SAFEEND P4 WORKING DESCRIPTION INSTALLATION, REPAIRS AND MAINTENANCE Doc. No.: SafeEnd P4 - Rev. A

Transcript of Working Instruction - SafeEnd P4 · SafeEnd P4 is a terminal tested according ENV 1317-4,...

Page 1: Working Instruction - SafeEnd P4 · SafeEnd P4 is a terminal tested according ENV 1317-4, performance class P4. Performance class P4 Permanent lateral displacement (approach side)

SAFEEND P4 WORKING DESCRIPTIONINSTALLATION, REPAIRS AND MAINTENANCE

Doc. No.: SafeEnd P4 - Rev. A

Page 2: Working Instruction - SafeEnd P4 · SafeEnd P4 is a terminal tested according ENV 1317-4, performance class P4. Performance class P4 Permanent lateral displacement (approach side)

Working Description

SafeRoad Birsta AB - Birstavägen 10 - S-863 22 Sundsbruk - Tel: +46 (0)60 52 72 00 - Fax: +46 (0)60 52 72 16

Prepared by: Fredrik Sangö

Doc. no.: SafeEnd P4

Introduction/data:

SafeEnd P4 is a terminal tested according ENV 1317-4, performance class P4. Performance class P4 Permanent lateral displacement (approach side) X1 Permanent lateral displacement (departure side) Y1 Exit box Z1 ASI value 1.1 Impact severity class B The installation work can be broken down into the following 10 steps, which will be processed individually in the work description in the order shown below. 1) Planning 2) Unloading of material 3) Proprietary inspection 4) Safety 5) Establishment 6) Installation 7) Repairs to zinc damage 8) Demobilisation 9) Repairs 10) Maintenance Chap. 11 includes additional information (Drawings and Declaration of Conformity). Rev. no. Date Signature Reason for revision

A 2015-06-08 Fredrik Sangö Approved by SafeRoad Birsta

Page 3: Working Instruction - SafeEnd P4 · SafeEnd P4 is a terminal tested according ENV 1317-4, performance class P4. Performance class P4 Permanent lateral displacement (approach side)

SafeEnd P4 Page 3 SafeEnd P4 - Rev. AINSTALLATION, REPAIRS AND MAINTENANCE WORKING DESCRIPTION

Contents

1  PLANNING ............................................................................................................ 4 

2  UNLOADING OF MATERIAL ................................................................................ 4 

3  PROPRIETARY INSPECTION .............................................................................. 4 

4  SAFETY ................................................................................................................. 5 

5  ESTABLISHMENT ................................................................................................. 5 

6  INSTALLATION ..................................................................................................... 5 

7  REPAIRS TO ZINC DAMAGE ............................................................................... 6 

8  DEMOBILISATION ................................................................................................ 6 

9  REPAIRS ............................................................................................................... 7 

10  MAINTENANCE ..................................................................................................... 7 

11  OTHER INFORMATION ........................................................................................ 8 

Page 4: Working Instruction - SafeEnd P4 · SafeEnd P4 is a terminal tested according ENV 1317-4, performance class P4. Performance class P4 Permanent lateral displacement (approach side)

SafeEnd P4 Page 4 SafeEnd P4 - Rev. AINSTALLATION, REPAIRS AND MAINTENANCE WORKING DESCRIPTION

1 PLANNING

It is at this point that the quality and flexibility of the project is determined. Well planned installation routines are a good basis when you are looking to achieve high quality, good logistics, work that is conducted safely and satisfied employees.

All the parties involved should have discussed the preconditions for the installation in good time and agreed on how it should be done.

It is important that both the client and the contractor are aware of the undertakings that each other have agreed to. These are best coordinated through good contacts.

Plan deliveries and installation in a timely manner. All the parties involved must keep each other notified as to any changed circumstances.

2 UNLOADING OF MATERIAL

The material is unloaded and suitably placed where the installation is to be carried out. This is to ensure that any unnecessary handling in the workplace can be avoided. Handle the material carefully, use wood pieces as support for material that is not placed on pallets.

When unloading, check that the unloaded goods match the delivery note. The goods must be checked to ensure that no damage is present. Non-conformance regarding package quantities or damages must be indicated on the delivery note and the sender must be contacted immediately.

3 PROPRIETARY INSPECTION

Assembly personnel are to perform and report, in the appropriate documents, proprietary inspections which must include the minimum of the following points: Inspection points for installation in settings with traffic:

• The material is checked for damage and quantity following delivery to the worksite

• The height is checked

• All bolt joints are fitted and tightened

• Any minor damage to the galvanizing or painting is treated

Page 5: Working Instruction - SafeEnd P4 · SafeEnd P4 is a terminal tested according ENV 1317-4, performance class P4. Performance class P4 Permanent lateral displacement (approach side)

SafeEnd P4 Page 5 SafeEnd P4 - Rev. AINSTALLATION, REPAIRS AND MAINTENANCE WORKING DESCRIPTION

4 SAFETY

As installation is often performed in a busy setting, the safety aspect is crucial. Temporary barriers (if needed) must be adapted to ensure that installation can be performed without them being removed.

5 ESTABLISHMENT

Assembly personnel must be notified or be privy to the conditions prevailing in the workplace by the time of establishment at the latest.

6 INSTALLATION

The installation description assumes that the company responsible for the installation has ensured that the assembly personnel have the necessary expertise with regard to the terminal components, terms and bolt dimensions, etc., see drawings in Chap . 11.1. This information is available in the drawings. These are attached at the end of this description. Each bolt must be tightened with a normal torque. Care should be taken to ensure that any over-tightening is avoided.

Setting out: Before installation can commence, the location for the “nail” and

post must be set out. This requires great accuracy. Setting out is done according to the drawing. NOTE: The dimension runs parallel with the roadway (inclined dimensions).

Installation of “nail”: The “nail” is installed by ramming. The “nail” is hammer down until

the top is 1dm above ground level.

Control point: Check so the twist is less than 10 degrees. If more adjusting by moving the bolts (see picture below)

The ”nail” is “hammered” to ground level. “Nail length” in asphalt 1500 mm, and 2000 mm in gravel.

Page 6: Working Instruction - SafeEnd P4 · SafeEnd P4 is a terminal tested according ENV 1317-4, performance class P4. Performance class P4 Permanent lateral displacement (approach side)

SafeEnd P4 Page 6 SafeEnd P4 - Rev. AINSTALLATION, REPAIRS AND MAINTENANCE WORKING DESCRIPTION

Installation of posts: The posts can be installed with different methods (depending on the post type and ground condition):

Ramming the post

Pre-drilled or pre-punched holes. The post must be fitted immediately after hole drilling/punching. Special equipment is needed for pre- punching holes in order to minimize damage in the asphalt and to optimize stability of the post.

Note: If the ground where the pre-boring or pre-punched occurs is perceived as “loose”, the site management must be notified.

Installation: Install the pre-mounted terminal to the ”nail” and the post. Install the transition to the connection safety barrier.

The terminal is correctly aligned and fully tightened followed by an inspection as specified in Chap 3.

Unless different tolerances are specified, ± 20 mm applies for installation.

7 REPAIRS TO ZINC DAMAGE

Repairs to any zinc damage in the delivered materials are carried out according to SS/EN-1461 and “Industry Standard - finishing and repairs”.

Zinc damage must be treated as follows:

• Scratches and elongated spots narrower than 2 mm and less than 10 cm2. No action required.

• Damage wider than 2 mm and less than 3.16x3.16 cm (or less than 10 cm2) must be rectified by painting with zinc-rich paint. It is also possible to use a suitable zinc paste, zinc flakes or alloyed “sticks”. Before any repairs are made, clean with a stainless steel brush.

• Damages larger than 10 cm2 must be re-galvanized.

8 DEMOBILISATION

Inspection regarding heights and general visual impression.

A proprietary inspection in accordance with point 3 must be conducted and completed, and copies forwarded to the client (customer).

Page 7: Working Instruction - SafeEnd P4 · SafeEnd P4 is a terminal tested according ENV 1317-4, performance class P4. Performance class P4 Permanent lateral displacement (approach side)

SafeEnd P4 Page 7 SafeEnd P4 - Rev. AINSTALLATION, REPAIRS AND MAINTENANCE WORKING DESCRIPTION

9 REPAIRS

All damaged material must be replaced immediately. Damage means that the steel is weakened such as deep scratches, rips, creases and suchlike. Damaged material must be replaced with genuine parts.

Replacing damaged components following a collision is no different from a normal installation besides the disassembly operation. Bear in mind that there may be a lot of tension in the safety barrier that has been hit.

10 MAINTENANCE

A minimum of maintenance includes rinsing with clean water where necessary followed by a visual inspection for damage.

Page 8: Working Instruction - SafeEnd P4 · SafeEnd P4 is a terminal tested according ENV 1317-4, performance class P4. Performance class P4 Permanent lateral displacement (approach side)

SafeEnd P4 Page 8 SafeEnd P4 - Rev. AINSTALLATION, REPAIRS AND MAINTENANCE WORKING DESCRIPTION

11 OTHER INFORMATION

11.1 Drawings: Page 9 - 13. 11.2 Declaration of Conformity: Page 14

Page 9: Working Instruction - SafeEnd P4 · SafeEnd P4 is a terminal tested according ENV 1317-4, performance class P4. Performance class P4 Permanent lateral displacement (approach side)

A ( 1 : 5

)

B ( 1 : 5

)

C ( 1 : 5

)

D ( 1 : 5

) L

EFT M

OUNTED

E ( 1 : 5

) R

IGHT M

OUNTED

8920082 /

RSK75110.5BL

PE

Safe

End S

IDE C

AP

211

1123160000

M6M M

16HDG

HEX N

UT M

166

10

1126173400

17x34

HDG

WASHER R

OUND

129

1120161500

M16x150

HDG

BOLT M

16

68

8920026

HDG

CONNECTION R

EVERSIBLE

17

1126132402

13x24x4

HDG

WASHER R

OUND T

BRUB

16.3

1120120300

M12x30

HDG

SCREW M

12

16.2

8920505

HDG

CONNECTOR P

LATE

16.1

8920301A

(ASSAMBLED)

HDG

C-POST 140x40

16

112320000

M6M M

20

HDG

HEX N

UT M

20

25

1126213600

21x36

HDG

WASHER R

OUND

104

1120120080

M20x80

HDG

CARRIAGE B

OLT M

20

23

8920531 / 8

920530

2000 /

1500

HDG

Birsta

"Nail" ANCHOR T

UBE

12

89200080

Birsta

Safe

End

11

A

BC

DE

Copyright Birstaverken AB

Safe

End 0

7Re

v.Dra

wing n

o.

Date

Sca

leCopied

Design.

Dra

wn

Sta

nd.

Check

ed

Appr.

Replace

sReplace

d b

y

ww

w.b

irsta

.eu

a SAFEROAD company

GLN

GLN

FSö

GLN

1:20

2015-0

2-23

Safe

End 0

7

Birsta

Safe

End P

4PROFILE-A L

EFT/RIGHT

507,9 k

g

ASSEMBLY D

RAWING

In R

eview

65220

8450

Safe

End ~

CONNECTION ~

700

6800

20

250

1

2

33

34

5

OPTION: 8920081

PLASTIC C

OVER M

OUNTED O

N S

ITE W

ITH 6

x

MAURUTEX S

CREW A

2 M

5,5x20.

CAN B

E P

ROVIDED W

ITH V

ARIOUS T

YPE O

F

REFLEX, POINTING T

O R

IGHT, LEFT O

R

MIDDLE E

X.

6

89

10

CONNECTING S

YSTEM

SINGLE S

IDED P

ROFILE-A

(W-PROFILE)

HEIGHT 7

00 /

750 M

M

HDG. IN

PART L

IST S

TANDS F

OR H

OT D

IP G

ALVANIZING

ACCORDING T

O E

N ISO 1461

BOLT, SCREWS &

NUTS A

CC. TO E

N ISO 10648

6.1

6.2

6.3

HEIGHT A

CC. TO C

ONNECTING S

YSTEM

8700

50

1900

20

REGULATIONS

ENV 1317-4

EN ISO 1461 (HOT D

IP G

AVANIZING)

ADDITIONAL INFORMATION

PERFOMANCE L

EVEL:

P

4

IMPACT S

EVERITY L

EVEL: B

LATERAL D

ISPLACEMENT C

LASS: D1.1

REDIRECTION Z

ONE:

Z

1

7

~ 2

95

33

11

Page 9

Page 10: Working Instruction - SafeEnd P4 · SafeEnd P4 is a terminal tested according ENV 1317-4, performance class P4. Performance class P4 Permanent lateral displacement (approach side)

A ( 1 : 5

)

B ( 1 : 5

)

C ( 1 : 5

)

D ( 1 : 5

)

8920082 /

RSK75110.5BL

PE

Safe

End S

IDE C

AP

211

1123160000

M6M M

16HDG

HEX N

UT M

166

10

1126173400

17x34

HDG

WASHER R

OUND

129

1120161500

M16x150

HDG

BOLT M

16

68

8920029

HDG

CONNECTION D

OUBLE

17

1126132402

13x24x4

HDG

WASHER R

OUND T

BRUB

16.3

1120120300

M12x30

HDG

SCREW M

12

16.2

8920505

HDG

CONNECTOR P

LATE

16.1

8920301A

(ASSAMBLED)

HDG

C-POST 140x40

16

112320000

M6M M

20

HDG

HEX N

UT M

20

25

1126213600

21x36

HDG

WASHER R

OUND

104

1120120080

M20x80

HDG

CARRIAGE B

OLT M

20

23

8920531 / 8

920530

2000 /

1500

HDG

Birsta

"Nail" ANCHOR T

UBE

12

89200080

Birsta

Safe

End

11

A

BC

D

Copyright Birstaverken AB

Safe

End 0

8Re

v.Dra

wing n

o.

Date

Sca

leCopied

Design.

Dra

wn

Sta

nd.

Check

ed

Appr.

Replace

sReplace

d b

y

ww

w.b

irsta

.eu

a SAFEROAD company

GLN

GLN

LGN

LGN

1:20

2015-0

2-25

Safe

End 0

8

Birsta

Safe

End P

4PROFILE-A D

OUBLE

517,4 k

g

ASSEMBLY D

RAWING

In R

eview

65220

8450

Safe

End ~

CONNECTION ~

700

6800

20

250

1

2

34

5

OPTION: 8920081

PLASTIC C

OVER M

OUNTED O

N S

ITE W

ITH 6

x

MAURUTEX S

CREW A

2 M

5,5x20.

CAN B

E P

ROVIDED W

ITH V

ARIOUS T

YPE O

F

REFLEX, POINTING T

O R

IGHT, LEFT O

R

MIDDLE E

X.

6

89

10

CONNECTING S

YSTEM

DOUBLE P

ROFILE-A (W-PROFILE)

HEIGHT 7

00 /

750 M

M

HDG. IN

PART L

IST S

TANDS F

OR H

OT D

IP G

ALVANIZING

ACCORDING T

O E

N ISO 1461

BOLT, SCREWS &

NUTS A

CC. TO E

N ISO 10648

6.1

6.2

6.3

HEIGHT A

CC. TO C

ONNECTING S

YSTEM

8700

50

1900

20

REGULATIONS

ENV 1317-4

EN ISO 1461 (HOT D

IP G

AVANIZING)

ADDITIONAL INFORMATION

PERFOMANCE L

EVEL:

P

4

IMPACT S

EVERITY L

EVEL: B

LATERAL D

ISPLACEMENT C

LASS: D1.1

REDIRECTION Z

ONE:

Z

1

7

~ 2

95

11

L=2000 IN GRAVEL

L=1500 IN ASPHALT

Page 10

Page 11: Working Instruction - SafeEnd P4 · SafeEnd P4 is a terminal tested according ENV 1317-4, performance class P4. Performance class P4 Permanent lateral displacement (approach side)

A ( 1 : 5

)

B ( 1 : 5

)

C ( 1 : 5

)

D ( 1 : 5

) L

EFT M

OUNTED

E ( 1 : 5

) R

IGHT M

OUNTED

8920082 /

RSK75110.5BL

PE

Safe

End S

IDE C

AP

211

1123160000

M6M M

16HDG

HEX N

UT M

166

10

1126173400

17x34

HDG

WASHER R

OUND

129

1120161500

M16x150

HDG

BOLT M

16

68

8920031

HDG

CONNECTION R

EVERSIBLE

17

1126132402

13x24x4

HDG

WASHER R

OUND T

BRUB

16.3

1120120300

M12x30

HDG

SCREW M

12

16.2

8920505

HDG

CONNECTOR P

LATE

16.1

8920301A

(ASSAMBLED)

HDG

C-POST 140x40

16

112320000

M6M M

20

HDG

HEX N

UT M

20

25

1126213600

21x36

HDG

WASHER R

OUND

104

1120120080

M20x80

HDG

CARRIAGE B

OLT M

20

23

8920531 / 8

920530

2000 /

1500

HDG

Birsta

"Nail" ANCHOR T

UBE

12

89200080

Birsta

Safe

End

11

A

BC

DE

Copyright Birstaverken AB

Safe

End 0

9Re

v.Dra

wing n

o.

Date

Sca

leCopied

Design.

Dra

wn

Sta

nd.

Check

ed

Appr.

Replace

sReplace

d b

y

ww

w.b

irsta

.eu

a SAFEROAD company

GLN

GLN

FSö

GLN

2015-0

2-26

Safe

End 0

9

Birsta

Safe

End P

4PROFILE-B L

EFT/RIGHT

508,1 k

g

ASSEMBLY D

RAWING

In R

eview

65220

8450

Safe

End ~

CONNECTION ~

700

6800

20

250

1

2

28

34

5

OPTION: 8920081

PLASTIC C

OVER M

OUNTED O

N S

ITE W

ITH 6

x

MAURUTEX S

CREW A

2 M

5,5x20.

CAN B

E P

ROVIDED W

ITH V

ARIOUS T

YPE O

F

REFLEX, POINTING T

O R

IGHT, LEFT O

R

MIDDLE E

X.

6

89

10

CONNECTING S

YSTEM

SINGLE S

IDED P

ROFILE-B

HEIGHT 7

00 /

750 M

M

HDG. IN

PART L

IST S

TANDS F

OR H

OT D

IP G

ALVANIZING

ACCORDING T

O E

N ISO 1461

BOLT, SCREWS &

NUTS A

CC. TO E

N ISO 10648

6.1

6.2

6.3

HEIGHT A

CC. TO C

ONNECTING S

YSTEM

8700

50

1900

20

REGULATIONS

ENV 1317-4

EN ISO 1461 (HOT D

IP G

AVANIZING)

ADDITIONAL INFORMATION

PERFOMANCE L

EVEL:

P

4

IMPACT S

EVERITY L

EVEL: B

LATERAL D

ISPLACEMENT C

LASS: D1.1

REDIRECTION Z

ONE:

Z

1

7

~ 2

95

11

L=2000 IN GRAVEL

L=1500 IN ASPHALT

30

Page 11

Page 12: Working Instruction - SafeEnd P4 · SafeEnd P4 is a terminal tested according ENV 1317-4, performance class P4. Performance class P4 Permanent lateral displacement (approach side)

A ( 1 : 5

)

B ( 1 : 5

)

C ( 1 : 5

)

D( 1 : 5 )

8920082 /

RSK75110.5BL

PE

Safe

End S

IDE C

AP

211

1123160000

M6M M

16HDG

HEX N

UT M

166

10

1126173400

17x34

HDG

WASHER R

OUND

129

1120161500

M16x150

HDG

BOLT M

16

68

8920032

HDG

CONNECTION

17

1126132402

13x24x4

HDG

WASHER R

OUND T

BRUB

16.3

1120120300

M12x30

HDG

SCREW M

12

16.2

8920505

HDG

CONNECTOR P

LATE

16.1

8920301A

(ASSAMBLED)

HDG

C-POST 140x40

16

112320000

M6M M

20

HDG

HEX N

UT M

20

25

1126213600

21x36

HDG

WASHER R

OUND

104

1120120080

M20x80

HDG

CARRIAGE B

OLT M

20

23

8920531 / 8

920530

2000 /

1500

HDG

Birsta

"Nail" ANCHOR T

UBE

12

89200080

Birsta

Safe

End

11

A

BC

D

Copyright Birstaverken AB

Safe

End 10

Rev.

Dra

wing n

o.

Date

Sca

leCopied

Design.

Dra

wn

Sta

nd.

Check

ed

Appr.

Replace

sReplace

d b

y

ww

w.b

irsta

.eu

a SAFEROAD company

GLN

GLN

FSö

GLN

2015-0

3-05

Safe

End 10

Birsta

Safe

End P

4PROFILE-B D

UBLE

N/A

ASSEMBLY D

RAWING

In R

eview

65220

8450

Safe

End ~

CONNECTION ~

700

6800

20

250

1

2

34

5

OPTION: 8920081

PLASTIC C

OVER M

OUNTED O

N S

ITE W

ITH 6

x

MAURUTEX S

CREW A

2 M

5,5x20.

CAN B

E P

ROVIDED W

ITH V

ARIOUS T

YPE O

F

REFLEX, POINTING T

O R

IGHT, LEFT O

R

MIDDLE E

X.

6

89

10

CONNECTING S

YSTEM

DOUBLE S

IDED P

ROFILE-B

HEIGHT 7

00 /

750 M

M

HDG. IN

PART L

IST S

TANDS F

OR H

OT D

IP G

ALVANIZING

ACCORDING T

O E

N ISO 1461

BOLT, SCREWS &

NUTS A

CC. TO E

N ISO 10648

6.1

6.2

6.3

HEIGHT A

CC. TO C

ONNECTING S

YSTEM

8700

50

1900

20

REGULATIONS

ENV 1317-4

EN ISO 1461 (HOT D

IP G

AVANIZING)

ADDITIONAL INFORMATION

PERFOMANCE L

EVEL:

P

4

IMPACT S

EVERITY L

EVEL: B

LATERAL D

ISPLACEMENT C

LASS: D1.1

REDIRECTION Z

ONE:

Z

1

7

~ 2

95

11

L=2000 IN GRAVEL

L=1500 IN ASPHALT

Page 12

Page 13: Working Instruction - SafeEnd P4 · SafeEnd P4 is a terminal tested according ENV 1317-4, performance class P4. Performance class P4 Permanent lateral displacement (approach side)

A ( 1 : 5

)

B ( 1 : 5

)

C(1:5

)

8920082 /

RSK75110.5BL

PE

Safe

End S

IDE C

AP

211

1123160000

M6M M

16HDG

HEX N

UT M

166

10

1126173400

17x34

HDG

WASHER R

OUND

129

1120161500

M16x150

HDG

BOLT M

16

68

HDG

CONNECTION

17

1126132402

13x24x4

HDG

WASHER R

OUND T

BRUB

16.3

1120120300

M12x30

HDG

SCREW M

12

16.2

8920505

HDG

CONNECTOR P

LATE

16.1

8920301A

(ASSAMBLED)

HDG

C-POST 140x40

16

112320000

M6M M

20

HDG

HEX N

UT M

20

25

1126213600

21x36

HDG

WASHER R

OUND

104

1120120080

M20x80

HDG

CARRIAGE B

OLT M

20

23

8920531 / 8

920530

2000 /

1500

HDG

Birsta

"Nail" ANCHOR T

UBE

12

89200080

Birsta

Safe

End

11

A

B

C

Copyright Birstaverken AB

Safe

End 11

Rev.

Dra

wing n

o.

Date

Sca

leCopied

Design.

Dra

wn

Sta

nd.

Check

ed

Appr.

Replace

sReplace

d b

y

ww

w.b

irsta

.eu

a SAFEROAD company

GLN

GLN

LGN

LGN

1:20

2015-0

2-26

Safe

End 11

Birsta

Safe

End P

4ER O

BB

525,1 k

g

ASSEMBLY D

RAWING

In R

eview

65220

8450

Safe

End ~

1544

CONNECTION ~

6800

20

250

1

2

34

5

OPTION: 8920081

PLASTIC C

OVER M

OUNTED O

N S

ITE W

ITH 6

x

MAURUTEX S

CREW A

2 M

5,5x20.

CAN B

E P

ROVIDED W

ITH V

ARIOUS T

YPE O

F

REFLEX, POINTING T

O R

IGHT, LEFT O

R

MIDDLE E

X.

6

89

10

CONNECTING S

YSTEM

ER O

BB

HEIGHT 7

20±30 M

M

HDG. IN

PART L

IST S

TANDS F

OR H

OT D

IP G

ALVANIZING

ACCORDING T

O E

N ISO 1461

BOLT, SCREWS &

NUTS A

CC. TO E

N ISO 10648

6.1

6.2

6.3

HEIGHT A

CC. TO C

ONNECTING S

YSTEM±

8700

50

1900

20

REGULATIONS

ENV 1317-4

EN ISO 1461 (HOT D

IP G

AVANIZING)

ADDITIONAL INFORMATION

PERFOMANCE L

EVEL:

P

4

IMPACT S

EVERITY L

EVEL: B

LATERAL D

ISPLACEMENT C

LASS: D1.1

REDIRECTION Z

ONE:

Z

1

~ 2

95

11

L=2000 IN GRAVEL

L=1500 IN ASPHALT

998

7

Page 13

Page 14: Working Instruction - SafeEnd P4 · SafeEnd P4 is a terminal tested according ENV 1317-4, performance class P4. Performance class P4 Permanent lateral displacement (approach side)

Post address City Country Visit address Telephone Fax Web

Box 30 Sundsvall Sweden Birstavägen 10 060 527200 060 527215 www.birsta.eu

Supplier’s Declaration of Conformity

No: SafeEnd P4 terminal

Issuer’s name: Birstaverken AB

Issuer’s address: Box 30

SE 863 32 Sundsbruk

Sweden

Object of the declaration: SafeEnd P4 terminal

The object of the declaration described above is in conformity with the requirements of the

following documents:

Document No. Edition/Date of issue

ENV 1317-4 November 2001

EN ISO 1461 April 2009

Additional information:

Performance level: P4

Impact severity level: B

Lateral Displacement Class: D1.1

Redirection zone: Z1

Durability: HDG according to EN ISO 1461

Signed for and on behalf of:

Birstaverken AB

Sundsvall, 2015-01-21

Fredrik Sangö

Senior Technical Adviser

Page 14

Page 15: Working Instruction - SafeEnd P4 · SafeEnd P4 is a terminal tested according ENV 1317-4, performance class P4. Performance class P4 Permanent lateral displacement (approach side)

Main Office

SafeRoad Birsta ABBirstavägen 10

Box 30863 22 Sundsbruk

SwedenTel: +46 60 52 72 00 Fax: +46 60 52 72 16

www.birsta.eu

Arboga Office

Kapellgatan 29Box 216

732 24 Arboga Sweden

Borås Office

Viaredsvägen 35 504 94 Borås

Sweden