Indias first 3 public sector steel plants startedproduction in 1959 under HSL, which was laterincorporated in the year January 24, 1973 and
known as SAIL. In May 2010 it has been accorded with a highest
status called Maharatna Company.
It is the 4th largest steel producer in the worldleading in Asia.
In 2014 total turn over was 51,866 Crore andManpower around 96,047.
A vibrant, market-driven enterprise managing 5Integrated Steel Plants, 3 Special Plants and 01Ferro-Alloy Plant and 01 SAIL Refractory Unit
across the country.
-
7/26/2019 VT Presentation 2016
3/74
5 Integrated Steel Plants
1. Bhilai Steel Plant(BSP),Chhatisgarh
2. Rourkela Steel Plant(RSP),Odisha
3. Bokaro Steel Plant(BSL),Bokaro
4. Durgapur Steel Plant(DSP),WB5. IISCO Steel Plant(ISP),WB
-
7/26/2019 VT Presentation 2016
4/74
3 Special Steel Plants
1. Alloy Steels Plant(ASP),Durgapur2. Salem Steel Plant(SSP),Tamil Nadu
3. Visvesvaraya Iron & Steel Plant(VISL),
Bhadrabati,Karnataka.
01 Ferro-Alloy PlantFerro-Alloy Plant at Chandrapur, Maharastra
SAIL Refractory Company Ltd at Salem,
Tamil Nadu
01 Subsidiary
-
7/26/2019 VT Presentation 2016
5/74
-
7/26/2019 VT Presentation 2016
6/74
6
-
7/26/2019 VT Presentation 2016
7/74
Commissioned in 1959 in collaboration with theleading steel makers from the Federal Republic of
Germany
Installed Capacity1.00 MT
1stBF commissioned in 1959
2ndBF commissioned in 1960
3rdBF commissioned in 1962
Capacity enhanced to 1.80 MT by commissioning
BF#4 in 1967
Now again capacity enhanced to 4.5MT by
commissioning BF#5 in 2014
HISTORY OF RSP
-
7/26/2019 VT Presentation 2016
8/74
SSM with technical collaboration fromARMCO,USA was commissioned in 1984.
CPP-II was commissioned in 1987 now it
is under joint venture of NTPC and SAIL.
Last modernisation had taken place during
1988-1997 in two phases.
Capacity enhanced to 2.00 MT of HM.
This modernisation again capacity enhanced
to 4.5 MT by commissioning BF#5 in 1914
HISTORY OF RSP
-
7/26/2019 VT Presentation 2016
9/74
First Plant in Asia to adopt LD process of steelmaking.
First Plant to producing large diameter ERW/SW
Pipes.First Plant to adopt external desulphurisation ofhot metal by adding magnesium powder.
First Plant to produce Cold Rolled Non Oriented
(CRNO) Steel sheets for use in the electricalindustries.
SPECIAL FEATURES OF RSP
-
7/26/2019 VT Presentation 2016
10/74
First Plant to have a system of vacuumdegassing metallurgy.
First Plant to adopt the cost effective andquality centered continuous casting route toprocess 100% of steel produced.
All the major production units and some
service departments are certified underIntegrated Management System(IMS) policy.
SPECIAL FEATURES OF RSP
-
7/26/2019 VT Presentation 2016
11/74
-
7/26/2019 VT Presentation 2016
12/74
We have 74 departments workingunder one roof.
Total Man Power strength of RSP is
17,781
Total Executives = 2,112
Total Non-Executives = 14,529 Trainees(Excludes MTs)= 1140
Labour Productivity = 240.27(Mar)
-
7/26/2019 VT Presentation 2016
13/74
RAW MATERIALS
-
7/26/2019 VT Presentation 2016
14/74
OBBP
COSP-IISP-I
CP-I & II
PBCC
BF
CCD
Iron Ore(L&F), Mn
Ore, L/S & DoloCoking Coal
Coke
CO
Gas
Amm.
Sulph.
& Coal
Chem.
HM, Slag
& BF gas
Fuel
Gas
Base Mix
Sinter
Lime & Dolo
L/S & Dolo
(SMS Gr.)
I/O Lumps &
L/S BF Gr.
PROCESS FLOW CHARTRAW MATERIAL HANDLING TO IRON MAKING
-
7/26/2019 VT Presentation 2016
15/74
SMS-I
SGPCCM-I
SMS-II
BF
CCM-II
Lime, Dolo & O2
Hot Metal
Slab
Lime, Dolo & O2
Slag
Slab
HSM & PM
STEEL MAKING
-
7/26/2019 VT Presentation 2016
16/74
HSM
Div.
Line
PM
Slab From
CCM-I & II
CRM SSM ERWPP SWPP SPP
HR CR C/S CRNO ERW SW plates Spl.
Plates ETP Pipes Pipes
Plates GP/GC
ROLLING MILLS
-
7/26/2019 VT Presentation 2016
17/74
Af i R
-
7/26/2019 VT Presentation 2016
18/74
5 . 0 M T C a p a c i t y, 1 4 0 C o n v e y o r B e l t s o f 4 5 K m s L e n g t h . 2
W a g o n T i p p l e r s ( 2 0 W a g o n s / H r e a c h ) , 2 T r a c k H o p p e r s
( 6 0 0 0 T o n s e a c h ) , 1 4 B e d s ( 5 0 , 0 0 0 T e a c h ) , 4 S t a c k e r s
( 1 2 0 0 T / H r e a c h ) , 3 B a r r e l R e c l a i m e r s ( 6 0 0 T / H r e a c h ) a n d
2 B u c k e t R e c l a i m e r s ( 6 0 0 T / H r e a c h )
Come up in 1994,Ph-I & 1996,Ph-II during Modn
To meet raw material needs of various units of RSP
Main task is unloading, stacking, blending of IronOre, Limestone, Dolomite, Manganese and preparebase mix then send it to different units throughconveyor belts.
After expansion Raw
material requirement of
RSP will increase from
5 MT/yr to 12 MT/yr
-
7/26/2019 VT Presentation 2016
19/74
Proximate Analysis Blended Coal BF Coke
Ash 14.5
0.5% 19.7
0.7%Volatile Matter 23 - 24% < 0.7%
Gross Moisture 6 - 8% 4.5 0.5%
Fixed Carbon 61 - 63% > 80%
1stproduction unit, to make good quality of coke to be used in BF to make Hot Metal.
-
7/26/2019 VT Presentation 2016
20/74
Coke Making Unit
3 Batteries of 70 ovens each and 2 Batteries of 80 ovens each.
Length 13.59 Mtrs., Height 4.5 Mtrs, & Volume 21.6 M3
New CO Battery #6 with 7 Mtr Tall and 67 ovens.
Old Battery oven pushing 70/day and new 90/day
-
7/26/2019 VT Presentation 2016
21/74
It handles the by-products of Coke Ovens.
Site AHandles CO gas from Batteries 1,2 & 3
Site BStorage Facilities
Site CHandles CO Gas from Batteries 4 & 5New CCD handle CO Gas generated from new CO Battery 6
Products: Coal Tar, Road Tar, Soft Pitch, Hard Pitch,Naphthalene Oil, H2SO4 , Ammonium Sulphate, Benzol,Carbolic Oil, Light Oil, Wash Oil, Anthrasene Oil.
Biological Oxidation and Dephenolisation (BOD) facility exist.
Coal Chemicals Department
-
7/26/2019 VT Presentation 2016
22/74
Sinter Plants
Sinter Plant I:2 Sinter Machines of 1.5 MT/year
Sinter Plant II:1 Sinter Machine of 1.57 MT/year
New SP-III with 3.70 MT/year
Make good quality sinter to use in BF,
Reduce coke rate &
Increase BF productivity etc..
-
7/26/2019 VT Presentation 2016
23/74
Raw Materials & Inputs:Iron Ore, Sinter, Coke, Lime Stone or LD Slag, Quartzite, Hot Air &
Water for Cooling.
To produce good quality of liquid hot metal.
3 BFs of 1139 M3 useful volume and 1 BF of 1658 M3 useful volumeNew BF#5 coming up with 4060 M3 useful volume & 7924 TPD capacity
Blast Furnaces
-
7/26/2019 VT Presentation 2016
24/74
-
7/26/2019 VT Presentation 2016
25/74
Tonnage Oxygen Plant I(To produce gaseous oxygen+nitrogen)
3 Air Separation Units of 100 TPD each
and 1 unit of 200 TPD
Tonnage Oxygen Plant II(To produce liquid oxygen+nitrogen)
2 Air Separation Units of 180 TPD each
Captive Power Plant-I5 units to produce 125 MW of power
TONNAGE OXYGEN PLANTS
Tonnage Oxygen Plant III(To produce both liquid & gaseous
oxygen+nitrogen)
1 Air Separation Units of 700 TPD
-
7/26/2019 VT Presentation 2016
26/74
Lime Plant
For producing Metall-urgicalLime for use in LD Converters
of SMS-I as flux..
Brick Plant
To produce Magnesia Carbon
Bricks used as working lining in
LD Converters of SMS-I & II and
in the ladles of CCM - I & II.
LIME DOLOMITE BRICK PLANT
New LDBP with 350 TPD capacity
-
7/26/2019 VT Presentation 2016
27/74
Steel Melting Shop I:
2 mixers of 1100 Ton each,
2 LDs of 60/66 Tons/ blow &1 single strand slab caster of
0.305 MT/year
Steel Melting Shop II:
2 mixers of 1300 Ton each,
2 LDs of 150 Tons each &
2 single strand slab casters of
1.355 MT/year
STEEL MELTING SHOPSTo produce good quality of steel and slabs
Fi t t l l t i A i t
-
7/26/2019 VT Presentation 2016
28/74
First steel plant in Asia tocommercially use Basic Oxygen
steel making process
-
7/26/2019 VT Presentation 2016
29/74
-
7/26/2019 VT Presentation 2016
30/74
Produce good quality of HR Coil/ Plates
To send to CRM, SSM, Pipes plant, Dividing line for further processing
-
7/26/2019 VT Presentation 2016
31/74
To produce good quality of Plates of different sizes
like 880 mm thickness, 15002500 mm width & 450012500 mm length.
PIPE PLAN
TS
-
7/26/2019 VT Presentation 2016
32/74
To produce API pipes uptograde API-5L-X70 & IS-3589of 8.5/818 dia and wallthickness 3.212.7 mm usinghigh frequency welding (400
KHz)
To produce API pipes upto gradeAPI-5L, IS-3589, IS-5504 Pipes of1672 dia and wall thickness
5.6-14.2 mm using double sub-merged arc welding.
Both units are made by West
Germany.
PIPE PLANTS
-
7/26/2019 VT Presentation 2016
33/74
To produce various grades of high
hardness and abrasion resistant steelplates like SPADE, JACKAL, DMR-249A.
Follow Stringent Quality Control Norms
of CQA (MET) to produce Armour Platesand Components for Defence Units.
SPECIAL PLATE PLANTS (SPP)
-
7/26/2019 VT Presentation 2016
34/74
Input:Hot Rolled Coils from HSM
Output:
CR Coils(Width 920
1270 mm, Thickness 0.35
1.6 mm),
CR Sheets(Length 2500 3600 mm, Width 1250 mm max.,Thickness 0.51.6 mm),
Tin Sheets(Width 560 1040 mm, Thickness 0.150.31 mm,Coating Weight 5.6 22.4 gm/m2)and
GP/GC Sheets(Width 610 1220 mm, Thickness 0.31 1.6 mm)
-
7/26/2019 VT Presentation 2016
35/74
Input: HR Coils from HSM
Output: Cold Rolled Non-Oriented(CRNO) coils as
well as sheets to be used in Electrical Industries.
Other 56 units are also working in different locations under RSP
-
7/26/2019 VT Presentation 2016
36/74
-
7/26/2019 VT Presentation 2016
37/74
PLATES
-
7/26/2019 VT Presentation 2016
38/74
SHEETS
-
7/26/2019 VT Presentation 2016
39/74
COILS
-
7/26/2019 VT Presentation 2016
40/74
PIPES
-
7/26/2019 VT Presentation 2016
41/74
EXTENSIVE TESTING
-
7/26/2019 VT Presentation 2016
42/74
RIGOROUS INSPECTION
-
7/26/2019 VT Presentation 2016
43/74
IMPROVED PACKAGING
-
7/26/2019 VT Presentation 2016
44/74
CUSTOMER DELIGHT
Use of VCI Stretch Film with TENAX Polyesters Strap for CRNO
-
7/26/2019 VT Presentation 2016
45/74
CUSTOMER DELIGHT
Use of Inner Eye Protector for HR Coil
-
7/26/2019 VT Presentation 2016
46/74
Product Application
-
7/26/2019 VT Presentation 2016
47/74
Product Application
HR Coil LPG Cylinders,automobile, railway
wagon chassis and manytypes of high-strengthapplications
Plates Pressure vessels, ship
building and engineering
structures
ChequeredPlates Flooring and staircasesin industrial sectors and
railway platforms
P d t A li ti
-
7/26/2019 VT Presentation 2016
48/74
Product Application
CR Sheets
and Coils
Steel furniture, white goods,railway coach paneling,drums, barrels, deep drawingsand extra deep drawings
Galvanised
Sheets
Roofing, Paneling, industrial
sheeting, air condition
ducting and structural
ElectrolyticTin Plates
Container for packaging ofvarious products including
edible oils and confectionary
items
-
7/26/2019 VT Presentation 2016
49/74
Product Application
Silicon Steel
Sheets andCoils
Small generators, starters
for high efficiency rotatingequipment and relays etc.
SW Pipes High pressure transportation
of crude oil, natural gas andslurry.
ERW Pipes High pressure transportation
for oil, water, sewage
disposal, and tube wells etc.
-
7/26/2019 VT Presentation 2016
50/74
-
7/26/2019 VT Presentation 2016
51/74
Sl.
No.
FACILITIES
1 AUGMENTATION AND MODIFICATION IN OBBP
2 NEW 7Mtr Tall BATTERY # 6 (1 X 67 OVENS)
3 NEW SINTER PLANTIII (1 X 360 M2)
4 NEW BLAST FURNACE # 5 (4060 M3)5 OXYGEN PLANT
6 SMS-II - 3RDBASIC OXYGEN FURNACE(150 T),
RH-OB, 3RDLADLE HEATING FURNACE & CASTER
7 NEW LIME & DOLOMITE PLANT ( 2 X 350 TPD)
8 NEW 4.3 M WIDE PLATE MILL
9 AUXILIARY PACKAGES, UTILITIES, LOGISTICS FOR
WHOLE PLANT
-
7/26/2019 VT Presentation 2016
52/74
-
7/26/2019 VT Presentation 2016
53/74
53
Chairman SAIL inaugurates modernenvironment friendly Coke Ovens
Battery complex on 1st June 2013.
-
7/26/2019 VT Presentation 2016
54/74
54
Coke Pushing on 12/4/2013
Coal charging on 10/4/2013
-
7/26/2019 VT Presentation 2016
55/74
ASU-III of TOP-II
New OBBPHot Blast Stove of new BF-5
-
7/26/2019 VT Presentation 2016
56/74
56
Sinter Plant (SP-III)
-
7/26/2019 VT Presentation 2016
57/74
57
OBBP- Raw Material
Handling Section (RMHS)
-
7/26/2019 VT Presentation 2016
58/74
Blast Furnace (BF-V)
Blow in of BF#5,
-
7/26/2019 VT Presentation 2016
59/74
DURGA on 5th
August 2013
-
7/26/2019 VT Presentation 2016
60/74
Blast Furnace-5 Complex
-
7/26/2019 VT Presentation 2016
61/74
61
Hot trial of the new Slab Caster in SMS-II was tested successfully on 14th
June.
During the hot trial 8 slabs were cast using a full ladle of steel,
with all the systems running perfectly.
-
7/26/2019 VT Presentation 2016
62/74
Inauguration
of 3rdSlab
Caster atSMS-IIby
Chairman
SAIL on10th
August, 2013
-
7/26/2019 VT Presentation 2016
63/74
63
New Plate Mill
-
7/26/2019 VT Presentation 2016
64/74
-
7/26/2019 VT Presentation 2016
65/74
HAVE A NICE TIME
IN
-
7/26/2019 VT Presentation 2016
66/74
ROURKELA
-
7/26/2019 VT Presentation 2016
67/74
Length of Ring Road 23 KMs
RSP Works Area37.83 Sq. KMs.
Area of Steel City 47.38 Sq. KMs.
ROURKELA
TOWNSHIP & MEDICAL FACILITIES
-
7/26/2019 VT Presentation 2016
68/74
25,000 quarters of 14 categories spread over 18
sectors.
16 market areas in different sectors comprising
about 1,800 shops and 1,000 hawkerssheds
Utkalmani Gopabandhu Ispat Library, A/cAuditorium called Civic Centre, Bhanja Bhawan,
several Social Homes and Community Centres.
Social Welfare Unit which organises celebration of
National Festivals and other Socio-Cultural
activities.
TOWNSHIP & MEDICAL FACILITIES
TOWNSHIP & MEDICAL FACILITIES
-
7/26/2019 VT Presentation 2016
69/74
12 Schools run by RSP and many private schools
with different facilities extended by RSP.2 Outdoor Stadiums - Ispat Stadium, Biju Patnaik
Hockey Stadium with Synthetic Turf and one Ispat
Indoor Stadium.
Indo German Club and Rourkela Club
Indira Gandhi Park with Musical Fountain and
Jubilee Park
A 685 beded Ispat General Hospital with state of artdiagnostic facilities and equipment
Four Health Centres located in different sectors.
Contd.TOWNSHIP & MEDICAL FACILITIES
-
7/26/2019 VT Presentation 2016
70/74
We the employees of RSP willprovide defects free products
and services to our internal &external customers on time,
every time through continual
improvement of our processes
and systems.
Separate units engaged in Research &
-
7/26/2019 VT Presentation 2016
71/74
p g gDevelopment, Engineering & Technology,Consultancy, Environment Management, Coal
Supply, Logistics & Management Training. 04 operating collieries at Chasnalla, Jitpur,
Ramnagar and Tasra located in the states of
Jharkhand and West Bengal. 01 Captive Washery at Chasnalla whcih supplies
washed coking coal to all SAIL units.
37 Brach Sales Offices
10 Customer Contact Offices
67 Warehouses
2837 Dealers spread across the nation.
Major Mines of SAIL are :
-
7/26/2019 VT Presentation 2016
72/74
Kiriburu Iron Ore Mines(KIOM) in Jharkhand
Meghahatuburu Iron Ore Mines(MIOM) inJharkhand
Bolani Iron Ore Mines(BOM) in Odisha
Barsuan Iron Ore Mines(BIM) in Odisha Kalta Iron Ore Mines(KIM) in Odisha
Manoharpur(Chiria) Iron Ore Mines(MOM) inJharkhand
Gua Iron Ore Mines(GOM) in Jharkhand
Dalli-Rajhara Iron Ore Mines in Chhatisgarh
j
Major Mines of SAIL are :
-
7/26/2019 VT Presentation 2016
73/74
Nandini Limestone Mines in Chhatisgarh
Kuteshwar Limestone Mines in Madhya Pradesh
Bhawanathpur & Tulsidamar(Dolomite) Mines inJharkhand
Hirri Dolomite Mines in Chhattisgarh
j
-
7/26/2019 VT Presentation 2016
74/74
CAPACITY FROM TO
Hot Metal 2.0 MT 4.5 MT
Crude Steel 1.9 MT 4.2 MT
Saleable Steel 1.671 MT 3.9 MT
EXP NSION PL N