WELCOME!
MURRAY BASIN
CSO CONTROL PROJECT
Community Design Charette Public Meeting
October 29, 2011
![Page 2: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being](https://reader034.fdocuments.in/reader034/viewer/2022050112/5f49d468d32ab336bc24c94e/html5/thumbnails/2.jpg)
Today’s Program
Introductions and meeting goals
CSO overview and project background information
Dialogue on values
Required facility components
Lunch
Small group discussion and input
Small group reports to large group
Closing and next steps
![Page 3: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being](https://reader034.fdocuments.in/reader034/viewer/2022050112/5f49d468d32ab336bc24c94e/html5/thumbnails/3.jpg)
A productive and respectful discussion
will include:
Listening, encouraging others to speak, and allowing others to speak without being interrupted.
Avoiding side conversations.
Raising your hand before speaking in full group discussions.
Respecting each person’s opinions; acknowledging the value of different perspectives.
Participating in a problem-solving atmosphere.
Since we have limited time & everyone should get a chance to speak:
Sharing the air time
Contributing ideas & opinions as clearly & succinctly as you can
Setting cell phones to silent.
![Page 4: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being](https://reader034.fdocuments.in/reader034/viewer/2022050112/5f49d468d32ab336bc24c94e/html5/thumbnails/4.jpg)
Introductions & Goals for Today
State your name (and affiliation or interest)
What do YOU want to get out of this workshop?
![Page 5: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being](https://reader034.fdocuments.in/reader034/viewer/2022050112/5f49d468d32ab336bc24c94e/html5/thumbnails/5.jpg)
What is a CSO?
Most older cities—including Seattle—built one conveyance system to carry both wastewater and stormwater to treatment plants.
Combined Sewer Overflows (CSOs) are untreated overflows sent directly to Seattle water bodies during storms when sewers are full.
CSOs are a safety valve to prevent sewer backups in homes and streets, but they contain harmful chemicals and disease-causing pathogens.
![Page 6: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being](https://reader034.fdocuments.in/reader034/viewer/2022050112/5f49d468d32ab336bc24c94e/html5/thumbnails/6.jpg)
King County CSO Control Program
CSO control required by state and federal law
State standard for untreated overflows=1 per year
average
Highest priority projects along Puget Sound beaches
For more information on King County’s efforts, visit:
http://www.kingcounty.gov/environment/wastewate
r/CSO/ProgramReview.aspx
![Page 7: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being](https://reader034.fdocuments.in/reader034/viewer/2022050112/5f49d468d32ab336bc24c94e/html5/thumbnails/7.jpg)
![Page 8: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being](https://reader034.fdocuments.in/reader034/viewer/2022050112/5f49d468d32ab336bc24c94e/html5/thumbnails/8.jpg)
Murray Basin-CSO General Site Features Layout
PLACEHOLDER: MAP THAT HIDES CURRENT
HOUSING ON STORAGE TANK SITE +
SHOWS BROADER AREA WOULD BE IDEAL
![Page 9: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being](https://reader034.fdocuments.in/reader034/viewer/2022050112/5f49d468d32ab336bc24c94e/html5/thumbnails/9.jpg)
![Page 10: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being](https://reader034.fdocuments.in/reader034/viewer/2022050112/5f49d468d32ab336bc24c94e/html5/thumbnails/10.jpg)
Next Steps & Upcoming Process
Open house in November (workshop summary)
Synthesized information from design charette
Presentation and input on your design ideas
Keep your feedback coming (via comment forms, website, contacting King County)
Visit project website: www.kingcounty.gov/environment/wtd/Construction/Seattle/ MurrayCSOStorage.aspx
Design Advisory Group meetings (open to the public)
Contact Doug Marsano
206-684-1235
![Page 11: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being](https://reader034.fdocuments.in/reader034/viewer/2022050112/5f49d468d32ab336bc24c94e/html5/thumbnails/11.jpg)
Dialogue on Values
What do you want to see embodied in this site
when it’s completed?
![Page 12: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being](https://reader034.fdocuments.in/reader034/viewer/2022050112/5f49d468d32ab336bc24c94e/html5/thumbnails/12.jpg)
MURRAY CSO CONTROL FACILITY
![Page 13: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being](https://reader034.fdocuments.in/reader034/viewer/2022050112/5f49d468d32ab336bc24c94e/html5/thumbnails/13.jpg)
Murray Ave Pump Station
Lowman
Beach Park
North
Existing Murray
Ave Pump Station
Flows to
Pump Station
CSO Outfall
![Page 14: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being](https://reader034.fdocuments.in/reader034/viewer/2022050112/5f49d468d32ab336bc24c94e/html5/thumbnails/14.jpg)
![Page 15: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being](https://reader034.fdocuments.in/reader034/viewer/2022050112/5f49d468d32ab336bc24c94e/html5/thumbnails/15.jpg)
Tanks: Shapes and Sizes
Volume = 1.0 Million Gallons
Plan (Footprint)
Isometric
Depth Depth Depth
![Page 16: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being](https://reader034.fdocuments.in/reader034/viewer/2022050112/5f49d468d32ab336bc24c94e/html5/thumbnails/16.jpg)
Facility Components
Odor Control Equipment
Carbon Scrubber or Equivalent
Fans
Ductwork
Exhaust Stack
Electrical Panels and Control Panels
Engine Generator
Sound Reduction
Fuel Tank
Exhaust Stack
Miscellaneous Mechanical Equipment
Storage Tank Cleaning Equipment
HVAC Equipment
![Page 17: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being](https://reader034.fdocuments.in/reader034/viewer/2022050112/5f49d468d32ab336bc24c94e/html5/thumbnails/17.jpg)
Odor Control Equipment
Carbon Scrubber Vessel
Design Considerations
•Operator and public
safety
•Equipment access for
maintenance and
operation
•Ability to replace
carbon media
![Page 18: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being](https://reader034.fdocuments.in/reader034/viewer/2022050112/5f49d468d32ab336bc24c94e/html5/thumbnails/18.jpg)
Odor Control Room General Layout
Odor Control Vessel
55 Feet Long
Foul Air
From Pump
Station &
Storage
Tank
Treated Air
Exhaust Stack
Exhaust
Fan
Grease
Eliminator
25
Feet
Wid
e
Silencer
![Page 19: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being](https://reader034.fdocuments.in/reader034/viewer/2022050112/5f49d468d32ab336bc24c94e/html5/thumbnails/19.jpg)
Electrical Room General Layout
Electrical
Panels
40 Feet Long
18
Feet
Wid
e
Design Considerations
•Operator safety
•Codes and regulations
•Equipment access for maintenance and replacement Electrical Panels
![Page 20: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being](https://reader034.fdocuments.in/reader034/viewer/2022050112/5f49d468d32ab336bc24c94e/html5/thumbnails/20.jpg)
Engine Generator Equipment
Engine Generator
Louver
![Page 21: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being](https://reader034.fdocuments.in/reader034/viewer/2022050112/5f49d468d32ab336bc24c94e/html5/thumbnails/21.jpg)
Engine Generator Room
General Layout
Engine Generator
and Fuel Storage
Ambient
Air
Exhaust Air Intake
Sound Reduction
Components
36 Feet Long
22
Feet W
ide
Engine Generator
Exhaust Silencer
Exhaust
Stack
Design Considerations
•Operator safety
•Codes and regulations
•Refueling
Louver
Louver
![Page 22: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being](https://reader034.fdocuments.in/reader034/viewer/2022050112/5f49d468d32ab336bc24c94e/html5/thumbnails/22.jpg)
Miscellaneous Mechanical Equipment
Tank Cleaning Systems
![Page 23: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being](https://reader034.fdocuments.in/reader034/viewer/2022050112/5f49d468d32ab336bc24c94e/html5/thumbnails/23.jpg)
Mechanical Equipment General Layout
12 Feet Long
12
Feet
Wid
e
Water Tanks
Water Pumps
Water
To Wash Systems
![Page 24: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being](https://reader034.fdocuments.in/reader034/viewer/2022050112/5f49d468d32ab336bc24c94e/html5/thumbnails/24.jpg)
All Together
Odor Control Room
![Page 25: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being](https://reader034.fdocuments.in/reader034/viewer/2022050112/5f49d468d32ab336bc24c94e/html5/thumbnails/25.jpg)
All Together
Odor Control Room
Gene
rato
r
Room
Electrical Room
Building Footprint
![Page 26: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being](https://reader034.fdocuments.in/reader034/viewer/2022050112/5f49d468d32ab336bc24c94e/html5/thumbnails/26.jpg)
All Together
Od
or C
ontro
l Room
Generator
Room
Electrica
l Room
Building Footprint
![Page 27: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being](https://reader034.fdocuments.in/reader034/viewer/2022050112/5f49d468d32ab336bc24c94e/html5/thumbnails/27.jpg)
Imagining surface design
![Page 28: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being](https://reader034.fdocuments.in/reader034/viewer/2022050112/5f49d468d32ab336bc24c94e/html5/thumbnails/28.jpg)
Small Group Work
Parameters for activity
Questions for discussion
Written comments by end of day today if possible
Report back to full group – small groups need:
Scribe
Reporter
![Page 29: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being](https://reader034.fdocuments.in/reader034/viewer/2022050112/5f49d468d32ab336bc24c94e/html5/thumbnails/29.jpg)
SMALL GROUP
DISCUSSION TOPICS
• Theme and character of the site • Site use • Aesthetics of visible elements • Landscaping • Green building opportunities • Miscellaneous (Lighting, fencing,
ventilation stacks, etc.)
![Page 30: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being](https://reader034.fdocuments.in/reader034/viewer/2022050112/5f49d468d32ab336bc24c94e/html5/thumbnails/30.jpg)
SMALL GROUP REPORTS
![Page 31: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being](https://reader034.fdocuments.in/reader034/viewer/2022050112/5f49d468d32ab336bc24c94e/html5/thumbnails/31.jpg)
Next Steps & Upcoming Process
Open house in November (workshop summary)
Synthesized information from design charette
Presentation and input on your design ideas
Keep your feedback coming (via comment forms, website, contacting King County)
Visit project website: www.kingcounty.gov/environment/wtd/Construction/Seattle/ MurrayCSOStorage.aspx
Design Advisory Group meetings (open to the public)
Contact Doug Marsano
206-684-1235