Weekly Notice of Operations (WNoO) - Rampion Offshore Wind · 2017. 10. 10. · NTM 060 01-04-2016...

13
Weekly Notice of Operations (WNoO) Rampion Offshore Wind Farm Limited Construction Operations Issue Date: 03/04/2017 RAM-ERA-LOG-NOT-0001_67 - Weekly Notice of Operations Page 1 of 13 “Rampion Offshore Wind is owned by E. ON, UK Green Investment Bank and Enbridge” Contents 1) Notice to Mariners (NtM) (Active) ......................................................................................................... 2 2) Hazards/Mitigation for Project Vessels and PAX ............................................................................... 3 3) WTG Installation Vessel ............................................................................................................................. 4 4) Array cable installation Vessel ................................................................................................................... 4 5) Rock Pad Installation ................................................................................................................................. 4 6) Top Side Installation Vessels ..................................................................................................................... 4 7) UXO & Boulder ROV and Grab Operations ................................................................................................ 5 8) Survey Vessel ............................................................................................................................................. 5 9) Guard Vessels ............................................................................................................................................ 6 10) Crew Transfer Vessels................................................................................................................................ 6 11) Upcoming Operations (following 7 days) ............................................................................................ 9 12) Summary of Operations (previous 7 days) ....................................................................................... 10 13) Looking further ahead (beyond 7 days) (new activities starting) ................................................... 10 14) Project Met mast details....................................................................................................................... 10 15) Project Wave Rider ............................................................................................................................... 10 16) As Laid Cardinal Buoy Positions ........................................................................................................ 11 17) Contact details....................................................................................................................................... 11 18) Site Chart ............................................................................................................................................... 12 19) WTG Coordinates in LAT and LON.................................................................................................... 13

Transcript of Weekly Notice of Operations (WNoO) - Rampion Offshore Wind · 2017. 10. 10. · NTM 060 01-04-2016...

  • Weekly Notice of Operations (WNoO)

    Rampion Offshore Wind Farm Limited Construction Operations

    Issue Date: 03/04/2017 RAM-ERA-LOG-NOT-0001_67 - Weekly Notice of Operations

    Page 1 of 13

    “Rampion Offshore Wind is owned by E. ON, UK Green Investment Bank and Enbridge”

    Contents

    1) Notice to Mariners (NtM) (Active) ......................................................................................................... 2

    2) Hazards/Mitigation for Project Vessels and PAX ............................................................................... 3

    3) WTG Installation Vessel ............................................................................................................................. 4

    4) Array cable installation Vessel ................................................................................................................... 4

    5) Rock Pad Installation ................................................................................................................................. 4

    6) Top Side Installation Vessels ..................................................................................................................... 4

    7) UXO & Boulder ROV and Grab Operations ................................................................................................ 5

    8) Survey Vessel ............................................................................................................................................. 5

    9) Guard Vessels ............................................................................................................................................ 6

    10) Crew Transfer Vessels ................................................................................................................................ 6

    11) Upcoming Operations (following 7 days) ............................................................................................ 9

    12) Summary of Operations (previous 7 days) ....................................................................................... 10

    13) Looking further ahead (beyond 7 days) (new activities starting) ................................................... 10

    14) Project Met mast details....................................................................................................................... 10

    15) Project Wave Rider ............................................................................................................................... 10

    16) As Laid Cardinal Buoy Positions ........................................................................................................ 11

    17) Contact details ....................................................................................................................................... 11

    18) Site Chart ............................................................................................................................................... 12

    19) WTG Coordinates in LAT and LON .................................................................................................... 13

  • Weekly Notice of Operations (WNoO)

    Rampion Offshore Wind Farm Limited Construction Operations

    Issue Date: 03/04/2017 RAM-ERA-LOG-NOT-0001_67 - Weekly Notice of Operations

    Page 2 of 13

    “Rampion Offshore Wind is owned by E. ON, UK Green Investment Bank and Enbridge”

    WNoO application:

    - Issued weekly by the ROW Project Marine Co-ordination Team

    - Notice to Mariners (NtM) will be issued for any unplanned/unmarked navigational hazards introduced by the project within our area of operation

    1) Notice to Mariners (NtM) (Active)

    Notice to Mariners Ref.

    Date of Issue

    Activity (Vessel in brackets) Status of

    Works Expected close out

    ROWF NTM001

    15/12/2015 ROWF Cardinal as Laid Positions Ongoing June 2018

    ROWF NTM009

    10/03/2016 Approval of Safety Zones Ongoing June 2018

    ROWF NTM016

    27/05/2016 Installation Rock Pads Ongoing June 2018

    ROWF NTM017

    24/06/2016 Installation Rock Pads Round 2 Ongoing June 2018

    ROWF NTM032

    28/09/2016 Revised Project Wave Rider

    Positions Ongoing June 2018

    ROWF NTM042

    09/02/2017 Special Marks on HDD ducts inshore Export cable

    Ongoing 15/03/2017

    ROWF NTM049

    09/02/2017 Safe distances of all structures within Rampion Offshore Wind

    Ongoing Until further notice

    ROWF NTM056

    28/03/2017 Revised Export Cable Hazards Ongoing Until further notice

    ROWF NTM057

    28/03/2017 Inter Array cables shallow buried/exposed cable hazards

    Ongoing Until further notice

    ROWF NTM 058

    29/03/2017 Rock Pad Installation Ongoing Until further notice

    ROWF NTM 059

    29/03/2017 UXO & Boulder ROV and Grab Operations

    Ongoing 15/04/2017

    ROWF NTM 060

    01-04-2016 Installation Of Offshore Substation Topside

    Ongoing 30-05-2016

  • Weekly Notice of Operations (WNoO)

    Rampion Offshore Wind Farm Limited Construction Operations

    Issue Date: 03/04/2017 RAM-ERA-LOG-NOT-0001_67 - Weekly Notice of Operations

    Page 3 of 13

    “Rampion Offshore Wind is owned by E. ON, UK Green Investment Bank and Enbridge”

    Secretary of State has approved our application for statutory Safety Zones (08/03/16) during the

    construction of the Rampion Wind Farm. These Safety Zones are defined as:

    • 500m around all structures (where construction vessels are present)

    • 50m around all structures (whilst personnel are working on them) including the offshore sub

    station.

    All project vessel masters and 3rd party sea users are requested to remain a minimum safe distance of

    500m around each vessel. Project vessels are to keep a sharp lookout (Radar/AIS and visual) for non-

    project vessels entering these zones and report to Duty MC via VHF P1 ASAP.

    2) Hazards/Mitigation for Project Vessels and PAX

    • GSK pipeline

    o 30m Safety Zone either side of the GSK pipeline situated to the East of the export cable

    corridor. No project vessels will be permitted to enter this safety zone without prior

    permission by the Duty MC

    • Redundant sewage outfall pipeline

    o 30m Safety Zone either side of the redundant sewage outfall pipeline to the west of the

    cable route

    • Fishing gear

    o All Vessels to keep a sharp lookout and report any fishing gear to duty MC who will in

    turn distribute information to all other project vessels.

    o All vessels to operate appropriately where the hazard of fishing gear exists

    • Fishing vessels

    o Standing order for all project vessels to pass at a safe distance.

    • Dive Vessels/Divers

    o Standing order for all project vessels to pass at a safe distance

    o Specifically, if any vessel is present over a known dive site, project vessels are to pass a

    minimum of 1NM uptide.

    • Scour protection and exposed cables on sea bed around foundations

    o Guard vessel in operation

    o Co-ordinates disseminated to FLOs

    • Subsea cables (buried, shallow buried and surface laid).

    o All project vessels to keep a sharp lookout for third party sea users venturing near

    subsea cables laid on sea bed. Report any such instances to Traffic ASAP.

    • Drift Netting

    o Project vessels to operate acordingly during transits in darkness with regard to the

    commencement of the drift net season

    Refer to Documents RAM-ERA-SMG-SAF-0001_00 (Guidelines for CTV operators on specific hazards)

    • Ensure all project vessels have latest Office Site Chart-currently REV 44-21.03.17

  • Weekly Notice of Operations (WNoO)

    Rampion Offshore Wind Farm Limited Construction Operations Issue Date: 03/04/2017 RAM-ERA-LOG-NOT-0001_67 - Weekly Notice of Operations

    Page 4 of 13

    “Rampion Offshore Wind is owned by E. ON, UK Green Investment Bank and Enbridge”

    Name Flag Call Sign/MMSI Contact

    Info L (m) B (m) D (m) GT (t) Contractor Status (Start) Picture

    3) WTG Installation Vessel

    MPI Discovery NL PCFF/246741000

    VHF Ch16 and

    P1

    138 40 5.9 19533 Eon WTG Installation Start

    01/03/2017

    4) Array cable installation Vessel

    Fugro Symphony

    BS C6YY3/9492581 VHF

    CH16/P1 130 24 5.9 11324 HBC

    Array cable installation Start 07/04/2017

    5) Rock Pad Installation

    Nordnes NL PHOG/244962000 VHF

    CH16/P1 166 24.5 7.2 18226 Van Oord

    Rock pad Installation 07/04/2017

    6) Top Side Installation Vessels

    Rambiz BL ORKA/205132000 VHF

    CH16/P1 85 44.4 3.8 7547 Scaldis Heavy Lift Vessel March 2017

    http://www.marinetraffic.com/en/photos/of/ships/shipid:373629/ship_name:FUGRO SYMPHONY#1329798

  • Weekly Notice of Operations (WNoO)

    Rampion Offshore Wind Farm Limited Construction Operations Issue Date: 03/04/2017 RAM-ERA-LOG-NOT-0001_67 - Weekly Notice of Operations

    Page 5 of 13

    “Rampion Offshore Wind is owned by E. ON, UK Green Investment Bank and Enbridge”

    Name Flag Call Sign/MMSI Contact

    Info L (m) B (m) D (m) GT (t) Contractor Status (Start) Picture

    AMT Venturer NW LG2019 VHF

    CH16/P1 120 33.5 5.7 8191 Scaldis Lay Barge 04/04/2017

    Mustang CY 5BZD2/212854000 VHF

    CH16/P1 35.5 10.5 4 332 Scaldis Anchor Handler April 2017

    Multratug 4 NLs PDBV/244740921 VHF

    CH16/P1 34.5 11.6 6.8 497 Scaldis Anchor Handler April 2017

    7) UXO & Boulder ROV and Grab Operations

    Grand Canyon NL 3EVR8/370505000 VHF

    CH16/P1 125.6 30 6.8 12652 Fisher ROV Operations 07/04/2017

    8) Survey Vessel

    RRV Audrey (UK) 2CTN7/235075634 VHF

    CH16/P1 13 6 1.1 13.5 Turbine Transfers

    Survey’s. Working out of

    Brighton Start 01-11-2016

  • Weekly Notice of Operations (WNoO)

    Rampion Offshore Wind Farm Limited Construction Operations Issue Date: 03/04/2017 RAM-ERA-LOG-NOT-0001_67 - Weekly Notice of Operations

    Page 6 of 13

    “Rampion Offshore Wind is owned by E. ON, UK Green Investment Bank and Enbridge”

    Name Flag Call Sign/MMSI Contact

    Info L (m) B (m) D (m) GT (t) Contractor Status (Start) Picture

    9) Guard Vessels

    George Johannes (UK) MCPF5/232006450 VHF

    CH16/P1 26.27 6.48 3.2 122 Choice Marine

    Guard Boat Duties 24/7 Start 31/03/2016

    Commodore P (UK) 2GIR2/235097729 VHF

    CH16/P1 18 6 0.9 27

    Offshore Turbine Services

    Fast Response Guard vessel Start 26/09/2016

    10) Crew Transfer Vessels

    Rix Tiger (UK) 2GGY4/235097309 VHF

    CH16/P1 19 9 1.8 42 Rix Sea Shuttle

    CTV and Ad-hoc Inspections Working out of Newhaven

    Start 01/08/2016

    Rix Panther (UK) 2FRT9/235093688 VHF

    CH16/P1 19 8 1.5 42 Rix Sea Shuttle

    CTV and Ad-hoc Inspections Working out of Newhaven

    Start 15/03/2016

    Windcat 6 (UK) MXFD/235057789 VHF CH

    16/P1 16 6 2 40 Windcat

    Site CTV Working out of Newhaven

    Windcat 10 (UK) 2BAN2/235064453 VHF

    CH16/P1 22 6 2 36 Windcat

    Bolt Tensioning CTV Working out of Newhaven

    Start 29/07/2016

    https://www.marinetraffic.com/en/photos/of/ships/shipid:192472/ship_name:WINDCAT 6#99249

  • Weekly Notice of Operations (WNoO)

    Rampion Offshore Wind Farm Limited Construction Operations Issue Date: 03/04/2017 RAM-ERA-LOG-NOT-0001_67 - Weekly Notice of Operations

    Page 7 of 13

    “Rampion Offshore Wind is owned by E. ON, UK Green Investment Bank and Enbridge”

    Name Flag Call Sign/MMSI Contact

    Info L (m) B (m) D (m) GT (t) Contractor Status (Start) Picture

    Windcat 12 (UK) 2B008/235067955 VHF

    CH16/P1 18 6 2.0 31 Windcat

    Site CTV Working out of Newhaven

    Start 14/03/2016

    Windcat 17 (UK) 2BYDS/235070402 VHF

    CH16/P1 18 6 2.5 35 Windcat

    Bolt Tensioning CTV Working out of Newhaven

    Start 19/09/2016

    Windcat 19 (UK) 2CUS9/235075935 VHF

    CH16/P1 22 6.5 1.9 40 Windcat

    WTG Commissioning Start

    06/03/2017

    Windcat 22 (UK) 2CUS9/235075935 VHF

    CH16/P1 22 6.5 2.1 40 Windcat

    Bolt Tensioning CTV Working out of Newhaven

    Start 11/01/2016

    Njord Snipe (UK) 2HGH2/235103431 VHF

    CH16/P1 20 8 1.8 65 Njord Offshore

    Terminations Package Support Vessel

    Working out of Newhaven Start 26/09/2016

    Njord Skua (UK) 2HGG9/235103429 VHF

    CH16/P1 20 8 1.8 65 Njord Offshore

    Terminations Package Support Vessel Working out of Newhaven 26/09/2016

    Kinmel Bay (UK) 2FDF9/235090273 VHF

    CH16/P1 19 7 1.2 37.7 Turbine Transfers Fugro HBC Start 29/03/2017

    Penrhos Bay (UK) 2DLB8/235079909 VHF

    CH16/P1 20 8 1.4 51.4 Turbine Transfers

    Fugro HBC Vessel Working out of Shoreham Start 06-04-

    2017

  • Weekly Notice of Operations (WNoO)

    Rampion Offshore Wind Farm Limited Construction Operations Issue Date: 03/04/2017 RAM-ERA-LOG-NOT-0001_67 - Weekly Notice of Operations

    Page 8 of 13

    “Rampion Offshore Wind is owned by E. ON, UK Green Investment Bank and Enbridge”

    Name Flag Call Sign/MMSI Contact

    Info L (m) B (m) D (m) GT (t) Contractor Status (Start) Picture

    Porth Nefyn (UK) 2IRQ8/235112231 VHF

    CH16/P1 19 8 1.6 48.1 Turbine Transfers

    WTG M&E completion Start

    07/04/2017

    Sure Pilgrim (UK) 2GEJ9/235096669 VHF CH

    16/P1 20 8 2 67 Surewind

    WTG Commissioning Start

    06/03/2017

    Trearddur Bay (UK) 2IBZ5/235108448 VHF CH

    16/P1 19 8 1.7 37 Turbine Transfers

    WTG M&E completion Start

    06/03/2017

    Porth Eilian (UK) 2GNX8/235099056 VHF CH

    16/P1 18 8 1.9 55 Turbine Transfers

    WTG M&E completion Start

    11/03/2017

    https://www.marinetraffic.com/en/photos/of/ships/shipid:200031/ship_name:SURE PILGRIM#1100262

  • Weekly Notice of Operations (WNoO)

    Rampion Offshore Wind Farm Limited Construction Operations

    Issue Date: 03/04/2017 RAM-ERA-LOG-NOT-0001_67 - Weekly Notice of Operations

    Page 9 of 13

    “Rampion Offshore Wind is owned by E. ON, UK Green Investment Bank and Enbridge”

    11) Upcoming Operations (following 7 days)

    Operation Location Vessel Operational Notes

    WTG Installation

    Loadout 1 I02.J02.H01.I01

    MPI Discovery Arrived on site

    09.03.17

    Array Cable Terminations

    I08, K12, J08, K13,J13, J14 Njord Snipe, Njord Skua

    Operations are due to be completed by end

    2017

    WTG M&E completion/co

    mmisioning G03. G02.H02. I02.J02. H01.I01. F03.

    Trearddur Bay Windcat 19 Sure Pilgrim

    Ongoing

    Servicing /

    Snagging /

    Crew Change All Locations

    Windcat 12,6 Rix

    Tiger/Panther

    AToN replacement / cleaning, Flange

    Survey, Sealing Kits / Shells, Inspections

    Foundation Bolt tensioning

    I06, F14, O07, J07, K07 I14, G13, H12,E12

    L07, I07, N09, M10, H08

    Windcat 10 Windcat 17 Windcat 22

    Ongoing

    Project Guard vessels

    Site 24hr Guard Vessels George – Johannes,

    Commodore P,

    Guarding Windfarm and Export cable

    route

    Survey Multibeam Surveys Audrey

    Ongoing operations until end of construction Start Sept 16

    Installation of Offshore

    Substation Topside

    Offshore Sub Station

    Rambiz AMT Venturer Mustang Tug Multratug 4

    Commencing week starting 03/04/2017

    Boulder Clearance and

    UXO

    Boulder clearance for OSP/Fibre Optic

    cable installation

    Grand Canyon 07/04/2017

    Rock Pad Installation

    Installation of rock berms at OSP

    Nordnes 07/04/2017

    All Mariners Operating in the Vicinity of Rampion Offshore Wind

    Farm are advised to familiarise themselves with MGN 372

    https://www.gov.uk/government/uploads/system/uploads/attachme

    nt_data/file/440734/MGN_372.pdf

    https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/440734/MGN_372.pdfhttps://www.gov.uk/government/uploads/system/uploads/attachment_data/file/440734/MGN_372.pdf

  • Weekly Notice of Operations (WNoO)

    Rampion Offshore Wind Farm Limited Construction Operations

    Issue Date: 03/04/2017 RAM-ERA-LOG-NOT-0001_67 - Weekly Notice of Operations

    Page 10 of 13

    “Rampion Offshore Wind is owned by E. ON, UK Green Investment Bank and Enbridge”

    12) Summary of Operations (previous 7 days)

    • Guard vessel offshore 24/7

    • WTG installation

    • MVOW mechanical completions.

    • Ongoing surveys

    • Terminations

    • Bolting

    13) Looking further ahead (beyond 7 days) (new activities starting)

    • Array Cable installation/ burial Phase 2

    • Flotel arriving end of April.

    • Boulder clearance for OSP/Fibre Optic cable installation

    • Substation Topside Installation

    14) Project Met mast details

    • The current lattice structure has failed and will be replaced in due course.

    • Currently on the sea bed at coordinates below:

    ID Latitude Longitude

    Met mast 50°41.287'N 0°20.594'W

    15) Project Wave Rider

    ID Latitude Longitude

    Wave Rider No1 50o 41.675’ N 000o 16.299’ W As Laid

    Wave Rider No2 50o 40.219’ N 000o 12.949’ W As Laid

    Wave Rider No3 50o 39.037’ N 000o 19.644’ W As Laid

  • Weekly Notice of Operations (WNoO)

    Rampion Offshore Wind Farm Limited Construction Operations

    Issue Date: 03/04/2017 RAM-ERA-LOG-NOT-0001_67 - Weekly Notice of Operations

    Page 11 of 13

    “Rampion Offshore Wind is owned by E. ON, UK Green Investment Bank and Enbridge”

    16) As Laid Cardinal Buoy Positions

    Cardinal Name Light Signature Deployed Latitude Deployed Longitude

    North 1(AIS) Q 50° 41.377’N 0° 21.898’W

    North 2 V Q 50° 42.072’N 0° 17.098’W

    North 3 (AIS) Q 50° 42.771’N 0° 12.286’W

    East 1 Q (3) 10s 50° 41.050’N 0° 11.311’W

    South 1(AIS) Q (6) + L Fl 15s 50° 39.172'N 0° 11.363'W

    South 2 V Q (6)+L Fl 10s 50° 38.398’N 0° 16. 147’W

    South 3 (AIS) Q (6) + L Fl 15s 50° 37.631’N 0° 20.931’W

    West 1 Q (9) + 15s 50° 39.439’N 0° 21.930’W

    17) Contact details

    • Gordon Bain (Lead Marine Coordinator)

    o Tel: +44 (0) 7816 648082

    o Email: [email protected]

    • Duty Marine Coordinator

    o Tel: +44 (0) 7557 942945

    o Email: [email protected]

    mailto:[email protected]:[email protected]

  • Weekly Notice of Operations (WNoO)

    Rampion Offshore Wind Farm Limited Construction Operations

    Issue Date: 03/04/2017 RAM-ERA-LOG-NOT-0001_67 - Weekly Notice of Operations

    Page 12 of 13

    “Rampion Offshore Wind is owned by E. ON, UK Green Investment Bank and Enbridge”

    18) Site Chart

  • Weekly Notice of Operations (WNoO)

    Rampion Offshore Wind Farm Limited Construction Operations

    Issue Date: 03/04/2017 RAM-ERA-LOG-NOT-0001_67 - Weekly Notice of Operations

    Page 13 of 13

    “Rampion Offshore Wind is owned by E. ON, UK Green Investment Bank and Enbridge”

    19) WTG Coordinates in LAT and LON