Weekly Notice of Operations (WNoO) - Rampion Offshore Wind · 2017. 10. 10. · NTM 060 01-04-2016...
Transcript of Weekly Notice of Operations (WNoO) - Rampion Offshore Wind · 2017. 10. 10. · NTM 060 01-04-2016...
-
Weekly Notice of Operations (WNoO)
Rampion Offshore Wind Farm Limited Construction Operations
Issue Date: 03/04/2017 RAM-ERA-LOG-NOT-0001_67 - Weekly Notice of Operations
Page 1 of 13
“Rampion Offshore Wind is owned by E. ON, UK Green Investment Bank and Enbridge”
Contents
1) Notice to Mariners (NtM) (Active) ......................................................................................................... 2
2) Hazards/Mitigation for Project Vessels and PAX ............................................................................... 3
3) WTG Installation Vessel ............................................................................................................................. 4
4) Array cable installation Vessel ................................................................................................................... 4
5) Rock Pad Installation ................................................................................................................................. 4
6) Top Side Installation Vessels ..................................................................................................................... 4
7) UXO & Boulder ROV and Grab Operations ................................................................................................ 5
8) Survey Vessel ............................................................................................................................................. 5
9) Guard Vessels ............................................................................................................................................ 6
10) Crew Transfer Vessels ................................................................................................................................ 6
11) Upcoming Operations (following 7 days) ............................................................................................ 9
12) Summary of Operations (previous 7 days) ....................................................................................... 10
13) Looking further ahead (beyond 7 days) (new activities starting) ................................................... 10
14) Project Met mast details....................................................................................................................... 10
15) Project Wave Rider ............................................................................................................................... 10
16) As Laid Cardinal Buoy Positions ........................................................................................................ 11
17) Contact details ....................................................................................................................................... 11
18) Site Chart ............................................................................................................................................... 12
19) WTG Coordinates in LAT and LON .................................................................................................... 13
-
Weekly Notice of Operations (WNoO)
Rampion Offshore Wind Farm Limited Construction Operations
Issue Date: 03/04/2017 RAM-ERA-LOG-NOT-0001_67 - Weekly Notice of Operations
Page 2 of 13
“Rampion Offshore Wind is owned by E. ON, UK Green Investment Bank and Enbridge”
WNoO application:
- Issued weekly by the ROW Project Marine Co-ordination Team
- Notice to Mariners (NtM) will be issued for any unplanned/unmarked navigational hazards introduced by the project within our area of operation
1) Notice to Mariners (NtM) (Active)
Notice to Mariners Ref.
Date of Issue
Activity (Vessel in brackets) Status of
Works Expected close out
ROWF NTM001
15/12/2015 ROWF Cardinal as Laid Positions Ongoing June 2018
ROWF NTM009
10/03/2016 Approval of Safety Zones Ongoing June 2018
ROWF NTM016
27/05/2016 Installation Rock Pads Ongoing June 2018
ROWF NTM017
24/06/2016 Installation Rock Pads Round 2 Ongoing June 2018
ROWF NTM032
28/09/2016 Revised Project Wave Rider
Positions Ongoing June 2018
ROWF NTM042
09/02/2017 Special Marks on HDD ducts inshore Export cable
Ongoing 15/03/2017
ROWF NTM049
09/02/2017 Safe distances of all structures within Rampion Offshore Wind
Ongoing Until further notice
ROWF NTM056
28/03/2017 Revised Export Cable Hazards Ongoing Until further notice
ROWF NTM057
28/03/2017 Inter Array cables shallow buried/exposed cable hazards
Ongoing Until further notice
ROWF NTM 058
29/03/2017 Rock Pad Installation Ongoing Until further notice
ROWF NTM 059
29/03/2017 UXO & Boulder ROV and Grab Operations
Ongoing 15/04/2017
ROWF NTM 060
01-04-2016 Installation Of Offshore Substation Topside
Ongoing 30-05-2016
-
Weekly Notice of Operations (WNoO)
Rampion Offshore Wind Farm Limited Construction Operations
Issue Date: 03/04/2017 RAM-ERA-LOG-NOT-0001_67 - Weekly Notice of Operations
Page 3 of 13
“Rampion Offshore Wind is owned by E. ON, UK Green Investment Bank and Enbridge”
Secretary of State has approved our application for statutory Safety Zones (08/03/16) during the
construction of the Rampion Wind Farm. These Safety Zones are defined as:
• 500m around all structures (where construction vessels are present)
• 50m around all structures (whilst personnel are working on them) including the offshore sub
station.
All project vessel masters and 3rd party sea users are requested to remain a minimum safe distance of
500m around each vessel. Project vessels are to keep a sharp lookout (Radar/AIS and visual) for non-
project vessels entering these zones and report to Duty MC via VHF P1 ASAP.
2) Hazards/Mitigation for Project Vessels and PAX
• GSK pipeline
o 30m Safety Zone either side of the GSK pipeline situated to the East of the export cable
corridor. No project vessels will be permitted to enter this safety zone without prior
permission by the Duty MC
• Redundant sewage outfall pipeline
o 30m Safety Zone either side of the redundant sewage outfall pipeline to the west of the
cable route
• Fishing gear
o All Vessels to keep a sharp lookout and report any fishing gear to duty MC who will in
turn distribute information to all other project vessels.
o All vessels to operate appropriately where the hazard of fishing gear exists
• Fishing vessels
o Standing order for all project vessels to pass at a safe distance.
• Dive Vessels/Divers
o Standing order for all project vessels to pass at a safe distance
o Specifically, if any vessel is present over a known dive site, project vessels are to pass a
minimum of 1NM uptide.
• Scour protection and exposed cables on sea bed around foundations
o Guard vessel in operation
o Co-ordinates disseminated to FLOs
• Subsea cables (buried, shallow buried and surface laid).
o All project vessels to keep a sharp lookout for third party sea users venturing near
subsea cables laid on sea bed. Report any such instances to Traffic ASAP.
• Drift Netting
o Project vessels to operate acordingly during transits in darkness with regard to the
commencement of the drift net season
Refer to Documents RAM-ERA-SMG-SAF-0001_00 (Guidelines for CTV operators on specific hazards)
• Ensure all project vessels have latest Office Site Chart-currently REV 44-21.03.17
-
Weekly Notice of Operations (WNoO)
Rampion Offshore Wind Farm Limited Construction Operations Issue Date: 03/04/2017 RAM-ERA-LOG-NOT-0001_67 - Weekly Notice of Operations
Page 4 of 13
“Rampion Offshore Wind is owned by E. ON, UK Green Investment Bank and Enbridge”
Name Flag Call Sign/MMSI Contact
Info L (m) B (m) D (m) GT (t) Contractor Status (Start) Picture
3) WTG Installation Vessel
MPI Discovery NL PCFF/246741000
VHF Ch16 and
P1
138 40 5.9 19533 Eon WTG Installation Start
01/03/2017
4) Array cable installation Vessel
Fugro Symphony
BS C6YY3/9492581 VHF
CH16/P1 130 24 5.9 11324 HBC
Array cable installation Start 07/04/2017
5) Rock Pad Installation
Nordnes NL PHOG/244962000 VHF
CH16/P1 166 24.5 7.2 18226 Van Oord
Rock pad Installation 07/04/2017
6) Top Side Installation Vessels
Rambiz BL ORKA/205132000 VHF
CH16/P1 85 44.4 3.8 7547 Scaldis Heavy Lift Vessel March 2017
http://www.marinetraffic.com/en/photos/of/ships/shipid:373629/ship_name:FUGRO SYMPHONY#1329798
-
Weekly Notice of Operations (WNoO)
Rampion Offshore Wind Farm Limited Construction Operations Issue Date: 03/04/2017 RAM-ERA-LOG-NOT-0001_67 - Weekly Notice of Operations
Page 5 of 13
“Rampion Offshore Wind is owned by E. ON, UK Green Investment Bank and Enbridge”
Name Flag Call Sign/MMSI Contact
Info L (m) B (m) D (m) GT (t) Contractor Status (Start) Picture
AMT Venturer NW LG2019 VHF
CH16/P1 120 33.5 5.7 8191 Scaldis Lay Barge 04/04/2017
Mustang CY 5BZD2/212854000 VHF
CH16/P1 35.5 10.5 4 332 Scaldis Anchor Handler April 2017
Multratug 4 NLs PDBV/244740921 VHF
CH16/P1 34.5 11.6 6.8 497 Scaldis Anchor Handler April 2017
7) UXO & Boulder ROV and Grab Operations
Grand Canyon NL 3EVR8/370505000 VHF
CH16/P1 125.6 30 6.8 12652 Fisher ROV Operations 07/04/2017
8) Survey Vessel
RRV Audrey (UK) 2CTN7/235075634 VHF
CH16/P1 13 6 1.1 13.5 Turbine Transfers
Survey’s. Working out of
Brighton Start 01-11-2016
-
Weekly Notice of Operations (WNoO)
Rampion Offshore Wind Farm Limited Construction Operations Issue Date: 03/04/2017 RAM-ERA-LOG-NOT-0001_67 - Weekly Notice of Operations
Page 6 of 13
“Rampion Offshore Wind is owned by E. ON, UK Green Investment Bank and Enbridge”
Name Flag Call Sign/MMSI Contact
Info L (m) B (m) D (m) GT (t) Contractor Status (Start) Picture
9) Guard Vessels
George Johannes (UK) MCPF5/232006450 VHF
CH16/P1 26.27 6.48 3.2 122 Choice Marine
Guard Boat Duties 24/7 Start 31/03/2016
Commodore P (UK) 2GIR2/235097729 VHF
CH16/P1 18 6 0.9 27
Offshore Turbine Services
Fast Response Guard vessel Start 26/09/2016
10) Crew Transfer Vessels
Rix Tiger (UK) 2GGY4/235097309 VHF
CH16/P1 19 9 1.8 42 Rix Sea Shuttle
CTV and Ad-hoc Inspections Working out of Newhaven
Start 01/08/2016
Rix Panther (UK) 2FRT9/235093688 VHF
CH16/P1 19 8 1.5 42 Rix Sea Shuttle
CTV and Ad-hoc Inspections Working out of Newhaven
Start 15/03/2016
Windcat 6 (UK) MXFD/235057789 VHF CH
16/P1 16 6 2 40 Windcat
Site CTV Working out of Newhaven
Windcat 10 (UK) 2BAN2/235064453 VHF
CH16/P1 22 6 2 36 Windcat
Bolt Tensioning CTV Working out of Newhaven
Start 29/07/2016
https://www.marinetraffic.com/en/photos/of/ships/shipid:192472/ship_name:WINDCAT 6#99249
-
Weekly Notice of Operations (WNoO)
Rampion Offshore Wind Farm Limited Construction Operations Issue Date: 03/04/2017 RAM-ERA-LOG-NOT-0001_67 - Weekly Notice of Operations
Page 7 of 13
“Rampion Offshore Wind is owned by E. ON, UK Green Investment Bank and Enbridge”
Name Flag Call Sign/MMSI Contact
Info L (m) B (m) D (m) GT (t) Contractor Status (Start) Picture
Windcat 12 (UK) 2B008/235067955 VHF
CH16/P1 18 6 2.0 31 Windcat
Site CTV Working out of Newhaven
Start 14/03/2016
Windcat 17 (UK) 2BYDS/235070402 VHF
CH16/P1 18 6 2.5 35 Windcat
Bolt Tensioning CTV Working out of Newhaven
Start 19/09/2016
Windcat 19 (UK) 2CUS9/235075935 VHF
CH16/P1 22 6.5 1.9 40 Windcat
WTG Commissioning Start
06/03/2017
Windcat 22 (UK) 2CUS9/235075935 VHF
CH16/P1 22 6.5 2.1 40 Windcat
Bolt Tensioning CTV Working out of Newhaven
Start 11/01/2016
Njord Snipe (UK) 2HGH2/235103431 VHF
CH16/P1 20 8 1.8 65 Njord Offshore
Terminations Package Support Vessel
Working out of Newhaven Start 26/09/2016
Njord Skua (UK) 2HGG9/235103429 VHF
CH16/P1 20 8 1.8 65 Njord Offshore
Terminations Package Support Vessel Working out of Newhaven 26/09/2016
Kinmel Bay (UK) 2FDF9/235090273 VHF
CH16/P1 19 7 1.2 37.7 Turbine Transfers Fugro HBC Start 29/03/2017
Penrhos Bay (UK) 2DLB8/235079909 VHF
CH16/P1 20 8 1.4 51.4 Turbine Transfers
Fugro HBC Vessel Working out of Shoreham Start 06-04-
2017
-
Weekly Notice of Operations (WNoO)
Rampion Offshore Wind Farm Limited Construction Operations Issue Date: 03/04/2017 RAM-ERA-LOG-NOT-0001_67 - Weekly Notice of Operations
Page 8 of 13
“Rampion Offshore Wind is owned by E. ON, UK Green Investment Bank and Enbridge”
Name Flag Call Sign/MMSI Contact
Info L (m) B (m) D (m) GT (t) Contractor Status (Start) Picture
Porth Nefyn (UK) 2IRQ8/235112231 VHF
CH16/P1 19 8 1.6 48.1 Turbine Transfers
WTG M&E completion Start
07/04/2017
Sure Pilgrim (UK) 2GEJ9/235096669 VHF CH
16/P1 20 8 2 67 Surewind
WTG Commissioning Start
06/03/2017
Trearddur Bay (UK) 2IBZ5/235108448 VHF CH
16/P1 19 8 1.7 37 Turbine Transfers
WTG M&E completion Start
06/03/2017
Porth Eilian (UK) 2GNX8/235099056 VHF CH
16/P1 18 8 1.9 55 Turbine Transfers
WTG M&E completion Start
11/03/2017
https://www.marinetraffic.com/en/photos/of/ships/shipid:200031/ship_name:SURE PILGRIM#1100262
-
Weekly Notice of Operations (WNoO)
Rampion Offshore Wind Farm Limited Construction Operations
Issue Date: 03/04/2017 RAM-ERA-LOG-NOT-0001_67 - Weekly Notice of Operations
Page 9 of 13
“Rampion Offshore Wind is owned by E. ON, UK Green Investment Bank and Enbridge”
11) Upcoming Operations (following 7 days)
Operation Location Vessel Operational Notes
WTG Installation
Loadout 1 I02.J02.H01.I01
MPI Discovery Arrived on site
09.03.17
Array Cable Terminations
I08, K12, J08, K13,J13, J14 Njord Snipe, Njord Skua
Operations are due to be completed by end
2017
WTG M&E completion/co
mmisioning G03. G02.H02. I02.J02. H01.I01. F03.
Trearddur Bay Windcat 19 Sure Pilgrim
Ongoing
Servicing /
Snagging /
Crew Change All Locations
Windcat 12,6 Rix
Tiger/Panther
AToN replacement / cleaning, Flange
Survey, Sealing Kits / Shells, Inspections
Foundation Bolt tensioning
I06, F14, O07, J07, K07 I14, G13, H12,E12
L07, I07, N09, M10, H08
Windcat 10 Windcat 17 Windcat 22
Ongoing
Project Guard vessels
Site 24hr Guard Vessels George – Johannes,
Commodore P,
Guarding Windfarm and Export cable
route
Survey Multibeam Surveys Audrey
Ongoing operations until end of construction Start Sept 16
Installation of Offshore
Substation Topside
Offshore Sub Station
Rambiz AMT Venturer Mustang Tug Multratug 4
Commencing week starting 03/04/2017
Boulder Clearance and
UXO
Boulder clearance for OSP/Fibre Optic
cable installation
Grand Canyon 07/04/2017
Rock Pad Installation
Installation of rock berms at OSP
Nordnes 07/04/2017
All Mariners Operating in the Vicinity of Rampion Offshore Wind
Farm are advised to familiarise themselves with MGN 372
https://www.gov.uk/government/uploads/system/uploads/attachme
nt_data/file/440734/MGN_372.pdf
https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/440734/MGN_372.pdfhttps://www.gov.uk/government/uploads/system/uploads/attachment_data/file/440734/MGN_372.pdf
-
Weekly Notice of Operations (WNoO)
Rampion Offshore Wind Farm Limited Construction Operations
Issue Date: 03/04/2017 RAM-ERA-LOG-NOT-0001_67 - Weekly Notice of Operations
Page 10 of 13
“Rampion Offshore Wind is owned by E. ON, UK Green Investment Bank and Enbridge”
12) Summary of Operations (previous 7 days)
• Guard vessel offshore 24/7
• WTG installation
• MVOW mechanical completions.
• Ongoing surveys
• Terminations
• Bolting
13) Looking further ahead (beyond 7 days) (new activities starting)
• Array Cable installation/ burial Phase 2
• Flotel arriving end of April.
• Boulder clearance for OSP/Fibre Optic cable installation
• Substation Topside Installation
14) Project Met mast details
• The current lattice structure has failed and will be replaced in due course.
• Currently on the sea bed at coordinates below:
ID Latitude Longitude
Met mast 50°41.287'N 0°20.594'W
15) Project Wave Rider
ID Latitude Longitude
Wave Rider No1 50o 41.675’ N 000o 16.299’ W As Laid
Wave Rider No2 50o 40.219’ N 000o 12.949’ W As Laid
Wave Rider No3 50o 39.037’ N 000o 19.644’ W As Laid
-
Weekly Notice of Operations (WNoO)
Rampion Offshore Wind Farm Limited Construction Operations
Issue Date: 03/04/2017 RAM-ERA-LOG-NOT-0001_67 - Weekly Notice of Operations
Page 11 of 13
“Rampion Offshore Wind is owned by E. ON, UK Green Investment Bank and Enbridge”
16) As Laid Cardinal Buoy Positions
Cardinal Name Light Signature Deployed Latitude Deployed Longitude
North 1(AIS) Q 50° 41.377’N 0° 21.898’W
North 2 V Q 50° 42.072’N 0° 17.098’W
North 3 (AIS) Q 50° 42.771’N 0° 12.286’W
East 1 Q (3) 10s 50° 41.050’N 0° 11.311’W
South 1(AIS) Q (6) + L Fl 15s 50° 39.172'N 0° 11.363'W
South 2 V Q (6)+L Fl 10s 50° 38.398’N 0° 16. 147’W
South 3 (AIS) Q (6) + L Fl 15s 50° 37.631’N 0° 20.931’W
West 1 Q (9) + 15s 50° 39.439’N 0° 21.930’W
17) Contact details
• Gordon Bain (Lead Marine Coordinator)
o Tel: +44 (0) 7816 648082
o Email: [email protected]
• Duty Marine Coordinator
o Tel: +44 (0) 7557 942945
o Email: [email protected]
-
Weekly Notice of Operations (WNoO)
Rampion Offshore Wind Farm Limited Construction Operations
Issue Date: 03/04/2017 RAM-ERA-LOG-NOT-0001_67 - Weekly Notice of Operations
Page 12 of 13
“Rampion Offshore Wind is owned by E. ON, UK Green Investment Bank and Enbridge”
18) Site Chart
-
Weekly Notice of Operations (WNoO)
Rampion Offshore Wind Farm Limited Construction Operations
Issue Date: 03/04/2017 RAM-ERA-LOG-NOT-0001_67 - Weekly Notice of Operations
Page 13 of 13
“Rampion Offshore Wind is owned by E. ON, UK Green Investment Bank and Enbridge”
19) WTG Coordinates in LAT and LON