ 947$ 947$ 947$

BILLED COSTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 1,348 846 2,972 5,137 8,282 947 947 947

Total Billed Costs 1,348$ 846$ 2,972$ 5,137$ 8,282$ 947$ 947$ 947$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-327 GRC APPLICATION - December 2010

Page 330: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR -$ -$ 8,282$ 8,282$ -

- - (7,335) (7,335)

Change in Allocation 2009-2012 - - - -

-$ -$ (7,335)$ (7,335)$ -

2012 - TEST YEAR -$ -$ 947$ 947$ -

0.00% 0.00% 100.00% 100.00%

-$ -$ 947$ 947$

- - - -

-$ -$ 947$ 947$

E External AffairsE-1 Communications

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

Allocations

Direct Assignments

TOTAL 2012 ALLOCATIONS

1100-0208-INTERNET COMMUNICATIONSE-1.4 Recon

Decrease due to transfer of advertising function to SDG&E

Total Change from 2009

2012 ALLOCATION METHOD

Retained

SDG&E-17-WP BAF-WP-328 GRC APPLICATION - December 2010

Page 331: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-1 Communications Witness: Bruce Folkmann

Cost Center: 1100-0208-INTERNET COMMUNICATIONS

Workpaper: E-1.4 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ 0$ -$ -$ -$ Non-Labor Costs 1,348 846 2,972 5,137 8,282 964 988 1,016 Total Costs 1,348$ 846$ 2,972$ 5,137$ 8,282$ 964$ 988$ 1,016$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 1,348 846 2,972 5,137 8,282 964 988 1,016

Total Allocations 1,348$ 846$ 2,972$ 5,137$ 8,282$ 964$ 988$ 1,016$

BILLED COSTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 1,348 846 2,972 5,137 8,282 964 988 1,016

Total Billed Costs 1,348$ 846$ 2,972$ 5,137$ 8,282$ 964$ 988$ 1,016$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-329 GRC APPLICATION - December 2010

Page 332: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-1 Communications Witness: Bruce Folkmann

Cost Center: 1100-0294-CORPORATE HOSPITALITY

Workpaper: E-1.5

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ -$ -$ -$ -$ Non-Labor Costs 388 436 668 383 240 225 225 225 Total Costs 388$ 436$ 668$ 383$ 240$ 225$ 225$ 225$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ (2)$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - (2) - - -

Global/Retained - - - 2 - - - -

Total Direct Assignments -$ -$ -$ 2$ (2)$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 388 436 668 381 242 225 225 225

Total Allocations 388$ 436$ 668$ 381$ 242$ 225$ 225$ 225$

BILLED COSTS SDG&E -$ -$ -$ -$ (2)$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - (2) - - -

Global/Retained 388 436 668 383 242 225 225 225

Total Billed Costs 388$ 436$ 668$ 383$ 240$ 225$ 225$ 225$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-330 GRC APPLICATION - December 2010

Page 333: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR (2)$ -$ 242$ 240$ -

2 - (17) (15)

Change in Allocation 2009-2012 - - - -

2$ -$ (17)$ (15)$ -

2012 - TEST YEAR -$ -$ 225$ 225$ -

0.00% 0.00% 100.00% 100.00%

-$ -$ 225$ 225$

- - - -

-$ -$ 225$ 225$

E External AffairsE-1 Communications

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

Allocations

Direct Assignments

TOTAL 2012 ALLOCATIONS

1100-0294-CORPORATE HOSPITALITYE-1.5 Recon

Reduction in Corporate Community Relations' Petco suite events.

Total Change from 2009

2012 ALLOCATION METHOD

Retained

SDG&E-17-WP BAF-WP-331 GRC APPLICATION - December 2010

Page 334: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-1 Communications Witness: Bruce Folkmann

Cost Center: 1100-0294-CORPORATE HOSPITALITY

Workpaper: E-1.5 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ -$ -$ -$ -$ Non-Labor Costs 388 436 668 383 240 229 235 241 Total Costs 388$ 436$ 668$ 383$ 240$ 229$ 235$ 241$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ (2)$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - (2) - - -

Global/Retained - - - 2 - - - -

Total Direct Assignments -$ -$ -$ 2$ (2)$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 388 436 668 381 242 229 235 241

Total Allocations 388$ 436$ 668$ 381$ 242$ 229$ 235$ 241$

BILLED COSTS SDG&E -$ -$ -$ -$ (2)$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - (2) - - -

Global/Retained 388 436 668 383 242 229 235 241

Total Billed Costs 388$ 436$ 668$ 383$ 240$ 229$ 235$ 241$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-332 GRC APPLICATION - December 2010

Page 335: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-1 Communications Witness: Bruce Folkmann

Cost Center: 1100-0378-ANNUAL REPORT

Workpaper: E-1.6

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs 0$ -$ -$ -$ -$ -$ -$ -$ Non-Labor Costs 733 777 640 764 513 500 500 500 Total Costs 733$ 777$ 640$ 764$ 513$ 500$ 500$ 500$

DIRECT ASSIGNMENTS SDG&E 4$ 28$ 23$ 30$ 11$ -$ -$ -$ So Cal Gas 30 14 14 10 9 - - -

Subtotal - Utility 35 42 37 40 20 - - -

Global/Retained 14 15 14 11 9 (0) - -

Total Direct Assignments 48$ 58$ 51$ 51$ 28$ (0)$ -$ -$

ALLOCATIONS SDG&E 238$ 249$ 208$ 281$ 186$ 194$ 200$ 208$ So Cal Gas 288 309 245 326 211 205 207 208

Subtotal - Utility 526 558 453 607 397 400 406 415

Global/Retained 159 161 137 107 88 100 94 85

Total Allocations 684$ 719$ 589$ 713$ 485$ 500$ 500$ 500$

BILLED COSTS SDG&E 242$ 277$ 230$ 310$ 197$ 194$ 200$ 208$ So Cal Gas 319 323 259 336 220 205 207 208

Subtotal - Utility 560 600 489 647 417 400 406 415

Global/Retained 173 177 151 118 97 100 94 85

Total Billed Costs 733$ 777$ 640$ 764$ 513$ 500$ 500$ 500$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-333 GRC APPLICATION - December 2010

Page 336: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 197$ 220$ 97$ 513$ -

(5) (2) (6) (13)

Change in Allocation 2009-2012 15 (10) (6) 0

11$ (12)$ (12)$ (13)$ -

2012 - TEST YEAR 208$ 208$ 85$ 500$ -

41.54% 41.52% 16.94% 100.00%

208$ 208$ 85$ 500$

- - - -

208$ 208$ 85$ 500$

E External AffairsE-1 Communications

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

Allocations

Direct Assignments

TOTAL 2012 ALLOCATIONS

1100-0378-ANNUAL REPORTE-1.6 Recon

Savings anticipated in Annual Report design and printing costs

Total Change from 2009

2012 ALLOCATION METHOD

Multi-Factor Basic

SDG&E-17-WP BAF-WP-334 GRC APPLICATION - December 2010

Page 337: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-1 Communications Witness: Bruce Folkmann

Cost Center: 1100-0378-ANNUAL REPORT

Workpaper: E-1.6 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs 0$ -$ -$ -$ -$ -$ -$ -$ Non-Labor Costs 733 777 640 764 513 509 521 535 Total Costs 733$ 777$ 640$ 764$ 513$ 509$ 521$ 535$

DIRECT ASSIGNMENTS SDG&E 4$ 28$ 23$ 30$ 11$ -$ -$ -$ So Cal Gas 30 14 14 10 9 - - -

Subtotal - Utility 35 42 37 40 20 - - -

Global/Retained 14 15 14 11 9 - - -

Total Direct Assignments 48$ 58$ 51$ 51$ 28$ -$ -$ -$

ALLOCATIONS SDG&E 238$ 249$ 208$ 281$ 186$ 198$ 208$ 222$ So Cal Gas 288 309 245 326 211 209 216 222

Subtotal - Utility 526 558 453 607 397 407 424 445

Global/Retained 159 161 137 107 88 102 98 91

Total Allocations 684$ 719$ 589$ 713$ 485$ 509$ 521$ 535$

BILLED COSTS SDG&E 242$ 277$ 230$ 310$ 197$ 198$ 208$ 222$ So Cal Gas 319 323 259 336 220 209 216 222

Subtotal - Utility 560 600 489 647 417 407 424 445

Global/Retained 173 177 151 118 97 102 98 91

Total Billed Costs 733$ 777$ 640$ 764$ 513$ 509$ 521$ 535$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-335 GRC APPLICATION - December 2010

Page 338: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E External Affairs Witness: Bruce Folkmann

Cost Center: E-2 Government Affairs

Workpaper: E-2

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 6 8 10 10 13 12 13 13

Labor Costs 737$ 1,047$ 1,110$ 1,403$ 1,371$ 1,538$ 1,534$ 1,534$ Non-Labor Costs 1,626 1,863 2,239 4,442 1,889 2,168 2,157 2,157 Total Costs 2,363$ 2,910$ 3,349$ 5,845$ 3,260$ 3,706$ 3,691$ 3,691$

DIRECT ASSIGNMENTS SDG&E -$ -$ 20$ 32$ 5$ -$ -$ -$ So Cal Gas -$ -$ 11$ 19$ 6$ -$ -$ -$

Subtotal - Utility - - 31 51 11 - - -

Global/Retained 9$ (10)$ 83$ 131$ (13)$ -$ -$ -$

Total Direct Assignments 9$ (10)$ 114$ 182$ (2)$ -$ -$ -$

ALLOCATIONS SDG&E 46$ 48$ 280$ 380$ 341$ 501$ 497$ 507$ So Cal Gas 56 59 352 463 410 574 564 563

Subtotal - Utility 102 107 632 843 751 1,075 1,061 1,070

Global/Retained 2,252 2,813 2,603 4,820 2,511 2,631 2,630 2,621

Total Allocations 2,354$ 2,920$ 3,235$ 5,663$ 3,262$ 3,706$ 3,691$ 3,691$

BILLED COSTS SDG&E 46$ 48$ 300$ 412$ 346$ 501$ 497$ 507$ So Cal Gas 56 59 363 482 416 574 564 563

Subtotal - Utility 102 107 663 894 762 1,075 1,061 1,070

Global/Retained 2,261 2,803 2,686 4,951 2,498 2,631 2,630 2,621

Total Billed Costs 2,363$ 2,910$ 3,349$ 5,845$ 3,260$ 3,706$ 3,691$ 3,691$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-336 GRC APPLICATION - December 2010

Page 339: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 346$ 416$ 2,498$ 3,260$ 13

87 104 159 350

- - 60 60

- - 20 20

Change in Allocation 2009-2012 73 43 (116) (0)

161$ 147$ 123$ 430$

2012 - TEST YEAR 507$ 563$ 2,621$ 3,690$ 13

507$ 563$ 2,621$ 3,691$

(0) (0) (0) (0)

507$ 563$ 2,621$ 3,690$

Direct Assignments

TOTAL 2012 ALLOCATIONS

E-2 Government AffairsE-2 Recon

Total Change from 2009

Allocations

Labor changes as a result of the reorganization and filling vacancies. Increased political activity for the 2012 Presidential election. Increase in Washington office rent due to the escalation in contract terms.

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

I CORPORATE CENTER SHARED SERVICESE External Affairs

SDG&E-17-WP BAF-WP-337 GRC APPLICATION - December 2010

Page 340: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E External Affairs Witness: Bruce Folkmann

Cost Center: E-2 Government Affairs

Workpaper: E-2 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 6 8 10 10 13 12 13 13

Labor Costs 737$ 1,047$ 1,110$ 1,403$ 1,371$ 1,565$ 1,600$ 1,638$ Non-Labor Costs 1,626 1,863 2,239 4,442 1,889 2,208 2,251 2,313 Total Costs 2,363$ 2,910$ 3,348$ 5,845$ 3,260$ 3,773$ 3,851$ 3,952$

DIRECT ASSIGNMENTS SDG&E -$ -$ 20$ 32$ 5$ -$ -$ -$ So Cal Gas - - 11 19 6 - - -

Subtotal - Utility - - 31 50 12 - - -

Global/Retained 11 (10) 82 132 (13) - - -

Total Direct Assignments 11$ (10)$ 113$ 182$ (1)$ -$ -$ -$

ALLOCATIONS SDG&E 46$ 48$ 280$ 380$ 341$ 510$ 518$ 542$ So Cal Gas 56 59 352 463 410 584 589 602

Subtotal - Utility 101 107 632 843 750 1,094 1,107 1,144

Global/Retained 2,252 2,813 2,603 4,820 2,511 2,679 2,744 2,808

Total Allocations 2,353$ 2,921$ 3,235$ 5,662$ 3,261$ 3,773$ 3,851$ 3,952$

BILLED COSTS SDG&E 46$ 48$ 300$ 412$ 346$ 510$ 518$ 542$ So Cal Gas 56 59 363 482 416 584 589 602

Subtotal - Utility 101 107 663 893 762 1,094 1,107 1,144

Global/Retained 2,262 2,803 2,685 4,951 2,498 2,679 2,744 2,808

Total Billed Costs 2,363$ 2,910$ 3,348$ 5,845$ 3,260$ 3,773$ 3,851$ 3,952$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-338 GRC APPLICATION - December 2010

Page 341: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-2 Government Affairs Witness: Bruce Folkmann

Cost Center: 1100-0150-VP - CORP RELATIONS

Workpaper: E-2.1

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 2 2 1 1 1 1 2 2

Labor Costs 338$ 573$ 300$ 413$ 332$ 325$ 325$ 325$ Non-Labor Costs 206 122 503 410 142 326 326 326 Total Costs 544$ 695$ 802$ 823$ 474$ 651$ 651$ 651$

DIRECT ASSIGNMENTS SDG&E -$ -$ 20$ 32$ -$ -$ -$ -$ So Cal Gas - - 11 19 - - - -

Subtotal - Utility - - 31 51 - - - -

Global/Retained - - 79 129 - - - -

Total Direct Assignments -$ -$ 110$ 180$ -$ -$ -$ -$

ALLOCATIONS SDG&E 46$ 37$ 80$ 80$ 59$ 159$ 150$ 155$ So Cal Gas 56 46 97 97 70 174 164 164

Subtotal - Utility 101 82 177 177 129 333 314 318

Global/Retained 443 612 515 466 345 318 337 332

Total Allocations 544$ 695$ 692$ 643$ 474$ 651$ 651$ 651$

BILLED COSTS SDG&E 46$ 37$ 99$ 112$ 59$ 159$ 150$ 155$ So Cal Gas 56 46 108 116 70 174 164 164

Subtotal - Utility 101 82 208 228 129 333 314 318

Global/Retained 443 612 595 596 345 318 337 332

Total Billed Costs 544$ 695$ 802$ 823$ 474$ 651$ 651$ 651$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-339 GRC APPLICATION - December 2010

Page 342: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 59$ 70$ 345$ 474$ 1

42 44 90 176 1

Change in Allocation 2009-2012 54 49 (103) (0)

96$ 93$ (13)$ 176$ 1

2012 - TEST YEAR 155$ 164$ 332$ 651$ 2

23.76% 25.17% 51.07% 100.00%

155$ 164$ 332$ 651$

(0) (0) (0) (0)

155$ 164$ 332$ 651$

E External AffairsE-2 Government Affairs

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

Allocations

Direct Assignments

TOTAL 2012 ALLOCATIONS

1100-0150-VP - CORP RELATIONSE-2.1 Recon

Consulting and additional division support after 2010 reorganization and reductions in E-3.

Total Change from 2009

2012 ALLOCATION METHOD

Avg - VP Corporate Relations

SDG&E-17-WP BAF-WP-340 GRC APPLICATION - December 2010

Page 343: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-2 Government Affairs Witness: Bruce Folkmann

Cost Center: 1100-0150-VP - CORP RELATIONS

Workpaper: E-2.1 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 2 2 1 1 1 1 2 2

Labor Costs 338$ 573$ 300$ 413$ 332$ 330$ 339$ 347$ Non-Labor Costs 206 122 503 410 142 332 340 350 Total Costs 544$ 695$ 802$ 823$ 474$ 662$ 679$ 697$

DIRECT ASSIGNMENTS SDG&E -$ -$ 20$ 32$ -$ -$ -$ -$ So Cal Gas - - 11 19 - - - -

Subtotal - Utility - - 31 51 - - - -

Global/Retained - - 79 129 - - - -

Total Direct Assignments -$ -$ 110$ 180$ -$ -$ -$ -$

ALLOCATIONS SDG&E 46$ 37$ 80$ 80$ 59$ 162$ 157$ 165$ So Cal Gas 56 46 97 97 70 177 171 175

Subtotal - Utility 101 82 177 177 129 339 328 341

Global/Retained 443 612 515 466 345 324 351 356

Total Allocations 544$ 695$ 692$ 643$ 474$ 662$ 679$ 697$

BILLED COSTS SDG&E 46$ 37$ 99$ 112$ 59$ 162$ 157$ 165$ So Cal Gas 56 46 108 116 70 177 171 175

Subtotal - Utility 101 82 208 228 129 339 328 341

Global/Retained 443 612 595 596 345 324 351 356

Total Billed Costs 544$ 695$ 802$ 823$ 474$ 662$ 679$ 697$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-341 GRC APPLICATION - December 2010

Page 344: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-2 Government Affairs Witness: Bruce Folkmann

Cost Center: 1100-0152-FEDERAL GOVERNMENT AFFAIRS

Workpaper: E-2.2

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 4 3 2 2 3 3 3 3

Labor Costs 399$ 450$ 275$ 227$ 312$ 398$ 398$ 398$ Non-Labor Costs 679 688 733 629 617 647 647 647 Total Costs 1,079$ 1,138$ 1,009$ 856$ 930$ 1,044$ 1,044$ 1,044$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 11 (10) - - - - - -

Total Direct Assignments 11$ (10)$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 1,068 1,149 1,009 856 930 1,044 1,044 1,044

Total Allocations 1,068$ 1,149$ 1,009$ 856$ 930$ 1,044$ 1,044$ 1,044$

BILLED COSTS SDG&E -$ 0$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - 0 - - - - - -

Global/Retained 1,079 1,138 1,009 856 930 1,044 1,044 1,044

Total Billed Costs 1,079$ 1,138$ 1,009$ 856$ 930$ 1,044$ 1,044$ 1,044$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-342 GRC APPLICATION - December 2010

Page 345: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR -$ -$ 930$ 930$ 3

- - 95 95

- - 20 20

Change in Allocation 2009-2012 - - - -

-$ -$ 115$ 115$

2012 - TEST YEAR -$ -$ 1,044$ 1,044$ 3

0.00% 0.00% 100.00% 100.00%

0$ 0$ 1,044$ 1,044$

(0) (0) (0) (0)

1100-0152-FEDERAL GOVERNMENT AFFAIRSE-2.2 Recon

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

E External AffairsE-2 Government Affairs

Partial year labor vacancy filled in 2009.Increase in office rent due to escalation in contract terms.

Retained

Allocations

Direct Assignments

Total Change from 2009

2012 ALLOCATION METHOD

SDG&E-17-WP BAF-WP-343 GRC APPLICATION - December 2010

Page 346: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-2 Government Affairs Witness: Bruce Folkmann

Cost Center: 1100-0152-FEDERAL GOVERNMENT AFFAIRS

Workpaper: E-2.2 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 4 3 2 2 3 3 3 3

Labor Costs 399$ 450$ 275$ 227$ 312$ 404$ 415$ 425$ Non-Labor Costs 679 688 733 629 617 659 675 694 Total Costs 1,079$ 1,138$ 1,009$ 856$ 930$ 1,063$ 1,090$ 1,119$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 11 (10) - - - - - -

Total Direct Assignments 11$ (10)$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 1,068 1,149 1,009 856 930 1,063 1,090 1,119

Total Allocations 1,068$ 1,149$ 1,009$ 856$ 930$ 1,063$ 1,090$ 1,119$

BILLED COSTS SDG&E -$ 0$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - 0 - - - - - -

Global/Retained 1,079 1,138 1,009 856 930 1,063 1,090 1,119

Total Billed Costs 1,079$ 1,138$ 1,009$ 856$ 930$ 1,063$ 1,090$ 1,119$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-344 GRC APPLICATION - December 2010

Page 347: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-2 Government Affairs Witness: Bruce Folkmann

Cost Center: 1100-0157-GOVT PROGRAMS & CORP RESPONSIBILITY

Workpaper: E-2.3

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 2 4 4 4 5 5 5

Labor Costs -$ 23$ 339$ 406$ 323$ 481$ 499$ 499$ Non-Labor Costs - 6 117 56 69 73 73 73 Total Costs -$ 29$ 457$ 462$ 392$ 554$ 572$ 572$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - 3 - - - - -

Total Direct Assignments -$ -$ 3$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ 11$ 179$ 181$ 156$ 216$ 226$ 230$ So Cal Gas - 14 230 228 196 266 276 276

Subtotal - Utility - 25 409 408 351 483 502 506

Global/Retained - 4 45 54 41 71 70 66

Total Allocations -$ 29$ 454$ 462$ 392$ 554$ 572$ 572$

BILLED COSTS SDG&E -$ 11$ 179$ 181$ 156$ 216$ 226$ 230$ So Cal Gas - 14 230 228 196 266 276 276

Subtotal - Utility - 25 409 408 351 483 502 506

Global/Retained - 4 48 54 41 71 70 66

Total Billed Costs -$ 29$ 457$ 462$ 392$ 554$ 572$ 572$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-345 GRC APPLICATION - December 2010

Page 348: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 156$ 196$ 41$ 392$ 4

35 42 10 87

37 45 11 93 1

Change in Allocation 2009-2012 2 (6) 4 (0)

74$ 80$ 25$ 180$ 1

2012 - TEST YEAR 230$ 276$ 66$ 572$ 5

40.16% 48.29% 11.55% 100.00%

230$ 276$ 66$ 572$

(0) (0) (0) (0)

230$ 276$ 66$ 572$

1100-0157-GOVT PROGRAMS & CORP RESPONSIBILITYE-2.3 Recon

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

E External AffairsE-2 Government Affairs

Full-year impact of 2 labor vacancies filled in 2009.Transferred 1 FTE from 1100-0456; see Recon workpaper E-1.2

Causal - Local Govt Affairs

Allocations

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

SDG&E-17-WP BAF-WP-346 GRC APPLICATION - December 2010

Page 349: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-2 Government Affairs Witness: Bruce Folkmann

Cost Center: 1100-0157-GOVT PROGRAMS & CORP RESPONSIBILITY

Workpaper: E-2.3 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 2 4 4 4 5 5 5

Labor Costs -$ 23$ 339$ 406$ 323$ 490$ 521$ 533$ Non-Labor Costs - 6 117 56 69 74 76 78 Total Costs -$ 29$ 457$ 462$ 392$ 564$ 597$ 611$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - 3 - - - - -

Total Direct Assignments -$ -$ 3$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ 11$ 179$ 181$ 156$ 220$ 236$ 245$ So Cal Gas - 14 230 228 196 271 288 295

Subtotal - Utility - 25 409 408 351 491 523 541

Global/Retained - 4 45 54 41 73 73 71

Total Allocations -$ 29$ 454$ 462$ 392$ 564$ 597$ 611$

BILLED COSTS SDG&E -$ 11$ 179$ 181$ 156$ 220$ 236$ 245$ So Cal Gas - 14 230 228 196 271 288 295

Subtotal - Utility - 25 409 408 351 491 523 541

Global/Retained - 4 48 54 41 73 73 71

Total Billed Costs -$ 29$ 457$ 462$ 392$ 564$ 597$ 611$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-347 GRC APPLICATION - December 2010

Page 350: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-2 Government Affairs Witness: Bruce Folkmann

Cost Center: 1100-0151-CORPORATE POLITICAL CONTR

Workpaper: E-2.4

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ -$ -$ -$ -$ Non-Labor Costs 740 1,047 851 3,131 853 914 914 914 Total Costs 740$ 1,047$ 851$ 3,131$ 853$ 914$ 914$ 914$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 740 1,047 851 3,131 853 914 914 914

Total Allocations 740$ 1,047$ 851$ 3,131$ 853$ 914$ 914$ 914$

BILLED COSTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 740 1,047 851 3,131 853 914 914 914

Total Billed Costs 740$ 1,047$ 851$ 3,131$ 853$ 914$ 914$ 914$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-348 GRC APPLICATION - December 2010

Page 351: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR -$ -$ 853$ 853$ -

- - 60 60

Change in Allocation 2009-2012 - - - -

-$ -$ 60$ 60$ -

2012 - TEST YEAR -$ -$ 914$ 914$ -

0.00% 0.00% 100.00% 100.00%

-$ -$ 914$ 914$

- - - -

-$ -$ 914$ 914$

E External AffairsE-2 Government Affairs

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

Allocations

Direct Assignments

TOTAL 2012 ALLOCATIONS

1100-0151-CORPORATE POLITICAL CONTRE-2.4 Recon

Increased contributions for the 2012 Presidential election

Total Change from 2009

2012 ALLOCATION METHOD

Retained

SDG&E-17-WP BAF-WP-349 GRC APPLICATION - December 2010

Page 352: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-2 Government Affairs Witness: Bruce Folkmann

Cost Center: 1100-0151-CORPORATE POLITICAL CONTR

Workpaper: E-2.4 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ -$ -$ -$ -$ Non-Labor Costs 740 1,047 851 3,131 853 931 954 980 Total Costs 740$ 1,047$ 851$ 3,131$ 853$ 931$ 954$ 980$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 740 1,047 851 3,131 853 931 954 980

Total Allocations 740$ 1,047$ 851$ 3,131$ 853$ 931$ 954$ 980$

BILLED COSTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 740 1,047 851 3,131 853 931 954 980

Total Billed Costs 740$ 1,047$ 851$ 3,131$ 853$ 931$ 954$ 980$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-350 GRC APPLICATION - December 2010

Page 353: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-2 Government Affairs Witness: Bruce Folkmann

Cost Center: 1100-0395-COMPLIANCE / REPORTING & ANALYSIS

Workpaper: E-2.5

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 1 1 2 3 1 1 1

Labor Costs -$ 1$ 52$ 162$ 197$ 125$ 103$ 103$ Non-Labor Costs - 0 9 22 27 25 16 16 Total Costs -$ 1$ 60$ 183$ 224$ 150$ 119$ 119$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - 2 (1) - - -

Total Direct Assignments -$ -$ -$ 2$ (1)$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ 21$ 37$ 42$ 31$ 24$ 25$ So Cal Gas - - 25 43 48 32 25 25

Subtotal - Utility - - 46 81 91 63 50 50

Global/Retained - 1 14 100 134 87 69 69

Total Allocations -$ 1$ 60$ 181$ 225$ 150$ 119$ 119$

BILLED COSTS SDG&E -$ -$ 21$ 37$ 42$ 31$ 24$ 25$ So Cal Gas - - 25 43 48 32 25 25

Subtotal - Utility - - 46 81 91 63 50 50

Global/Retained - 1 14 102 133 87 69 69

Total Billed Costs -$ 1$ 60$ 183$ 224$ 150$ 119$ 119$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-351 GRC APPLICATION - December 2010

Page 354: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 42$ 48$ 133$ 224$ 3

Staff reduction in 2010 Reorganization. (22) (22) (60) (105) (2)

Change in Allocation 2009-2012 5 (1) (3) (0)

(18)$ (23)$ (64)$ (105)$ (2)

2012 - TEST YEAR 25$ 25$ 69$ 119$ 1

20.93% 20.92% 58.15% 100.00%

25$ 25$ 69$ 119$

(0) (0) (0) (0)

25$ 25$ 69$ 119$

E External AffairsE-2 Government Affairs

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

Direct Assignments

TOTAL 2012 ALLOCATIONS

1100-0395-COMPLIANCE / REPORTING & ANALYSISE-2.5 Recon

Total Change from 2009

2012 ALLOCATION METHOD

Multi-Factor Variation - Political

Allocations

SDG&E-17-WP BAF-WP-352 GRC APPLICATION - December 2010

Page 355: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-2 Government Affairs Witness: Bruce Folkmann

Cost Center: 1100-0395-COMPLIANCE / REPORTING & ANALYSIS

Workpaper: E-2.5 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 1 1 2 3 1 1 1

Labor Costs -$ 1$ 52$ 162$ 197$ 127$ 107$ 110$ Non-Labor Costs - 0 9 22 27 26 17 17 Total Costs -$ 1$ 60$ 183$ 224$ 153$ 124$ 127$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - 2 (1) - - -

Total Direct Assignments -$ -$ -$ 2$ (1)$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ 21$ 37$ 42$ 31$ 26$ 27$ So Cal Gas - - 25 43 48 33 26 27

Subtotal - Utility - - 46 81 91 64 52 53

Global/Retained - 1 14 100 134 89 72 74

Total Allocations -$ 1$ 60$ 181$ 225$ 153$ 124$ 127$

BILLED COSTS SDG&E -$ -$ 21$ 37$ 42$ 31$ 26$ 27$ So Cal Gas - - 25 43 48 33 26 27

Subtotal - Utility - - 46 81 91 64 52 53

Global/Retained - 1 14 102 133 89 72 74

Total Billed Costs -$ 1$ 60$ 183$ 224$ 153$ 124$ 127$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-353 GRC APPLICATION - December 2010

Page 356: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-2 Government Affairs Witness: Bruce Folkmann

Cost Center: 1100-0163-FERC RELATIONS

Workpaper: E-2.6

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 2 1 2 2 2 2

Labor Costs -$ -$ 144$ 194$ 207$ 209$ 209$ 209$ Non-Labor Costs - - 26 195 180 183 181 181 Total Costs -$ -$ 170$ 389$ 387$ 393$ 390$ 390$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ 5$ -$ -$ -$ So Cal Gas - - - - 6 - - -

Subtotal - Utility - - - - 12 - - -

Global/Retained - - - - (12) - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ 82$ 84$ 95$ 96$ 98$ So Cal Gas - - - 95 95 101 99 98

Subtotal - Utility - - - 177 179 196 195 195

Global/Retained - - 170 212 208 196 195 195

Total Allocations -$ -$ 170$ 389$ 387$ 393$ 390$ 390$

BILLED COSTS SDG&E -$ -$ -$ 82$ 90$ 95$ 96$ 98$ So Cal Gas - - - 95 102 101 99 98

Subtotal - Utility - - - 177 191 196 195 195

Global/Retained - - 170 212 196 196 195 195

Total Billed Costs -$ -$ 170$ 389$ 387$ 393$ 390$ 390$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-354 GRC APPLICATION - December 2010

Page 357: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 90$ 102$ 196$ 387$ 2

(5) (5) 13 3

Change in Allocation 2009-2012 13 1 (14) -

8$ (4)$ (1)$ 3$ -

2012 - TEST YEAR 98$ 98$ 195$ 390$ 2

25.01% 24.99% 50.00% 100.00%

98$ 98$ 195$ 391$

(0) (0) (0) (0)

98$ 98$ 195$ 390$

E External AffairsE-2 Government Affairs

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

Allocations

Direct Assignments

TOTAL 2012 ALLOCATIONS

1100-0163-FERC RELATIONSE-2.6 Recon

Change due to 2009 direct charges included in allocation for 2012

Total Change from 2009

2012 ALLOCATION METHOD

Multi-Factor Split

SDG&E-17-WP BAF-WP-355 GRC APPLICATION - December 2010

Page 358: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-2 Government Affairs Witness: Bruce Folkmann

Cost Center: 1100-0163-FERC RELATIONS

Workpaper: E-2.6 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 2 1 2 2 2 2

Labor Costs -$ -$ 144$ 194$ 207$ 213$ 218$ 224$ Non-Labor Costs - - 26 195 180 187 189 194 Total Costs -$ -$ 170$ 389$ 387$ 400$ 407$ 418$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ 5$ -$ -$ -$ So Cal Gas - - - - 6 - - -

Subtotal - Utility - - - - 12 - - -

Global/Retained - - - - (12) - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ 82$ 84$ 97$ 100$ 104$ So Cal Gas - - - 95 95 103 104 104

Subtotal - Utility - - - 177 179 200 204 209

Global/Retained - - 170 212 208 200 204 209

Total Allocations -$ -$ 170$ 389$ 387$ 400$ 407$ 418$

BILLED COSTS SDG&E -$ -$ -$ 82$ 90$ 97$ 100$ 104$ So Cal Gas - - - 95 102 103 104 104

Subtotal - Utility - - - 177 191 200 204 209

Global/Retained - - 170 212 196 200 204 209

Total Billed Costs -$ -$ 170$ 389$ 387$ 400$ 407$ 418$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-356 GRC APPLICATION - December 2010

Page 359: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E External Affairs Witness: Bruce Folkmann

Cost Center: E-3 External Affairs

Workpaper: E-3

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 30 40 38 45 44 0 0 0

Labor Costs 3,300$ 2,710$ 4,957$ 5,347$ 5,660$ 1,341$ -$ -$ Non-Labor Costs 3,473 3,273 5,000 3,817 2,952 830 - - Total Costs 6,774$ 5,983$ 9,958$ 9,164$ 8,612$ 2,171$ -$ -$

DIRECT ASSIGNMENTS SDG&E 15$ 19$ 10$ -$ 25$ -$ -$ -$ So Cal Gas -$ -$ 8$ -$ 27$ -$ -$ -$

Subtotal - Utility 15 19 18 - 53 - - -

Global/Retained 879$ 46$ 169$ 132$ 310$ -$ -$ -$

Total Direct Assignments 893$ 65$ 187$ 132$ 363$ -$ -$ -$

ALLOCATIONS SDG&E 426$ 464$ 1,078$ 1,119$ 1,318$ 901$ -$ -$ So Cal Gas 543 589 1,310 1,312 1,510 485 - -

Subtotal - Utility 969 1,053 2,388 2,431 2,828 1,386 - -

Global/Retained 4,911 4,865 7,382 6,600 5,421 785 - -

Total Allocations 5,880$ 5,918$ 9,771$ 9,031$ 8,249$ 2,170$ -$ -$

BILLED COSTS SDG&E 441$ 483$ 1,088$ 1,119$ 1,344$ 901$ -$ -$ So Cal Gas 543 589 1,318 1,313 1,537 485 - -

Subtotal - Utility 983 1,072 2,406 2,432 2,881 1,386 - -

Global/Retained 5,790 4,911 7,551 6,732 5,731 785 - -

Total Billed Costs 6,774$ 5,983$ 9,958$ 9,164$ 8,612$ 2,171$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-357 GRC APPLICATION - December 2010

Page 360: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 30,310$ 30,460$ 89,894$ 150,665$ 44

(16,695) (17,265) (32,863) (66,823) (44)

Change in Allocation 2009-2012 - - - -

(30,310)$ (30,460)$ (89,894)$ (66,823)$ (44)

2012 - TEST YEAR -$ -$ -$ -$ -

-$ -$ -$ -$

- - - -

-$ -$ -$ -$ TOTAL 2012 ALLOCATIONS

E-3 External AffairsE-3 Recon

Total Change from 2009

Allocations

Eliminated or transferred department, as a result of the 2010 reorganization.

I CORPORATE CENTER SHARED SERVICESE External Affairs

Direct Assignments

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

SDG&E-17-WP BAF-WP-358 GRC APPLICATION - December 2010

Page 361: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E External Affairs Witness: Bruce Folkmann

Cost Center: E-3 External Affairs

Workpaper: E-3 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 30 40 38 45 44 0 0 0

Labor Costs 3,300$ 2,710$ 4,957$ 5,347$ 5,660$ 1,365$ -$ -$ Non-Labor Costs 3,473 3,273 5,000 3,817 2,952 845 - - Total Costs 6,774$ 5,983$ 9,958$ 9,164$ 8,612$ 2,210$ -$ -$

DIRECT ASSIGNMENTS SDG&E 15$ 19$ 10$ -$ 25$ -$ -$ -$ So Cal Gas - - 8 - 27 - - -

Subtotal - Utility 15 19 18 - 53 - - -

Global/Retained 879 46 169 132 310 - - -

Total Direct Assignments 893$ 65$ 187$ 132$ 363$ -$ -$ -$

ALLOCATIONS SDG&E 426$ 464$ 1,078$ 1,119$ 1,318$ 917$ -$ -$ So Cal Gas 543 589 1,310 1,312 1,510 494 - -

Subtotal - Utility 969 1,053 2,388 2,431 2,828 1,410 - -

Global/Retained 4,911 4,865 7,382 6,600 5,421 799 - -

Total Allocations 5,880$ 5,918$ 9,771$ 9,031$ 8,249$ 2,209$ -$ -$

BILLED COSTS SDG&E 441$ 483$ 1,088$ 1,119$ 1,344$ 917$ -$ -$ So Cal Gas 543 589 1,318 1,313 1,537 494 - -

Subtotal - Utility 983 1,072 2,406 2,432 2,881 1,411 - -

Global/Retained 5,790 4,911 7,551 6,732 5,731 799 - -

Total Billed Costs 6,774$ 5,983$ 9,958$ 9,164$ 8,612$ 2,210$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-359 GRC APPLICATION - December 2010

Page 362: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-3 External Affairs Witness: Bruce Folkmann

Cost Center: 1100-0147-EVP - EXTERNAL RELATIONS

Workpaper: E-3.1

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 2 2 2 2 0 0 0

Labor Costs 1$ 210$ 418$ 477$ 482$ 115$ -$ -$ Non-Labor Costs 0 43 293 251 166 72 - - Total Costs 1$ 254$ 711$ 728$ 648$ 187$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ 7$ -$ -$ -$ -$ -$ So Cal Gas - - 8 - - - - -

Subtotal - Utility - - 15 - - - - -

Global/Retained - - 45 - - - - -

Total Direct Assignments -$ -$ 61$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 0$ 35$ 123$ 129$ 122$ 29$ -$ -$ So Cal Gas 0 44 150 155 144 32 - -

Subtotal - Utility 0 79 272 283 267 61 - -

Global/Retained 1 175 378 444 382 126 - -

Total Allocations 1$ 254$ 650$ 728$ 648$ 187$ -$ -$

BILLED COSTS SDG&E 0$ 35$ 130$ 129$ 122$ 29$ -$ -$ So Cal Gas 0 44 158 155 144 32 - -

Subtotal - Utility 0 79 288 283 267 61 - -

Global/Retained 1 175 423 444 382 126 - -

Total Billed Costs 1$ 254$ 711$ 728$ 648$ 187$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-360 GRC APPLICATION - December 2010

Page 363: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 122$ 144$ 382$ 648$ 2

(122) (144) (382) (648) (2)

Change in Allocation 2009-2012 - - - -

(122)$ (144)$ (382)$ (648)$ (2)

2012 - TEST YEAR -$ -$ -$ -$ -

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

Eliminated cost center as a result of the 2010 Reorganization

Total Change from 2009

E External AffairsE-3 External Affairs1100-0147-EVP - EXTERNAL RELATIONSE-3.1 Recon

SDG&E-17-WP BAF-WP-361 GRC APPLICATION - December 2010

Page 364: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-3 External Affairs Witness: Bruce Folkmann

Cost Center: 1100-0147-EVP - EXTERNAL RELATIONS

Workpaper: E-3.1 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 2 2 2 2 0 0 0

Labor Costs 1$ 210$ 418$ 477$ 482$ 117$ -$ -$ Non-Labor Costs 0 43 293 251 166 74 - - Total Costs 1$ 254$ 711$ 728$ 648$ 190$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ 7$ -$ -$ -$ -$ -$ So Cal Gas - - 8 - - - - -

Subtotal - Utility - - 15 - - - - -

Global/Retained - - 45 - - - - -

Total Direct Assignments -$ -$ 61$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 0$ 35$ 123$ 129$ 122$ 29$ -$ -$ So Cal Gas 0 44 150 155 144 32 - -

Subtotal - Utility 0 79 272 283 267 62 - -

Global/Retained 1 175 378 444 382 129 - -

Total Allocations 1$ 254$ 650$ 728$ 648$ 190$ -$ -$

BILLED COSTS SDG&E 0$ 35$ 130$ 129$ 122$ 29$ -$ -$ So Cal Gas 0 44 158 155 144 32 - -

Subtotal - Utility 0 79 288 283 267 62 - -

Global/Retained 1 175 423 444 382 129 - -

Total Billed Costs 1$ 254$ 711$ 728$ 648$ 190$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-362 GRC APPLICATION - December 2010

Page 365: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-3 External Affairs Witness: Bruce Folkmann

Cost Center: 1100-0379-VP - REGULATORY AFFAIRS

Workpaper: E-3.2

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 7 1 1 1 1 0 0 0

Labor Costs 1,197$ 86$ 343$ 350$ 359$ 83$ -$ -$ Non-Labor Costs 688 88 170 116 207 69 - - Total Costs 1,885$ 174$ 513$ 466$ 567$ 153$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 273 - - 8 - - - -

Total Direct Assignments 273$ -$ -$ 8$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ 2$ 23$ 47$ 65$ 64$ -$ -$ So Cal Gas - 3 27 54 74 8 - -

Subtotal - Utility - 5 51 101 139 71 - -

Global/Retained 1,613 169 462 357 428 81 - -

Total Allocations 1,613$ 174$ 513$ 458$ 567$ 153$ -$ -$

BILLED COSTS SDG&E -$ 2$ 23$ 47$ 65$ 64$ -$ -$ So Cal Gas 0 3 27 54 74 8 - -

Subtotal - Utility 0 5 51 101 139 71 - -

Global/Retained 1,885 169 462 365 428 81 - -

Total Billed Costs 1,885$ 174$ 513$ 466$ 567$ 153$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-363 GRC APPLICATION - December 2010

Page 366: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 65$ 74$ 428$ 567$ 1

(65) (74) (428) (567) (1)

Change in Allocation 2009-2012 - - - -

(65)$ (74)$ (428)$ (567)$ (1)

2012 - TEST YEAR -$ -$ -$ -$ -

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

Eliminated cost center as a result of the 2010 Reorganization

Total Change from 2009

E External AffairsE-3 External Affairs1100-0379-VP - REGULATORY AFFAIRSE-3.2 Recon

SDG&E-17-WP BAF-WP-364 GRC APPLICATION - December 2010

Page 367: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-3 External Affairs Witness: Bruce Folkmann

Cost Center: 1100-0379-VP - REGULATORY AFFAIRS

Workpaper: E-3.2 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 7 1 1 1 1 0 0 0

Labor Costs 1,197$ 86$ 343$ 350$ 359$ 84$ -$ -$ Non-Labor Costs 688 88 170 116 207 71 - - Total Costs 1,885$ 174$ 513$ 466$ 567$ 155$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 273 - - 8 - - - -

Total Direct Assignments 273$ -$ -$ 8$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ 2$ 23$ 47$ 65$ 65$ -$ -$ So Cal Gas - 3 27 54 74 8 - -

Subtotal - Utility - 5 51 101 139 73 - -

Global/Retained 1,613 169 462 357 428 83 - -

Total Allocations 1,613$ 174$ 513$ 458$ 567$ 155$ -$ -$

BILLED COSTS SDG&E -$ 2$ 23$ 47$ 65$ 65$ -$ -$ So Cal Gas 0 3 27 54 74 8 - -

Subtotal - Utility 0 5 51 101 139 73 - -

Global/Retained 1,885 169 462 365 428 83 - -

Total Billed Costs 1,885$ 174$ 513$ 466$ 567$ 155$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-365 GRC APPLICATION - December 2010

Page 368: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-3 External Affairs Witness: Bruce Folkmann

Cost Center: 1100-0400-CORPORATE LEGISLATIVE POL

Workpaper: E-3.3

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 2 3 5 5 0 0 0

Labor Costs -$ 31$ 377$ 366$ 550$ 133$ -$ -$ Non-Labor Costs - 0 16 10 118 29 - - Total Costs -$ 31$ 393$ 376$ 668$ 162$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - (1) 1 - - - - -

Total Direct Assignments -$ (1)$ 1$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ 10$ 138$ 148$ 256$ 63$ -$ -$ So Cal Gas - 12 163 172 291 67 - -

Subtotal - Utility - 22 301 320 547 130 - -

Global/Retained - 10 91 56 121 32 - -

Total Allocations -$ 32$ 392$ 376$ 668$ 162$ -$ -$

BILLED COSTS SDG&E -$ 10$ 138$ 148$ 256$ 63$ -$ -$ So Cal Gas - 12 163 172 291 67 - -

Subtotal - Utility - 22 301 320 547 130 - -

Global/Retained - 9 92 56 121 32 - -

Total Billed Costs -$ 31$ 393$ 376$ 668$ 162$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-366 GRC APPLICATION - December 2010

Page 369: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 256$ 291$ 121$ 668$ 5

(256) (291) (121) (668) (5)

Change in Allocation 2009-2012 - - - -

(256)$ (291)$ (121)$ (668)$ (5)

2012 - TEST YEAR -$ -$ -$ -$ -

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

Eliminated cost center as a result of the 2010 Reorganization

Total Change from 2009

E External AffairsE-3 External Affairs1100-0400-CORPORATE LEGISLATIVE POLE-3.3 Recon

SDG&E-17-WP BAF-WP-367 GRC APPLICATION - December 2010

Page 370: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-3 External Affairs Witness: Bruce Folkmann

Cost Center: 1100-0400-CORPORATE LEGISLATIVE POL

Workpaper: E-3.3 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 2 3 5 5 0 0 0

Labor Costs -$ 31$ 377$ 366$ 550$ 135$ -$ -$ Non-Labor Costs - 0 16 10 118 30 - - Total Costs -$ 31$ 392$ 375$ 668$ 165$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ 10$ 138$ 148$ 256$ 64$ -$ -$ So Cal Gas - 12 163 172 291 68 - -

Subtotal - Utility - 21 301 319 547 132 - -

Global/Retained - 10 91 56 121 33 - -

Total Allocations -$ 31$ 392$ 375$ 668$ 165$ -$ -$

BILLED COSTS SDG&E -$ 10$ 138$ 148$ 256$ 64$ -$ -$ So Cal Gas - 12 163 172 291 68 - -

Subtotal - Utility - 21 301 319 547 132 - -

Global/Retained - 10 91 56 121 33 - -

Total Billed Costs -$ 31$ 392$ 375$ 668$ 165$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-368 GRC APPLICATION - December 2010

Page 371: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-3 External Affairs Witness: Bruce Folkmann

Cost Center: 1100-0148-ENVIROMENTAL & REG AFFAIRS

Workpaper: E-3.4

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 2 0 0 0

Labor Costs -$ -$ -$ -$ 214$ 85$ -$ -$ Non-Labor Costs - - - - 81 27 - - Total Costs -$ -$ -$ -$ 295$ 112$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ 14$ -$ -$ -$ So Cal Gas - - - - 1 - - -

Subtotal - Utility - - - - 15 - - -

Global/Retained - - - - 34 1 - -

Total Direct Assignments -$ -$ -$ -$ 49$ 1$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ 43$ -$ -$ So Cal Gas - - - - - 46 - -

Subtotal - Utility - - - - - 89 - -

Global/Retained - - - - 246 22 - -

Total Allocations -$ -$ -$ -$ 246$ 111$ -$ -$

BILLED COSTS SDG&E -$ -$ -$ -$ 14$ 43$ -$ -$ So Cal Gas - - - - 1 46 - -

Subtotal - Utility - - - - 15 89 - -

Global/Retained - - - - 280 23 - -

Total Billed Costs -$ -$ -$ -$ 295$ 112$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-369 GRC APPLICATION - December 2010

Page 372: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 14$ 1$ 279$ 295$ 2

(14) (1) (279) (295) (2)

Change in Allocation 2009-2012 - - - -

(14)$ (1)$ (279)$ (295)$ (2)

2012 - TEST YEAR -$ -$ -$ -$ -

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

Eliminated cost center as a result of the 2010 Reorganization

Total Change from 2009

E External AffairsE-3 External Affairs1100-0148-ENVIROMENTAL & REG AFFAIRSE-3.4 Recon

SDG&E-17-WP BAF-WP-370 GRC APPLICATION - December 2010

Page 373: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-3 External Affairs Witness: Bruce Folkmann

Cost Center: 1100-0148-ENVIROMENTAL & REG AFFAIRS

Workpaper: E-3.4 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 2 0 0 0

Labor Costs -$ -$ -$ -$ 214$ 86$ -$ -$ Non-Labor Costs - - - - 81 28 - - Total Costs -$ -$ -$ -$ 295$ 114$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ 14$ -$ -$ -$ So Cal Gas - - - - 1 - - -

Subtotal - Utility - - - - 16 - - -

Global/Retained - - - - 33 - - -

Total Direct Assignments -$ -$ -$ -$ 49$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ 44$ -$ -$ So Cal Gas - - - - - 47 - -

Subtotal - Utility - - - - - 91 - -

Global/Retained - - - - 246 23 - -

Total Allocations -$ -$ -$ -$ 246$ 114$ -$ -$

BILLED COSTS SDG&E -$ -$ -$ -$ 14$ 44$ -$ -$ So Cal Gas - - - - 1 47 - -

Subtotal - Utility - - - - 16 91 - -

Global/Retained - - - - 279 23 - -

Total Billed Costs -$ -$ -$ -$ 295$ 114$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-371 GRC APPLICATION - December 2010

Page 374: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-3 External Affairs Witness: Bruce Folkmann

Cost Center: 1100-0006-COMPLIANCE

Workpaper: E-3.5

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 3 1 0 0 0

Labor Costs -$ -$ -$ 10$ 281$ 36$ -$ -$ Non-Labor Costs - - - 19 95 32 - - Total Costs -$ -$ -$ 29$ 376$ 68$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - 1 - - - -

Total Direct Assignments -$ -$ -$ 1$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ 11$ 144$ 33$ -$ -$ So Cal Gas - - - 13 164 35 - -

Subtotal - Utility - - - 24 308 68 - -

Global/Retained - - - 4 68 - - -

Total Allocations -$ -$ -$ 28$ 376$ 68$ -$ -$

BILLED COSTS SDG&E -$ -$ -$ 11$ 144$ 33$ -$ -$ So Cal Gas - - - 13 164 35 - -

Subtotal - Utility - - - 24 308 68 - -

Global/Retained - - - 5 68 - - -

Total Billed Costs -$ -$ -$ 29$ 376$ 68$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-372 GRC APPLICATION - December 2010

Page 375: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 144$ 164$ 68$ 377$ 1

(144) (164) (68) (377) (1)

Change in Allocation 2009-2012 - - - -

(144)$ (164)$ (68)$ (377)$ (1)

2012 - TEST YEAR -$ -$ -$ -$ -

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

Eliminated cost center as a result of the 2010 Reorganization

Total Change from 2009

E External AffairsE-3 External Affairs1100-0006-COMPLIANCEE-3.5 Recon

SDG&E-17-WP BAF-WP-373 GRC APPLICATION - December 2010

Page 376: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-3 External Affairs Witness: Bruce Folkmann

Cost Center: 1100-0006-COMPLIANCE

Workpaper: E-3.5 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 3 1 0 0 0

Labor Costs -$ -$ -$ 10$ 281$ 37$ -$ -$ Non-Labor Costs - - - 19 95 32 - - Total Costs -$ -$ -$ 29$ 377$ 69$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ 11$ 144$ 34$ -$ -$ So Cal Gas - - - 13 164 35 - -

Subtotal - Utility - - - 24 308 69 - -

Global/Retained - - - 4 68 - - -

Total Allocations -$ -$ -$ 29$ 377$ 69$ -$ -$

BILLED COSTS SDG&E -$ -$ -$ 11$ 144$ 34$ -$ -$ So Cal Gas - - - 13 164 35 - -

Subtotal - Utility - - - 24 308 69 - -

Global/Retained - - - 4 68 - - -

Total Billed Costs -$ -$ -$ 29$ 377$ 69$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-374 GRC APPLICATION - December 2010

Page 377: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-3 External Affairs Witness: Bruce Folkmann

Cost Center: 1100-0164-SVP COMMS & COMMUNITY PAR

Workpaper: E-3.6

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 2 2 2 2 0 0 0

Labor Costs -$ 88$ 407$ 424$ 435$ 104$ -$ -$ Non-Labor Costs - 8 77 79 51 63 - - Total Costs -$ 96$ 484$ 503$ 486$ 167$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - 11 (1) - - - -

Total Direct Assignments -$ -$ 11$ (1)$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ 21$ 131$ 160$ 155$ 42$ -$ -$ So Cal Gas - 27 161 194 184 95 - -

Subtotal - Utility - 48 292 354 339 137 - -

Global/Retained - 48 181 150 147 30 - -

Total Allocations -$ 96$ 473$ 504$ 486$ 167$ -$ -$

BILLED COSTS SDG&E -$ 21$ 131$ 160$ 155$ 42$ -$ -$ So Cal Gas - 27 161 194 184 95 - -

Subtotal - Utility - 48 292 354 339 137 - -

Global/Retained - 48 192 149 147 30 - -

Total Billed Costs -$ 96$ 484$ 503$ 486$ 167$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-375 GRC APPLICATION - December 2010

Page 378: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 155$ 184$ 147$ 486$ 2

(155) (184) (147) (486) (2)

Change in Allocation 2009-2012 - - - -

(155)$ (184)$ (147)$ (486)$ (2)

2012 - TEST YEAR -$ -$ -$ -$ -

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

Eliminated cost center as a result of the 2010 Reorganization

Total Change from 2009

E External AffairsE-3 External Affairs1100-0164-SVP COMMS & COMMUNITY PARE-3.6 Recon

SDG&E-17-WP BAF-WP-376 GRC APPLICATION - December 2010

Page 379: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-3 External Affairs Witness: Bruce Folkmann

Cost Center: 1100-0164-SVP COMMS & COMMUNITY PAR

Workpaper: E-3.6 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 2 2 2 2 0 0 0

Labor Costs -$ 88$ 407$ 424$ 435$ 106$ -$ -$ Non-Labor Costs - 8 77 79 51 64 - - Total Costs -$ 96$ 484$ 503$ 486$ 170$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - 10 - - - - -

Total Direct Assignments -$ -$ 10$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ 21$ 131$ 160$ 155$ 43$ -$ -$ So Cal Gas - 27 161 194 184 97 - -

Subtotal - Utility - 48 292 353 339 140 - -

Global/Retained - 48 181 150 147 30 - -

Total Allocations -$ 96$ 473$ 503$ 486$ 170$ -$ -$

BILLED COSTS SDG&E -$ 21$ 131$ 160$ 155$ 43$ -$ -$ So Cal Gas - 27 161 194 184 97 - -

Subtotal - Utility - 48 293 353 339 140 - -

Global/Retained - 48 191 150 147 30 - -

Total Billed Costs -$ 96$ 484$ 503$ 486$ 170$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-377 GRC APPLICATION - December 2010

Page 380: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-3 External Affairs Witness: Bruce Folkmann

Cost Center: 1100-1398-COMMUNITY REL - SAN DIEGO

Workpaper: E-3.7

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 1 4 4 0 0 0

Labor Costs -$ -$ 152$ 347$ 345$ 78$ -$ -$ Non-Labor Costs - - 37 63 127 25 - - Total Costs -$ -$ 189$ 410$ 472$ 103$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ 4$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - 4 - - -

Global/Retained - - - 26 67 - - -

Total Direct Assignments -$ -$ -$ 26$ 71$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ 43$ 97$ 117$ 103$ -$ -$ So Cal Gas - - 50 113 133 - - -

Subtotal - Utility - - 93 210 250 103 - -

Global/Retained - - 96 174 151 - - -

Total Allocations -$ -$ 189$ 384$ 401$ 103$ -$ -$

BILLED COSTS SDG&E -$ -$ 43$ 97$ 121$ 103$ -$ -$ So Cal Gas - - 50 113 133 - - -

Subtotal - Utility - - 93 210 254 103 - -

Global/Retained - - 96 200 218 - - -

Total Billed Costs -$ -$ 189$ 410$ 472$ 103$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-378 GRC APPLICATION - December 2010

Page 381: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 121$ 133$ 217$ 472$ 4

(121) (133) (217) (472) (4)

Change in Allocation 2009-2012 - - - -

(121)$ (133)$ (217)$ (472)$ (4)

2012 - TEST YEAR -$ -$ -$ -$ -

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

Eliminated cost center as a result of the 2010 Reorganization

Total Change from 2009

E External AffairsE-3 External Affairs1100-1398-COMMUNITY REL - SAN DIEGOE-3.7 Recon

SDG&E-17-WP BAF-WP-379 GRC APPLICATION - December 2010

Page 382: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-3 External Affairs Witness: Bruce Folkmann

Cost Center: 1100-1398-COMMUNITY REL - SAN DIEGO

Workpaper: E-3.7 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 1 4 4 0 0 0

Labor Costs -$ -$ 152$ 347$ 345$ 79$ -$ -$ Non-Labor Costs - - 37 63 127 25 - - Total Costs -$ -$ 189$ 410$ 472$ 105$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ 4$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - 4 - - -

Global/Retained - - - 26 66 - - -

Total Direct Assignments -$ -$ -$ 26$ 70$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ 43$ 97$ 117$ 105$ -$ -$ So Cal Gas - - 50 113 133 - - -

Subtotal - Utility - - 93 210 251 105 - -

Global/Retained - - 96 174 151 - - -

Total Allocations -$ -$ 189$ 384$ 402$ 105$ -$ -$

BILLED COSTS SDG&E -$ -$ 43$ 97$ 121$ 105$ -$ -$ So Cal Gas - - 50 113 133 - - -

Subtotal - Utility - - 93 210 255 105 - -

Global/Retained - - 96 200 217 - - -

Total Billed Costs -$ -$ 189$ 410$ 472$ 105$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-380 GRC APPLICATION - December 2010

Page 383: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-3 External Affairs Witness: Bruce Folkmann

Cost Center: 1100-2451-COMMUNITY RELATIONS - LOS

Workpaper: E-3.8

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 8 6 6 6 0 0 0

Labor Costs -$ 64$ 410$ 439$ 451$ 108$ -$ -$ Non-Labor Costs - 4 186 132 97 20 - - Total Costs -$ 68$ 596$ 571$ 548$ 128$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ 2$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - 2 - - - - -

Global/Retained - - - 40 45 - - -

Total Direct Assignments -$ -$ 2$ 40$ 45$ -$ -$ -$

ALLOCATIONS SDG&E -$ 29$ 134$ 134$ 147$ -$ -$ -$ So Cal Gas - 36 158 156 167 128 - -

Subtotal - Utility - 65 292 290 314 128 - -

Global/Retained - 3 302 241 189 - - -

Total Allocations -$ 68$ 594$ 531$ 503$ 128$ -$ -$

BILLED COSTS SDG&E -$ 29$ 136$ 134$ 147$ -$ -$ -$ So Cal Gas - 36 158 156 167 128 - -

Subtotal - Utility - 65 294 290 314 128 - -

Global/Retained - 3 302 281 234 - - -

Total Billed Costs -$ 68$ 596$ 571$ 548$ 128$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-381 GRC APPLICATION - December 2010

Page 384: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 147$ 167$ 233$ 547$ 6

(147) (167) (233) (547) (6)

Change in Allocation 2009-2012 - - - -

(147)$ (167)$ (233)$ (547)$ (6)

2012 - TEST YEAR -$ -$ -$ -$ -

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

Eliminated cost center as a result of the 2010 Reorganization

Total Change from 2009

E External AffairsE-3 External Affairs1100-2451-COMMUNITY RELATIONS - LOSE-3.8 Recon

SDG&E-17-WP BAF-WP-382 GRC APPLICATION - December 2010

Page 385: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-3 External Affairs Witness: Bruce Folkmann

Cost Center: 1100-2451-COMMUNITY RELATIONS - LOS

Workpaper: E-3.8 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 8 6 6 6 0 0 0

Labor Costs -$ 64$ 410$ 439$ 451$ 110$ -$ -$ Non-Labor Costs - 4 186 132 97 20 - - Total Costs -$ 68$ 596$ 571$ 547$ 130$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ 2$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - 2 - - - - -

Global/Retained - - - 40 44 - - -

Total Direct Assignments -$ -$ 2$ 40$ 44$ -$ -$ -$

ALLOCATIONS SDG&E -$ 29$ 134$ 134$ 147$ -$ -$ -$ So Cal Gas - 36 158 156 167 130 - -

Subtotal - Utility - 65 293 291 314 130 - -

Global/Retained - 3 302 241 189 - - -

Total Allocations -$ 68$ 594$ 531$ 504$ 130$ -$ -$

BILLED COSTS SDG&E -$ 29$ 136$ 134$ 147$ -$ -$ -$ So Cal Gas - 36 158 156 167 130 - -

Subtotal - Utility - 65 295 291 314 130 - -

Global/Retained - 3 302 281 233 - - -

Total Billed Costs -$ 68$ 596$ 571$ 547$ 130$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-383 GRC APPLICATION - December 2010

Page 386: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-3 External Affairs Witness: Bruce Folkmann

Cost Center: 1100-2149-CORPORATE EVENTS

Workpaper: E-3.9

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 4 4 3 4 4 0 0 0

Labor Costs 214$ 205$ 243$ 268$ 260$ 63$ -$ -$ Non-Labor Costs 41 49 43 46 62 13 - - Total Costs 255$ 254$ 286$ 314$ 322$ 76$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ 3$ -$ -$ -$ So Cal Gas - - - - 2 - - -

Subtotal - Utility - - - - 5 - - -

Global/Retained - - 10 - 1 - - -

Total Direct Assignments -$ -$ 10$ -$ 6$ -$ -$ -$

ALLOCATIONS SDG&E 67$ 65$ 80$ 101$ 104$ -$ -$ -$ So Cal Gas 81 81 94 118 117 76 - -

Subtotal - Utility 148 146 174 219 221 76 - -

Global/Retained 107 108 102 95 95 - - -

Total Allocations 255$ 254$ 276$ 314$ 316$ 76$ -$ -$

BILLED COSTS SDG&E 67$ 65$ 80$ 101$ 107$ -$ -$ -$ So Cal Gas 81 81 94 118 119 76 - -

Subtotal - Utility 148 146 174 219 226 76 - -

Global/Retained 107 108 112 95 96 - - -

Total Billed Costs 255$ 254$ 286$ 314$ 322$ 76$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-384 GRC APPLICATION - December 2010

Page 387: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 107$ 119$ 96$ 322$ 4

(107) (119) (96) (322) (4)

Change in Allocation 2009-2012 - - - -

(107)$ (119)$ (96)$ (322)$ (4)

2012 - TEST YEAR -$ -$ -$ -$ -

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

Eliminated cost center as a result of the 2010 Reorganization

Total Change from 2009

E External AffairsE-3 External Affairs1100-2149-CORPORATE EVENTSE-3.9 Recon

SDG&E-17-WP BAF-WP-385 GRC APPLICATION - December 2010

Page 388: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-3 External Affairs Witness: Bruce Folkmann

Cost Center: 1100-2149-CORPORATE EVENTS

Workpaper: E-3.9 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 4 4 3 4 4 0 0 0

Labor Costs 214$ 205$ 243$ 268$ 260$ 64$ -$ -$ Non-Labor Costs 41 49 43 46 62 13 - - Total Costs 255$ 254$ 286$ 314$ 322$ 77$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ 3$ -$ -$ -$ So Cal Gas - - - - 2 - - -

Subtotal - Utility - - - - 5 - - -

Global/Retained - - 9 - - - - -

Total Direct Assignments -$ -$ 9$ -$ 5$ -$ -$ -$

ALLOCATIONS SDG&E 67$ 65$ 80$ 101$ 104$ -$ -$ -$ So Cal Gas 81 81 94 118 117 77 - -

Subtotal - Utility 148 146 174 219 221 77 - -

Global/Retained 107 108 102 95 95 - - -

Total Allocations 255$ 254$ 277$ 314$ 316$ 77$ -$ -$

BILLED COSTS SDG&E 67$ 65$ 80$ 101$ 107$ -$ -$ -$ So Cal Gas 81 81 94 118 119 77 - -

Subtotal - Utility 148 146 175 219 226 77 - -

Global/Retained 107 108 111 95 96 - - -

Total Billed Costs 255$ 254$ 286$ 314$ 322$ 77$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-386 GRC APPLICATION - December 2010

Page 389: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-3 External Affairs Witness: Bruce Folkmann

Cost Center: 1100-1153-STATE GOVERNMENT AFFAIRS

Workpaper: E-3.10

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 5 5 5 5 5 0 0 0

Labor Costs 496$ 537$ 593$ 569$ 654$ 141$ -$ -$ Non-Labor Costs 501 581 523 598 578 154 - - Total Costs 997$ 1,118$ 1,116$ 1,167$ 1,232$ 295$ -$ -$

DIRECT ASSIGNMENTS SDG&E 15$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility 15 - - - - - - -

Global/Retained (1) (1) - - - 1 - -

Total Direct Assignments 14$ (1)$ -$ -$ -$ 1$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ 294$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - 294 - -

Global/Retained 983 1,119 1,116 1,167 1,232 - - -

Total Allocations 983$ 1,119$ 1,116$ 1,167$ 1,232$ 294$ -$ -$

BILLED COSTS SDG&E 15$ -$ -$ -$ -$ 294$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility 15 - - - - 294 - -

Global/Retained 982 1,118 1,116 1,167 1,232 1 - -

Total Billed Costs 997$ 1,118$ 1,116$ 1,167$ 1,232$ 295$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-387 GRC APPLICATION - December 2010

Page 390: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR -$ -$ 1,232$ 1,232$ 5

- - (1,232) (1,232) (5)

Change in Allocation 2009-2012 - - - -

-$ -$ (1,232)$ (1,232)$ (5)

2012 - TEST YEAR -$ -$ -$ -$ -

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

Eliminated cost center as a result of the 2010 Reorganization

Total Change from 2009

E External AffairsE-3 External Affairs1100-1153-STATE GOVERNMENT AFFAIRSE-3.10 Recon

SDG&E-17-WP BAF-WP-388 GRC APPLICATION - December 2010

Page 391: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-3 External Affairs Witness: Bruce Folkmann

Cost Center: 1100-1153-STATE GOVERNMENT AFFAIRS

Workpaper: E-3.10 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 5 5 5 5 5 0 0 0

Labor Costs 496$ 537$ 593$ 569$ 654$ 143$ -$ -$ Non-Labor Costs 501 581 523 598 578 156 - - Total Costs 998$ 1,119$ 1,116$ 1,167$ 1,232$ 300$ -$ -$

DIRECT ASSIGNMENTS SDG&E 15$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility 15 - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments 15$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ 300$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - 300 - -

Global/Retained 983 1,119 1,116 1,167 1,232 - - -

Total Allocations 983$ 1,119$ 1,116$ 1,167$ 1,232$ 300$ -$ -$

BILLED COSTS SDG&E 15$ -$ -$ -$ -$ 300$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility 15 - - - - 300 - -

Global/Retained 983 1,119 1,116 1,167 1,232 - - -

Total Billed Costs 998$ 1,119$ 1,116$ 1,167$ 1,232$ 300$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-389 GRC APPLICATION - December 2010

Page 392: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-3 External Affairs Witness: Bruce Folkmann

Cost Center: 1100-1160-STATE REGULATORY AFFAIRS

Workpaper: E-3.11

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 6 5 3 0 1 0 0 0

Labor Costs 565$ 495$ 378$ 453$ 51$ 26$ -$ -$ Non-Labor Costs 202 193 339 208 11 11 - - Total Costs 767$ 688$ 717$ 661$ 62$ 37$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained (1) (1) - - (1) - - -

Total Direct Assignments (1)$ (1)$ -$ -$ (1)$ -$ -$ -$

ALLOCATIONS SDG&E 173$ 144$ 154$ 153$ 15$ 37$ -$ -$ So Cal Gas 211 179 182 178 17 - - -

Subtotal - Utility 384 323 336 331 32 37 - -

Global/Retained 384 366 381 330 31 - - -

Total Allocations 768$ 689$ 717$ 661$ 63$ 37$ -$ -$

BILLED COSTS SDG&E 173$ 144$ 154$ 153$ 15$ 37$ -$ -$ So Cal Gas 211 179 182 178 17 - - -

Subtotal - Utility 384 323 336 331 32 37 - -

Global/Retained 383 365 381 330 30 - - -

Total Billed Costs 767$ 688$ 717$ 661$ 62$ 37$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-390 GRC APPLICATION - December 2010

Page 393: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 15$ 17$ 31$ 63$ 1

(15) (17) (31) (63) (1)

Change in Allocation 2009-2012 - - - -

(15)$ (17)$ (31)$ (63)$ (1)

2012 - TEST YEAR -$ -$ -$ -$ -

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

Eliminated cost center as a result of the 2010 Reorganization

Total Change from 2009

E External AffairsE-3 External Affairs1100-1160-STATE REGULATORY AFFAIRSE-3.11 Recon

SDG&E-17-WP BAF-WP-391 GRC APPLICATION - December 2010

Page 394: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-3 External Affairs Witness: Bruce Folkmann

Cost Center: 1100-1160-STATE REGULATORY AFFAIRS

Workpaper: E-3.11 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 6 5 3 0 1 0 0 0

Labor Costs 565$ 495$ 378$ 453$ 51$ 26$ -$ -$ Non-Labor Costs 202 193 339 208 11 11 - - Total Costs 767$ 689$ 717$ 661$ 63$ 38$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 173$ 144$ 154$ 153$ 15$ 38$ -$ -$ So Cal Gas 211 179 182 178 17 - - -

Subtotal - Utility 383 323 336 330 31 38 - -

Global/Retained 384 366 381 330 31 - - -

Total Allocations 767$ 689$ 717$ 661$ 63$ 38$ -$ -$

BILLED COSTS SDG&E 173$ 144$ 154$ 153$ 15$ 38$ -$ -$ So Cal Gas 211 179 182 178 17 - - -

Subtotal - Utility 383 323 336 330 31 38 - -

Global/Retained 384 366 381 330 31 - - -

Total Billed Costs 767$ 689$ 717$ 661$ 63$ 38$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-392 GRC APPLICATION - December 2010

Page 395: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-3 External Affairs Witness: Bruce Folkmann

Cost Center: 1100-1159-CORP REGULATORY POLICY

Workpaper: E-3.12

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 3 3 4 5 4 0 0 0

Labor Costs 364$ 363$ 512$ 558$ 716$ 168$ -$ -$ Non-Labor Costs 49 27 64 42 96 24 - - Total Costs 413$ 390$ 576$ 600$ 812$ 192$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ 19$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - 19 - - - - - -

Global/Retained (1) - - - - - - -

Total Direct Assignments (1)$ 19$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 93$ 84$ 134$ 139$ 190$ 192$ -$ -$ So Cal Gas 114 104 158 161 216 - - -

Subtotal - Utility 207 188 292 300 406 192 - -

Global/Retained 207 183 284 300 406 - - -

Total Allocations 414$ 371$ 576$ 600$ 812$ 192$ -$ -$

BILLED COSTS SDG&E 93$ 103$ 134$ 139$ 190$ 192$ -$ -$ So Cal Gas 114 104 158 161 216 - - -

Subtotal - Utility 207 207 292 300 406 192 - -

Global/Retained 206 183 284 300 406 - - -

Total Billed Costs 413$ 390$ 576$ 600$ 812$ 192$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-393 GRC APPLICATION - December 2010

Page 396: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 190$ 216$ 406$ 813$ 4

(190) (216) (406) (813) (4)

Change in Allocation 2009-2012 - - - -

(190)$ (216)$ (406)$ (813)$ (4)

2012 - TEST YEAR -$ -$ -$ -$ -

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

Eliminated cost center as a result of the 2010 Reorganization

Total Change from 2009

E External AffairsE-3 External Affairs1100-1159-CORP REGULATORY POLICYE-3.12 Recon

SDG&E-17-WP BAF-WP-394 GRC APPLICATION - December 2010

Page 397: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-3 External Affairs Witness: Bruce Folkmann

Cost Center: 1100-1159-CORP REGULATORY POLICY

Workpaper: E-3.12 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 3 3 4 5 4 0 0 0

Labor Costs 364$ 363$ 512$ 558$ 716$ 171$ -$ -$ Non-Labor Costs 49 27 64 42 96 24 - - Total Costs 414$ 390$ 576$ 600$ 813$ 196$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ 19$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - 19 - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ 19$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 93$ 84$ 134$ 139$ 190$ 196$ -$ -$ So Cal Gas 114 104 158 161 216 - - -

Subtotal - Utility 207 188 292 300 406 196 - -

Global/Retained 207 183 284 300 406 - - -

Total Allocations 414$ 371$ 576$ 600$ 813$ 196$ -$ -$

BILLED COSTS SDG&E 93$ 103$ 134$ 139$ 190$ 196$ -$ -$ So Cal Gas 114 104 158 161 216 - - -

Subtotal - Utility 207 207 292 300 406 196 - -

Global/Retained 207 183 284 300 406 - - -

Total Billed Costs 414$ 390$ 576$ 600$ 813$ 196$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-395 GRC APPLICATION - December 2010

Page 398: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-3 External Affairs Witness: Bruce Folkmann

Cost Center: 1100-6381-DIRECTOR - GOVT AFFAIRS

Workpaper: E-3.13

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 5 5 4 5 5 0 0 0

Labor Costs 463$ 568$ 514$ 524$ 592$ 140$ -$ -$ Non-Labor Costs 662 485 617 564 764 132 - - Total Costs 1,125$ 1,053$ 1,131$ 1,088$ 1,356$ 272$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 173 46 26 47 147 - - -

Total Direct Assignments 173$ 46$ 26$ 47$ 147$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 952 1,007 1,105 1,041 1,209 272 - -

Total Allocations 952$ 1,007$ 1,105$ 1,041$ 1,209$ 272$ -$ -$

BILLED COSTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 1,125 1,053 1,131 1,088 1,356 272 - -

Total Billed Costs 1,125$ 1,053$ 1,131$ 1,088$ 1,356$ 272$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-396 GRC APPLICATION - December 2010

Page 399: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR -$ -$ 1,355$ 1,355$ 5

- - (1,355) (1,355) (5)

Change in Allocation 2009-2012 - - - -

-$ -$ (1,355)$ (1,355)$ (5)

2012 - TEST YEAR -$ -$ -$ -$ -

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

Eliminated cost center as a result of the 2010 Reorganization

Total Change from 2009

E External AffairsE-3 External Affairs1100-6381-DIRECTOR - GOVT AFFAIRSE-3.13 Recon

SDG&E-17-WP BAF-WP-397 GRC APPLICATION - December 2010

Page 400: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-3 External Affairs Witness: Bruce Folkmann

Cost Center: 1100-6381-DIRECTOR - GOVT AFFAIRS

Workpaper: E-3.13 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 5 5 4 5 5 0 0 0

Labor Costs 463$ 568$ 514$ 524$ 592$ 142$ -$ -$ Non-Labor Costs 662 485 617 564 764 135 - - Total Costs 1,125$ 1,053$ 1,131$ 1,089$ 1,355$ 277$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 173 46 26 48 147 - - -

Total Direct Assignments 173$ 46$ 26$ 48$ 147$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 952 1,007 1,105 1,041 1,209 277 - -

Total Allocations 952$ 1,007$ 1,105$ 1,041$ 1,209$ 277$ -$ -$

BILLED COSTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 1,125 1,053 1,131 1,089 1,355 277 - -

Total Billed Costs 1,125$ 1,053$ 1,131$ 1,089$ 1,355$ 277$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-398 GRC APPLICATION - December 2010

Page 401: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-3 External Affairs Witness: Bruce Folkmann

Cost Center: 1100-6452-GAS RESEARCH & ANALYSIS

Workpaper: E-3.14

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 2 2 2 0 0 0

Labor Costs -$ -$ 158$ 392$ 265$ 63$ -$ -$ Non-Labor Costs - - 359 438 355 120 - - Total Costs -$ -$ 517$ 830$ 620$ 183$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ 6$ -$ -$ -$ So Cal Gas - - - - 26 - - -

Subtotal - Utility - - - - 32 - - -

Global/Retained - - 4 - 17 - - -

Total Direct Assignments -$ -$ 4$ -$ 49$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - 513 830 571 183 - -

Total Allocations -$ -$ 513$ 830$ 571$ 183$ -$ -$

BILLED COSTS SDG&E -$ -$ -$ -$ 6$ -$ -$ -$ So Cal Gas - - - - 26 - - -

Subtotal - Utility - - - - 32 - - -

Global/Retained - - 517 830 588 183 - -

Total Billed Costs -$ -$ 517$ 830$ 620$ 183$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-399 GRC APPLICATION - December 2010

Page 402: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 6$ 26$ 588$ 620$ 2

(6) (26) (588) (620) (2)

Change in Allocation 2009-2012 - - - -

(6)$ (26)$ (588)$ (620)$ (2)

2012 - TEST YEAR -$ -$ -$ -$ -

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

Eliminated cost center as a result of the 2010 Reorganization

Total Change from 2009

E External AffairsE-3 External Affairs1100-6452-GAS RESEARCH & ANALYSISE-3.14 Recon

SDG&E-17-WP BAF-WP-400 GRC APPLICATION - December 2010

Page 403: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-3 External Affairs Witness: Bruce Folkmann

Cost Center: 1100-6452-GAS RESEARCH & ANALYSIS

Workpaper: E-3.14 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 2 2 2 0 0 0

Labor Costs -$ -$ 158$ 392$ 265$ 64$ -$ -$ Non-Labor Costs - - 359 438 355 123 - - Total Costs -$ -$ 518$ 830$ 620$ 186$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ 6$ -$ -$ -$ So Cal Gas - - - - 26 - - -

Subtotal - Utility - - - - 32 - - -

Global/Retained - - 4 - 17 - - -

Total Direct Assignments -$ -$ 4$ -$ 49$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - 513 830 571 186 - -

Total Allocations -$ -$ 513$ 830$ 571$ 186$ -$ -$

BILLED COSTS SDG&E -$ -$ -$ -$ 6$ -$ -$ -$ So Cal Gas - - - - 26 - - -

Subtotal - Utility - - - - 32 - - -

Global/Retained - - 518 830 588 186 - -

Total Billed Costs -$ -$ 518$ 830$ 620$ 186$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-401 GRC APPLICATION - December 2010

Page 404: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-3 External Affairs Witness: Bruce Folkmann

Cost Center: 1100-4397-PUBLIC RELATIONS - MEXICO

Workpaper: E-3.15

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 2 0 0 0 0 0 0

Labor Costs -$ 1$ 153$ 5$ -$ -$ -$ -$ Non-Labor Costs - 4 121 139 130 32 - - Total Costs -$ 5$ 274$ 144$ 130$ 32$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ (2)$ -$ -$ -$ So Cal Gas - - - - (2) - - -

Subtotal - Utility - - - - (4) - - -

Global/Retained - - 75 5 5 - - -

Total Direct Assignments -$ -$ 75$ 5$ 1$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ 2$ -$ -$ -$ So Cal Gas - - - - 2 - - -

Subtotal - Utility - - - - 4 - - -

Global/Retained - 5 199 139 125 32 - -

Total Allocations -$ 5$ 199$ 139$ 129$ 32$ -$ -$

BILLED COSTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - 5 274 144 130 32 - -

Total Billed Costs -$ 5$ 274$ 144$ 130$ 32$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-402 GRC APPLICATION - December 2010

Page 405: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR -$ -$ 130$ 130$ -

- - (130) (130)

Change in Allocation 2009-2012 - - - -

-$ -$ (130)$ (130)$ -

2012 - TEST YEAR -$ -$ -$ -$ -

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

Eliminated cost center as a result of the 2010 Reorganization

Total Change from 2009

E External AffairsE-3 External Affairs1100-4397-PUBLIC RELATIONS - MEXICOE-3.15 Recon

SDG&E-17-WP BAF-WP-403 GRC APPLICATION - December 2010

Page 406: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-3 External Affairs Witness: Bruce Folkmann

Cost Center: 1100-4397-PUBLIC RELATIONS - MEXICO

Workpaper: E-3.15 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 2 0 0 0 0 0 0

Labor Costs -$ 1$ 153$ 5$ -$ -$ -$ -$ Non-Labor Costs - 4 121 139 130 32 - - Total Costs -$ 5$ 273$ 144$ 130$ 32$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ (2)$ -$ -$ -$ So Cal Gas - - - - (2) - - -

Subtotal - Utility - - - - (5) - - -

Global/Retained - - 74 5 5 - - -

Total Direct Assignments -$ -$ 74$ 5$ 0$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ 2$ -$ -$ -$ So Cal Gas - - - - 2 - - -

Subtotal - Utility - - - - 5 - - -

Global/Retained - 5 199 139 125 32 - -

Total Allocations -$ 5$ 199$ 139$ 130$ 32$ -$ -$

BILLED COSTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - 5 273 144 130 32 - -

Total Billed Costs -$ 5$ 273$ 144$ 130$ 32$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-404 GRC APPLICATION - December 2010

Page 407: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-3 External Affairs Witness: Bruce Folkmann

Cost Center: 1100-4394-VP INTERNATIONAL AFFAIRS

Workpaper: E-3.16

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 1 2 1 0 0 0 0

Labor Costs -$ 60$ 299$ 166$ 6$ -$ -$ -$ Non-Labor Costs - 1 191 100 14 6 - - Total Costs -$ 61$ 490$ 266$ 20$ 6$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - 4 - 1 - -

Total Direct Assignments -$ -$ -$ 4$ -$ 1$ -$ -$

ALLOCATIONS SDG&E -$ 2$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - 2 - - - - - -

Global/Retained - 59 490 262 20 5 - -

Total Allocations -$ 61$ 490$ 262$ 20$ 5$ -$ -$

BILLED COSTS SDG&E -$ 2$ -$ 0$ 0$ 0$ -$ -$ So Cal Gas - - - 0 0 0 - -

Subtotal - Utility - 2 - - - - - -

Global/Retained - 59 490 266 20 6 - -

Total Billed Costs -$ 61$ 490$ 266$ 20$ 6$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-405 GRC APPLICATION - December 2010

Page 408: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 0$ 0$ 19$ 19$ -

(0) (0) (19) (20)

Change in Allocation 2009-2012 - - - -

(0)$ (0)$ (19)$ (20)$ -

2012 - TEST YEAR -$ -$ -$ -$ -

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

Eliminated cost center as a result of the 2010 Reorganization

Total Change from 2009

E External AffairsE-3 External Affairs1100-4394-VP INTERNATIONAL AFFAIRSE-3.16 Recon

SDG&E-17-WP BAF-WP-406 GRC APPLICATION - December 2010

Page 409: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-3 External Affairs Witness: Bruce Folkmann

Cost Center: 1100-4394-VP INTERNATIONAL AFFAIRS

Workpaper: E-3.16 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 1 2 1 0 0 0 0

Labor Costs -$ 60$ 299$ 166$ 6$ -$ -$ -$ Non-Labor Costs - 1 191 100 14 6 - - Total Costs -$ 61$ 490$ 266$ 20$ 6$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - 3 (1) - - -

Total Direct Assignments -$ -$ -$ 3$ (1)$ -$ -$ -$

ALLOCATIONS SDG&E -$ 2$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - 2 - - - - - -

Global/Retained - 59 490 262 20 5 - -

Total Allocations -$ 61$ 490$ 262$ 20$ 5$ -$ -$

BILLED COSTS SDG&E -$ 2$ -$ 0$ 0$ 0$ -$ -$ So Cal Gas - - - 0 0 0 - -

Subtotal - Utility - 2 - 1 1 0 - -

Global/Retained - 59 490 265 19 6 - -

Total Billed Costs -$ 61$ 490$ 266$ 20$ 6$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-407 GRC APPLICATION - December 2010

Page 410: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-3 External Affairs Witness: Bruce Folkmann

Cost Center: 1100-0207-STAPLES CENTER

Workpaper: E-3.17

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ -$ -$ -$ -$ Non-Labor Costs 1,069 1,596 1,660 1,012 - - - - Total Costs 1,069$ 1,596$ 1,660$ 1,012$ -$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 433 - - 2 - - - -

Total Direct Assignments 433$ -$ -$ 2$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 636 1,596 1,660 1,010 - - - -

Total Allocations 636$ 1,596$ 1,660$ 1,010$ -$ -$ -$ -$

BILLED COSTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 1,069 1,596 1,660 1,012 - - - -

Total Billed Costs 1,069$ 1,596$ 1,660$ 1,012$ -$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-408 GRC APPLICATION - December 2010

Page 411: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-3 External Affairs Witness: Bruce Folkmann

Cost Center: 1100-0207-STAPLES CENTER

Workpaper: E-3.17 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ -$ -$ -$ -$ Non-Labor Costs 1,069 1,596 1,660 1,012 - - - - Total Costs 1,069$ 1,596$ 1,660$ 1,012$ -$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 433 - - 2 - - - -

Total Direct Assignments 433$ -$ -$ 2$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 636 1,596 1,660 1,010 - - - -

Total Allocations 636$ 1,596$ 1,660$ 1,010$ -$ -$ -$ -$

BILLED COSTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 1,069 1,596 1,660 1,012 - - - -

Total Billed Costs 1,069$ 1,596$ 1,660$ 1,012$ -$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-409 GRC APPLICATION - December 2010

Page 412: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-3 External Affairs Witness: Bruce Folkmann

Cost Center: 1100-0166-NEW MARKET COMMUNICATIONS

Workpaper: E-3.18

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ -$ -$ -$ -$ Non-Labor Costs - - - - - - - - Total Costs -$ -$ -$ -$ -$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Allocations -$ -$ -$ -$ -$ -$ -$ -$

BILLED COSTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Billed Costs -$ -$ -$ -$ -$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-410 GRC APPLICATION - December 2010

Page 413: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-3 External Affairs Witness: Bruce Folkmann

Cost Center: 1100-0166-NEW MARKET COMMUNICATIONS

Workpaper: E-3.18 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ -$ -$ -$ -$ Non-Labor Costs - - - - - - - - Total Costs -$ -$ -$ -$ -$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Allocations -$ -$ -$ -$ -$ -$ -$ -$

BILLED COSTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Billed Costs -$ -$ -$ -$ -$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-411 GRC APPLICATION - December 2010

Page 414: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-3 External Affairs Witness: Bruce Folkmann

Cost Center: 1100-0154-POLICY COORDINATION & ADV

Workpaper: E-3.19

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ -$ -$ -$ -$ Non-Labor Costs 0 - - - - - - - Total Costs -$ -$ -$ -$ -$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 0 - - - - - - -

Total Allocations -$ -$ -$ -$ -$ -$ -$ -$

BILLED COSTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Billed Costs -$ -$ -$ -$ -$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-412 GRC APPLICATION - December 2010

Page 415: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-3 External Affairs Witness: Bruce Folkmann

Cost Center: 1100-0154-POLICY COORDINATION & ADV

Workpaper: E-3.19 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ -$ -$ -$ -$ Non-Labor Costs 0 - - - - - - - Total Costs 0$ -$ -$ -$ -$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 0 - - - - - - -

Total Allocations 0$ -$ -$ -$ -$ -$ -$ -$

BILLED COSTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 0 - - - - - - -

Total Billed Costs 0$ -$ -$ -$ -$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-413 GRC APPLICATION - December 2010

Page 416: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-3 External Affairs Witness: Bruce Folkmann

Cost Center: 1100-0171-EMPLOYEE COMMUNICATIONS

Workpaper: E-3.20

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ -$ -$ -$ -$ Non-Labor Costs 260 193 305 (0) 0 - - - Total Costs 260$ 193$ 305$ -$ 0$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 93$ 72$ 118$ (0)$ -$ -$ -$ -$ So Cal Gas 138 104 166 (0) - - - -

Subtotal - Utility 231 176 284 - - - - -

Global/Retained 29 17 22 - 0 - - -

Total Allocations 260$ 193$ 305$ -$ 0$ -$ -$ -$

BILLED COSTS SDG&E 93$ 72$ 118$ (0)$ -$ -$ -$ -$ So Cal Gas 138 104 166 (0) - - - -

Subtotal - Utility 231 176 284 - - - - -

Global/Retained 29 17 22 - 0 - - -

Total Billed Costs 260$ 193$ 305$ -$ 0$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-414 GRC APPLICATION - December 2010

Page 417: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: E-3 External Affairs Witness: Bruce Folkmann

Cost Center: 1100-0171-EMPLOYEE COMMUNICATIONS

Workpaper: E-3.20 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ -$ -$ -$ -$ Non-Labor Costs 260 193 305 (0) 0 - - - Total Costs 260$ 193$ 305$ -$ 0$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 93$ 72$ 118$ (0)$ -$ -$ -$ -$ So Cal Gas 138 104 166 (0) - - - -

Subtotal - Utility 231 176 284 - - - - -

Global/Retained 29 17 22 - 0 - - -

Total Allocations 260$ 193$ 305$ -$ 0$ -$ -$ -$

BILLED COSTS SDG&E 93$ 72$ 118$ (0)$ -$ -$ -$ -$ So Cal Gas 138 104 166 (0) - - - -

Subtotal - Utility 231 176 284 - - - - -

Global/Retained 29 17 22 - 0 - - -

Total Billed Costs 260$ 193$ 305$ -$ 0$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-415 GRC APPLICATION - December 2010

Page 418: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: I CORPORATE CENTER SHARED SERVICES Witness: Bruce Folkmann

Cost Center: F Facilities/Assets

Workpaper: F

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 19 18 18 21 21 16 17 17

Labor Costs 2,415$ 3,011$ 3,086$ 4,639$ 3,545$ 2,475$ 1,884$ 1,851$ Non-Labor Costs 12,621 15,917 16,692 16,370 15,906 14,457 13,781 13,591 Total Costs 15,036$ 18,928$ 19,778$ 21,009$ 19,451$ 16,932$ 15,665$ 15,442$

DIRECT ASSIGNMENTS SDG&E 2,829$ 3,708$ 3,927$ 4,520$ 4,616$ 4,008$ 3,842$ 3,847$ So Cal Gas 3,285 4,641 4,934 5,309 5,002 4,381 4,187 4,038

Subtotal - Utility 6,114 8,350 8,861 9,829 9,618 8,389 8,029 7,885

Global/Retained 5,812 7,482 7,568 7,475 6,459 5,464 4,652 4,563

Total Direct Assignments 11,926$ 15,831$ 16,429$ 17,305$ 16,078$ 13,853$ 12,681$ 12,448$

ALLOCATIONS SDG&E 810$ 789$ 889$ 984$ 917$ 984$ 987$ 1,001$ So Cal Gas 1,070 1,060 1,107 1,273 1,226 1,202 1,203 1,208

Subtotal - Utility 1,880 1,849 1,995 2,258 2,142 2,186 2,189 2,209

Global/Retained 1,230 1,248 1,354 1,447 1,231 893 794 785

Total Allocations 3,110$ 3,097$ 3,350$ 3,705$ 3,373$ 3,079$ 2,984$ 2,994$

BILLED COSTS SDG&E 3,640$ 4,498$ 4,816$ 5,505$ 5,533$ 4,993$ 4,829$ 4,849$ So Cal Gas 4,355 5,701 6,040 6,582 6,228 5,582 5,389 5,246

Subtotal - Utility 7,994 10,199 10,856 12,087 11,761 10,575 10,219 10,094

Global/Retained 7,042 8,729 8,922 8,922 7,690 6,357 5,446 5,348

Total Billed Costs 15,036$ 18,928$ 19,778$ 21,009$ 19,451$ 16,932$ 15,665$ 15,442$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-416 GRC APPLICATION - December 2010

Page 419: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 5,533$ 6,228$ 7,690$ 19,451$ 21

(303) (719) (412) (1,434)

- - (609) (609)

(540) (311) (1,065) (1,916) (4)

32 30 (26) 37

2 (17) (72) (87)

Change in Allocation 2009-2012 141 53 (193) 0

(668)$ (964)$ (2,377)$ (4,009)$ (4)

2012 - TEST YEAR 4,865$ 5,264$ 5,313$ 15,442$ 17

1,018$ 1,226$ 751$ 2,995$

3,847 4,038 4,563 12,447

4,865$ 5,264$ 5,313$ 15,442$

Direct Assignments

TOTAL 2012 ALLOCATIONS

F Facilities/AssetsF Recon

Total Change from 2009

Allocations

Impact of corporate assets becoming fully depreciated in excess of new asset additionsExpense for Casa Azul forecast in the Global budget

Reductions in executive security services.

Miscellaneous non-recurring and expenses in 2009, not forecast for 2012

Changes in real and personal property taxes.

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

GRC TotalI CORPORATE CENTER SHARED SERVICES

SDG&E-17-WP BAF-WP-417 GRC APPLICATION - December 2010

Page 420: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Test Year 2012 General Rate CaseSummary of Allocation Change for Utilities

(2009 $000's)

Division: Facilities/Assets Witness: Bruce A. Folkmann

SDG&E SOCALGAS Change

F-1.1 1100-0248-DEPRECIATION & AMORTIZATION - - - F-1 Depreciation/Rate of Return - - -

F-2.1 1100-0311-PROPERTY TAXES 12 (7) 4 F-2 Property Taxes 12 (7) 4

F-3.1 1100-0341-AIRCRAFT FRACTIONAL SHARE - - - F-3.2 1100-0391-HQ RENEW BUILDING PROJECT - - - F-3.3 1100-0455-CASA AZUL - - - F-3.4 1100-0058-ACCOUNTS PAYABLE (0) 0 0 F-3.5 1100-0314-MISCELLANEOUS REVENUE (3) 5 2 F-3 Other Facilities (3) 5 2

F-4.1 1100-0133-CORPORATE SECURITY DIR 131 55 - F-4.2 1100-0275-EXECUTIVE SECURITY (0) (0) (0) F-4.3 1100-0043-AFFILIATE SECURITY SERVICES - - - F-4.4 1100-0369-CORPORATE BENEFITS 0 (0) 0 F-4.5 1100-0310-AFFILIATE BENEFITS - HR 0 (0) (0) F-4 Security Services 132 55 187

Change in Allocation 2009-2012 141 53 193

Department / Cost Center

Sempra Energy Corporate Center

SDG&E-17-WP BAF-WP-418 GRC APPLICATION - December 2010

Page 421: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division: F Facilities/Assets Witness: Bruce Folkmann

Workpaper: F - Esc Recon

This workpaper details the methodology used to escalate the 2012 Forecast stated in 2009 $'s in Testimony and in Workpapers

Department Summaries, A-G, to the 2012 $'s as shown in Testimony and in Workpapers Escalated Department Summaries A-G

A B C D E FLabor/ Standard Total

Standard Non-Standard Total Non-labor Escalated EscalatedCosts Costs Costs Indexes 2012 $'s Costs

(A + B) (A X D) (B + E)F-1 Depreciation/Rate of Return Labor -$ -$ -$ - -$ -$ Non-Labor - 11,788 11,788 - - 11,788 Total - 11,788 11,788 - 11,788

F-2 Property Taxes Labor - - - - - - Non-Labor 533 - 533 1.0727 572 572 Total 533 - 533 572 572

F-3 Other Facilities Labor - - - - - - Non-Labor 199 - 199 1.0727 214 214 Total 199 - 199 214 214

F-4 Security Services Labor 1,851 - 1,851 1.0680 1,977 1,977 Non-Labor 1,071 - 1,071 1.0727 1,149 1,149 Total 2,922 - 2,922 3,126 3,126

Total Facilities/ Assets Labor 1,851 - 1,851 1.0680 1,977 1,977 Non-Labor 1,803 11,788 13,591 1.0727 1,934 13,722 Total 3,654$ 11,788$ 15,442$ 3,911$ 15,699$

2012 Forecast (in 2009 $'s) 2012 Forecast Escalated

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Escalation Reconciliation($000's)

SDG&E-17-WP BAF-WP-419 GRC APPLICATION - December 2010

Page 422: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: I CORPORATE CENTER SHARED SERVICES Witness: Bruce Folkmann

Cost Center: F Facilities/Assets

Workpaper: F Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 19 18 18 21 21 16 17 17

Labor Costs 2,415$ 3,011$ 3,086$ 4,639$ 3,545$ 2,518$ 1,965$ 1,977$ Non-Labor Costs 12,621 15,917 16,692 16,370 15,906 14,491 13,860 13,722 Total Costs 15,036$ 18,928$ 19,778$ 21,009$ 19,451$ 17,009$ 15,825$ 15,699$

DIRECT ASSIGNMENTS SDG&E 2,829$ 3,708$ 3,927$ 4,520$ 4,616$ 4,013$ 3,849$ 3,857$ So Cal Gas 3,285 4,641 4,934 5,309 5,002 4,384 4,192 4,046

Subtotal - Utility 6,114 8,350 8,861 9,829 9,618 8,396 8,041 7,903

Global/Retained 5,812 7,482 7,568 7,475 6,459 5,479 4,671 4,592

Total Direct Assignments 11,926$ 15,831$ 16,429$ 17,305$ 16,078$ 13,875$ 12,711$ 12,495$

ALLOCATIONS SDG&E 810$ 789$ 889$ 984$ 917$ 1,002$ 1,029$ 1,071$ So Cal Gas 1,070 1,060 1,107 1,273 1,226 1,223 1,255 1,293

Subtotal - Utility 1,880 1,849 1,995 2,258 2,142 2,225 2,284 2,364

Global/Retained 1,230 1,248 1,354 1,447 1,231 909 829 840

Total Allocations 3,110$ 3,097$ 3,350$ 3,705$ 3,373$ 3,134$ 3,113$ 3,204$

BILLED COSTS SDG&E 3,640$ 4,498$ 4,816$ 5,505$ 5,533$ 5,015$ 4,878$ 4,929$ So Cal Gas 4,355 5,701 6,040 6,582 6,228 5,607 5,447 5,338

Subtotal - Utility 7,994 10,199 10,856 12,087 11,761 10,622 10,325 10,267

Global/Retained 7,042 8,729 8,922 8,922 7,690 6,387 5,500 5,432

Total Billed Costs 15,036$ 18,928$ 19,778$ 21,009$ 19,451$ 17,009$ 15,825$ 15,699$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-420 GRC APPLICATION - December 2010

Page 423: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: F-1 Depreciation/Rate of Return Witness: Bruce Folkmann

Cost Center: 1100-0248-DEPRECIATION & AMORTIZATION

Workpaper: F-1.1

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ -$ -$ -$ -$ Non-Labor Costs 10,422 11,931 13,524 13,766 13,221 12,620 11,978 11,788 Total Costs 10,422$ 11,931$ 13,524$ 13,766$ 13,221$ 12,620$ 11,978$ 11,788$

DIRECT ASSIGNMENTS SDG&E 2,457$ 3,099$ 3,584$ 4,050$ 4,009$ 3,754$ 3,692$ 3,707$ So Cal Gas 2,861 4,082 4,586 5,003 4,647 4,198 4,073 3,928

Subtotal - Utility 5,319 7,181 8,170 9,052 8,656 7,952 7,765 7,635

Global/Retained 5,104 4,750 5,354 4,714 4,565 4,668 4,214 4,153

Total Direct Assignments 10,422$ 11,931$ 13,524$ 13,766$ 13,221$ 12,620$ 11,978$ 11,788$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Allocations -$ -$ -$ -$ -$ -$ -$ -$

BILLED COSTS SDG&E 2,457$ 3,099$ 3,584$ 4,050$ 4,009$ 3,754$ 3,692$ 3,707$ So Cal Gas 2,861 4,082 4,586 5,003 4,647 4,198 4,073 3,928

Subtotal - Utility 5,319 7,181 8,170 9,052 8,656 7,952 7,765 7,635

Global/Retained 5,104 4,750 5,354 4,714 4,565 4,668 4,214 4,153

Total Billed Costs 10,422$ 11,931$ 13,524$ 13,766$ 13,221$ 12,620$ 11,978$ 11,788$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-421 GRC APPLICATION - December 2010

Page 424: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 4,009$ 4,647$ 4,565$ 13,221$ -

(303) (719) (412) (1,434)

Change in Allocation 2009-2012 - - - -

(303)$ (719)$ (412)$ (1,434)$ -

2012 - TEST YEAR 3,707$ 3,928$ 4,153$ 11,788$ -

41.54% 41.52% 16.94% 100.00%

-$ -$ -$ -$

3,707 3,928 4,153 11,788

3,707$ 3,928$ 4,153$ 11,788$

F Facilities/AssetsF-1 Depreciation/Rate of Return

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0248-DEPRECIATION & AMORTIZATIONF-1.1 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Multi-Factor Basic

Allocations

Impact of corporate assets becoming fully depreciated in excess of new asset additions

SDG&E-17-WP BAF-WP-422 GRC APPLICATION - December 2010

Page 425: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: F-1 Depreciation/Rate of Return Witness: Bruce Folkmann

Cost Center: 1100-0248-DEPRECIATION & AMORTIZATION

Workpaper: F-1.1 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ -$ -$ -$ -$ Non-Labor Costs 10,422 11,931 13,524 13,766 13,221 12,620 11,978 11,788 Total Costs 10,422$ 11,931$ 13,524$ 13,766$ 13,221$ 12,620$ 11,978$ 11,788$

DIRECT ASSIGNMENTS SDG&E 2,457$ 3,099$ 3,584$ 4,050$ 4,009$ 3,754$ 3,692$ 3,707$ So Cal Gas 2,861 4,082 4,586 5,003 4,647 4,198 4,073 3,928

Subtotal - Utility 5,319 7,181 8,170 9,052 8,656 7,952 7,765 7,635

Global/Retained 5,104 4,750 5,354 4,714 4,565 4,668 4,214 4,153

Total Direct Assignments 10,422$ 11,931$ 13,524$ 13,766$ 13,221$ 12,620$ 11,978$ 11,788$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Allocations -$ -$ -$ -$ -$ -$ -$ -$

BILLED COSTS SDG&E 2,457$ 3,099$ 3,584$ 4,050$ 4,009$ 3,754$ 3,692$ 3,707$ So Cal Gas 2,861 4,082 4,586 5,003 4,647 4,198 4,073 3,928

Subtotal - Utility 5,319 7,181 8,170 9,052 8,656 7,952 7,765 7,635

Global/Retained 5,104 4,750 5,354 4,714 4,565 4,668 4,214 4,153

Total Billed Costs 10,422$ 11,931$ 13,524$ 13,766$ 13,221$ 12,620$ 11,978$ 11,788$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-423 GRC APPLICATION - December 2010

Page 426: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: F-2 Property Taxes Witness: Bruce Folkmann

Cost Center: 1100-0311-PROPERTY TAXES

Workpaper: F-2.1

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ -$ -$ -$ -$ Non-Labor Costs 467 460 520 474 496 515 526 533 Total Costs 467$ 460$ 520$ 474$ 496$ 515$ 526$ 533$

DIRECT ASSIGNMENTS SDG&E 23$ 22$ 34$ 38$ 39$ 45$ 46$ 46$ So Cal Gas 27 26 40 44 41 45 45 45

Subtotal - Utility 51 48 74 82 80 90 92 91

Global/Retained 59 40 71 57 55 64 63 60

Total Direct Assignments 110$ 87$ 145$ 138$ 135$ 155$ 155$ 151$

ALLOCATIONS SDG&E 124$ 129$ 131$ 132$ 139$ 140$ 148$ 159$ So Cal Gas 151 160 155 154 157 148 153 159

Subtotal - Utility 275 289 286 286 296 288 302 317

Global/Retained 83 84 89 50 66 72 69 65

Total Allocations 357$ 373$ 375$ 336$ 362$ 360$ 371$ 382$

BILLED COSTS SDG&E 147$ 151$ 165$ 170$ 177$ 185$ 194$ 205$ So Cal Gas 178 186 195 197 198 193 199 203

Subtotal - Utility 325 337 360 367 376 378 393 408

Global/Retained 142 123 160 107 121 136 132 125

Total Billed Costs 467$ 460$ 520$ 474$ 496$ 515$ 526$ 533$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-424 GRC APPLICATION - December 2010

Page 427: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 177$ 198$ 121$ 496$ -

22 20 (30) 12

10 10 4 25

Change in Allocation 2009-2012 12 (7) (4) 0

28$ 5$ 4$ 37$ -

2012 - TEST YEAR 205$ 203$ 125$ 533$ -

41.54% 41.52% 16.94% 100.00%

159$ 159$ 65$ 382$

46 45 60 151

205$ 203$ 125$ 533$

Direct Assignment DetailsUnsecured Personal Property Tax 46 45 60 151 Property taxes- Sacramento office - - 1 1

46$ 45$ 60$ 151$

F Facilities/AssetsF-2 Property Taxes

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0311-PROPERTY TAXESF-2.1 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Multi-Factor Basic

Allocations

Directly charged 2009 taxes included in allocation for forecast purposes.Additional real property taxes based on increased value of the corporate headquarters building.

SDG&E-17-WP BAF-WP-425 GRC APPLICATION - December 2010

Page 428: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: F-2 Property Taxes Witness: Bruce Folkmann

Cost Center: 1100-0311-PROPERTY TAXES

Workpaper: F-2.1 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ -$ -$ -$ -$ Non-Labor Costs 467 460 520 474 496 524 549 572 Total Costs 467$ 460$ 520$ 474$ 496$ 524$ 549$ 572$

DIRECT ASSIGNMENTS SDG&E 23$ 22$ 34$ 38$ 39$ 46$ 48$ 50$ So Cal Gas 27 26 40 44 41 46 47 48

Subtotal - Utility 51 48 74 82 80 92 96 97

Global/Retained 59 40 71 57 55 65 66 65

Total Direct Assignments 110$ 87$ 145$ 138$ 135$ 157$ 161$ 162$

ALLOCATIONS SDG&E 124$ 129$ 131$ 132$ 139$ 142$ 155$ 170$ So Cal Gas 151 160 155 154 157 151 160 170

Subtotal - Utility 275 289 286 286 296 293 315 340

Global/Retained 83 84 89 50 66 74 72 69

Total Allocations 357$ 373$ 375$ 336$ 362$ 367$ 387$ 410$

BILLED COSTS SDG&E 147$ 151$ 165$ 170$ 177$ 189$ 203$ 220$ So Cal Gas 178 186 195 197 198 197 208 218

Subtotal - Utility 325 337 360 367 376 385 410 438

Global/Retained 142 123 160 107 121 139 138 134

Total Billed Costs 467$ 460$ 520$ 474$ 496$ 524$ 549$ 572$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-426 GRC APPLICATION - December 2010

Page 429: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: F Facilities/Assets Witness: Bruce Folkmann

Cost Center: F-3 Other Facilities

Workpaper: F-3

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ 0$ -$ -$ 0$ -$ -$ -$ Non-Labor Costs 431 952 1,343 401 761 212 199 199 Total Costs 431$ 952$ 1,343$ 401$ 761$ 212$ 199$ 199$

DIRECT ASSIGNMENTS SDG&E 21$ 126$ 158$ 10$ -$ -$ -$ -$ So Cal Gas 25$ 152$ 177$ 11$ -$ -$ -$ -$

Subtotal - Utility 46 279 335 21 - - - -

Global/Retained 54$ 307$ 545$ 20$ 647$ -$ -$ -$

Total Direct Assignments 100$ 585$ 880$ 41$ 647$ -$ -$ -$

ALLOCATIONS SDG&E 56$ (4)$ (4)$ (38)$ (46)$ -$ -$ -$ So Cal Gas 54 (6) (5) (45) (53) - - -

Subtotal - Utility 110 (10) (8) (83) (99) - - -

Global/Retained 222 377 471 442 213 212 199 199

Total Allocations 332$ 367$ 463$ 359$ 113$ 212$ 199$ 199$

BILLED COSTS SDG&E 77$ 122$ 154$ (29)$ (46)$ -$ -$ -$ So Cal Gas 79 147 172 (33) (53) - - -

Subtotal - Utility 156 269 327 (62) (99) - - -

Global/Retained 276 684 1,017 463 860 212 199 199

Total Billed Costs 431$ 952$ 1,343$ 401$ 761$ 212$ 199$ 199$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-427 GRC APPLICATION - December 2010

Page 430: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR (46)$ (53)$ 860$ 761$ -

(15,211) (15,082) (50) (30,343)

- - (609) (609)

Change in Allocation 2009-2012 (3) 5 (2) (0)

46$ 53$ (661)$ (30,952)$ -

2012 - TEST YEAR -$ -$ 199$ 199$ -

-$ -$ 199$ 199$

- - - -

-$ -$ 199$ 199$

Direct Assignments

TOTAL 2012 ALLOCATIONS

F-3 Other FacilitiesF-3 Recon

Total Change from 2009

Allocations

Miscellaneous non-recurring credits and expenses in 2009, not forecast for 2012Expense for Casa Azul forecast in the Global budget

I CORPORATE CENTER SHARED SERVICESF Facilities/Assets

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

SDG&E-17-WP BAF-WP-428 GRC APPLICATION - December 2010

Page 431: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: F Facilities/Assets Witness: Bruce Folkmann

Cost Center: F-3 Other Facilities

Workpaper: F-3 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ 0$ -$ -$ 0$ -$ -$ -$ Non-Labor Costs 431 952 1,343 401 761 216 208 214 Total Costs 431$ 952$ 1,343$ 401$ 761$ 216$ 208$ 214$

DIRECT ASSIGNMENTS SDG&E 21$ 126$ 158$ 10$ -$ -$ -$ -$ So Cal Gas 25 152 177 11 - - - -

Subtotal - Utility 46 279 335 21 - - - -

Global/Retained 54 307 545 20 647 - - -

Total Direct Assignments 100$ 585$ 880$ 41$ 647$ -$ -$ -$

ALLOCATIONS SDG&E 56$ (4)$ (4)$ (38)$ (46)$ -$ -$ -$ So Cal Gas 54 (6) (5) (45) (53) - - -

Subtotal - Utility 110 (10) (8) (83) (99) - - -

Global/Retained 222 377 471 442 213 216 208 214

Total Allocations 332$ 367$ 463$ 359$ 113$ 216$ 208$ 214$

BILLED COSTS SDG&E 77$ 122$ 154$ (29)$ (46)$ -$ -$ -$ So Cal Gas 79 147 172 (33) (53) - - -

Subtotal - Utility 156 269 327 (62) (99) - - -

Global/Retained 276 684 1,017 463 860 216 208 214

Total Billed Costs 431$ 952$ 1,343$ 401$ 761$ 216$ 208$ 214$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-429 GRC APPLICATION - December 2010

Page 432: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: F-3 Other Facilities Witness: Bruce Folkmann

Cost Center: 1100-0341-AIRCRAFT FRACTIONAL SHARE

Workpaper: F-3.1

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ -$ -$ -$ -$ Non-Labor Costs 359 378 474 453 227 212 199 199 Total Costs 359$ 378$ 474$ 453$ 227$ 212$ 199$ 199$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 67$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas 68 - - - - - - -

Subtotal - Utility 135 - - - - - - -

Global/Retained 224 377 474 453 227 212 199 199

Total Allocations 359$ 377$ 474$ 453$ 227$ 212$ 199$ 199$

BILLED COSTS SDG&E 67$ 0$ -$ -$ -$ -$ -$ -$ So Cal Gas 68 0 - - - - - -

Subtotal - Utility 135 0 - - - - - -

Global/Retained 224 378 474 453 227 212 199 199

Total Billed Costs 359$ 378$ 474$ 453$ 227$ 212$ 199$ 199$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-430 GRC APPLICATION - December 2010

Page 433: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR -$ -$ 227$ 227$ -

- - (27) (27)

Change in Allocation 2009-2012 - - - -

-$ -$ (27)$ (27)$ -

2012 - TEST YEAR -$ -$ 199$ 199$ -

0.00% 0.00% 100.00% 100.00%

-$ -$ 199$ 199$

- - - -

-$ -$ 199$ 199$

F Facilities/AssetsF-3 Other Facilities

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0341-AIRCRAFT FRACTIONAL SHAREF-3.1 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Retained

Allocations

Non-recurring expenses in 2009

SDG&E-17-WP BAF-WP-431 GRC APPLICATION - December 2010

Page 434: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: F-3 Other Facilities Witness: Bruce Folkmann

Cost Center: 1100-0341-AIRCRAFT FRACTIONAL SHARE

Workpaper: F-3.1 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ -$ -$ -$ -$ Non-Labor Costs 359 378 474 453 227 216 208 214 Total Costs 359$ 378$ 474$ 453$ 227$ 216$ 208$ 214$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 67$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas 68 - - - - - - -

Subtotal - Utility 135 - - - - - - -

Global/Retained 224 377 474 453 227 216 208 214

Total Allocations 359$ 377$ 474$ 453$ 227$ 216$ 208$ 214$

BILLED COSTS SDG&E 67$ 0$ -$ -$ -$ -$ -$ -$ So Cal Gas 68 0 - - - - - -

Subtotal - Utility 135 0 - - - - - -

Global/Retained 224 378 474 453 227 216 208 214

Total Billed Costs 359$ 378$ 474$ 453$ 227$ 216$ 208$ 214$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-432 GRC APPLICATION - December 2010

Page 435: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: F-3 Other Facilities Witness: Bruce Folkmann

Cost Center: 1100-0391-HQ RENEW BUILDING PROJECT

Workpaper: F-3.2

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ -$ -$ -$ -$ Non-Labor Costs 116 585 882 51 69 - - - Total Costs 116$ 585$ 882$ 51$ 69$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E 21$ 126$ 158$ 10$ -$ -$ -$ -$ So Cal Gas 25 152 177 11 - - - -

Subtotal - Utility 46 278 335 21 - - - -

Global/Retained 56 301 546 20 64 - - -

Total Direct Assignments 102$ 579$ 881$ 41$ 64$ -$ -$ -$

ALLOCATIONS SDG&E 3$ 1$ 0$ 2$ 1$ -$ -$ -$ So Cal Gas 3 1 0 3 1 - - -

Subtotal - Utility 6 2 0 5 1 - - -

Global/Retained 7 3 0 5 4 - - -

Total Allocations 14$ 6$ 0$ 9$ 5$ -$ -$ -$

BILLED COSTS SDG&E 24$ 127$ 158$ 12$ 1$ -$ -$ -$ So Cal Gas 28 153 177 14 1 - - -

Subtotal - Utility 52 281 335 26 1 - - -

Global/Retained 64 304 546 25 68 - - -

Total Billed Costs 116$ 585$ 882$ 51$ 69$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-433 GRC APPLICATION - December 2010

Page 436: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 1$ 1$ 68$ 69$ -

(1) (1) (68) (70)

Change in Allocation 2009-2012 - - - -

(1)$ (1)$ (68)$ (70)$ -

2012 - TEST YEAR -$ -$ -$ -$ -

30.09% 27.92% 41.99% 100.00%

-$ -$ -$ -$

- - - -

-$ -$ -$ -$

F Facilities/AssetsF-3 Other Facilities

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0391-HQ RENEW BUILDING PROJECTF-3.2 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Causal - HQ Depreciation

Allocations

Non-recurring expenses in 2009

SDG&E-17-WP BAF-WP-434 GRC APPLICATION - December 2010

Page 437: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: F-3 Other Facilities Witness: Bruce Folkmann

Cost Center: 1100-0391-HQ RENEW BUILDING PROJECT

Workpaper: F-3.2 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ -$ -$ -$ -$ Non-Labor Costs 116 585 882 51 69 - - - Total Costs 116$ 585$ 882$ 51$ 69$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E 21$ 126$ 158$ 10$ -$ -$ -$ -$ So Cal Gas 25 152 177 11 - - - -

Subtotal - Utility 46 278 335 21 - - - -

Global/Retained 56 301 546 20 64 - - -

Total Direct Assignments 102$ 579$ 881$ 41$ 64$ -$ -$ -$

ALLOCATIONS SDG&E 3$ 1$ 0$ 2$ 1$ -$ -$ -$ So Cal Gas 3 1 0 3 1 - - -

Subtotal - Utility 6 2 0 5 1 - - -

Global/Retained 7 3 0 5 4 - - -

Total Allocations 14$ 6$ 0$ 9$ 5$ -$ -$ -$

BILLED COSTS SDG&E 24$ 127$ 158$ 12$ 1$ -$ -$ -$ So Cal Gas 28 153 177 14 1 - - -

Subtotal - Utility 52 281 335 26 1 - - -

Global/Retained 64 304 546 25 68 - - -

Total Billed Costs 116$ 585$ 882$ 51$ 69$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-435 GRC APPLICATION - December 2010

Page 438: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: F-3 Other Facilities Witness: Bruce Folkmann

Cost Center: 1100-0455-CASA AZUL

Workpaper: F-3.3

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ -$ -$ -$ -$ Non-Labor Costs - - - - 609 - - - Total Costs -$ -$ -$ -$ 609$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - 609 - - -

Total Direct Assignments -$ -$ -$ -$ 609$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Allocations -$ -$ -$ -$ -$ -$ -$ -$

BILLED COSTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - 609 - - -

Total Billed Costs -$ -$ -$ -$ 609$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-436 GRC APPLICATION - December 2010

Page 439: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR -$ -$ 609$ 609$ -

- - (609) (609)

Change in Allocation 2009-2012 - - - -

-$ -$ (609)$ (609)$ -

2012 - TEST YEAR -$ -$ -$ -$ -

0.00% 0.00% 100.00% 100.00%

-$ -$ -$ -$

- - - -

-$ -$ -$ -$

F Facilities/AssetsF-3 Other Facilities

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0455-CASA AZULF-3.3 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Retained

Allocations

Expense forecast in Global

SDG&E-17-WP BAF-WP-437 GRC APPLICATION - December 2010

Page 440: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: F-3 Other Facilities Witness: Bruce Folkmann

Cost Center: 1100-0455-CASA AZUL

Workpaper: F-3.3 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ -$ -$ -$ -$ Non-Labor Costs - - - - 609 - - - Total Costs -$ -$ -$ -$ 609$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - 609 - - -

Total Direct Assignments -$ -$ -$ -$ 609$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Allocations -$ -$ -$ -$ -$ -$ -$ -$

BILLED COSTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - 609 - - -

Total Billed Costs -$ -$ -$ -$ 609$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-438 GRC APPLICATION - December 2010

Page 441: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: F-3 Other Facilities Witness: Bruce Folkmann

Cost Center: 1100-0058-ACCOUNTS PAYABLE

Workpaper: F-3.4

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ -$ -$ -$ -$ Non-Labor Costs (38) (5) (10) (1) (4) - - - Total Costs (38)$ (5)$ (10)$ (1)$ (4)$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - (1) - - - - -

Total Direct Assignments -$ -$ (1)$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E (13)$ (2)$ (3)$ (0)$ (2)$ -$ -$ -$ So Cal Gas (16) (2) (4) (0) (2) - - -

Subtotal - Utility (30) (4) (7) (0) (4) - - -

Global/Retained (9) (1) (2) (0) (1) - - -

Total Allocations (38)$ (5)$ (9)$ (1)$ (4)$ -$ -$ -$

BILLED COSTS SDG&E (13)$ (2)$ (3)$ (0)$ (2)$ -$ -$ -$ So Cal Gas (16) (2) (4) (0) (2) - - -

Subtotal - Utility (30) (4) (7) (0) (4) - - -

Global/Retained (9) (1) (3) (0) (1) - - -

Total Billed Costs (38)$ (5)$ (10)$ (1)$ (4)$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-439 GRC APPLICATION - December 2010

Page 442: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR (2)$ (2)$ (1)$ (4)$ -

2 2 1 4

Change in Allocation 2009-2012 (0) 0 (0) (0)

2$ 2$ 1$ 4$ -

2012 - TEST YEAR -$ -$ -$ -$ -

41.54% 41.52% 16.94% 100.00%

-$ -$ -$ -$

- - - -

-$ -$ -$ -$

F Facilities/AssetsF-3 Other Facilities

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0058-ACCOUNTS PAYABLEF-3.4 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Multi-Factor Basic

Allocations

Non-recurring credits in 2009

SDG&E-17-WP BAF-WP-440 GRC APPLICATION - December 2010

Page 443: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: F-3 Other Facilities Witness: Bruce Folkmann

Cost Center: 1100-0058-ACCOUNTS PAYABLE

Workpaper: F-3.4 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ -$ -$ -$ -$ Non-Labor Costs (38) (5) (10) (1) (4) - - - Total Costs (38)$ (5)$ (10)$ (1)$ (4)$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - (1) - - - - -

Total Direct Assignments -$ -$ (1)$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E (13)$ (2)$ (3)$ (0)$ (2)$ -$ -$ -$ So Cal Gas (16) (2) (4) (0) (2) - - -

Subtotal - Utility (30) (4) (7) (0) (4) - - -

Global/Retained (9) (1) (2) (0) (1) - - -

Total Allocations (38)$ (5)$ (9)$ (1)$ (4)$ -$ -$ -$

BILLED COSTS SDG&E (13)$ (2)$ (3)$ (0)$ (2)$ -$ -$ -$ So Cal Gas (16) (2) (4) (0) (2) - - -

Subtotal - Utility (30) (4) (7) (0) (4) - - -

Global/Retained (9) (1) (3) (0) (1) - - -

Total Billed Costs (38)$ (5)$ (10)$ (1)$ (4)$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-441 GRC APPLICATION - December 2010

Page 444: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: F-3 Other Facilities Witness: Bruce Folkmann

Cost Center: 1100-0314-MISCELLANEOUS REVENUE

Workpaper: F-3.5

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ 0$ -$ -$ 0$ -$ -$ -$ Non-Labor Costs (6) (5) (2) (103) (140) - - - Total Costs (6)$ (5)$ (2)$ (103)$ (140)$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained (3) 6 - - (26) - - -

Total Direct Assignments (3)$ 6$ -$ -$ (26)$ -$ -$ -$

ALLOCATIONS SDG&E (1)$ (4)$ (1)$ (40)$ (45)$ -$ -$ -$ So Cal Gas (1) (5) (1) (47) (52) - - -

Subtotal - Utility (2) (8) (2) (87) (97) - - -

Global/Retained (1) (2) (1) (15) (17) - - -

Total Allocations (3)$ (11)$ (2)$ (103)$ (114)$ -$ -$ -$

BILLED COSTS SDG&E (1)$ (4)$ (1)$ (40)$ (45)$ -$ -$ -$ So Cal Gas (1) (5) (1) (47) (52) - - -

Subtotal - Utility (2) (8) (2) (87) (97) - - -

Global/Retained (4) 3 (1) (15) (43) - - -

Total Billed Costs (6)$ (5)$ (2)$ (103)$ (140)$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-442 GRC APPLICATION - December 2010

Page 445: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR (45)$ (52)$ (43)$ (140)$ -

47 47 45 140

Change in Allocation 2009-2012 (3) 5 (2) (0)

45$ 52$ 43$ 140$ -

2012 - TEST YEAR -$ -$ -$ -$ -

41.54% 41.52% 16.94% 100.00%

-$ -$ -$ -$

- - - -

-$ -$ -$ -$

F Facilities/AssetsF-3 Other Facilities

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0314-MISCELLANEOUS REVENUEF-3.5 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Multi-Factor Basic

Allocations

Non-recurring credits in 2009

SDG&E-17-WP BAF-WP-443 GRC APPLICATION - December 2010

Page 446: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: F-3 Other Facilities Witness: Bruce Folkmann

Cost Center: 1100-0314-MISCELLANEOUS REVENUE

Workpaper: F-3.5 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ 0$ -$ -$ 0$ -$ -$ -$ Non-Labor Costs (6) (5) (2) (103) (140) - - - Total Costs (6)$ (5)$ (2)$ (103)$ (140)$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained (3) 6 - - (26) - - -

Total Direct Assignments (3)$ 6$ -$ -$ (26)$ -$ -$ -$

ALLOCATIONS SDG&E (1)$ (4)$ (1)$ (40)$ (45)$ -$ -$ -$ So Cal Gas (1) (5) (1) (47) (52) - - -

Subtotal - Utility (2) (8) (2) (87) (97) - - -

Global/Retained (1) (2) (1) (15) (17) - - -

Total Allocations (3)$ (11)$ (2)$ (103)$ (114)$ -$ -$ -$

BILLED COSTS SDG&E (1)$ (4)$ (1)$ (40)$ (45)$ -$ -$ -$ So Cal Gas (1) (5) (1) (47) (52) - - -

Subtotal - Utility (2) (8) (2) (87) (97) - - -

Global/Retained (4) 3 (1) (15) (43) - - -

Total Billed Costs (6)$ (5)$ (2)$ (103)$ (140)$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-444 GRC APPLICATION - December 2010

Page 447: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: F Facilities/Assets Witness: Bruce Folkmann

Cost Center: F-4 Security Services

Workpaper: F-4

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 19 18 18 21 21 16 17 17

Labor Costs 2,415$ 3,011$ 3,086$ 4,639$ 3,545$ 2,475$ 1,884$ 1,851$ Non-Labor Costs 1,300 2,574 1,305 1,730 1,428 1,111 1,078 1,071 Total Costs 3,715$ 5,585$ 4,391$ 6,368$ 4,973$ 3,586$ 2,962$ 2,922$

DIRECT ASSIGNMENTS SDG&E 328$ 462$ 151$ 423$ 568$ 209$ 104$ 94$ So Cal Gas 371 382 131 251 315 137 69 65

Subtotal - Utility 699 843 282 675 883 346 173 159

Global/Retained 595 2,385 1,597 2,685 1,192 733 375 350

Total Direct Assignments 1,295$ 3,228$ 1,880$ 3,360$ 2,074$ 1,079$ 548$ 509$

ALLOCATIONS SDG&E 631$ 665$ 761$ 891$ 824$ 845$ 839$ 843$ So Cal Gas 865 905 956 1,164 1,122 1,054 1,049 1,050

Subtotal - Utility 1,496 1,570 1,717 2,055 1,946 1,899 1,888 1,892

Global/Retained 925 787 794 954 953 608 526 521

Total Allocations 2,420$ 2,357$ 2,512$ 3,009$ 2,898$ 2,507$ 2,414$ 2,413$

BILLED COSTS SDG&E 958$ 1,126$ 913$ 1,314$ 1,392$ 1,054$ 943$ 937$ So Cal Gas 1,236 1,287 1,087 1,416 1,436 1,191 1,118 1,114

Subtotal - Utility 2,195 2,413 2,000 2,730 2,829 2,245 2,061 2,051

Global/Retained 1,520 3,172 2,392 3,639 2,144 1,341 901 871

Total Billed Costs 3,715$ 5,585$ 4,391$ 6,368$ 4,973$ 3,586$ 2,962$ 2,922$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-445 GRC APPLICATION - December 2010

Page 448: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 1,392$ 1,436$ 2,144$ 4,973$ 21

(164) (63) (226) (454) (4)

(376) (248) (839) (1,463)

(46) (65) (22) (133)

Change in Allocation 2009-2012 132 55 (187) 0

(455)$ (322)$ (1,273)$ (2,051)$ (4)

2012 - TEST YEAR 937$ 1,114$ 871$ 2,922$ 17

843$ 1,050$ 521$ 2,413$

94 65 350 509

937$ 1,114$ 871$ 2,922$

Non-recurring consulting expense in 2009.

Direct Assignments

TOTAL 2012 ALLOCATIONS

F-4 Security ServicesF-4 Recon

Total Change from 2009

Allocations

Permanent staff reduction as a result of the corporate reorganization in 2010.

Usage of call-in drivers reduced in 2010.

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

I CORPORATE CENTER SHARED SERVICESF Facilities/Assets

SDG&E-17-WP BAF-WP-446 GRC APPLICATION - December 2010

Page 449: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: F Facilities/Assets Witness: Bruce Folkmann

Cost Center: F-4 Security Services

Workpaper: F-4 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 19 18 18 21 21 16 17 17

Labor Costs 2,415$ 3,011$ 3,086$ 4,639$ 3,545$ 2,518$ 1,965$ 1,977$ Non-Labor Costs 1,300 2,574 1,305 1,730 1,428 1,131 1,125 1,149 Total Costs 3,715$ 5,585$ 4,391$ 6,368$ 4,973$ 3,649$ 3,090$ 3,126$

DIRECT ASSIGNMENTS SDG&E 328$ 462$ 151$ 423$ 568$ 213$ 109$ 101$ So Cal Gas 371 382 131 251 315 140 72 70

Subtotal - Utility 699 843 282 675 883 352 181 171

Global/Retained 595 2,385 1,597 2,685 1,192 746 391 374

Total Direct Assignments 1,295$ 3,228$ 1,880$ 3,360$ 2,074$ 1,098$ 572$ 545$

ALLOCATIONS SDG&E 631$ 665$ 761$ 891$ 824$ 859$ 875$ 901$ So Cal Gas 865 905 956 1,164 1,122 1,073 1,095 1,122

Subtotal - Utility 1,496 1,570 1,717 2,055 1,946 1,932 1,970 2,024

Global/Retained 925 787 794 954 953 619 549 557

Total Allocations 2,420$ 2,357$ 2,512$ 3,009$ 2,898$ 2,552$ 2,518$ 2,581$

BILLED COSTS SDG&E 958$ 1,126$ 913$ 1,314$ 1,392$ 1,072$ 984$ 1,002$ So Cal Gas 1,236 1,287 1,087 1,416 1,436 1,212 1,166 1,192

Subtotal - Utility 2,195 2,413 2,000 2,730 2,829 2,285 2,150 2,194

Global/Retained 1,520 3,172 2,392 3,639 2,144 1,365 940 932

Total Billed Costs 3,715$ 5,585$ 4,391$ 6,368$ 4,973$ 3,649$ 3,090$ 3,126$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-447 GRC APPLICATION - December 2010

Page 450: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: F-4 Security Services Witness: Bruce Folkmann

Cost Center: 1100-0133-CORPORATE SECURITY DIR

Workpaper: F-4.1

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 14 14 13 15 16 13 14 14

Labor Costs 939$ 911$ 1,026$ 1,296$ 1,375$ 1,283$ 1,323$ 1,323$ Non-Labor Costs 651 802 649 770 807 636 626 626 Total Costs 1,589$ 1,713$ 1,674$ 2,066$ 2,182$ 1,919$ 1,949$ 1,949$

DIRECT ASSIGNMENTS SDG&E -$ -$ 1$ 30$ 95$ -$ -$ -$ So Cal Gas - - 1 - - - - -

Subtotal - Utility - - 2 30 95 - - -

Global/Retained - 28 4 0 8 0 (0) -

Total Direct Assignments -$ 28$ 6$ 30$ 103$ 0$ (0)$ -$

ALLOCATIONS SDG&E 489$ 543$ 613$ 726$ 685$ 746$ 761$ 765$ So Cal Gas 722 781 807 999 982 956 972 972

Subtotal - Utility 1,210 1,324 1,420 1,724 1,667 1,703 1,733 1,737

Global/Retained 379 360 248 312 412 216 216 212

Total Allocations 1,589$ 1,684$ 1,668$ 2,036$ 2,079$ 1,919$ 1,949$ 1,949$

BILLED COSTS SDG&E 489$ 543$ 614$ 756$ 780$ 746$ 761$ 765$ So Cal Gas 722 781 808 999 982 956 972 972

Subtotal - Utility 1,210 1,324 1,422 1,755 1,762 1,703 1,733 1,737

Global/Retained 379 388 252 312 420 216 216 212

Total Billed Costs 1,589$ 1,713$ 1,674$ 2,066$ 2,182$ 1,919$ 1,949$ 1,949$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-448 GRC APPLICATION - December 2010

Page 451: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 780$ 982$ 420$ 2,182$ 16

(100) - - (100) (2)

(46) (65) (22) (133)

Change in Allocation 2009-2012 131 55 (187) (0)

(15)$ (9)$ (208)$ (233)$ (2)

2012 - TEST YEAR 765$ 972$ 212$ 1,949$ 14

39.26% 49.88% 10.85% 100.00%

765$ 972$ 212$ 1,949$

(0) (0) (0) (0)

765$ 972$ 212$ 1,949$

Non-recurring consulting expense in 2009.

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

F Facilities/AssetsF-4 Security Services1100-0133-CORPORATE SECURITY DIRF-4.1 Recon

Permanent staff reduction as a result of the corporate reorganization in 2010.

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Causal - HQ Security

Allocations

SDG&E-17-WP BAF-WP-449 GRC APPLICATION - December 2010

Page 452: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: F-4 Security Services Witness: Bruce Folkmann

Cost Center: 1100-0133-CORPORATE SECURITY DIR

Workpaper: F-4.1 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 14 14 13 15 16 13 14 14

Labor Costs 939$ 911$ 1,026$ 1,296$ 1,375$ 1,305$ 1,380$ 1,412$ Non-Labor Costs 651 802 649 770 807 648 654 672 Total Costs 1,589$ 1,713$ 1,674$ 2,066$ 2,182$ 1,953$ 2,034$ 2,084$

DIRECT ASSIGNMENTS SDG&E -$ -$ 1$ 30$ 95$ -$ -$ -$ So Cal Gas - - 1 - - - - -

Subtotal - Utility - - 2 30 95 - - -

Global/Retained - 28 4 0 8 0 (0) -

Total Direct Assignments -$ 28$ 6$ 30$ 103$ 0$ (0)$ -$

ALLOCATIONS SDG&E 489$ 543$ 613$ 726$ 685$ 760$ 794$ 818$ So Cal Gas 722 781 807 999 982 973 1,014 1,040

Subtotal - Utility 1,210 1,324 1,420 1,724 1,667 1,733 1,808 1,858

Global/Retained 379 360 248 312 412 220 226 226

Total Allocations 1,589$ 1,684$ 1,668$ 2,036$ 2,079$ 1,953$ 2,034$ 2,084$

BILLED COSTS SDG&E 489$ 543$ 614$ 756$ 780$ 760$ 794$ 818$ So Cal Gas 722 781 808 999 982 973 1,014 1,040

Subtotal - Utility 1,210 1,324 1,422 1,755 1,762 1,733 1,808 1,858

Global/Retained 379 388 252 312 420 220 226 226

Total Billed Costs 1,589$ 1,713$ 1,674$ 2,066$ 2,182$ 1,953$ 2,034$ 2,084$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-450 GRC APPLICATION - December 2010

Page 453: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: F-4 Security Services Witness: Bruce Folkmann

Cost Center: 1100-0275-EXECUTIVE SECURITY

Workpaper: F-4.2

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 5 4 5 6 5 3 3 3

Labor Costs 610$ 485$ 692$ 614$ 555$ 467$ 399$ 367$ Non-Labor Costs 261 372 448 376 262 234 235 236 Total Costs 870$ 857$ 1,140$ 990$ 818$ 701$ 634$ 603$

DIRECT ASSIGNMENTS SDG&E 15$ 36$ 67$ 1$ 2$ 16$ 26$ 16$ So Cal Gas 12 37 71 1 1 14 20 16

Subtotal - Utility 26 73 139 1 3 30 46 32

Global/Retained 32 137 181 28 7 83 123 106

Total Direct Assignments 58$ 210$ 320$ 29$ 10$ 113$ 169$ 138$

ALLOCATIONS SDG&E 135$ 113$ 140$ 160$ 135$ 98$ 77$ 77$ So Cal Gas 135 113 140 160 135 98 77 77

Subtotal - Utility 271 227 280 320 269 196 155 155

Global/Retained 541 421 539 640 538 392 310 310

Total Allocations 812$ 647$ 820$ 961$ 808$ 588$ 464$ 464$

BILLED COSTS SDG&E 150$ 149$ 208$ 161$ 137$ 114$ 103$ 93$ So Cal Gas 147 150 211 161 135 112 97 94

Subtotal - Utility 297 299 419 321 272 226 201 187

Global/Retained 573 558 721 669 546 475 433 416

Total Billed Costs 870$ 857$ 1,140$ 990$ 818$ 701$ 634$ 603$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-451 GRC APPLICATION - December 2010

Page 454: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 137$ 135$ 546$ 818$ 5

(64) (63) (226) (354) (2)

21 21 97 139

Change in Allocation 2009-2012 (0) (0) 0 0

(43)$ (42)$ (130)$ (215)$ (2)

2012 - TEST YEAR 93$ 94$ 416$ 603$ 3

16.67% 16.67% 66.67% 100.00%

77$ 77$ 310$ 464$

16 16 106 138

93$ 94$ 416$ 603$

Direct Assignment DetailsCall-in drivers allocated based on 16 16 106 138 2009 actuals. 16$ 16$ 106$ 138$

Call-in drivers' expenses moved from 1100-0369 (see Recon workpaper F-4.4)

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

F Facilities/AssetsF-4 Security Services1100-0275-EXECUTIVE SECURITYF-4.2 Recon

Permanent staff reduction as a result of the corporate reorganization in 2010.

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Causal - Exec Security

Allocations

SDG&E-17-WP BAF-WP-452 GRC APPLICATION - December 2010

Page 455: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: F-4 Security Services Witness: Bruce Folkmann

Cost Center: 1100-0275-EXECUTIVE SECURITY

Workpaper: F-4.2 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 5 4 5 6 5 3 3 3

Labor Costs 610$ 485$ 692$ 614$ 555$ 475$ 416$ 392$ Non-Labor Costs 261 372 448 376 262 238 245 253 Total Costs 870$ 857$ 1,140$ 990$ 818$ 713$ 661$ 645$

DIRECT ASSIGNMENTS SDG&E 15$ 36$ 67$ 1$ 2$ 16$ 27$ 17$ So Cal Gas 12 37 71 1 1 14 21 17

Subtotal - Utility 26 73 139 1 3 30 48 35

Global/Retained 32 137 181 28 7 84 129 114

Total Direct Assignments 58$ 210$ 320$ 29$ 10$ 115$ 177$ 148$

ALLOCATIONS SDG&E 135$ 113$ 140$ 160$ 135$ 100$ 81$ 83$ So Cal Gas 135 113 140 160 135 100 81 83

Subtotal - Utility 271 227 280 320 269 200 161 166

Global/Retained 541 421 539 640 538 399 323 331

Total Allocations 812$ 647$ 820$ 961$ 808$ 599$ 484$ 497$

BILLED COSTS SDG&E 150$ 149$ 208$ 161$ 137$ 116$ 108$ 100$ So Cal Gas 147 150 211 161 135 114 102 100

Subtotal - Utility 297 299 419 321 272 230 209 200

Global/Retained 573 558 721 669 546 484 452 445

Total Billed Costs 870$ 857$ 1,140$ 990$ 818$ 713$ 661$ 645$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-453 GRC APPLICATION - December 2010

Page 456: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: F-4 Security Services Witness: Bruce Folkmann

Cost Center: 1100-0043-AFFILIATE SECURITY SERVICES

Workpaper: F-4.3

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ -$ 108$ 162$ 162$ Non-Labor Costs - - - - - 139 209 209 Total Costs -$ -$ -$ -$ -$ 247$ 370$ 370$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ 52$ 78$ 78$ So Cal Gas - - - - - 32 49 49

Subtotal - Utility - - - - - 85 127 127

Global/Retained - - - - - 162 243 243

Total Direct Assignments -$ -$ -$ -$ -$ 247$ 370$ 370$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Allocations -$ -$ -$ -$ -$ -$ -$ -$

BILLED COSTS SDG&E -$ -$ -$ -$ -$ 52$ 78$ 78$ So Cal Gas - - - - - 32 49 49

Subtotal - Utility - - - - - 85 127 127

Global/Retained - - - - - 162 243 243

Total Billed Costs -$ -$ -$ -$ -$ 247$ 370$ 370$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-454 GRC APPLICATION - December 2010

Page 457: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR -$ -$ -$ -$ -

78 49 243 370

Change in Allocation 2009-2012 - - - -

78$ 49$ 243$ 370$ -

2012 - TEST YEAR 78$ 49$ 243$ 370$ -

0.00% 0.00% 100.00% 100.00%

-$ -$ -$ -$

78 49 243 370

78$ 49$ 243$ 370$

Direct Assignment DetailsCall-in drivers allocated based on 78 49 243 370 2009 actuals. 78$ 49$ 243$ 370$

F Facilities/AssetsF-4 Security Services

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0043-AFFILIATE SECURITY SERVICESF-4.3 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Retained

Allocations

New cost center created for call in drivers, which were previously part of cost center 1100-0310 (see Recon workpaper F-4.5)

SDG&E-17-WP BAF-WP-455 GRC APPLICATION - December 2010

Page 458: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: F-4 Security Services Witness: Bruce Folkmann

Cost Center: 1100-0043-AFFILIATE SECURITY SERVICES

Workpaper: F-4.3 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ -$ 110$ 169$ 173$ Non-Labor Costs - - - - - 142 218 224 Total Costs -$ -$ -$ -$ -$ 251$ 386$ 397$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ 53$ 82$ 84$ So Cal Gas - - - - - 33 51 52

Subtotal - Utility - - - - - 86 133 136

Global/Retained - - - - - 165 254 261

Total Direct Assignments -$ -$ -$ -$ -$ 251$ 386$ 397$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Allocations -$ -$ -$ -$ -$ -$ -$ -$

BILLED COSTS SDG&E -$ -$ -$ -$ -$ 53$ 82$ 84$ So Cal Gas - - - - - 33 51 52

Subtotal - Utility - - - - - 86 133 136

Global/Retained - - - - - 165 254 261

Total Billed Costs -$ -$ -$ -$ -$ 251$ 386$ 397$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-456 GRC APPLICATION - December 2010

Page 459: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: F-4 Security Services Witness: Bruce Folkmann

Cost Center: 1100-0369-CORPORATE BENEFITS

Workpaper: F-4.4

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs 477$ 682$ 83$ 303$ 445$ 187$ -$ -$ Non-Labor Costs 72 197 100 107 80 32 2 - Total Costs 550$ 879$ 183$ 410$ 525$ 219$ 2$ -$

DIRECT ASSIGNMENTS SDG&E 108$ 135$ 13$ 29$ 60$ 31$ -$ -$ So Cal Gas 112 140 14 33 67 27 - -

Subtotal - Utility 220 275 26 62 126 58 - -

Global/Retained 324 587 144 343 397 162 2 -

Total Direct Assignments 544$ 862$ 170$ 406$ 523$ 219$ 2$ -$

ALLOCATIONS SDG&E 2$ 6$ 5$ 2$ 1$ -$ -$ -$ So Cal Gas 2 7 5 2 1 - - -

Subtotal - Utility 4 13 10 4 1 - - -

Global/Retained 1 4 3 1 0 - - -

Total Allocations 6$ 17$ 13$ 5$ 2$ -$ -$ -$

BILLED COSTS SDG&E 110$ 141$ 17$ 31$ 60$ 31$ -$ -$ So Cal Gas 114 148 19 35 67 27 - -

Subtotal - Utility 224 288 36 66 127 58 - -

Global/Retained 325 591 147 344 397 162 2 -

Total Billed Costs 550$ 879$ 183$ 410$ 525$ 219$ 2$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-457 GRC APPLICATION - December 2010

Page 460: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 60$ 67$ 397$ 525$ -

(39) (46) (300) (385)

(21) (21) (97) (139)

Change in Allocation 2009-2012 0 (0) (0) (0)

(60)$ (67)$ (397)$ (524)$ -

2012 - TEST YEAR -$ -$ -$ -$ -

1100-0369-CORPORATE BENEFITSF-4.4 Recon

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

Total Change from 2009

Reduced usage of call-in drivers in 2010.Remaining call-in drivers' expenses moved to 1100-0275 (see Recon workpaper F-4.2)

F Facilities/AssetsF-4 Security Services

SDG&E-17-WP BAF-WP-458 GRC APPLICATION - December 2010

Page 461: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: F-4 Security Services Witness: Bruce Folkmann

Cost Center: 1100-0369-CORPORATE BENEFITS

Workpaper: F-4.4 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs 477$ 682$ 83$ 303$ 445$ 191$ -$ -$ Non-Labor Costs 72 197 100 107 80 32 2 - Total Costs 550$ 879$ 183$ 410$ 525$ 223$ 2$ -$

DIRECT ASSIGNMENTS SDG&E 108$ 135$ 13$ 29$ 60$ 31$ -$ -$ So Cal Gas 112 140 14 33 67 27 - -

Subtotal - Utility 220 275 26 62 126 59 - -

Global/Retained 324 587 144 343 397 164 2 -

Total Direct Assignments 544$ 862$ 170$ 406$ 523$ 223$ 2$ -$

ALLOCATIONS SDG&E 2$ 6$ 5$ 2$ 1$ -$ -$ -$ So Cal Gas 2 7 5 2 1 - - -

Subtotal - Utility 4 13 10 4 1 - - -

Global/Retained 1 4 3 1 0 - - -

Total Allocations 6$ 17$ 13$ 5$ 2$ -$ -$ -$

BILLED COSTS SDG&E 110$ 141$ 17$ 31$ 60$ 31$ -$ -$ So Cal Gas 114 148 19 35 67 27 - -

Subtotal - Utility 224 288 36 66 127 59 - -

Global/Retained 325 591 147 344 397 164 2 -

Total Billed Costs 550$ 879$ 183$ 410$ 525$ 223$ 2$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-459 GRC APPLICATION - December 2010

Page 462: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: F-4 Security Services Witness: Bruce Folkmann

Cost Center: 1100-0310-AFFILIATE BENEFITS - HR

Workpaper: F-4.5

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs 390$ 934$ 1,285$ 2,426$ 1,170$ 430$ -$ -$ Non-Labor Costs 316 1,202 109 476 279 70 6 - Total Costs 706$ 2,136$ 1,394$ 2,902$ 1,449$ 500$ 6$ -$

DIRECT ASSIGNMENTS SDG&E 205$ 291$ 70$ 363$ 411$ 110$ -$ -$ So Cal Gas 248 204 45 218 247 64 - -

Subtotal - Utility 453 495 115 581 659 174 - -

Global/Retained 240 1,633 1,268 2,314 780 326 6 -

Total Direct Assignments 692$ 2,128$ 1,383$ 2,895$ 1,439$ 500$ 6$ -$

ALLOCATIONS SDG&E 5$ 3$ 3$ 3$ 4$ -$ -$ -$ So Cal Gas 6 3 4 3 5 - - -

Subtotal - Utility 10 6 8 6 8 - - -

Global/Retained 3 2 4 1 2 - - -

Total Allocations 13$ 8$ 11$ 7$ 10$ -$ -$ -$

BILLED COSTS SDG&E 210$ 294$ 74$ 366$ 415$ 110$ -$ -$ So Cal Gas 253 208 49 221 252 64 - -

Subtotal - Utility 463 501 123 587 667 174 - -

Global/Retained 243 1,635 1,272 2,315 782 326 6 -

Total Billed Costs 706$ 2,136$ 1,394$ 2,902$ 1,449$ 500$ 6$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-460 GRC APPLICATION - December 2010

Page 463: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 415$ 252$ 782$ 1,449$ -

(337) (203) (538) (1,078)

(78) (49) (243) (370)

Change in Allocation 2009-2012 0 (0) 0 (0)

(415)$ (252)$ (782)$ (1,449)$ -

2012 - TEST YEAR -$ -$ -$ -$ -

1100-0310-AFFILIATE BENEFITS - HRF-4.5 Recon

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

Total Change from 2009

Reduced usage of call-in drivers in 2010.Remaining call-in drivers' expenses moved to 1100-0043 (see Recon workpaper F-4.3)

F Facilities/AssetsF-4 Security Services

SDG&E-17-WP BAF-WP-461 GRC APPLICATION - December 2010

Page 464: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: F-4 Security Services Witness: Bruce Folkmann

Cost Center: 1100-0310-AFFILIATE BENEFITS - HR

Workpaper: F-4.5 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs 390$ 934$ 1,285$ 2,426$ 1,170$ 438$ -$ -$ Non-Labor Costs 316 1,202 109 476 279 71 7 - Total Costs 706$ 2,136$ 1,394$ 2,902$ 1,449$ 509$ 7$ -$

DIRECT ASSIGNMENTS SDG&E 205$ 291$ 70$ 363$ 411$ 112$ -$ -$ So Cal Gas 248 204 45 218 247 65 - -

Subtotal - Utility 453 495 115 581 659 177 - -

Global/Retained 240 1,633 1,268 2,314 780 332 7 -

Total Direct Assignments 692$ 2,128$ 1,383$ 2,895$ 1,439$ 509$ 7$ -$

ALLOCATIONS SDG&E 5$ 3$ 3$ 3$ 4$ -$ -$ -$ So Cal Gas 6 3 4 3 5 - - -

Subtotal - Utility 10 6 8 6 8 - - -

Global/Retained 3 2 4 1 2 - - -

Total Allocations 13$ 8$ 11$ 7$ 10$ -$ -$ -$

BILLED COSTS SDG&E 210$ 294$ 74$ 366$ 415$ 112$ -$ -$ So Cal Gas 253 208 49 221 252 65 - -

Subtotal - Utility 463 501 123 587 667 177 - -

Global/Retained 243 1,635 1,272 2,315 782 332 7 -

Total Billed Costs 706$ 2,136$ 1,394$ 2,902$ 1,449$ 509$ 7$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-462 GRC APPLICATION - December 2010

Page 465: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: I CORPORATE CENTER SHARED SERVICES Witness: Bruce Folkmann

Cost Center: G Pension & Benefits

Workpaper: G

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs 33,057$ 34,350$ 39,568$ 43,608$ 36,617$ 27,768$ 26,571$ 26,020$ Non-Labor Costs 80,323 63,440 57,649 83,211 86,073 52,240 60,143 66,753 Total Costs 113,380$ 97,789$ 97,217$ 126,819$ 122,689$ 80,007$ 86,715$ 92,773$

DIRECT ASSIGNMENTS SDG&E 8,475$ 6,650$ 4,722$ 6,832$ 5,943$ 7,070$ 6,601$ 4,661$ So Cal Gas 8,773 7,134 5,135 6,702 5,669 4,668 3,636 4,432

Subtotal - Utility 17,249 13,785 9,857 13,534 11,613 11,738 10,237 9,092

Global/Retained 47,950 47,304 46,387 52,049 50,978 37,763 39,741 41,720

Total Direct Assignments 65,198$ 61,088$ 56,244$ 65,583$ 62,590$ 49,501$ 49,978$ 50,812$

ALLOCATIONS SDG&E 16,585$ 13,467$ 14,960$ 19,331$ 17,360$ 9,513$ 10,149$ 10,315$ So Cal Gas 19,585 15,149 15,403 19,855 16,755 8,769 9,190 9,725

Subtotal - Utility 36,171 28,616 30,363 39,185 34,115 18,282 19,340 20,040

Global/Retained 12,011 8,085 10,610 22,051 25,984 12,224 17,397 21,921

Total Allocations 48,181$ 36,701$ 40,973$ 61,236$ 60,099$ 30,506$ 36,737$ 41,961$

BILLED COSTS SDG&E 25,060$ 20,118$ 19,682$ 26,163$ 23,303$ 16,583$ 16,751$ 14,976$ So Cal Gas 28,359 22,283 20,538 26,557 22,425 13,438 12,827 14,157

Subtotal - Utility 53,419 42,401 40,220 52,719 45,727 30,021 29,577 29,132

Global/Retained 59,961 55,388 56,997 74,100 76,962 49,987 57,137 63,641

Total Billed Costs 113,380$ 97,789$ 97,217$ 126,819$ 122,689$ 80,007$ 86,715$ 92,773$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-463 GRC APPLICATION - December 2010

Page 466: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division: GRC TotalDept: I CORPORATE CENTER SHARED SERVICESCost Center: G Pension & BenefitsWorkpaper: G Recon

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 23,303$ 22,425$ 76,962$ 122,689$ -

(9,335) (8,893) (4,121) (22,349)

1,333 700 (8,168) (6,135)

(322) (308) (802) (1,432)

Change in Allocation 2009-2012 (3) 233 (230) (0)

(8,327)$ (8,268)$ (13,321)$ (29,916)$ -

2012 - TEST YEAR 14,976$ 14,157$ 63,641$ 92,773$ -

10,349$ 9,786$ 21,826$ 41,961$

4,626 4,371 41,815 50,812

14,976$ 14,157$ 63,641$ 92,773$

Direct Assignments

TOTAL 2012 ALLOCATIONS

Transfer/staff reductions as a result of the 2010 reorganization.Increase in external costs net of distribution forecast.2009 Actuals included above-target accrual; forecast is held at target.

Total Change from 2009

Allocations

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

SDG&E-17-WP BAF-WP-464 GRC APPLICATION - December 2010

Page 467: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Allocation Change for Utilities(2009 $000's)

Division: Pension & Benefits Witness: Bruce A. Folkmann

SDG&E SOCALGAS Change

G-1.1 1100-0802-P&B OVERHEAD (22) 109 87 G-1.2 1100-0814-BOD Pension (FAS87) 22 (14) 8 G-1.3 1100-0306-PENSION (FAS87) - - - G-1.4 1100-0370-LIFE INSURANCE - - - G-1 Employee Benefits 0 95 95

G-2.1 1100-0803-PAYROLL TAX 15 60 75 G-2 Payroll Taxes 15 60 75

G-3.1 1100-0800-EXECUTIVE ICP (57) (60) (118) G-3.2 1100-0801-ICP OVERHEAD 39 139 178 G-3 Incentive Compensation (18) 79 60

G-4.1 1100-0805-RESTRICTED STOCK - - - G-4.2 1100-0811-STOCK OPTIONS - - - G-4.3 1100-0806-LIFE INSURANCE - - - G-4.4 1100-0129-EXECUTIVE BENEFITS 0 (0) 0 G-4 Term Incentives 0 (0) 0

G-5.1 1100-0804-SERP - - - G-5 Supplemental Retirement - - -

Change in Allocation 2009-2012 (3) 233 230

Department / Cost Center

SDG&E-17-WP BAF-WP-465 GRC APPLICATION - December 2010

Page 468: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division: G Pension & Benefits Witness: Bruce Folkmann

Workpaper: G - Esc Recon

This workpaper details the methodology used to escalate the 2012 Forecast stated in 2009 $'s in Testimony and in Workpapers

Department Summaries, A-G, to the 2012 $'s as shown in Tesitmony and in Workpapers Escalated Department Summaries A-G

A B C D E FLabor/ Standard Total

Standard Non-Standard Total Nonabor Escalated EscalatedCosts Costs Costs Indexes 2012 $'s Costs

(A + B) (A X D) (B + E)G-1 Employee Benefits Labor 11,319$ -$ 11,319$ 1.0680 12,088$ 12,088$ Non-Labor 725 - 725 1.0727 778 778 Total 12,044 - 12,044 12,866 12,866

G-2 Payroll Taxes Labor 3,572 - 3,572 1.0680 3,815 3,815 Non-Labor - - - - - - Total 3,572 - 3,572 3,815 3,815

G-3 Incentive Compensation Labor 11,129 - 11,129 1.0680 11,886 11,886 Non-Labor - - - - - - Total 11,129 - 11,129 11,886 11,886

G-4 Long-Term Incentives Labor - - - - - - Non-Labor - 35,198 35,198 - - 35,198 Total - 35,198 35,198 - 35,198

G-5 Supplemental Retirement Labor - - - - - - Non-Labor 14,130 16,700 30,830 1.0000 14,130 30,830 Total 14,130 16,700 30,830 14,130 30,830

Total Pension & Benefits Labor 26,020 - 26,020 1.0680 27,789 27,789 Non-Labor 14,855 51,898 66,753 1.0035 14,908 66,805 Total 40,875$ 51,898$ 92,773$ 42,697$ 94,595$

2012 Forecast (in 2009 $'s) 2012 Forecast Escalated

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Escalation Reconciliation($000's)

SDG&E-17-WP BAF-WP-466 GRC APPLICATION - December 2010

Page 469: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: I CORPORATE CENTER SHARED SERVICES Witness: Bruce Folkmann

Cost Center: G Pension & Benefits

Workpaper: G Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs 33,057$ 34,350$ 39,568$ 43,608$ 36,617$ 28,251$ 27,714$ 27,789$ Non-Labor Costs 80,323 63,440 57,649 83,211 86,073 52,253 60,175 66,805 Total Costs 113,380$ 97,789$ 97,217$ 126,819$ 122,689$ 80,504$ 87,889$ 94,595$

DIRECT ASSIGNMENTS SDG&E 8,475$ 6,650$ 4,722$ 6,832$ 5,943$ 7,070$ 6,601$ 4,661$ So Cal Gas 8,773 7,134 5,135 6,702 5,669 4,668 3,636 4,432

Subtotal - Utility 17,249 13,785 9,857 13,534 11,613 11,738 10,237 9,092

Global/Retained 47,950 47,304 46,387 52,049 50,978 37,764 39,743 41,724

Total Direct Assignments 65,198$ 61,088$ 56,244$ 65,583$ 62,590$ 49,502$ 49,981$ 50,816$

ALLOCATIONS SDG&E 16,585$ 13,467$ 14,960$ 19,331$ 17,360$ 9,672$ 10,522$ 10,868$ So Cal Gas 19,585 15,149 15,403 19,855 16,755 8,917 9,535 10,273

Subtotal - Utility 36,171 28,616 30,363 39,185 34,115 18,589 20,057 21,141

Global/Retained 12,011 8,085 10,610 22,051 25,984 12,413 17,851 22,638

Total Allocations 48,181$ 36,701$ 40,973$ 61,236$ 60,099$ 31,002$ 37,908$ 43,779$

BILLED COSTS SDG&E 25,060$ 20,118$ 19,682$ 26,163$ 23,303$ 16,742$ 17,123$ 15,529$ So Cal Gas 28,359 22,283 20,538 26,557 22,425 13,585 13,172 14,704

Subtotal - Utility 53,419 42,401 40,220 52,719 45,727 30,327 30,295 30,233

Global/Retained 59,961 55,388 56,997 74,100 76,962 50,177 57,594 64,362

Total Billed Costs 113,380$ 97,789$ 97,217$ 126,819$ 122,689$ 80,504$ 87,889$ 94,595$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-467 GRC APPLICATION - December 2010

Page 470: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: G Pension & Benefits Witness: Bruce Folkmann

Cost Center: G-1 Employee Benefits

Workpaper: G-1

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs 7,990$ 7,962$ 9,656$ 9,922$ 13,291$ 11,649$ 11,965$ 11,319$ Non-Labor Costs 5,199 5,924 5,624 3,079 4,060 725 725 725 Total Costs 13,189$ 13,886$ 15,280$ 13,001$ 17,351$ 12,374$ 12,690$ 12,044$

DIRECT ASSIGNMENTS SDG&E 16$ 25$ 29$ 53$ 62$ -$ -$ -$ So Cal Gas 18 26 63 66 59 - - -

Subtotal - Utility 34 51 92 119 120 - - -

Global/Retained 4,371 5,295 5,768 2,476 4,202 29 33 31

Total Direct Assignments 4,405$ 5,347$ 5,860$ 2,595$ 4,322$ 29$ 33$ 31$

ALLOCATIONS SDG&E 2,548$ 2,579$ 2,957$ 3,368$ 4,294$ 4,225$ 4,291$ 3,954$ So Cal Gas 2,629 2,694 2,818 3,405 4,134 3,964 4,047 3,923

Subtotal - Utility 5,177 5,273 5,775 6,774 8,428 8,189 8,338 7,877

Global/Retained 3,608 3,266 3,646 3,632 4,601 4,157 4,320 4,136

Total Allocations 8,785$ 8,539$ 9,420$ 10,406$ 13,029$ 12,345$ 12,658$ 12,013$

BILLED COSTS SDG&E 2,564$ 2,604$ 2,986$ 3,421$ 4,356$ 4,225$ 4,291$ 3,954$ So Cal Gas 2,647 2,720 2,881 3,472 4,193 3,964 4,047 3,923

Subtotal - Utility 5,211 5,324 5,867 6,893 8,548 8,189 8,338 7,877

Global/Retained 7,978 8,562 9,413 6,108 8,803 4,185 4,352 4,167

Total Billed Costs 13,189$ 13,886$ 15,280$ 13,001$ 17,351$ 12,374$ 12,690$ 12,044$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-468 GRC APPLICATION - December 2010

Page 471: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: G Pension & Benefits Witness: Bruce Folkmann

Cost Center: G-1 Employee Benefits

Workpaper: G-1 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs 7,990$ 7,962$ 9,656$ 9,922$ 13,291$ 11,851$ 12,480$ 12,088$ Non-Labor Costs 5,199 5,924 5,624 3,079 4,060 738 757 778 Total Costs 13,189$ 13,886$ 15,280$ 13,001$ 17,351$ 12,590$ 13,237$ 12,866$

DIRECT ASSIGNMENTS SDG&E 16$ 25$ 29$ 53$ 62$ -$ -$ -$ So Cal Gas 18 26 63 66 59 - - -

Subtotal - Utility 34 51 92 119 120 - - -

Global/Retained 4,371 5,295 5,768 2,476 4,202 29 34 33

Total Direct Assignments 4,405$ 5,347$ 5,860$ 2,595$ 4,322$ 29$ 34$ 33$

ALLOCATIONS SDG&E 2,548$ 2,579$ 2,957$ 3,368$ 4,294$ 4,299$ 4,476$ 4,224$ So Cal Gas 2,629 2,694 2,818 3,405 4,134 4,033 4,221 4,191

Subtotal - Utility 5,177 5,273 5,775 6,774 8,428 8,332 8,697 8,415

Global/Retained 3,608 3,266 3,646 3,632 4,601 4,229 4,505 4,418

Total Allocations 8,785$ 8,539$ 9,420$ 10,406$ 13,029$ 12,561$ 13,203$ 12,833$

BILLED COSTS SDG&E 2,564$ 2,604$ 2,986$ 3,421$ 4,356$ 4,299$ 4,476$ 4,224$ So Cal Gas 2,647 2,720 2,881 3,472 4,193 4,033 4,221 4,191

Subtotal - Utility 5,211 5,324 5,867 6,893 8,548 8,332 8,697 8,415

Global/Retained 7,978 8,562 9,413 6,108 8,803 4,258 4,540 4,451

Total Billed Costs 13,189$ 13,886$ 15,280$ 13,001$ 17,351$ 12,590$ 13,237$ 12,866$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-469 GRC APPLICATION - December 2010

Page 472: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: G-1 Employee Benefits Witness: Bruce Folkmann

Cost Center: 1100-0802-P&B OVERHEAD

Workpaper: G-1.1

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs 8,012$ 7,962$ 9,651$ 9,829$ 12,470$ 11,649$ 11,965$ 11,319$ Non-Labor Costs - - - - - - - - Total Costs 8,012$ 7,962$ 9,651$ 9,829$ 12,470$ 11,649$ 11,965$ 11,319$

DIRECT ASSIGNMENTS SDG&E 16$ 25$ 29$ 27$ 30$ -$ -$ -$ So Cal Gas 18 26 63 38 25 - - -

Subtotal - Utility 34 51 92 65 55 - - -

Global/Retained 8 51 63 72 84 29 33 31

Total Direct Assignments 42$ 103$ 155$ 137$ 138$ 29$ 33$ 31$

ALLOCATIONS SDG&E 2,265$ 2,343$ 2,985$ 3,087$ 4,026$ 3,943$ 4,002$ 3,653$ So Cal Gas 2,286 2,402 2,851 3,079 3,830 3,666 3,747 3,622

Subtotal - Utility 4,551 4,746 5,836 6,167 7,857 7,609 7,749 7,274

Global/Retained 3,419 3,114 3,660 3,525 4,475 4,011 4,184 4,013

Total Allocations 7,970$ 7,859$ 9,496$ 9,692$ 12,332$ 11,620$ 11,933$ 11,288$

BILLED COSTS SDG&E 2,281$ 2,368$ 3,014$ 3,115$ 4,056$ 3,943$ 4,002$ 3,653$ So Cal Gas 2,304 2,428 2,914 3,117 3,855 3,666 3,747 3,622

Subtotal - Utility 4,585 4,797 5,928 6,232 7,911 7,609 7,749 7,274

Global/Retained 3,427 3,165 3,723 3,597 4,558 4,040 4,217 4,044

Total Billed Costs 8,012$ 7,962$ 9,651$ 9,829$ 12,470$ 11,649$ 11,965$ 11,319$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-470 GRC APPLICATION - December 2010

Page 473: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 4,056$ 3,855$ 4,558$ 12,470$ -

600 587 678 1,865

200 195 224 619

(1,182) (1,124) (1,329) (3,635)

Change in Allocation 2009-2012 (22) 109 (87) 0

(403)$ (233)$ (514)$ (1,151)$ -

2012 - TEST YEAR 3,653$ 3,622$ 4,044$ 11,319$ -

0.00% 0.00% 0.00% 0.00%

3,653$ 3,622$ 4,013$ 11,288$

- - 31 31

3,653$ 3,622$ 4,044$ 11,319$

Increase in pension costs

G Pension & BenefitsG-1 Employee Benefits

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0802-P&B OVERHEADG-1.1 Recon

Increase in medical premiums

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Weighted Average Overheads

Allocations

Direct Assignments

Staff reductions/transfers due to reorganization

SDG&E-17-WP BAF-WP-471 GRC APPLICATION - December 2010

Page 474: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: G-1 Employee Benefits Witness: Bruce Folkmann

Cost Center: 1100-0802-P&B OVERHEAD

Workpaper: G-1.1 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs 8,012$ 7,962$ 9,651$ 9,829$ 12,470$ 11,851$ 12,480$ 12,088$ Non-Labor Costs - - - - - - - - Total Costs 8,012$ 7,962$ 9,651$ 9,829$ 12,470$ 11,851$ 12,480$ 12,088$

DIRECT ASSIGNMENTS SDG&E 16$ 25$ 29$ 27$ 30$ -$ -$ -$ So Cal Gas 18 26 63 38 25 - - -

Subtotal - Utility 34 51 92 65 55 - - -

Global/Retained 8 51 63 72 84 29 34 33

Total Direct Assignments 42$ 103$ 155$ 137$ 138$ 29$ 34$ 33$

ALLOCATIONS SDG&E 2,265$ 2,343$ 2,985$ 3,087$ 4,026$ 4,012$ 4,174$ 3,901$ So Cal Gas 2,286 2,402 2,851 3,079 3,830 3,730 3,908 3,868

Subtotal - Utility 4,551 4,746 5,836 6,167 7,857 7,741 8,082 7,769

Global/Retained 3,419 3,114 3,660 3,525 4,475 4,081 4,364 4,286

Total Allocations 7,970$ 7,859$ 9,496$ 9,692$ 12,332$ 11,822$ 12,446$ 12,055$

BILLED COSTS SDG&E 2,281$ 2,368$ 3,014$ 3,115$ 4,056$ 4,012$ 4,174$ 3,901$ So Cal Gas 2,304 2,428 2,914 3,117 3,855 3,730 3,908 3,868

Subtotal - Utility 4,585 4,797 5,928 6,232 7,911 7,741 8,082 7,769

Global/Retained 3,427 3,165 3,723 3,597 4,558 4,110 4,398 4,319

Total Billed Costs 8,012$ 7,962$ 9,651$ 9,829$ 12,470$ 11,851$ 12,480$ 12,088$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-472 GRC APPLICATION - December 2010

Page 475: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: G-1 Employee Benefits Witness: Bruce Folkmann

Cost Center: 1100-0814-BOD Pension (FAS87)

Workpaper: G-1.2

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ -$ -$ -$ -$ Non-Labor Costs 815 680 (80) 714 697 725 725 725 Total Costs 815$ 680$ (80)$ 714$ 697$ 725$ 725$ 725$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 283$ 235$ (28)$ 281$ 267$ 282$ 289$ 301$ So Cal Gas 343 292 (33) 326 303 298 300 301

Subtotal - Utility 626 527 (61) 607 571 580 589 602

Global/Retained 189 152 (19) 107 126 145 136 123

Total Allocations 815$ 680$ (80)$ 714$ 697$ 725$ 725$ 725$

BILLED COSTS SDG&E 283$ 235$ (28)$ 281$ 267$ 282$ 289$ 301$ So Cal Gas 343 292 (33) 326 303 298 300 301

Subtotal - Utility 626 527 (61) 607 571 580 589 602

Global/Retained 189 152 (19) 107 126 145 136 123

Total Billed Costs 815$ 680$ (80)$ 714$ 697$ 725$ 725$ 725$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-473 GRC APPLICATION - December 2010

Page 476: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 267$ 303$ 126$ 697$ -

Change in Actuarial Estimate 12 12 4 28

Change in Allocation 2009-2012 22 (14) (8) -

34$ (2)$ (4)$ 28$ -

2012 - TEST YEAR 301$ 301$ 123$ 725$ -

0.00% 0.00% 0.00% 0.00%

301$ 301$ 123$ 725$

- - - -

301$ 301$ 123$ 725$

G Pension & BenefitsG-1 Employee Benefits

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0814-BOD Pension (FAS87)G-1.2 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Multi-Factor Basic

Allocations

SDG&E-17-WP BAF-WP-474 GRC APPLICATION - December 2010

Page 477: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: G-1 Employee Benefits Witness: Bruce Folkmann

Cost Center: 1100-0814-BOD Pension (FAS87)

Workpaper: G-1.2 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ -$ -$ -$ -$ Non-Labor Costs 815 680 (80) 714 697 738 757 778 Total Costs 815$ 680$ (80)$ 714$ 697$ 738$ 757$ 778$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 283$ 235$ (28)$ 281$ 267$ 287$ 302$ 323$ So Cal Gas 343 292 (33) 326 303 303 313 323

Subtotal - Utility 626 527 (61) 607 571 590 615 646

Global/Retained 189 152 (19) 107 126 148 142 132

Total Allocations 815$ 680$ (80)$ 714$ 697$ 738$ 757$ 778$

BILLED COSTS SDG&E 283$ 235$ (28)$ 281$ 267$ 287$ 302$ 323$ So Cal Gas 343 292 (33) 326 303 303 313 323

Subtotal - Utility 626 527 (61) 607 571 590 615 646

Global/Retained 189 152 (19) 107 126 148 142 132

Total Billed Costs 815$ 680$ (80)$ 714$ 697$ 738$ 757$ 778$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-475 GRC APPLICATION - December 2010

Page 478: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: G-1 Employee Benefits Witness: Bruce Folkmann

Cost Center: 1100-0306-PENSION (FAS87)

Workpaper: G-1.3

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs (21)$ -$ 2$ -$ -$ -$ -$ -$ Non-Labor Costs 4,340 5,244 5,705 2,365 3,363 - - - Total Costs 4,319$ 5,244$ 5,707$ 2,365$ 3,363$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 4,319 5,244 5,705 2,365 3,363 - - -

Total Direct Assignments 4,319$ 5,244$ 5,705$ 2,365$ 3,363$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - 2 - - - - -

Total Allocations -$ -$ 2$ -$ -$ -$ -$ -$

BILLED COSTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 4,319 5,244 5,707 2,365 3,363 - - -

Total Billed Costs 4,319$ 5,244$ 5,707$ 2,365$ 3,363$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-476 GRC APPLICATION - December 2010

Page 479: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR -$ -$ 3,363$ 3,363$ -

- - (3,363) (3,363)

Change in Allocation 2009-2012 - - - -

-$ -$ (3,363)$ (3,363)$ -

2012 - TEST YEAR -$ -$ -$ -$ -

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

Total Change from 2009

Transfer of budget from Sempra to Global business units

G Pension & BenefitsG-1 Employee Benefits1100-0306-PENSION (FAS87)G-1.3 Recon

SDG&E-17-WP BAF-WP-477 GRC APPLICATION - December 2010

Page 480: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: G-1 Employee Benefits Witness: Bruce Folkmann

Cost Center: 1100-0306-PENSION (FAS87)

Workpaper: G-1.3 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs (21)$ -$ 2$ -$ -$ -$ -$ -$ Non-Labor Costs 4,340 5,244 5,705 2,365 3,363 - - - Total Costs 4,319$ 5,244$ 5,707$ 2,365$ 3,363$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 4,319 5,244 5,705 2,365 3,363 - - -

Total Direct Assignments 4,319$ 5,244$ 5,705$ 2,365$ 3,363$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - 2 - - - - -

Total Allocations -$ -$ 2$ -$ -$ -$ -$ -$

BILLED COSTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained 4,319 5,244 5,707 2,365 3,363 - - -

Total Billed Costs 4,319$ 5,244$ 5,707$ 2,365$ 3,363$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-478 GRC APPLICATION - December 2010

Page 481: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: G-1 Employee Benefits Witness: Bruce Folkmann

Cost Center: 1100-0370-LIFE INSURANCE

Workpaper: G-1.4

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ 3$ 93$ 821$ -$ -$ -$ Non-Labor Costs 44 - - - - - - - Total Costs 44$ -$ 3$ 93$ 821$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ 25$ 32$ -$ -$ -$ So Cal Gas - - - 28 34 - - -

Subtotal - Utility - - - 54 66 - - -

Global/Retained 44 - - 39 756 - - -

Total Direct Assignments 44$ -$ -$ 93$ 821$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - 3 - - - - -

Total Allocations -$ -$ 3$ -$ -$ -$ -$ -$

BILLED COSTS SDG&E -$ -$ -$ 25$ 32$ -$ -$ -$ So Cal Gas - - - 28 34 - - -

Subtotal - Utility - - - 54 66 - - -

Global/Retained 44 - 3 39 756 - - -

Total Billed Costs 44$ -$ 3$ 93$ 821$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-479 GRC APPLICATION - December 2010

Page 482: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 32$ 34$ 756$ 821$ -

(32) (34) (756) (821)

Change in Allocation 2009-2012 - - - -

(32)$ (34)$ (756)$ (821)$ -

2012 - TEST YEAR -$ -$ -$ -$ -

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

Total Change from 2009

Transfer of budget to cost center 1100-0806 (see Recon workpaper G-4.3).

G Pension & BenefitsG-1 Employee Benefits1100-0370-LIFE INSURANCEG-1.4 Recon

SDG&E-17-WP BAF-WP-480 GRC APPLICATION - December 2010

Page 483: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: G-1 Employee Benefits Witness: Bruce Folkmann

Cost Center: 1100-0370-LIFE INSURANCE

Workpaper: G-1.4 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ 3$ 93$ 821$ -$ -$ -$ Non-Labor Costs 44 - - - - - - - Total Costs 44$ -$ 3$ 93$ 821$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ 25$ 32$ -$ -$ -$ So Cal Gas - - - 28 34 - - -

Subtotal - Utility - - - 54 66 - - -

Global/Retained 44 - - 39 756 - - -

Total Direct Assignments 44$ -$ -$ 93$ 821$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - 3 - - - - -

Total Allocations -$ -$ 3$ -$ -$ -$ -$ -$

BILLED COSTS SDG&E -$ -$ -$ 25$ 32$ -$ -$ -$ So Cal Gas - - - 28 34 - - -

Subtotal - Utility - - - 54 66 - - -

Global/Retained 44 - 3 39 756 - - -

Total Billed Costs 44$ -$ 3$ 93$ 821$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-481 GRC APPLICATION - December 2010

Page 484: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: G-2 Payroll Taxes Witness: Bruce Folkmann

Cost Center: 1100-0803-PAYROLL TAX

Workpaper: G-2.1

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs 4,327$ 5,042$ 5,628$ 5,435$ 6,189$ 3,964$ 3,542$ 3,572$ Non-Labor Costs - - - - - - - - Total Costs 4,327$ 5,042$ 5,628$ 5,435$ 6,189$ 3,964$ 3,542$ 3,572$

DIRECT ASSIGNMENTS SDG&E 18$ 30$ 32$ 39$ 43$ -$ -$ -$ So Cal Gas 24 30 47 33 31 - - -

Subtotal - Utility 42 60 79 72 74 - - -

Global/Retained 29 128 88 120 112 10 10 10

Total Direct Assignments 71$ 188$ 167$ 191$ 186$ 10$ 10$ 10$

ALLOCATIONS SDG&E 1,206$ 1,448$ 1,707$ 1,647$ 1,926$ 1,342$ 1,184$ 1,153$ So Cal Gas 1,215 1,488 1,633 1,664 1,845 1,248 1,109 1,143

Subtotal - Utility 2,420 2,936 3,340 3,311 3,771 2,589 2,294 2,296

Global/Retained 1,836 1,918 2,121 1,933 2,232 1,365 1,239 1,267

Total Allocations 4,256$ 4,854$ 5,461$ 5,244$ 6,003$ 3,954$ 3,533$ 3,563$

BILLED COSTS SDG&E 1,224$ 1,478$ 1,740$ 1,686$ 1,969$ 1,342$ 1,184$ 1,153$ So Cal Gas 1,239 1,518 1,680 1,696 1,876 1,248 1,109 1,143

Subtotal - Utility 2,463 2,996 3,419 3,383 3,845 2,589 2,294 2,296

Global/Retained 1,864 2,046 2,209 2,052 2,344 1,374 1,248 1,276

Total Billed Costs 4,327$ 5,042$ 5,628$ 5,435$ 6,189$ 3,964$ 3,542$ 3,572$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-482 GRC APPLICATION - December 2010

Page 485: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 1,969$ 1,876$ 2,344$ 6,189$ -

(831) (793) (993) (2,616)

Change in Allocation 2009-2012 15 60 (75) -

(816)$ (733)$ (1,068)$ (2,616)$ -

2012 - TEST YEAR 1,153$ 1,143$ 1,276$ 3,572$ -

0.00% 0.00% 0.00% 0.00%

1,153$ 1,143$ 1,267$ 3,563$

- - 10 10

1,153$ 1,143$ 1,276$ 3,572$

1100-0803-PAYROLL TAXG-2.1 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Weighted Average Overheads

Allocations

Staff reductions/transfers due to reorganization

G Pension & BenefitsG-2 Payroll Taxes

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

SDG&E-17-WP BAF-WP-483 GRC APPLICATION - December 2010

Page 486: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: G-2 Payroll Taxes Witness: Bruce Folkmann

Cost Center: 1100-0803-PAYROLL TAX

Workpaper: G-2.1 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs 4,327$ 5,042$ 5,628$ 5,435$ 6,189$ 4,033$ 3,695$ 3,815$ Non-Labor Costs - - - - - - - - Total Costs 4,327$ 5,042$ 5,628$ 5,435$ 6,189$ 4,033$ 3,695$ 3,815$

DIRECT ASSIGNMENTS SDG&E 18$ 30$ 32$ 39$ 43$ -$ -$ -$ So Cal Gas 24 30 47 33 31 - - -

Subtotal - Utility 42 60 79 72 74 - - -

Global/Retained 29 128 88 120 112 10 10 10

Total Direct Assignments 71$ 188$ 167$ 191$ 186$ 10$ 10$ 10$

ALLOCATIONS SDG&E 1,206$ 1,448$ 1,707$ 1,647$ 1,926$ 1,365$ 1,235$ 1,231$ So Cal Gas 1,215 1,488 1,633 1,664 1,845 1,269 1,157 1,221

Subtotal - Utility 2,420 2,936 3,340 3,311 3,771 2,634 2,393 2,452

Global/Retained 1,836 1,918 2,121 1,933 2,232 1,388 1,292 1,353

Total Allocations 4,256$ 4,854$ 5,461$ 5,244$ 6,003$ 4,023$ 3,685$ 3,805$

BILLED COSTS SDG&E 1,224$ 1,478$ 1,740$ 1,686$ 1,969$ 1,365$ 1,235$ 1,231$ So Cal Gas 1,239 1,518 1,680 1,696 1,876 1,269 1,157 1,221

Subtotal - Utility 2,463 2,996 3,419 3,383 3,845 2,634 2,393 2,452

Global/Retained 1,864 2,046 2,209 2,052 2,344 1,398 1,302 1,363

Total Billed Costs 4,327$ 5,042$ 5,628$ 5,435$ 6,189$ 4,033$ 3,695$ 3,815$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-484 GRC APPLICATION - December 2010

Page 487: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: G Pension & Benefits Witness: Bruce Folkmann

Cost Center: G-3 Incentive Compensation

Workpaper: G-3

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs 20,669$ 21,132$ 24,264$ 28,181$ 17,137$ 12,155$ 11,063$ 11,129$ Non-Labor Costs - - - - - - - - Total Costs 20,669$ 21,132$ 24,264$ 28,181$ 17,137$ 12,155$ 11,063$ 11,129$

DIRECT ASSIGNMENTS SDG&E 29$ 44$ 53$ 49$ 37$ -$ -$ -$ So Cal Gas 32 51 104 68 31 - - -

Subtotal - Utility 61 95 157 116 68 - - -

Global/Retained 14 94 81 153 96 22 22 22

Total Direct Assignments 74$ 189$ 238$ 270$ 163$ 22$ 22$ 22$

ALLOCATIONS SDG&E 4,979$ 5,338$ 6,065$ 7,309$ 4,723$ 3,577$ 3,185$ 3,009$ So Cal Gas 5,086 5,539 5,850 7,286 4,514 3,233 2,858 2,971

Subtotal - Utility 10,065 10,878 11,915 14,595 9,237 6,811 6,043 5,980

Global/Retained 10,530 10,065 12,111 13,316 7,736 5,323 4,999 5,127

Total Allocations 20,595$ 20,943$ 24,026$ 27,911$ 16,973$ 12,133$ 11,041$ 11,107$

BILLED COSTS SDG&E 5,008$ 5,383$ 6,117$ 7,357$ 4,760$ 3,577$ 3,185$ 3,009$ So Cal Gas 5,117 5,590 5,954 7,354 4,545 3,233 2,858 2,971

Subtotal - Utility 10,126 10,973 12,072 14,711 9,305 6,811 6,043 5,980

Global/Retained 10,544 10,159 12,192 13,470 7,832 5,345 5,021 5,149

Total Billed Costs 20,669$ 21,132$ 24,264$ 28,181$ 17,137$ 12,155$ 11,063$ 11,129$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-485 GRC APPLICATION - December 2010

Page 488: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: G Pension & Benefits Witness: Bruce Folkmann

Cost Center: G-3 Incentive Compensation

Workpaper: G-3 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs 20,669$ 21,132$ 24,264$ 28,181$ 17,137$ 12,367$ 11,539$ 11,886$ Non-Labor Costs - - - - - - - - Total Costs 20,669$ 21,132$ 24,264$ 28,181$ 17,137$ 12,367$ 11,539$ 11,886$

DIRECT ASSIGNMENTS SDG&E 29$ 44$ 53$ 49$ 37$ -$ -$ -$ So Cal Gas 32 51 104 68 31 - - -

Subtotal - Utility 61 95 157 116 68 - - -

Global/Retained 14 94 81 153 96 23 23 24

Total Direct Assignments 74$ 189$ 238$ 270$ 163$ 23$ 23$ 24$

ALLOCATIONS SDG&E 4,979$ 5,338$ 6,065$ 7,309$ 4,723$ 3,640$ 3,322$ 3,213$ So Cal Gas 5,086 5,539 5,850 7,286 4,514 3,290 2,981 3,174

Subtotal - Utility 10,065 10,878 11,915 14,595 9,237 6,929 6,302 6,387

Global/Retained 10,530 10,065 12,111 13,316 7,736 5,415 5,214 5,475

Total Allocations 20,595$ 20,943$ 24,026$ 27,911$ 16,973$ 12,344$ 11,516$ 11,862$

BILLED COSTS SDG&E 5,008$ 5,383$ 6,117$ 7,357$ 4,760$ 3,640$ 3,322$ 3,213$ So Cal Gas 5,117 5,590 5,954 7,354 4,545 3,290 2,981 3,174

Subtotal - Utility 10,126 10,973 12,072 14,711 9,305 6,929 6,302 6,387

Global/Retained 10,544 10,159 12,192 13,470 7,832 5,438 5,237 5,499

Total Billed Costs 20,669$ 21,132$ 24,264$ 28,181$ 17,137$ 12,367$ 11,539$ 11,886$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-486 GRC APPLICATION - December 2010

Page 489: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: G-3 Incentive Compensation Witness: Bruce Folkmann

Cost Center: 1100-0800-EXECUTIVE ICP

Workpaper: G-3.1

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs 9,295$ 8,165$ 10,626$ 11,339$ 6,042$ 4,498$ 4,242$ 4,242$ Non-Labor Costs - - - - - - - - Total Costs 9,295$ 8,165$ 10,626$ 11,339$ 6,042$ 4,498$ 4,242$ 4,242$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 1,535$ 1,287$ 1,360$ 1,548$ 962$ 850$ 779$ 618$ So Cal Gas 1,639 1,383 1,403 1,595 937 644 538 597

Subtotal - Utility 3,174 2,670 2,763 3,143 1,899 1,494 1,317 1,215

Global/Retained 6,121 5,495 7,863 8,195 4,143 3,004 2,925 3,027

Total Allocations 9,295$ 8,165$ 10,626$ 11,339$ 6,042$ 4,498$ 4,242$ 4,242$

BILLED COSTS SDG&E 1,535$ 1,287$ 1,360$ 1,548$ 962$ 850$ 779$ 618$ So Cal Gas 1,639 1,383 1,403 1,595 937 644 538 597

Subtotal - Utility 3,174 2,670 2,763 3,143 1,899 1,494 1,317 1,215

Global/Retained 6,121 5,495 7,863 8,195 4,143 3,004 2,925 3,027

Total Billed Costs 9,295$ 8,165$ 10,626$ 11,339$ 6,042$ 4,498$ 4,242$ 4,242$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-487 GRC APPLICATION - December 2010

Page 490: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 962$ 937$ 4,143$ 6,042$ -

(152) (148) (653) (953)

(135) (131) (581) (847)

Change in Allocation 2009-2012 (57) (60) 118 (0)

(344)$ (339)$ (1,116)$ (1,800)$ -

2012 - TEST YEAR 618$ 597$ 3,027$ 4,242$ -

0.00% 0.00% 0.00% 0.00%

618$ 597$ 3,027$ 4,242$

- - - -

618$ 597$ 3,027$ 4,242$

G Pension & BenefitsG-3 Incentive Compensation

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0800-EXECUTIVE ICPG-3.1 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Weighted Average Overheads

Allocations

2009 Actuals included above-target accrual; forecast is held at target

Transfers due to reorganization

SDG&E-17-WP BAF-WP-488 GRC APPLICATION - December 2010

Page 491: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: G-3 Incentive Compensation Witness: Bruce Folkmann

Cost Center: 1100-0800-EXECUTIVE ICP

Workpaper: G-3.1 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs 9,295$ 8,165$ 10,626$ 11,339$ 6,042$ 4,576$ 4,424$ 4,530$ Non-Labor Costs - - - - - - - - Total Costs 9,295$ 8,165$ 10,626$ 11,339$ 6,042$ 4,576$ 4,424$ 4,530$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E 1,535$ 1,287$ 1,360$ 1,548$ 962$ 865$ 813$ 660$ So Cal Gas 1,639 1,383 1,403 1,595 937 655 561 638

Subtotal - Utility 3,174 2,670 2,763 3,143 1,899 1,520 1,374 1,298

Global/Retained 6,121 5,495 7,863 8,195 4,143 3,056 3,051 3,233

Total Allocations 9,295$ 8,165$ 10,626$ 11,339$ 6,042$ 4,576$ 4,424$ 4,530$

BILLED COSTS SDG&E 1,535$ 1,287$ 1,360$ 1,548$ 962$ 865$ 813$ 660$ So Cal Gas 1,639 1,383 1,403 1,595 937 655 561 638

Subtotal - Utility 3,174 2,670 2,763 3,143 1,899 1,520 1,374 1,298

Global/Retained 6,121 5,495 7,863 8,195 4,143 3,056 3,051 3,233

Total Billed Costs 9,295$ 8,165$ 10,626$ 11,339$ 6,042$ 4,576$ 4,424$ 4,530$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-489 GRC APPLICATION - December 2010

Page 492: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: G-3 Incentive Compensation Witness: Bruce Folkmann

Cost Center: 1100-0801-ICP OVERHEAD

Workpaper: G-3.2

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs 11,375$ 12,966$ 13,639$ 16,842$ 11,095$ 7,658$ 6,821$ 6,887$ Non-Labor Costs - - - - - - - - Total Costs 11,375$ 12,966$ 13,639$ 16,842$ 11,095$ 7,658$ 6,821$ 6,887$

DIRECT ASSIGNMENTS SDG&E 29$ 44$ 53$ 49$ 37$ -$ -$ -$ So Cal Gas 32 51 104 68 31 - - -

Subtotal - Utility 61 95 157 116 68 - - -

Global/Retained 14 94 81 153 96 22 22 22

Total Direct Assignments 74$ 189$ 238$ 270$ 163$ 22$ 22$ 22$

ALLOCATIONS SDG&E 3,444$ 4,051$ 4,705$ 5,760$ 3,761$ 2,727$ 2,406$ 2,391$ So Cal Gas 3,447 4,157 4,448 5,691 3,578 2,590 2,320 2,374

Subtotal - Utility 6,891 8,207 9,152 11,452 7,338 5,317 4,725 4,765

Global/Retained 4,410 4,570 4,248 5,121 3,593 2,319 2,074 2,100

Total Allocations 11,300$ 12,777$ 13,401$ 16,572$ 10,931$ 7,636$ 6,799$ 6,865$

BILLED COSTS SDG&E 3,473$ 4,095$ 4,758$ 5,809$ 3,798$ 2,727$ 2,406$ 2,391$ So Cal Gas 3,478 4,207 4,551 5,759 3,608 2,590 2,320 2,374

Subtotal - Utility 6,952 8,302 9,309 11,568 7,406 5,317 4,725 4,765

Global/Retained 4,423 4,664 4,329 5,274 3,689 2,341 2,096 2,122

Total Billed Costs 11,375$ 12,966$ 13,639$ 16,842$ 11,095$ 7,658$ 6,821$ 6,887$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-490 GRC APPLICATION - December 2010

Page 493: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 3,798$ 3,608$ 3,689$ 11,095$ -

(170) (160) (149) (479)

(1,276) (1,213) (1,240) (3,729)

Change in Allocation 2009-2012 39 139 (178) 0

(1,407)$ (1,234)$ (1,567)$ (4,208)$ -

2012 - TEST YEAR 2,391$ 2,374$ 2,122$ 6,887$ -

0.00% 0.00% 0.00% 0.00%

2,391$ 2,374$ 2,100$ 6,865$

- - 22 22

2,391$ 2,374$ 2,122$ 6,887$

G Pension & BenefitsG-3 Incentive Compensation

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0801-ICP OVERHEADG-3.2 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Weighted Average Overheads

Allocations

2009 Actuals included above-target accrual; forecast is held at targetStaff reductions/transfers due to reorganization

SDG&E-17-WP BAF-WP-491 GRC APPLICATION - December 2010

Page 494: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: G-3 Incentive Compensation Witness: Bruce Folkmann

Cost Center: 1100-0801-ICP OVERHEAD

Workpaper: G-3.2 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs 11,375$ 12,966$ 13,639$ 16,842$ 11,095$ 7,791$ 7,115$ 7,355$ Non-Labor Costs - - - - - - - - Total Costs 11,375$ 12,966$ 13,639$ 16,842$ 11,095$ 7,791$ 7,115$ 7,355$

DIRECT ASSIGNMENTS SDG&E 29$ 44$ 53$ 49$ 37$ -$ -$ -$ So Cal Gas 32 51 104 68 31 - - -

Subtotal - Utility 61 95 157 116 68 - - -

Global/Retained 14 94 81 153 96 23 23 24

Total Direct Assignments 74$ 189$ 238$ 270$ 163$ 23$ 23$ 24$

ALLOCATIONS SDG&E 3,444$ 4,051$ 4,705$ 5,760$ 3,761$ 2,775$ 2,509$ 2,553$ So Cal Gas 3,447 4,157 4,448 5,691 3,578 2,635 2,420 2,536

Subtotal - Utility 6,891 8,207 9,152 11,452 7,338 5,409 4,929 5,089

Global/Retained 4,410 4,570 4,248 5,121 3,593 2,359 2,163 2,243

Total Allocations 11,300$ 12,777$ 13,401$ 16,572$ 10,931$ 7,768$ 7,092$ 7,332$

BILLED COSTS SDG&E 3,473$ 4,095$ 4,758$ 5,809$ 3,798$ 2,775$ 2,509$ 2,553$ So Cal Gas 3,478 4,207 4,551 5,759 3,608 2,635 2,420 2,536

Subtotal - Utility 6,952 8,302 9,309 11,568 7,406 5,409 4,929 5,089

Global/Retained 4,423 4,664 4,329 5,274 3,689 2,381 2,186 2,266

Total Billed Costs 11,375$ 12,966$ 13,639$ 16,842$ 11,095$ 7,791$ 7,115$ 7,355$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-492 GRC APPLICATION - December 2010

Page 495: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: G Pension & Benefits Witness: Bruce Folkmann

Cost Center: G-4 Long-Term Incentives

Workpaper: G-4

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs 70$ 214$ 20$ 70$ -$ -$ -$ -$ Non-Labor Costs 72,279 53,513 48,064 53,571 42,146 32,945 34,098 35,198 Total Costs 72,348$ 53,727$ 48,083$ 53,642$ 42,146$ 32,945$ 34,098$ 35,198$

DIRECT ASSIGNMENTS SDG&E 7,235$ 5,157$ 3,650$ 5,092$ 4,127$ 4,974$ 4,906$ 3,529$ So Cal Gas 7,155 5,477 3,867 4,876 3,936 3,387 2,721 3,355

Subtotal - Utility 14,390 10,635 7,517 9,968 8,063 8,360 7,627 6,883

Global/Retained 37,489 31,515 29,766 31,322 23,869 24,584 26,471 28,314

Total Direct Assignments 51,879$ 42,150$ 37,283$ 41,291$ 31,932$ 32,945$ 34,098$ 35,198$

ALLOCATIONS SDG&E 8,592$ 5,015$ 4,810$ 5,963$ 5,198$ -$ -$ -$ So Cal Gas 11,635 6,430 5,732 6,333 4,968 - - -

Subtotal - Utility 20,226 11,445 10,541 12,296 10,166 - - -

Global/Retained 243 133 259 55 48 - - -

Total Allocations 20,470$ 11,578$ 10,800$ 12,351$ 10,214$ -$ -$ -$

BILLED COSTS SDG&E 15,826$ 10,172$ 8,460$ 11,055$ 9,325$ 4,974$ 4,906$ 3,529$ So Cal Gas 18,790 11,907 9,599 11,209 8,904 3,387 2,721 3,355

Subtotal - Utility 34,616 22,079 18,058 22,264 18,229 8,360 7,627 6,883

Global/Retained 37,732 31,648 30,025 31,377 23,917 24,584 26,471 28,314

Total Billed Costs 72,348$ 53,727$ 48,083$ 53,642$ 42,146$ 32,945$ 34,098$ 35,198$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-493 GRC APPLICATION - December 2010

Page 496: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: G Pension & Benefits Witness: Bruce Folkmann

Cost Center: G-4 Long-Term Incentives

Workpaper: G-4 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs 70$ 214$ 20$ 70$ -$ -$ -$ -$ Non-Labor Costs 72,279 53,513 48,064 53,571 42,146 32,945 34,098 35,198 Total Costs 72,348$ 53,727$ 48,083$ 53,642$ 42,146$ 32,945$ 34,098$ 35,198$

DIRECT ASSIGNMENTS SDG&E 7,235$ 5,157$ 3,650$ 5,092$ 4,127$ 4,974$ 4,906$ 3,529$ So Cal Gas 7,155 5,477 3,867 4,876 3,936 3,387 2,721 3,355

Subtotal - Utility 14,390 10,635 7,517 9,968 8,063 8,360 7,627 6,883

Global/Retained 37,489 31,515 29,766 31,322 23,869 24,584 26,471 28,314

Total Direct Assignments 51,879$ 42,150$ 37,283$ 41,291$ 31,932$ 32,945$ 34,098$ 35,198$

ALLOCATIONS SDG&E 8,592$ 5,015$ 4,810$ 5,963$ 5,198$ -$ -$ -$ So Cal Gas 11,635 6,430 5,732 6,333 4,968 - - -

Subtotal - Utility 20,226 11,445 10,541 12,296 10,166 - - -

Global/Retained 243 133 259 55 48 - - -

Total Allocations 20,470$ 11,578$ 10,800$ 12,351$ 10,214$ -$ -$ -$

BILLED COSTS SDG&E 15,826$ 10,172$ 8,460$ 11,055$ 9,325$ 4,974$ 4,906$ 3,529$ So Cal Gas 18,790 11,907 9,599 11,209 8,904 3,387 2,721 3,355

Subtotal - Utility 34,616 22,079 18,058 22,264 18,229 8,360 7,627 6,883

Global/Retained 37,732 31,648 30,025 31,377 23,917 24,584 26,471 28,314

Total Billed Costs 72,348$ 53,727$ 48,083$ 53,642$ 42,146$ 32,945$ 34,098$ 35,198$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-494 GRC APPLICATION - December 2010

Page 497: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: G-4 Long-Term Incentives Witness: Bruce Folkmann

Cost Center: 1100-0805-RESTRICTED STOCK

Workpaper: G-4.1

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ -$ -$ -$ -$ Non-Labor Costs 70,836 41,431 35,295 39,371 31,973 23,232 23,777 24,568 Total Costs 70,836$ 41,431$ 35,295$ 39,371$ 31,973$ 23,232$ 23,777$ 24,568$

DIRECT ASSIGNMENTS SDG&E 6,945$ 3,964$ 2,698$ 3,799$ 3,231$ 3,786$ 3,847$ 2,742$ So Cal Gas 6,915 4,302 2,895 3,706 3,114 2,591 2,117 2,635

Subtotal - Utility 13,860 8,266 5,593 7,506 6,345 6,377 5,964 5,377

Global/Retained 36,637 23,314 20,993 21,840 17,181 16,855 17,813 19,191

Total Direct Assignments 50,497$ 31,579$ 26,586$ 29,346$ 23,526$ 23,232$ 23,777$ 24,568$

ALLOCATIONS SDG&E 8,547$ 4,280$ 3,932$ 4,842$ 4,287$ -$ -$ -$ So Cal Gas 11,582 5,460 4,669 5,139 4,121 - - -

Subtotal - Utility 20,128 9,740 8,601 9,981 8,409 - - -

Global/Retained 211 112 108 44 39 - - -

Total Allocations 20,339$ 9,852$ 8,709$ 10,025$ 8,447$ -$ -$ -$

BILLED COSTS SDG&E 15,491$ 8,244$ 6,630$ 8,641$ 7,518$ 3,786$ 3,847$ 2,742$ So Cal Gas 18,497 9,761 7,564 8,846 7,235 2,591 2,117 2,635

Subtotal - Utility 33,988 18,006 14,194 17,487 14,753 6,377 5,964 5,377

Global/Retained 36,848 23,426 21,101 21,884 17,220 16,855 17,813 19,191

Total Billed Costs 70,836$ 41,431$ 35,295$ 39,371$ 31,973$ 23,232$ 23,777$ 24,568$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-495 GRC APPLICATION - December 2010

Page 498: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 7,518$ 7,235$ 17,220$ 31,973$ -

(4,776) (4,600) 1,971 (7,405)

Change in Allocation 2009-2012 - - - -

(4,776)$ (4,600)$ 1,971$ (7,405)$ -

2012 - TEST YEAR 2,742$ 2,635$ 19,191$ 24,568$ -

0.00% 0.00% 0.00% 0.00%

28$ 48$ (76)$ (0)$

2,715 2,586 19,267 24,568

2,742$ 2,635$ 19,191$ 24,568$

G Pension & BenefitsG-4 Long-Term Incentives

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0805-RESTRICTED STOCKG-4.1 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

All Direct Assignments

Allocations

Staff reductions/transfers due to reorganization

SDG&E-17-WP BAF-WP-496 GRC APPLICATION - December 2010

Page 499: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: G-4 Long-Term Incentives Witness: Bruce Folkmann

Cost Center: 1100-0805-RESTRICTED STOCK

Workpaper: G-4.1 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ -$ -$ -$ -$ Non-Labor Costs 70,836 41,431 35,295 39,371 31,973 23,232 23,777 24,568 Total Costs 70,836$ 41,431$ 35,295$ 39,371$ 31,973$ 23,232$ 23,777$ 24,568$

DIRECT ASSIGNMENTS SDG&E 6,945$ 3,964$ 2,698$ 3,799$ 3,231$ 3,786$ 3,847$ 2,742$ So Cal Gas 6,915 4,302 2,895 3,706 3,114 2,591 2,117 2,635

Subtotal - Utility 13,860 8,266 5,593 7,506 6,345 6,377 5,964 5,377

Global/Retained 36,637 23,314 20,993 21,840 17,181 16,855 17,813 19,191

Total Direct Assignments 50,497$ 31,579$ 26,586$ 29,346$ 23,526$ 23,232$ 23,777$ 24,568$

ALLOCATIONS SDG&E 8,547$ 4,280$ 3,932$ 4,842$ 4,287$ -$ -$ -$ So Cal Gas 11,582 5,460 4,669 5,139 4,121 - - -

Subtotal - Utility 20,128 9,740 8,601 9,981 8,409 - - -

Global/Retained 211 112 108 44 39 - - -

Total Allocations 20,339$ 9,852$ 8,709$ 10,025$ 8,447$ -$ -$ -$

BILLED COSTS SDG&E 15,491$ 8,244$ 6,630$ 8,641$ 7,518$ 3,786$ 3,847$ 2,742$ So Cal Gas 18,497 9,761 7,564 8,846 7,235 2,591 2,117 2,635

Subtotal - Utility 33,988 18,006 14,194 17,487 14,753 6,377 5,964 5,377

Global/Retained 36,848 23,426 21,101 21,884 17,220 16,855 17,813 19,191

Total Billed Costs 70,836$ 41,431$ 35,295$ 39,371$ 31,973$ 23,232$ 23,777$ 24,568$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-497 GRC APPLICATION - December 2010

Page 500: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: G-4 Long-Term Incentives Witness: Bruce Folkmann

Cost Center: 1100-0811-STOCK OPTIONS

Workpaper: G-4.2

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ -$ -$ -$ -$ Non-Labor Costs - 7,975 8,933 9,742 6,408 4,564 5,486 5,659 Total Costs -$ 7,975$ 8,933$ 9,742$ 6,408$ 4,564$ 5,486$ 5,659$

DIRECT ASSIGNMENTS SDG&E -$ 958$ 798$ 1,171$ 845$ 890$ 878$ 620$ So Cal Gas - 1,005 821 1,085 781 615 489 595

Subtotal - Utility - 1,963 1,619 2,256 1,626 1,505 1,368 1,215

Global/Retained - 4,297 5,382 5,166 3,022 3,059 4,119 4,443

Total Direct Assignments -$ 6,260$ 7,001$ 7,422$ 4,647$ 4,564$ 5,486$ 5,659$

ALLOCATIONS SDG&E -$ 731$ 863$ 1,119$ 908$ -$ -$ -$ So Cal Gas - 965 1,046 1,192 845 - - -

Subtotal - Utility - 1,696 1,909 2,311 1,753 - - -

Global/Retained - 19 23 10 8 - - -

Total Allocations -$ 1,715$ 1,932$ 2,321$ 1,761$ -$ -$ -$

BILLED COSTS SDG&E -$ 1,689$ 1,660$ 2,290$ 1,753$ 890$ 878$ 620$ So Cal Gas - 1,970 1,867 2,277 1,625 615 489 595

Subtotal - Utility - 3,659 3,527 4,567 3,379 1,505 1,368 1,215

Global/Retained - 4,316 5,406 5,176 3,030 3,059 4,119 4,443

Total Billed Costs -$ 7,975$ 8,933$ 9,742$ 6,408$ 4,564$ 5,486$ 5,659$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-498 GRC APPLICATION - December 2010

Page 501: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 1,753$ 1,625$ 3,030$ 6,408$ -

(1,133) (1,030) 1,414 (749)

Change in Allocation 2009-2012 - - - -

(1,133)$ (1,030)$ 1,414$ (749)$ -

2012 - TEST YEAR 620$ 595$ 4,443$ 5,659$ -

0.00% 0.00% 0.00% 0.00%

6$ 11$ (18)$ (0)$

614 584 4,461 5,659

620$ 595$ 4,443$ 5,659$

G Pension & BenefitsG-4 Long-Term Incentives

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0811-STOCK OPTIONSG-4.2 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

All Direct Assignments

Allocations

Staff reductions/transfers due to reorganization

SDG&E-17-WP BAF-WP-499 GRC APPLICATION - December 2010

Page 502: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: G-4 Long-Term Incentives Witness: Bruce Folkmann

Cost Center: 1100-0811-STOCK OPTIONS

Workpaper: G-4.2 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ -$ -$ -$ -$ Non-Labor Costs - 7,975 8,933 9,742 6,408 4,564 5,486 5,659 Total Costs -$ 7,975$ 8,933$ 9,742$ 6,408$ 4,564$ 5,486$ 5,659$

DIRECT ASSIGNMENTS SDG&E -$ 958$ 798$ 1,171$ 845$ 890$ 878$ 620$ So Cal Gas - 1,005 821 1,085 781 615 489 595

Subtotal - Utility - 1,963 1,619 2,256 1,626 1,505 1,368 1,215

Global/Retained - 4,297 5,382 5,166 3,022 3,059 4,119 4,443

Total Direct Assignments -$ 6,260$ 7,001$ 7,422$ 4,647$ 4,564$ 5,486$ 5,659$

ALLOCATIONS SDG&E -$ 731$ 863$ 1,119$ 908$ -$ -$ -$ So Cal Gas - 965 1,046 1,192 845 - - -

Subtotal - Utility - 1,696 1,909 2,311 1,753 - - -

Global/Retained - 19 23 10 8 - - -

Total Allocations -$ 1,715$ 1,932$ 2,321$ 1,761$ -$ -$ -$

BILLED COSTS SDG&E -$ 1,689$ 1,660$ 2,290$ 1,753$ 890$ 878$ 620$ So Cal Gas - 1,970 1,867 2,277 1,625 615 489 595

Subtotal - Utility - 3,659 3,527 4,567 3,379 1,505 1,368 1,215

Global/Retained - 4,316 5,406 5,176 3,030 3,059 4,119 4,443

Total Billed Costs -$ 7,975$ 8,933$ 9,742$ 6,408$ 4,564$ 5,486$ 5,659$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-500 GRC APPLICATION - December 2010

Page 503: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: G-4 Long-Term Incentives Witness: Bruce Folkmann

Cost Center: 1100-0806-LIFE INSURANCE

Workpaper: G-4.3

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ -$ -$ -$ -$ Non-Labor Costs 1,430 4,107 3,836 4,453 3,759 5,149 4,835 4,971 Total Costs 1,430$ 4,107$ 3,836$ 4,453$ 3,759$ 5,149$ 4,835$ 4,971$

DIRECT ASSIGNMENTS SDG&E 290$ 235$ 155$ 122$ 51$ 298$ 181$ 166$ So Cal Gas 240 171 151 85 42 180 114 125

Subtotal - Utility 530 406 306 207 93 478 296 291

Global/Retained 852 3,691 3,371 4,246 3,667 4,671 4,539 4,680

Total Direct Assignments 1,381$ 4,097$ 3,677$ 4,453$ 3,759$ 5,149$ 4,835$ 4,971$

ALLOCATIONS SDG&E 17$ 3$ 15$ -$ -$ -$ -$ -$ So Cal Gas 18 4 17 - - - - -

Subtotal - Utility 35 8 31 - - - - -

Global/Retained 14 2 128 - - - - -

Total Allocations 49$ 10$ 159$ -$ -$ -$ -$ -$

BILLED COSTS SDG&E 306$ 239$ 169$ 122$ 51$ 298$ 181$ 166$ So Cal Gas 258 175 168 85 42 180 114 125

Subtotal - Utility 565 414 337 207 93 478 296 291

Global/Retained 865 3,693 3,499 4,246 3,667 4,671 4,539 4,680

Total Billed Costs 1,430$ 4,107$ 3,836$ 4,453$ 3,759$ 5,149$ 4,835$ 4,971$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-501 GRC APPLICATION - December 2010

Page 504: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 51$ 42$ 3,667$ 3,759$ -

32 34 756 821

83 49 258 390

Change in Allocation 2009-2012 - - - -

115$ 83$ 1,013$ 1,211$ -

2012 - TEST YEAR 166$ 125$ 4,680$ 4,971$ -

0.00% 0.00% 0.00% 0.00%

1$ 1$ (2)$ 0$

166 124 4,681 4,971

166$ 125$ 4,680$ 4,971$

G Pension & BenefitsG-4 Long-Term Incentives

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0806-LIFE INSURANCEG-4.3 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

All Direct Assignments

Allocations

Transfer of budget from cost center 1100-0806 (see Recon workpaper G-1.4).

Increase in insurance premiums

SDG&E-17-WP BAF-WP-502 GRC APPLICATION - December 2010

Page 505: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: G-4 Long-Term Incentives Witness: Bruce Folkmann

Cost Center: 1100-0806-LIFE INSURANCE

Workpaper: G-4.3 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ -$ -$ -$ -$ Non-Labor Costs 1,430 4,107 3,836 4,453 3,759 5,149 4,835 4,971 Total Costs 1,430$ 4,107$ 3,836$ 4,453$ 3,759$ 5,149$ 4,835$ 4,971$

DIRECT ASSIGNMENTS SDG&E 290$ 235$ 155$ 122$ 51$ 298$ 181$ 166$ So Cal Gas 240 171 151 85 42 180 114 125

Subtotal - Utility 530 406 306 207 93 478 296 291

Global/Retained 852 3,691 3,371 4,246 3,667 4,671 4,539 4,680

Total Direct Assignments 1,381$ 4,097$ 3,677$ 4,453$ 3,759$ 5,149$ 4,835$ 4,971$

ALLOCATIONS SDG&E 17$ 3$ 15$ -$ -$ -$ -$ -$ So Cal Gas 18 4 17 - - - - -

Subtotal - Utility 35 8 31 - - - - -

Global/Retained 14 2 128 - - - - -

Total Allocations 49$ 10$ 159$ -$ -$ -$ -$ -$

BILLED COSTS SDG&E 306$ 239$ 169$ 122$ 51$ 298$ 181$ 166$ So Cal Gas 258 175 168 85 42 180 114 125

Subtotal - Utility 565 414 337 207 93 478 296 291

Global/Retained 865 3,693 3,499 4,246 3,667 4,671 4,539 4,680

Total Billed Costs 1,430$ 4,107$ 3,836$ 4,453$ 3,759$ 5,149$ 4,835$ 4,971$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-503 GRC APPLICATION - December 2010

Page 506: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: G-4 Long-Term Incentives Witness: Bruce Folkmann

Cost Center: 1100-0129-EXECUTIVE BENEFITS

Workpaper: G-4.4

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs 70$ 214$ 20$ 70$ -$ -$ -$ -$ Non-Labor Costs 12 - - 5 5 - - - Total Costs 82$ 214$ 20$ 75$ 5$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - 214 20 70 - - - -

Total Direct Assignments -$ 214$ 20$ 70$ -$ -$ -$ -$

ALLOCATIONS SDG&E 28$ 0$ -$ 2$ 2$ -$ -$ -$ So Cal Gas 34 0 - 2 2 - - -

Subtotal - Utility 63 1 - 4 4 - - -

Global/Retained 19 0 - 1 1 - - -

Total Allocations 82$ 1$ -$ 5$ 5$ -$ -$ -$

BILLED COSTS SDG&E 28$ 0$ -$ 2$ 2$ -$ -$ -$ So Cal Gas 34 0 - 2 2 - - -

Subtotal - Utility 63 1 - 4 4 - - -

Global/Retained 19 214 20 71 1 - - -

Total Billed Costs 82$ 214$ 20$ 75$ 5$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-504 GRC APPLICATION - December 2010

Page 507: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 2$ 2$ 1$ 5$ -

(2) (2) (1) (5)

Change in Allocation 2009-2012 0 (0) (0) 0

(2)$ (2)$ (1)$ (5)$ -

2012 - TEST YEAR -$ -$ -$ -$ -

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

Total Change from 2009

Cost center no longer used

G Pension & BenefitsG-4 Long-Term Incentives1100-0129-EXECUTIVE BENEFITSG-4.4 Recon

SDG&E-17-WP BAF-WP-505 GRC APPLICATION - December 2010

Page 508: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: G-4 Long-Term Incentives Witness: Bruce Folkmann

Cost Center: 1100-0129-EXECUTIVE BENEFITS

Workpaper: G-4.4 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs 70$ 214$ 20$ 70$ -$ -$ -$ -$ Non-Labor Costs 12 - - 5 5 - - - Total Costs 82$ 214$ 20$ 75$ 5$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - 214 20 70 - - - -

Total Direct Assignments -$ 214$ 20$ 70$ -$ -$ -$ -$

ALLOCATIONS SDG&E 28$ 0$ -$ 2$ 2$ -$ -$ -$ So Cal Gas 34 0 - 2 2 - - -

Subtotal - Utility 63 1 - 4 4 - - -

Global/Retained 19 0 - 1 1 - - -

Total Allocations 82$ 1$ -$ 5$ 5$ -$ -$ -$

BILLED COSTS SDG&E 28$ 0$ -$ 2$ 2$ -$ -$ -$ So Cal Gas 34 0 - 2 2 - - -

Subtotal - Utility 63 1 - 4 4 - - -

Global/Retained 19 214 20 71 1 - - -

Total Billed Costs 82$ 214$ 20$ 75$ 5$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-506 GRC APPLICATION - December 2010

Page 509: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: G-4 Long-Term Incentives Witness: Bruce Folkmann

Cost Center: 1100-0808-DEFERRED COMP INSURANCE

Workpaper: G-4.5

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ 1$ -$ -$ -$ -$ Non-Labor Costs - - - - - - - - Total Costs -$ -$ -$ 1$ -$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ 0$ -$ -$ -$ -$ So Cal Gas - - - 0 - - - -

Subtotal - Utility - - - 0 - - - -

Global/Retained - - - 0 - - - -

Total Allocations -$ -$ -$ 1$ -$ -$ -$ -$

BILLED COSTS SDG&E -$ -$ -$ 0$ -$ -$ -$ -$ So Cal Gas - - - 0 - - - -

Subtotal - Utility - - - 0 - - - -

Global/Retained - - - 0 - - - -

Total Billed Costs -$ -$ -$ 1$ -$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-507 GRC APPLICATION - December 2010

Page 510: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: G-4 Long-Term Incentives Witness: Bruce Folkmann

Cost Center: 1100-0808-DEFERRED COMP INSURANCE

Workpaper: G-4.5 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ 1$ -$ -$ -$ -$ Non-Labor Costs - - - - - - - - Total Costs -$ -$ -$ 1$ -$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ 0$ -$ -$ -$ -$ So Cal Gas - - - 0 - - - -

Subtotal - Utility - - - 0 - - - -

Global/Retained - - - 0 - - - -

Total Allocations -$ -$ -$ 1$ -$ -$ -$ -$

BILLED COSTS SDG&E -$ -$ -$ 0$ -$ -$ -$ -$ So Cal Gas - - - 0 - - - -

Subtotal - Utility - - - 0 - - - -

Global/Retained - - - 0 - - - -

Total Billed Costs -$ -$ -$ 1$ -$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-508 GRC APPLICATION - December 2010

Page 511: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: G-4 Long-Term Incentives Witness: Bruce Folkmann

Cost Center: 1100-0385-SCG EXECUTIVE BENEFITS

Workpaper: G-4.6

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ -$ -$ -$ -$ Non-Labor Costs - - - - - - - - Total Costs -$ -$ -$ -$ -$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Allocations -$ -$ -$ -$ -$ -$ -$ -$

BILLED COSTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Billed Costs -$ -$ -$ -$ -$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-509 GRC APPLICATION - December 2010

Page 512: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: G-4 Long-Term Incentives Witness: Bruce Folkmann

Cost Center: 1100-0385-SCG EXECUTIVE BENEFITS

Workpaper: G-4.6 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ -$ -$ -$ -$ Non-Labor Costs - - - - - - - - Total Costs -$ -$ -$ -$ -$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Allocations -$ -$ -$ -$ -$ -$ -$ -$

BILLED COSTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Billed Costs -$ -$ -$ -$ -$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-510 GRC APPLICATION - December 2010

Page 513: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: G-4 Long-Term Incentives Witness: Bruce Folkmann

Cost Center: 1100-0384-SDG&E EXECUTIVE BENEFITS

Workpaper: G-4.7

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ -$ -$ -$ -$ Non-Labor Costs - - - - 0 - - - Total Costs -$ -$ -$ -$ 0$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ 0$ -$ -$ -$ So Cal Gas - - - - 0 - - -

Subtotal - Utility - - - - 0 - - -

Global/Retained - - - - 0 - - -

Total Allocations -$ -$ -$ -$ 0$ -$ -$ -$

BILLED COSTS SDG&E -$ -$ -$ -$ 0$ -$ -$ -$ So Cal Gas - - - - 0 - - -

Subtotal - Utility - - - - 0 - - -

Global/Retained - - - - 0 - - -

Total Billed Costs -$ -$ -$ -$ 0$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-511 GRC APPLICATION - December 2010

Page 514: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: G-4 Long-Term Incentives Witness: Bruce Folkmann

Cost Center: 1100-0384-SDG&E EXECUTIVE BENEFITS

Workpaper: G-4.7 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ -$ -$ -$ -$ Non-Labor Costs - - - - 0 - - - Total Costs -$ -$ -$ -$ 0$ -$ -$ -$

DIRECT ASSIGNMENTS SDG&E -$ -$ -$ -$ -$ -$ -$ -$ So Cal Gas - - - - - - - -

Subtotal - Utility - - - - - - - -

Global/Retained - - - - - - - -

Total Direct Assignments -$ -$ -$ -$ -$ -$ -$ -$

ALLOCATIONS SDG&E -$ -$ -$ -$ 0$ -$ -$ -$ So Cal Gas - - - - 0 - - -

Subtotal - Utility - - - - 0 - - -

Global/Retained - - - - 0 - - -

Total Allocations -$ -$ -$ -$ 0$ -$ -$ -$

BILLED COSTS SDG&E -$ -$ -$ -$ 0$ -$ -$ -$ So Cal Gas - - - - 0 - - -

Subtotal - Utility - - - - 0 - - -

Global/Retained - - - - 0 - - -

Total Billed Costs -$ -$ -$ -$ 0$ -$ -$ -$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-512 GRC APPLICATION - December 2010

Page 515: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: G-5 Supplemental Retirement Witness: Bruce Folkmann

Cost Center: 1100-0804-SERP

Workpaper: G-5.1

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ -$ -$ -$ -$ Non-Labor Costs 2,845 4,003 3,961 26,561 39,867 18,570 25,320 30,830 Total Costs 2,845$ 4,003$ 3,961$ 26,561$ 39,867$ 18,570$ 25,320$ 30,830$

DIRECT ASSIGNMENTS SDG&E 1,177$ 1,394$ 958$ 1,600$ 1,674$ 2,096$ 1,695$ 1,132$ So Cal Gas 1,545 1,550 1,054 1,659 1,613 1,282 915 1,077

Subtotal - Utility 2,722 2,944 2,012 3,259 3,287 3,378 2,610 2,209

Global/Retained 6,048 10,271 10,684 17,978 22,700 13,118 13,205 13,343

Total Direct Assignments 8,770$ 13,214$ 12,696$ 21,236$ 25,987$ 16,496$ 15,815$ 15,552$

ALLOCATIONS SDG&E (739)$ (912)$ (578)$ 1,044$ 1,219$ 369$ 1,489$ 2,199$ So Cal Gas (979) (1,003) (630) 1,166 1,294 325 1,176 1,688

Subtotal - Utility (1,718) (1,915) (1,209) 2,210 2,513 694 2,665 3,887

Global/Retained (4,206) (7,297) (7,526) 3,115 11,367 1,380 6,840 11,392

Total Allocations (5,924)$ (9,212)$ (8,735)$ 5,324$ 13,880$ 2,074$ 9,505$ 15,278$

BILLED COSTS SDG&E 438$ 482$ 379$ 2,643$ 2,893$ 2,465$ 3,184$ 3,331$ So Cal Gas 566 547 424 2,825 2,907 1,607 2,092 2,764

Subtotal - Utility 1,004 1,029 803 5,468 5,800 4,072 5,276 6,096

Global/Retained 1,842 2,974 3,157 21,092 34,066 14,498 20,044 24,734

Total Billed Costs 2,845$ 4,003$ 3,961$ 26,561$ 39,867$ 18,570$ 25,320$ 30,830$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-513 GRC APPLICATION - December 2010

Page 516: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division:Dept:Cost Center:Workpaper:

Global/EVALUATION OF CHANGE SDGE SoCal Gas Retained TOTAL FTE's

2009 - BASE YEAR 2,893$ 2,907$ 34,066$ 39,867$ -

438 (143) (9,332) (9,037)

Change in Allocation 2009-2012 - - - -

438$ (143)$ (9,332)$ (9,037)$ -

2012 - TEST YEAR 3,331$ 2,764$ 24,735$ 30,830$ -

0.00% 0.00% 0.00% 0.00%

2,199$ 1,688$ 11,392$ 15,278$

1,132 1,077 13,343 15,552

3,331$ 2,764$ 24,735$ 30,830$

G Pension & BenefitsG-5 Supplemental Retirement

Sempra Energy Corporate CenterAllocation Reconciliation

Test Year 2012 General Rate CaseFY2009 $ - 000's

1100-0804-SERPG-5.1 Recon

Direct Assignments

TOTAL 2012 ALLOCATIONS

Total Change from 2009

2012 ALLOCATION METHOD

Weighted Average

Allocations

Decrease in distributions as projected by actuary.

SDG&E-17-WP BAF-WP-514 GRC APPLICATION - December 2010

Page 517: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: G-5 Supplemental Retirement Witness: Bruce Folkmann

Cost Center: 1100-0804-SERP

Workpaper: G-5.1 Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 0 0 0 0 0 0 0 0

Labor Costs -$ -$ -$ -$ -$ -$ -$ -$ Non-Labor Costs 2,845 4,003 3,961 26,561 39,867 18,570 25,320 30,830 Total Costs 2,845$ 4,003$ 3,961$ 26,561$ 39,867$ 18,570$ 25,320$ 30,830$

DIRECT ASSIGNMENTS SDG&E 1,177$ 1,394$ 958$ 1,600$ 1,674$ 2,096$ 1,695$ 1,132$ So Cal Gas 1,545 1,550 1,054 1,659 1,613 1,282 915 1,077

Subtotal - Utility 2,722 2,944 2,012 3,259 3,287 3,378 2,610 2,209

Global/Retained 6,048 10,271 10,684 17,978 22,700 13,118 13,205 13,343

Total Direct Assignments 8,770$ 13,214$ 12,696$ 21,236$ 25,987$ 16,496$ 15,815$ 15,552$

ALLOCATIONS SDG&E (739)$ (912)$ (578)$ 1,044$ 1,219$ 369$ 1,489$ 2,199$ So Cal Gas (979) (1,003) (630) 1,166 1,294 325 1,176 1,688

Subtotal - Utility (1,718) (1,915) (1,209) 2,210 2,513 694 2,665 3,887

Global/Retained (4,206) (7,297) (7,526) 3,115 11,367 1,380 6,840 11,392

Total Allocations (5,924)$ (9,212)$ (8,735)$ 5,324$ 13,880$ 2,074$ 9,505$ 15,278$

BILLED COSTS SDG&E 438$ 482$ 379$ 2,643$ 2,893$ 2,465$ 3,184$ 3,331$ So Cal Gas 566 547 424 2,825 2,907 1,607 2,092 2,764

Subtotal - Utility 1,004 1,029 803 5,468 5,800 4,072 5,276 6,096

Global/Retained 1,842 2,974 3,157 21,092 34,066 14,498 20,044 24,734

Total Billed Costs 2,845$ 4,003$ 3,961$ 26,561$ 39,867$ 18,570$ 25,320$ 30,830$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-515 GRC APPLICATION - December 2010

Page 518: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Sempra Energy Corporate Center2012 Test Year General Rate Case

Restatement Schedule - 2005 SoCal Gas(2009 $000's)

Workpaper: H-1 Witness: Bruce Folkmann

(1) (2) (3) (4) (5)Total Reclassify 2005

SoCalGas Remove Labor Normalizing RestatedBill Exclusions Overheads Adjustments O&M

SHARED SERVICESA SC Finance 13,692 - (2,812) - 10,879 B SC Governance 3,657 - (1,067) - 2,590 C SC Legal 28,242 - (2,358) - 25,884 D SC Human Resources 7,291 - (1,864) - 5,427 E SC External Affairs 1,347 - (264) - 1,083 F SC Facilities/Assets 4,649 - (294) - 4,355 G SC Pension & Benefits 21,057 - 8,660 (1,358) 28,359

Transferred Services - - - - - Insurance 11,579 (11,579) - - - Accounting Adjustments 2,611 (2,611) - -

Total Costs 94,124$ (14,189)$ 0$ (1,358)$ 78,576$

(1) Total Bill

(2) Exclusions

Insurance

Accounting Adjustments

(3) Labor Overheads

(4) Normalizing Adjustments:

Finance

Pension & Benefits

(5) Restated O&M

Column Descriptions:

Total cash paid by SoCal Gas to Sempra during 2005

Corporate Center A&G testimony and workpapers refer to this amount as 2005 actual costs.

Insurance is presented in testimony and workpapers of Maury de Bont in this GRC.

Adjustments in bills are primarily cash transfers which transfer liabilities between the two companies and do not represent expenses used in ratemaking.

Each department's labor overheads are consolidated in section G for testimony purposes.

Cyclical Finance & Bank Fees adjusted to represent average annual expense.

Supplemental retirement benefits adjusted to represent actual payments rather than accrual.

SDG&E-17-WP BAF-WP-516 GRC APPLICATION - December 2010

Page 519: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Sempra Energy Corporate Center2012 Test Year General Rate Case

Restatement Schedule - 2005 SDG&E(2009 $000's)

Workpaper: H-2 Witness: Bruce Folkmann

(1) (2) (3) (4) (5)Total Reclassify 2005

SDG&E Remove Labor Normalizing RestatedBill Exclusions Overheads Adjustments O&M

SHARED SERVICESA SD Finance 12,001 - (2,297) - 9,704 B SD Governance 3,475 - (1,050) - 2,425 C SD Legal 25,728 - (3,399) - 22,329 D SD Human Resources 5,182 - (1,331) - 3,851 E SD External Affairs 1,087 - (225) - 862 F SD Facilities/Assets 3,850 - (211) - 3,640 G SD Pension & Benefits 17,599 - 8,513 (1,051) 25,060

Insurance 9,242 (9,242) - - - Accounting Adjustments 9,417 (9,417) - - -

Total Costs 87,582$ (18,659)$ -$ (1,051)$ 67,871$

(1) Total Bill

(2) Exclusions

Insurance

Accounting Adjustments

(3) Labor Overheads

(4) Normalizing Adjustments:

Finance

Pension & Benefits

(5) Restated O&M

Column Descriptions:

Total cash paid by SDG&E to Sempra during 2005

Corporate Center A&G testimony and workpapers refer to this amount as 2005 actual costs.

Insurance is presented in testimony and workpapers of Maury de Bont in this GRC.

Adjustments in bills are primarily cash transfers which transfer liabilities between the two companies and do not represent expenses used in ratemaking.

Each department's labor overheads are consolidated in section G for testimony purposes.

Cyclical Finance & Bank Fees adjusted to represent average annual expense.

Supplemental retirement benefits adjusted to represent actual payments rather than accrual.

SDG&E-17-WP BAF-WP-517 GRC APPLICATION - December 2010

Page 520: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Sempra Energy Corporate Center2012 Test Year General Rate Case

Restatement Schedule - 2006 SoCal Gas(2009 $000's)

Workpaper: H-3 Witness: Bruce Folkmann

(1) (2) (3) (4) (5)Total Reclassify 2006

SoCalGas Remove Labor Normalizing RestatedBill Exclusions Overheads Adjustments O&M

SHARED SERVICESA SC Finance 13,565 - (3,064) 549 11,051 B SC Governance 4,393 - (972) - 3,421 C SC Legal 14,469 - (2,718) - 11,750 D SC Human Resources 9,830 - (2,094) - 7,736 E SC External Affairs 1,553 - (385) - 1,168 F SC Facilities/Assets 6,004 - (303) - 5,701 G SC Pension & Benefits 14,134 - 9,537 (1,388) 22,283

Transferred Services - - - - - Insurance 13,982 (13,982) - - - Accounting Adjustments 34,166 (34,166) - -

Total Costs 112,097$ (48,148)$ -$ (838)$ 63,110$

(1) Total Bill

(2) Exclusions

Insurance

Accounting Adjustments

(3) Labor Overheads

(4) Normalizing Adjustments:

Finance

Pension & Benefits

(5) Restated O&M

Column Descriptions:

Total cash paid by SoCal Gas to Sempra during 2006

Corporate Center A&G testimony and workpapers refer to this amount as 2006 actual costs.

Insurance is presented in testimony and workpapers of Maury de Bont in this GRC.

Adjustments in bills are primarily cash transfers which transfer liabilities between the two companies and do not represent expenses used in ratemaking.

Each department's labor overheads are consolidated in section G for testimony purposes.

Cyclical Finance & Bank Fees adjusted to represent average annual expense.

Supplemental retirement benefits adjusted to represent actual payments rather than accrual.

SDG&E-17-WP BAF-WP-518 GRC APPLICATION - December 2010

Page 521: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Sempra Energy Corporate Center2012 Test Year General Rate Case

Restatement Schedule - 2006 SDG&E(2009 $000's)

Workpaper: H-4 Witness: Bruce Folkmann

(1) (2) (3) (4) (5)Total Reclassify 2006

SDG&E Remove Labor Normalizing RestatedBill Exclusions Overheads Adjustments O&M

SHARED SERVICESA SD Finance 11,009 - (2,475) 531 9,065 B SD Governance 3,329 - (894) - 2,435 C SD Legal 24,121 - (3,798) - 20,323 D SD Human Resources 6,956 - (1,511) - 5,445 E SD External Affairs 1,286 - (320) - 967 F SD Facilities/Assets 4,729 - (231) - 4,498 G SD Pension & Benefits 12,112 - 9,229 (1,223) 20,118

Insurance 11,571 (11,571) - - - Accounting Adjustments 11,862 (11,862) - - -

Total Costs 86,974$ (23,432)$ -$ (692)$ 62,850$

(1) Total Bill

(2) Exclusions

Insurance

Accounting Adjustments

(3) Labor Overheads

(4) Normalizing Adjustments:

Finance

Pension & Benefits

(5) Restated O&M

Column Descriptions:

Total cash paid by SDG&E to Sempra during 2006

Corporate Center A&G testimony and workpapers refer to this amount as 2006 actual costs.

Insurance is presented in testimony and workpapers of Maury de Bont in this GRC.

Adjustments in bills are primarily cash transfers which transfer liabilities between the two companies and do not represent expenses used in ratemaking.

Each department's labor overheads are consolidated in section G for testimony purposes.

Cyclical Finance & Bank Fees adjusted to represent average annual expense.

Supplemental retirement benefits adjusted to represent actual payments rather than accrual.

SDG&E-17-WP BAF-WP-519 GRC APPLICATION - December 2010

Page 522: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Sempra Energy Corporate Center2012 Test Year General Rate Case

Restatement Schedule - 2007 SoCal Gas(2009 $000's)

Workpaper: H-5 Witness: Bruce Folkmann

(1) (2) (3) (4) (5)Total Reclassify 2007

SoCalGas Remove Labor Normalizing RestatedBill Exclusions Overheads Adjustments O&M

SHARED SERVICESA SC Finance 14,823 - (3,174) (549) 11,100 B SC Governance 3,025 - (684) - 2,341 C SC Legal 13,271 - (2,876) - 10,395 D SC Human Resources 10,514 - (2,407) - 8,107 E SC External Affairs 3,642 - (1,082) - 2,559 F SC Facilities/Assets 6,365 - (325) - 6,040 G SC Pension & Benefits 10,927 - 10,548 (938) 20,538

Transferred Services - - - - - Insurance 12,216 (12,216) - - - Accounting Adjustments 42,072 (42,072) - -

Total Costs 116,854$ (54,288)$ 0$ (1,487)$ 61,079$

(1) Total Bill

(2) Exclusions

Insurance

Accounting Adjustments

(3) Labor Overheads

(4) Normalizing Adjustments:

Finance

Pension & Benefits

(5) Restated O&M

Column Descriptions:

Total cash paid by SoCal Gas to Sempra during 2007

Corporate Center A&G testimony and workpapers refer to this amount as 2007 actual costs.

Insurance is presented in testimony and workpapers of Maury de Bont in this GRC.

Adjustments in bills are primarily cash transfers which transfer liabilities between the two companies and do not represent expenses used in ratemaking.

Each department's labor overheads are consolidated in section G for testimony purposes.

Cyclical Finance & Bank Fees adjusted to represent average annual expense.

Supplemental retirement benefits adjusted to represent actual payments rather than accrual.

SDG&E-17-WP BAF-WP-520 GRC APPLICATION - December 2010

Page 523: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Sempra Energy Corporate Center2012 Test Year General Rate Case

Restatement Schedule - 2007 SDG&E(2009 $000's)

Workpaper: H-6 Witness: Bruce Folkmann

(1) (2) (3) (4) (5)Total Reclassify 2007

SDG&E Remove Labor Normalizing RestatedBill Exclusions Overheads Adjustments O&M

SHARED SERVICESA SD Finance 12,506 - (2,648) (531) 9,328 B SD Governance 2,523 - (609) - 1,914 C SD Legal 26,443 - (4,625) - 21,818 D SD Human Resources 7,770 - (1,799) - 5,970 E SD External Affairs 3,114 - (928) - 2,186 F SD Facilities/Assets 5,077 - (262) - 4,816 G SD Pension & Benefits 9,650 - 10,871 (839) 19,682

Insurance 11,045 (11,045) - - - Accounting Adjustments 26,674 (26,674) - - -

Total Costs 104,803$ (37,719)$ (0)$ (1,370)$ 65,714$

(1) Total Bill

(2) Exclusions

Insurance

Accounting Adjustments

(3) Labor Overheads

(4) Normalizing Adjustments:

Finance

Pension & Benefits

(5) Restated O&M

Column Descriptions:

Total cash paid by SDG&E to Sempra during 2007

Corporate Center A&G testimony and workpapers refer to this amount as 2007 actual costs.

Insurance is presented in testimony and workpapers of Maury de Bont in this GRC.

Adjustments in bills are primarily cash transfers which transfer liabilities between the two companies and do not represent expenses used in ratemaking.

Each department's labor overheads are consolidated in section G for testimony purposes.

Cyclical Finance & Bank Fees adjusted to represent average annual expense.

Supplemental retirement benefits adjusted to represent actual payments rather than accrual.

SDG&E-17-WP BAF-WP-521 GRC APPLICATION - December 2010

Page 524: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Sempra Energy Corporate Center2012 Test Year General Rate Case

Restatement Schedule - 2008 SoCal Gas(2009 $000's)

Workpaper: H-7 Witness: Bruce Folkmann

(1) (2) (3) (4) (5)Total Reclassify 2008

SoCalGas Remove Labor Normalizing RestatedBill Exclusions Overheads Adjustments O&M

SHARED SERVICESA SC Finance 15,857 - (3,647) (350) 11,860 B SC Governance 3,552 - (807) - 2,745 C SC Legal 16,407 - (3,349) - 13,058 D SC Human Resources 11,254 - (2,492) - 8,762 E SC External Affairs 4,431 - (1,444) - 2,986 F SC Facilities/Assets 7,011 - (429) - 6,582 G SC Pension & Benefits 13,858 - 12,168 531 26,557

Transferred Services - - - - - Insurance 16,922 (16,922) - - - Accounting Adjustments 21,349 (21,349) - -

Total Costs 110,640$ (38,271)$ 0$ 181$ 72,550$

(1) Total Bill

(2) Exclusions

Insurance

Accounting Adjustments

(3) Labor Overheads

(4) Normalizing Adjustments:

Finance

Pension & Benefits

(5) Restated O&M

Column Descriptions:

Total cash paid by SoCal Gas to Sempra during 2008

Corporate Center A&G testimony and workpapers refer to this amount as 2008 actual costs.

Insurance is presented in testimony and workpapers of Maury de Bont in this GRC.

Adjustments in bills are primarily cash transfers which transfer liabilities between the two companies and do not represent expenses used in ratemaking.

Each department's labor overheads are consolidated in section G for testimony purposes.

Cyclical Finance & Bank Fees adjusted to represent average annual expense.

Supplemental retirement benefits adjusted to represent actual payments rather than accrual.

SDG&E-17-WP BAF-WP-522 GRC APPLICATION - December 2010

Page 525: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Sempra Energy Corporate Center2012 Test Year General Rate Case

Restatement Schedule - 2008 SDG&E(2009 $000's)

Workpaper: H-8 Witness: Bruce Folkmann

(1) (2) (3) (4) (5)Total Reclassify 2008

SDG&E Remove Labor Normalizing RestatedBill Exclusions Overheads Adjustments O&M

SHARED SERVICESA SD Finance 13,793 - (3,217) (350) 10,227 B SD Governance 3,404 - (778) - 2,626 C SD Legal 29,543 - (4,675) - 24,868 D SD Human Resources 8,451 - (1,904) - 6,546 E SD External Affairs 3,795 - (1,229) - 2,566 F SD Facilities/Assets 5,860 - (355) - 5,505 G SD Pension & Benefits 13,508 - 12,158 497 26,163

Insurance 15,807 (15,807) - - - Accounting Adjustments 6,295 (6,295) - - -

Total Costs 100,456$ (22,102)$ 0$ 147$ 78,501$

(1) Total Bill

(2) Exclusions

Insurance

Accounting Adjustments

(3) Labor Overheads

(4) Normalizing Adjustments:

Finance

Pension & Benefits

(5) Restated O&M

Column Descriptions:

Total cash paid by SDG&E to Sempra during 2008

Corporate Center A&G testimony and workpapers refer to this amount as 2008 actual costs.

Insurance is presented in testimony and workpapers of Maury de Bont in this GRC.

Adjustments in bills are primarily cash transfers which transfer liabilities between the two companies and do not represent expenses used in ratemaking.

Each department's labor overheads are consolidated in section G for testimony purposes.

Cyclical Finance & Bank Fees adjusted to represent average annual expense.

Supplemental retirement benefits adjusted to represent actual payments rather than accrual.

SDG&E-17-WP BAF-WP-523 GRC APPLICATION - December 2010

Page 526: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Sempra Energy Corporate Center2012 Test Year General Rate Case

Restatement Schedule - 2009 SoCal Gas(2009 $000's)

Workpaper: H-9 Witness: Bruce Folkmann

(1) (2) (3) (4) (5)Total Reclassify 2009

SoCalGas Remove Labor Normalizing RestatedBill Exclusions Overheads Adjustments O&M

SHARED SERVICESA SC Finance 14,797 - (2,979) 350 12,168 B SC Governance 3,234 - (712) - 2,523 C SC Legal 14,797 - (2,838) - 11,959 D SC Human Resources 10,807 - (2,076) - 8,730 E SC External Affairs 4,430 - (1,303) - 3,127 F SC Facilities/Assets 6,595 - (367) - 6,228 G SC Pension & Benefits 11,470 - 10,276 679 22,425

Transferred Services - - - - - Insurance 15,460 (15,460) - - - Accounting Adjustments 94,456 (94,456) - -

Total Costs 176,046$ (109,916)$ 0$ 1,029$ 67,159$

(1) Total Bill

(2) Exclusions

Insurance

Accounting Adjustments

(3) Labor Overheads

(4) Normalizing Adjustments:

Finance

Pension & Benefits

(5) Restated O&M

Column Descriptions:

Total cash paid by SoCal Gas to Sempra during 2009

Corporate Center A&G testimony and workpapers refer to this amount as 2009 actual costs.

Insurance is presented in testimony and workpapers of Maury de Bont in this GRC.

Adjustments in bills are primarily cash transfers which transfer liabilities between the two companies and do not represent expenses used in ratemaking.

Each department's labor overheads are consolidated in section G for testimony purposes.

Cyclical Finance & Bank Fees adjusted to represent average annual expense.

Supplemental retirement benefits adjusted to represent actual payments rather than accrual.

SDG&E-17-WP BAF-WP-524 GRC APPLICATION - December 2010

Page 527: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Sempra Energy Corporate Center2012 Test Year General Rate Case

Restatement Schedule - 2009 SDG&E(2009 $000's)

Workpaper: H-10 Witness: Bruce Folkmann

(1) (2) (3) (4) (5)Total Reclassify 2009

SDG&E Remove Labor Normalizing RestatedBill Exclusions Overheads Adjustments O&M

SHARED SERVICESA SD Finance 13,911 - (2,696) 350 11,565 B SD Governance 3,150 - (733) - 2,417 C SD Legal 41,582 - (4,385) - 37,197 D SD Human Resources 7,825 - (1,512) - 6,313 E SD External Affairs 3,859 - (1,130) - 2,728 F SD Facilities/Assets 5,863 - (330) - 5,533 G SD Pension & Benefits 11,840 - 10,786 677 23,303

Insurance 55,207 (55,207) - - - Accounting Adjustments 58,873 (58,873) - - -

Total Costs 202,108$ (114,080)$ -$ 1,027$ 89,056$

(1) Total Bill

(2) Exclusions

Insurance

Accounting Adjustments

(3) Labor Overheads

(4) Normalizing Adjustments:

Finance

Pension & Benefits

(5) Restated O&M

Column Descriptions:

Total cash paid by SDG&E to Sempra during 2009

Corporate Center A&G testimony and workpapers refer to this amount as 2009 actual costs.

Insurance is presented in testimony and workpapers of Maury de Bont in this GRC.

Adjustments in bills are primarily cash transfers which transfer liabilities between the two companies and do not represent expenses used in ratemaking.

Each department's labor overheads are consolidated in section G for testimony purposes.

Cyclical Finance & Bank Fees adjusted to represent average annual expense.

Supplemental retirement benefits adjusted to represent actual payments rather than accrual.

SDG&E-17-WP BAF-WP-525 GRC APPLICATION - December 2010

Page 528: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: GRC Total Witness: Bruce Folkmann

Cost Center: I CORPORATE CENTER SHARED SERVICES

Workpaper: I

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 443 475 489 520 520 346 358 361

Labor Costs 81,210$ 84,888$ 96,649$ 107,148$ 101,049$ 73,819$ 66,931$ 66,682$ Non-Labor Costs 209,311 181,750 188,330 216,931 216,139 158,158 164,447 169,939 Total Costs 290,521$ 266,637$ 284,978$ 324,079$ 317,188$ 231,977$ 231,378$ 236,621$

DIRECT ASSIGNMENTS SDG&E 29,345$ 25,248$ 22,691$ 28,547$ 40,825$ 24,617$ 25,477$ 23,141$ So Cal Gas 35,765 21,506 17,314 20,843 19,025 18,674 18,716 19,918

Subtotal - Utility 65,110 46,754 40,005 49,390 59,850 43,291 44,193 43,059

Global/Retained 89,776 90,824 79,044 123,729 87,237 75,803 74,227 75,161

Total Direct Assignments 154,887$ 137,579$ 119,049$ 173,119$ 147,087$ 119,094$ 118,420$ 118,220$

ALLOCATIONS SDG&E 38,526$ 37,602$ 43,022$ 49,953$ 48,231$ 35,518$ 34,279$ 34,187$ So Cal Gas 42,811 41,604 43,765 51,708 48,134 34,320 33,388 34,243

Subtotal - Utility 81,337 79,206 86,787 101,661 96,365 69,839 67,667 68,430

Global/Retained 54,297 49,853 79,142 49,298 73,736 43,044 45,291 49,971

Total Allocations 135,634$ 129,059$ 165,929$ 150,959$ 170,101$ 112,883$ 112,958$ 118,401$

BILLED COSTS SDG&E 67,871$ 62,850$ 65,714$ 78,501$ 89,056$ 60,135$ 59,757$ 57,328$ So Cal Gas 78,576 63,110 61,079 72,550 67,159 52,995 52,104 54,160

Subtotal - Utility 146,447 125,960 126,793 151,051 156,215 113,130 111,860 111,489

Global/Retained 144,073 140,677 158,186 173,027 160,973 118,847 119,518 125,132

Total Billed Costs 290,521$ 266,637$ 284,978$ 324,079$ 317,188$ 231,977$ 231,378$ 236,621$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in 2009 $000's)

SDG&E-17-WP BAF-WP-526 GRC APPLICATION - December 2010

Page 529: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Department: GRC Total Witness: Bruce Folkmann

Cost Center: I CORPORATE CENTER SHARED SERVICES

Workpaper: I Esc

Actuals Actuals Actuals Actuals Actuals Forecast Forecast Forecast2005 2006 2007 2008 2009 2010 2011 2012

FTE'S 443 475 489 520 520 346 358 361

Labor Costs 81,210$ 84,888$ 96,649$ 107,148$ 101,049$ 75,103$ 69,809$ 71,217$ Non-Labor Costs 209,311 181,750 188,330 216,931 216,139 158,876 166,241 172,897 Total Costs 290,521$ 266,637$ 284,978$ 324,079$ 317,188$ 233,980$ 236,050$ 244,113$

DIRECT ASSIGNMENTS SDG&E 29,345$ 25,248$ 22,691$ 28,547$ 40,825$ 24,642$ 25,536$ 23,218$ So Cal Gas 35,765 21,506 17,314 20,843 19,025 18,691 18,756 19,984

Subtotal - Utility 65,110 46,754 40,005 49,390 59,850 43,333 44,292 43,202

Global/Retained 89,776 90,824 79,044 123,729 87,237 75,824 74,367 75,401

Total Direct Assignments 154,887$ 137,579$ 119,049$ 173,119$ 147,087$ 119,158$ 118,659$ 118,603$

ALLOCATIONS SDG&E 38,526$ 37,602$ 43,022$ 49,953$ 48,231$ 36,135$ 35,690$ 36,400$ So Cal Gas 42,811 41,604 43,765 51,708 48,134 34,918 34,774 36,498

Subtotal - Utility 81,337 79,206 86,787 101,661 96,365 71,053 70,463 72,897

Global/Retained 54,297 49,853 79,142 49,298 73,736 43,769 46,928 52,613

Total Allocations 135,634$ 129,059$ 165,929$ 150,959$ 170,101$ 114,822$ 117,391$ 125,510$

BILLED COSTS SDG&E 67,871$ 62,850$ 65,714$ 78,501$ 89,056$ 60,777$ 61,226$ 59,618$ So Cal Gas 78,576 63,110 61,079 72,550 67,159 53,609 53,530 56,481

Subtotal - Utility 146,447 125,960 126,793 151,051 156,215 114,386 114,755 116,099

Global/Retained 144,073 140,677 158,186 173,027 160,973 119,593 121,295 128,014

Total Billed Costs 290,521$ 266,637$ 284,978$ 324,079$ 317,188$ 233,980$ 236,050$ 244,113$

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Summary of Results(Forecast in Escalated $000's)

SDG&E-17-WP BAF-WP-527 GRC APPLICATION - December 2010

Page 530: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Division: I-Corporate Center Shared Services Witness: Bruce Folkmann

Workpaper: I Esc Recon

This workpaper details the methodology used to escalate the 2012 Forecast stated in 2009 $'s in Testimony and in Workpapers

Department Summaries, A-G, to the 2012 $'s as shown in Testimony and in Workpapers Escalated Department Summaries A-G

A B C D E FLabor/ Standard Total

Standard Non-Standard Total Non-labor Escalated EscalatedCosts Costs Costs Indexes 2012 $'s Costs

(A + B) (A X D) (B + E)A Finance Labor 18,294$ -$ 18,294$ 1.0680 19,538$ 19,538$ Non-Labor 13,290 26,315 39,605 1.0727 14,256 40,571 Total 31,584 26,315 57,899 33,794 60,109

B Governance Labor 6,594 - 6,594 1.0680 7,042 7,042 Non-Labor 3,512 5 3,517 1.0727 3,768 3,773 Total 10,106 5 10,111 10,810 10,815

C Legal Labor 6,071 - 6,071 1.0680 6,484 6,484 Non-Labor 5,993 25,099 31,092 1.0727 6,429 31,528 Total 12,064 25,099 37,163 12,913 38,012

D Human Resources Labor 5,730 - 5,730 1.0680 6,119 6,119 Non-Labor 11,328 - 11,328 1.0727 12,152 12,152 Total 17,058 - 17,058 18,271 18,271

E External Affairs Labor 2,122 - 2,122 1.0680 2,266 2,266 Non-Labor 4,036 16 4,052 1.0727 4,330 4,346 Total 6,159 16 6,175 6,596 6,612

F Facilities/Assets Labor 1,851 - 1,851 1.0680 1,977 1,977 Non-Labor 1,803 11,788 13,591 1.0727 1,934 13,722 Total 3,654 11,788 15,442 3,911 15,699 G Pension & Benefits Labor 26,020 - 26,020 1.0680 27,789 27,789 Non-Labor 14,855 51,898 66,753 1.0727 14,908 66,805 Total 40,875 51,898 92,773 42,697 94,595

Corporate Center Shared Services Labor 66,682 - 66,682 1.0680 71,217 71,217 Non-Labor 54,818 115,120 169,939 1.0727 57,776 172,897 Total 121,500$ 115,120$ 236,621$ 128,993$ 244,113$

2012 Forecast (in 2009 $'s) 2012 Forecast Escalated

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Escalation Reconciliation($000's)

SDG&E-17-WP BAF-WP-528 GRC APPLICATION - December 2010

Page 531: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Test Year 2012 General Rate CaseSummary of Allocation for Utilities

(Escalated $000's)

Division: I-Corporate Center Shared Services Witness: Bruce A. Folkmann

TOTALSDG&E SOCALGAS UTILITIES

A-1 CFO 279$ 277$ 556$ A-2 Accounting Services 4,592 4,583 9,176 A-3 Tax Services 1,795 1,688 3,483 A-4 Treasury 3,917 5,245 9,163 A-5 Investor Relations 954 932 1,886 A-6 Corporate Planning 609 609 1,218 A-7 Risk Management 467 467 935 A-8 Financial Leadership Program 618 618 1,236 A Finance 13,232 14,419 27,652

B-1 Internal Audit 2,139 1,953 4,092 B-2 Corporate Secretary 355 355 710 B-3 Board of Directors 624 623 1,247 B-4 Executive - - - B Governance 3,118 2,931 6,049

C-1 General Counsel 381 276 657 C-2 Law Department 4,363 3,106 7,470 C-3 Outside Legal 10,949 6,737 17,686 C Legal 15,693 10,119 25,812

D-1 Human Resources SVP 394 505 899 D-2 Compensation & Benefits 1,570 1,820 3,391 D-3 Payroll/HRIS (MyInfo) 3,465 4,841 8,306 D-4 Employee Development 443 443 886 D-5 Employee Programs 183 239 423 D Human Resources 6,057 7,848 13,905

E-1 Communications 519 519 1,038 E-2 Government Affairs 542 602 1,144 E-3 External Affairs - - - E External Affairs 1,061 1,120 2,181

F-1 Depreciation/Rate of Return 3,707 3,928 7,635 F-2 Property Taxes 220 218 438 F-3 Other Facilities - - - F-4 Security Services 1,002 1,192 2,194 F Facilities/Assets 4,929 5,338 10,267

G-1 Employee Benefits 4,224 4,191 8,415 G-2 Payroll Taxes 1,231 1,221 2,452 G-3 Incentive Compensation 3,213 3,174 6,387 G-4 Term Incentives 3,529 3,355 6,883 G-5 Supplemental Retirement 3,331 2,764 6,096 G Pension & Benefits 15,529 14,704 30,233

Total Allocation - 2012 Forecast 59,618$ 56,481$ 116,099$

Sempra Energy Corporate Center

Department / Cost Center

SDG&E-17-WP BAF-WP-529 GRC APPLICATION - December 2010

Page 532: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Reference: I-Esc Index Witness: Bruce Folkmann

Utility Cost Indexes (set to year 2009=1.0000)

This data derived from Workpapers and Testimony by Scott Wilder, SDG&E Witness (Exhibit SDG&E-38, SoCalGas-31)

O&M Non-Labor Cost Index:

A simple average of the following two cost indexes: 2009 2010 2011 2012

1.00000 1.01900 1.04500 1.07490

1.00000 1.01780 1.04250 1.07040

Sempra Corporate Center Average 1.00000 1.01840 1.04375 1.07265

O&M Labor Cost Index:

A simple average of the following two cost indexes: 2009 2010 2011 2012

1.00000 1.01830 1.04110 1.06500

1.00000 1.01640 1.04390 1.07030

Sempra Corporate Center Average 1.00000 1.01735 1.04250 1.06765

Sempra Energy Corporate CenterTest Year 2012 General Rate Case

Escalation Indexes

Source: Global Insight 1st Quarter 2010 Utility Cost Forecast, May 7, 2010

ECIPWMBFNS Managers & Administrators Labor

Labor

Non-Labor

JEADGOMMS_X926 Administrative and General (Electric) except 926

JGADGOMMS_X926 Administrative and General (Gas) except 926

ECIPWPARNS Professional & Technical

SDG&E-17-WP BAF-WP-530 GRC APPLICATION - December 2010

Page 533: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

Sempra Energy Corporate CenterTest Year 2012 General Rate CaseHISTORICAL AND FORECAST GRID INPUT - SHARED SERVICES ALLOCATIONSTotal ExpensesEscalated($ - 000's)

2005- NSE 2006- NSE 2007- NSE 2008- NSE 2009- NSE 2010- NSE 2011- NSE 2012- NSE

2100-8951 Outside Services Employed F923.1 65,414$ 59,752$ 62,130$ 74,451$ 85,047$ 57,032$ 57,534$ 55,911$ 2100-8952 Depreciation & ROR F923.4 2,457 3,099 3,584 4,050 4,009 3,754 3,692 3,707

Total 67,871$ 62,850$ 65,714$ 78,501$ 89,056$ 60,786$ 61,226$ 59,618$

2005- NSE 2006- NSE 2007- NSE 2008- NSE 2009- NSE 2010- NSE 2011- NSE 2012- NSE

2200-8951 Outside Services Employed F923.1 75,715$ 59,028$ 56,493$ 67,548$ 62,512$ 49,411$ 49,457$ 52,553$ 2200-8952 Depreciation & ROR F923.4 2,861 4,082 4,586 5,003 4,647 4,198 4,073 3,928

Total 78,576$ 63,110$ 61,079$ 72,550$ 67,159$ 53,609$ 53,530$ 56,481$

--------------------------------------------------Recorded----------------------------------------------------- ----------------------------Forecast-----------------------------

SDG&E Allocations - Company Code 2100

--------------------------------------------------Recorded----------------------------------------------------- ----------------------------Forecast-----------------------------

SCG Allocations - Company Code 2200

SDG&E-17-WP BAF-WP-531 GRC APPLICATION - December 2010

Page 534: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

NARRATIVE DESCRIPTION OF METHOD:

SEMPRA ENERGY SHARED SERVICESALLOCATION WORKPAPER

2012 Rate Case

Multi-Factor Basic

Also known as "Four-Factor", this method is used by departments that serve all business units, but for which there is no clear cost driver. The Multi-Factor Basic weights four factors equally for each business unit: Operating Revenues, Operating Expenses, Gross Plant & Investment, and Employees (FTE's). The average of these weightings result in the overall Multi-Factor. The percentage for forecast years have been calculated by statistically projecting historical factors from 2005 - 2009 using the "least square" method.

31.88%34.30%

33.76%36.52% 38.86% 39.92%

41.54%

41.19% 40.09% 39.68%42.07%

41.08% 41.36% 41.52%

26.93%25.60% 26.55%

21.41%20.05%

18.72% 16.94%

5%

10%

15%

20%

25%

30%

35%

40%

45%

50%

2005 2006 2007 2008 2009 2010 2011 2012

Multifactor - Basic

SDG&E SoCal Gas UN-REGULATED

SCG

SDG&E

UN-REGULATED

ForecastHistorical

2006 2007 2008 2009 2010 2011 2012SDG&E 32% 34% 34% 37% 39% 40% 42%

SoCal Gas 41% 40% 40% 42% 41% 41% 42%

UTILITIES 73% 74% 74% 79% 80% 81% 83%

UN-REGULATED 27% 26% 26% 21% 20% 19% 17%

TOTAL 100% 100% 100% 100% 100% 100% 100%

Data from year 2005 2006 2007 2008 2009 Trend Trend

Historical Forecast

(See Next page for factor amounts from each year)

31.88%34.30%

33.76%36.52% 38.86% 39.92%

41.54%

41.19% 40.09% 39.68%42.07%

41.08% 41.36% 41.52%

26.93%25.60% 26.55%

21.41%20.05%

18.72% 16.94%

5%

10%

15%

20%

25%

30%

35%

40%

45%

50%

2005 2006 2007 2008 2009 2010 2011 2012

Multifactor - Basic

SDG&E SoCal Gas UN-REGULATED

SCG

SDG&E

UN-REGULATED

ForecastHistorical

SDG&E-17-WP BAF-WP-532 GRC APPLICATION - December 2010

Page 535: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

FACTOR WEIGHT 25.00% 25.00% 25.00% 25.00% Average of

Gross Four Factors

($ - 000's) Operating Operating Plant MultifactorRevenues Percent Expenses Percent Assets Percent FTE Percent Percent

2006 (from 12/31/2005 data)SDG&E 3,235 29.81% 776 22.40% 8,095 41.75% 4,505 33.57% 31.88%

So Cal Gas 4,617 42.54% 1,176 33.94% 7,762 40.03% 6,473 48.23% 41.19%Unregulated 3,001 27.65% 1,513 43.67% 3,534 18.22% 2,442 18.20% 26.93%

Total 10,853 100.00% 3,465 100.00% 19,391 100.00% 13,420 100.00% 100.00%

2007 (from 12/31/2006 data)SDG&E 3,499 32.10% 917 29.07% 8,659 40.91% 4,715 35.13% 34.30%

So Cal Gas 4,181 38.36% 1,070 33.93% 8,148 38.50% 6,655 49.59% 40.09%Unregulated 3,220 29.54% 1,167 37.00% 4,359 20.59% 2,050 15.28% 25.60%

Total 10,900 100.00% 3,154 100.00% 21,166 100.00% 13,420 100.00% 100.00%

2008 (from 12/31/2007 data)SDG&E 3,351 30.98% 962 28.91% 9,446 40.50% 4,732 34.66% 33.76%

So Cal Gas 4,282 39.58% 1,146 34.45% 8,446 36.21% 6,618 48.48% 39.68%Unregulated 3,184 29.43% 1,219 36.64% 5,432 23.29% 2,301 16.86% 26.55%

Total 10,817 100.00% 3,327 100.00% 23,324 100.00% 13,651 100.00% 100.00%

2009 (from 12/31/2008 data)SDG&E 3,819 34.51% 1,071 37.61% 10,259 37.22% 4,788 36.75% 36.52%

So Cal Gas 4,768 43.09% 1,213 42.59% 8,814 31.98% 6,597 50.63% 42.07%Unregulated 2,479 22.40% 564 19.80% 8,492 30.81% 1,644 12.62% 21.41%

Total 11,066 100.00% 2,848 100.00% 27,565 100.00% 13,029 100.00% 100.00%

2010 (from 12/31/2009 data)SDG&E 3,540 40.55% 1,121 40.49% 10,516 36.42% 5,012 37.98% 38.86%

SEMPRA ENERGY SHARED SERVICESALLOCATION WORKPAPER

2012 Rate Case

Multi-Factor Basic (Support)

S G& 3,5 0 0 55% , 0 9% 0,5 6 36 % 5,0 3 98% 38 86% So Cal Gas 3,355 38.44% 1,244 44.93% 9,037 31.30% 6,554 49.67% 41.08%Unregulated 1,834 21.01% 404 14.58% 9,318 32.27% 1,629 12.35% 20.05%

Total 8,729 100.00% 2,768 100.00% 28,871 100.00% 13,195 100.00% 100.00%

Note: The Multi-Factor Basic percentages used for 2009 actuals were calculated using November 2008 YTD results, per Sempra's policy and thebest available information at the time. Thus, the actual percentages used in 2009 may vary slightly from the calculation above, which used year-endpublished financials.

SDG&E-17-WP BAF-WP-533 GRC APPLICATION - December 2010

Page 536: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

NARRATIVE DESCRIPTION OF METHOD:

allocation between SDG&E and SoCal Gas.

Calculation for 2009 ActualMFSPLIT

Multi-factor Basic Multi-factor Split Business UnitPercent Basis Allocations

SDG&E A 38.35% (A/C) 46.84% X 50% 23.42% SoCal Gas B 43.52% (B/C) 53.16% X 50% 26.58%

Utility Total C 81.87% 100.00% 50.00%

Global D 18.13% 100.00% X 50% 50.00%

TOTAL E 100.00% 100.00%

Calculation for 2010 ForecastMFSPLIT

Multi-factor Basic Multi-factor Split Business UnitPercent Basis Allocations

SDG&E A 38.86% (A/C) 48.61% X 50% 24.31% SoCal Gas B 41.08% (B/C) 51.39% X 50% 25.69%

Utility Total C 79.95% 100.00% 50.00%

Global D 20.05% 100.00% X 50% 50.00%

TOTAL E 100.00% 100.00%

Calculation for 2011 ForecastMFSPLIT

Multi-factor Basic Multi-factor Split Business UnitPercent Basis Allocations

SDG&E A 39.92% (A/C) 49.11% X 50% 24.56% SoCal Gas B 41.36% (B/C) 50.89% X 50% 25.44%

Utility Total C 81.29% 100.00% 50.00%

Global D 18.71% 100.00% X 50% 50.00%E

TOTAL 100.00% 100.00%

Calculation for 2012 ForecastMFSPLIT

Multi-factor Basic Multi-factor Split Business UnitPercent Basis Allocations

SDG&E A 41.54% (A/C) 50.01% X 50% 25.01% SoCal Gas B 41.52% (B/C) 49.99% X 50% 24.99%

Utility Total C 83.06% 100.00% 50.00%

Global D 16.94% 100.00% X 50% 50.00%E

TOTAL 100.00% 100.00%

COST CENTERS WHICH USE THIS METHOD:1100-0298-VP - CORPORATE PLANNING1100-0053-ONE-YEAR BUSINESS PLANNING1100-0299-FIVE-YEAR BUSINESS PLANNING1100-0326-CORP BUDGETS & REPORTING1100-0342-FINL SYSTEMS1100-0169-CORPORATE COMMUNICATIONS1100-0163-FERC RELATIONS

This method divides costs 50% to Utilities, 50% to Global. The MultiFactor-Basic percentages are the basis for the

SEMPRA ENERGY SHARED SERVICESALLOCATION WORKPAPER

2012 General Rate Case

Multi-Factor Split

SDG&E-17-WP BAF-WP-534 GRC APPLICATION - December 2010

Page 537: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

NARRATIVE DESCRIPTION OF METHOD:

Calculation for 2009 Actual

A B C D E F G2009 2009 Allocate 2009 Allocate Allocable CBAUDITPLAN

Audit Plan MFUTILITY Combined MFBASIC Corp. Ctr. Audit Hours by Business unitHours Alloc Rate Utility Hours Alloc Rate Hours Business Unit Allocations

(A X B) (A X D) (A+C+E) (By column F)

SDGE 6,580 47.34% 5,544 38.35% 2,112 14,235 38.30%SoCal Gas 4,840 52.66% 6,166 43.52% 2,396 13,403 36.06%Utility (Common Audits) 11,710 (11,710) Global Business Units 8,530 0.00% - 18.13% 998 9,528 25.64%Corporate Retained 5,506 0.00% - 0.00% (5,506) - 0.00%

Total 37,166 100.00% - 100.00% - 37,166 100.00%

Calculation for 2010 Forecast

A B C D E F G2010 2010 Allocate 2010 Allocate Allocable CBAUDITPLAN

Audit Plan MFUTILITY Combined MFBASIC Corp. Ctr. Audit Hours by Business unitHours Alloc Rate Utility Hours Alloc Rate Hours Business Unit Allocations

(A X B) (A X D) (A+C+E) (By column F)

SDGE 12,220 48.96% 3,148 38.86% 2,934 18,302 42.92%SoCal Gas 10,610 51.04% 3,282 41.08% 3,102 16,993 39.85%Utility (Common Audits) 6,430 (6,430) Global Business Units 5,830 0.00% - 20.05% 1,514 7,344 17.22%Corporate Retained 7,550 0.00% - 0.00% (7,550) - 0.00%

Total 42,640 100.00% - 100.00% - 42,640 100.00%

Calculation for 2011 Forecast

A B C D E F G2010 2011 Allocate 2011 Allocate Allocable CBAUDITPLAN

Audit Plan MFUTILITY Combined MFBASIC Corp. Ctr. Audit Hours by Business unitHours Alloc Rate Utility Hours Alloc Rate Hours Business Unit Allocations

(A X B) (A X D) (A+C+E) (By column F)

SDGE 12,220 49.11% 3,158 39.92% 3,014 18,392 43.13%SoCal Gas 10,610 50.89% 3,272 41.36% 3,123 17,005 39.88%Utility (Common Audits) 6,430 (6,430) Global Business Units 5,830 0.00% - 18.71% 1,413 7,243 16.99%Corporate Retained 7,550 0.00% - 0.00% (7,550) - 0.00%

Total 42,640 100.00% - 100.00% (0) 42,640 100.00%

Calculation for 2012 Forecast

A B C D E F G2010 2012 Allocate 2012 Allocate Allocable CBAUDITPLAN

Audit Plan MFUTILITY Combined MFBASIC Corp. Ctr. Audit Hours by Business unitHours Alloc Rate Utility Hours Alloc Rate Hours Business Unit Allocations

(A X B) (A X D) (A+C+E) (By column F)

SDGE 12,220 50.01% 3,216 41.54% 3,136 18,572 43.56%SoCal Gas 10,610 49.99% 3,214 41.52% 3,135 16,959 39.77%Utility (Common Audits) 6,430 (6,430) Global Business Units 5,830 0.00% - 16.94% 1,279 7,109 16.67%Corporate Retained 7,550 0.00% - 0.00% (7,550) - 0.00%

Total 42,640 100.00% - 100.00% - 42,640 100.00%

COST CENTERS WHICH USE THIS METHOD:1100-0041-AUDIT - FIN & OPS1100-0050-AUDIT QUALITY ASSUR1100-0349-VP AUDIT SERVICES1100-0453-AUDIT - FIN & OPS II1100-0454-AUDIT - INFO TECH1100-0380-ENVIRONMENTAL COMPLIANCE

Audit Plan hours are used to forecast the allocation, although year end adjustments are made to reflect actual hours spent.

SEMPRA ENERGY SHARED SERVICESALLOCATION WORKPAPER

2012 General Rate Case

Causal - Audit Plan

This method is based on the hours Audit Services spends auditing each business unit. The portion of services attributable to Corporate Center is re-allocated using the Multi-Factor Basic method to result in a blended percentage for each business unit.

SDG&E-17-WP BAF-WP-535 GRC APPLICATION - December 2010

Page 538: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

NARRATIVE DESCRIPTION OF METHOD:

Multi-Factor Basic, resulting in a blended percentage.

Calculations for 2009 ActualsA B C D E

2009 2009 Allocate Net CBTIMETAXTime Survey MFBASIC Corp Center Total Business unit

(hours) Alloc Rate Workload Allocable Allocations(By column B) (A + C) (By column D)

SDG&E 953 38.35% 381 1,334 22.61%SoCal Gas 935 43.52% 433 1,368 23.18%Corp. Center 994 0.00% (994) - 0.00%Global 3,018 18.13% 180 3,198 54.21%

Total 5,900 100.00% - 5,900 100.00%

Calculations for 2010 ForecastA B C D E

2010 2010 Allocate Net CBTIMETAXTime Survey MFBASIC Corp Center Total Business unit

(hours) Alloc Rate Workload Allocable Allocations(By column B) (A + C) (By column D)

SDG&E 827 38.86% 347 1,174 20.25%SoCal Gas 756 41.08% 367 1,123 19.37%Corp. Center 894 0.00% (894) - 0.00%Global 3,323 20.05% 179 3,502 60.38%

Total 5,800 100.00% - 5,800 100.00%

Calculations for 2011 ForecastA B C D E

2010 2011 Allocate Net CBTIMETAXTime Survey MFBASIC Corp Center Total Business unit

(hours) Alloc Rate Workload Allocable Allocations(By column B) (A + C) (By column D)

SDG&E 827 39.92% 357 1,184 20.41%SoCal Gas 756 41.36% 370 1,126 19.41%Corp. Center 894 0.00% (894) - 0.00%Global 3,323 18.71% 167 3,490 60.18%

Total 5,800 100.00% (0) 5,800 100.00%

Calculations for 2012 ForecastA B C D E

2010 2012 Allocate Net CBTIMETAXTime Survey MFBASIC Corp Center Total Business unit

(hours) Alloc Rate Workload Allocable Allocations(By column B) (A + C) (By column D)

SDG&E 827 41.54% 371 1,198 20.66%SoCal Gas 756 41.52% 371 1,127 19.43%Corp. Center 894 0.00% (894) - 0.00%Global 3,323 16.94% 151 3,474 59.90%

Total 5,800 100.00% - 5,800 100.00%

COST CENTERS WHICH USE THIS METHOD:1100-0046-VP OF CORPORATE TAX1100-0045-CORPORATE TAX ACCTG & SYSTEMS1100-0373-DOMESTIC TAX COMPLIANCE1100-0374-INTL TAX1100-0376-TRANSACTIONAL TAX1100-0399-TAX LAW GROUP

This allocation is a weighted average of the hours of each employee within the Tax department based on a timesurvey they complete annually, identifying the business units they support. Parent workload is reallocated using

SEMPRA ENERGY SHARED SERVICESALLOCATION WORKPAPER

2012 General Rate Case

Causal - Tax Services

SDG&E-17-WP BAF-WP-536 GRC APPLICATION - December 2010

Page 539: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

NARRATIVE DESCRIPTION OF METHOD:This method splits costs between all of the business units basedon a current management estimate.

SDGE 5.0%SoCal Gas 5.0%Global/Retained 90.0%Total 100.0%

SDGE 5.0%SoCal Gas 5.0%Global/Retained 90.0%Total 100.0%

SDGE 5.0%SoCal Gas 5.0%Global/Retained 90.0%Total 100.0%

SDGE 5.0%SoCal Gas 5.0%Global/Retained 90.0%Total 100.0%

COST CENTERS WHICH USE THIS METHOD:1100-0393-CORP ECONOMIC ANALYSIS

Calculation for 2011 Forecast

Calculation for 2012 Forecast

SEMPRA ENERGY SHARED SERVICESALLOCATION WORKPAPER

2012 General Rate Case

Causal - Economic Analysis

Calculation for 2009 Actual

Calculation for 2010 Forecast

SDG&E-17-WP BAF-WP-537 GRC APPLICATION - December 2010

Page 540: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

NARRATIVE DESCRIPTION OF METHOD:

timekeeping charges during the previous January-September period. Actuals are updated monthly percentages.

Calculations of 2009 PlanA B C D E

2009 Allocate DIRLAWDEPT2008 MFBASIC Corp Total Business unit

Hours Alloc Rate Workload Allocable Allocations(By column B) (A + C) (By column D)

SDG&E 48,211 38.35% 14,779 62,990 44.80%SoCal Gas 30,368 43.52% 16,771 47,139 33.53%Corp. Center 38,537 0.00% (38,537) - 0.00%Global 23,475 18.13% 6,987 30,462 21.67%Total 140,591 100.00% - 140,591 100.00%

Calculations for 2010 ForecastA B C D E

2010 Allocate DIRLAWDEPT2009 MFBASIC Corp Total Business unit

Hours Alloc Rate Workload Allocable Allocations(By column B) (A + C) (By column D)

SDG&E 68,305 38.86% 18,742 87,047 43.83%SoCal Gas 43,983 41.08% 19,814 63,797 32.13%Corp. Center 48,228 0.00% (48,228) - 0.00%Global 38,070 20.05% 9,672 47,742 24.04%Total 198,586 100.00% - 198,586 100.00%

Calculations for 2011 ForecastA B C D E

2011 Allocate DIRLAWDEPT2009 MFBASIC Corp Total Business unit

Hours Alloc Rate Workload Allocable Allocations(By column B) (A + C) (By column D)

SDG&E 68,305 39.92% 19,255 87,560 44.09%SoCal Gas 43,983 41.36% 19,949 63,932 32.19%Corp. Center 48,228 0.00% (48,228) - 0.00%Global 38,070 18.71% 9,024 47,094 23.71%Total 198,586 100.00% (0) 198,586 100.00%

Calculations for 2012 ForecastA B C D E

2012 Allocate DIRLAWDEPT2009 MFBASIC Corp Total Business unit

Hours Alloc Rate Workload Allocable Allocations(By column B) (A + C) (By column D)

SDG&E 68,305 41.54% 20,034 88,339 44.48%SoCal Gas 43,983 41.52% 20,024 64,007 32.23%Corp. Center 48,228 0.00% (48,228) - 0.00%Global 38,070 16.94% 8,170 46,240 23.28%Total 198,586 100.00% - 198,586 100.00%

COST CENTERS WHICH USE THIS METHOD:1100-0141-EXECUTIVE VP & GENERAL CO1100-0144-LEGAL1100-0145-OUTSIDE LEGAL

This allocation method is based on direct time charged by attorneys, paralegal and law clerks in support of eachbusiness unit as recorded in the LawPak timekeeping system. The calculation is based on average of actual

SEMPRA ENERGY SHARED SERVICESALLOCATION WORKPAPER

2012 General Rate Case

Legal

SDG&E-17-WP BAF-WP-538 GRC APPLICATION - December 2010

Page 541: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

NARRATIVE DESCRIPTION OF METHOD:

Calculation for 2009 ActualsA B C D E F

2009 2009 CBLOCALGOVT

Employee Employee PercentMulti-Factor

CA Allocate Director's Total Business unitJob Title Salary Retained Alloc Rate Unretained Salary Allocable Allocations

10.0% (A - B X C) (A + D) (By column E)

SDG&E Manager - Govt. Affairs (San Diego) 88,938 39.60% 56,357 145,295 39.69%SoCal Gas Manager - Govt. Affairs (Los Angeles) 118,963 44.69% 63,601 182,564 49.88%Corp. Center Director - Local Govt. Affairs 158,129 15,813 0.00% (142,316) 15,813 4.32%Global 15.71% 22,358 22,358 6.11%

Total 366,030$ 15,813$ 100.00% -$ 366,030$ 100.00%

Calculation for 2010 Forecast*A B C D E F

2010 2010 CBLOCALGOVT

Employee Employee PercentMulti-Factor

CA Allocate Director's Total Business unitJob Title Salary Retained Alloc Rate Unretained Salary Allocable Allocations

10.0% (A - B X C) (A + D) (By column E)

SDG&E Manager - Govt. Affairs (San Diego) 88,938 38.86% 55,307 144,245 39.41%SoCal Gas Manager - Govt. Affairs (Los Angeles) 118,963 41.08% 58,469 177,432 48.47%Corp. Center Director - Local Govt. Affairs 158,129 15,813 0.00% (142,316) 15,813 4.32%Global 20.05% 28,540 28,540 7.80%

Total 366,030$ 15,813$ 100.00% -$ 366,030$ 100.00%

Calculation for 2011 Forecast*A B C D E F

2010 2011 CBLOCALGOVT

Employee Employee PercentMulti-Factor

CA Allocate Director's Total Business unitJob Title Salary Retained Alloc Rate Unretained Salary Allocable Allocations

10.0% (A - B X C) (A + D) (By column E)

SDG&E Manager - Govt. Affairs (San Diego) 88,938 39.92% 56,818 145,756 39.82%SoCal Gas Manager - Govt. Affairs (Los Angeles) 118,963 41.36% 58,868 177,831 48.58%Corp. Center Director - Local Govt. Affairs 158,129 15,813 0.00% (142,316) 15,813 4.32%Global 18.71% 26,630 26,630 7.28%

Total 366,030$ 15,813$ 100.00% (0)$ 366,030$ 100.00%

Calculation for 2012 Forecast*A B C D E F

2010 2012 CBLOCALGOVT

Employee Employee PercentMulti-Factor

CA Allocate Director's Total Business unitJob Title Salary Retained Alloc Rate Unretained Salary Allocable Allocations

10.0% (A - B X C) (A + D) (By column E)

SDG&E Manager - Govt. Affairs (San Diego) 88,938 41.54% 59,118 148,056 40.45%SoCal Gas Manager - Govt. Affairs (Los Angeles) 118,963 41.52% 59,090 178,053 48.64%Corp. Center Director - Local Govt. Affairs 158,129 15,813 0.00% (142,316) 15,813 4.32%Global 16.94% 24,108 24,108 6.59%

Total 366,030$ 15,813$ 100.00% -$ 366,030$ 100.00%

COST CENTERS WHICH USE THIS METHOD: *Allocations used in forecast calculations vary slighty from 1100-0157-GOVT PROGRAMS & CORP RESPONSIBILITY this formula.

This method uses a distribution of salaries for the two managers based on their efforts for the two utilities. The Director's salary is multi-factored, with an 10% retained for non-allocable purposes.

SEMPRA ENERGY SHARED SERVICESALLOCATION WORKPAPER

2012 General Rate Case

Causal - Local Government

SDG&E-17-WP BAF-WP-539 GRC APPLICATION - December 2010

Page 542: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

NARRATIVE DESCRIPTION OF METHOD:

Calculation for 2009 ActualA B C D E

Current Est'd % of Labor $'s Total 2009 % of TotalAnnual Time to be to be Department Costs to beSalary Retained Retained Planned Labor Retained

(A x B) (C / D)Bus. Planning Mgr. 102,211$ 25% 25,553$ Financial Analyst 63,354$ 10% 6,335

31,888$ 165,565$ 19.26%

F G H2009 MFVPOLITICAL

Multi-Factor Retained % Business unitSplit Allocation Allocations

(F + G)SDG&E 23.42% -4.51% 18.91%SCG 26.58% -5.12% 21.46%Global BU 50.00% -9.63% 40.37%Corp Center 0.00% 19.26% 19.26%Total 100.00% 0.00% 100.00%

Calculation for 2010 ForecastA B C D E

Current Est'd % of Labor $'s Total 2010 % of TotalAnnual Time to be to be Department Costs to beSalary Retained Retained Planned Labor Retained

(A x B) (C / D)Bus. Planning Mgr. 102,211$ 25% 25,553$ Financial Analyst 63,354$ 10% 6,335

31,888$ 201,118$ 15.86%

F G H2010 MFVPOLITICAL

Multi-Factor Retained % Business unitSplit Allocation Allocations

(F + G)SDG&E 24.31% -3.85% 20.45%SCG 25.69% -4.08% 21.62%Global BU 50.00% -7.93% 42.07%Corp Center 0.00% 15.86% 15.86%Total 100.00% 0.00% 100.00%

Calculation for 2011 Forecast

F G H2011 2010 MFVPOLITICAL

Multi-Factor Retained % Business unitSplit Allocation Allocations

(F + G)SDG&E 24.56% -3.89% 20.66%SCG 25.44% -4.04% 21.41%Global BU 50.00% -7.93% 42.07%Corp Center 0.00% 15.86% 15.86%Total 100.00% 0.00% 100.00%

Calculation for 2012 Forecast

F G H2012 2010 MFVPOLITICAL

Multi-Factor Retained % Business unitSplit Allocation Allocations

(F + G)SDG&E 25.01% -3.97% 21.04%SCG 24.99% -3.96% 21.03%Global BU 50.00% -7.93% 42.07%Corp Center 0.00% 15.86% 15.86%Total 100.00% 0.00% 100.00%

COST CENTERS WHICH USE THIS METHOD: *Allocations used in forecast calculations vary slightly1100-0395-COMPLIANCE / REPORTING & ANALYSIS from this formula.

SEMPRA ENERGY SHARED SERVICESALLOCATION WORKPAPER

2012 General Rate Case

Causal - Political

This method uses the Multi-Split as a starting point, then reduces the percentages to exclude a portion attributed to managing costs which are estimated to be retained (e.g. political reporting).

SDG&E-17-WP BAF-WP-540 GRC APPLICATION - December 2010

Page 543: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

NARRATIVE DESCRIPTION OF METHOD:

Calculation for 2009 ActualsA B C D E

Dec 2008 Reallocate CBFTEActual MFBASIC Corp Ctr Allocable Business UnitFTE's Alloc Rate FTE's FTE's Allocations

(A x B) (A + C) (by column D)

SDG&E 4,756 38.35% 207 4,963 38.36%SoCal Gas 6,952 43.52% 235 7,187 55.55%Corp. Center 541 0.00% (541) - 0.00%Global 689 18.13% 98 787 6.08%

Total 12,938 100.00% - 12,938 100.00%

Calculation for 2010 ForecastA B C D E

Dec 2009 Reallocate CBFTEActual MFBASIC Corp Ctr Allocable Business UnitFTE's Alloc Rate FTE's FTE's Allocations

(A x B) (A + C) (by column D)

SDG&E 5,011 38.86% 211 5,222 40.63%SoCal Gas 6,606 41.08% 223 6,829 53.14%Corp. Center 543 0.00% (543) - 0.00%Global 692 20.05% 109 801 6.23%

Total 12,852 100.00% - 12,852 100.00%

Calculation for 2011 ForecastA B C D E

Dec 2009 Reallocate CBFTEActual MFBASIC Corp Ctr Allocable Business UnitFTE's Alloc Rate FTE's FTE's Allocations

(A x B) (A + C) (by column D)

SDG&E 5,011 39.92% 217 5,228 40.68%SoCal Gas 6,606 41.36% 225 6,831 53.15%Corp. Center 543 0.00% (543) - 0.00%Global 692 18.71% 102 794 6.17%

Total 12,852 100.00% (0) 12,852 100.00%

Calculation for 2012 ForecastA B C D E

Dec 2009 Reallocate CBFTEActual MFBASIC Corp Ctr Allocable Business UnitFTE's Alloc Rate FTE's FTE's Allocations

(A x B) (A + C) (by column D)

SDG&E 5,011 41.54% 226 5,237 40.75%SoCal Gas 6,606 41.52% 225 6,831 53.15%Corp. Center 543 0.00% (543) - 0.00%Global 692 16.94% 92 784 6.10%

Total 12,852 100.00% - 12,852 100.00%

COST CENTERS WHICH USE THIS METHOD:1100-0134-COMP & BENEFITS DIR1100-0135-COMPENSATION1100-0137-HR ACCTG & BUDGETS1100-0276-EMPLOYEE BENEFITS SERVICE1100-0131-CORP DIVERSITY AFFAIRS1100-0170-INTERNAL COMMUNICATIONS1100-0155-CORP COMM PARTNERSHIPS1100-0171-EMPLOYEE COMMUNICATIONS

percentage.

SEMPRA ENERGY SHARED SERVICESALLOCATION WORKPAPER

2012 Rate Case

Causal - FTE's

Total current FTE's are used as the basis for allocation the cost of most HR services provided on behalf of allbusiness units. Corporate Center's share is reallocated using the Multi-Factor Basic, resulting in a blended

SDG&E-17-WP BAF-WP-541 GRC APPLICATION - December 2010

Page 544: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

NARRATIVE DESCRIPTION OF METHOD:

Calculation for 2009 ActualsA B C D E

Dec 2008 2009 CBFTEMYINFOEmployee MFBASIC Reallocate Allocable Business UnitRecords Alloc Rate Parent Share FTE Allocations

(by column B) (A + C) (by column D)

SDG&E 4,833.0 38.35% 213.6 5,046.6 38.04%SoCal Gas 7,188.0 43.52% 242.4 7,430.4 56.01%Corp. Center 557.0 0.00% (557.0) - 0.00%Global 689.0 18.13% 101.0 790.0 5.95%

Total 13,267.0 100.00% - 13,267.0 100.00%

Calculation for 2010 ForecastA B C D E

Dec 2009 2010 CBFTEMYINFOEmployee MFBASIC Reallocate Allocable Business UnitRecords Alloc Rate Parent Share FTE Allocations

(by column B) (A + C) (by column D)

SDG&E 5,069.0 38.86% 213.7 5,282.7 39.12%SoCal Gas 7,194.0 41.08% 226.0 7,420.0 54.94%Corp. Center 550.0 0.00% (550.0) - 0.00%Global 692.0 20.05% 110.3 802.3 5.94%

Total 13,505.0 100.00% - 13,505.0 100.00%

Calculation for 2011 ForecastA B C D E

Dec 2009 2011 CBFTEMYINFOEmployee MFBASIC Reallocate Allocable Business UnitRecords Alloc Rate Parent Share FTE Allocations

(by column B) (A + C) (by column D)

SDG&E 5,069.0 39.92% 219.6 5,288.6 39.16%SoCal Gas 7,194.0 41.36% 227.5 7,421.5 54.95%Corp. Center 550.0 0.00% (550.0) - 0.00%Global 692.0 18.71% 102.9 794.9 5.89%

Total 13,505.0 100.00% (0.0) 13,505.0 100.00%

Calculation for 2012 ForecastA B C D E

Dec 2009 2012 CBFTEMYINFOEmployee MFBASIC Reallocate Allocable Business UnitRecords Alloc Rate Parent Share FTE Allocations

(by column B) (A + C) (by column D)

SDG&E 5,069.0 41.54% 228.5 5,297.5 39.23%SoCal Gas 7,194.0 41.52% 228.4 7,422.4 54.96%Corp. Center 550.0 0.00% (550.0) - 0.00%Global 692.0 16.94% 93.2 785.2 5.81%

Total 13,505.0 100.00% - 13,505.0 100.00%

COST CENTERS WHICH USE THIS METHOD:1100-0383-MYINFO SERVICES

Multi-factor Basic, resulting in a blended percentage.

SEMPRA ENERGY SHARED SERVICESALLOCATION WORKPAPER

2012 General Rate Case

Causal - MyInfo

MyInfo Services allocation is based on the number of employee records maintained in the centralized MyInfo systemon behalf of all business units. The employee records attributable to Corporate Center are reallocated using

SDG&E-17-WP BAF-WP-542 GRC APPLICATION - December 2010

Page 545: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

NARRATIVE DESCRIPTION OF METHOD:

Calculation for 2009 ActualsA B C D E F G

2009 Weighted 2009 CBFTEEXEC2009 Directors & Average MFBASIC Reallocate Allocable Business Unit

Executives VPs (A X 0.75 + Alloc Rate Parent Share FTE AllocationsB X 0.25) (by column D) (C+E) (by column F)

SDG&E 4.0 54.0 16.5 38.35% 16.8 33.3 30.67%SoCal Gas 3.0 47.0 14.0 43.52% 19.0 33.0 30.45%Corp. Center 23.0 106.0 43.8 0.00% (43.8) - 0.00%Global 3.0 128.0 34.3 18.13% 7.9 42.2 38.88%Total 33.0 335.0 108.5 100.00% - 108.5 100.00%

Calculation for 2010 ForecastA B C D E F G

2010 Weighted 2010 CBFTEEXEC2010 Directors & Average MFBASIC Reallocate Allocable Business Unit

Executives VPs (A X 0.75 + Alloc Rate Parent Share FTE AllocationsB X 0.25) (by column D) (C+E) (by column F)

SDG&E 5.0 85.0 25.0 38.86% 7.2 32.2 40.36%SoCal Gas 4.0 52.0 16.0 41.08% 7.6 23.6 29.59%Corp. Center 7.0 53.0 18.5 0.00% (18.5) - 0.00%Global 3.0 72.0 20.3 20.05% 3.7 24.0 30.04%Total 19.0 262.0 79.8 100.00% - 79.8 100.00%

Calculation for 2011 ForecastA B C D E F G

2010 Weighted 2011 CBFTEEXEC2010 Directors & Average MFBASIC Reallocate Allocable Business Unit

Executives VPs (A X 0.75 + Alloc Rate Parent Share FTE AllocationsB X 0.25) (by column D) (C+E) (by column F)

SDG&E 5.0 85.0 25.0 39.92% 7.4 32.4 40.61%SoCal Gas 4.0 52.0 16.0 41.36% 7.7 23.7 29.66%Corp. Center 7.0 53.0 18.5 0.00% (18.5) - 0.00%Global 3.0 72.0 20.3 18.71% 3.5 23.7 29.73%Total 19.0 262.0 79.8 100.00% (0.0) 79.7 100.00%

Calculation for 2012 ForecastA B C D E F G

2010 Weighted 2012 CBFTEEXEC2010 Directors & Average MFBASIC Reallocate Allocable Business Unit

Executives VPs (A X 0.75 + Alloc Rate Parent Share FTE AllocationsB X 0.25) (by column D) (C+E) (by column F)

SDG&E 5.0 85.0 25.0 41.54% 7.7 32.7 40.98%SoCal Gas 4.0 52.0 16.0 41.52% 7.7 23.7 29.69%Corp. Center 7.0 53.0 18.5 0.00% (18.5) - 0.00%Global 3.0 72.0 20.3 16.94% 3.1 23.4 29.32%Total 19.0 262.0 79.8 100.00% - 79.8 100.00%

COST CENTERS WHICH USE THIS METHOD: Note: 2010 Executive headcount was left incomplete during1100-0136-EXECUTIVE COMPENSATION the Reorganization; so forecast calculation is largely

based on Director/VP level counts.

service executives are then multifactored, resulting in a blended percentage.

SEMPRA ENERGY SHARED SERVICESALLOCATION WORKPAPER

2012 General Rate Case

Causal - Executive FTE's

This method allocates the support and administration cost for executive compensation plans using a weighted average of participatingofficers. Executive level officers are heavily weighted (75%) compared to Directors and Vice Presidents (25%). Corporate shared

SDG&E-17-WP BAF-WP-543 GRC APPLICATION - December 2010

Page 546: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

NARRATIVE DESCRIPTION OF METHOD:

Calculations for 2009 ActualsA B C D E F G H

blended percentage.

SEMPRA ENERGY SHARED SERVICESALLOCATION WORKPAPER

2012 General Rate Case

Causal - HQ Security

This method allocates the costs of Corporate Security excluding the HQ guard service contract by the Causal-FTE method, and allocates the HQ guard service by the ratio of employees occupying the HQ building. Corporate shared service employees are reallocated using Multi-factor Basic, to result in a

A B C D E F G HAllocated

Budget for BU 2009 CBHQSECCorp Security CBFTE FTE's HQ Guard MFBASIC Reallocate Allocable Business Unit(w/o Guard) Alloc Rate at HQ Service Plan Alloc Rate Parent Share Costs per BU Allocations

(by Column B) (by column C) (by column E) (A+D+F) (by column G)

SDG&E 863,893 38.36% 5.0 10,825 38.35% 37,686 912,404 32.94%SoCal Gas 1,262,781 55.55% 1.0 2,165 43.52% 42,767 1,307,713 47.21%Corp. Center 98,269 0.00% - - 0.00% (98,269) - 0.00%Global 125,151 6.09% 188.0 407,011 18.13% 17,816 549,978 19.85%Total 2,350,094 100.00% 194.0 420,001 100.00% - 2,770,095 100.00%

Calculations for 2010 ForecastA B C D E F G H

AllocatedBudget for BU 2010 CBHQSEC

Corp Security CBFTE FTE's HQ Guard MFBASIC Reallocate Allocable Business Unit(w/o Guard) Alloc Rate at HQ Service Plan Alloc Rate Parent Share Costs per BU Allocations

(by Column B) (by column C) (by column E) (A+D+F) (by column G)

SDG&E 1,055,446 40.63% 4.0 2,523 38.86% 115,921 1,173,890 38.90%SoCal Gas 1,380,257 53.14% 1.0 631 41.08% 122,548 1,503,436 49.82%C C t 0 00% 473 0 298 288 0 00% (298 288) 0 00%Corp. Center - 0.00% 473.0 298,288 0.00% (298,288) - 0.00%Global 161,870 6.23% 188.0 118,559 20.05% 59,819 340,248 11.28%Total 2,597,574 100.00% 666.0 420,000 100.00% - 3,017,574 100.00%

Calculations for 2011 ForecastA B C D E F G H

AllocatedBudget for BU 2010 CBHQSEC

Corp Security CBFTE FTE's HQ Guard MFBASIC Reallocate Allocable Business Unit(w/o Guard) Alloc Rate at HQ Service Plan Alloc Rate Parent Share Costs per BU Allocations

(by Column B) (by column C) (by column E) (A+D+F) (by column G)( y ) ( y ) ( y ) ( ) ( y )

SDG&E 1,055,446 40.68% 4.0 2,523 39.92% 119,089 1,177,057 39.01%SoCal Gas 1,380,257 53.15% 1.0 631 41.36% 123,384 1,504,272 49.85%Corp. Center - 0.00% 473.0 298,288 0.00% (298,288) - 0.00%Global 161,870 6.18% 188.0 118,559 18.71% 55,815 336,244 11.14%Total 2,597,574 100.00% 666.0 420,000 100.00% (0) 3,017,574 100.00%

Calculations for 2012 ForecastA B C D E F G H

AllocatedBudget for BU 2010 CBHQSECBudget for BU 2010 CBHQSEC

Corp Security CBFTE FTE's HQ Guard MFBASIC Reallocate Allocable Business Unit(w/o Guard) Alloc Rate at HQ Service Plan Alloc Rate Parent Share Costs per BU Allocations

(by Column B) (by column C) (by column E) (A+D+F) (by column G)

SDG&E 1,055,446 40.75% 4.0 2,523 41.54% 123,909 1,181,878 39.17%SoCal Gas 1,380,257 53.15% 1.0 631 41.52% 123,849 1,504,737 49.87%Corp. Center - 0.00% 473.0 298,288 0.00% (298,288) - 0.00%Global 161,870 6.10% 188.0 118,559 16.94% 50,530 330,959 10.97%Total 2,597,574 100.00% 666.0 420,000 100.00% - 3,017,574 100.00%

COST CENTERS WHICH USE THIS METHOD:1100-0133-CORPORATE SECURITY DIR

SDG&E-17-WP BAF-WP-544 GRC APPLICATION - December 2010

Page 547: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

NARRATIVE DESCRIPTION OF METHOD:

Calculation for 2009 ActualsCBEXECSEC

Group Business UnitShare Allocations

SDG&E 16.67%SoCal Gas 16.67% Total Utilities 33.33%Global 33.33% 33.33%Corp. Center 33.33% 33.33%Total 100.00% 100.00%

Calculation for 2010 ForecastCBEXECSEC

Group Business UnitShare Allocations

SDG&E 16.67%SoCal Gas 16.67% Total Utilities 33.33%Global 33.33% 33.33%Corp. Center 33.33% 33.33%Total 100.00% 100.00%

Calculation for 2011 ForecastCBEXECSEC

Group Business UnitShare Allocations

SDG&E 16.67%SoCal Gas 16.67% Total Utilities 33.33%Global 33.33% 33.33%Corp. Center 33.33% 33.33%Total 100.00% 100.00%

Calculation for 2012 ForecastCBEXECSEC

Group Business UnitShare Allocations

SDG&E 16.67%SoCal Gas 16.67% Total Utilities 33.33%Global 33.33% 33.33%Corp. Center 33.33% 33.33%Total 100.00% 100.00%

COST CENTERS WHICH USE THIS METHOD:1100-0275-EXECUTIVE SECURITY

This method divides costs evenly by estimated executive usage (1/3 to Utilities, 1/3 to Global, and 1/3 retained at Corp. Center).

SEMPRA ENERGY SHARED SERVICESALLOCATION WORKPAPER

2012 General Rate Case

Causal - Executive Security

SDG&E-17-WP BAF-WP-545 GRC APPLICATION - December 2010

Page 548: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

NARRATIVE DESCRIPTION OF METHOD:This method is a weighted average of annual budget for departments that directly report to the Chief Financial Officer.

Calculation for 2009 ActualVPCFO

Investor Risk Total Business UnitController Relations Treasurer Analysis Budgets Allocations

SDG&E 33.90%SCG The CFO average included a different mix of reports prior to the 34.50%Global/Retained Reorganization; only the average is shown here. 31.60%Total 100.00%

Calculation for 2010 Forecast

SDG&E 243,479 300,019 203,793 723,387 1,470,678 43.75%SCG 243,771 317,170 215,443 - 776,384 23.10%Global/Retained 459,323 325,363 329,923 - 1,114,609 33.16%Total 946,573$ 942,553$ 749,159$ 723,387$ 3,361,671$ 100.00%

Calculation for 2011 Forecast

SDG&E 261,343 326,138 221,767 1,260,452 2,069,701 51.55%SCG 258,786 337,903 229,767 - 826,455 20.58%Global/Retained 471,387 332,108 315,321 - 1,118,816 27.87%Total 991,516$ 996,149$ 766,855$ 1,260,452$ 4,014,973$ 100.00%

Calculation for 2012 Forecast

SDG&E 271,557 343,355 233,817 319,074 1,167,803 28.72%SCG 262,922 343,190 233,704 318,921 1,158,737 28.50%Global/Retained 470,413 321,381 309,780 637,995 1,739,570 42.78%Total 1,004,893$ 1,007,927$ 777,300$ 1,275,990$ 4,066,110$ 100.00%

Controller - VPCONTRInvestor Relations - MFBASICTreasurer - VPTREAS Risk Analysis & Mgmt - SDGE; MFSPLIT for 2012

COST CENTERS WHICH USE THIS METHOD:1100-0039-EVP & CFO

SEMPRA ENERGY SHARED SERVICESALLOCATION WORKPAPER

2012 General Rate Case

VP Average - CFO

SDG&E-17-WP BAF-WP-546 GRC APPLICATION - December 2010

Page 549: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

NARRATIVE DESCRIPTION OF METHOD:This method is a weighted average of annual budget for departments that report to the SVP - Controller & Chief Tax Counsel

Calculation for 2009 Actuals VPCONTRFinancial Corporate Tax Total Business UnitReporting Accounting Services Budgets Allocations

SDG&E 22.54%SCG The Controller average included a different mix of reports 24.57%Global/Retained prior to the Reorganization; only the average is shown here. 52.89%Total 100.00%

Calculation for 2010 Forecast

SDG&E 605,478 850,270 1,820,919 3,276,667 25.72%SCG 640,091 898,876 1,741,629 3,280,597 25.75%Global/Retained 312,448 438,768 5,430,201 6,181,417 48.52%Total 1,558,017$ 2,187,915$ 8,992,750$ 12,738,682$ 100.00%

Calculation for 2011 Forecast

SDG&E 655,510 987,794 1,917,081 3,560,385 26.36%SCG 679,156 1,023,425 1,822,961 3,525,542 26.10%Global/Retained 307,229 462,966 5,651,694 6,421,890 47.54%Total 1,641,896$ 2,474,185$ 9,391,736$ 13,507,817$ 100.00%

Calculation for 2012 Forecast

SDG&E 692,123 1,042,133 1,968,225 3,702,481 27.02%

SEMPRA ENERGY SHARED SERVICESALLOCATION WORKPAPER

2012 General Rate Case

VP Average - Controller

SDG&E 692,123 1,042,133 1,968,225 3,702,481 27.02%SCG 691,790 1,041,631 1,851,319 3,584,740 26.16%Global/Retained 282,248 424,981 5,706,500 6,413,730 46.81%Total 1,666,161$ 2,508,745$ 9,526,044$ 13,700,950$ 100.00%

Financial Reporting 1100-0047-Financial Reporting Director - MFBASIC 1100-0048-Financial Reporting - MFBASIC

Corporate Accounting 1100-0049-Corporate Center Accounting - MFBASIC 1100-0345-Dir Of Corp Finl Acctg - MFBASIC 1100-0012-Corporate Acct Special Projects - MFBASIC 1100-0347-Accounting Research - MFBASIC 1100-0390-Sox Compliance - MFBASIC

Tax Services 1100-0046-VP Of Corporate Tax - CBTIMETAX 1100-0045-Corporate Tax Acctg & Systems - CBTIMETAX 1100-0373-Domestic Tax Compliance - CBTIMETAX 1100-0374-Intl Tax - CBTIMETAX 1100-0376-Transactional Tax - CBTIMETAX 1100-0399-Tax Law Group - CBTIMETAX

COST CENTERS WHICH USE THIS METHOD: 1100-0338-SVP & CONTROLLER

SDG&E-17-WP BAF-WP-547 GRC APPLICATION - December 2010

Page 550: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

NARRATIVE DESCRIPTION OF METHOD:This method is a weighted average of annual budget for departments that report to the VP of Corporate Relations.

Calculation for 2009 Actuals VPCORPRELGovt Compl. Government FERC Corporate Business Unit

Comm. & Reporting Affairs* Relations Secretary Total BU AllocationsSDG&E 0.00%SCG The VP of Corp Relations is a new position since the 2010 Reorganization. The 0.00%Global/Retained previous VP of Fed & State Affairs had a different mix of reports. 0.00%Total 0.00%

Calculation for 2010 Forecast

SDG&E 537,218 421,617 - 80,922 298,161 1,337,917 25.44%SCG 567,928 497,436 - 85,547 315,206 1,466,117 27.87%Global/Retained 543,056 256,631 1,335,851 166,469 153,861 2,455,869 46.69%Total 1,648,202$ 1,175,684$ 1,335,851$ 332,938$ 767,228$ 5,259,904$ 100.00%

Calculation for 2011 Forecast

SDG&E 331,658 365,064 - 85,935 321,950 1,104,606 23.09%SCG 343,621 438,890 - 89,035 333,563 1,205,108 25.19%Global/Retained 308,015 202,752 1,637,443 174,970 150,893 2,474,073 51.72%Total 983,294$ 1,006,705$ 1,637,443$ 349,940$ 806,405$ 4,783,787$ 100.00%

Calculation for 2012 Forecast

SDG&E 346,956 375,534 - 88,536 338,923 1,149,949 23.76%SCG 346,790 444,217 - 88,493 338,760 1,218,260 25.17%Global/Retained 301,119 198,799 1,656,711 177,029 138,213 2,471,870 51.07%Total 994,865$ 1,018,550$ 1,656,711$ 354,057$ 815,895$ 4,840,079$ 100.00%

Communications 1100-0169-Corporate Communications - MFSPLIT 1100-0168-Digital/Print Communications - MFBASIC 1100-0456-Corp Responsibility Report - MFBASIC

Govt Compliance & Reporting 1100-0157-Govt Programs & Corp Responsibility - CBLOCALGOVT 1100-0395-Compliance / Reporting & Analysis - MFVPOLITICAL 1100-0400-Corporate Legislative Policy - MFBASIC (2010 only) Govt Affairs 1100-0152-Federal Government Affairs - RETAIN *1100-0381-Director - Govt Affairs - CBGOVTAFF (Transferred to Global)

FERC Relations 1100-0163-Ferc Relations - MFSPLIT Corporate Secretary 1100-0143-Corporate Secretary - MFBASIC

COST CENTERS WHICH USE THIS METHOD:1100-0150-VP CORPORATE RELATIONS

SEMPRA ENERGY SHARED SERVICESALLOCATION WORPAPER

2012 General Rate Case

VP Average - Corporate Relations

SDG&E-17-WP BAF-WP-548 GRC APPLICATION - December 2010

Page 551: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

NARRATIVE DESCRIPTION OF METHOD:This method is a weighted average of annual budget for departments that report to the SVP of Human Resources

Calculation for 2009 ActualsVPHR

Compensation Payroll & HR Info Employee Employee Total Business Unit& Benefits Systems Programs Development Budgets Allocations

SDG&E 32.30%SCG The HR SVP average included a different mix of reports prior to the Reorganization; 44.20%Global/Retained only the average is shown here. 23.50%Total 100.00%

Calculation for 2010 ForecastSDG&E 1,442,447 1,469,390 146,240 501,678 3,559,755 38.39%SCG 1,790,733 2,049,289 191,245 523,804 4,555,070 49.12%Global/Retained 319,577 223,385 22,428 592,406 1,157,796 12.49%Total 3,552,756$ 3,371,737$ 359,912$ 1,617,888$ 9,272,622$ 100.00%

Calculation for 2011 ForecastSDG&E 1,520,865 1,464,790 94,467 375,078 3,455,200 39.97%SCG 1,885,741 2,049,040 123,430 388,607 4,446,818 51.44%Global/Retained 333,014 220,274 14,341 175,794 743,423 8.60%Total 3,739,620$ 3,568,683$ 232,237$ 939,479$ 8,645,441$ 100.00%

Calculation for 2012 ForecastSDG&E 1,542,690 1,484,533 95,739 394,852 3,517,813 40.22%SCG 1,908,309 2,073,416 124,898 394,662 4,501,285 51.46%Global/Retained 332,625 220,133 14,333 161,021 728,112 8.32%Total 3,783,624$ 3,610,713$ 234,970$ 950,535$ 8,747,210$ 100.00%

LegendCompensation & Benefits 1100-0134-Comp & Benefits Dir 1100-0135-Compensation 1100-0136-Executive Compensation 1100-0137-Hr Acctg & Budgets

Payroll & HR Info 1100-0383-Myinfo Services

Employee Programs 1100-0155-Corp Comm Partnerships 1100-0170-Internal Communications

Employee Development 1100-0130-Hr Business Partner 1100-0131-Corp Diversity Affairs 1100-0269-Executive Development

COST CENTERS WHICH USE THIS METHOD: 1100-0122-SVP HUMAN RESOURCES

SEMPRA ENERGY SHARED SERVICESALLOCATION WORKPAPER

2012 General Rate Case

VP Average - Human Resources SVP

SDG&E-17-WP BAF-WP-549 GRC APPLICATION - December 2010

Page 552: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

NARRATIVE DESCRIPTION OF METHOD:This method is a weighted average of annual budget for departments that report to the VP of Treasury

Calculation for 2009 Actuals VPTREASCorporate Total Business Unit

Development Finance Budgets AllocationsSDG&E The CFO average included a different mix 10.21%SCG of reports prior to the Reorganization; 11.59%Global/Retained only the average is shown here. 78.20%Total 100.00%

Calculation for 2010 ForecastSDG&E - 953,190 953,190 27.20%SCG - 1,007,680 1,007,680 28.76%Global/Retained 1,051,250 491,879 1,543,129 44.04%Total 1,051,250$ 983,541$ 3,503,999$ 100.00%

Calculation for 2011 ForecastSDG&E - 1,032,757 1,032,757 28.92%SCG - 1,070,010 1,070,010 29.96%Global/Retained 984,393 484,038 1,468,431 41.12%Total 984,393$ 1,033,764$ 3,571,199$ 100.00%

Calculation for 2012 ForecastSDG&E - 1,087,205 1,087,205 30.08%SCG - 1,086,681 1,086,681 30.07%Global/Retained 997,058 443,362 1,440,420 39.85%Total 997,058$ 1,045,930$ 3,614,306$ 100.00%

LegendCorporate Develoment 1100-0392-Corporate Development

Finance 1100-0113-Cash Management 1100-0119-Finance Director 1100-0120-Pens & Trust Inv Dir

COST CENTERS WHICH USE THIS METHOD: 1100-0112-VP TREASURER & STAFF

SEMPRA ENERGY SHARED SERVICESALLOCATION WORKPAPER

2012 General Rate Case

VP Average - Treasury

SDG&E-17-WP BAF-WP-550 GRC APPLICATION - December 2010

Page 553: WORKPAPERS TO PREPARED DIRECT TESTIMONY OF BRUCE A ... · Sempra Energy Corporate Center Test Year 2012 General Rate Case Workpaper Index A-2.8Esc Sempra Financial Staff Escalation

NARRATIVE DESCRIPTION OF METHOD:

Calculation for 2009 ActualA B C D E

Distribution of 2009 Distribution Allocable CBDEPHQBusiness HQ Square Footage MFBASIC of Corp. Center Square Business UnitUnit by Business Unit Alloc Rate Square Footage Footage Allocations

(by column B) (A + C) (by column D)

SDG&E 6,171 38.35% 73,989 80,160 27.94%SoCal Gas - 43.52% 83,963 83,963 29.27%Corp. Center 192,930 0.00% (192,930) - 0.00%Global / Retained 87,796 18.13% 34,978 122,774 42.79%

Total 286,897 100.00% - 286,897 100.00%

Calculation for 2010 ForecastA B C D E

Distribution of 2010 Distribution Allocable CBDEPHQBusiness HQ Square Footage MFBASIC of Corp. Center Square Business UnitUnit by Business Unit Alloc Rate Square Footage Footage Allocations

(by column B) (A + C) (by column D)

SDG&E 6,171 38.86% 74,977 81,148 28.28%SoCal Gas - 41.08% 79,263 79,263 27.63%Corp. Center 192,930 0.00% (192,930) - 0.00%Global / Retained 87,796 20.05% 38,691 126,487 44.09%

Total 286,897 100.00% - 286,897 100.00%

Calculation for 2011 ForecastA B C D E

Distribution of 2011 Distribution Allocable CBDEPHQBusiness HQ Square Footage MFBASIC of Corp. Center Square Business UnitUnit by Business Unit Alloc Rate Square Footage Footage Allocations

(by column B) (A + C) (by column D)

SDG&E 6,171 39.92% 77,025 83,196 29.00%SoCal Gas - 41.36% 79,804 79,804 27.82%Corp. Center 192,930 0.00% (192,930) - 0.00%Global / Retained 87,796 18.71% 36,101 123,897 43.19%

Total 286,897 100.00% (0) 286,897 100.00%

Calculation for 2012 ForecastA B C D E

Distribution of 2012 Distribution Allocable CBDEPHQBusiness HQ Square Footage MFBASIC of Corp. Center Square Business UnitUnit by Business Unit Alloc Rate Square Footage Footage Allocations

(by column B) (A + C) (by column D)

SDG&E 6,171 41.54% 80,143 86,314 30.09%SoCal Gas - 41.52% 80,105 80,105 27.92%Corp. Center 192,930 0.00% (192,930) - 0.00%Global / Retained 87,796 16.94% 32,682 120,478 41.99%

Total 286,897 100.00% - 286,897 100.00%

COST CENTERS WHICH USE THIS METHOD:1100-0248-DEPRECIATION - Internal orders for HQ Assets

is allocated to the affiliate business units based on the "multi-factor" allocation.

SEMPRA ENERGY SHARED SERVICESALLOCATION WORKPAPER

2012 General Rate Case

Causal - HQ Depreciation

Depreciation expense & ROR related to "HQ leasehold improvements" is allocated based on the square footage directly business units. Expense resulting from Corporate Center's direct occupation, except for the portion which is retained,

SDG&E-17-WP BAF-WP-551 GRC APPLICATION - December 2010