WIBBLY WOBBLY MPO COUNTS - dot.ny.gov · • Receive package in expected format • Contact...
Transcript of WIBBLY WOBBLY MPO COUNTS - dot.ny.gov · • Receive package in expected format • Contact...
4/4/2019
1
WIBBLY WOBBLY MPO COUNTS
KYLE FELLOWS
OVERVIEW
• Beginning Stages• Planning Out a Course of Action• Data Review• Takeaway and Future Counting
4/4/2019
2
THE REQUEST
• Need Help• Class Counts• Possible Splits• Decided to take on experiment
THE PLAN
• Map of the segments
4/4/2019
3
Each of the “A” segments signifies where counts were supposed to have been taken and all subsequent letters signify the splits requested.
THE PLAN
• Map of the segments• Receive Package and Organize
4/4/2019
4
THE PLAN
Many stations duplicated.TCE cannot discern between different counts from same station.Each subletter organized into its own folder with all supporting documentation.
THE PLAN
• Map of the segments• Receive Package and Organize• Research History
• And transfer GPS to log
4/4/2019
5
THE PLAN
THE PLAN
• Map of the segments• Receive Package and Organize• Research History• Verify field sheets and photos
4/4/2019
7
‐Photo requirements have been in EB since 2015‐Unacceptable that photos are still an issue‐As of February 2018, wording revised on photo
requirements‐Encourage those that have not understood
requirements within the past 4 years to reach out to us immediately
‐We will be rejecting for bad photos
THE DATA
• Determine if counts are good• Many were not
• Where possible, compare
4/4/2019
9
THE DATA
• Determine if counts are good• Many were not
• Where possible, compare• Did we split?
Split as necessary – Update limits of station as requested where prudent, others were saved as 9XXX stations as it was determined not to matter whether the count was placed at either location.
THE AFTERMATH
• Contact MPO with fixes• Receive word back from MPO on contractor’s response
• Process any additional counts where problems remedied
• Sent data to MPO as CSV’s and PDF Reports
4/4/2019
10
• 27 Accepted in full• 13 Volume Only• 5 Total Rejections
• 17 Splits Created• 14 Not Split
4/4/2019
11
MOVING FORWARD• Count stations under our contract
• Ensure data collection to our standards• Receive package in expected format• Contact contractor directly for fixes• Easier to track in tracking system• Might be easier for some MPOs if we pay since its coming our of same federal fund
MOVING FORWARD
• Received locations from MPO• Determined countability of counts
• Some locations not possible
• Scheduled them with our contractor
4/4/2019
12
MOVING FORWARD
• Having worked these in after, some wound up challenging• Already scheduled• Choose how to create a supplemental list, but still maintain our item numbers
CONCLUSION
• Plan for MPOs to be able to add what they need in the future
• Instead of receive counts afterward we would like to distribute our schedule and have counts added as needed