WORKING GROUP#3 DISTRIBUSI TO THE 9 TH WORKING COMMITTEE MEETING

24
WORKING GROUP#3 DISTRIBUSI TO THE 9 TH WORKING COMMITTEE MEETING PLN - INDONESIA 1 December 2008 Singapore PROJECT COORDINATOR REPORT

description

PROJECT COORDINATOR REPORT. WORKING GROUP#3 DISTRIBUSI TO THE 9 TH WORKING COMMITTEE MEETING. PLN - INDONESIA 1 December 200 8 Singapore. CONTENT. Executive Summary Project 5, Material Management Project 7, Asset Management Status of the 10 Projects of WG3 Distribution - PowerPoint PPT Presentation

Transcript of WORKING GROUP#3 DISTRIBUSI TO THE 9 TH WORKING COMMITTEE MEETING

Page 1: WORKING GROUP#3 DISTRIBUSI TO THE  9 TH  WORKING COMMITTEE MEETING

WORKING GROUP#3 DISTRIBUSI

TO THE 9TH WORKING COMMITTEE MEETING

PLN - INDONESIA

1 December 2008

Singapore

PROJECT COORDINATOR REPORT

Page 2: WORKING GROUP#3 DISTRIBUSI TO THE  9 TH  WORKING COMMITTEE MEETING

2

CONTENT

1. Executive Summary

2. Project 5, Material Management

3. Project 7, Asset Management

4. Status of the 10 Projects of WG3 Distribution

5. Consideration when proposing projects for 2009

6. Proposed projects for 2009

7. Endorsement Required

WG3 Disribution - 1 Dec 2008

Page 3: WORKING GROUP#3 DISTRIBUSI TO THE  9 TH  WORKING COMMITTEE MEETING

3

Executive Summary [1/4]1. Previous 8th Working Committee Meeting and 24th Council Meeting in Cebu/Philippine, on

June 2008, recommended WG3 to:– Submit Project Completion Report– Come up with salient point and recommendation for each completed project for

adoption of the Council– Proposed Program for 2009.

2. WG3 activities since June 2008:a) Project Leaders 3 (Singapore, Distribution System Performance ) and Project Leaders

4 (Indonesia, Distribution Operation & Maintenance) have finished Project Completion Report through Networking (email discussion).

b) The 7th WG#3 Meeting was held on 27-28 November 2008, in Singapore, hosted by SP POWERGRID Ltd. :• Discussion on Project 5 (Material Management, Project Leader :

Philippine/Meralco) and Project 7 (Asset Management)• Initial discussion by email, both Project Completion Reports had been finalized on

the Meeting.• The Meeting was attended by 25 delegates from 7 countries namely Brunei

Darussalam, Cambodia, Indonesia, Malaysia, Myanmar, Philippines and Singapore.

• Thailand, Vietnam, Laos could not attend because of the incident at Bangkok Airport.

WG3 Disribution - 1 Dec 2008

Page 4: WORKING GROUP#3 DISTRIBUSI TO THE  9 TH  WORKING COMMITTEE MEETING

4

Executive Summary [2/4]

3. Obstacles:– Some project member received assigment from their management

only 1-2 weeks before the Meeting. Assistance from Country Coordinators are expected to assigning project member earlier.

4. Result of the 7th Meeting WG3 Distribution in Singapore:– Project Completion Report 5 ,Material Management– Project Completion Report 7, Asset Management– Next WG3 Meeting:

• 8th Meeting WG3 Distribution, tentatively, in Cambodia, on March 2009

• 9th Meeting WG3 Distribution, tentatively, in Brunei Darussalam, on September 2009

– Proposed Projects for 2009

WG3 Disribution - 1 Dec 2008

Page 5: WORKING GROUP#3 DISTRIBUSI TO THE  9 TH  WORKING COMMITTEE MEETING

5

Executive Summary [3/4]5. Recommendation & Endorsement required:

• Slides on respective Project

6. Proposed Project 2009:1) HAPUA Guidelines to minimizing losses in energy delivery: 2) HAPUA Guidelines to connecting alternative & renewable

energy power plant to distribution:3) HAPUA Guidelines to encouraging DSM on end-user side:4) Programs of staff exchange among member countries on

implementation of (1), (2) & (3) Pilot Project in implementing (1), (2), (3)

WG3 Disribution - 1 Dec 2008

Page 6: WORKING GROUP#3 DISTRIBUSI TO THE  9 TH  WORKING COMMITTEE MEETING

6

Executive Summary [4/4]

8. Endorsement Required:a) Project 5, Material Management (slides on respective project)b) Project 7, Asset Management (slides on respective project)c) Proposed Project 2009:

– Considering the highlight of the previous Council Meeting– Project scope would not exceed 1 year– Extending to more cooperation between ASEAN engineers

in real project

WG3 Disribution - 1 Dec 2008

Page 7: WORKING GROUP#3 DISTRIBUSI TO THE  9 TH  WORKING COMMITTEE MEETING

7

Project 5, Material Management [1/4]

WG3 Disribution - 1 Dec 2008

– Project Objectives• Exchange information and experiences on the various processes & practices

employed by HAPUA member countries in addressing challenges in materials management

• Recommend a common policy, strategy or information exchange facility to encourage cooperation among member countries.

– Project Outcomes• 7 countries (Brunei, Cambodia, Indonesia, Malaysia, Philippines, Singapore and

Myanmar) participate in the discussion, 6 countries presented papers.• Project leader: Mr. Roberto D. Serica, from Philippines/Meralco • The participants able to benchmark or compare their existing practices with those

of other utilities, and share insights on how materials management are being practiced by other member countries.

• The discussions yielded helpful suggestions on how to address the common materials management challenges faced by the different participants.

Page 8: WORKING GROUP#3 DISTRIBUSI TO THE  9 TH  WORKING COMMITTEE MEETING

8

Project 5, Material Management [2/4]

WG3 Disribution - 1 Dec 2008

– Issues• Scope of Material management are: purchasing, spend management, vendor

management, stock management, material process management, store management, enhance specification.

• The different item-identification methods used by the different members of HAPUA and recommends a common item identification system between members to improve comparison of items. Suggestions were made in the discussion for a possible use of existing international product naming convention.

• The difficulty of obtaining verifiable information on supplier and product performance and proposes the sharing of these information on supplier and product performance under the auspices of HAPUA.

• The trend is that activities under Material Management are put under Procurement function which is defined as the combined functions of purchasing, inventory control, transportation, receiving, inspection, storekeeping, and salvage and disposal operations.

Page 9: WORKING GROUP#3 DISTRIBUSI TO THE  9 TH  WORKING COMMITTEE MEETING

9

Project 5, Material Management [3/4]

WG3 Disribution - 1 Dec 2008

– Lessons Learned• Material management has evolved from administrative/support activity to a

strategic activity and has an important effect on the utility’s bottom line.

• Among the different members there is also a different level of maturity on practices and information systems of Material Management, but all members has shown a common interest to improve.

• The different member utilities employ different strategies such as different purchase strategies for different items. They also employ spend analysis in strategic sourcing. Standardization, quality assurance and use of Vendor Managed Inventory are also practiced by the members.

• Process-wise, member countries employ various generic processes for materials management and practices may vary depending on local laws or conditions and many emphasize constant improvement in their processes.

Page 10: WORKING GROUP#3 DISTRIBUSI TO THE  9 TH  WORKING COMMITTEE MEETING

10

Project 5, Material Management [4/4]

WG3 Disribution - 1 Dec 2008

– Recommendation

• Implement sharing of information among member countries in terms of having a common item-identification system and supplier & product performance information.

• Implement a program of staff exchange under HAPUA to facilitate the transfer of best practices among the different members as a way of addressing the different maturity level in the area of materials management.

• Expand the scope of WG5’s Project 4 Procurement Circle, :

– To include other areas of the supply chain such as planning, warehousing, inventory management and quality assurance.

– To consider WG3’s Project 5 Material Management regarding distribution engineer’s technical and operations concerns.

Page 11: WORKING GROUP#3 DISTRIBUSI TO THE  9 TH  WORKING COMMITTEE MEETING

11

Project 7, Asset Management [1/8]

WG3 Disribution - 1 Dec 2008

– Project Objectives• To exchange information and experiences among ASEAN member countries in their

policy of Asset Classification in relation to ‘Targeted Service Level Standard’ (Reliability & Security) which is selected on the basis of cost-effectiveness and potential business value of solutions (i.e.: the criticality of supply area, customer category).

• To benchmark between countries on the asset reliability standard (failure rate).– Project Outcome

• 7 countries (Brunei, Cambodia, Indonesia, Malaysia, Philippines, Singapore and Myanmar) participate in the discussion, however Cambodia & Myanmar did not present papers. Project leader: Mr. Haji Ismail Bin Mohd Din of Malaysia.

• The importance of classifying the asset based on the reliability standard of major network components, such as: power transformer, MV switchgear, MV underground cable and MV overhead lines.

• Deliverable of the discussion are as follows:-– Asset Classification Methodology– Asset Classification Reliability Standards

Page 12: WORKING GROUP#3 DISTRIBUSI TO THE  9 TH  WORKING COMMITTEE MEETING

12

Summary of Asset Classification

WG3 Disribution - 1 Dec 2008

Class of Asset/ Service Level Standar

Customer Category

1 – No interruption Major Government building, Major business district, Major petrochemical, electronic, steel industries, Airport, Hospital

2 – recovery in several minutes

Commercial area, Industrial area ( Electronic, chemical), Army installations, Telecommunication installations, Water treatment plant

3 – recovery in several hours

Residential area, Isolated commercial areaLight industry

4 – recovery can be many hours

Isolated villagesRemote islands

Page 13: WORKING GROUP#3 DISTRIBUSI TO THE  9 TH  WORKING COMMITTEE MEETING

13

Project 7, Asset Management [2/8]

WG3 Disribution - 1 Dec 2008

COUNTRY METHODOLOGY COUNTRY METHODOLOGY

Malaysia CLASS 1 TO 4 Philippines CLASS 1 TO 3

Vietnam NA Brunei CLASS 2 TO 4

Thailand NA Myanmar NA

Singapore CLASS 1 TO 2 Laos NA

Indonesia CLASS 1 TO 4 Cambodia NA

Asset Classification Methodology:

Page 14: WORKING GROUP#3 DISTRIBUSI TO THE  9 TH  WORKING COMMITTEE MEETING

14

Project 7, Asset Management [3/8]

WG3 Disribution - 1 Dec 2008

Asset Classification for Class 1 Reliability Standard:

EQUIPMENT/REALIBILITY STANDARD

Power Txs

(failures/100unit/yr)

33kV GIS & 11kV GIS breakers

(failures/ 100units /yr)

11kV UG feeders

(failures / 100km/yr)

Malaysia 0.03 0.025 0.1

Singapore 0.02 0.002 0.1

Indonesia 0.5 NA 2

Philippines 0.028 1.1 5.86 (O/H lines)

Brunei IPP IPP IPP

Page 15: WORKING GROUP#3 DISTRIBUSI TO THE  9 TH  WORKING COMMITTEE MEETING

15

Project 7, Asset Management [4/8]

WG3 Disribution - 1 Dec 2008

Aset Classification for Class 2 Reliability Standard;

EQUIPMENT/REALIBILITY STANDARD

Power Txs

(failures/100unit/yr)

33kV GIS & 11kV GIS breakers

(failures/ 100units /yr)

11kV UG feeders

(failures / 100km/yr)

Malaysia 0.04 0.025 >0.1, <0.4

Singapore 0.04 0.0025 0.4

Indonesia 1 NA 3

Philippines NA NA 7.24 (O/H lines)

Brunei 0.06 0.009 0.3

Page 16: WORKING GROUP#3 DISTRIBUSI TO THE  9 TH  WORKING COMMITTEE MEETING

16

Project 7, Asset Management [5/8]

WG3 Disribution - 1 Dec 2008

Set Clasification for Clas 3 Reliability Standard:

EQUIPMENT/REALIBILITY STANDARD

Power Txs

(failures/100unit/yr)

33kV GIS & 11kV GIS breakers

(failures/ 100units /yr)

11kV UG feeders

(failures / 100km/yr)

Malaysia 0.05 0.025

0.033

>0. 4 , < 0.8

Singapore NA NA NA

Indonesia 1 NA 4 (O/H lines)

Philippines 0.01 NA NA

Brunei 0.06 0.009 0.3

Page 17: WORKING GROUP#3 DISTRIBUSI TO THE  9 TH  WORKING COMMITTEE MEETING

17

Project 7, Asset Management [6/8]

WG3 Disribution - 1 Dec 2008

– Asset Classification for Class 4 Reliability Standard:

EQUIPMENT/REALIBILITY STANDARD

Power Txs

(failures/100unit/yr)

33kV GIS & 11kV GIS breakers

(failures/ 100units /yr)

11kV UG feeders

(failures / 100km/yr)

Malaysia 0.05 0.025

0.033

> 0.8

Singapore NIL NIL NIL

Indonesia 1 NA 10(O/H lines)

Philippines NA NA NA

Brunei 0.06 0.009 0.3

Page 18: WORKING GROUP#3 DISTRIBUSI TO THE  9 TH  WORKING COMMITTEE MEETING

18

Project 7, Asset Management [7/8]

WG3 Disribution - 1 Dec 2008

– Issues

• Asset classes and reliability standard vary between utilities.

• Different type of asset used by utilities.

• Different means of measuring or indices used for determining failure rate of asset.

• To ensure high reliability standard will require higher investment.

– Lesson Learnt

• Assets need to be classified into several classes based on their importance.

• Reliability standard for each class varies for different countries, however this classification exercise will provide a mean to make further improvement in their respective countries.

• Some countries have even achieved a reliability standard that is comparable to European standard.

Page 19: WORKING GROUP#3 DISTRIBUSI TO THE  9 TH  WORKING COMMITTEE MEETING

19

Project 7, Asset Management [8/8]

WG3 Disribution - 1 Dec 2008

– Recommendation

• Each country should identify the security level of the designated area based on the reliability standard required.

• It is envisaged that the use of GIS (Gas Insulated Switchgear), premoulded straight through joint, (N-1) transformer configuration and automation must be adopted for ensuring a better reliability standard.

• The extensive use of Condition Based Monitoring (CBM) is a critical tool to further improve the performance of the assets.

• Since the effort in ensuring of a higher reliability standard requires a substantial investment, it is also recommended that customers enjoying these privileges would be subjected to a higher tariff structure (negotiated B-to-B tarrif, not standard tarrif) .

• To further enhance collaboration among country members with respect to implementation of asset classification, the needs to have a technical exchange program between utilities is greatly encouraged.

Page 20: WORKING GROUP#3 DISTRIBUSI TO THE  9 TH  WORKING COMMITTEE MEETING

20

Status of the 10 Projects of WG3 Distribution

No Projects Project Leader WG#3 Meeting STATUS

Action Plan

1 Non Technical Losses

Thai/PEA

Numchai Lowattanakul

Meeting 1,2 & 3, 2004/5

Updating by Networking, Formal Project Completion Report - Target dead-line: Jan 2009

2` Technical Losses Thai/MEA

Surachai Asawaprecha

Meeting 1,2 & 3, 2004/5

Updating by Networking, Formal Project Completion Report - Target dead-line: Jan 2009

3 Dist System Performance

Singapore

Cheah Wi Kwong

Meeting 4,5,

2006/7

Formal Project Completion Report : DONE

4 Operation and Maintenance

Indonesia

Widyastomo Sarli

Meeting 6,

2008, Vetnam

Formal Project Completion Report : DONE

5 Material Management

Philippines, Meralco

Roberto Serica

Meeting 7,

Nov 2008, Singapore

Formal Project Completion Report : DONE

6 CRM Malaysia

Nirinder Singh Johl

Meeting 6,

2008, Vietnam

Formal Project Completion Report - Target dead-line: Jan 2009

7 Asset Management

Malaysia

Ismail Bin Mohd Din

Meeting 7,

Nov 2008, Singapore

Formal Project Completion Report : DONE

8 Demand Side Management

Vietnam

Nguyen Ngoc Giap

Meeting 5,

2007, Philippines

Formal Project Completion Report - Target dead-line: Jan 2009

9 Rural Electrification

Philippine, DoE

Mylene C Capongcol

Meeting 5,

2007, Phiippines

Formal Project Completion Report - Target dead-line: Jan 2009

10 Embedded Generation

Brunei

Musa bin Metali

Meeting 6,

2008, Vietnam

Formal Project Completion Report - Target dead-line: Jan 2009

Page 21: WORKING GROUP#3 DISTRIBUSI TO THE  9 TH  WORKING COMMITTEE MEETING

21

Consideration in Proposing WG3 Distribution Projects for 2009

• Concerns of The 24th HAPUA Council Meeting, 19 June 2008 in Philippine, in responding to the soaring price of fossil fuel by highlighting the importance of:

– minimizing losses in energy delivery,

– supporting alternative and renewable sources of energy, and

– the encouragement of Demand Side Management on end-user side, to ensure effciency in the electricity industry.

• Encouraging more involvement, engagement and undertaking by engineers of HAPUA countries in solving HAPUA utility problems, extending to more cooperation between ASEAN engineers in real project

• Project scope would not exceed 1 year

Page 22: WORKING GROUP#3 DISTRIBUSI TO THE  9 TH  WORKING COMMITTEE MEETING

Proposed Project for 20091) HAPUA Guidelines to minimizing losses in energy delivery:

– Following up the previous Project 1+2

– Compiling best practices in HAPUA

2) HAPUA Guidelines to connecting alternative & renewable energy power plant to distribution:

– Following up the previous Project 10

– Compiling best practices in HAPUA

3) HAPUA Guidelines to encouraging DSM on end-user side:

– Following up the previous Project 8

– Compiling best practices in HAPUA

4) Programs of staff exchange among member countries on implementation of (1), (2) & (3)

5) Pilot Project in implementing (1), (2), (3)

22WG3 Disribution - 1 Dec 2008

Page 23: WORKING GROUP#3 DISTRIBUSI TO THE  9 TH  WORKING COMMITTEE MEETING

Endorsement Required1) Country Coordinator will assign project member earlier.

2) 8th WG3 Distribution Meeting on March 2009,

a) Hosted by Cambodia

b) Focus on:• Formulating guidelines to minimizing losses in energy delivery

3) 9th WG3 Distribution Meeting on September 2009,

a) Hosted by Brunei Darussalam

b) Focus on:• Formulating guidelines to encouraging DSM on end-user side:

4) 10th WG3 Distribution Meeting on March 2010,

a) Hosted by Myanmar/Lao PDR

b) Focus on:• Formulating guidelines to connecting alternative & renewable energy power

plant to distribution

5) Programs of staff exchange among member countries on (2), (3) & (4)

6) Pilot Project in implementing (2), (3) & (4)

23WG3 Disribution - 1 Dec 2008

Page 24: WORKING GROUP#3 DISTRIBUSI TO THE  9 TH  WORKING COMMITTEE MEETING

24

Thank youWG3 Disribution - 1 Dec 2008