Work Placement 3 Presentation

8
Prepared and Presented by: Husain Baqer Tahleeq: Graduate Training Program 3 RD WORK PLACEMENT PRESENTATION May 2015 1

Transcript of Work Placement 3 Presentation

Page 1: Work Placement 3 Presentation

Prepared and Presented by: Husain Baqer

Tahleeq: Graduate Training Program

3RD WORK PLACEMENT PRESENTATIONMay 2015

1

Page 2: Work Placement 3 Presentation

Work Placement Duration

BAC FM

15th Mar 2015

23rd Apr 2015

Week 4

ADPi Design – D&T

6 weeks

2

Page 3: Work Placement 3 Presentation

3

Outline

ADPI-DSC

Reviewing the design drawings and tender documents

Attending the progress meetings

Monitoring the condition on site (Package 1A )

Preparation of cooling system presentation

BAC FM

Monitoring the progress of AC installation project at level 2.8 arrivals

Performing Planned Preventive Maintenance (PPM) and corrective maintenance

Research

Page 4: Work Placement 3 Presentation

ADPI - DSC

4

Drawings Meetings Site Presentation

Page 5: Work Placement 3 Presentation

BAC FM

2.8 level Arrivals Project

PPMCM

Research

5

Types of Compressors

Start & Run Capacitor

Pumping Stations

Cooling Load

Escalators

Page 6: Work Placement 3 Presentation

Runway Shot Down

6

Page 7: Work Placement 3 Presentation

Learning Outcomes

Gaining on-hand experience

Enhancing technical knowledge

Extending professional network

Interacting with colleague from different backgrounds

7

Page 8: Work Placement 3 Presentation

8

Questions and Answers

?