W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

47
7/25/2019 W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing http://slidepdf.com/reader/full/w1440-p4-s-00301-specification-for-structural-fabrication-welding-inspection 1/47  ech nip CLIENT: TECHNIP OCEANIA PTY LTD A.C.N. 062 878 719 1100 Hay Street, West Perth, WA, 6005 Australia Locked Bag 236, West Perth, WA, 6872 MODEC Tel: 61-08-9463 2500 Fax: 61-08-9463 2501 PROJECT TITLE: MUTINEER EXETER FPSO TOPSIDE MODULES PROJECT NO: AP003164 M ODE 1 02/02/04 Approved for Use 0 11/12/03 Approved for Use B 12/11/03 Re-issued for Internal Review A 13/10/03 DOCUMENT TITLE: SPECIFICATION FOR STRUCTURAL FABRICATION WELDING INSPECTION AND TESTING DOCUMENT NO: AP003164-G-JSD-1800-003 CONFIDENTIALITY RATING: C CLIENT REF: W1440-P4-S-0030 THIS DOCUMENT CONTAINS CONFIDENTIAL INFORMATION. ALL RIGHTS INCLUDING COPYRIGHT, CONFIDENTIAL INFORMATION, TRADE SECRETS AND DESIGN RIGHTS) ARE OWNED BY TECHNIP OCEANIA PTY LTD NO USE OR DISCLOSURE IS TO BE MADE WITHOUT THE WRITTEN PERMISSION OF TECHNIP OCEANIA PTY LTD. COPYRIGHT TECHNIP OCEANIA PTY LTD ALL RIGHTS RESERVED. AP003164-G-JSD-1800-003 Spec For Structural Fab Welding lnspec Test Rev 1.doc

Transcript of W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

Page 1: W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

7/25/2019 W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

http://slidepdf.com/reader/full/w1440-p4-s-00301-specification-for-structural-fabrication-welding-inspection 1/47

  ech nip

CLIENT:

TECHNIP OCEANIA PTY LTD

A.C.N. 062 878 719

1100 Hay Street, West Perth, WA, 6005 Australia

Locked Bag 236, West Perth, WA, 6872

MODEC

Tel: 61-08-9463 2500

Fax: 61-08-9463

2501

PROJECT TITLE:

MUTINEER EXETER FPSO TOPSIDE MODULES

PROJECT

NO:

AP003164

M ODE

1 02/02/04 Approved for Use

0 11/12/03 Approved for Use

B 12/11/03 Re-issued for Internal Review

A 13/10/03

DOCUMENT TITLE:

SPECIFICATION FOR STRUCTURAL FABRICATION WELDING INSPECTION

AND TESTING

DOCUMENT NO:

AP003164-G-JSD-1800-003 CONFIDENTIALITY RATING:

C

CLIENT REF:

W1440-P4-S-0030

THIS DOCUMENT CONTAINS CONFIDENTIAL INFORMATION. ALL RIGHTS INCLUDING COPYRIGHT, CONFIDENTIAL

INFORMATION, TRADE SECRETS AND DESIGN RIGHTS) ARE OWNED BY TECHNIP OCEANIA PTY LTD NO USE

OR

DISCLOSURE IS TO BE MADE WITHOUT THE WRITTEN PERMISSION OF TECHNIP OCEANIA

PTY

LTD. COPYRIGHT TECHNIP

OCEANIA PTY

LTD

ALL RIGHTS RESERVED.

AP003164-G-JSD-1800-003 Spec For Structural Fab Welding lnspec Test Rev 1.doc

Page 2: W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

7/25/2019 W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

http://slidepdf.com/reader/full/w1440-p4-s-00301-specification-for-structural-fabrication-welding-inspection 2/47

 

DETAILED DESIGN FOR MUTINEER /

EXETER FPSO TOPSIDES

Specification for Structural Fabrication,

Welding, Inspection and Testing

Doc. No : AP003164-G-JSD-1800-003Rev : Rev. 1Page : 2 of 47 

 AP003164-G-JSD-1800-003 Spec For Structural Fab, Welding, Inspec, Test Rev 1.doc  

RECORD OF AMENDMENT

It is certified that the amendments listed below have been incorporated in this copy of the publication.  

AMDT

NO

AMENDED

SECTION

PARA

NO

DESCRIPTION OF CHANGES

1 2 8 Revised. Vendor to supply “black steel”.

Page 3: W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

7/25/2019 W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

http://slidepdf.com/reader/full/w1440-p4-s-00301-specification-for-structural-fabrication-welding-inspection 3/47

 

DETAILED DESIGN FOR MUTINEER /

EXETER FPSO TOPSIDES

Specification for Structural Fabrication,

Welding, Inspection and Testing

Doc. No : AP003164-G-JSD-1800-003Rev : Rev. 1Page : 3 of 47 

 AP003164-G-JSD-1800-003 Spec For Structural Fab, Welding, Inspec, Test Rev 1.doc  

HOLD'S STATUS SHEET

This revision has the following HOLD's 

SECTION PARA

NO

DESCRIPTION OF HOLD

Page 4: W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

7/25/2019 W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

http://slidepdf.com/reader/full/w1440-p4-s-00301-specification-for-structural-fabrication-welding-inspection 4/47

 

DETAILED DESIGN FOR MUTINEER /

EXETER FPSO TOPSIDES

Specification for Structural Fabrication,

Welding, Inspection and Testing

Doc. No : AP003164-G-JSD-1800-003Rev : Rev. 1Page : 4 of 47 

 AP003164-G-JSD-1800-003 Spec For Structural Fab, Welding, Inspec, Test Rev 1.doc  

TABLE OF CONTENTS

1.0  GENERAL................................................................................................................ 7 

1.1  Introduction.............................................................................................................. 7 

1.2  Document Purpose.................................................................................................. 7 

1.3  Scope of Work ......................................................................................................... 7 

1.4  Definition of Terms...................................................................................................8 

1.5  Referenced Documents ........................................................................................... 8 

1.6 

Vendor Responsibility ............................................................................................ 10 

1.7  Documentation....................................................................................................... 11 

1.8   After Fabrication .................................................................................................... 13 

1.9   Abbreviations ......................................................................................................... 13 

2.0  MATERIALS .......................................................................................................... 15 

2.1  General..................................................................................................................15 

2.2 

Transportation, Storage And Handling Of Materials............................................... 15 

2.3  Used Materials ....................................................................................................... 15 

2.4  Classification and Certification of Structural Steels................................................ 15 

2.5  Structural Steel Types............................................................................................15 

2.6  Material Identification ............................................................................................. 16 

2.7  Miscellaneous Steel............................................................................................... 16 

2.8 

Pre-fabrication Paint Priming ................................................................................. 16 

3.0  WELDING.............................................................................................................. 17 

3.1  General..................................................................................................................17 

4.0  WELDING CONSUMABLES.................................................................................. 17 

4.1  General..................................................................................................................17 

4.2  Processes .............................................................................................................. 18 

4.3 

Types of Electrodes, Wires and Fluxes ................................................................. 18 

4.4  Conditions and Storage ......................................................................................... 19 

Page 5: W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

7/25/2019 W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

http://slidepdf.com/reader/full/w1440-p4-s-00301-specification-for-structural-fabrication-welding-inspection 5/47

 

DETAILED DESIGN FOR MUTINEER /

EXETER FPSO TOPSIDES

Specification for Structural Fabrication,

Welding, Inspection and Testing

Doc. No : AP003164-G-JSD-1800-003Rev : Rev. 1Page : 5 of 47 

 AP003164-G-JSD-1800-003 Spec For Structural Fab, Welding, Inspec, Test Rev 1.doc  

4.5  Heating and Baking Requirements ........................................................................ 19 

5.0  QUALIFICATION OF WELDING PROCEDURE..................................................... 21 

5.1  General..................................................................................................................21 

5.2  Parameters in Welding Procedure Specification.................................................... 21 

5.3  Welding Procedure Qualification Test.................................................................... 21 

5.4  Essential Variables in Qualification of Welding Procedures................................... 22 

5.5 

Procedure Qualification Record ............................................................................. 22 

5.6  Testing Requirements for Procedural Qualification Test........................................22 

5.7   Acceptance Criteria and Retest ............................................................................. 22 

5.8  Welding Procedure Register.................................................................................. 23 

6.0  QUALIFICATION OF WELDERS AND WELDING OPERATORS.......................... 24 

6.1  General..................................................................................................................24 

7.0 

PRODUCTION WELDING...................................................................................... 26 

7.1  General..................................................................................................................26 

7.2  WELDING SEQUENCE ......................................................................................... 26 

7.3  Weld Preparations ................................................................................................. 26 

7.4  Weld Execution...................................................................................................... 27 

7.5  Preheating and Interpass Temperatures................................................................ 29 

7.6 

Stress Relieving - Post Weld Heat Treatment........................................................ 30 

8.0  FABRICATION AND DELIVERY............................................................................ 32 

8.1  General..................................................................................................................32 

8.2  Material Preparation............................................................................................... 32 

8.3  Stiffeners ............................................................................................................... 33 

8.4  Splices ................................................................................................................... 33 

8.5 

Camber.................................................................................................................. 34 

8.6  Laying-Out, Alignment and Fit-Up.......................................................................... 34 

Page 6: W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

7/25/2019 W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

http://slidepdf.com/reader/full/w1440-p4-s-00301-specification-for-structural-fabrication-welding-inspection 6/47

 

DETAILED DESIGN FOR MUTINEER /

EXETER FPSO TOPSIDES

Specification for Structural Fabrication,

Welding, Inspection and Testing

Doc. No : AP003164-G-JSD-1800-003Rev : Rev. 1Page : 6 of 47 

 AP003164-G-JSD-1800-003 Spec For Structural Fab, Welding, Inspec, Test Rev 1.doc  

8.7  Temporary and Non-Structural Attachments and Cut-Outs.................................... 35 

8.8  Finishing of Surfaces ............................................................................................. 35 

8.9  REPAIR AND REMEDIAL PROCEDURES ............................................................ 36 

8.10   ANCILLARIES AND TEMPORARY WORKS ......................................................... 36 

9.0  DIMENSIONAL CONTROL.................................................................................... 38 

9.1  General..................................................................................................................38 

9.2 

Tolerances for Structural Components and Sub-Assemblies................................. 39 

10.0  INSPECTION AND TESTING ................................................................................ 40 

10.1  General..................................................................................................................40 

10.2  Inspection Requirements ....................................................................................... 40 

10.3  Extent of Inspection ............................................................................................... 41 

10.4  Padeye Testing and Marking ................................................................................. 45 

11.0 

FIELD INSTALLED ITEMS ....................................................................................46 

12.0  ADDITIONAL REQUIREMENTS............................................................................ 47 

12.1  Painting..................................................................................................................47 

12.2  Pre-Commissioning................................................................................................ 47 

12.3  Final Weighing & COG Determination ...................................................................47 

12.4  Loadout.................................................................................................................. 47 

Page 7: W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

7/25/2019 W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

http://slidepdf.com/reader/full/w1440-p4-s-00301-specification-for-structural-fabrication-welding-inspection 7/47

 

DETAILED DESIGN FOR MUTINEER /

EXETER FPSO TOPSIDES

Specification for Structural Fabrication,

Welding, Inspection and Testing

Doc. No : AP003164-G-JSD-1800-003Rev : Rev. 1Page : 7 of 47 

 AP003164-G-JSD-1800-003 Spec For Structural Fab, Welding, Inspec, Test Rev 1.doc  

1.0 GENERAL

1.1 Introduction

The Mutineer Exeter Project is located in the North-West Shelf of Australia within thepetroleum permit WA-191-P. Santos Ltd is the major operator of this field with MODEC asmain contractor to supply and deliver the FPSO including the topside modules.

MODEC have sub-contracted the supply and delivery of Process Modules A and B andFlare Knockout Module to TOPL.

 All equipment and activities shall meet the requirements of this specification and of thecodes, standards and specifications nominated herein.

This Specification shall be read in conjunction with Project Document No.: AP003164-G-JSD-1800-002 - “Specification for Structural Materials”

Where it is necessary for certain structural steel components to be installed offshore,compliance with all the requirements of this Specification shall also mean that suchcomponents shall be trial assembled onshore to the maximum extent practicable to ensuresubsequent correct fit, whenever directed by COMPANY.

1.2 Document Purpose

This Specification covers the fabrication, welding, inspection and testing of structural

steels with nominal yield strengths of less than or equal to 358 MPa as defined in the

material specification of Project Document No.: AP003164-G-JSD-1800-002 -“Specification for Structural Materials”.

1.3 Scope of Work

This specification applies to the following components of the FPSO Topside Modules:

i) Primary steel that includes deck beams, plan bracing, support columns, verticalbracing and their associated connections.

ii) Secondary steel that includes deck stringers, trimmers, equipment supports, piperacks/supports and their associated connections.

iii) Tertiary steel that includes deck grating/plating, access platforms, stairways, handrails,ladders etc.

iv) Temporary steel for module handling purposes during load-out, transportation andinstallation.

v) Interface connections between underside of module support columns/vertical bracingand FPSO support stools.

vi) Module lifting padeyes.

vii) Decks shall be build with bottom of columns not less than 1500 mm above ground

level to assist installation of seafastening steel prior to loadout.

Page 8: W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

7/25/2019 W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

http://slidepdf.com/reader/full/w1440-p4-s-00301-specification-for-structural-fabrication-welding-inspection 8/47

 

DETAILED DESIGN FOR MUTINEER /

EXETER FPSO TOPSIDES

Specification for Structural Fabrication,

Welding, Inspection and Testing

Doc. No : AP003164-G-JSD-1800-003Rev : Rev. 1Page : 8 of 47 

 AP003164-G-JSD-1800-003 Spec For Structural Fab, Welding, Inspec, Test Rev 1.doc  

1.4 Definition of Terms

The following terms as used in this specification, assume the meanings given below:

Company : Technip Oceania Pty Ltd (TOPL) sub-contracted byMODEC to supply Topside Modules for the FPSO

Vendor : The person, firm or company specified in the Order andto whom the Order is issued to fabricate and supply theTopside Modules as further defined in the Terms and

Conditions of Contract.

Inspector : Such persons as appointed by the Company to monitorthe fabrication and supply of the Work.

Certifying Authority : ABS is the independent, accredited, third partycertification authority appointed by the COMPANY toensure that the steel supply and fabrication complies

with the relevant codes and standards.

Client MODEC is COMPANY'S client and major contractor forthe supply of the FPSO.

Sub-vendor : A person, firm or company authorised to undertake workon behalf of the Vendor.

Contract Drawings : Design drawings, with AFC status, issued by theCompany to the Vendor.

1.5 Referenced Documents

1.5.1 Base Specifications

a) Materials

 All steel materials shall meet the requirements of Project Document No.: AP003164-G-JSD-1800-002 - "Structural Specification for Materials" and Section 2.0 of thisSpecification.

b) Welding

 All welding, temporary or permanent, shall meet the requirements of the latest edition

of AWS D1.1 "Structural Welding Code-Steel” and this Specification.

c) Inspection and Testing

 All inspection requirements shall meet ABS requirements, AWS D1.1 and Section

10.0 of this Specification.

d) Company Specifications

•  AP003164-G-JSD-1800-001 - Structural Basis of Design

•  AP003164-G-JSD-1800-002 - Structural Specification for Materials

•  AP003164-G-JSD-2310-0001 - Painting Specification

•  AP003164-G-JSD-1800-005 - Structural Specification for EquipmentSkids

Page 9: W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

7/25/2019 W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

http://slidepdf.com/reader/full/w1440-p4-s-00301-specification-for-structural-fabrication-welding-inspection 9/47

 

DETAILED DESIGN FOR MUTINEER /

EXETER FPSO TOPSIDES

Specification for Structural Fabrication,

Welding, Inspection and Testing

Doc. No : AP003164-G-JSD-1800-003Rev : Rev. 1Page : 9 of 47 

 AP003164-G-JSD-1800-003 Spec For Structural Fab, Welding, Inspec, Test Rev 1.doc  

1.5.2 Codes, Standards and references

a) Unless otherwise specifically indicated, the following standards, rules and codes

shall govern the works. These shall be considered complimentary to and providingfurther detailed requirements and recommendations to those stated in this

Specification and shall be complied with. Where, however, the requirements of thisSpecification are in conflict with or expand the above requirements, this Specificationshall prevail.

b) All the standards, rules and codes stated below are to be the latest editions at thecommencement of the Works.

i) Australian National Regulations

ii) American Petroleum Institute (API)

•  API 5L - Specification for Line Pipe.

•  API RP 2A - Recommended Practice For Planning, Designing And Constructing Fixed Offshore Platforms

•  API 2H - Specification for Carbon Manganese Steel Plate ForOffshore Platform Tubular Joints.

iii) American Institute of Steel Construction (AISC)

•  Code of Standard Practice For Steel Building And Bridges

•  Specification for Structural Steel Buildings.

iv) American Welding Society (AWS)

•  AWS D1.1 - Structural Welding Code-Steel

•  AWS A.2.4 - Symbols For Welding And Non Destructive Testing

•  AWS A.3.0 - Welding Terms And Definitions

•  AWS A.5.1 -Specification For Carbon Steel Covered ArcWelding Electrodes

•  AWS A.5.5 - Specification For Low Alloy Steel Covered Arc

Welding Electrodes

•  AWS A.5.17 - Specification For Bare Carbon Steel Electrodes

For Submerged Arc Welding•  AWS A.5.18 - Specification For Carbon Steel Filler Metals For

Gas Shielded Arc Welding

v) American Society for Testing and Materials (ASTM)

•  ASTM A6 - Specification For General Requirements For Delivery ofRolled Steel Plates, Shapes, Sheet Piles And Bars For Structural Use

•  ASTM A36 - Specification For Structural Steels

•  ASTM A572 - Specification For High-Strength, Low-AlloyColumbium - Vanadium Structural Steels

vi) American Bureau of Shipping (ABS)

•  Guide for Building and Classing Floating Production Installations

•  Guide for Building and Classing Facilities on Offshore Installations

Page 10: W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

7/25/2019 W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

http://slidepdf.com/reader/full/w1440-p4-s-00301-specification-for-structural-fabrication-welding-inspection 10/47

 

DETAILED DESIGN FOR MUTINEER /

EXETER FPSO TOPSIDES

Specification for Structural Fabrication,

Welding, Inspection and Testing

Doc. No : AP003164-G-JSD-1800-003Rev : Rev. 1Page : 10 of 47 

 AP003164-G-JSD-1800-003 Spec For Structural Fab, Welding, Inspec, Test Rev 1.doc  

•  Rule Requirements for Materials and Welding – Part 2

1.6 Vendor Responsibility

1.6.1 General

The Vendor shall operate a documented Quality, Health, Safety and EnvironmentalManagement System in accordance with ISO 9002 or Company approved equivalentstandards.

The vendor shall provide documentary evidence of implementation of the above systemsincluding audit reports /non-conformance reports as requested by the Company.

The Vendor shall ensure that all materials, workmanship, inspection and deliverablesconform to the requirements of the Drawings and this Specification.

The Vendor shall allow access to personnel and records for the purpose of the Companyas required.

1.6.2 Personnel

The Vendor shall have fully experienced supervisory personnel in charge of all aspects ofthe work, and shall employ only fully experienced tradesmen to carry out the work.

1.6.3 Materials

The checking, testing, preparation, fabrication and corrosion protection of all materials to

be used shall be the responsibility of the Vendor, and is to be in accordance with the

requirements of this Specification and the Certifying Authority.1.6.4 Subcontracts

The Vendor shall obtain approval from the Company prior to subcontracting any work. TheVendor shall demonstrate that any Sub-Vendor nominated is capable of producing work tothe required standard. Vendor shall be responsible for all of its Sub-Vendors. Companyreserves the right to oppose the choice of any Sub-Vendor who will not fulfil the qualityand schedule requirements.

1.6.5 Substitutions and Modifications

The Vendor shall make no substitution of materials and/or modification of details, without

the prior approval of the Company. The Vendor shall submit in writing all such changesduly documented to the Company for approval.

1.6.6 Errors and Omissions

It is an obligation of the Vendor to check the contract documents and Drawings and tonotify the Company of any errors or omissions.

1.6.7 Conflicts and Deviations

 All conflicts between requirements of this Specification, related contract documents,national standards, codes of practice, and the contract shall be referred to the Companyfor clarification. Where conflicts occur, the generalised order of precedence shall be asfollows:

a) Statutory Requirementsb) Design Drawings

c) This Specification

Page 11: W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

7/25/2019 W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

http://slidepdf.com/reader/full/w1440-p4-s-00301-specification-for-structural-fabrication-welding-inspection 11/47

 

DETAILED DESIGN FOR MUTINEER /

EXETER FPSO TOPSIDES

Specification for Structural Fabrication,

Welding, Inspection and Testing

Doc. No : AP003164-G-JSD-1800-003Rev : Rev. 1Page : 11 of 47 

 AP003164-G-JSD-1800-003 Spec For Structural Fab, Welding, Inspec, Test Rev 1.doc  

d) Other Specificationse) Minimum Code or Standard requirementsf) Contractor Quality Plan

In no case will this specification release the Vendor from its responsibilities and obligationswith regards to Codes, Rules and Regulations generally applicable to the fabrication andassembling of steel equipment.

1.7 Documentation

1.7.1 Prior To Fabrication

Prior to commencement of any part of the fabrication, VENDOR shall submit the following

documentation for COMPANY approval:

a) Schedule of work to illustrate how delivery will be met in accordance with COMPANYsupplied delivery schedule. Shall include shop detail drawings, procurement of

material, fabrication sequence, test & inspection, painting etc.

b) Inspection and Test plan.

c) Mill certificates for VENDOR supplied materials.

d) Fabrication and assembly procedures, welding sequence and erection sequence. Thisis to include the welding procedure specification to be applied, welding sequence anddirection, and number and location of welders at each stage of assembly.

e) Shop detail/fabrication drawings which shall include all pertinent information required

for fabrication and shall include material grade, section size, dimensions, stiffeningplates etc. VENDOR to generate such drawings from TOPL supplied AFC drawings.

f) Drawings and calculations of temporary works, inclusive of support points, jackingpoints and sling points, approved by a qualified engineer.

g) List of proposed welding consumables and their areas of application including detailedcontrol procedures for consumable handling, baking, storage and issue.

h) Welding procedures, repair welding procedures with their supporting procedurequalification records and including weld maps.

i) Certificates of welders, welding operators and tackers qualified in accordance with

this Specification complete with list of welder identification numbers and photographs. j) Key plan showing an unambiguous member identification and weld marking scheme

(weld map).

k) Inspection procedures and detailed report sheets for non-destructive testing andinspection. This shall include separate sheets for Visual, Radiography, Ultrasonic, DyePenetration, Magnetic Particle, Painting and Coating.

l) Identification and control procedures for materials.

m) Procedures for control of tolerances during fabrication and procedure for distortionrectification.

n) Detail procedures for welding equipment maintenance and calibration.

o) Qualification certificates for all inspection personnel.

p) Post-Weld Heat Treatment.

Page 12: W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

7/25/2019 W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

http://slidepdf.com/reader/full/w1440-p4-s-00301-specification-for-structural-fabrication-welding-inspection 12/47

 

DETAILED DESIGN FOR MUTINEER /

EXETER FPSO TOPSIDES

Specification for Structural Fabrication,

Welding, Inspection and Testing

Doc. No : AP003164-G-JSD-1800-003Rev : Rev. 1Page : 12 of 47 

 AP003164-G-JSD-1800-003 Spec For Structural Fab, Welding, Inspec, Test Rev 1.doc  

q) Structural design calculation of equipment skids in accordance with Project DocumentNo.: AP003164-G-JSD-1800-005 - "Structural Specification for Equipment Skids".

r) A complete weighing procedure, which shall also include the COG determination, forthe completed modules.

Page 13: W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

7/25/2019 W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

http://slidepdf.com/reader/full/w1440-p4-s-00301-specification-for-structural-fabrication-welding-inspection 13/47

 

DETAILED DESIGN FOR MUTINEER /

EXETER FPSO TOPSIDES

Specification for Structural Fabrication,

Welding, Inspection and Testing

Doc. No : AP003164-G-JSD-1800-003Rev : Rev. 1Page : 13 of 47 

 AP003164-G-JSD-1800-003 Spec For Structural Fab, Welding, Inspec, Test Rev 1.doc  

1.7.2 During Fabrication

 As the work progresses, the VENDOR shall provide the following:

a) As-built dimensional survey records which shall be updated continuously.

b) Where traceability is required, plans marked to relate certificate references for allmaterials to its final position in the structure.

c) NDT test reports (original only) including radiographs and key plans marked showingfinal identification numbering, test report numbers and the results. Summary sheets forNDT test reports for each joint shall be kept up to date as the work progresses.

d) As-built drawings and Specifications which shall show in detail the manner in whichthe facility was constructed and shall reflect all changes, additions, corrections orrevisions made during the course of construction. The objective being to build up a full

documented history of the Construction Work.

e) Weight control report shall be produced and updated continuously.

1.8 After Fabrication

 After fabrication is completed, the VENDOR shall provide a full MDR report, which shall

include as a minimum the following:

a) Welder qualifications

b) Weld procedures and qualifications

c) Welder traceability

d) Material traceability

e) Mill certificates

f) Weld consumable certificates

g) Inspection and testing certificates

h) Paint report

i) As-built drawings and weight control report

 j) Final measured weight and centre of gravity for all three modules

1.9 Abbreviations

 ABS American Bureau of Shipping

 AFC Approved for Construction

 API American Petroleum Institute

 ASNT American Society for Non-destructive Testing

 ASTM American Society for Testing and Materials

 AWS American Welding Society

CAR COMPANY Authorised Representative

COG Centre of Gravity

CSWIP Certification Scheme For Welding Inspection Personnel

DPI Dye Penetrant Inspection

Page 14: W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

7/25/2019 W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

http://slidepdf.com/reader/full/w1440-p4-s-00301-specification-for-structural-fabrication-welding-inspection 14/47

 

DETAILED DESIGN FOR MUTINEER /

EXETER FPSO TOPSIDES

Specification for Structural Fabrication,

Welding, Inspection and Testing

Doc. No : AP003164-G-JSD-1800-003Rev : Rev. 1Page : 14 of 47 

 AP003164-G-JSD-1800-003 Spec For Structural Fab, Welding, Inspec, Test Rev 1.doc  

E&I Electrical and Instrumentation

GTAW Gas Tungsten Arc Welding

GMAW Gas Metallic Arc Welding

MPI Magnetic Particle Inspection

NDT Non Destructive Testing

PQR Procedure Qualification Record

PWHT Post Weld Heat Treatment

PQR Procedure Qualification Record

RT Radiographic Testing

SAW Submerged Arc Welding

SMAW Shielded Metallic Arc Welding

TOPL Technip Oceania Pty Ltd

TTP Through Thickness Properties

UT Ultrasonic Testing

WPS Welding Procedure Specification

WQT Welder Qualification Test

Page 15: W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

7/25/2019 W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

http://slidepdf.com/reader/full/w1440-p4-s-00301-specification-for-structural-fabrication-welding-inspection 15/47

 

DETAILED DESIGN FOR MUTINEER /

EXETER FPSO TOPSIDES

Specification for Structural Fabrication,

Welding, Inspection and Testing

Doc. No : AP003164-G-JSD-1800-003Rev : Rev. 1Page : 15 of 47 

 AP003164-G-JSD-1800-003 Spec For Structural Fab, Welding, Inspec, Test Rev 1.doc  

2.0 MATERIALS

2.1 General

This section shall be read in conjunction with Project document no.: AP003164-G-JSD-1800-002 - “Specification for Structural Materials”.

2.2 Transportation, Storage And Handling Of Materials

a) VENDOR shall ensure adequate protection to all steelwork during any loading andtransportation activities.

b) VENDOR shall provide nylon or similar lifting slings during handling or lifting

operations; wire ropes or chain slings will not be permitted.c) The steelwork shall be stored above ground on pallets, timber blocks or other similar

supports, be kept above the level of any standing water and be kept free from dirt,grease, paint spray, etc. and shall be protected from harmful environments.

d) Particular care shall be taken in storage and handling of parts which have beenmetal sprayed, galvanised, painted, etc., and should the coating be damaged, it shallbe restored by an approved method, and be compatible with the particular coating.

2.3 Used Materials

Temporary bracing, erection aids, scaffolding and materials and equipment for testing shall

be furnished by VENDOR and shall be safe, serviceable and adequate.

2.4 Classification and Certification of Structural Steels

Refer Project Document No.: AP003164-G-JSD-1800-002 - “Specification for StructuralMaterials”.

2.5 Structural Steel Types

Steel have been classified into three main types as follows:

TYPE I STEEL : Primary Structural Steel – High Strength

Primary structural steel - high strength, is steel with minimum yield strength of 345 MPaand is used in members essential to the overall integrity of the structure and for other

structural members of importance to the operational safety of the structure.

Example: Support Columns & Braces, Primary deck plan members, (pipe racks optional)etc.

TYPE II STEEL : Primary Structural Steel – High Strength with Through

Thickness Properties

Primary structural steel - high strength with through thickness properties (TTP), is steel

with minimum yield strength of 345 MPa and is used in members essential to the overallintegrity of the structure, where stress concentrations are high and where the stresses inthe Z (thickness) direction may lead to lamellar tearing.

Example: tubular chords at chord/brace connection lift points/padeyes

TYPE III STEEL : Secondary Structural Steel – Mild Steel

Page 16: W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

7/25/2019 W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

http://slidepdf.com/reader/full/w1440-p4-s-00301-specification-for-structural-fabrication-welding-inspection 16/47

 

DETAILED DESIGN FOR MUTINEER /

EXETER FPSO TOPSIDES

Specification for Structural Fabrication,

Welding, Inspection and Testing

Doc. No : AP003164-G-JSD-1800-003Rev : Rev. 1Page : 16 of 47 

 AP003164-G-JSD-1800-003 Spec For Structural Fab, Welding, Inspec, Test Rev 1.doc  

Secondary structural steel - mild steel, is steel with specified yield strength between 240MPa ~ 345 MPa and is used in members which are not essential to the overall integrity ofthe structure.

Typical Examples: Handrails, Grating, Floor plate, Grating support stringers, Pipe supports,etc.

2.6 Material Identification

Refer Project Document No.: AP003164-G-JSD-1800-002 - “Specification for StructuralMaterials”.

2.7 Miscellaneous Steel

2.7.1 Bolts, Nuts And WashersRefer Project Document No.: AP003164-G-JSD-1800-002 - “Specification for StructuralMaterials”.

2.7.2 Grating

Refer Project Document No.: AP003164-G-JSD-1800-002 - “Specification for StructuralMaterials”.

2.7.3 Deck Plate

The use of chequer plates shall be avoided where possible and only be installed when

indicated on the AFC Drawings. They shall be of the type where no slippery surfaces willbe created due to standing water or oily products.

2.8 Pre-fabrication Paint Priming

VENDOR shall procure or provide structural steel sections unprimed “black steel” inaccordance with project document No.: AP003164-G-JSD-1800-002.

Page 17: W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

7/25/2019 W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

http://slidepdf.com/reader/full/w1440-p4-s-00301-specification-for-structural-fabrication-welding-inspection 17/47

 

DETAILED DESIGN FOR MUTINEER /

EXETER FPSO TOPSIDES

Specification for Structural Fabrication,

Welding, Inspection and Testing

Doc. No : AP003164-G-JSD-1800-003Rev : Rev. 1Page : 17 of 47 

 AP003164-G-JSD-1800-003 Spec For Structural Fab, Welding, Inspec, Test Rev 1.doc  

3.0 WELDING

3.1 General

•  All welding, temporary or permanent, shall meet the requirements of the latest editionof AWS D1.1 "Structural Welding Code-Steel", as modified by this Specification and

 ABS requirements.

•  All welds shall be full penetration and continuous butt welds except where noted ondrawings.

•  All fillet welds indicated on AFC drawings given as leg size.

•  All touching surfaces shall be seal welded with continuos 3 mm minimum fillet welds

e.g. deck plate on beams/stringers. All seal plates shall be 6mm minimum thicknesse.g. open end tubulars. Exception is deck grating on beams/stringers which shall befastened using clips.

•  ABS qualified welders shall carry out all welding and welding operators using qualifiedwelding procedures in accordance with this Specification.

•  All welding (including tack welding) shall be accomplished using low hydrogenprocess. Automatic submerged arc (SAW) or manual shielded metal arc (SMAW)welding processes shall be used wherever practical. Other welding processes such asflux cored arc welding (FCAW) or gas metal arc welding (GMAW) may be accepted for

certain applications, upon written approval. Flux cored arc welding (FCAW) processes

will not be allowed for welding of any installation aids such as padeyes, lifting /launching lugs, guide / bumper system etc.

4.0 WELDING CONSUMABLES

4.1 General

Welding wire and flux for submerged arc welding shall conform to ABS requirements and AWS A5.17 or AWS A5.23. Unless otherwise approved by the COMPANY, weldingelectrodes for manual shielded metal arc welding shall conform to low hydrogen (E70/E60

see 4.3.1 below) classification of AWS A5.1.

a) The electrodes, wires and fluxes used in fabrication shall be selected to producewelds with mechanical properties equivalent to those required for the base metal or as

specified by COMPANY.

b) When steels of different strengths are joined, the tensile properties of the weld metal

shall be matched to the lower strength steel.

c) The welding consumables applied shall be certified and brand approved by ABS or

any other internationally recognised certifying authority to Company approval.

d) All welding processes and consumables shall be ”low hydrogen”, capable of producing

less than 10ml of hydrogen per 100g of deposited weld metal when tested inaccordance with the requirements of AWS D1.1. Electrodes shall comply with the

requirements of AWS D1.1.

e) Flux for submerged arc welding shall be free from any active weld metal alloyingadditions.

Page 18: W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

7/25/2019 W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

http://slidepdf.com/reader/full/w1440-p4-s-00301-specification-for-structural-fabrication-welding-inspection 18/47

 

DETAILED DESIGN FOR MUTINEER /

EXETER FPSO TOPSIDES

Specification for Structural Fabrication,

Welding, Inspection and Testing

Doc. No : AP003164-G-JSD-1800-003Rev : Rev. 1Page : 18 of 47 

 AP003164-G-JSD-1800-003 Spec For Structural Fab, Welding, Inspec, Test Rev 1.doc  

f) Consumables shall deposit weld metal having minimum yield and ultimate tensilestrengths at least equal to that specified for the parent metal.

g) The Vendor shall submit to the Company batch certificates for all consumables usedduring fabrication.

h) Consumables shall be conditioned and handled in accordance with Manufacturers’

recommendations or a minimum of section 4.4 and 4.5 below.

4.2 Processes

Welding processes approved for this project shall be as follows:

a) Shielded Metal Arc Welding - SMAW

b) Submerged Arc Welding - SAWc) Flux-cored Arc Welding - FCAW

Other welding processes may only be used with the prior approval of the Company. If the

Vendor desires to use an alternative process, a proposal shall be submitted at the bidstage. The Vendor will be required to identify areas of intended use together with fulldetails of the processes and consumables proposed.

The use of Gas Metal Arc Welding (GMAW), not of the Pulse/Synergic type, is not allowedunless all fillet welds are 100% MP examined and all full & partial penetration welds are100% UT and 100% MP examined and is subject to company approval.

4.3 Types of Electrodes, Wires and Fluxes

4.3.1 Electrode Strength Grades

Electrode strength grade shall be selected based on the parent metal in accordance withthe following table:

Table 4.3.1 Electrode Strength Grades

Steel Type Electrode Grade Comments

Type I – primary E70XX High strength steel

Type II – primarywith TTP

E70XX High strength steel

Type III –secondary/tertiary

E60XX Low strength steel – mild steel grade

Type I with Type III

Or

Type II with Type III

E70XX High strength steel governs

Refer to AP003164-G-JSD-1800-002 – “Specification for Structural Material” for theappropriate standard or equivalent steel grades associated with the steel types (e.g. Type ISteel: ASTM A572 Grade 50). 

4.3.2 Wire and Flux for Submerged Arc Welding

Wire and flux shall be carefully selected and the flux shall be of the fully basic type. Thestorage and use of wire and flux shall be as recommended by the manufacturer. The fluxsupplier shall define the range of chemical composition of wire to be used for his particular

Page 19: W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

7/25/2019 W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

http://slidepdf.com/reader/full/w1440-p4-s-00301-specification-for-structural-fabrication-welding-inspection 19/47

 

DETAILED DESIGN FOR MUTINEER /

EXETER FPSO TOPSIDES

Specification for Structural Fabrication,

Welding, Inspection and Testing

Doc. No : AP003164-G-JSD-1800-003Rev : Rev. 1Page : 19 of 47 

 AP003164-G-JSD-1800-003 Spec For Structural Fab, Welding, Inspec, Test Rev 1.doc  

flux. No low-alloy wires shall be accepted. VENDOR shall submit the proposed wire andflux for approval.

4.3.3 Wire for Gas Metal Arc Welding

The gas metal-arc process may only be used on mild steel in enclosed shop fabrication

conditions, and provided that the filler wire selected is such that the welds produced havethe same mechanical properties as the base metal.

4.4 Conditions and Storage

VENDOR shall establish detailed procedures for electrode handling, storage and issuingprocedure for COMPANY written approval. The procedures shall comply with ABSrequirements and AWS D1.1 Section 5, along with the following:

•  A positive means of identifying wires, flux or electrodes shall be established,maintained, and submitted to COMPANY for approval.

•  Any consumable unmarked, or showing signs of damage or deterioration, be itelectrode, wire, gas or flux, shall be discarded.

•  Low hydrogen electrodes shall not be stored in heated cabinets containing electrodes

of other types as approved by the COMPANY.

•  Electrodes, wire spools for automatic and semi-automatic processes shall be stored incabinets with supplier wrapping not removed and remain clearly identifiable up to thetime of usage. Unidentifiable wire shall not be used.

•  All welding consumables, electrodes, wires and fluxes shall be stored in a dry area

where humidity can be controlled, at a temperature of not less than 20ºC (68ºF). Allwelding electrodes shall be supplied in clearly identified, hermetically sealedcontainers.

•  Submerged arc flux shall be supplied in clearly identified moisture proof containers.

•  Submerged arc, gas metal arc and flux cored welding wire shall be clearly identified.

•  Agglomerated/bonded submerged arc fluxes shall only be recycled once and shall befree of flux, mill scale, dirt and other foreign matter. No flux shall be used from thefloor or after exposure to dampness. Compressed air shall not be used for feeding orrecycling flux. Flux design single pass joints shall not be used for multi-pass joints.

•  All manual-type electrodes shall be properly identified up to the time of usage. Eachelectrode shall be distinguishable by colour code marking. If colours are destroyed bybaking, handling or other causes, the electrodes shall be replaced with properlyidentified electrodes. Submerged arc flux, and submerged arc, gas metal arc and fluxcored wires, shall be clearly identified with manufacturer’s grade and batch number.

•  Each batch of wire and flux shall be labelled with the information from the supplycontainers. Unidentified wire, flux, electrodes and other welding consumable shall notbe used.

4.5 Heating and Baking Requirements

Heating, baking and rebaking requirements shall comply with ABS requirements and AWSD1.1 Section 5.3/Annex VIII along with the following:

•  Vendor shall have baking ovens and heated storage cabinets with automatic heat

control and temperature gauges and each welder shall be supplied with a heatedquiver.

Page 20: W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

7/25/2019 W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

http://slidepdf.com/reader/full/w1440-p4-s-00301-specification-for-structural-fabrication-welding-inspection 20/47

 

DETAILED DESIGN FOR MUTINEER /

EXETER FPSO TOPSIDES

Specification for Structural Fabrication,

Welding, Inspection and Testing

Doc. No : AP003164-G-JSD-1800-003Rev : Rev. 1Page : 20 of 47 

 AP003164-G-JSD-1800-003 Spec For Structural Fab, Welding, Inspec, Test Rev 1.doc  

•  All low hydrogen electrodes shall be purchased in hermetically sealed containers orshall be rebaked prior to use. Immediately after opening the hermetically sealed

container, electrodes shall be stored in ovens held at temperatures of at least 120

0

 C.•  Prior to use, low-hydrogen electrodes shall be baked at a temperature of 300ºC

(570ºF) for a minimum period of one (1) hour, or in accordance with themanufacturer’s instructions, to give a weld metal deposit with a hydrogen content notexceeding 10 ml of hydrogen per100 grams of deposited welded metal.

•  Submerged arc, gas metal arc and semi-automatic consumables shall be withdrawnfrom the storage as required for immediate use. Unused consumables shall bereturned to the storage on completion of the welding operation. After issue from

storage, flux shall be held in a heated 70°C (160°F).

•  Following baking, the electrodes shall be transferred to a heated storage cabinet at

150ºC (300ºF) for later use. Low-hydrogen, manual and metal arc electrodes shall bewithdrawn as required for immediate use and held in a heated quiver at a minimum

temperature of 75ºC (170ºF). All low-hydrogen electrodes unused after a period ofeight (8) hours shall be returned and re-baked as specified above before being re-used for welding. Low hydrogen electrodes left out of heated quivers for more thanfour (4) hours shall be discarded or rebaked as specified above. Under humidconditions this eight (8) hour period shall be reduced at the discretion of the Company

or based on manufacturer’s recommendation. No electrodes shall be left lying aroundthe site/workshop. Electrodes so left shall be scrapped and removed.

•  Electrodes shall be rebaked only once. Returned electrodes shall be marked prior torebaking.

Page 21: W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

7/25/2019 W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

http://slidepdf.com/reader/full/w1440-p4-s-00301-specification-for-structural-fabrication-welding-inspection 21/47

 

DETAILED DESIGN FOR MUTINEER /

EXETER FPSO TOPSIDES

Specification for Structural Fabrication,

Welding, Inspection and Testing

Doc. No : AP003164-G-JSD-1800-003Rev : Rev. 1Page : 21 of 47 

 AP003164-G-JSD-1800-003 Spec For Structural Fab, Welding, Inspec, Test Rev 1.doc  

5.0 QUALIFICATION OF WELDING PROCEDURE

5.1 General

Detailed welding procedures for typical structural welding of plates, shapes and tubularmembers shall be established and qualified in accordance with ABS requirements and AWS D1.1 and as further required in this Specification. All procedures shall be submittedto COMPANY for review and approval before any welding is commenced and COMPANY's

representative shall witness the procedure test.

Procedures previously qualified by VENDOR and witnessed and endorsed by a reputable

independent certifying party for other work are acceptable without running anotherprocedure test at the discretion of COMPANY. The major welding parameters must be the

same.Welding procedures and qualification records already qualified for non-COMPANY workshall be acceptable solely at the discretion of COMPANY.

 Any structural repair welding shall be limited to two attempts and approved by COMPANY.Repair welding procedures shall be established and qualified. See Section 8.9.

5.2 Parameters in Welding Procedure Specification

 A Welding procedure specification (WPS) shall contain the following parameters with allexplanatory details necessary:

a) Material specification of the base metal(s)b) Welding process(es), manual or semi-automatic.

c) Material thickness and diameter range for which the procedure is valid.

d) Geometry of welding groove showing allowable tolerances.

e) Root gap showing allowable tolerances.

f) Welding position and direction.

g) Filler metal specification and brand.

h) Filler metal classification.

i) Specification of flux.

 j) Gas shielding - flow, mixture and composition.

k) Number and sequence of passes.

l) Welding current, voltage, polarity and heat input(including ranges).

m) Travel speed and electrode runout length for each pass and range.

n) Preheat and interpass temperatures.

o) Post weld heat treatment including heating and cooling rates.

p) Method of cleaning and gouging.

5.3 Welding Procedure Qualification Test

a) Welding Procedure Qualification tests shall be carried out prior to any welding, toverify the WPS and shall simulate, as far as is practicable, the conditions and

Page 22: W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

7/25/2019 W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

http://slidepdf.com/reader/full/w1440-p4-s-00301-specification-for-structural-fabrication-welding-inspection 22/47

 

DETAILED DESIGN FOR MUTINEER /

EXETER FPSO TOPSIDES

Specification for Structural Fabrication,

Welding, Inspection and Testing

Doc. No : AP003164-G-JSD-1800-003Rev : Rev. 1Page : 22 of 47 

 AP003164-G-JSD-1800-003 Spec For Structural Fab, Welding, Inspec, Test Rev 1.doc  

materials to be used for production welding. Limitations imposed by the essentialvariables of the procedure qualification shall be adhered to in production welding.

b) Changes in any of the essential variables (See Section 5.4) will call for a newqualification test.

c) Changes in one or more of the non-essential variables will not call for a new

qualification test, but a new WPS is required.

d) Any WPS qualification for COMPANY shall be witnessed by COMPANY and ABS

with ownership of the WPS/PQR shall be jointly shared between both parties.

e) Proposed WPS packages that will be qualified shall be submitted for COMPANY

acceptance

5.4 Essential Variables in Qualification of Welding Procedures

 Any changes in the essential variables listed in AWS D1.1 paragraph 4.7, table 4.5 shallrequire the resubmission of a new WPS and a complete qualification of the procedure.

5.5 Procedure Qualification Record

The specific facts from the WPS and test results from the welding procedure qualificationtest shall be recorded in the procedure qualification record (PQR). The applicable WPSwith the PQR shall be submitted to COMPANY for approval before any production welding

is commenced. At the discretion of COMPANY, test results from previous jobs or contractsmay be acceptable but only when the essential parameters are similar, original copy of thePQR is available and the PQR is endorsed by a third party independent certifying authority

acceptable to ABS.

The form used for the WPS and PQR shall be such as described in AWS D1.1. However,the parameters stated in Section 5.2 above shall be recorded.

5.6 Testing Requirements for Procedural Qualification Test

 An independent qualified testing laboratory shall perform all qualification testing.

5.6.1 Non Destructive Testing and Destructive Testing

Each test specimen shall be non-destructively or destructively tested for soundness using

methods outlined in the AWS D1.1 section 4.8.

5.7 Acceptance Criteria and Retest

The weld shall be inspected or tested in accordance with AWS D1.1 for acceptance orretest.

Unacceptable defects evaluated by visual, MPI, DPI, radiographic, ultrasonic and macroetch testing shall be cause for rejection for a retest. In this case a new test weld shall berequired.

5.7.1 When Retest Is Allowed

When one of the following mechanical test specimens fail to meet the required acceptancecriteria, two additional specimens shall be prepared for retesting. The location of the twoadditional specimens shall reflect the location of the failed specimen. If one or both of the

retest specimens fail, then this shall be cause for rejection. A new test weld shall berequired.

Page 23: W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

7/25/2019 W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

http://slidepdf.com/reader/full/w1440-p4-s-00301-specification-for-structural-fabrication-welding-inspection 23/47

 

DETAILED DESIGN FOR MUTINEER /

EXETER FPSO TOPSIDES

Specification for Structural Fabrication,

Welding, Inspection and Testing

Doc. No : AP003164-G-JSD-1800-003Rev : Rev. 1Page : 23 of 47 

 AP003164-G-JSD-1800-003 Spec For Structural Fab, Welding, Inspec, Test Rev 1.doc  

a) Tensile test

b) Bend test

c) Impact test (when applicable)

d) Hardness test

5.8 Welding Procedure Register

The Vendor shall maintain a register of welding procedures, including NDT procedures,approved by the Company and shall ensure that only registered, approved procedures areemployed in the fabrication.

Page 24: W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

7/25/2019 W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

http://slidepdf.com/reader/full/w1440-p4-s-00301-specification-for-structural-fabrication-welding-inspection 24/47

 

DETAILED DESIGN FOR MUTINEER /

EXETER FPSO TOPSIDES

Specification for Structural Fabrication,

Welding, Inspection and Testing

Doc. No : AP003164-G-JSD-1800-003Rev : Rev. 1Page : 24 of 47 

 AP003164-G-JSD-1800-003 Spec For Structural Fab, Welding, Inspec, Test Rev 1.doc  

6.0 QUALIFICATION OF WELDERS AND WELDING OPERATORS

6.1 General

6.1.1 Qualifications Required

Welders and welding operators shall be qualified in accordance with the requirements of

 ABS, AWS D1.1 and this Specification. Only qualified welders shall be employed duringthe fabrication including tack welding, structural welding and repair welding of anystructural steel part. They shall only perform welding for positions and processes for whichthey are qualified. Backing materials shall not be used during testing. All welders who will

perform the work in this project shall be qualified in accordance with this specification.

6.1.2 Witness And Approval Of Test Before Welding

 All welders and welding operator's tests shall be witnessed and approved by COMPANYbefore the welder or welding operator is permitted to work on the structure. The decision

by COMPANY regarding qualification of any welder or welding operator shall be final.Evidence of previous qualification tests may be accepted solely at the discretion ofCOMPANY Representatives provided:

•  WQT not done more than a year ago,

•  record endorsed by a third party independent certifying authority,

•  welder performed welding work for the past 6 months.

6.1.3 Welder Identification System

 An identification system shall be worked out for welders and welding operators. Thesystem, which shall include a numbering and identification card index, shall be established

and agreed with COMPANY. Whilst on the Works, the welder/welding operator shallalways be identifiable by a badge bearing his name, his photograph and his identificationnumber. COMPANY representatives will dismiss welders and welding operators notwearing their badges from the Works. In the event that a welder leaves the Works, his

welder and identification mark shall not be assigned to another welder employed on theWorks.

6.1.4 Marking Of WeldsEach qualified welder and welding operator shall be supplied with an identification marker.

The welder shall clearly mark the plate or pipe adjacent to his weld using soft die stampsor non erasable paint with the identification mark assigned to him in his qualificationcertificate. Tack welding of components need not be marked.

6.1.5 Applicability Of Qualifications

The qualified welders and welding operators can only, after ABS acceptance, carry out thework on welding the type, process and positions of weld for which their qualification test soqualifies them. Violators shall be removed from the WORK.

6.1.6 Base Material

 As far as is practicable, welders and welding operators shall be qualified on the samematerial to be used for fabrication. Similar types of materials may be substituted at thediscretion of COMPANY provided that it can clearly be demonstrated that the weldability isequivalent to the material intended for use in the fabrication.

Page 25: W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

7/25/2019 W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

http://slidepdf.com/reader/full/w1440-p4-s-00301-specification-for-structural-fabrication-welding-inspection 25/47

 

DETAILED DESIGN FOR MUTINEER /

EXETER FPSO TOPSIDES

Specification for Structural Fabrication,

Welding, Inspection and Testing

Doc. No : AP003164-G-JSD-1800-003Rev : Rev. 1Page : 25 of 47 

 AP003164-G-JSD-1800-003 Spec For Structural Fab, Welding, Inspec, Test Rev 1.doc  

6.1.7 Retest

If the test joint does not meet the requirements, the welder or welding operator, may at the

discretion of COMPANY, carry out a new test joint of the same type as the one rejected.

Failing of both these tests shall result in the welder or welding operator not beingemployed further on the work. The welder shall only be considered for requalification after14 days provided proof is given of proper training of the welder over that period.

6.1.8 Welder Qualification Record

 A record of the welder’s qualification test, including a reference to the corresponding WPSnumber, the essential variables according to AWS D1.1 and the test results, shall beissued for each welder or welding operator for each test they pass. Not withstanding any

other radiography requirements of codes or of this specification, the first five productionwelds completed by each welder shall be subjected to 100% testing by radiography orultrasonic.

6.1.9 Period Of Effectiveness

a) Welders and welding operators who will perform welds in the process/positioncombinations for which they were previously qualified need not requalify for thosecombinations if both of the following requirements are met :

i) VENDOR can show that the welder's performance has been monitored andproven satisfactory since the qualification test.

ii) The welder certificate has been endorsed by a COMPANY recognisedCertifying Authority at a date less than six months before construction starts.

b) During construction, VENDOR shall provide evidence indicated in a) above toCOMPANY so that the welder certificates can be re-endorsed within six months ofthe previous endorsement date.

 Any certificate not endorsed every six months shall be considered invalid.

c) A qualified welder or welding operator may, at the discretion of COMPANY, berequired to requalify if inspection reveals that the repair work is 5% or moremeasured by weld length over a period of any one week.

Page 26: W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

7/25/2019 W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

http://slidepdf.com/reader/full/w1440-p4-s-00301-specification-for-structural-fabrication-welding-inspection 26/47

 

DETAILED DESIGN FOR MUTINEER /

EXETER FPSO TOPSIDES

Specification for Structural Fabrication,

Welding, Inspection and Testing

Doc. No : AP003164-G-JSD-1800-003Rev : Rev. 1Page : 26 of 47 

 AP003164-G-JSD-1800-003 Spec For Structural Fab, Welding, Inspec, Test Rev 1.doc  

7.0 PRODUCTION WELDING

7.1 General

a) Preparation and welding of structural members shall be in accordance with theappropriate qualified welding procedure specifications. Manual electrodes, wires andflux shall be of the same type and manufacture as those used in the procedurequalification tests.

b) A complete list with pertinent description of all welding equipment intended by theVENDOR to carry out the works shall be submitted to COMPANY for approval.

c) No welding shall be carried out until the structure to be welded has been properlyaligned (refer to Section 8.6).

7.2 WELDING SEQUENCE

VENDOR shall develop welding sequences to control warping, creeping and the build-upof excessive internal stresses in the structure. The sequences shall be submitted to

COMPANY for approval before the assembly of any components. VENDOR shall furnishthe necessary supervision to ensure that the planned sequences are followed.

Sequences shall include :

a) Welding procedure specification to be applied.

b) Sequence of connections to be welded.

c) Any differences from the specified welding procedures, such as areas of preheating,reinforcements, etc.

d) Post weld heat treatment, heating and cooling rates.

e) Number and location of welders at each stage of assembly.

f) Tack welds and spacers used in the assembly of components.

7.3 Weld Preparations

7.3.1 Alignment

a) At Splices (butt welding)

The offset at butt joints shall not exceed T/10 (where T is the thickness of the thinnermaterial) or 6 mm, whichever is less. The offset in longitudinal seams shall notexceed T/10 or 3 mm, whichever is less. All offsets greater than 2 mm shall be givena 1:4 transition.

b) At Welded Intersections

The utmost attention shall be paid to good alignment of the structural parts onopposite sides of the through member.

7.3.2 Surface Cleaning Before Welding

Surfaces to be welded shall be free from loose scales, slag, rust, grease, paint and anyother foreign material.

Page 27: W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

7/25/2019 W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

http://slidepdf.com/reader/full/w1440-p4-s-00301-specification-for-structural-fabrication-welding-inspection 27/47

 

DETAILED DESIGN FOR MUTINEER /

EXETER FPSO TOPSIDES

Specification for Structural Fabrication,

Welding, Inspection and Testing

Doc. No : AP003164-G-JSD-1800-003Rev : Rev. 1Page : 27 of 47 

 AP003164-G-JSD-1800-003 Spec For Structural Fab, Welding, Inspec, Test Rev 1.doc  

7.3.3 Edge Preparation

Preparation of weld edges by gas cutting shall, wherever practicable, be done with a

mechanically guided torch. Edges shall be left free of slag and the cut surface shall beground to a smooth uniform surface by removing approximately 0.5 mm of metal. After

grinding, the weld edges shall be visually examined to ensure freedom from defects.

7.3.4 Cleaning During And After Welding

In between welding passes and after welding is complete, weld surfaces and surroundingareas shall be thoroughly cleaned of all spatter and deposits.

7.4 Weld Execution

7.4.1 Welding Position And Progression

a) SMAW Welding

Electrodes shall only be used in the position recommended by the manufacturer.Weld progression in vertical joints shall utilise the uphill method. For the 1G, 2G, 1Fand 2 F positions, the maximum size of electrode allowed is 6.4 mm. For any other

position, the maximum size of electrode shall be 5.0 mm. The capping passes shallalways be done with a 4.0 mm maximum electrode.

b) SAW Welding

This shall be done in the flat 1G position and in the case that it is done on pipe, the

pipe shall be mechanically rotated 1GR.

7.4.2 Size Of Welds

a) To obtain optimum toughness, a small bead multipass technique shall be used. Theweave width for SMAW, i.e. maximum oscillation of the electrode, shall not exceed

two and a half times the electrode diameter or 12 mm whichever is the least.

b) The width of SAW beads shall not exceed six times the electrode diameter and the

welding speed shall be 375 mm per minute minimum.

c) Fillet welds shall be completed in three or more runs except for seal welds, whichmay be done in one run. Two run fillet welds are not permitted.

d) COMPANY shall have the right to limit the thickness of each weld bead or pass when

this exceeds those given in the weld procedure qualification test.

7.4.3 Intermittent Welding

Stitch welding i.e. partial seal welds shall not be allowed unless otherwise approved byCOMPANY. All seams (not seal welded) which are exposed to corrosion shall be sealedby approved sealant.

7.4.4 Seal Welds

Where stress bearing welds are required by Contract Drawings to extend only partiallyaround a member, including plates joining another member, a seal weld of 4 mm minimumfillet shall be applied continuously to the remainder, but note should be taken that a

hardness of HV 325 maximum shall not be exceeded.

Page 28: W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

7/25/2019 W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

http://slidepdf.com/reader/full/w1440-p4-s-00301-specification-for-structural-fabrication-welding-inspection 28/47

 

DETAILED DESIGN FOR MUTINEER /

EXETER FPSO TOPSIDES

Specification for Structural Fabrication,

Welding, Inspection and Testing

Doc. No : AP003164-G-JSD-1800-003Rev : Rev. 1Page : 28 of 47 

 AP003164-G-JSD-1800-003 Spec For Structural Fab, Welding, Inspec, Test Rev 1.doc  

7.4.5 Tack Welds

Bridge tacking is the preferred method to avoid the tack becoming part of the final weld.

Wherever possible, tack welds shall be temporary and the welding shall be performedusing the same procedures as required for the final weld.

Tack welds shall not be less than 50mm in length nor be smaller than 6mm equivalent filletwelds in section and spaced so that shrinkage forces cannot cause cracking (See 7.5.2 (c)

for preheat requirements). Tack welds shall be performed by qualified welders. NDT,either MP or DP, shall be carried out on the tack welds as per the relevant code i.e. AWSD1.1. Any surface breaking defect apparent after removal or feathering of tack welds is tobe ground out and NDT repeated until a satisfactory surface is reported.

When the tack weld is to form part of the completed weld, it shall be ground to a featheredge, non-destructively tested and completely fused with the root run.

Tack welds, which are not to become part of the final weld, shall be removed by grinding,and the parent metal non-destructively tested.

7.4.6 Butt Welds

a) Design of the groove and performance of welding shall be in accordance with theapproved WPS. However, in general, the groove shall be bevelled to give anincluded angle of not less than 60 degrees and shall be of the V or X type (singlebevel or double bevel). The root opening shall not be less than 2 mm and not greater

than 5 mm and the root face, if any, shall not be greater than 2 mm.

b) Where access to both sides is possible, double bevel groove welds shall be used to

minimise welding stresses and shrinkage effects.

c) When different thicknesses are to be butt welded, a 1:4 taper shall be provided on

the thicker member starting at the toe of the weld cap.

d) At any joint, no butt weld shall be located such that an incoming member will result ina weld overlapping the butt weld.

7.4.7 Plate and Tubular, T or Y Joints

Design of the groove and performance of welding shall be in accordance with theapproved WPS.

However, in general, Figure 3.9 of AWS D1.1 shall be used as a guide for all T-K-Y

connections.The bevel shall preferably be feather edged and the root opening shall be 3 - 5mm oraccording to an approved procedure.

Welding of minor members shall be a full penetration type weld and where fabricationmethod permits, welding from both sides shall be carried out.

7.4.8 Weld Compatibility

 All weld joints shall develop the mechanical properties specified for the steel being welded.Where different grades of steel are joined, the weld metal shall be matched to the lowerstrength steel. The procedure shall be such as to safeguard the mechanical properties of

the higher strength member.

7.4.9 Weld Finish

Welds shall be left as welded and not be doctored with a torch or by any mechanicalmeans to change their appearance.

Page 29: W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

7/25/2019 W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

http://slidepdf.com/reader/full/w1440-p4-s-00301-specification-for-structural-fabrication-welding-inspection 29/47

 

DETAILED DESIGN FOR MUTINEER /

EXETER FPSO TOPSIDES

Specification for Structural Fabrication,

Welding, Inspection and Testing

Doc. No : AP003164-G-JSD-1800-003Rev : Rev. 1Page : 29 of 47 

 AP003164-G-JSD-1800-003 Spec For Structural Fab, Welding, Inspec, Test Rev 1.doc  

7.4.10 Weld Interruption

Welding of each weld shall be a continuous operation, with the exception of manually

welded root runs for submerged arc welding. In the case that welding must bediscontinued, this shall not take place before at least half of the final weld thickness is

achieved. The maximum time that a production weld will remain part welded is two days.The maximum number of heat cycles that will be used in a production weld shall be two.Slow cooling of the weld area shall be ensured. Before continuation of welding, the weldshall be inspected for cracks visually and by MPI.

7.4.11 Weather Protection

Welding operations shall be prohibited when the ambient air temperature in the immediatevicinity of the weld site is below -18

o C. Welding operations shall also be prohibited when

surfaces to be welded, welding consumables or welding personnel are wet or are exposed

to rain, snow, or are exposed to wind velocities exceeding five (5) miles per hour (2.235M/sec). Shelters shall be provided at all times to give protection to the weld areas fromwind, rain and moisture.

Precautions required :-

a) The weld surfaces shall be thoroughly dried by preheating (not above 300o

C).

Temperature control shall be carried out.

b) If any fabrication is to be carried out in the vicinity of equipment already installed in

connection with the Work, then, before such fabrication work commences, VENDORshall provide adequate protection to prevent any damage from weld spatter, flamecutting droplets and the like. Such protection shall be subject to the approval of

COMPANY.

7.4.12 Arc Strikes

 Arcs shall be struck only on fusion faces and contact of the electrodes or the non-insulatedparts of the electrode holder with the assembly shall be avoided. Places where any strayarcs have accidentally occurred shall be subject to repair or rejection at the discretion of

COMPANY.

Where permission to repair arc strikes mechanically has been given, the procedure shall

include, but not necessarily be limited to, the mechanical removal of the defective material,blending of the excavation, checking by MPI and confirmation that the thickness of therepaired material is within permitted tolerances.

7.5 Preheating and Interpass Temperatures

7.5.1 General

a) Preheating shall be carried out by electrical resistance induction equipment or withgas burners specifically made and shaped for this type of operation. Torches forflame cutting or gouging shall not be used.

b) The preheating temperature shall be established to a distance of at least 75 mm oneither side of the weld line and throughout the wall thickness prior to welding and be

maintained over the full length of the weld joint until the weld is completed unless

specifically agreed otherwise by COMPANY.

c) The temperature measurement for preheating may be by thermocouples or

temperature sensitive crayons, or a combination of both as may be appropriate forthe type of joint being heated and the method of heating.

Page 30: W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

7/25/2019 W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

http://slidepdf.com/reader/full/w1440-p4-s-00301-specification-for-structural-fabrication-welding-inspection 30/47

 

DETAILED DESIGN FOR MUTINEER /

EXETER FPSO TOPSIDES

Specification for Structural Fabrication,

Welding, Inspection and Testing

Doc. No : AP003164-G-JSD-1800-003Rev : Rev. 1Page : 30 of 47 

 AP003164-G-JSD-1800-003 Spec For Structural Fab, Welding, Inspec, Test Rev 1.doc  

d) At all joints where preheating is required, COMPANY shall subject the joint totemperature checks before welding commences.

e) During welding particularly where preheat has been used and for high heat inputprocesses, care shall be exercised to control the interpass temperature and in noevent shall it exceed 300

o C or as indicated in the WPS. The interpass temperature

shall be monitored by means of thermocouples or thermo sticks or another approvedmethod.

7.5.2 Temperature Requirements

a) Preheat and inter-pass temperatures and procedures shall be in accordance with ABS requirements and AWS D1.1 Section 5.6 or as indicated in the approved WPS.

b) Preheat temperatures for lifting lugs or padeyes shall be 150o C minimum

c) For tack welding where the tack becomes part of the main weld, the preheattemperature shall be 50

o  C higher than specified on the WPS with a maximum of

300o C.

d) If the metal temperature is less than 10o C, a minimum preheat metal temperature of

38o

C is required. Preheat shall be maintained during the mulitipass welding. Ifsurface moisture has gathered on the steel, the weld joint shall be dried by

preheating the surface to remove the moisture.

7.6 Stress Relieving - Post Weld Heat Treatment

7.6.1 General

Where required by contract drawings or specifications, welded assemblies shall be stress

relieved by heat treating. The stress – relief treatment shall conform to the requirementsstipulated in AWS D1.1 Section 5.8

a) VENDOR shall inform COMPANY prior to any PWHT operation so that the proposedformat can be reviewed and inspected as a prerequisite for COMPANY approval toproceed with the PWHT operation.

b) PWHT of nodes shall be carried out following complete assembly of the node.

c) The requirements for PWHT shall be determined from the thickness of the thickest

component of the welded assembly. For tapered sections, the thickness at the weld

shall be taken as the base metal thickness.d) Assemblies with different maximum thickness (but not exceeding a ratio of 2 : 1) may

be post-weld heat treated in the same furnace charge in accordance with the heattreatment requirements for the thickest assembly in the charge.

e) Following PWHT, the temperature charts shall be marked with a clear identificationand shall be retained for the quality control dossier. A copy shall be forwarded toCOMPANY.

7.6.2 Requirements For PWHT

PWHT is required when any of the following conditions apply:

a) PWHT is indicated on drawings.

b) PWHT is indicated in the WPS.

c) The base metal thickness exceeds 65 mm.

Page 31: W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

7/25/2019 W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

http://slidepdf.com/reader/full/w1440-p4-s-00301-specification-for-structural-fabrication-welding-inspection 31/47

 

DETAILED DESIGN FOR MUTINEER /

EXETER FPSO TOPSIDES

Specification for Structural Fabrication,

Welding, Inspection and Testing

Doc. No : AP003164-G-JSD-1800-003Rev : Rev. 1Page : 31 of 47 

 AP003164-G-JSD-1800-003 Spec For Structural Fab, Welding, Inspec, Test Rev 1.doc  

7.6.3 Method

a) Post-weld heat treatment shall be done in a suitable furnace or using proper

induction or electrical resistance equipment.

b) Where it is impracticable to heat the whole assembly in a furnace, VENDOR shallpropose, in writing, an adequate method of PWHT for the approval of COMPANY.

This procedure shall include the following information :-

•  The number, dimensions, locations and method of attachment of heatingelements

•  The location, type and thickness of insulation.

•  Thermocouple types and their calibration procedures.

  Method of attachment of thermocouples, locations and number.•  Types of temperature recorder and the calibration procedures.

•  Standard information to be recorded on the chart.

c) The procedure for PWHT shall comply with the following :-

 An assembly may be heat treated in sections in an enclosed furnace, providing the

overlap is at least 5SQRT(Rt) (R is the internal radius and t is the base metalthickness) with a maximum of 1500 mm. Where this method is used, the portionoutside the furnace shall be insulated so that the longitudinal temperature gradient issuch that the distance between the peak and half peak temperature is not less than

2.5SQRT(Rt) with a minimum of 750 mm.

Circumferential seams in tubulars may be heat treated locally by electrically heating

a shielded band around the entire circumference. The width of the heated band shallnot be less than 5SQRT(Rt), the weld being in the centre. For plate the width of theband shall be 20t. Sufficient insulation shall be fitted to ensure that the temperatureat the edge of the heated band is not less than half the peak temperature. The ends

of the tubulars shall be covered to avoid draughts inside the tubular.

In addition, the adjacent portion of the tubular outside the heated zone shall bethermally insulated such that the temperature gradient is in accordance with the

above. A minimum total insulated bandwidth of 10SQRT(Rt) for tubulars, or 40t forplate, is recommended for the purpose of meeting this requirement.

Welded attachments may be locally heat treated by electrically heating a shieldedcircumferential band around the entire surface. In such cases, the aboverequirements for circumferential seams in tubulars shall apply with the exception thatthe width of the circumferential band (2.5Rt minimum or 750mm for plate) shall be

measured from the edge of the weld which connects the attachments to the mainfabrication.

Items or subassemblies to be post-weld heat treated shall be robust and adequatelysupported to prevent warping and damage.

In cases where these requirements cannot be strictly applied, modifications may beagreed between VENDOR and COMPANY.

Page 32: W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

7/25/2019 W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

http://slidepdf.com/reader/full/w1440-p4-s-00301-specification-for-structural-fabrication-welding-inspection 32/47

 

DETAILED DESIGN FOR MUTINEER /

EXETER FPSO TOPSIDES

Specification for Structural Fabrication,

Welding, Inspection and Testing

Doc. No : AP003164-G-JSD-1800-003Rev : Rev. 1Page : 32 of 47 

 AP003164-G-JSD-1800-003 Spec For Structural Fab, Welding, Inspec, Test Rev 1.doc  

8.0 FABRICATION AND DELIVERY

8.1 General

Fabrication and delivery shall be in accordance with:

•  API RP2A Section 11

•  AISC "Specification for Structural Steel Buildings" - Chapter M

•  AISC "Code of Standard Practice for Steel Buildings and Bridges" - Section 6

•  ABS Rules (see Section 1.5.2)

8.1.1 Erection Loads and Stability

a) During site assembly, VENDOR shall take account of all temporary erection loadsimposed on the structure from supports, jacking and slinging at each stage of thestructure assembly.

b) At each stage of the structure assembly, VENDOR shall take account of the local oroverall stability from self weight and environmental loads; inclusive of scaffolding,

staging, welding shelters and temporary works. VENDOR shall ensure that allstresses induced in the structure during fabrication and load out are withinacceptable limits.

c) VENDOR shall take due consideration of the effect of wind induced vortex sheddingon the structure or parts of the structure during construction.

d) VENDOR shall demonstrate to the satisfaction of COMPANY that he has consideredall relevant erection and temporary loads.

e) VENDOR shall produce a procedure for each erection or transport activity where theitem under consideration exceeds 50 tonnes in weight, and at other times whenrequested by COMPANY. The procedure shall cover all aspects detailed in thisClause and shall satisfy the requirements of the regulatory authorities.

f) VENDOR shall produce and maintain on a continuous basis a reliable weigh controlreport.

8.1.2 Material Identification

a) All components shall be clearly marked in accordance with the approved scheme forthe identification of members, welds and welders.

b) VENDOR shall maintain full identification of primary structural steel throughoutfabrication and VENDOR’s reference number shall be die-stamped, using roundnosed dies or by paint marking, on cut sections of plate, sections and tubulars, in amanner to be approved by COMPANY.

8.2 Material Preparation

8.2.1 Straightening

 All rolled plates, bars and sections shall be flattened and straightened and made free from

twist, without damage, before marking and cutting. The limit on the amount of straininduced by cold working shall be 3%.

Page 33: W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

7/25/2019 W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

http://slidepdf.com/reader/full/w1440-p4-s-00301-specification-for-structural-fabrication-welding-inspection 33/47

 

DETAILED DESIGN FOR MUTINEER /

EXETER FPSO TOPSIDES

Specification for Structural Fabrication,

Welding, Inspection and Testing

Doc. No : AP003164-G-JSD-1800-003Rev : Rev. 1Page : 33 of 47 

 AP003164-G-JSD-1800-003 Spec For Structural Fab, Welding, Inspec, Test Rev 1.doc  

8.2.2 Cutting And Edge Preparation

The steel shall be cut to size by thermal cutting or machining in accordance with approved

procedures except that for plates less than 15 mm thick, cold shearing may be used,provided that the sheared edge is dressed back by machining or grinding for a distance of

not less than 1.5mm. All cut edges shall be prepared to the satisfaction of COMPANY.

The hardness of flame cut edges shall be limited to 325 HV 10 maximum either by

controlled speed flame cutting, by preheat, or by grinding back or machining after cutting.

The cut edges shall be 100% visually examined for laminations, cracks, and other defects.If such defects are detected, the extent shall be established. A repair procedure shall be

agreed with COMPANY. At the discretion of COMPANY, the material component may berejected.

Where there is a steel location of the chord to brace the connection area shall be UT

inspected to detect any defect such as lamination, etc. This is not applicable if the brace tochord connection is via gusset plates i.e. load transfer is principally by shear

 Any bevelled edge that has been damaged shall be restored to the minimum tolerances.Where such restoration involves welding, only welding procedures approved byCOMPANY shall be used. Maximum buttering heights shall not exceed 8mm.

8.3 Stiffeners

Stiffeners shall be fitted accurately and neatly between the flanges of beams, and where

tight fits are required to transmit bearing, the ends of the stiffeners shall be milled orground, as detailed on the Contract Drawings, to secure an even bearing against the

flange faces, or shall be bevelled and fully butt welded to the flange. Cope holes shall beused only when indicated on the design drawings (see Section 8.6.4).

8.4 Splices

8.4.1 General

a) Splices shall be kept to a minimum by making individual sections as large as possibleconsistent with the size of the steel supplied and VENDOR’s approved assembly

sequence.

b) Splices shall be arranged to minimise overhead welding. Spliced materials of

different widths and thicknesses shall have smooth transitions as specified in Section7.3.1.

c) Lapped joints are not permitted.

d) Unless specified otherwise on the drawings, when two or more members intersect oroverlap at a joint, the order in which each member comes into the joint will be

determined by wall thickness and/or diameter. The member with the thickest wall willbe the continuous or through member, and the sequence for framing the remainingmembers shall be based on the order of decreasing wall thickness.

8.4.2 Beams

Segments of beams with the same cross-section may be spliced. The use of the beamshall determine the location and frequency of splicing. In cantilever beams there shall beno splice located closer to the point of support than one-half the cantilevered length. Forbeams employed in any span between supports, there shall be no splice in the middle

one-fourth of the span. Splices shall not be located closer together than twice the depth ofthe beams, or 900 mm, whichever is larger.

Page 34: W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

7/25/2019 W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

http://slidepdf.com/reader/full/w1440-p4-s-00301-specification-for-structural-fabrication-welding-inspection 34/47

 

DETAILED DESIGN FOR MUTINEER /

EXETER FPSO TOPSIDES

Specification for Structural Fabrication,

Welding, Inspection and Testing

Doc. No : AP003164-G-JSD-1800-003Rev : Rev. 1Page : 34 of 47 

 AP003164-G-JSD-1800-003 Spec For Structural Fab, Welding, Inspec, Test Rev 1.doc  

8.5 Camber

When members require camber, the amount shall be specified and shown on the contact

drawings, and the means of achieving the correct amount of camber shall be agreed withCOMPANY.

8.6 Laying-Out, Alignment and Fit-Up

8.6.1 Laying-out

a) At all stages during fabrication, VENDOR shall ensure correct positioning, alignmentand levels in accordance with the required datum.

b) During layout and assembly of each node, VENDOR shall permanently mark andidentify all wrap lines, working points and centre lines.

c) Overloading, damage or any permanent deformation of any of the structuralcomponents at any stage of the erection shall be rectified in accordance with a

procedure approved by COMPANY.

d) No structural welding shall commence until the members to be joined have been

properly aligned and braced to prevent distortion.

8.6.2 Alignment And Fit-up For Welding And Tack Welding

a) Whenever practicable, clamps, holding devices or other setting up fixtures shall beused in assembling parts of the structure to avoid temporary welded attachments or

tack welding. In fit-up where clamps cannot be used, temporary spacer strips shall be

used to ensure the correct root gap prior to tack welding.b) Ring stiffeners, stiffeners and diaphragms shall be close fitted to the shape of the

surface to which they are attached either by machining or by flame cutting andgrinding.

c) At intersections, the utmost attention shall be paid to good alignment of the structuralparts where members meet on opposite sides of a through member. As-builtdimensions shall be used to align such plates and not theoretical dimensions.

d) Where powered manipulations are used in conjunction with Mechanised WeldingMachines for the production of circumferential seams in tubulars, the tubular shall beset to turn at a constant angular velocity to ensure uniform deposit of weld metal.

8.6.3 Temporary Attachment Welds

Temporary weld attachments and their removal shall meet the requirements of Section 8.7below.

8.6.4 Cope Holes

Cope holes for ring stiffeners, stiffeners and diaphragms shall be permitted to a maximumradius of 50 mm. The cut edges of the cope holes shall be ground smooth to remove allnotches, prior too fit-up of the member(s). The fillet portions of all welds are to be returnedthrough the cope hole.

Cope holes shall be used only with the permission of COMPANY and may have to be filledto an approved method.

Cope holes shall not be adopted where sealed/bunded areas are required for drainagepurposes.

Page 35: W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

7/25/2019 W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

http://slidepdf.com/reader/full/w1440-p4-s-00301-specification-for-structural-fabrication-welding-inspection 35/47

 

DETAILED DESIGN FOR MUTINEER /

EXETER FPSO TOPSIDES

Specification for Structural Fabrication,

Welding, Inspection and Testing

Doc. No : AP003164-G-JSD-1800-003Rev : Rev. 1Page : 35 of 47 

 AP003164-G-JSD-1800-003 Spec For Structural Fab, Welding, Inspec, Test Rev 1.doc  

8.7 Temporary and Non-Structural Attachments and Cut-Outs

8.7.1 Welding

Temporary and non-structural attachments shall be fitted to the shape of the surface towhich they are attached, and welding shall be to a qualified and approved procedure byqualified welders. Temporary or non-structural attachments shall not be welded within 75mm of any other structural weld measured from weld toe to weld toe.

Locations and fixing details of all temporary attachments are subject to the prior approvalof the COMPANY.

8.7.2 Removal

The removal of temporary attachments shall be either by thermal cutting or by grinding. Ifthermal cutting is employed, the attachments shall be cut off at a minimum distance of5mm from the surface of the material and then ground flush.

Following removal, the area of the attachment weld shall be subjected to 100% magneticparticle inspection.

Temporary attachments shall not be removed by hammering, or by any other technique,which may cause mechanical damage to the surface of the steel, forming the main

structure.

Following removal, any damaged area shall be ground to merge smoothly with the originalsurface, and the surface is to be magnetic particle inspected. Where gouges up to 20% of

the steel member thickness have been made, then after grinding and testing they shall berepair welded to an approved procedure. Where gouges exceed 20% of the materialthickness, the repair procedure or alternative solution shall be proposed by VENDOR andbe subject to the approval of COMPANY.

8.7.3 Temporary Cut-Outs

The need for temporary cut-outs shall be subject to approval by COMPANY in eachinstance unless they are detailed on the Contract Drawings.

When temporary cut-outs are necessary, they shall be prepared with the same degree ofcare as for permanent cut-outs and shall be cut-out prior to erection of the member(s).

Special care shall be taken to ensure that the weld preparation applied to the cut-out isappropriate to the final erected orientation of cut-out at the time of rewelding. The cut-out

shall be trial fitted prior to erection of the member. An approved welding sequencedeveloped such that welding will be minimized shall be followed. All cut-outs shall beprepared with radius corners not less than 50 mm.

8.8 Finishing of Surfaces

a) Prior to completion, VENDOR shall remove all burrs, tack welds and other marksmade by welding, scaffolding or temporary bracing used in the fabricationprocedures.

b) Any plate defects resultant from handling or fabrication works shall be repairedmechanically or to an approved welding procedure in accordance with the

requirements of this Specification. The method applied for plate repairs shall besubject to the approval by COMPANY.

c) For areas with arc strikes see Section 7.4.12.

Page 36: W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

7/25/2019 W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

http://slidepdf.com/reader/full/w1440-p4-s-00301-specification-for-structural-fabrication-welding-inspection 36/47

 

DETAILED DESIGN FOR MUTINEER /

EXETER FPSO TOPSIDES

Specification for Structural Fabrication,

Welding, Inspection and Testing

Doc. No : AP003164-G-JSD-1800-003Rev : Rev. 1Page : 36 of 47 

 AP003164-G-JSD-1800-003 Spec For Structural Fab, Welding, Inspec, Test Rev 1.doc  

8.9 REPAIR AND REMEDIAL PROCEDURES

8.9.1 Welding Repairs

Weld repairs shall be carried out in accordance with an approved welding procedure.

In the case of repairing cracks, the cause of cracking shall first be established satisfactorily

before repair is allowed.

When a welding defect has been identified, the following procedure shall be initiated:

a) Any defect which requires repair, shall be brought to the immediate attention of theCompany Representative.

b) The removal of defective areas shall be by machining, grinding, or arc-air gougingfollowed by grinding. The resulting excavation shall be clean and have a contour topermit ease of repair welding.

c) The complete removal of defects shall be confirmed by magnetic particle inspection.d) Repair welding shall be performed in accordance with the approved, qualified

welding (or repair welding) procedure.e) Subsequent to repair, the repair area plus 100mm on either side shall be 100% re-

tested. The NDT method(s) shall be as specified for the original weld.f) All repairs shall be fully identified and documented. Documents shall be made

available to the Company Representative for review.g) The Vendor shall bear the cost of repairing and re-testing all defective welds.

8.9.2 Straightening Of Distorted Members

a) Prior to straightening of a distorted member, calculations of the strains involved shallbe submitted to COMPANY for approval. Members may be straightened cold if thedeformation does not exceed 3% strain.

b) When carried out hot, the temperature of heated areas, measured by methodsapproved by COMPANY shall not exceed 600

o C.

The part to be heated shall be substantially free of stress and from external forcesexcept those stresses imposed resulting from the mechanical straightening used inconjunction with the application of heat.

c) Flame heating rectification shall be carried out only in accordance with approvedprocedures and with the agreement of COMPANY in each specific instance.

d) Straightening procedures, which will include full details of methods of monitoringtemperatures and times, are to be submitted to COMPANY for approval prior to anyattempt being made at straightening. Methods of assessing the extent of any

damage to the parent material by straightening are to be included in the proposals.

8.10 ANCILLARIES AND TEMPORARY WORKS

8.10.1 Material Selection

Materials for ancillaries and temporary works, which are to be welded directly to theprimary structure, shall meet the requirements as set for Type III secondary steel (refer to

Project Documents No.: AP003164-G-JSD-1800-002 - "Structural Specification forMaterials")

Page 37: W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

7/25/2019 W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

http://slidepdf.com/reader/full/w1440-p4-s-00301-specification-for-structural-fabrication-welding-inspection 37/47

 

DETAILED DESIGN FOR MUTINEER /

EXETER FPSO TOPSIDES

Specification for Structural Fabrication,

Welding, Inspection and Testing

Doc. No : AP003164-G-JSD-1800-003Rev : Rev. 1Page : 37 of 47 

 AP003164-G-JSD-1800-003 Spec For Structural Fab, Welding, Inspec, Test Rev 1.doc  

8.10.2 Temporary Fabrication Aids

a) Where possible, slings shall be wrapped around primary structural members for the

purpose of lifting or rearing sections of the structure. Timber packers or other devicesapproved by COMPANY shall be used to prevent distortion and damage, particularly

where slings pass over protrusions such as stubs, flange outstands, etc.

b) Additional precautions shall be taken to ensure that miscellaneous projections such

as pipes, pipe supports, nozzles, etc. are fully protected from interference with liftingslings during installation.

c) Adequate safety factors shall be used to cater for the effects of variation in self

weight, impact, dynamic effects and unequal sling lengths when determining liftingrequirements.

d) Proper account shall be taken of the effects of differential deformation of support

points during lifting or jacking. Structural calculations to investigate both global andlocal member adequacy shall be carried out by VENDOR to prove the integrity of anylifting or jacking operation and shall be submitted to COMPANY for approval prior to

execution of the operation.

e) Care shall be taken that the paint work of the structure is not damaged.

8.10.3 Stairways And Ladders

 All components of stairways and ladders shall be fabricated to the dimensions shown inthe Contract Drawings. All pipe ends shall be sealed. Safety cages to ladders shall not beprovided unless indicated in the Contract Drawings. All stairways and ladders shall be of

welded construction. On the rung of the ladders antislip ladder rung covers of the type“Safemate” industrial grade or equivalent as approved by COMPANY shall be installed.

Small areas of galvanising damaged during erection shall be degreased and wire brushedto a clean metal finish and the area painted according to COMPANY approved paintingscheme.

8.10.4 Bar Grating

a) All grating shall be serrated and be located and secured in accordance with theContract Drawings. Fastening design shall include wave splash and constructionforces.

b) Clips, bolt, top washers and bosses shall be hot-dipped galvanised after completion

of fabrication.

c) All bar grating and installation pieces shall be cut to the required dimensions andinstalled as indicated in the Contract Drawings. Maximum dimensions of bar gratingare envisaged to minimise joints. The bar grating which will not be installed prior toload-out shall be test fitted and given identification marks to ease installation

offshore. All bar grating installed before load-out shall be secured to its supportingmembers, in accordance with the Contract Drawings.

Small areas of galvanising damaged during erection are to be repaired. Damagedareas shall be cleaned of all traces of oil and grease by means of a solvent cleaner.The damaged areas of galvanising shall be wire brushed to a clean metal finish and

the area repaired by painting according to Project document No.: AP003164-G-JSD-2310-0001 - "Painting Specification".

Page 38: W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

7/25/2019 W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

http://slidepdf.com/reader/full/w1440-p4-s-00301-specification-for-structural-fabrication-welding-inspection 38/47

 

DETAILED DESIGN FOR MUTINEER /

EXETER FPSO TOPSIDES

Specification for Structural Fabrication,

Welding, Inspection and Testing

Doc. No : AP003164-G-JSD-1800-003Rev : Rev. 1Page : 38 of 47 

 AP003164-G-JSD-1800-003 Spec For Structural Fab, Welding, Inspec, Test Rev 1.doc  

8.10.5 Handrails And Safety Fencing

a) Tubular sections of handrailing consists of horizontal rails, vertical standards and

associated sockets, clamps and bolts.

b) All components of the handrail shall be fabricated to the dimensions shown in theContract Drawings. All pipe ends shall be sealed. Kicker kerbs shall be provided ifcalled for in the Contract Drawings. Handrails shall be of welded construction.

c) Handrails shall be painted in accordance with Project Document No.: AP003164-G-JSD-2310-0001 - "Painting Specification". Handrails shall be hot-dipped galvanisedprior to application of paint. Bleed holes shall be sealed.

d) Field installed handrails shall be trial fitted at fabrication site and properly identified.

8.10.6 Temporary Bracing And Supports

a) Scaffolding supports and facilities for supervision and inspection of the work shall beprovided as necessary. They shall be sufficiently solid to prevent deformation.

b) Adequate temporary bracing shall be provided and shall be left in position until suchtime as the structure is sufficiently far advanced for the bracing to be no longerrequired.

9.0 DIMENSIONAL CONTROL

9.1 General

The general requirements for the dimensional control of the structure/s during fabricationare as follows :

a) Prior to the commencement of fabrication, the Vendor shall submit to the Companyfor review and approval, a proposed method of monitoring dimensions andtolerances.

b) The Vendor shall provide personnel, equipment and instruments necessary tomonitor and control dimensions and tolerances. All instruments used shall havecurrent valid calibration certificates that are traceable to a Company approved

standards system.

c) Tolerances shall be based on the theoretical work points and centre-lines of thestructures, referenced to a permanent axis system as stipulated in the contract

drawings.

d) All structural elements shall be surveyed at the fit up stage and any discrepancies

rectified prior to the commencement of welding.

e) The Vendor shall assemble the structure/s to within the acceptable tolerances.

Where no appropriate tolerance is provided in the contact drawings and/or codes(see Section 9.2), values shall be obtained directly from the COMPANY.

f) Tolerances shall be checked at every stage and the final survey shall meet thedefined tolerances. The final survey shall be on complete sections and on thecompleted structure, after post weld heat treatment if applicable, and shall be carriedout by VENDOR.

Page 39: W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

7/25/2019 W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

http://slidepdf.com/reader/full/w1440-p4-s-00301-specification-for-structural-fabrication-welding-inspection 39/47

 

DETAILED DESIGN FOR MUTINEER /

EXETER FPSO TOPSIDES

Specification for Structural Fabrication,

Welding, Inspection and Testing

Doc. No : AP003164-G-JSD-1800-003Rev : Rev. 1Page : 39 of 47 

 AP003164-G-JSD-1800-003 Spec For Structural Fab, Welding, Inspec, Test Rev 1.doc  

g) All setting out and fit-ups shall be subject to an appropriate tolerance. Where noappropriate tolerance is stated in the contract drawings and/or codes (see Section9.2), then the tolerance shall be obtained from COMPANY.

h) COMPANY shall reserve the right to employ independent dimensional controlsources as a crosscheck whenever considered necessary throughout the fabricationprogram.

i) No forcing or constraining of components shall be undertaken to obtain the requiredtolerance without the approval of COMPANY.

 j) Fabrication and yard assembly supports shall be set to the appropriate level shownon VENDOR’s approved setting-out drawings to within ± 3mm. Where no suchdrawings exist fabrication shall be carried out from a level plane to within ± 3mm.

k) Where there is settlement of supports outside the tolerances given above this shall

be immediately reported to COMPANY. Such settlement shall be corrected byshimming if in the opinion of COMPANY such settlement will cause localoverstressing, permanent deformation or lead to fit-up problems.

9.2 Tolerances for Structural Components and Sub-Assemblies

If not specifically stated in the contract drawings each member of the structure shall belocated accurately to the final fabrication tolerances given in:

•  Section 11.1.5 of API-RP-2A (Recommended Practice for Planning, Designing andConstructing Fixed Offshore Platforms)

•  API 2B (Specification for the Fabrication of Structural Steel Pipe)

•  AISC (Code of Standard Practice for Steel Buildings and Bridges) – Section 6

•  AWS D1.1 (Structural Welding Code - Steel)

•  ABS Rules (see Section 1.5.2)

Page 40: W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

7/25/2019 W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

http://slidepdf.com/reader/full/w1440-p4-s-00301-specification-for-structural-fabrication-welding-inspection 40/47

 

DETAILED DESIGN FOR MUTINEER /

EXETER FPSO TOPSIDES

Specification for Structural Fabrication,

Welding, Inspection and Testing

Doc. No : AP003164-G-JSD-1800-003Rev : Rev. 1Page : 40 of 47 

 AP003164-G-JSD-1800-003 Spec For Structural Fab, Welding, Inspec, Test Rev 1.doc  

10.0 INSPECTION AND TESTING

10.1 General

a) COMPANY shall have the right to inspect the fabrication and erection of all itemscovered by this Specification. Any weld defects, damage due to lift up, arc strikes orother weld features, which COMPANY specified as deficient or detrimental to theintegrity of the structure, shall not be acceptable.

b) Inspection personnel shall have free access at all times to any part of VENDOR’s, orhis sub-contractor’s yard and facilities that are concerned with the Works. They shall

be shown full cooperation and allowed sufficient time for all inspection and testingprocedures to be properly executed. VENDOR shall carry out all necessary cleaning

of the area necessary to facilitate inspection and testing.c) As far as possible, no testing shall be carried out within 48 hours of completion of

welding.

d) VENDOR shall furnish, install and maintain in safe operating condition all scaffolding,ladders, walkways, adequate lighting, etc, necessary for safe and thoroughinspection. This equipment must conform with local industrial specification andsafety codes.

e) COMPANY reserves the right to retest and reject any and all NDT personnel atanytime. COMPANY will be responsible for the cost of removing and replacing

samples found not to be defective as retesting specified additionally by COMPANY.

f) VENDOR shall inform COMPANY at least 48 hours prior to any work such asassembling or fabrication of any section, grit blasting or painting to enable

COMPANY and its Representative to adequately arrange any inspection and testingdeemed necessary.

g) Whenever any piece is to be assembled that will prevent subsequent inspection ofan area, COMPANY shall be so notified such that the said area can be inspectedand any defects corrected before proceeding with the assembly.

h) When required by the Contract documents, VENDOR shall provide on site completefacilities for radiography, ultrasonic and magnetic particle inspection of weldsincluding equipment for developing and viewing films and the full time service of

qualified technicians conversant with radiographic and ultrasonic inspectiontechniques.

i) Any inspection by COMPANY or by the verification party shall not absolve VENDORfrom his responsibility to exercise such quality assurance procedures as will ensurethat the requirements and intent of this Specification are satisfied.

 j) Final acceptance of Post Weld Heat Treated (PWHT) joints shall be done afterPWHT.

10.2 Inspection Requirements

The Vendor shall implement an Inspection and Test Plan to ensure compliance with the

workmanship requirements of ABS, AWS D1.1, the Contract Drawings and thisSpecification. The Vendor shall submit the proposed plan to the Company for approval

prior to the commencement of fabrication. The cost of carrying out all inspection(excluding the Company appointed Inspector/Certifying Authority) and testing shall beborne by the Vendor.

Page 41: W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

7/25/2019 W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

http://slidepdf.com/reader/full/w1440-p4-s-00301-specification-for-structural-fabrication-welding-inspection 41/47

 

DETAILED DESIGN FOR MUTINEER /

EXETER FPSO TOPSIDES

Specification for Structural Fabrication,

Welding, Inspection and Testing

Doc. No : AP003164-G-JSD-1800-003Rev : Rev. 1Page : 41 of 47 

 AP003164-G-JSD-1800-003 Spec For Structural Fab, Welding, Inspec, Test Rev 1.doc  

10.3 Extent of Inspection

10.3.1 Fabrication Classes

Components and sub-assemblies of the construction are distributed into the followingfabrication classes :

Class 1 :

Failure of any of these members either causes total or partial destruction of the platform

during its service, or destruction of portion of it during their installation, or they arecomponents that cannot be repaired.

Class 2 :

Failure of any of these members causes platform shut-down, but without inducing total or

partial destruction of the platform. Repairs of these members can only be made ifinstallation or production of the platform is stopped.

Class 3 :

These are members other than those classified in class 1 or class 2.

Class 4 :

These are Non Structural components or tertiary structures.

10.3.2 Extent of Non-Destructive Testing

Unless noted otherwise on the contract drawings, all fabrication welds completed inaccordance with this Specification shall be non-destructively tested in accordance with the

minimum requirements specified in Table 10.3.2 below:

Unless otherwise agreed upon by COMPANY and the VENDOR, the percentages of weld

inspections shall be understood as follows:

•  For welds above 2 metre long, the percentages of welds to be inspected shall meanthe thorough inspection of the stated percentage of all welded connections of agiven type ie. a 20% check means inspection of 20% of the length of each weldedconnection in the category concerned and not 100% inspection of 20% of the

connections.

•  On the contrary, for Welds not exceeding 2 metres in length, 100% inspection isnormally to be carried out on the stated percentage of the connections of the given

type.

If partial checking of welds reveals that a particular weld appears defective the entireweld shall be examined and the partial checking of all other welds made by the same

welder or procedure since the last partial check will be extended as specified below.

Initial Test

Retest

Class 1

Retest

Class 2

Retest

Class 3

Spot 100% 20% 10%5% 100% 20% 10%

10% 100% 50% 20%

20% 100% 100% 50%

Page 42: W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

7/25/2019 W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

http://slidepdf.com/reader/full/w1440-p4-s-00301-specification-for-structural-fabrication-welding-inspection 42/47

 

DETAILED DESIGN FOR MUTINEER /

EXETER FPSO TOPSIDES

Specification for Structural Fabrication,

Welding, Inspection and Testing

Doc. No : AP003164-G-JSD-1800-003Rev : Rev. 1Page : 42 of 47 

 AP003164-G-JSD-1800-003 Spec For Structural Fab, Welding, Inspec, Test Rev 1.doc  

If any of these welds are defective then the retesting is extended to 100% whatever the

member classification. Consequently, the level of inspection of the future welds of thistype may be increased at the discretion of the Inspector, until satisfactory results areobtained.

 As a general rule, initial inspection shall be 100% until a satisfactory level of quality hasbeen verified.

Non-Destructive Testing (N.D.T.) shall be carried out especially on intersection of buttwelds, cruciform joints, as well as on start and stop points of automatically welded seams.

 Areas which have been strained in the through thickness direction by welding will beultrasonically tested for lamellar tearing.

The Inspector shall have the right to select the welds or part of the welds to be inspected.

When Gas Metal Arc Welding (G.M.A.W) is used, Ultrasonic and Magnetic Particle testingmay be required by Inspector on a spot basis in addition to Radiographic Testing.

If difficulty is experienced in categorising defects revealed by ultrasonic testing,radiography shall also be used to facilitate interpretation, or vice versa. At the discretion of

the Inspector supplementary radiography, or substitution of radiography in lieu of ultrasonictesting, shall be used to confirm the ability of ultrasonic testing to detect and evaluatecorrectly defects such as root concavity and linear porosity and other root defects in singlesided groove welds.

When either radiography or ultrasonic testing are used as a check or a substitution for theother technique, the acceptance criteria applied shall be as defined for the actual

technique used, unless the Inspector requires otherwise.

Page 43: W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

7/25/2019 W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

http://slidepdf.com/reader/full/w1440-p4-s-00301-specification-for-structural-fabrication-welding-inspection 43/47

 

DETAILED DESIGN FOR MUTINEER /

EXETER FPSO TOPSIDES

Specification for Structural Fabrication,

Welding, Inspection and Testing

Doc. No : AP003164-G-JSD-1800-003Rev : Rev. 1Page : 43 of 47 

 AP003164-G-JSD-1800-003 Spec For Structural Fab, Welding, Inspec, Test Rev 1.doc  

TABLE 10.3.2 : EXTENT OF NON DESTRUCTIVE TESTING

Steel Type andMember

Classification (1)

Type ofConnection

VisualInspection

Radiography(8)

Ultrasonics(7)

MagneticParticle

(3)

- - 20% (4)Butt Welds

100% (10) - 100% (5)

20% (4)T-joints

- 100% (2) 100% (5)

Class 1

Type II Steel

Primary with TTP

Fillet Welds

100%

- - 100%

10% - -Butt Welds

100% (9) - 20% (5)

T-joints - 20% (2) 20% (5)

Class 2

Type I Steel

Primary

Fillet Welds

100%

- - 20% (5)

Butt Welds 5% - 5% (5)

T-joints - Spot (2) (6) 5% (5)

Class 3

Type III Steel

Secondary Fillet Welds

100%

- - 5% (5)Class 4

Type III Steel

Tertiary

 All Welds 100% (11) - (12)

Page 44: W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

7/25/2019 W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

http://slidepdf.com/reader/full/w1440-p4-s-00301-specification-for-structural-fabrication-welding-inspection 44/47

 

DETAILED DESIGN FOR MUTINEER /

EXETER FPSO TOPSIDES

Specification for Structural Fabrication,

Welding, Inspection and Testing

Doc. No : AP003164-G-JSD-1800-003Rev : Rev. 1Page : 44 of 47 

 AP003164-G-JSD-1800-003 Spec For Structural Fab, Welding, Inspec, Test Rev 1.doc  

NOTES on table above:

(1) Classification of members is defined in clause 10.3.1 of this Specification. Welds

connecting members of different categories of importance shall be subject to therequirements of the most stringent class.

(2) Applies to all welds (such as T or Y-joints, tubular joints) other than Butt Weld

shaving full penetration, or partial penetration with weld metal cross-sectionexceeding 12.7 mm.

(3) Magnetic Particle Testing may be replaced by Liquid Penetrant Testing with priorapproval of Inspector.

(4) Applies to welds performed on Mild Steels and subject to static load only.

(5) Applies to welds subject to dynamic load or welds performed on High Strength

Steels (Type I or Type II)

(6) “Spot” means 0 to 5% at the Inspector’s discretion.

(7) Ultrasonic Testing applies when material thickness is more than 12.7 mm. Ultrasonicmay be replaced by radiography where wall thickness is less than or equal to 35mm.

(8) Radiography is normally replaced by ultrasonic for thicknesses > 35 mm.Radiography applies by priority to intersections of butt welds and to start and stop

points of automatically welded seams.

(9) 100% extent for radiography (WT ≤ 35 mm) or ultrasonic (WT > 35 mm) of :

i. flanges of beams and columns

ii. circular welds of tubulars

iii. 10% for other connections.

(10) Butt Welds on materials, which comply with the following conditions all togethermay be required by the Inspector to be, inspected 90% radiography +10% ultrasonic(instead of 100% radiography) :

i. Specified Yield Strength > 295 MPa,

ii. I.I.W. Carbon Equivalent > 0.41% (ladle),

iii. Wall Thickness > 25.4 mm (1”).

(11) Extent of radiography (when necessary) as stated in the Particular Specification.

(12) Magnetic Particle to 100% extent only when welding on semi-hard or hard steelsand alloy steels liable to quenching under welding operation (for instance welding ofbearing plates). Purpose of inspection mainly to ensure freedom of cracks,excessive undercuts or other injurious notch defects.

(13) Where steel plate thickness exceeds 20mm, the Vendor, subject to approval bythe Company, may elect to substitute UT for RT inspection.

(14) Where RT is selected for all welds of a particular type, some UT may beprescribed by the Company or Certifying Authority to confirm that all significantdefects are being detected. Similarly, UT procedures may be checked by some RT

where nominated by the Company or Certifying Authority. In the event that thepreferred method is found to be deficient, the procedure shall be revised and re-submitted for approval. Welds already examined shall be re-examined with therevised procedure.

(15) Butt welds include T butt welds and corner welds.

Page 45: W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

7/25/2019 W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

http://slidepdf.com/reader/full/w1440-p4-s-00301-specification-for-structural-fabrication-welding-inspection 45/47

 

DETAILED DESIGN FOR MUTINEER /

EXETER FPSO TOPSIDES

Specification for Structural Fabrication,

Welding, Inspection and Testing

Doc. No : AP003164-G-JSD-1800-003Rev : Rev. 1Page : 45 of 47 

 AP003164-G-JSD-1800-003 Spec For Structural Fab, Welding, Inspec, Test Rev 1.doc  

(16) All repair welds shall be 100% inspected after completion by the methodsappropriate to the material and joint type as required by this specification.

(17) If defective welds are found in areas of the structure requiring less than 100%testing, the Vendor shall increase the test requirements in such areas to 100%coverage, at no additional cost to the Company.

(18) The required percentage of welds to be inspected shall mean the thoroughinspection of the stated percentage of all welded connections of a given type andshall not mean the inspection of the stated percentage of the total length.

(19) During fabrication, the non-destructive testing of a completed weld shall beperformed prior to commencing any further work in the vicinity of the connection. TheVendor shall schedule his work in such a manner as to permit this.

(20) Inspection of completed welds is to be performed no sooner than 48 hours

following the deposition of the final weld pass.

10.4 Padeye Testing and Marking

 All padeyes shall be hard-stamped with the WLL. Padeyes where specified on the

drawings shall be load tested to 1.1 x WLL to provide a test matching the as liftedrequirements to Company approval. Proof load testing shall be carried out using load cellswith current certificates of calibration that are traceable to a company approved standard

Page 46: W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

7/25/2019 W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

http://slidepdf.com/reader/full/w1440-p4-s-00301-specification-for-structural-fabrication-welding-inspection 46/47

 

DETAILED DESIGN FOR MUTINEER /

EXETER FPSO TOPSIDES

Specification for Structural Fabrication,

Welding, Inspection and Testing

Doc. No : AP003164-G-JSD-1800-003Rev : Rev. 1Page : 46 of 47 

 AP003164-G-JSD-1800-003 Spec For Structural Fab, Welding, Inspec, Test Rev 1.doc  

11.0 FIELD INSTALLED ITEMS

Field installed sections of gratings and handrails shall be adequately marked (tagged) and

a placement drawing prepared by VENDOR to show uniquely where each section ofgrating or handrail has to be placed. This shall also apply to all other structural items to befield installed.

Page 47: W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

7/25/2019 W1440-P4-S-0030_1 Specification for Structural Fabrication, Welding, Inspection & Testing

http://slidepdf.com/reader/full/w1440-p4-s-00301-specification-for-structural-fabrication-welding-inspection 47/47

 

DETAILED DESIGN FOR MUTINEER /

EXETER FPSO TOPSIDES

Specification for Structural Fabrication,

Welding, Inspection and Testing

Doc. No : AP003164-G-JSD-1800-003Rev : Rev. 1Page : 47 of 47 

12.0 ADDITIONAL REQUIREMENTS

12.1 Painting

VENDOR shall present modules in a location, orientation, position and shelter suitable forperforming blasting, cleaning and painting in accordance with Project Document No.: AP003164-G-JSD-2310-0001 – “Painting Specification”.

12.2 Pre-Commissioning

VENDOR shall present modules in a location, orientation, position and shelter suitable forthe modules to be appropriately and conveniently fitted-out with all the necessary

equipment, piping, E&I, and bulks ready for the pre-commissioning phase.

12.3 Final Weighing & COG Determination

Before fabrication commences the VENDOR shall submit to the COMPANY, for review andapproval, a weighing procedure for the completed modules, including COG determination.

Prior to loadout the VENDOR shall weigh and determine the COG for each module inaccordance with this COMPANY approved weighing procedure. The COMPANYRepresentative shall witness all weighing and there shall be no variance to procedures andequipment used (including instrumentation) for any weight test.

12.4 LoadoutModules shall be fabricated by VENDOR in a location, orientation and position as agreed

with COMPANY to facilitate loadout by COMPANY advised method.