Working Group on Nowcasting Research Annual Report to JSC6

49
WGNR - JSC6 July 18 2013 1 Working Group on Nowcasting Research Annual Report to JSC6 20130718 Paul Joe

description

Working Group on Nowcasting Research Annual Report to JSC6. 20130718 Paul Joe. Outline. Membership JSC5 Action Items Projects – Near Past, Current and Future Other Activities Planned Meetings. Approval/Advice from JSC. Membership Scheduling? Lake Victoria (defer to 4.7) - PowerPoint PPT Presentation

Transcript of Working Group on Nowcasting Research Annual Report to JSC6

Page 1: Working Group on Nowcasting Research Annual Report to JSC6

WGNR - JSC6 July 18 2013 1

Working Group on Nowcasting Research

Annual Report to JSC6

20130718

Paul Joe

Page 2: Working Group on Nowcasting Research Annual Report to JSC6

WGNR - JSC6 July 18 2013 2

Outline

• Membership

• JSC5 Action Items

• Projects – Near Past, Current and Future

• Other Activities

• Planned Meetings

Page 3: Working Group on Nowcasting Research Annual Report to JSC6

WGNR - JSC6 July 18 2013 3

Approval/Advice from JSC

1. Membership Scheduling?

2. Lake Victoria (defer to 4.7)

3. WGNR Meeting – EA 2014?

4. WSN15 or WSN16 – begin to prepare?

5. WWOSC Nowcasting White Paper?

6. Merging?

Page 4: Working Group on Nowcasting Research Annual Report to JSC6

WGNR - JSC6 July 18 2013 4

Tom Keenan Steve Goodman

Page 5: Working Group on Nowcasting Research Annual Report to JSC6

WGNR - JSC6 July 18 2013 5

•Startup in 2003•Staggered membership began in 2011 •Now organized to change every 4 years*•Chair in year preceding year•2 term rule*

Page 6: Working Group on Nowcasting Research Annual Report to JSC6

WGNR - JSC6 July 18 2013 6

JSC5 Action Items

• 36 – CIMO Link

• 38 – Lake Victoria

• 39 – Contribute to WIGOS

Page 7: Working Group on Nowcasting Research Annual Report to JSC6

WGNR - JSC6 July 18 2013 7

36 CIMO Link

• “Link should be established with CIMO to look into defining a standard for operational instrumentation.”

• Action to: Chairs of JWGFVR, WGNR, CAS President

• DONE!• JWGFVR is a member of the Solid Precipitation

Inter-comparison Experiment International Organizing Committee of CIMO (June 2013)

• Defer to JWGFR report

Page 8: Working Group on Nowcasting Research Annual Report to JSC6

WGNR - JSC6 July 18 2013 8

38 – Lake Victoria

• “Executive Council requested WWRP to investigate a Lake Victoria Basin Understanding project.  UKMO noted gap in lack of evaluation process for local forecasts in Lake Victoria region, JSC asked to consider establishing a field RDP.”

• On-going• Discussed under “future project 4.7”

Page 9: Working Group on Nowcasting Research Annual Report to JSC6

WGNR - JSC6 July 18 2013 9

39 - Contribute to WIGOS

• JSC recommended provision of quantified WWRP requirements as input to WIGOS.

• Provided input to CBS/SBO Weather Radar Data Exchange Initiative - DONE

• Plan is to organize various FDP science and monitoring leads to draft “user requirements table” for nowcasting data requirements for fine scale observation and prediction– On-going/see next slide

Page 10: Working Group on Nowcasting Research Annual Report to JSC6

WGNR - JSC6 July 18 2013 10

GCOS Data Requirements Table

Cycle Time

Spatial Resolution

Page 11: Working Group on Nowcasting Research Annual Report to JSC6

WGNR - JSC6 July 18 2013 11

Projects

• SNOW-V10

• NWP for Nowcasting

• FROST14

• INCA-CE

• TOMACS

• Korea 2018

• Lake Victoria Project

Page 12: Working Group on Nowcasting Research Annual Report to JSC6

WGNR - JSC6 July 18 2013 12

SNOW-V10

3 journal papers published

17 journal papers accepted for publication

40+ Conference papers

More to come…

Page 13: Working Group on Nowcasting Research Annual Report to JSC6

WGNR - JSC6 July 18 2013 13

SNOW-V10 FROST-14Capacity Building Oct 2012

Sochi Forecaster Training

Page 14: Working Group on Nowcasting Research Annual Report to JSC6

WGNR - JSC6 July 18 2013 14

Weather Olympians

2014 1980 2000 2014

Page 15: Working Group on Nowcasting Research Annual Report to JSC6

WGNR - JSC6 July 18 2013 15

FROST-2014:• To improve and exploit:– high-resolution deterministic mesoscale forecasts of meteorological conditions in winter complex terrain environment;

– regional meso-scale ensemble forecast products in winter complex terrain environment;

– nowcast systems of high impact weather phenomena (wind, visibility, precipitation type and intensity etc.) in complex terrain.

• To improve the understanding of physics of high impact weather phenomena in the region;

• To deliver deterministic and probabilistic forecasts in real time to Olympic weather forecasters and decision makers.

• To assess benefits of forecast improvement (verification and societal impacts)

• To develop a comprehensive information resource of alpine winter weather observations;

Page 16: Working Group on Nowcasting Research Annual Report to JSC6

WGNR - JSC6 July 18 2013 16

Today’s network of meteorological stations in the region of Sochi

Page 17: Working Group on Nowcasting Research Annual Report to JSC6

WGNR - JSC6 July 18 2013 17

Vaisala C-band Doppler radar WRM200 on Akhun mountain in Sochi was launched in September 2012

• Max reflectivity; • wind&refl 2km-cappy; • echo tops;• 1-hour precipitation

Altitude – 646 m Location: 43о32’52,6״ N, 39о51 ״05,0׳ E.

Raw Turkish data are expected to be

available

Page 18: Working Group on Nowcasting Research Annual Report to JSC6

WGNR - JSC6 July 18 2013 18

+ 4 times/day upper air sounding in Sochi

Mobile Remote Sensing

MRR Radiometer Wind Profiler

Radiometer MRR

Vertical Profile of Doppler Spectra

Page 19: Working Group on Nowcasting Research Annual Report to JSC6

WGNR - JSC6 July 18 2013 19

3. DEMOS – 24 Jan 2013 (heavy rain/snow)

2.5 km 1.0 km 250m

Model Elevation – Jason Milbrandt25 Jan 2013

Precipitation Cascading Domain

Wind Same domain

Page 20: Working Group on Nowcasting Research Annual Report to JSC6

WGNR - JSC6 July 18 2013 20

3. DEMOS – 24 Jan 2013 (heavy rain/snow)

250 m

X-C

S-JAlpine

Page 21: Working Group on Nowcasting Research Annual Report to JSC6

WGNR - JSC6 July 18 2013 21

Ensemble project component

Current state: COSMO-S14-EPS, GLAMEPS, NOAA-7km EPS, COSMO-RU2-EPS

Expected: HARMON-EPS, Aladin LAEF / AROME-1km, KMA’s downscaling of probabilistic forecasts.Poor man’s ensemble of deterministic high-resolution models

Page 22: Working Group on Nowcasting Research Annual Report to JSC6

WGNR - JSC6 July 18 2013 22

INCA-CE

See Ingo Meirold-Mautner report. Agenda item 4.3..

Page 23: Working Group on Nowcasting Research Annual Report to JSC6

WGNR - JSC6 July 18 2013 23

TOMACS Proposal

Page 24: Working Group on Nowcasting Research Annual Report to JSC6

WGNR - JSC6 July 18 2013 24

Use of Dense Observations

11+ radars

Page 25: Working Group on Nowcasting Research Annual Report to JSC6

WGNR - JSC6 July 18 2013 25

Fine Scale Data Assimilation

Page 26: Working Group on Nowcasting Research Annual Report to JSC6

WGNR - JSC6 July 18 2013 26Radars Wind Profiler AWS Met. Sensors of

IPS Surface detectors

PyeongChang Korea 2018

Page 27: Working Group on Nowcasting Research Annual Report to JSC6

WGNR - JSC6 July 18 2013 27

Met. Supports : Specialized Support System

Special Observation Research (snow process and physics) Forecasting system development

Sonde Special OBS Snow process and physics Precipitation type Forecast

Page 28: Working Group on Nowcasting Research Annual Report to JSC6

WGNR - JSC6 July 18 2013 28

Research on the physical processes over the rugged terrain and High Mountain

Understanding the specific physical processes over the mountainous area through the special observation

Met. Supports : Specialized Support System

Forecast system specialized on mountain :

Radiation over slope

SFC TEMP at sunrise(SH-ORG)

Freezing level Forecast

Page 29: Working Group on Nowcasting Research Annual Report to JSC6

WGNR - JSC6 July 18 2013 29

Supporting system for each venues

Met. Supports : Specialized Support System

Page 30: Working Group on Nowcasting Research Annual Report to JSC6

WGNR - JSC6 July 18 2013 30

Lake Victoria Project Proposal

1. The Nowcast System2. The SWFDP3. The Field Project4. Capacity Building

Four Components

“WMO Executive Council (EC)

recommended that a World Weather

Research Programme (WWRP) project

be considered for the Lake Victoria

Watershed that would include a test-bed

for field campaigns to collect data for

research to understand the dynamics

over the lake in order to reduce

disaster from water spouts, waves, and

wind gusts that affect both lake transport

and fishermen who rely on the lake for

their livelihoods. The EC further noted

the potential linkages with the SWFDP

for Eastern Africa."

EC 2010

Page 31: Working Group on Nowcasting Research Annual Report to JSC6

WGNR - JSC6 July 18 2013 31

Lake Victoria(Item 4.7)

Page 32: Working Group on Nowcasting Research Annual Report to JSC6

WGNR - JSC6 July 18 2013 32

The Field Project• Meteorological Understanding• Scientific Validation• Statistical Verification

Red Stars – surveillance radar

White Stars – hi res radar, dual-doppler

Blue Star 6 – IOS

Blue Star 4 – Upper Air Station

Yellow – Met Stns

Page 33: Working Group on Nowcasting Research Annual Report to JSC6

WGNR - JSC6 July 18 2013 33

Other ActivitiesPlanned Meetings

Page 34: Working Group on Nowcasting Research Annual Report to JSC6

WGNR - JSC6 July 18 2013 34

NWP for Nowcasting

1. Predictability of Precipitation Systems

2. Mesoscale Networks

3. Data Assimilation and Rapid Update

Page 35: Working Group on Nowcasting Research Annual Report to JSC6

WGNR - JSC6 July 18 2013 35

WWRP Symposium on Nowcasting Research Rio di Janiero, Aug 2012

166 participants from 21 countries

+ 2 hours of lectures each day

Radar Renewal in SA

Nowcasting Impetus

La Plata

Rio 2016

Port Ops

Page 36: Working Group on Nowcasting Research Annual Report to JSC6

WGNR - JSC6 July 18 2013 36

Argentina Training (T-NOTE)• Initiated by radar

renewal, radar networks, nowcasting needs, La Plata Basin

• Initiated by Celeste Saulo, Paola Salio, Claudio Campetella, WSN12

• Lead trainer is Rita Roberts of NCAR

• 5-16 August 2013 in Buenos Aires TRMM Lightning Flash #/min

TRMM Height of 40 dBZ Echo

Page 37: Working Group on Nowcasting Research Annual Report to JSC6

WGNR - JSC6 July 18 2013 37

The Workshop Agenda

Page 38: Working Group on Nowcasting Research Annual Report to JSC6

WGNR - JSC6 July 18 2013 38

EUMETNET – NowcastingNew initiative began 1 Jan 2013

Page 39: Working Group on Nowcasting Research Annual Report to JSC6

WGNR - JSC6 July 18 2013 39

Membership(23 Countries)

Page 40: Working Group on Nowcasting Research Annual Report to JSC6

WGNR - JSC6 July 18 2013 40

Milestones

• Establishment of a group of nowcasting experts under the EUMETNET governance and their motivation for engagement in the nowcasting related planning within EUMETNET

• Provision of a scientific and technical overview of the applied nowcasting systems in Europe including quality assessment and development of verification standards for nowcasting (define parameters to verify, methods and observations to use for verification)

• Identification of (scientific or technical) elements in the presently existing nowcasting systems, which are worthwhile for exchange between members and the organization of the exchange process

• Assessment and interpretation of observation and NWP requirements for improved nowcasting and their communication with the relevant communities

• Preparation of the Nowcasting Activity proposal for the second phase (2014-2017)

Nowcasting Activity

EUMETNET

24.04.2013

Page 41: Working Group on Nowcasting Research Annual Report to JSC6

WGNR - JSC6 July 18 2013 41

Deliverables

Deadline Deliverables01.03.2013 Nomination of representative experts of members;

set up Working Area (WA) teams, Expert Team, Observers;ToR of ET, WA teams and WA leaders

23.-24.04.2013(orig. 15.06.2013)

1. Face-to-face Meeting of ET (in the frame of INCA-CE Progress Meeting), WA working plan

15.11.2013 ET meeting (possibly via teleconference), WA progress report

01.05.2014 Nowcasting conference, WA final report

01.06.2014 Different reports and assessments 

30.06.2014 Proposal for the second phase to be submitted to EUMETNET

Nowcasting Activity

EUMETNET

24.04.2013

Page 42: Working Group on Nowcasting Research Annual Report to JSC6

WGNR - JSC6 July 18 2013 42

Re-Organization

JONAS + WGNR

WGNR + WGMWFR

Page 43: Working Group on Nowcasting Research Annual Report to JSC6

43

JONAS = WGNR + PWS

• Action item from JSC4• Discussion initiated with PWS

– Open discussion, various options discussed– Planned to meet this week -> TBD

CBS

GDPFS (SWFDP)

PWS (SWFDP, WENS)

WGNR/WWRP

-FDP’s/RDP’s

-Advance

-Promote

-Capacity BuildJWGVFR?

SERA?

Obs Dept?

Technology Transfer Activities

•Guide to Nowcasting

•Promote

•Capacity Building

•Training Workshop

Page 44: Working Group on Nowcasting Research Annual Report to JSC6

WGNR - JSC6 July 18 2013 44

WGNR + WGMWFR

WWW CBS CIMO CAS

WWRP

GDPFS

PWS

WGNR WGMWFR HIW

WGNE DAOS

JONAS

•Initiated by WWRP

•Telecon, WGMWFR in June 2013

•No discussion within WGNR

Page 45: Working Group on Nowcasting Research Annual Report to JSC6

WGNR - JSC6 July 18 2013 45

Brainstorm at WGMWFR

Hi-Res NWP use

Fine Scale DA analysis

Observations DQ

Hi-Res NWP dev

Fine Scale DA dev

Observations DQ

•Parameterization•Numerics•Gray Zone•Typhoon LAM•Land Surface Data Sets•Optimal Use of existing networks

•Understanding•Systems, Heuristics•Forecaster Interaction•Promotion•Capacity Building•New Technologies•Maturity, skill of NWP for severe weather (core)

Impact

•Co-chair, membership at 20?

•Too broad? 20 is unwieldy, difficult to cover expectations if much less?

•Severe Weather?

Brief Summary:

No one at WGMWFR adverse to re-organization

Address gaps?

Clarity on rationale? Since many options.

Gaps:

Forecast Systems

Observations

Benefits:

Automation -> NWP

Probabilistic/Ensemble Nowcasting

Focus on 2-12 gap

Mutli-parameter

Page 46: Working Group on Nowcasting Research Annual Report to JSC6

WGNR - JSC6 July 18 2013 46

Early Activities

• Guide to Nowcasting (P. Li, HKO)• Aviation Nowcasting Initiative (P. Li, HKO)

– CAEM developing strategic plan for aviation– SESAR in Europe– NEXTGEN in U.S.

• Brazil Regional Training Centre – Nowcasting– Presented in WGNR Rio meeting– At USP, extended training workshops (2-6 weeks);

annual– Request sustainability plan

Page 47: Working Group on Nowcasting Research Annual Report to JSC6

WGNR - JSC6 July 18 2013 47

Planned Meetings

• Lake Victoria Planning Meetings? • WGNR – East Africa 2014?• EUMETNET Nowcasting 11/2013 or Spring 2014?• TOMACS Kickoff – Dec 2013• FROST 14 Science – Spring 2014• WWOSC – Montreal, July 2014• WSN 15 or 16?

– Hong Kong, Capetown, Sydney, Shanghai– EUMENET Nowcasting Meeting ~May 2014

• Urban Nowcasting Workshop 2015/16?– TOMACS, SREP, Pan Am2015– With WSN?

PanAm15 Wx, AQ, HI

Page 48: Working Group on Nowcasting Research Annual Report to JSC6

WGNR - JSC6 July 18 2013 48

Approval/Advice from JSC

1. Membership Scheduling?

2. Lake Victoria (defer to 4.7)

3. WGNR Meeting – EA 2014?

4. WSN15 or WSN16 – begin to prepare?

5. WWOSC Nowcasting White Paper expected?

6. Merging?

Page 49: Working Group on Nowcasting Research Annual Report to JSC6

WGNR - JSC6 July 18 2013 49

Thank You