Wind Energy Update Indiana Wind Working Group …...2006/12/21 · Wind Energy Update Indiana Wind...
Transcript of Wind Energy Update Indiana Wind Working Group …...2006/12/21 · Wind Energy Update Indiana Wind...
Wind Energy Update Wind Energy Update Indiana Wind Working Group Meeting #2Indiana Wind Working Group Meeting #2
Ryan Brown Ryan Brown Indiana Office of Energy & Defense Development Indiana Office of Energy & Defense Development
December 21, 2006December 21, 2006Indianapolis, INIndianapolis, IN
0
5000
10000
15000
20000
25000
30000
35000
40000
45000
50000
55000
60000
65000
70000
1982198319841985198619871988198919901991199219931994199519961997199819992000200120022003200420052006
Cap
acity
(MW
)
United States Europe Rest of World
1. Germany: 19540 MW2. Spain: 11340 MW3. United States: 10640 MW4. India: 5341 MW5. Denmark: 3127 MW
Source: WindPower Monthly
World total Oct 2006: 66869 MW
Total Installed Wind CapacityTotal Installed Wind Capacity
People Want Renewable Energy!People Want Renewable Energy!
Installed Wind Capacities (99Installed Wind Capacities (99--05)05)
2
4
6
8
10
12
1990
CO
E (¢
/kW
h [c
onst
ant 2
000
$])
Low wind speed sites
1995 2000 2005 2010 2015 2020
High windspeed sites
New Bulk Power Competitive Price Band
2006: New Wind
Depreciated CoalDepreciated Wind
Natural Gas (fuel only)
Wind Cost of EnergyWind Cost of Energy
Natural Gas Natural Gas –– Historic PricesHistoric Prices
0
2
4
6
8
10
12
14
16
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
Nom
inal
$/M
MB
tu (H
enry
Hub
)
0
2
4
6
8
10
12
14
16
Nom
inal
$/M
MB
tu (H
enry
Hub
)
Source: LBNL
NYMEXnatural gas futures strip
from 07/21/2006
Daily price history of 1st-nearbyNYMEX natural gas futures contract
Historical Coal PricesHistorical Coal Prices
Wind Energy InvestorsWind Energy Investors
State Goal
☼ PA: 18%¹ by 2020☼ NJ: 22.5% by 2021
CT: 10% by 2010
MA: 4% by 2009 + 1% annual increase
WI: requirement varies by utility; 10% by 2015 Goal
IA: 105 MW
MN: 10% by 2015 Goal +Xcel mandate of
1,125 MW wind by 2010
TX: 5,880 MW by 2015
*NM: 10% by 2011☼ AZ: 15% by 2025
CA: 20% by 2010
☼ NV: 20% by 2015
ME: 30% by 2000;10% by 2017 goal - new RE
State RPS
*MD: 7.5% by 2019
☼ Minimum solar or customer-sited requirement* Increased credit for solar
¹PA: 8% Tier I, 10% Tier II (includes non-renewable sources)
HI: 20% by 2020
RI: 15% by 2020
☼ CO: 10% by 2015
☼ DC: 11% by 2022
DSIRE: www.dsireusa.org October 2006
☼ NY: 24% by 2013
MT: 15% by 2015
*DE: 10% by 2019
IL: 8% by 2013
VT: RE meets load growth by 2012
SWH eligible
RenewablesRenewables Portfolio StandardsPortfolio Standards
Environmental BenefitsEnvironmental Benefits
• No SOx or NOx• No particulates• No mercury• No CO2• No water
VisionVision
Wind energy will provide 20% of U.S. electricity needs by 2030, securing
America’s leadership in reliable, clean energy technology. As an inexhaustible and
affordable domestic resource, wind strengthens our energy security, improves
the quality of the air we breathe, slows climate change, and revitalizes rural
communities.
20% Wind RPS Picture20% Wind RPS Picture
The white square in the center of a state represents the land area needed for a single wind farm to produce the projected installed capacity in that state.
• Black and Veatch, an engineering firm with large nuclear, coal, and gas businesses
• Finds 350 GW of wind available today for a delivered cost of under $85/MWh without any form of policy support
- 100 200 300 400 500 600 700 8000
10
20
30
40
50
60
70
80
90
100
Quantity Available, GW
Leve
lized
Cos
t of E
nerg
y, $
/MW
h
Class 6
Class 4Class 5
Class 3
Credible, Independent AnalysisCredible, Independent Analysis
Source: AWEA 20% Vision
0
50
100
150
200
250
300
350
400
450
500
2000 2005 2010 2015 2020 2025 2030
Cum
ulat
ive
Inst
alle
d C
apac
ity (G
W)
0
2
4
6
8
10
12
14
16
18
20
Ann
ual I
nsta
lled
Cap
acity
(GW
)
What does 20% Wind look like?What does 20% Wind look like?
Source: AWEA 20% Vision
Cost reduction and performance Cost reduction and performance improvement associated with R&Dimprovement associated with R&D……
Class 4 - Land-Based Wind Technology
0
200
400
600
800
1000
1200
1400
1600
1800
2000
2000 2005 2010 2015 2020 2025 2030 2035Year
Cap
ital C
ost (
$/kW
)
0
10
20
30
40
50
60
70
80
90
100
Cap
acity
Fac
tor (
%)
Baseline Capital CostTech1 Capital CostBaseline Capacity FactorTech1 Capacity Factor
-15%
+20%
Source: AWEA 20% Vision
20% Wind Scenario 20% Wind Scenario New Manufacturing JobsNew Manufacturing Jobs
>50k20 – 50k10 – 20k5 – 10k1 – 5k
New Manufacturing Jobs Created
by state
Source: REPP (extrapolated)
No Resource Show Stoppers to 20%No Resource Show Stoppers to 20%• With stable and predictable market, manufacturing is readily
expandable• Using a very aggressive 20% by 2020 Sustained Manufacturing
Model:~ 4% of 2005 U.S. annual steel production, 0.3% of 2005 world
annual production~ 32% of 2005 U.S. fiberglass production – no base material
limits~ 0.75% of USGS estimates of U.S. reserves for rare earth
magnets – no base material limits~ 150,000 FTE for a geographically dispersed industry – can
focus in rural areas where development is needed~ 4% of 2005 U.S. annual copper consumption and < 2.5% of
U.S. copper reserves – no base material limitsSteel and copper are needed for any generation technology
and are recyclable for future generations of turbines.
Further analysis and more detailed investigation required
ConclusionsConclusions
• 20% wind energy penetration is possible• 20% penetration is not going to happen under business
as usual scenarios• Policy choices will have a large impact on assessing the
timing and rate of achieving a 20% goal• Key issues: market transformation, transmission, project
diversity, technology development, policy, public acceptance
• 20% Vision action plan: WindPower 2007
Source: AWEA 20% Vision
Wind Powering America Priority StatesWind Powering America Priority States
HighMediumLow
State Maturity Index State Maturity Index –– 20062006Midwest Midwest
*based on data through 1/19/06
WWG Effectiveness
None
Formative
Maturing
Sustainable
Installed Capacity*
< 20 MW
20-100 MW
100-500 MW
> 500 MW
Policy Environment
Minimal
Selective
< 10% RPS
> 10% RPS
Installed Capacity*
WWG Effectiveness
Policy Environment
Illinois 107Indiana 0
Missouri 0
Iowa 836Kentucky 0Michigan 3Minnesota 744
Nebraska 73North Dakota 98Ohio 7South Dakota 44Tennessee 29Wisconsin 53
WWG Effectiveness
None
Formative
Maturing
Sustainable
Installed Capacity*
< 20 MW
20-100 MW
100-500 MW
> 500 MW
Policy Environment
Minimal
Selective
< 10% RPS
> 10% RPS*based on data through 12/31/99
State Maturity Index State Maturity Index –– 19991999MidwestMidwest
Installed Capacity*
WWG Effectiveness
Policy Environment
Illinois
Indiana
Missouri
Iowa 243KentuckyMichiganMinnesota 273
Nebraska 3North DakotaOhioSouth DakotaTennesseeWisconsin 23
Revised: 12-05-06 < 200620062007200820092010> 2010
> 100 MW Installed Capacity by Year (projected)> 100 MW Installed Capacity by Year (projected)
Indiana Wind Working Group ActivitiesIndiana Wind Working Group Activities• Kick-off meeting, Purdue University November 2005
– Tall towers study findings, 2004-2005– Richmond Power & Light tall tower study
• National and Regional meetings/workshops– American Wind Energy Association workshops/meetings
• See handout for upcoming events– Great Lakes Offshore Wind Collaborative
• AWS Truewind and DOE resource study– Educational presentations
• East Central Indiana landowners field trip, 1/13/2006• Spring trip to IL wind farm
• Office of Energy & Defense Development website– www.energy.in.gov
Indiana Wind Working Group ActivitiesIndiana Wind Working Group Activities
1. Introductions– Name, organization, interest in wind
power development in Indiana2. Networking/Bathroom break3. IWWG Planning Session for 2007
– Small group brainstorming– Sharing with the large group– Discussion– Next meeting
• Friday, February 16, 2007
IWWG Planning Session for 2007IWWG Planning Session for 2007
• What topics/issues should the IWWG address in 2007?
• Continue to meet as a large group or do we create sub-committees? How often?
• What kinds of activities should the IWWG engage in? e.g. meetings, workshops, conferences, studies, field trips, etc.
• How to best spend $50k/year IWWG budget?• Other ideas/issues?
Carpe Ventem
www.windpoweringamerica.gov