SCOPE

• Water distribution system• Improve irrigation• Effectively mage supply of water• System will use database system• Communication will b possible via SMS, A Login Portal

Page 3: Water Supply System

CONT…….• Land will be mapped for water distribution• Benefit for poor farmers• Extra supply of water will saved• Poverty will be reduced• Increase in productivity

Page 4: Water Supply System

WHY SINDH IS FACING IRRIGATION PROBLEMS?

• Low surface water availability• Water distribution inequities• Lack of storage capacity and control structures• Wasteful on-farm water use• Inadequate drainage infrastructure leading to water logging,

salinity. • Poor operation and maintenance and low cost recovery• A restrictive investment climate

Page 5: Water Supply System

CRITICAL FACTORS

• Engineer’s knowledge and background in the respective fields.• Location considerations; office to be in the near area.• Availability of machinery services for land • Efficient utilization of resources to ensure fast work within

specified financial resources and timeframe.• Linkage with suppliers and related material companies.

Page 6: Water Supply System

GANTT CHART

Page 7: Water Supply System
Page 8: Water Supply System

RISK ID RISK STATEMENT CATEGORY PROBABILITY(% P)

COST(C)

IMPACT(I)

EXPOSE(RE=P*C)

RMMM ID

RK001 Pipe or structural element

breakage, Pumping breakage or failure

(Technical Risk)

85% 9000 1 7,650 5.5.1

RK002 Failure in deployment of project

Project Risk 30% 5300 2 1,590 N/A

RK003 The software is not working properly and is not facilitating consumers.

Project Risk 20% 5500 2 1,100 N/A

RK004 The target audience is not understanding the system

Communication Risk

%40 5300 2 1,590 N/A

RK005 Occurrence of damage due to any natural disaster.

Environmental Risk

%20 5500 2 1,100 N/A

RK006 Machines are not working properly and water distribution is stopped

Technical Risk %40 5300 2 1,590 N/A

Page 9: Water Supply System