1 / 3 STAMPED CONCRETE APPLICATION FAST AND EASY FIRST DAY-STEP 1: First add to concrete mixer Style Beton Fibbers. The fibbers are very strong to acids and to alkalis and perfectly stable to ultraviolet rays, to bacteria and muffs, have a good adhesion to cement thanks to chemical bonds that develop. FIRST DAY-STEP 2: Reinforce the concrete floor with a metal grid. Ensure reinforcement, inserts, embedded parts, and formed joints are not disturbed during concrete placement. FIRST DAY-STEP 3: Deposit concrete so that specified slab thickness will be obtained after finishing operations.

description

Decorative Concrete, Stamped Concrete and Wall Overlays Applications.

Transcript of WALL AND FLOOR CONCRETE APPLICATIONS

Page 1: WALL AND FLOOR CONCRETE APPLICATIONS

1 / 3

STAMPED CONCRETE APPLICATION

FAST AND EASY

FIRST DAY-STEP 1: First add to concrete mixer Style Beton Fibbers. The fibbers are very strong to acids and to alkalis and perfectly stable to ultraviolet rays, to bacteria and muffs, have a good adhesion to cement thanks to chemical bonds that develop.

FIRST DAY-STEP 2: Reinforce the concrete floor with a metal grid. Ensure reinforcement, inserts, embedded parts, and formed joints are not disturbed during concrete placement.

FIRST DAY-STEP 3: Deposit concrete so that specified slab thickness will be obtained after finishing operations.

Page 2: WALL AND FLOOR CONCRETE APPLICATIONS

2 / 3

FIRST DAY-STEP 4: Make the concrete surface smooth, using a trowel.

FIRST DAY-STEP 5: Make the concrete edges smooth, using hand edger.

FIRST DAY-STEP 6: After the concrete surface is poured and floated, Style Beton Color Hardener, which is a tinted, powdery sub-stance blended of mineral-based pigments, portland cement, silica and quartz, is applied and worked into the surface using a trowel.

FIRST DAY-STEP 7: Make the concrete surface smooth, using a trowel.

FIRST DAY-STEP 8: Dust the surface using Style Beton Release Powder, which adds two-tone color on the concrete and prevents the stamps to stick to the surface.

Page 3: WALL AND FLOOR CONCRETE APPLICATIONS

3 / 3

FIRST DAY-STEP 9: Use proper tamp tools into the stamp surface to achieve the required texture, with uniformity of pattern and depth of stamping.

AFTER THREE DAYS-STEP 10: After the concrete cures, it is rinsed with clean water to remove loose Release Powder.

THE SAME DAY-STEP 11: When the floor is dry, seal, using Style Beton Sealer, a UV resistant sealer that prevents color changes or fading caused by the sun. It is pure acrylic-based resin in virgin solvents for improved clarity and anti-yellowing characteristics.

Visit our website: www.stylebeton.com for more information and videos for all our products.

Page 4: WALL AND FLOOR CONCRETE APPLICATIONS

1 / 2

NANO-TOP APPLICATION

FAST AND EASY SELF LEVELING FLOOR

STEP 1:

We spread the surface, where Nano-Top will be applied, with

Acrylic Primer.

We continue spreading the surface, where Nano-Top will be

applied, with Acrylic Primer.

STEP 2:

We mix very well one bag Nano-Top (25kg) with 6 lt fresh and

clean water using low speed mixing.

We mix very well one bag Nano-Top (25kg) with 6 lt fresh

and clean water using low speed mixing.

Page 5: WALL AND FLOOR CONCRETE APPLICATIONS

2 / 2

STEP 3:

We apply Nano-Top, self leveling flooring.

We apply Nano-Top, self leveling flooring.

STEP 4:

We help a little bit in spreading Nano-Top with a trowel or

roller.

We help a little bit in spreading Nano-Top with a trowel or

roller.

Nano Top is ready.

You can find it in several colors, which can also be combined to

each other and create a “unique game of colors” or after the

floor is completely dry, it can be applied Acid Stain (see Acid

Stain Application).

Visit our website: www.stylebeton.com for more information and videos

about all our products.

Page 6: WALL AND FLOOR CONCRETE APPLICATIONS

1 / 2

DECO PEBBLE APPLICATION

FAST AND EASY

FIRST DAY-STEP 1: We mix every sack of Decopebble (25kg) with 5kg cement, gray or white.

FIRST DAY-STEP 2: We apply on concrete sub-base the mix of Decopebble. a) We apply minimum 2 cm (31,5kg/m²)Decopebble (wet-on-wet) on fresh concrete surface, which we have left to absorb the water. b) We apply minimum 4 cm (63kg/m²) Decopebble on old concrete surface, on which we have applied earlier a coat of Polystyle.

FIRST DAY-STEP 3: We apply the mix.

FIRST DAY-STEP 4: We make the surface smooth and leave the mix to absorb the surface water.

Page 7: WALL AND FLOOR CONCRETE APPLICATIONS

2 / 2

FIRST DAY-STEP 5: We spread the surface with Style Lack and cover the surface with nylon.

SECOND DAY-STEP 6: We rinse the surface, using water pump and fresh water.

SECOND DAY-STEP 7: Decopebble Floor is ready and we can apply Style Sealer, when the surface is dry.

Visit our website: www.stylebeton.com for more information and videos about all our products.

Page 8: WALL AND FLOOR CONCRETE APPLICATIONS

1 / 4

DECO CREATE APPLICATION

NEW IMPROVED FORMULATION

TWO DAYS PROCEDURE – LESS TIME, LESS COST

10 EASY STEPS

STEP 1:

Spread the surface, where you will apply Deco Create, with Style

Contact.

STEP 2:

Mix the ready to made plaster Deco Create with 5 lt (±0,500 Kg)

fresh and clean water .

Deco Create should be as thick as shown in the picture.

STEP 3:

Apply the first coat Deco Create (1-2mm) and right after that

continue with STEP 5. First and second coat should be applied wet to

wet.

Page 9: WALL AND FLOOR CONCRETE APPLICATIONS

2 / 4

STEP 4:

Apply the second coat Deco Create (1-5 cm), depending on the

pattern of the stamp you have choose.

STEP 5:

Make the surface smooth.

STEP 6:

Check the difference in thickness between first and second coat.

STEP 7:

Apply Style Liquid Release on the stamp, using a brush.

STEP 8:

Start stamping the plaster.

Continue stamping, covering all the surface.

Page 10: WALL AND FLOOR CONCRETE APPLICATIONS

3 / 4

Continue stamping, covering all the surface

STEP 9:

The same day, 3-4hours after stamping, Deco Create is still soft and

you can correct some details using Deco Create Tools.

STEP 10:

The second day you can start coloring using Decochrom, which is in

8 basic colors that you can mix. Try to begin with light colors and

small quantities.

You can use sponges to spread the colors on the surface.

It can be used a brush to painted joints, if it is not applicated from

the beginning colored plaster Deco Create.

A clean sponge can be used to remove the paint that has come off

plaster’s joints.

Page 11: WALL AND FLOOR CONCRETE APPLICATIONS

4 / 4

This is the final result of stamped wall Deco Create. You can change

the color if after some years you don’t like it.

Page 12: WALL AND FLOOR CONCRETE APPLICATIONS

1 / 3

BRICK-CREATE APPLICATION

LESS TIME – LESS COST THAN BRICK

STEP 1:

Apply the first coat Deco Create® (1-2mm).

STEP 2:

Apply the second coat Deco Create® (1.5cm) wet on

wet.

STEP 3:

Make the surface smooth.

Page 13: WALL AND FLOOR CONCRETE APPLICATIONS

2 / 3

Make the surface smooth.

STEP 4:

Apply the third coat Deco Create® (2 mm) wet on wet,

choosing the desirable color.

STEP 5:

Make the surface smooth.

Make the surface smooth.

Page 14: WALL AND FLOOR CONCRETE APPLICATIONS

3 / 3

STEP 6:

The next day use special tools Deco Create® to create

joints horizontally. During the summer you can do it the

same day, after some hours.

Also, use special tools Deco Create® to create joints

vertically.

Continue and create the look of brick, covering all the

surface.

LESS TIME-LESS COST THAN BRICK

Page 15: WALL AND FLOOR CONCRETE APPLICATIONS

1 / 5

ROCK-CREATE APPLICATION

STEP 1:

We cut the blocks of polystyrene and model them in

order to achieve shapes, very similar to natural rocks.

The same.

Final shape like a natural stone. We can assemble the

blocks using polyurethane foam.

Page 16: WALL AND FLOOR CONCRETE APPLICATIONS

2 / 5

STEP 2:

We spread the surface, where we will apply Rock

Create, with Style Contact.

STEP 3:

We install fiber glass mesh as a reinforcement of the

plaster.

STEP 6:

We apply primer Rock Create.

The same.

Page 17: WALL AND FLOOR CONCRETE APPLICATIONS

3 / 5

The result after the primer Rock Create.

STEP 4:

We apply Rock Create using a plaster sprayer.

We continue.

STEP 5:

We start texturing the surface using Style Beton®

stamps and Style Liquid Release.

Page 18: WALL AND FLOOR CONCRETE APPLICATIONS

4 / 5

The same.

The result after the texturing.

STEP 6:

We start coloring the surface using Rock Staining with

a brush, a sponge or a sprayer.

We continue.

Page 19: WALL AND FLOOR CONCRETE APPLICATIONS

5 / 5

We continue.

We color the surface using Rock Staining with a brush,

a sponge or a sprayer, until the wanted result.