We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

65
We help the best buildings in the world get that way. LDD Workshop Energy 101 2008
  • date post

    21-Dec-2015
  • Category

    Documents

  • view

    213
  • download

    0

Transcript of We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Page 1: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

We help the best buildings in the world get that way.

LDD WorkshopEnergy 101

2008

Page 2: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

We help the best buildings in the world get that way.

Special thanks to our workshop sponsors

Page 3: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

Workshop Objective

• Introduce the global perspective on energy economics.

• Identify what this means for your organization.• Begin to understand your energy bills.• Understand the impact of your energy use.• Consider a plan to manage your energy use.

Page 4: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

A Global Perspective

• Global energy demand• Hubbert theory of fossil fuel supply• How will this affect future costs?

Past history is the best predictor of future performance.

Page 5: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

Page 6: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

Page 7: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

Page 8: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

Page 9: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

What Does This Mean?

• Energy demand is growing• Increased reliance on fossil fuels• New discoveries fuel production• Production must meet growing demand

Page 10: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

Individual Oil Well Production

One oil well acts with a long, fairly stable plateau

-Source: diagrammatic

Page 11: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

Hubbert Curve: Four Oil Wells

Four wells begin to create a smooth curve

-Source: diagrammatic

Page 12: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

Hubbert Curve: Eight Oil Wells

Eight wells smoothes the curve more

-Source: diagrammatic

Page 13: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

Time

Idealized Hubbert Curve

Am

ount

The Hubbert Model

Hundreds or thousands of oil wells would ideally look like a bell curve

Page 14: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

The Hubbert Curve

Fossil fuel discoveries• Exponential growth• Peak numbers reached• Discoveries begin declining

Fossil fuel production• Wells are drilled – technology improves• Production increases• Peak output is reached• Production begins declining

Page 15: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

Discovery Production

Time

Idealized Discovery and Production Curves

Am

ount

The Hubbert Model

Discovery fuels the production

Page 16: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

US Oil Production

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

9,000

10,000

1946 1956 1966 1976 1986 1996 2006

Thousa

nd B

arr

els

Per

Day

Source: Energy Information Administration – www.eia.doe.gov

Oil Crisis

1970s oil production began to fall…what happened?

Page 17: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

Pennsylvania Coal ProductionA need for alternate sources!

Page 18: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

US Natural Gas Production

Source: Energy Information Administration – www.eia.doe.gov

0

50

100

150

200

250

300

350

400

450

500

1946 1956 1966 1976 1986 1996 2006

Thousa

nd C

F per

Day

Similar trend in natural gas

Page 19: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

Don’t see electric – It is a by-product of other fuels!

Energy: Important to Our Economy

Page 20: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

Fuel Price Escalations are Real

Price Summary

2004 2005 2006 2007 17% 33% 50%

Coal Anthracite 58.96 70.37 78.41 92.89 19.35% 11.43% 18.47% 16.29%

Coal Bituminous 47.09 47.1 46.23 85.95 0.02% -1.85% 85.92% 42.35%

Dieselc ($/gal) 1.81 2.41 2.81 2.78 33 16.5 -1 10.56%

Electric 5.87 5.81 5.97 6.02 -1.02% 2.75% 0.84% 1.15%

Gasolineb ($/gal)  1.85 2.27 2.65 2.66 22.7 17 0.3 9.62%

Heating Oild ($/gal) 1.54 2.04 2.42 2.46 32.5 18.5 1.8 12.53%

Natural Gasd ($/mcf) 10.75 12.82 13.88 13.39 19.3 8.3 -3.5 4.27%

Propane 60.11 73.51 92.12 101.87 22.29% 25.32% 10.58% 17.44%

WTI Crudea ($/barrel) 41.44 56.49 69.75 70.38 36.3 23.5 0.9 14.38%

c On-highway retail.                d Residential average. 

Year

a West Texas Intermediate.   b Average regular pump price.

AnnualIncrease

19.2%27.5%36.5%0.9%

22.3%37.0%14.9%23.2%23.3%

Page 21: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

Real Budget ImplicationsCurrent Condition

Annual Use Annual Cost 2008 2009 2010 2011 2012 2013 2014Increase Escalation Cost

Facility FuelsElectric 0.0% 3.2% 215,000$ 221,880$ 228,980$ 236,308$ 243,869$ 251,673$ 259,727$

Natural Gas 0.0% 18.7% 140,000$ 166,180$ 197,256$ 234,142$ 277,927$ 329,899$ 391,591$

Coal 0.0% 0.0% -$ -$ -$ -$ -$ -$ -$

Propane 0.0% 0.0% -$ -$ -$ -$ -$ -$ -$

Fuel Oil 0.0% 0.0% -$ -$ -$ -$ -$ -$ -$

Water Sewer 0.0% 1.1% 16,000$ 16,176$ 16,354$ 16,534$ 16,716$ 16,900$ 17,085$

Garbage 0.0% 8.2% 8,500$ 9,197$ 9,951$ 10,767$ 11,650$ 12,605$ 13,639$

Facility MaintenanceService Contracts 0.0% 7.5% 85,100$ 91,483$ 98,344$ 105,719$ 113,648$ 122,172$ 131,335$

Material & Parts 0.0% 0.0% -$ -$ -$ -$ -$ -$ -$

Other 0.0% 0.0% -$ -$ -$ -$ -$ -$ -$

Vehicle FuelsDeisel 0.0% 0.0% -$ -$ -$ -$ -$ -$ -$

Gasoline 0.0% 20.6% 3,800$ 4,583$ 5,527$ 6,665$ 8,038$ 9,694$ 11,691$

Other 0.0% 0.0% -$ -$ -$ -$ -$ -$ -$

Vehicle MaintenanceService Contracts 0.0% 3.0% -$ -$ -$ -$ -$ -$ -$

Material & Parts 0.0% 3.0% -$ -$ -$ -$ -$ -$ -$

Other 0.0% 0.0% -$ -$ -$ -$ -$ -$ -$

383,300$ 418,016$ 458,068$ 504,416$ 558,201$ 620,772$ 693,733$

85,100$ 91,483$ 98,344$ 105,719$ 113,648$ 122,172$ 131,335$

Facility & Vehicle Budget 468,400$ 509,498$ 556,411$ 610,136$ 671,849$ 742,944$ 825,068$

Total Budget 5,634,962$ 5,894,170$ 6,165,302$ 6,448,906$ 6,745,556$ 7,055,851$ 7,380,420$ Millage Value 2,997,310$ 3,057,256$ 3,118,401$ 3,180,769$ 3,244,385$ 3,309,272$ 3,375,458$ Facility & Vehicles

% of Budget 8.3% 8.6% 9.0% 9.5% 10.0% 10.5% 11.2%Millage Required 0.16 0.17 0.18 0.19 0.21 0.22 0.24

Energy Budget

Maintenance Budget

4.6%2.0%

Typical Escalation

Page 22: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

Facility & Vehicle Budgeting

$-

$200,000

$400,000

$600,000

$800,000

$1,000,000

$1,200,000

$1,400,000

2006 2008 2010 2012 2014 2016 2018 2020

Fiscal Year

An

nu

al

Ex

pe

nd

itu

re

Reactive Condition

Proactive Reduced Expense

Return to Energy Costs of Five Years AgoHow do you make it happen?

Page 23: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

What can be done to prepare for the reality of higher fuel costs?

• Reduce consumption? How much?• Raise budgeted allocation? Increase taxes?• Develop a strategic plan!!!!

Implications??

Page 24: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

Any Guesses?• Coal• Oil• Natural Gas• Wind generated electricity

Can these be leveraged in your plan?

What Energy Sources Come from Pennsylvania?

Page 25: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

• Understand what is HYPE vs. REALITY.• You need to be able to communicate your situation.• Work towards developing a Strategic Energy Plan.• Need to gain an understanding of what we are going

to manage!!!!

Starting a Process to Take Control

Page 26: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

How Well Can You Define Your Situation?

Better Question: How well can you communicate your situation?

Page 27: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

Beginning in 2010, the five electric companies that serve 85 percent of the state’s electric customers have all but guaranteed they will increase customers’ bills by as much as 50 percent …The impending 2010 expiration of rate caps, projected to cause electric bills to jump by at least 30 percent, is getting attention in Harrisburg and has local political hopefuls talking.

This week, state Rep. Camille “Bud” George, D-Clearfield, and state Sen. Lisa M. Boscola, D-Bethlehem, met with Gov. Ed Rendell to persuade him to consider extending the rate caps. Boscola and George have bills targeted toward that end.

Is electricity rate caps extension possible? By MIKE REUTHER [email protected] February 7, 2008

Rate Caps Going Away

Page 28: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

Energy – What do you pay for?

ELECTRICITY• Generation (*)• Transmission (*)• Distribution• Consumption• Maximum Rate of Use• Inefficient Use• Stranded Costs (*)

* Partial Regulation until 2010.

NATURAL GAS• Commodity Purchase• Transportation• Distribution• Consumption• Seasonal Use

Page 29: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

Tariff • The document that the PUC must approve that establishes the

method and pricing of a regulated commodity.Rate

• A specific pricing class within the tariff.Demand

• The billed rate at which electricity has been used over the billing period.

On-peak • A term used to represent the energy used during normal

business hours. The time period varies by utility.Off-peak

• A term used to represent the energy used during non-business hours, typically evenings, holidays and weekends.

Block • A grouping of energy to be billed at a specific rate, i.e. a block of

kWh.200 hours use of demand

• Language found in many rates that refer to a block of kWh that is equivalent to 200 kWh per kW demand, or 200 hr x billed kW

Tariff Terminology

Page 30: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

Electric Account – Demand (KW)

Fifteen Minute I nterval Data

0

100

200

300

400

500

600

700

800

Time of Day

Dem

an

d K

W (

KW

h p

er

hr)

Monthly Peak Demand695 KW

Page 31: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

Electrical Distribution System

GenerationTransmission

Distribution

Page 32: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

Examples of an Electric Rate Tariff

Distrib CTC ITCCapy & Energy Xmission Total

Dmd Fee $4.42500 $0.00000 $0.00000 $4.46100 $0.00000 $8.88600

Marginal Dmd Fee (Includes effect of modifying the Block KWh) $12.72400

Blk 1 (200 KWh / KW) $0.00091 $0.00209 $0.01183 $0.04844 $0.00610 $0.06937

Blk 2 (200 KWh / KW) $0.00072 $0.00165 $0.00925 $0.03684 $0.00610 $0.05456

Balance $0.00060 $0.00160 $0.00888 $0.03519 $0.00610 $0.05237

Dmd Fee (0-20 KW) $3.59000 $0.00000 $0.00000 $7.01000 $0.19000 $10.79000

Dmd Fee (>20 KW) $1.30000 $0.00000 $0.00000 $2.75000 $0.19000 $4.24000

Marginal Dmd Fee (Includes effect of modifying the Block KWh) $12.29600

Balance $0.02031 $0.00000 $0.00000 $0.05462 $0.00162 $0.07655

PPLGS-3

Monthly Fee: $0.00

UGI GS 4

Monthly Fee: $9.94

Distrib CTC ITC Xmission Total

Dmd Fee $4.42500 $0.00000 $0.00000 $4.46100 $0.00000 $8.88600

Marginal Dmd Fee (Includes effect of modifying the Block KWh) $12.72400

Blk 1 (200 KWh / KW) $0.00091 $0.00209 $0.01183 $0.04844 $0.00610 $0.06937

Blk 2 (200 KWh / KW) $0.00072 $0.00165 $0.00925 $0.03684 $0.00610 $0.05456

Balance $0.00060 $0.00160 $0.00888 $0.03519 $0.00610 $0.05237

Dmd Fee (0-20 KW) $3.59000 $0.00000 $0.00000 $7.01000 $0.19000 $10.79000

Dmd Fee (>20 KW) $1.30000 $0.00000 $0.00000 $2.75000 $0.19000 $4.24000

Marginal Dmd Fee (Includes effect of modifying the Block KWh) $12.29600

Balance $0.02031 $0.00000 $0.00000 $0.05462 $0.00162 $0.07655

PPLGS-3

Monthly Fee: $0.00

UGI GS 4

Monthly Fee: $9.94

Distrib CTC ITC Xmission Total

Dmd Fee $4.42500 $0.00000 $0.00000 $4.46100 $0.00000 $8.88600

Marginal Dmd Fee (Includes effect of modifying the Block KWh) $12.72400

Blk 1 (200 KWh / KW) $0.00091 $0.00209 $0.01183 $0.04844 $0.00610 $0.06937

Blk 2 (200 KWh / KW) $0.00072 $0.00165 $0.00925 $0.03684 $0.00610 $0.05456

Balance $0.00060 $0.00160 $0.00888 $0.03519 $0.00610 $0.05237

Dmd Fee (0-20 KW) $3.59000 $0.00000 $0.00000 $7.01000 $0.19000 $10.79000

Dmd Fee (>20 KW) $1.30000 $0.00000 $0.00000 $2.75000 $0.19000 $4.24000

Marginal Dmd Fee (Includes effect of modifying the Block KWh) $12.29600

Balance $0.02031 $0.00000 $0.00000 $0.05462 $0.00162 $0.07655

Rate information from the Tariff

Summarized for Analysis

Page 33: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

Exercise #1 – Rate Interpretation

UGI GS-4 Rate

Page 34: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

Exercise #1 – Rate Interpretation

Fill in the table with the correct values:

Dmd Fee (0-20 KW)

Dmd Fee (>20 KW)

Blk 1

Blk 2

Balance

UGI GS 4

Monthly Fee: $9.94

Distrib CTC ITCCapy & Energy Xmission

Page 35: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

Exercise #1 – Rate Interpretation

Fill in the table with the correct values:

Dmd Fee (0-20 KW)

Dmd Fee (>20 KW)

Blk 1

Blk 2

Balance

UGI GS 4

Monthly Fee: $9.94

Distrib CTC ITCCapy & Energy Xmission

$3.59

$1.30

$0.03033

$0.02303

$0.02031

$5.68

$2.23

$0.08287

$0.07272

$0.06892

$0.19

$0.19

$0.00162

$0.00162

$0.00162

200 KWh / KW

300 KWh / KW

Page 36: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

Exercise #1 – Rate Interpretation

Fill in the table with the correct values:

Dmd Fee (0-20 KW)

Dmd Fee (>20 KW)

Blk 1

Blk 2

Balance

UGI GS 4

Monthly Fee: $9.94

Total

200 KWh / KW

300 KWh / KW

Page 37: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

Exercise #1 – Rate Interpretation

Fill in the table with the correct values:

Dmd Fee (0-20 KW)

Dmd Fee (>20 KW)

Blk 1

Blk 2

Balance

UGI GS 4

Monthly Fee: $9.94

Total

$9.46

$3.72

$0.11482

$0.09737

$0.09085

200 KWh / KW

300 KWh / KW

Page 38: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

Exercise #2 – Calculate an Electric Bill

Distrib CTC ITC Xmission Total

Dmd Fee $4.42500 $0.00000 $0.00000 $4.46100 $0.00000 $8.88600

Marginal Dmd Fee (Includes effect of modifying the Block KWh) $12.72400

Blk 1 (200 KWh / KW) $0.00091 $0.00209 $0.01183 $0.04844 $0.00610 $0.06937

Blk 2 (200 KWh / KW) $0.00072 $0.00165 $0.00925 $0.03684 $0.00610 $0.05456

Balance $0.00060 $0.00160 $0.00888 $0.03519 $0.00610 $0.05237

Dmd Fee (0-20 KW) $3.59000 $0.00000 $0.00000 $7.01000 $0.19000 $10.79000

Dmd Fee (>20 KW) $1.30000 $0.00000 $0.00000 $2.75000 $0.19000 $4.24000

Marginal Dmd Fee (Includes effect of modifying the Block KWh) $12.29600

Balance $0.02031 $0.00000 $0.00000 $0.05462 $0.00162 $0.07655

PPLGS-3

Monthly Fee: $0.00

UGI GS 4

Monthly Fee: $9.94

Distrib CTC ITC Xmission Total

Dmd Fee $4.42500 $0.00000 $0.00000 $4.46100 $0.00000 $8.88600

Marginal Dmd Fee (Includes effect of modifying the Block KWh) $12.72400

Blk 1 (200 KWh / KW) $0.00091 $0.00209 $0.01183 $0.04844 $0.00610 $0.06937

Blk 2 (200 KWh / KW) $0.00072 $0.00165 $0.00925 $0.03684 $0.00610 $0.05456

Balance $0.00060 $0.00160 $0.00888 $0.03519 $0.00610 $0.05237

Dmd Fee (0-20 KW) $3.59000 $0.00000 $0.00000 $7.01000 $0.19000 $10.79000

Dmd Fee (>20 KW) $1.30000 $0.00000 $0.00000 $2.75000 $0.19000 $4.24000

Marginal Dmd Fee (Includes effect of modifying the Block KWh) $12.29600

Balance $0.02031 $0.00000 $0.00000 $0.05462 $0.00162 $0.07655

April Usage informationMeter Constant = 300

Meter Reads: Present = 3462Previous = 3112

Peak Demand = 150 kW

Summary of Charges

Page 39: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

Exercise #2 – Calculate an Electric Bill

Distrib CTC ITC Xmission Total

Dmd Fee $4.42500 $0.00000 $0.00000 $4.46100 $0.00000 $8.88600

Marginal Dmd Fee (Includes effect of modifying the Block KWh) $12.72400

Blk 1 (200 KWh / KW) $0.00091 $0.00209 $0.01183 $0.04844 $0.00610 $0.06937

Blk 2 (200 KWh / KW) $0.00072 $0.00165 $0.00925 $0.03684 $0.00610 $0.05456

Balance $0.00060 $0.00160 $0.00888 $0.03519 $0.00610 $0.05237

Dmd Fee (0-20 KW) $3.59000 $0.00000 $0.00000 $7.01000 $0.19000 $10.79000

Dmd Fee (>20 KW) $1.30000 $0.00000 $0.00000 $2.75000 $0.19000 $4.24000

Marginal Dmd Fee (Includes effect of modifying the Block KWh) $12.29600

Balance $0.02031 $0.00000 $0.00000 $0.05462 $0.00162 $0.07655

PPLGS-3

Monthly Fee: $0.00

UGI GS 4

Monthly Fee: $9.94

Distrib CTC ITC Xmission Total

Dmd Fee $4.42500 $0.00000 $0.00000 $4.46100 $0.00000 $8.88600

Marginal Dmd Fee (Includes effect of modifying the Block KWh) $12.72400

Blk 1 (200 KWh / KW) $0.00091 $0.00209 $0.01183 $0.04844 $0.00610 $0.06937

Blk 2 (200 KWh / KW) $0.00072 $0.00165 $0.00925 $0.03684 $0.00610 $0.05456

Balance $0.00060 $0.00160 $0.00888 $0.03519 $0.00610 $0.05237

Dmd Fee (0-20 KW) $3.59000 $0.00000 $0.00000 $7.01000 $0.19000 $10.79000

Dmd Fee (>20 KW) $1.30000 $0.00000 $0.00000 $2.75000 $0.19000 $4.24000

Marginal Dmd Fee (Includes effect of modifying the Block KWh) $12.29600

Balance $0.02031 $0.00000 $0.00000 $0.05462 $0.00162 $0.07655

April Usage informationMeter Constant = 300

Meter Reads: Present = 3462Previous = 3112

Peak Demand = 150 KW

Summary of Charges

350 x 300 = 105,000 kWh

30,000 KWh

30,000 KWh

150 KW x 200 kWh/KW = 30,000 kWh

45,000 KWh

150 KW $1,332.90

$2,081.10

$1,636.80

$2,356.65

Page 40: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

Use Profile - Monthly

J an Feb Mar Apr May J un J ul Aug Sep Oct Nov Dec

20,000

25,000

30,000

35,000

40,000

45,000

Annual Load

PPL 375,000 MWh

GPU 260,000 MWh

APS 115,000 MWh

Page 41: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

Use Profile - Hourly

Page 42: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

How much do you use at any given time?• The rate at which electricity is used is measured as

“kilowatts” or kW.• The utility needs to provide enough wire and transformer

size to satisfy your largest “demand” of electricity. The utility meter can keep track of your largest 15-minute consumption every month.

Demand Costs: Rate of Use

Page 43: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

Not all electrons are created equal!• Some electrons require more “room” in the wire than

others. Electric loads that have a high amount of motors and fans require more wire capacity! – some utilities charge for this inefficiency.

Reactive Costs:Power Factor < 1.0 (pf% < 100%)KVAR > 0KVARh > 0KVA (instead of KW)

Reactive Costs: Result of Inefficient Use

Page 44: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

Need to pay for upgrades that are still being depreciated and divestiture of generating plants!

Stranded CostsHow will utilities collect on previous investments?

Page 45: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

Natural Gas – Distribution System

Generation

Transmission

Distribution

Page 46: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

Transportation • This refers to the pipeline movement of natural gas from a well-

head to your local distribution company (LDC).

Distribution • Refers to the underground pipes that your local LDC maintains

to deliver natural gas to your buildings.

Well-head• The originating location where processed natural gas is available

to the pipeline.

City Gate• The delivery point at which the LDC receives natural gas from

the pipeline and transitions it to their own distribution pipes.

Burner-Tip • The delivery point at which the end user receives natural gas

from the LDC.

Natural Gas Tariff Terminology

Page 47: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

CF, CCF, or MCF• A common measure of volume of natural gas at a given pressure

provided by the LDC at your local meter. Measured as cubic feet (CF), 100 cubic feet (CCF), or 1000 cubic feet (MCF).

DT, or dekatherm • The energy content of natural gas. This is the typical

measurement used in the transportation pipeline.

Shrinkage and Loss • Refers to the natural gas lost to the atmosphere.

Natural Gas Tariff Terminology

Page 48: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

Sample Natural Gas Bill

Page 49: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

• Outdoor Lighting• Street Lighting and Traffic Control• Vehicles• Water & Waste water treatment• Specific process needs (steam, chilled water)• Water consumption• Others???

Other Energy Consuming Areas

Page 50: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

Taking Control of Energy Bills

.

• Learn to understand how YOUR energy is billed.• Utility Bill Analysis!

Local LDD Local DEP 3rd Party Utility representative

• Look for opportunities to save energy and $$.• Learn to communicate what you uncover.• Determine why it is important to YOUR

Administration.

Page 51: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

Knowledgeable Understanding

Page 52: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

EUI by Activity

North-east

Mid-west South West

Principal Building ActivityEducation ........................................ 101.6 86.3 75.5 77.6Food Sales ...................................... 248.1 219.1 187.7 QFood Service ................................... 272.8 218.8 283.4 243.8Health Care ..................................... 212.2 205.6 169.8 179.6 Inpatient ........................................ 275.3 272.2 226.7 246.8 Outpatient ..................................... 84.7 124.4 60.9 115.3Lodging ........................................... 92.3 109.0 96.9 103.7Retail (Other Than Mall)................... 65.0 102.7 68.7 63.2Office .............................................. 101.2 108.8 87.0 72.1Public Assembly .............................. 89.2 101.7 93.2 91.2Public Order and Safety .................. 132.5 105.9 113.1 QReligious Worship ........................... 52.1 52.8 38.3 27.6Service ............................................ 79.8 85.0 66.3 80.0Warehouse and Storage ................. 41.6 74.7 26.7 39.0

Energy Intensity for Sum of Major Fuels

(thousand Btu/square foot)

Page 53: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

Exercise #3 – Simple Analysis

Use the “Annual Energy Management Report – Buildings”.For the Terminal Building (14,000 sq ft), do the following: 1. Calculate the operating cost per sq ft ($ / sq ft), and 2. Analyze the EUI.

Sum of kwh onAccount Name Ttl kwh mmBtu cost Misc Fee ccf mmBtu costCounty Garage 843 3 187.71$ 1.09$ - - -$

Entrance Sign 6,639 23 651.79$ 4.94$ - - -$

Fire Building 40,667 139 3,642.71$ 27.89$ 278 29 635.86$

Hanger #1 28 0 94.36$ 0.72$ - - -$

Hanger #2 5,023 17 513.13$ 4.31$ - - -$

Hanger #3 46 0 95.91$ 0.61$ - - -$

Hanger #4 32 0 94.76$ 0.63$ - - -$

Hanger #5 523 2 136.79$ 0.80$ - - -$

Maintenance Building 48,685 166 4,227.02$ 32.41$ 4,023 414 5,466.20$

Obstruction Light 670 2 146.59$ 0.79$ - - -$

Street Light 1,958 7 264.76$ 11.28$ - - -$

Terminal 277,680 948 22,322.09$ 156.52$ 16,839 1,731 21,571.18$

Vault Building 96,139 328 8,762.10$ 64.92$ - - -$

White Building 1,770 6 304.23$ 2.45$ - - -$

Grand Total 480,703 1,641 41,443.95$ 309.36$ 21,140 2,173 27,673.24$

Electric Natural Gas

Page 54: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

Knowledgeable Understanding Vehicles and Traffic Lighting

Page 55: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

KPI – Key Performance Indicators

Current ConditionAnnual Use Annual Cost 2008 2009 2010 2011 2012 2013 2014

Increase Escalation CostFacility Fuels

Electric 0.0% 3.2% 215,000$ 221,880$ 228,980$ 236,308$ 243,869$ 251,673$ 259,727$

Natural Gas 0.0% 18.7% 140,000$ 166,180$ 197,256$ 234,142$ 277,927$ 329,899$ 391,591$

Coal 0.0% 0.0% -$ -$ -$ -$ -$ -$ -$

Propane 0.0% 0.0% -$ -$ -$ -$ -$ -$ -$

Fuel Oil 0.0% 0.0% -$ -$ -$ -$ -$ -$ -$

Water Sewer 0.0% 1.1% 16,000$ 16,176$ 16,354$ 16,534$ 16,716$ 16,900$ 17,085$

Garbage 0.0% 8.2% 8,500$ 9,197$ 9,951$ 10,767$ 11,650$ 12,605$ 13,639$

Facility MaintenanceService Contracts 0.0% 7.5% 85,100$ 91,483$ 98,344$ 105,719$ 113,648$ 122,172$ 131,335$

Material & Parts 0.0% 0.0% -$ -$ -$ -$ -$ -$ -$

Other 0.0% 0.0% -$ -$ -$ -$ -$ -$ -$

Vehicle FuelsDeisel 0.0% 0.0% -$ -$ -$ -$ -$ -$ -$

Gasoline 0.0% 20.6% 3,800$ 4,583$ 5,527$ 6,665$ 8,038$ 9,694$ 11,691$

Other 0.0% 0.0% -$ -$ -$ -$ -$ -$ -$

Vehicle MaintenanceService Contracts 0.0% 3.0% -$ -$ -$ -$ -$ -$ -$

Material & Parts 0.0% 3.0% -$ -$ -$ -$ -$ -$ -$

Other 0.0% 0.0% -$ -$ -$ -$ -$ -$ -$

383,300$ 418,016$ 458,068$ 504,416$ 558,201$ 620,772$ 693,733$

85,100$ 91,483$ 98,344$ 105,719$ 113,648$ 122,172$ 131,335$

Facility & Vehicle Budget 468,400$ 509,498$ 556,411$ 610,136$ 671,849$ 742,944$ 825,068$

Total Budget 5,634,962$ 5,894,170$ 6,165,302$ 6,448,906$ 6,745,556$ 7,055,851$ 7,380,420$ Millage Value 2,997,310$ 3,057,256$ 3,118,401$ 3,180,769$ 3,244,385$ 3,309,272$ 3,375,458$ Facility & Vehicles

% of Budget 8.3% 8.6% 9.0% 9.5% 10.0% 10.5% 11.2%Millage Required 0.16 0.17 0.18 0.19 0.21 0.22 0.24

Energy Budget

Maintenance Budget

4.6%2.0%

Typical Escalation

Page 56: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

KPI – Key Performance Indicators

Performance Measures – monthly, quarterly, annually• Financial Measures

$ energy / $ Annual Budget $ energy / $ Tax Contribution $ energy / $ sales or $ energy / $ Earnings Btu / $ sales or Btu / $ Earnings

• Energy Utilization Index (Buildings) Btu / sq ft

• Energy Cost Index (Buildings) $ energy / sq ft or $ energy / Btu consumed

• Productivity Measures Btu / unit of production or $ energy / unit of production Btu / direct labor hour or $ energy / direct labor hour Btu / Degree-day or $ energy / Degree-day Btu / unit-degree day or Btu / unit-degree day-sq ft $ energy / Btu consumed

Page 57: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

Processes Programs ProjectsAccessible 0% Load Profiles 0% Sub-Metering 0%

Monthly Bills 0% Interval Data 0%

Benchmark & KPI 0%

Reporting 0%

Error Resolution 0% Supplier Choice 0% Demand - Supply Optimize 0%

Rate Optimize 0% Reliability & Quality 0% Risk Management 0%

Account Management 0%

Walk Through 0% Diagnostic Audit 0% DE Audit 0%

Benchmark & Rank Facilities 0% Operating Procedures 0% Commissioning 0%

On-going Monitoring 0%

Corrective Maint 0% Preventive Maint 0% System Upgrades 0%

Systems Control 0% Lighting Upgrades 0% Standards 0%

Alternate Fuels 0% New Technology 0%

System M&V 0%

Awareness & Participation 0% Energy Planning 0% Project Approval 0%

Defined Energy Manager Role 0% Performance & Training 0% Results Auditing 0%

Resource Mgmt 0% Financial Impact & Incentives 0%

Budget Preperation 0% Accountability 0%

Organizational Integration

Data

Supply

Use

Equipment

Processes Programs Projects

Accessible 100% Load Profiles 100% Sub-Metering 100%

Monthly Bills 100% Interval Data 100%

Benchmark & KPI 100%

Reporting 100%

Error Resolution 100% Supplier Choice 100% Demand - Supply Optimize 100%

Rate Optimize 100% Reliability & Quality 100% Risk Management 100%

Account Management 100%

Walk Through 100% Diagnostic Audit 100% DE Audit 100%

Benchmark & Rank Facilities 100% Operating Procedures 100% Commissioning 100%

On-going Monitoring 100%

Corrective Maint 100% Preventive Maint 100% System Upgrades 100%

Systems Control 100% Lighting Upgrades 100% Standards 100%

Alternate Fuels 100% New Technology 100%

System M&V 100%

Awareness & Participation 100% Energy Planning 100% Project Approval 100%

Defined Energy Manager Role 100% Performance & Training 100% Results Auditing 100%

Resource Mgmt 100% Financial Impact & Incentives 100%

Budget Preperation 100% Accountability 100%

Organizational Integration

Data

Supply

Use

Equipment

Scoring Your Energy Strategy

Page 58: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

Motivating Factors - Choices

Infrastructure Financial

Performance Partnership

Page 59: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

Choices: Infrastructure

Low Hanging FruitEnergy EfficiencyPartial UpgradesCode ComplianceComprehensive RenewalLEED EBPhasing

Page 60: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

Choices: Financial

Net SavingsQuick PaybacksFinancingEquity ContributionsMultiple Funding StreamsROIPriorities

Page 61: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

Dependence / IndependenceTrainingRisk AllocationMeasurement & VerificationReporting

ChoicesChoices: Partnership

Page 62: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

Choices: Performance

Utility ExpensesO&M ExpensesEnergy Usage & DemandOccupant ComfortComplaint ReductionCarbon Emissions

Choices

Page 63: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

Emission Considerations

Issue >>GreenhouseGas Global Warming

OzoneSulphur Dioxides

Acid RainMercury

ParticulatesBreathing Asthma

Energy Source Units CO2 NOx SO2 Hg PM10

Coal lb/ton 5680.000 9.000 91.433 0.0001300 0.800000

Electric lb/kwh 1.234 0.003 0.010 0.0000001 0.000125

Fuel Oil No 2 lb/mmBtu 159.290 0.129 1.014 0.0000000 0.002860

Fuel Oil No 6 lb/mmBtu 178.570 0.393 1.121 0.0000000 0.010000

Natural Gas lb/mmBtu 117.080 0.150 0.001 0.0000000 0.001860

Propane lb/mmBtu 139.180 0.149 0.000 0.0000000 0.004260

Butane lb/mmBtu 152.130 0.160 0.000 0.0000000 0.006380

Carbon Neutral Footprint?

Page 64: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

Emissions – Carbon Footprint

0

20

40

60

80

100

120

Am

ou

nt

of

CO

2

2005 2006 2007 2008 2009

Carbon Footprint

Vehicular

Purchased

On site

Page 65: We help the best buildings in the world get that way. LDD Workshop Energy 101 2008.

Energy 101

Closing Thoughts

Knowledge is the first step to understanding• Know what energy you are buying• Know where the largest dollars are spent• Know what is using the most energy• Know what is important to your Administration

Next steps…• Determine your baseline• Determine possible improvements• Communicate what can be done to manage energy• Develop the plan to TRANSFORM your organization