What does the cycle set sequence in a multiple.docx

download What does the cycle set sequence in a multiple.docx

of 2

Transcript of What does the cycle set sequence in a multiple.docx

What does the cycle set sequence in a multiple-counter maintenance plan determine? a The scheduling sequence of a maintenance item b The operation sequence of a maintenance order c The scheduling sequence for a group of maintenance plans d The operation sequence of a task listAnswer: A

Your customer needs a maintenance order type for use with Test Equipment Management in a maintenance plan. Which Customizing setting must you make for the order type?O a Assi gn an i nspecti on lot to order type only.O b Create an order type for Test Equipment Management. c Assign an inspection type to an order type with plant assignment.O d Create a plant for inspection lots.Answer: C

Your customer wants to subdivide the maintenance organization by production responsibility.What do you use to designate the contact person for coordination between production and plant maintenance? a Plant section O b Production cost center O c Work center O d Controlling areaAnswer: A

What happens when you set the system status in a maintenance order to technically completed (TECO)? (Choose two)0 a The system sets a deletion indicator for outstanding reservations.0 b The system sets a deletion indicator for outstanding purchase requisitions.c The system posts costs to the target account assignment.d The system sets a deletion indicator for purchase orders assigned to the maintenance order.Answer: A, B