Presented by
Win-Win
with PI System
IPSM Challenge
in Coal Power
Kiminori Sato, IHI Power System Malaysia
Engineer
![Page 2: Win-Win with PI System - OSIsoftcdn.osisoft.com/corp/sg/media/presentation/2013/RS2013... · 2013-09-13 · 2 Agenda Coal Power will be 120 years Reserve and Low Running Cost.. But,](https://reader033.fdocuments.in/reader033/viewer/2022042200/5e9fca802c3ca20c366c73b1/html5/thumbnails/2.jpg)
2
Agenda
Coal Power will be 120 years Reserve and Low Running Cost.
.
But, it will give significant Environmental Impacts!
.
We must share the knowledge to Improve Efficiency and Reliability.
.
Win-Win with PI System.
![Page 3: Win-Win with PI System - OSIsoftcdn.osisoft.com/corp/sg/media/presentation/2013/RS2013... · 2013-09-13 · 2 Agenda Coal Power will be 120 years Reserve and Low Running Cost.. But,](https://reader033.fdocuments.in/reader033/viewer/2022042200/5e9fca802c3ca20c366c73b1/html5/thumbnails/3.jpg)
3
Contents
1. Company Profile
2. Coal Power in Malaysia
3. Useful PI System
4. Powerful PI System
5. Knowledge Supportive PI System
6. Wrap up
![Page 4: Win-Win with PI System - OSIsoftcdn.osisoft.com/corp/sg/media/presentation/2013/RS2013... · 2013-09-13 · 2 Agenda Coal Power will be 120 years Reserve and Low Running Cost.. But,](https://reader033.fdocuments.in/reader033/viewer/2022042200/5e9fca802c3ca20c366c73b1/html5/thumbnails/4.jpg)
4
1-1). Company Profile
Coal Fired Boiler Japanese Supplier
51% Market Share in Japan 2000-2010
71% Market Share in Malaysia
5850MW
2750MW
2900MW5100MW
2100MW
Japan Malaysia
![Page 5: Win-Win with PI System - OSIsoftcdn.osisoft.com/corp/sg/media/presentation/2013/RS2013... · 2013-09-13 · 2 Agenda Coal Power will be 120 years Reserve and Low Running Cost.. But,](https://reader033.fdocuments.in/reader033/viewer/2022042200/5e9fca802c3ca20c366c73b1/html5/thumbnails/5.jpg)
5
1-2). Company Profile
IPSM, IHI Power System Malaysia
• Operation & Maintenance Support
• Services for Malaysian Coal Boilers
• Parts Supply for Malaysian Boilers
• Together with PI System
![Page 6: Win-Win with PI System - OSIsoftcdn.osisoft.com/corp/sg/media/presentation/2013/RS2013... · 2013-09-13 · 2 Agenda Coal Power will be 120 years Reserve and Low Running Cost.. But,](https://reader033.fdocuments.in/reader033/viewer/2022042200/5e9fca802c3ca20c366c73b1/html5/thumbnails/6.jpg)
6
1-3). IPSM with PI System
IPSM, we were studying many
of incidents through PI System.
Findings turns to improve customers
• SAFETY
• RELIABILITY
• HIGH EFFCIENCY
• MINIMUM COST
![Page 7: Win-Win with PI System - OSIsoftcdn.osisoft.com/corp/sg/media/presentation/2013/RS2013... · 2013-09-13 · 2 Agenda Coal Power will be 120 years Reserve and Low Running Cost.. But,](https://reader033.fdocuments.in/reader033/viewer/2022042200/5e9fca802c3ca20c366c73b1/html5/thumbnails/7.jpg)
7
2. Coal Power in Malaysia
Manjung
Kapar
Jimah
Tanjung Bin
![Page 8: Win-Win with PI System - OSIsoftcdn.osisoft.com/corp/sg/media/presentation/2013/RS2013... · 2013-09-13 · 2 Agenda Coal Power will be 120 years Reserve and Low Running Cost.. But,](https://reader033.fdocuments.in/reader033/viewer/2022042200/5e9fca802c3ca20c366c73b1/html5/thumbnails/8.jpg)
8
Manjung Power Station
700MW x 3units
Full Sub-Bituminous
1000MW USC under construction
![Page 9: Win-Win with PI System - OSIsoftcdn.osisoft.com/corp/sg/media/presentation/2013/RS2013... · 2013-09-13 · 2 Agenda Coal Power will be 120 years Reserve and Low Running Cost.. But,](https://reader033.fdocuments.in/reader033/viewer/2022042200/5e9fca802c3ca20c366c73b1/html5/thumbnails/9.jpg)
9
Kapar Power Station
300MW x 2units Oil and Gas
300MW x 2units Bituminous
500MW x 2units Bituminous
![Page 10: Win-Win with PI System - OSIsoftcdn.osisoft.com/corp/sg/media/presentation/2013/RS2013... · 2013-09-13 · 2 Agenda Coal Power will be 120 years Reserve and Low Running Cost.. But,](https://reader033.fdocuments.in/reader033/viewer/2022042200/5e9fca802c3ca20c366c73b1/html5/thumbnails/10.jpg)
10
Jimah Power Station
700MW x 2units
Bituminous + Sub Bituminous
![Page 11: Win-Win with PI System - OSIsoftcdn.osisoft.com/corp/sg/media/presentation/2013/RS2013... · 2013-09-13 · 2 Agenda Coal Power will be 120 years Reserve and Low Running Cost.. But,](https://reader033.fdocuments.in/reader033/viewer/2022042200/5e9fca802c3ca20c366c73b1/html5/thumbnails/11.jpg)
11
Tanjung Bin Power Station
700MW x 3units
Bituminous + Sub-Bituminous
1000MW USC under construction
![Page 12: Win-Win with PI System - OSIsoftcdn.osisoft.com/corp/sg/media/presentation/2013/RS2013... · 2013-09-13 · 2 Agenda Coal Power will be 120 years Reserve and Low Running Cost.. But,](https://reader033.fdocuments.in/reader033/viewer/2022042200/5e9fca802c3ca20c366c73b1/html5/thumbnails/12.jpg)
12
3. Useful PI System
• Data Collection and Storage
PI System execute it automatically without fail.
• Data Monitoring and Analyzing
for TAKING ACTION!We must well-utilize PI System!
PI System only provide valuable data!
![Page 13: Win-Win with PI System - OSIsoftcdn.osisoft.com/corp/sg/media/presentation/2013/RS2013... · 2013-09-13 · 2 Agenda Coal Power will be 120 years Reserve and Low Running Cost.. But,](https://reader033.fdocuments.in/reader033/viewer/2022042200/5e9fca802c3ca20c366c73b1/html5/thumbnails/13.jpg)
13
3-1) My 1st experience in 2009It was very user friendly.
![Page 14: Win-Win with PI System - OSIsoftcdn.osisoft.com/corp/sg/media/presentation/2013/RS2013... · 2013-09-13 · 2 Agenda Coal Power will be 120 years Reserve and Low Running Cost.. But,](https://reader033.fdocuments.in/reader033/viewer/2022042200/5e9fca802c3ca20c366c73b1/html5/thumbnails/14.jpg)
14
3-2) Old Faison DCS
PI system helps data collection.
![Page 15: Win-Win with PI System - OSIsoftcdn.osisoft.com/corp/sg/media/presentation/2013/RS2013... · 2013-09-13 · 2 Agenda Coal Power will be 120 years Reserve and Low Running Cost.. But,](https://reader033.fdocuments.in/reader033/viewer/2022042200/5e9fca802c3ca20c366c73b1/html5/thumbnails/15.jpg)
15
3-3) Typical DCS Mimic
![Page 16: Win-Win with PI System - OSIsoftcdn.osisoft.com/corp/sg/media/presentation/2013/RS2013... · 2013-09-13 · 2 Agenda Coal Power will be 120 years Reserve and Low Running Cost.. But,](https://reader033.fdocuments.in/reader033/viewer/2022042200/5e9fca802c3ca20c366c73b1/html5/thumbnails/16.jpg)
16
3-4) Discontent in DCS
• Limited day of data storage.
• No text editing on Trend Chart.
• Print out in Paper (USB = Virus)
• No Sense in Mimic• Flow is Left to Right
• Numerical information
• Fixed Graphic
• Data is spread into many pages
![Page 17: Win-Win with PI System - OSIsoftcdn.osisoft.com/corp/sg/media/presentation/2013/RS2013... · 2013-09-13 · 2 Agenda Coal Power will be 120 years Reserve and Low Running Cost.. But,](https://reader033.fdocuments.in/reader033/viewer/2022042200/5e9fca802c3ca20c366c73b1/html5/thumbnails/17.jpg)
17
3-5) PI System advantage
• NO LIMIT in data storage.
• Editable Trend Chart.
• Copy and Paste in Windows.
• Mimic & Trend as you like.
• No disturb to the operators.
![Page 18: Win-Win with PI System - OSIsoftcdn.osisoft.com/corp/sg/media/presentation/2013/RS2013... · 2013-09-13 · 2 Agenda Coal Power will be 120 years Reserve and Low Running Cost.. But,](https://reader033.fdocuments.in/reader033/viewer/2022042200/5e9fca802c3ca20c366c73b1/html5/thumbnails/18.jpg)
18
3-6) PI Process Book (1)
![Page 19: Win-Win with PI System - OSIsoftcdn.osisoft.com/corp/sg/media/presentation/2013/RS2013... · 2013-09-13 · 2 Agenda Coal Power will be 120 years Reserve and Low Running Cost.. But,](https://reader033.fdocuments.in/reader033/viewer/2022042200/5e9fca802c3ca20c366c73b1/html5/thumbnails/19.jpg)
19
3-7) PI Process Book (2)
![Page 20: Win-Win with PI System - OSIsoftcdn.osisoft.com/corp/sg/media/presentation/2013/RS2013... · 2013-09-13 · 2 Agenda Coal Power will be 120 years Reserve and Low Running Cost.. But,](https://reader033.fdocuments.in/reader033/viewer/2022042200/5e9fca802c3ca20c366c73b1/html5/thumbnails/20.jpg)
20
3-8) PI System Advantage
• EASY VISIBLE.
• Keep process stream. (Left is Left)
• Bar chart
• X-Y Plot
• Trend
• Re-arrange any time.
• ALL IN ONE SCREEN
![Page 21: Win-Win with PI System - OSIsoftcdn.osisoft.com/corp/sg/media/presentation/2013/RS2013... · 2013-09-13 · 2 Agenda Coal Power will be 120 years Reserve and Low Running Cost.. But,](https://reader033.fdocuments.in/reader033/viewer/2022042200/5e9fca802c3ca20c366c73b1/html5/thumbnails/21.jpg)
21
4. Powerful PI System
• PI System is much greater than DCS
• How many data do you see in a
screen display?
• How can you see a lot of ready-made
numerical data effectively?
• PI System has unlimited potential on
evaluating/judging the plant status
![Page 22: Win-Win with PI System - OSIsoftcdn.osisoft.com/corp/sg/media/presentation/2013/RS2013... · 2013-09-13 · 2 Agenda Coal Power will be 120 years Reserve and Low Running Cost.. But,](https://reader033.fdocuments.in/reader033/viewer/2022042200/5e9fca802c3ca20c366c73b1/html5/thumbnails/22.jpg)
22
4-1) 3 Units ComparisonEasy to compare reference data
![Page 23: Win-Win with PI System - OSIsoftcdn.osisoft.com/corp/sg/media/presentation/2013/RS2013... · 2013-09-13 · 2 Agenda Coal Power will be 120 years Reserve and Low Running Cost.. But,](https://reader033.fdocuments.in/reader033/viewer/2022042200/5e9fca802c3ca20c366c73b1/html5/thumbnails/23.jpg)
23
4-2) 21 Mills in one SheetEasy to find the abnormality
![Page 24: Win-Win with PI System - OSIsoftcdn.osisoft.com/corp/sg/media/presentation/2013/RS2013... · 2013-09-13 · 2 Agenda Coal Power will be 120 years Reserve and Low Running Cost.. But,](https://reader033.fdocuments.in/reader033/viewer/2022042200/5e9fca802c3ca20c366c73b1/html5/thumbnails/24.jpg)
24
4-3) 1500 Days TrendUnlimited Trend History Time
1) Mill Diagnosis
2) Early Detection
3) Tube Leak Monitoring
![Page 25: Win-Win with PI System - OSIsoftcdn.osisoft.com/corp/sg/media/presentation/2013/RS2013... · 2013-09-13 · 2 Agenda Coal Power will be 120 years Reserve and Low Running Cost.. But,](https://reader033.fdocuments.in/reader033/viewer/2022042200/5e9fca802c3ca20c366c73b1/html5/thumbnails/25.jpg)
25
4-4) 18 Lines in a TrendIt can create valuable data on operation
![Page 26: Win-Win with PI System - OSIsoftcdn.osisoft.com/corp/sg/media/presentation/2013/RS2013... · 2013-09-13 · 2 Agenda Coal Power will be 120 years Reserve and Low Running Cost.. But,](https://reader033.fdocuments.in/reader033/viewer/2022042200/5e9fca802c3ca20c366c73b1/html5/thumbnails/26.jpg)
26
4-5) Data IntegrationLab. data and DCS data,
it can integrate by PI DataLink.
![Page 27: Win-Win with PI System - OSIsoftcdn.osisoft.com/corp/sg/media/presentation/2013/RS2013... · 2013-09-13 · 2 Agenda Coal Power will be 120 years Reserve and Low Running Cost.. But,](https://reader033.fdocuments.in/reader033/viewer/2022042200/5e9fca802c3ca20c366c73b1/html5/thumbnails/27.jpg)
27
5. Knowledge Supportive PI System
• New findings only come from data analysis.
PI System helps us to study and analyze the data.
• Fine data monitoring only gives early detection on plant abnormality.
PI System helps us to provide reliable operation.
![Page 28: Win-Win with PI System - OSIsoftcdn.osisoft.com/corp/sg/media/presentation/2013/RS2013... · 2013-09-13 · 2 Agenda Coal Power will be 120 years Reserve and Low Running Cost.. But,](https://reader033.fdocuments.in/reader033/viewer/2022042200/5e9fca802c3ca20c366c73b1/html5/thumbnails/28.jpg)
28
5-1) Challenge to NEW Operation
We have succeed to save100ton
of LFO for cold unit start-up.
Cost Impact US$100K per start up
![Page 29: Win-Win with PI System - OSIsoftcdn.osisoft.com/corp/sg/media/presentation/2013/RS2013... · 2013-09-13 · 2 Agenda Coal Power will be 120 years Reserve and Low Running Cost.. But,](https://reader033.fdocuments.in/reader033/viewer/2022042200/5e9fca802c3ca20c366c73b1/html5/thumbnails/29.jpg)
29
5-2) New findings from analysis
High risk of explosion!
Mill empty due to Chute Block
![Page 30: Win-Win with PI System - OSIsoftcdn.osisoft.com/corp/sg/media/presentation/2013/RS2013... · 2013-09-13 · 2 Agenda Coal Power will be 120 years Reserve and Low Running Cost.. But,](https://reader033.fdocuments.in/reader033/viewer/2022042200/5e9fca802c3ca20c366c73b1/html5/thumbnails/30.jpg)
30
5-3) Taking ActionApply Safety Interlock in DCS
Mill Outlet Temp >90C Trip
Establish Reliable Operation
MOT High Trip
MOT
Temp DamperAir Flow
Motor CurrentMIAT DP
Flow Damper
Coal Flow
![Page 31: Win-Win with PI System - OSIsoftcdn.osisoft.com/corp/sg/media/presentation/2013/RS2013... · 2013-09-13 · 2 Agenda Coal Power will be 120 years Reserve and Low Running Cost.. But,](https://reader033.fdocuments.in/reader033/viewer/2022042200/5e9fca802c3ca20c366c73b1/html5/thumbnails/31.jpg)
31
5-4) New challenge
We can challenge because Reliable
Maximize Mill performance
> 80C > 300CLimit was 250C
![Page 32: Win-Win with PI System - OSIsoftcdn.osisoft.com/corp/sg/media/presentation/2013/RS2013... · 2013-09-13 · 2 Agenda Coal Power will be 120 years Reserve and Low Running Cost.. But,](https://reader033.fdocuments.in/reader033/viewer/2022042200/5e9fca802c3ca20c366c73b1/html5/thumbnails/32.jpg)
32
5-5) Gain from Challenge
Flue Gas Temp 25C = Efficiency 1%
Eff 0.5%
250 320C
Improve!-12.5C
![Page 33: Win-Win with PI System - OSIsoftcdn.osisoft.com/corp/sg/media/presentation/2013/RS2013... · 2013-09-13 · 2 Agenda Coal Power will be 120 years Reserve and Low Running Cost.. But,](https://reader033.fdocuments.in/reader033/viewer/2022042200/5e9fca802c3ca20c366c73b1/html5/thumbnails/33.jpg)
33
6. Wrap up
• Let’s fully well-utilize the PI System.
• Realize
• Let’s share the knowledge.
Win-Win with PI System
![Page 34: Win-Win with PI System - OSIsoftcdn.osisoft.com/corp/sg/media/presentation/2013/RS2013... · 2013-09-13 · 2 Agenda Coal Power will be 120 years Reserve and Low Running Cost.. But,](https://reader033.fdocuments.in/reader033/viewer/2022042200/5e9fca802c3ca20c366c73b1/html5/thumbnails/34.jpg)
34
Kiminori Sato
• Senior Engineer
• IPSM, IHI Power System Malaysia
![Page 35: Win-Win with PI System - OSIsoftcdn.osisoft.com/corp/sg/media/presentation/2013/RS2013... · 2013-09-13 · 2 Agenda Coal Power will be 120 years Reserve and Low Running Cost.. But,](https://reader033.fdocuments.in/reader033/viewer/2022042200/5e9fca802c3ca20c366c73b1/html5/thumbnails/35.jpg)