Wind Indiana 2008 Indianapolis June 17-18. By : Jamal Alsawalhi. In my presentation. Purpose of conference 20% Wind Energy Plan Wind Energy in Indiana Conclusion. Sponsors . Sponsored by:- Indiana Wind Working Group The Indiana Office of Energy & Defense Development Purdue University - PowerPoint PPT Presentation

Transcript of Wind Indiana 2008 Indianapolis June 17-18

Wind Indiana 2008 Indianapolis June 17-18

Wind Indiana 2008

Indianapolis

June 17-18By : Jamal AlsawalhiIn my presentationPurpose of conference

20% Wind Energy Plan

Wind Energy in Indiana

ConclusionSponsors Sponsored by:- Indiana Wind Working GroupThe Indiana Office of Energy & Defense DevelopmentPurdue University

Partially funded by National Renewable Energy Laboratory

Some Companies Involved in the ConferenceIndiana Utility Regulatory CommissionIMPADuke EnergyIndiana Power and Light (IPL)GE EnergyHoosier Environmental CouncilWhite Construction

Some Speakers Lt. Governor Becky Skillman

Larry Flower, National Technical director of Wind Powering America

Joan Wealing, past president of Benton County Advisory Plan Commission

Richard Benedict, Indianapolis Power and Light (IPL)

Diane Jenner, Duke Energy

Purpose of ConferenceHighlight the great wind energy opportunities in IN

Talk about current wind energy projects taking place in IN and other states

Discuss potential challenges and solutions regarding those projects

Why Wind EnergyHigh oil prices

Environmental Benefits

Economical Benefits

US Lagging Other Countries for Wind as a Percentage of Electricity Consumption

U.S. Leads World in Annual Wind Capacity Additions; Third in Cumulative Capacity

20% Wind Energy by 2030This will create many job opportunities in IN and other states.

According to Paul Cummings 300GW is needed to meet the 20% plan by 2030

http://www.20percentwind.org/Key challenges for the 20% planProduction Tax Credit (PTC) : 1.5 cents/ KWh for the first ten years of renewable energy facility's operation. It expires in December 31 2008

Transmission Lines

Materials

Trained Labor

Time

Public Acceptance

IN and Wind EnergyLt. Governor Becky Skillman announced that IN will supply 530 MW of wind energy by the end of 2008

Two main Projects:Benton County Wind Farm (130.5MW)Fowler Ridge Wind Farm (399.6MW) http://www.awea.org/projects/

January 2006

January 2006

January 2006IN Current Power PlantsIn 2006 IN Produced 3.2% of electricity in the US

Power plants are aging and demand for energy increasing

Need both Coal and WindEnvironmental BenefitsReduction of SOx, NOx and CO2 gasses

No WaterPublic AcceptanceLandowners concerns

The government, landowners and developers should work together

In general communities like the one in Benton County are looking forward for wind energyConclusionThe purpose of the conference was to discuss why wind energy is important and discuss current projects in IN

20% Wind Energy plan is possible

Unfortunately , No discussion regarding electric machinery involved