Water Supply System
-
Upload
shahzeb-pirzada -
Category
Software
-
view
127 -
download
0
Transcript of Water Supply System
![Page 1: Water Supply System](https://reader036.fdocuments.in/reader036/viewer/2022083106/58741f7e1a28abcb5b8b7a8d/html5/thumbnails/1.jpg)
WATER SUPPLY SYSTEM
FINAL PRESENTATIONGROUP MEMBERS:SHAHZEB PIRZADAIQRA SALEEMTALHA HASSAN
![Page 2: Water Supply System](https://reader036.fdocuments.in/reader036/viewer/2022083106/58741f7e1a28abcb5b8b7a8d/html5/thumbnails/2.jpg)
SCOPE
• Water distribution system• Improve irrigation• Effectively mage supply of water• System will use database system• Communication will b possible via SMS, A Login Portal
![Page 3: Water Supply System](https://reader036.fdocuments.in/reader036/viewer/2022083106/58741f7e1a28abcb5b8b7a8d/html5/thumbnails/3.jpg)
CONT…….• Land will be mapped for water distribution• Benefit for poor farmers• Extra supply of water will saved• Poverty will be reduced• Increase in productivity
![Page 4: Water Supply System](https://reader036.fdocuments.in/reader036/viewer/2022083106/58741f7e1a28abcb5b8b7a8d/html5/thumbnails/4.jpg)
WHY SINDH IS FACING IRRIGATION PROBLEMS?
• Low surface water availability• Water distribution inequities• Lack of storage capacity and control structures• Wasteful on-farm water use• Inadequate drainage infrastructure leading to water logging,
salinity. • Poor operation and maintenance and low cost recovery• A restrictive investment climate
![Page 5: Water Supply System](https://reader036.fdocuments.in/reader036/viewer/2022083106/58741f7e1a28abcb5b8b7a8d/html5/thumbnails/5.jpg)
CRITICAL FACTORS
• Engineer’s knowledge and background in the respective fields.• Location considerations; office to be in the near area.• Availability of machinery services for land • Efficient utilization of resources to ensure fast work within
specified financial resources and timeframe.• Linkage with suppliers and related material companies.
![Page 6: Water Supply System](https://reader036.fdocuments.in/reader036/viewer/2022083106/58741f7e1a28abcb5b8b7a8d/html5/thumbnails/6.jpg)
GANTT CHART
![Page 7: Water Supply System](https://reader036.fdocuments.in/reader036/viewer/2022083106/58741f7e1a28abcb5b8b7a8d/html5/thumbnails/7.jpg)
![Page 8: Water Supply System](https://reader036.fdocuments.in/reader036/viewer/2022083106/58741f7e1a28abcb5b8b7a8d/html5/thumbnails/8.jpg)
RISK ID RISK STATEMENT CATEGORY PROBABILITY(% P)
COST(C)
IMPACT(I)
EXPOSE(RE=P*C)
RMMM ID
RK001 Pipe or structural element
breakage, Pumping breakage or failure
(Technical Risk)
85% 9000 1 7,650 5.5.1
RK002 Failure in deployment of project
Project Risk 30% 5300 2 1,590 N/A
RK003 The software is not working properly and is not facilitating consumers.
Project Risk 20% 5500 2 1,100 N/A
RK004 The target audience is not understanding the system
Communication Risk
%40 5300 2 1,590 N/A
RK005 Occurrence of damage due to any natural disaster.
Environmental Risk
%20 5500 2 1,100 N/A
RK006 Machines are not working properly and water distribution is stopped
Technical Risk %40 5300 2 1,590 N/A