Western Canada Resource Plays:The Phoenix Awaits!

June 22, 2016

Meridee Fockler, B.Eng (Geol), P.GeolBen McKenzie, M.Sc., P.Geol

Page 2: Western Canada Resource Plays: The Phoenix Awaits! June 22 ... · Improves RF Bakken/3Forks Daly/Sinclair Flat Lake Bakken/3Forks. ... •Mature play―efficiencies Cons •Pay 5-15m

Disclaimers

The information contained herein has been prepared solely for information purposes and is not intended to be used for trading or investment purposes or as an offer to sell or the solicitation of an offer to buy any security or financial product. The information has been compiled by Canadian Discovery from internal sources as well as prepared from various public and industry sources that we believe are reliable, but no representation or warranty, expressed or implied is made by Canadian Discovery, its affiliates or any other person as to the accuracy or completeness of the information. Such information is provided with the expectation that it will be read as part of a mosaic of analyses and should not be relied upon on a stand-alone basis. Past performance should not be taken as an indication or guarantee of future performance, and Canadian Discovery makes no representation of warranty regarding future performance. The opinions expressed in this report (presentation) reflect the judgment of Canadian Discovery as of the date of this report and are subject to change without notice. This report (presentation) is not an offer to sell or a solicitation of an offer to buy any securities. To the full extent provided by law, neither Canadian Discovery nor any of its affiliates, nor any other person accepts any liability whatsoever for a direct or consequential loss arising from any use of this report (presentation) or the information contained herein. As in all aspects of oil and gas evaluation, there are uncertainties in the interpretation of engineering, reservoir and geological data: therefore, the recipient should rely solely on its own independent investigation, evaluation, and judgment with respect to the information contained herein and any additional information provided by Canadian Discovery or its representatives. All trademarks, service marks, and trade names not owned by Canadian Discovery are the property of their respective owners.

Forward-Looking Statements

This presentation may contain certain forward-looking information as defined in applicable securities laws (referred to herein as “forward-looking statements”). Forward-looking statements involve known and unknown risks, uncertainties and other factors which are beyond Canadian Discovery’s ability to predict or control and may cause Canadian Discovery’s actual results, performance or achievements to be materially different from any of its future results, performance or achievements expressed or implied by forward-looking statements.

Accordingly, readers should not place undue reliance on forward-looking statements. The forward-looking statements contained herein are made as of the date hereof, or such other date or dates specified in such statements. Canadian Discovery undertakes no obligation to update publicly or otherwise revise any forward-looking statements contained herein whether as a result of new information or future events or otherwise, except as may be required by law. If the Company does update one or more forward-looking statements, no inference should be drawn that it will make additional updates with respect to those or other forward-looking statements.

Disclaimer

Page 3: Western Canada Resource Plays: The Phoenix Awaits! June 22 ... · Improves RF Bakken/3Forks Daly/Sinclair Flat Lake Bakken/3Forks. ... •Mature play―efficiencies Cons •Pay 5-15m

• 2015 WCSB Production Highlights

• Hot Resource Plays―Activity and Completions

• Developing Resource Plays

• Wrap Up

OUTLINE

Page 4: Western Canada Resource Plays: The Phoenix Awaits! June 22 ... · Improves RF Bakken/3Forks Daly/Sinclair Flat Lake Bakken/3Forks. ... •Mature play―efficiencies Cons •Pay 5-15m

WCSB Resource Plays

Oil Sands

Spirit River

Viking

Cardium

Horn River

Montney

Duvernay

Montney

MannvilleHeavy Oil

Williston Basin

Viking

Bakken/3ForksMidale

Dunvegan

Charlie Lake

MannvilleThermal Oil

GlauconiticEllerslie

Shaunavon

Page 5: Western Canada Resource Plays: The Phoenix Awaits! June 22 ... · Improves RF Bakken/3Forks Daly/Sinclair Flat Lake Bakken/3Forks. ... •Mature play―efficiencies Cons •Pay 5-15m

2015 Production Highlights

Page 6: Western Canada Resource Plays: The Phoenix Awaits! June 22 ... · Improves RF Bakken/3Forks Daly/Sinclair Flat Lake Bakken/3Forks. ... •Mature play―efficiencies Cons •Pay 5-15m

3-Mo Cum ProdWells On-Stream in 2015

Oil Sands

Spirit River

Viking

Horn River

Montney

Duvernay

Montney

MannvilleHeavy Oil

Viking

Bakken/3ForksMidale

Glauconitic

Ellerslie

Shaunavon

MannvilleThermal Oil

Charlie Lk

Dunvegan

Williston Basin

Page 7: Western Canada Resource Plays: The Phoenix Awaits! June 22 ... · Improves RF Bakken/3Forks Daly/Sinclair Flat Lake Bakken/3Forks. ... •Mature play―efficiencies Cons •Pay 5-15m

Production and Well Count by Formation3-Mo Cum Prod―Wells On-Stream in 2015

Powered by IHS Data

1

4

8

5

32

Viking

Spirit River

Grand Rapids/Clearwater

Wabiskaw/Cummings

Montney

Duvernay

Well Count

3-Mo Cum (mboe)

Page 8: Western Canada Resource Plays: The Phoenix Awaits! June 22 ... · Improves RF Bakken/3Forks Daly/Sinclair Flat Lake Bakken/3Forks. ... •Mature play―efficiencies Cons •Pay 5-15m

Production and Well Count by FormationIP90 Average Rate―Wells On-Stream in 2015

Powered by IHS Data

Viking

Spirit River

Rock Creek

Halfway/Doig

Montney

Duvernay

241

3

42

5

Well Count

IP90 (boepd)

Page 9: Western Canada Resource Plays: The Phoenix Awaits! June 22 ... · Improves RF Bakken/3Forks Daly/Sinclair Flat Lake Bakken/3Forks. ... •Mature play―efficiencies Cons •Pay 5-15m

Hot Resource Plays

Page 10: Western Canada Resource Plays: The Phoenix Awaits! June 22 ... · Improves RF Bakken/3Forks Daly/Sinclair Flat Lake Bakken/3Forks. ... •Mature play―efficiencies Cons •Pay 5-15m

Oil Sands

Spirit River

Viking

Cardium

Horn River

Montney

Duvernay

Montney

Cardium

Heavy Oil

Viking

Bakken/3ForksMidale

Lwr Cret Spirit River Resource Gas Play

Williston Basin

Spirit River

Page 11: Western Canada Resource Plays: The Phoenix Awaits! June 22 ... · Improves RF Bakken/3Forks Daly/Sinclair Flat Lake Bakken/3Forks. ... •Mature play―efficiencies Cons •Pay 5-15m

SPIRIT RIVERPlay Development

Kakwa

Ferrier

Ansell

Sundance

Powered by IHS Data

Play has Moved Downdip;Focused on Sweet Spots

Highest Rates

More Continental

More Marine

Edson

Morningside

Page 12: Western Canada Resource Plays: The Phoenix Awaits! June 22 ... · Improves RF Bakken/3Forks Daly/Sinclair Flat Lake Bakken/3Forks. ... •Mature play―efficiencies Cons •Pay 5-15m

SPIRIT RIVERSpirit River Gas Completions Trends

Data from Canadian Discovery's Well Completions & Frac Database

171020 5,300

$2.9M $1.4M

Technology Group Distribution Avg D&C Costs per Well

Avg Stages, Measured Depth and Completed Length per Well Avg Proppant and Fluid per Well

4,400

1,415

StagesLength

ProppantCost

Page 13: Western Canada Resource Plays: The Phoenix Awaits! June 22 ... · Improves RF Bakken/3Forks Daly/Sinclair Flat Lake Bakken/3Forks. ... •Mature play―efficiencies Cons •Pay 5-15m

SPIRIT RIVEREstimated Ultimate Recovery (EUR) per Hz Well

Kakwa

Ferrier

Ansell

SundanceEdson

Page 14: Western Canada Resource Plays: The Phoenix Awaits! June 22 ... · Improves RF Bakken/3Forks Daly/Sinclair Flat Lake Bakken/3Forks. ... •Mature play―efficiencies Cons •Pay 5-15m

Powered by IHS Data

5-23-57-1W6

Pros• Pay ~ 120m• Stacked sands• Highest IP rates in Basin

Cons• Variable liquids rates• Geological complexity

Costs• Avg D&C Cost—$4.3MM• Half Cycle Cost—$5,137/boepd

SPIRIT RIVERPros and Cons

Page 15: Western Canada Resource Plays: The Phoenix Awaits! June 22 ... · Improves RF Bakken/3Forks Daly/Sinclair Flat Lake Bakken/3Forks. ... •Mature play―efficiencies Cons •Pay 5-15m

Oil Sands

Spirit River

Viking

Cardium

Horn River

Montney

Duvernay

Montney

Cardium

Heavy Oil

Viking

Bakken/3ForksMidale

Lwr Triassic Montney Resource Play

Williston Basin

Montney

Page 16: Western Canada Resource Plays: The Phoenix Awaits! June 22 ... · Improves RF Bakken/3Forks Daly/Sinclair Flat Lake Bakken/3Forks. ... •Mature play―efficiencies Cons •Pay 5-15m

MONTNEYPlay Development

Girouxville

Ante Creek

Elmworth

KarrKakwa

Dawson

Swan Lake

Tower

Gundy

Powered by IHS Data

Oil Along Subcrop

Liquids-Rich Gas

Beg

Altares

Page 17: Western Canada Resource Plays: The Phoenix Awaits! June 22 ... · Improves RF Bakken/3Forks Daly/Sinclair Flat Lake Bakken/3Forks. ... •Mature play―efficiencies Cons •Pay 5-15m

MONTNEYMontney Gas Completions Trends

Technology Group Distribution Avg D&C Costs per Well

Avg Stages, Measured Depth and Completed Length per Well Avg Proppant and Fluid per Well

Data from Canadian Discovery's Well Completions & Frac Database

20

2,020 14,595

$3.7M $2.7M

3,970 1,660 StagesLength

ProppantCost

Page 18: Western Canada Resource Plays: The Phoenix Awaits! June 22 ... · Improves RF Bakken/3Forks Daly/Sinclair Flat Lake Bakken/3Forks. ... •Mature play―efficiencies Cons •Pay 5-15m

MONTNEYEstimated Ultimate Recovery (EUR) per Hz Well

Beware of 6:1BOE conversion

Girouxville

Ante Creek

Elmworth

KarrKakwa

Dawson

Swan Lake

Tower

Gundy

Altares

Oil Along Subcrop

Liquids-Rich Gas

Page 19: Western Canada Resource Plays: The Phoenix Awaits! June 22 ... · Improves RF Bakken/3Forks Daly/Sinclair Flat Lake Bakken/3Forks. ... •Mature play―efficiencies Cons •Pay 5-15m

MONTNEYPros and Cons

Log analysis generated with GeoLog Multimin® Software; Powered by IHS Data

15-25-80-16W6

Pros• Pay ~ 300m• Potential for vertically stacked

laterals• High rates

Cons• Reservoir heterogeneity• Variable liquids content

Costs• Avg D&C Cost―$6.4MM• Half Cycle Cost―$9,412/boepd

Page 20: Western Canada Resource Plays: The Phoenix Awaits! June 22 ... · Improves RF Bakken/3Forks Daly/Sinclair Flat Lake Bakken/3Forks. ... •Mature play―efficiencies Cons •Pay 5-15m

Lwr Cret Viking Resource Oil Play

Oil Sands

Spirit River

Viking

Cardium

Horn River

Montney

Duvernay

Montney

Cardium

Heavy Oil

Viking

Bakken/3ForksMidale

Dodsland

Williston Basin

Viking

Page 21: Western Canada Resource Plays: The Phoenix Awaits! June 22 ... · Improves RF Bakken/3Forks Daly/Sinclair Flat Lake Bakken/3Forks. ... •Mature play―efficiencies Cons •Pay 5-15m

VIKINGPlay Development

HalkirkEast

ElrosePlato

Dodsland

Kerrobert

Provost

Forgan

Powered by IHS Data

Most Active

Downspacing to32 wells/section

Alb

erta

Sask

atch

ewan

Page 22: Western Canada Resource Plays: The Phoenix Awaits! June 22 ... · Improves RF Bakken/3Forks Daly/Sinclair Flat Lake Bakken/3Forks. ... •Mature play―efficiencies Cons •Pay 5-15m

VIKINGViking Oil Completions Trends

Data from Canadian Discovery's Well Completions & Frac Database

18

240 535

$0.3M $0.3M

Technology Group Distribution Avg D&C Costs per Well

Avg Stages, Measured Depth and Completed Length per Well Avg Proppant and Fluid per Well

1,535 600 StagesLength

ProppantCost

Page 23: Western Canada Resource Plays: The Phoenix Awaits! June 22 ... · Improves RF Bakken/3Forks Daly/Sinclair Flat Lake Bakken/3Forks. ... •Mature play―efficiencies Cons •Pay 5-15m

VIKINGEstimated Ultimate Recovery (EUR) per Hz Well

Data from CDL’s Catalyst; Powered by IHS Data

Alb

erta

Sask

atch

ewan

HalkirkEast

ElrosePlato

Dodsland

Kerrobert

Provost

Forgan

Page 24: Western Canada Resource Plays: The Phoenix Awaits! June 22 ... · Improves RF Bakken/3Forks Daly/Sinclair Flat Lake Bakken/3Forks. ... •Mature play―efficiencies Cons •Pay 5-15m

VIKINGPros and Cons

Log analysis generated with GeoLog Multimin® Software; Powered by IHS Data

3-23-31-21W3

Pros• Large areal extent• Lowest cost play WCSB• Most active play WCSB

Cons• Pay 5-10m

Costs• Avg D&C Cost―$0.6MM• Half Cycle Cost―$9,524/boepd

Page 25: Western Canada Resource Plays: The Phoenix Awaits! June 22 ... · Improves RF Bakken/3Forks Daly/Sinclair Flat Lake Bakken/3Forks. ... •Mature play―efficiencies Cons •Pay 5-15m

Miss Bakken/Three Forks Resource Oil Plays

Oil Sands

Spirit River

Viking

Cardium

Horn River

Montney

Duvernay

Montney

Cardium

Heavy Oil

Viking

MidaleBakken/3Forks

Williston Basin

Bakken/3Forks

Page 26: Western Canada Resource Plays: The Phoenix Awaits! June 22 ... · Improves RF Bakken/3Forks Daly/Sinclair Flat Lake Bakken/3Forks. ... •Mature play―efficiencies Cons •Pay 5-15m

BAKKEN/THREE FORKSPlay Development

BakkenViewfield

Oungre Taylorton

Powered by IHS Data

One Operator

Waterflooding Improves RF

Bakken/3ForksDaly/Sinclair

Flat Lake

Bakken/3Forks

Page 27: Western Canada Resource Plays: The Phoenix Awaits! June 22 ... · Improves RF Bakken/3Forks Daly/Sinclair Flat Lake Bakken/3Forks. ... •Mature play―efficiencies Cons •Pay 5-15m

BAKKEN/THREE FORKSBakken Oil Completions Trends

Data from Canadian Discovery's Well Completions & Frac Database

24

82 645

$0.7M $0.4M

Technology Group Distribution Avg D&C Costs per Well

Avg Stages, Measured Depth and Completed Length per Well Avg Proppant and Fluid per Well

2,9901,350 StagesLength

ProppantCost

Page 28: Western Canada Resource Plays: The Phoenix Awaits! June 22 ... · Improves RF Bakken/3Forks Daly/Sinclair Flat Lake Bakken/3Forks. ... •Mature play―efficiencies Cons •Pay 5-15m

BAKKEN/THREE FORKSEstimated Ultimate Recovery (EUR) per Hz Well

EURs from CDL’s Catalyst

BakkenViewfield

Oungre TaylortonFlat Lake

Bakken/3ForksDaly/Sinclair

Bakken/3Forks

Page 29: Western Canada Resource Plays: The Phoenix Awaits! June 22 ... · Improves RF Bakken/3Forks Daly/Sinclair Flat Lake Bakken/3Forks. ... •Mature play―efficiencies Cons •Pay 5-15m

BAKKEN/THREE FORKSPros and Cons

Log analysis generated with GeoLog Multimin® Software; Powered by IHS Data

21/5-17-1-15W2

Pros• Stacked Bakken/Three Forks• Mature play―efficiencies

Cons• Pay 5-15m

Costs• Avg D&C Cost―$1.1MM• Half Cycle Cost―$12,605/boepd

Page 30: Western Canada Resource Plays: The Phoenix Awaits! June 22 ... · Improves RF Bakken/3Forks Daly/Sinclair Flat Lake Bakken/3Forks. ... •Mature play―efficiencies Cons •Pay 5-15m

Developing Resource Plays

Page 31: Western Canada Resource Plays: The Phoenix Awaits! June 22 ... · Improves RF Bakken/3Forks Daly/Sinclair Flat Lake Bakken/3Forks. ... •Mature play―efficiencies Cons •Pay 5-15m

Charlie Lake

Oil Sands

Spirit River

Viking

Cardium

Horn River

Montney

Duvernay

Montney

Cardium

Heavy Oil

Viking

Bakken/3ForksMidale

Up Triassic Charlie Lake Resource Oil Play

Williston Basin

Page 32: Western Canada Resource Plays: The Phoenix Awaits! June 22 ... · Improves RF Bakken/3Forks Daly/Sinclair Flat Lake Bakken/3Forks. ... •Mature play―efficiencies Cons •Pay 5-15m

CHARLIE LAKEPlay Development

Cecil

Powered by IHS Data

Worsley

Valhalla

Mulligan

Page 33: Western Canada Resource Plays: The Phoenix Awaits! June 22 ... · Improves RF Bakken/3Forks Daly/Sinclair Flat Lake Bakken/3Forks. ... •Mature play―efficiencies Cons •Pay 5-15m

CHARLIE LAKECharlie Lake Completions Trends

Data from Canadian Discovery's Well Completions & Frac Database

26

500 3,900

$2.0M $1.1M

Technology Group Distribution Avg D&C Costs per Well

Avg Stages, Measured Depth and Completed Length per Well Avg Proppant and Fluid per Well

3,4001,800 StagesLength

ProppantCost

Page 34: Western Canada Resource Plays: The Phoenix Awaits! June 22 ... · Improves RF Bakken/3Forks Daly/Sinclair Flat Lake Bakken/3Forks. ... •Mature play―efficiencies Cons •Pay 5-15m

CHARLIE LAKEPros and Cons

Log analysis generated with GeoLog Multimin® Software; Powered by IHS Data

PM, PP, MF to update

16-15-81-8W6

Pros• Oil-prone• An upper and lower play

Cons• Pay ~10m• Rel thin reservoirs• Reservoir heterogeneity

Costs• Avg D&C Cost―$3.1MM• Half Cycle Cost―$12,863/boepd

Page 35: Western Canada Resource Plays: The Phoenix Awaits! June 22 ... · Improves RF Bakken/3Forks Daly/Sinclair Flat Lake Bakken/3Forks. ... •Mature play―efficiencies Cons •Pay 5-15m

Dunvegan

Oil Sands

Spirit River

Viking

Cardium

Horn River

Montney

Duvernay

Montney

Cardium

Heavy Oil

Viking

Bakken/3ForksMidale

Lwr Cretaceous Dunvegan Resource Play

Williston Basin

Page 36: Western Canada Resource Plays: The Phoenix Awaits! June 22 ... · Improves RF Bakken/3Forks Daly/Sinclair Flat Lake Bakken/3Forks. ... •Mature play―efficiencies Cons •Pay 5-15m

DUNVEGANPlay Development

Kaybob S

Simonette

Elmworth

Karr

Resthaven

Powered by IHS Data

Mixed Fluvial/Shoreline

SE Prograding Delta

Shallow Shelf

Liquids-RichGas

Oil-Prone

Page 37: Western Canada Resource Plays: The Phoenix Awaits! June 22 ... · Improves RF Bakken/3Forks Daly/Sinclair Flat Lake Bakken/3Forks. ... •Mature play―efficiencies Cons •Pay 5-15m

DUNVEGANDunvegan Oil Completions Trends

Data from Canadian Discovery's Well Completions & Frac Database

15

350 1,000

$2.5M $1.5M

Technology Group Distribution Avg D&C Costs per Well

Avg Stages, Measured Depth and Completed Length per Well Avg Proppant and Fluid per Well

3,300 1,300 StagesLength

ProppantCost

Page 38: Western Canada Resource Plays: The Phoenix Awaits! June 22 ... · Improves RF Bakken/3Forks Daly/Sinclair Flat Lake Bakken/3Forks. ... •Mature play―efficiencies Cons •Pay 5-15m

DUNVEGANEstimated Ultimate Recovery (EUR) per Hz Well

Kaybob S

Simonette

Elmworth

Karr

Resthaven

Data from CDL’s Catalyst

Beware of 6:1BOE conversion

Liquids-RichGas

Oil-Prone

Page 39: Western Canada Resource Plays: The Phoenix Awaits! June 22 ... · Improves RF Bakken/3Forks Daly/Sinclair Flat Lake Bakken/3Forks. ... •Mature play―efficiencies Cons •Pay 5-15m

DUNVEGANPros and Cons

Log analysis generated with GeoLog Multimin® Software; Powered by IHS Data

3-23-59-4W6

Pros• Oil, liquids-rich gas• Stacked reservoirs• High rates

Cons• Pay 5–20m• Rapid facies change• Liquids variable

Costs• Avg D&C Cost―$4.0MM• Half Cycle Cost―$9,153/boepd

Page 40: Western Canada Resource Plays: The Phoenix Awaits! June 22 ... · Improves RF Bakken/3Forks Daly/Sinclair Flat Lake Bakken/3Forks. ... •Mature play―efficiencies Cons •Pay 5-15m

Midale

Oil Sands

Spirit River

Viking

Cardium

Horn River

Montney

Duvernay

Montney

Cardium

Heavy Oil

Viking

Bakken/3ForksMidale

Mississippian Midale Resource Oil Play

Williston Basin

Page 41: Western Canada Resource Plays: The Phoenix Awaits! June 22 ... · Improves RF Bakken/3Forks Daly/Sinclair Flat Lake Bakken/3Forks. ... •Mature play―efficiencies Cons •Pay 5-15m

MIDALEPlay Development

Powered by IHS Data

Steelman

NorthgatePinto

Macoun

WeyburnTatagwa

Fracced

Unfracced

Page 42: Western Canada Resource Plays: The Phoenix Awaits! June 22 ... · Improves RF Bakken/3Forks Daly/Sinclair Flat Lake Bakken/3Forks. ... •Mature play―efficiencies Cons •Pay 5-15m

MIDALEMidale Oil Completions Trends

Data from Canadian Discovery's Well Completions & Frac Database

27

200 1,200

$0.9M $0.6M

Technology Group Distribution Avg D&C Costs per Well

Avg Stages, Measured Depth and Completed Length per Well Avg Proppant and Fluid per Well

3,250 1,400 StagesLength

ProppantCost

Page 43: Western Canada Resource Plays: The Phoenix Awaits! June 22 ... · Improves RF Bakken/3Forks Daly/Sinclair Flat Lake Bakken/3Forks. ... •Mature play―efficiencies Cons •Pay 5-15m

MIDALEEstimated Ultimate Recovery (EUR) per Hz Well

Data from CDL’s Catalyst

Steelman

NorthgatePinto

Macoun

WeyburnTatagwa

FraccedLower Φ and k

UnfraccedHigher Φ and k

Page 44: Western Canada Resource Plays: The Phoenix Awaits! June 22 ... · Improves RF Bakken/3Forks Daly/Sinclair Flat Lake Bakken/3Forks. ... •Mature play―efficiencies Cons •Pay 5-15m

MIDALEPros and Cons

Log analysis generated with GeoLog Multimin® Software; Powered by IHS Data

PM, PP, MF to update

Use this log

5-28-1-6W2

Pros• Large oil-in-place• Moderate decline rates• Short, shallow wells

Cons• Thin pay (<10m)• Complex lithology

Costs• Avg D&C Cost―$1.5MM• Half Cycle Cost―$12,605/boepd

Page 45: Western Canada Resource Plays: The Phoenix Awaits! June 22 ... · Improves RF Bakken/3Forks Daly/Sinclair Flat Lake Bakken/3Forks. ... •Mature play―efficiencies Cons •Pay 5-15m

Wrap Up

Page 46: Western Canada Resource Plays: The Phoenix Awaits! June 22 ... · Improves RF Bakken/3Forks Daly/Sinclair Flat Lake Bakken/3Forks. ... •Mature play―efficiencies Cons •Pay 5-15m

WRAP UPPlay Comparison

Powered by IHS Data

Page 47: Western Canada Resource Plays: The Phoenix Awaits! June 22 ... · Improves RF Bakken/3Forks Daly/Sinclair Flat Lake Bakken/3Forks. ... •Mature play―efficiencies Cons •Pay 5-15m

WCSB Deepest Penetration by Section

Thank you to other contributors

• Pearl Meyer – ppt maestro

• Candace Keeler – cartographer

• Paul Patton – infographic

• Zenith Phillips – graphic designer

• Joshua Lee – EURs

• Luigi Malinis – completions

• Ricky La – completions

CDL products used for this presentation:

Powered by IHS Data

To download this presentation, visitwww.canadiandiscovery.com

403.269.3644 | Find us on