MECHANICAL NARRATIVE: THE MECHANICAL SCOPE OF WORK FOR THIS PROJECT LOCATED IN THE LOWER LEVEL OF CONCOURSE C 9100 PENA BLVD DENVER, CO IS TO REMOVE AND REPLACE THE EXISTING SUMP PUMPS AND SEWAGE EJECTOR PUMPS IN THEIR ENTIRETY WHICH WILL INCLUDE NEW CONTROLS AND POWER. IN ADDITION, THE EXISTING SUMPS WILL BE REHABILITATED WHICH WILL INCLUDE REMOVAL OF THE EXISTING LADDER, SUMP LID, REPAIRING CRACKS AT THE SUMP WALLS, BASE AND PIPE INLETS, SEALING THE WALLS AND BASE, AND LINING THE ENTIRE SUMP WITH A SPRAY ON LINER. ALL METALS TO BE RECYCLED PER SPECS. CONTRACTOR TO INSERT DYE OR OTHER TRACING MATERIAL IN ALL FOOTING SUMPS AND DETERMINE LOCATION OF OUTFLOW OF FOOTING PUMPS. ELECTRICAL NARRATIVE: THE ELECTRICAL SCOPE OF WORK INCLUDES REMOVING POWER FROM THE EXISTING PUMPS, LOCKING OUT THE BREAKERS AND PROTECTING THE EXISTING BRANCH CIRCUITS IN PLACE. THEN RECONNECTING THE NEW PUMPS TO THAT SAME BRANCH CIRCUITS USED TO POWER THE PREVIOUS PUMPS. THE NEW PUMPS WILL HAVE THE SAME HP RATING AND ELECTRICAL REQUIREMENTS AS THE EXISTING PUMPS. ALL EXISTING ELECTRICAL SYSTEMS SHALL REMAIN INTACT AND BE UTILIZED TO SERVE THE NEW EQUIPMENT. A LOCAL ALARM HORN AND STROBE SHALL ALWAYS BE REQUIRED AT OR NEAR THE SUMP PUMP CONTROL PANEL TO ENSURE TIMELY RESPONSE. A REMOTE ALARM, STROBE ONLY, SHALL BE PROVIDED ABOVE THE DOOR TO THE SUMP PUMP ROOM WHERE IT CAN BE OBSERVED BY BUILDING OCCUPANTS. NEW PIPE, WIRE, BOXES, FITTINGS AND SUPPORTS WILL BE INSTALLED FOR THE ADDITION OF THE ALARM ANNUNCIATOR PANELS. THE LOCATION OF ALL NEW PUMP CONTROL EQUIPMENT WILL REMAIN THE SAME AS EXISTING. ALL PUMP LABELS WILL BE UPDATED WITH NEW IDENTIFICATION TAGS SHOWING THE PUMPS NAME AND ELECTRICAL INFORMATION. L A S E E V N E D F O R D N A Y T I C Y T O C N U L A S E E V N E D F O R D N A Y T I C Y T O C N U ARCHITECT MECHANICAL ENGINEER ELECTRICAL ENGINEER CONTACT: KEVIN STOCKTON EMAIL: [email protected] [email protected] CONTACT: MARK D'ROSARIO EMAIL: [email protected] [email protected] CONTACT: BRENDA GLAVIN EMAIL: [email protected] [email protected] CODE INFORMATION APPLICABLE CODES: 2015 INTERNATIONAL PLUMBING CODE 2015 INTERNATIONAL ELECTRICAL CODE FIRE RESISTIVE REQUIREMENTS AND ASSEMBLIES: BUILDING AREA SUMMARY: OCCUPANT LOAD: CADD FILE NO. SHEET NO. SHEET TITLE VOLUME NO. DESIGN CONTRACT NO. WORK BREAKDOWN NO. FAA AIP NO: CHECKED BY: DRAWN BY: DATE: ISSUE RECORD CITY & COUNTY of DENVER DENVER INTERNATIONAL AIRPORT XX OF XX CONST. CONTRACT NO. SCALE: DESIGNER OF RECORD PK ELECTRICAL, LLC 5105 DTC PARKWAY SUITE. 420 GREENWOOD VILLAGE, CO 80111 THE CE GROUP 700 AUTOMATION DR. SUITE. F WINDSOR, CO 80550 RS&H 7800 E UNION AVE, SUITE 700 DENVER, CO 80237 EXISTING CONCOURSE C SAME AS PREVIOUS NO CHANGE PDS 201732415 - 04 / P0 - 00046097 TBD 12" = 1' - 0" 09/18/19 09/18/2019 JRS 01 COVER SHEET M000 DENVER INTERNATIONAL AIRPORT CONCOURSE C SEWER REPAIRS 9100 PENA BLVD DENVER, CO 80249 DENVER INTERNATIONAL AIRPORT CONCOURSE C SEWER REPAIRS DESIGN CONTRACT No. 201732415-04 / P0-00046097 CONSTRUCTION CONTRACT No. TBD Volume No. 01 Addendum #1 NO. BY PURPOSE DATE CKD 1 CEG 100% DESIGN 01/18/19 PDS 2 CEG IFC 4/18/19 PDS 4 CEG Addendum #1 09/18/19 PDS

Transcript of Volume No. 01 Addendum #1 - Denver International...

Page 1: Volume No. 01 Addendum #1 - Denver International …business.flydenver.com/bizpdf/DIAID_2433.pdfCONTACT: BRENDA GLAVIN EMAIL: bglavin@pkelectrical.com name@zzz.com CODE INFORMATION

MECHANICAL NARRATIVE:

THE MECHANICAL SCOPE OF WORK FOR THIS PROJECT LOCATED IN THE LOWER LEVEL OF CONCOURSE C 9100 PENA BLVD DENVER, CO IS TO REMOVE AND REPLACE THE EXISTING SUMP PUMPS AND SEWAGE EJECTOR PUMPS IN THEIR ENTIRETY WHICH WILL INCLUDE NEW CONTROLS AND POWER. IN ADDITION, THE EXISTING SUMPS WILL BE REHABILITATED WHICH WILL INCLUDE REMOVAL OF THE EXISTING LADDER, SUMP LID, REPAIRING CRACKS AT THE SUMP WALLS, BASE AND PIPE INLETS, SEALING THE WALLS AND BASE, AND LINING THE ENTIRE SUMP WITH A SPRAY ON LINER. ALL METALS TO BE RECYCLED PER SPECS. CONTRACTOR TO INSERT DYE OR OTHER TRACING MATERIAL IN ALL FOOTING SUMPS AND DETERMINE LOCATION OF OUTFLOW OF FOOTING PUMPS.

ELECTRICAL NARRATIVE:

THE ELECTRICAL SCOPE OF WORK INCLUDES REMOVING POWER FROM THE EXISTING PUMPS, LOCKING OUT THE BREAKERS AND PROTECTING THE EXISTING BRANCH CIRCUITS IN PLACE. THEN RECONNECTING THE NEW PUMPS TO THAT SAME BRANCH CIRCUITS USED TO POWER THE PREVIOUS PUMPS. THE NEW PUMPS WILL HAVE THE SAME HP RATING AND ELECTRICAL REQUIREMENTS AS THE EXISTING PUMPS. ALL EXISTING ELECTRICAL SYSTEMS SHALL REMAIN INTACT AND BE UTILIZED TO SERVE THE NEW EQUIPMENT. A LOCAL ALARM HORN AND STROBE SHALL ALWAYS BE REQUIRED AT OR NEAR THE SUMP PUMP CONTROL PANEL TO ENSURE TIMELY RESPONSE. A REMOTE ALARM, STROBE ONLY, SHALL BE PROVIDED ABOVE THE DOOR TO THE SUMP PUMP ROOM WHERE IT CAN BE OBSERVED BY BUILDING OCCUPANTS. NEW PIPE, WIRE, BOXES, FITTINGS AND SUPPORTS WILL BE INSTALLED FOR THE ADDITION OF THE ALARM ANNUNCIATOR PANELS. THE LOCATION OF ALL NEW PUMP CONTROL EQUIPMENT WILL REMAIN THE SAME AS EXISTING. ALL PUMP LABELS WILL BE UPDATED WITH NEW IDENTIFICATION TAGS SHOWING THE PUMPS NAME AND ELECTRICAL INFORMATION.

LASE

EV

NE

DF

O

R

D

NA

YT I

C

YTOC NU

LASE

EVN

ED

FO

R

D

NA

YT IC

YTOC NU

ARCHITECT MECHANICAL ENGINEER ELECTRICAL ENGINEER

CONTACT: KEVIN STOCKTONEMAIL: [email protected]

[email protected]

CONTACT: MARK D'ROSARIOEMAIL: [email protected]

[email protected]

CONTACT: BRENDA GLAVINEMAIL: [email protected]

[email protected]

CODE INFORMATION

APPLICABLE CODES:

2015 INTERNATIONAL PLUMBING CODE2015 INTERNATIONAL ELECTRICAL CODE

FIRE RESISTIVE REQUIREMENTS AND ASSEMBLIES:

BUILDING AREA SUMMARY:

OCCUPANT LOAD:

CADD FILE NO.

SHEET NO.

SHEET TITLE

VOLUME NO.

DESIGN CONTRACT NO.

WORK BREAKDOWN NO.

FAA AIP NO:

CHECKED BY:

DRAWN BY:

DATE:

ISSUE RECORD

CITY & COUNTYof DENVER

DENVERINTERNATIONAL

AIRPORT

XX OF XX

CONST. CONTRACT NO.

SCALE:

DESIGNER OF RECORD

PK ELECTRICAL, LLC

5105 DTC PARKWAYSUITE. 420GREENWOOD VILLAGE, CO 80111

THE CE GROUP

700 AUTOMATION DR.SUITE. FWINDSOR, CO 80550

RS&H

7800 E UNION AVE,SUITE 700DENVER, CO 80237

EXISTING CONCOURSE C

SAME AS PREVIOUSNO CHANGE

PDS

201732415-04 / P0-00046097

TBD

12" = 1'-0"

09/18/19

09/18/2019

JRS

01

COVER SHEET

M000

DE

NV

ER

IN

TE

RN

AT

ION

AL A

IRP

OR

TC

ON

CO

UR

SE

C S

EW

ER

RE

PA

IRS

9100 PENA BLVDDENVER, CO 80249

DENVER INTERNATIONAL AIRPORTCONCOURSE C SEWER REPAIRS

DESIGN CONTRACT No. 201732415-04 / P0-00046097

CONSTRUCTION CONTRACT No. TBD

Volume No. 01Addendum #1

NO. BY PURPOSE DATE CKD

1 CEG 100% DESIGN 01/18/19 PDS

2 CEG IFC 4/18/19 PDS

4 CEG Addendum #1 09/18/19 PDS

Page 2: Volume No. 01 Addendum #1 - Denver International …business.flydenver.com/bizpdf/DIAID_2433.pdfCONTACT: BRENDA GLAVIN EMAIL: bglavin@pkelectrical.com name@zzz.com CODE INFORMATION

AN

NA

NN

2

1 3

4

4

5

5

3

5

5

W21W21.9

N2

N3

N4

N5

6

N4

N3

W21.4 W21

N5

N2.1

N2

W21.9

(E) 4"(E) 4"

(E) 4" INLET

(E) 4" PERF. PVC INLET

(E) 2" DISCHARGE

(E) 2" DISCHARGE

MECHANICAL

CCC_00_3W_016

(E) 4" PERF. PVC INLET

7

108

9

W21W21.9

N2

N3

N4

N5

N4

N3

W21.4 W21

N5

N2.1

N2

W21.9

(E) 4"(E) 4"

(E) 4" INLET

(E) 4" PERF. PVC INLET

(E) 2" DISCHARGE

(E) 2" DISCHARGE

1112

MECHANICAL

CCC_00_3W_016

STAIR #38

CCC_00_3W_ST38

CORRIDOR

CCC_00_3W_CR01

BASEMENT

CCC_00_3W_012

CCC_00_3W_SP_N_01CCC_00_3W_SP_N_02

S F

14

(E) 4" PERF. PVC INLET

15

FOOTER SUMP ASSEMBLY - CCC_00_3W_SP_N_02 SANITARY SUMP ASSEMBLY - CCC_00_3W_SP_N_01

LASE

EVN

ED

FO

R

D

NA

YT IC

YTOC NU

CITY & COUNTYof DENVER

DENVERINTERNATIONAL

AIRPORT

BIM FILE NAME:

SHEET NO.

SHEET TITLE

VOLUME NO.

DESIGN CONTRACT NO.

WORK BREAKDOWN NO.

FAA AIP NO:

CHECKED BY:

DRAWN BY:

DATE:

ISSUE RECORD

CONST. CONTRACT NO.

SCALE:

DESIGNER OF RECORD

PDS

201732415-04 / P0-00046097

TBD

As indicated

DE

NV

ER

IN

TE

RN

AT

ION

AL A

IRP

OR

TC

ON

CO

UR

SE

C S

EW

ER

RE

PA

IRS

09/18/2019

JRS

01

CONCOURSE CSUMP PITS

M101C

9100 PENA BLVDDENVER, CO 80249

3'4' 4'1'2' 0 8'

N

KEY PLAN

CONCOURSE C

3'4' 4'1'2' 0 8'

N

KEY PLAN

CONCOURSE C

1/4" = 1'-0"M100C M101C

MECHANICAL ROOM CCC_00_3W_016 ENLARGEDDEMOLITION PLUMBING PLAN1

1/4" = 1'-0"M100C M101C

MECHANICAL ROOM CCC_00_3W_016 ENLARGED NEWPLUMBING PLAN2

4 JANITOR SUMPS ARE 3' DEEP AND CONSIST OF ONE MANHOLE BARREL

3 FOOTER SUMPS ARE 7' DEEP AND CONSIST OF 2 MANHOLE BARRELS.

2 INDUSTRIAL AND SANITARY SUMPS ARE 12' DEEP AND CONSIST OF 3 MANHOLE BARRELS.

1

SUMP NOMENCLATURE:"F" REFERS TO SIMPLEX FOOTER SUMP."I" REFERS TO DUPLEX INDUSTRIAL SUMP."S" REFERS TO DUPLEX SANITARY SUMP."J" REFERS TO SIMPLEX JANITORS SANITARY SUMP.

GENERAL NOTES

6REMOVE (E) SUMP ACCESS LADDER RUNGS AND SUPPORTS. GRIND/REMOVE LADDERSUPPORTS FROM SUMP WALL PRIOR TO SEALING THE SUMPS. THIS SUMP HAS RUNGS.

5DISCONNECT VENT PIPING TO ALLOW REMOVAL OF SUMP COVER. REINSTALL WHEN NEWPUMPS AND VALVING, ETC. ARE COMPLETE.

4

DISCONNECT AND REMOVE EXISTING DISCHARGE PIPING ABOVE SUMP TO POINT INDICATEDAS SHOWN ON DETAIL 2, SHEET M501 AND THE PICTURE ON THIS SHEET TO ALLOW FORNEW VALVES. REMOVE SUMP PUMPS, QUICK DISCONNECT AND PUMP RAILS. EXISTING SUMPCOVER TO ALSO BE REMOVED.

3

DISCONNECT AND REMOVE EXISTING DISCHARGE PIPING ABOVE SUMP TO POINT INDICATEDAS SHOWN ON DETAIL 1, SHEET M501 AND THE PICTURE ON THIS SHEET TO ALLOW FORNEW VALVES. REMOVE SUMP PUMP, QUICK DISCONNECT AND PUMP RAIL. EXISTING SUMPCOVER TO ALSO BE REMOVED.

2ISOLATE ALL EXISTING WASTE OR STORM DRAINAGE ENTERING DUPLEX SUMP OR PROVIDEMEANS TO KEEP SUMP IN OPERATION DURING CONSTRUCTION. RE: DETAIL 2, SHEET M501AND DETAIL 3, SHEET M502

1ISOLATE ALL EXISTING WASTE OR STORM DRAINAGE ENTERING SUMP, OR PROVIDE MEANSTO KEEP SUMP IN OPERATION DURING CONSTRUCTION. RE: DETAIL 1, SHEET M501 ANDDETAIL 3, SHEET M502.

DEMOLITION NOTES

15CONTRACTOR TO INSERT DYE OR OTHER TRACING MATERIAL IN ALL FOOTING ANDINDUSTRIAL SUMPS AND DETERMINE LOCATION OF OUTFLOW OF FOOTING PUMPS.

14 REMOTE STROBE FURNISHED WITH PUMP PACKAGE.

13 SUMP IS FIBERGLASS AND REQUIRES NO RESTORATIVE ACTIONS.

12LOCATION ON NEW DUPLEX SUMP CONTROLLER. CONDUIT AND WIRING TO SUMP ANDREMOTE ALARM. REFER TO PUMP SCHEDULE SHEET M002 FOR CONTROLLER MODELNUMBER AND DETAIL 2, SHEET M502.

11LOCATION ON NEW SUMP PUMP CONTROLLER. CONDUIT AND WIRING TO SUMP AND REMOTEALARM. REFER TO PUMP SCHEDULE SHEET M002 FOR CONTROLLER MODEL NUMBER ANDDETAIL 1, SHEET M502.

10PROVIDE AND INSTALL NEW SUMP ACCESS COVER TO ACCOMMODATE NEW DUPLEX PUMPREQUIREMENTS. RE: PUMP SCHEDULE, SHEET M002 AND DETAIL 2, SHEET M502.

9PROVIDE AND INSTALL NEW SUMP ACCESS COVER TO ACCOMMODATE NEW PUMPREQUIREMENTS. RE: PUMP SHCEDULE, SHEET M002 AND DETAIL1, SHEET 502.

8PROVIDE AND INSTALL NEW DUPLEX SUMP PUMPS. RE: PUMP SCHEDULE, SHEET M002 ANDSUMP DETAIL 2, SHEET M502.

7PROVIDE AND INSTALL NEW SUMP PUMP. RE: PUMP SCHEDULE, SHEET M002 AND SUMPDETAIL 1, SHEET M502.

NEW CONSTRUCTION NOTES

5

NOTE: NOT ALL DEMO NOTES ARE USED ON EACH SHEET

NOTE: NOT ALL DEMO NOTES ARE USED ON EACH SHEET

NOTE: NOT ALL CONSTRUCTION NOTES ARE USED ON EACH SHEET

NO. BY PURPOSE DATE CKD

1 CEG 100% DESIGN 01/18/19 PDS

2 CEG IFC 4/18/19 PDS

4 CEG Addendum #1 09/18/19 PDS

44

Page 3: Volume No. 01 Addendum #1 - Denver International …business.flydenver.com/bizpdf/DIAID_2433.pdfCONTACT: BRENDA GLAVIN EMAIL: bglavin@pkelectrical.com name@zzz.com CODE INFORMATION

AN

NA

NN

(E) 4" INLET

2 413

5

4

3

5

5 5

W19

S2

S3

S4

S5

6

W19 W18.6 W18.1

S2

S2.1

S3

S4

S5

S5.1

(E) 4" PERF. PVC INLET

(E) 4" PERF. PVC INLETGROUTED CLOSED

(E) 2" DISCHARGE

(E) 2" DISCHARGE

(E) 6"

(E) 4"

(E) 4"

9

10

7

8

W19

S2

S3

S4

S5

W19 W18.6 W18.1

S2

S2.1

S3

S4

S5

S5.1

(E) 4" PERF. PVC INLET

(E) 4" PERF. PVC INLETGROUTED CLOSED

(E) 2" DISCHARGE

(E) 2" DISCHARGE

(E) 6"

(E) 4"

(E) 4"

1211

CCC_00_3W_SP_S_01

FCCC_00_3W_SP_S_02

S

MECHANICAL

CCC_00_3W_030

ELEVATOR MACHINEROOM CE-07

CCC_00_3W_034

ELEVATOR CE-07

CCC_00_3W_EL07

STAIR #35

CCC_00_3W_ST35

FIRE VALVE

CCC_00_3W_024

BASEMENT

CCC_00_3W_012

ELEV HOLD ROOM

CCC_00_3W_032

14

15

FOOTER SUMP ASSEMBLY - CCC_00_3W_SP_S_01 SANITARY SUMP ASSEMBLY - CCC_00_3W_SP_S_02

LASE

EVN

ED

FO

R

D

NA

YT IC

YTOC NU

CITY & COUNTYof DENVER

DENVERINTERNATIONAL

AIRPORT

BIM FILE NAME:

SHEET NO.

SHEET TITLE

VOLUME NO.

DESIGN CONTRACT NO.

WORK BREAKDOWN NO.

FAA AIP NO:

CHECKED BY:

DRAWN BY:

DATE:

ISSUE RECORD

CONST. CONTRACT NO.

SCALE:

DESIGNER OF RECORD

PDS

201732415-04 / P0-00046097

TBD

As indicated

DE

NV

ER

IN

TE

RN

AT

ION

AL A

IRP

OR

TC

ON

CO

UR

SE

C S

EW

ER

RE

PA

IRS

09/18/2019

JRS

01

CONCOURSE CSUMP PITS

M102C

9100 PENA BLVDDENVER, CO 80249

3'4' 4'1'2' 0 8'

N

KEY PLAN

CONCOURSE C

1/4" = 1'-0"M102C

MECHANICAL ROOM CCC_00_3W_030 ENLARGEDDEMOLITION PLUMBING PLAN1

1/4" = 1'-0"M102C

MECHANICAL ROOM CCC_00_3W_030 ENLARGED NEWPLUMBING PLAN2

3'4' 4'1'2' 0 8'

N

KEY PLAN

CONCOURSE C

4 JANITOR SUMPS ARE 3' DEEP AND CONSIST OF ONE MANHOLE BARREL

3 FOOTER SUMPS ARE 7' DEEP AND CONSIST OF 2 MANHOLE BARRELS.

2 INDUSTRIAL AND SANITARY SUMPS ARE 12' DEEP AND CONSIST OF 3 MANHOLE BARRELS.

1

SUMP NOMENCLATURE:"F" REFERS TO SIMPLEX FOOTER SUMP."I" REFERS TO DUPLEX INDUSTRIAL SUMP."S" REFERS TO DUPLEX SANITARY SUMP."J" REFERS TO SIMPLEX JANITORS SANITARY SUMP.

GENERAL NOTES

6REMOVE (E) SUMP ACCESS LADDER RUNGS AND SUPPORTS. GRIND/REMOVE LADDERSUPPORTS FROM SUMP WALL PRIOR TO SEALING THE SUMPS. THIS SUMP HAS RUNGS.

5DISCONNECT VENT PIPING TO ALLOW REMOVAL OF SUMP COVER. REINSTALL WHEN NEWPUMPS AND VALVING, ETC. ARE COMPLETE.

4

DISCONNECT AND REMOVE EXISTING DISCHARGE PIPING ABOVE SUMP TO POINT INDICATEDAS SHOWN ON DETAIL 2, SHEET M501 AND THE PICTURE ON THIS SHEET TO ALLOW FORNEW VALVES. REMOVE SUMP PUMPS, QUICK DISCONNECT AND PUMP RAILS. EXISTING SUMPCOVER TO ALSO BE REMOVED.

3

DISCONNECT AND REMOVE EXISTING DISCHARGE PIPING ABOVE SUMP TO POINT INDICATEDAS SHOWN ON DETAIL 1, SHEET M501 AND THE PICTURE ON THIS SHEET TO ALLOW FORNEW VALVES. REMOVE SUMP PUMP, QUICK DISCONNECT AND PUMP RAIL. EXISTING SUMPCOVER TO ALSO BE REMOVED.

2ISOLATE ALL EXISTING WASTE OR STORM DRAINAGE ENTERING DUPLEX SUMP OR PROVIDEMEANS TO KEEP SUMP IN OPERATION DURING CONSTRUCTION. RE: DETAIL 2, SHEET M501AND DETAIL 3, SHEET M502

1ISOLATE ALL EXISTING WASTE OR STORM DRAINAGE ENTERING SUMP, OR PROVIDE MEANSTO KEEP SUMP IN OPERATION DURING CONSTRUCTION. RE: DETAIL 1, SHEET M501 ANDDETAIL 3, SHEET M502.

DEMOLITION NOTES

5

NOTE: NOT ALL DEMO NOTES ARE USED ON EACH SHEET

15CONTRACTOR TO INSERT DYE OR OTHER TRACING MATERIAL IN ALL FOOTING ANDINDUSTRIAL SUMPS AND DETERMINE LOCATION OF OUTFLOW OF FOOTING PUMPS.

14 REMOTE STROBE FURNISHED WITH PUMP PACKAGE.

13 SUMP IS FIBERGLASS AND REQUIRES NO RESTORATIVE ACTIONS.

12LOCATION ON NEW DUPLEX SUMP CONTROLLER. CONDUIT AND WIRING TO SUMP ANDREMOTE ALARM. REFER TO PUMP SCHEDULE SHEET M002 FOR CONTROLLER MODELNUMBER AND DETAIL 2, SHEET M502.

11LOCATION ON NEW SUMP PUMP CONTROLLER. CONDUIT AND WIRING TO SUMP AND REMOTEALARM. REFER TO PUMP SCHEDULE SHEET M002 FOR CONTROLLER MODEL NUMBER ANDDETAIL 1, SHEET M502.

10PROVIDE AND INSTALL NEW SUMP ACCESS COVER TO ACCOMMODATE NEW DUPLEX PUMPREQUIREMENTS. RE: PUMP SCHEDULE, SHEET M002 AND DETAIL 2, SHEET M502.

9PROVIDE AND INSTALL NEW SUMP ACCESS COVER TO ACCOMMODATE NEW PUMPREQUIREMENTS. RE: PUMP SHCEDULE, SHEET M002 AND DETAIL1, SHEET 502.

8PROVIDE AND INSTALL NEW DUPLEX SUMP PUMPS. RE: PUMP SCHEDULE, SHEET M002 ANDSUMP DETAIL 2, SHEET M502.

7PROVIDE AND INSTALL NEW SUMP PUMP. RE: PUMP SCHEDULE, SHEET M002 AND SUMPDETAIL 1, SHEET M502.

NEW CONSTRUCTION NOTES NOTE: NOT ALL CONSTRUCTION NOTES ARE USED ON EACH SHEET

NO. BY PURPOSE DATE CKD

1 CEG 100% DESIGN 01/18/19 PDS

2 CEG IFC 4/18/19 PDS

4 CEG Addendum #1 09/18/19 PDS

4

Page 4: Volume No. 01 Addendum #1 - Denver International …business.flydenver.com/bizpdf/DIAID_2433.pdfCONTACT: BRENDA GLAVIN EMAIL: bglavin@pkelectrical.com name@zzz.com CODE INFORMATION

AN

N

2 4

5

4

5

W4W5

N4

N5

N6

6

W5 W4

N4

N5

N6

(E) 6"

(E) 2" DISCHARGE

(E) 4" INLET

(E) 4" (E) 4"

PUMP ROOM

CCC_00_1C_010

INDUSTRIAL SUMP ASSEMBLY - CCC_00_1C_SP_N_01

W4W5

N4

N5

N6

W5 W4

N4

N5

N6

PUMP ROOM

CCC_00_1C_010

(E) 6"

(E) 2" DISCHARGE

(E) 4" INLET

(E) 4" (E) 4"

CCC_00_1C_SP_N_01

I

14

8 10 13

12

LASE

EVN

ED

FO

R

D

NA

YT IC

YTOC NU

CITY & COUNTYof DENVER

DENVERINTERNATIONAL

AIRPORT

BIM FILE NAME:

SHEET NO.

SHEET TITLE

VOLUME NO.

DESIGN CONTRACT NO.

WORK BREAKDOWN NO.

FAA AIP NO:

CHECKED BY:

DRAWN BY:

DATE:

ISSUE RECORD

CONST. CONTRACT NO.

SCALE:

DESIGNER OF RECORD

PDS

201732415-04 / P0-00046097

TBD

As indicated

DE

NV

ER

IN

TE

RN

AT

ION

AL A

IRP

OR

TC

ON

CO

UR

SE

C S

EW

ER

RE

PA

IRS

09/18/2019

JRS

01

CONCOURSE CSUMP PITS

M103C

9100 PENA BLVDDENVER, CO 80249

3'4' 4'1'2' 0 8'

N

KEY PLAN

CONCOURSE C

3'4' 4'1'2' 0 8'

N

KEY PLAN

CONCOURSE C

1/4" = 1'-0"M100C M103C

PUMP ROOM CCC_00_1C_010 ENLARGED DEMOLITIONPLUMBING PLAN1

4 JANITOR SUMPS ARE 3' DEEP AND CONSIST OF ONE MANHOLE BARREL

3 FOOTER SUMPS ARE 7' DEEP AND CONSIST OF 2 MANHOLE BARRELS.

2 INDUSTRIAL AND SANITARY SUMPS ARE 12' DEEP AND CONSIST OF 3 MANHOLE BARRELS.

1

SUMP NOMENCLATURE:"F" REFERS TO SIMPLEX FOOTER SUMP."I" REFERS TO DUPLEX INDUSTRIAL SUMP."S" REFERS TO DUPLEX SANITARY SUMP."J" REFERS TO SIMPLEX JANITORS SANITARY SUMP.

GENERAL NOTES

6REMOVE (E) SUMP ACCESS LADDER RUNGS AND SUPPORTS. GRIND/REMOVE LADDERSUPPORTS FROM SUMP WALL PRIOR TO SEALING THE SUMPS. THIS SUMP HAS RUNGS.

5DISCONNECT VENT PIPING TO ALLOW REMOVAL OF SUMP COVER. REINSTALL WHEN NEWPUMPS AND VALVING, ETC. ARE COMPLETE.

4

DISCONNECT AND REMOVE EXISTING DISCHARGE PIPING ABOVE SUMP TO POINT INDICATEDAS SHOWN ON DETAIL 2, SHEET M501 AND THE PICTURE ON THIS SHEET TO ALLOW FORNEW VALVES. REMOVE SUMP PUMPS, QUICK DISCONNECT AND PUMP RAILS. EXISTING SUMPCOVER TO ALSO BE REMOVED.

3

DISCONNECT AND REMOVE EXISTING DISCHARGE PIPING ABOVE SUMP TO POINT INDICATEDAS SHOWN ON DETAIL 1, SHEET M501 AND THE PICTURE ON THIS SHEET TO ALLOW FORNEW VALVES. REMOVE SUMP PUMP, QUICK DISCONNECT AND PUMP RAIL. EXISTING SUMPCOVER TO ALSO BE REMOVED.

2ISOLATE ALL EXISTING WASTE OR STORM DRAINAGE ENTERING DUPLEX SUMP OR PROVIDEMEANS TO KEEP SUMP IN OPERATION DURING CONSTRUCTION. RE: DETAIL 2, SHEET M501AND DETAIL 3, SHEET M502

1ISOLATE ALL EXISTING WASTE OR STORM DRAINAGE ENTERING SUMP, OR PROVIDE MEANSTO KEEP SUMP IN OPERATION DURING CONSTRUCTION. RE: DETAIL 1, SHEET M501 ANDDETAIL 3, SHEET M502.

DEMOLITION NOTES

4

NOTE: NOT ALL DEMO NOTES ARE USED ON EACH SHEET

15CONTRACTOR TO INSERT DYE OR OTHER TRACING MATERIAL IN ALL FOOTING ANDINDUSTRIAL SUMPS AND DETERMINE LOCATION OF OUTFLOW OF FOOTING PUMPS.

14 REMOTE STROBE FURNISHED WITH PUMP PACKAGE.

13 SUMP IS FIBERGLASS AND REQUIRES NO RESTORATIVE ACTIONS.

12LOCATION ON NEW DUPLEX SUMP CONTROLLER. CONDUIT AND WIRING TO SUMP ANDREMOTE ALARM. REFER TO PUMP SCHEDULE SHEET M002 FOR CONTROLLER MODELNUMBER AND DETAIL 2, SHEET M502.

11LOCATION ON NEW SUMP PUMP CONTROLLER. CONDUIT AND WIRING TO SUMP AND REMOTEALARM. REFER TO PUMP SCHEDULE SHEET M002 FOR CONTROLLER MODEL NUMBER ANDDETAIL 1, SHEET M502.

10PROVIDE AND INSTALL NEW SUMP ACCESS COVER TO ACCOMMODATE NEW DUPLEX PUMPREQUIREMENTS. RE: PUMP SCHEDULE, SHEET M002 AND DETAIL 2, SHEET M502.

9PROVIDE AND INSTALL NEW SUMP ACCESS COVER TO ACCOMMODATE NEW PUMPREQUIREMENTS. RE: PUMP SHCEDULE, SHEET M002 AND DETAIL1, SHEET 502.

8PROVIDE AND INSTALL NEW DUPLEX SUMP PUMPS. RE: PUMP SCHEDULE, SHEET M002 ANDSUMP DETAIL 2, SHEET M502.

7PROVIDE AND INSTALL NEW SUMP PUMP. RE: PUMP SCHEDULE, SHEET M002 AND SUMPDETAIL 1, SHEET M502.

NEW CONSTRUCTION NOTES NOTE: NOT ALL CONSTRUCTION NOTES ARE USED ON EACH SHEET

NO. BY PURPOSE DATE CKD

1 CEG 100% DESIGN 01/18/19 PDS

2 CEG IFC 4/18/19 PDS

4 CEG Addendum #1 09/18/19 PDS

1/4" = 1'-0"M100C M103C

PUMP ROOM CCC_00_1C_010 ENLARGED NEW PLUMBINGPLAN2

4

Page 5: Volume No. 01 Addendum #1 - Denver International …business.flydenver.com/bizpdf/DIAID_2433.pdfCONTACT: BRENDA GLAVIN EMAIL: bglavin@pkelectrical.com name@zzz.com CODE INFORMATION

W2W3

S1

N1

NS

N1

NS

S1

W3 W2

WEST BAGGAGETUNNEL

CCC_22_2C_014

(E) 2" DISCHARGE

(E) 4" INLET

W2W3

S1

N1

NS

N1

NS

S1

W3 W2

11

CCC_00_2C_SP_S_01

WEST BAGGAGETUNNEL

CCC_00_2C_014

(E) 2" DISCHARGE

(E) 4" INLET

14

VERIFY LOCATIOIN

977

dsp-10

F

FOOTER SUMP ASSEMBLY - CCC_00_2C_SP_S_01

LASE

EVN

ED

FO

R

D

NA

YT IC

YTOC NU

CITY & COUNTYof DENVER

DENVERINTERNATIONAL

AIRPORT

BIM FILE NAME:

SHEET NO.

SHEET TITLE

VOLUME NO.

DESIGN CONTRACT NO.

WORK BREAKDOWN NO.

FAA AIP NO:

CHECKED BY:

DRAWN BY:

DATE:

ISSUE RECORD

CONST. CONTRACT NO.

SCALE:

DESIGNER OF RECORD

PDS

201732415-04 / P0-00046097

TBD

As indicated

DE

NV

ER

IN

TE

RN

AT

ION

AL A

IRP

OR

TC

ON

CO

UR

SE

C S

EW

ER

RE

PA

IRS

09/18/2019

JRS

01

CONCOURSE CSUMP PITS

M104C

9100 PENA BLVDDENVER, CO 80249

1/4" = 1'-0"M104C

BAGGAGE CROSSOVER ENLARGED DEMOLITION PLUMBINGPLAN1

1/4" = 1'-0"M104C

BAGGAGE CROSSOVER ENLARGED NEW PLUMBING PLAN2

3'4' 4'1'2' 0 8'

N

KEY PLAN

CONCOURSE C

3'4' 4'1'2' 0 8'

N

KEY PLAN

CONCOURSE C

4 JANITOR SUMPS ARE 3' DEEP AND CONSIST OF ONE MANHOLE BARREL

3 FOOTER SUMPS ARE 7' DEEP AND CONSIST OF 2 MANHOLE BARRELS.

2 INDUSTRIAL AND SANITARY SUMPS ARE 12' DEEP AND CONSIST OF 3 MANHOLE BARRELS.

1

SUMP NOMENCLATURE:"F" REFERS TO SIMPLEX FOOTER SUMP."I" REFERS TO DUPLEX INDUSTRIAL SUMP."S" REFERS TO DUPLEX SANITARY SUMP."J" REFERS TO SIMPLEX JANITORS SANITARY SUMP.

GENERAL NOTES

6REMOVE (E) SUMP ACCESS LADDER RUNGS AND SUPPORTS. GRIND/REMOVE LADDERSUPPORTS FROM SUMP WALL PRIOR TO SEALING THE SUMPS. THIS SUMP HAS RUNGS.

5DISCONNECT VENT PIPING TO ALLOW REMOVAL OF SUMP COVER. REINSTALL WHEN NEWPUMPS AND VALVING, ETC. ARE COMPLETE.

4

DISCONNECT AND REMOVE EXISTING DISCHARGE PIPING ABOVE SUMP TO POINT INDICATEDAS SHOWN ON DETAIL 2, SHEET M501 AND THE PICTURE ON THIS SHEET TO ALLOW FORNEW VALVES. REMOVE SUMP PUMPS, QUICK DISCONNECT AND PUMP RAILS. EXISTING SUMPCOVER TO ALSO BE REMOVED.

3

DISCONNECT AND REMOVE EXISTING DISCHARGE PIPING ABOVE SUMP TO POINT INDICATEDAS SHOWN ON DETAIL 1, SHEET M501 AND THE PICTURE ON THIS SHEET TO ALLOW FORNEW VALVES. REMOVE SUMP PUMP, QUICK DISCONNECT AND PUMP RAIL. EXISTING SUMPCOVER TO ALSO BE REMOVED.

2ISOLATE ALL EXISTING WASTE OR STORM DRAINAGE ENTERING DUPLEX SUMP OR PROVIDEMEANS TO KEEP SUMP IN OPERATION DURING CONSTRUCTION. RE: DETAIL 2, SHEET M501AND DETAIL 3, SHEET M502

1ISOLATE ALL EXISTING WASTE OR STORM DRAINAGE ENTERING SUMP, OR PROVIDE MEANSTO KEEP SUMP IN OPERATION DURING CONSTRUCTION. RE: DETAIL 1, SHEET M501 ANDDETAIL 3, SHEET M502.

DEMOLITION NOTES

0

NOTE: NOT ALL DEMO NOTES ARE USED ON EACH SHEET

15CONTRACTOR TO INSERT DYE OR OTHER TRACING MATERIAL IN ALL FOOTING ANDINDUSTRIAL SUMPS AND DETERMINE LOCATION OF OUTFLOW OF FOOTING PUMPS.

14 REMOTE STROBE FURNISHED WITH PUMP PACKAGE.

13 SUMP IS FIBERGLASS AND REQUIRES NO RESTORATIVE ACTIONS.

12LOCATION ON NEW DUPLEX SUMP CONTROLLER. CONDUIT AND WIRING TO SUMP ANDREMOTE ALARM. REFER TO PUMP SCHEDULE SHEET M002 FOR CONTROLLER MODELNUMBER AND DETAIL 2, SHEET M502.

11LOCATION ON NEW SUMP PUMP CONTROLLER. CONDUIT AND WIRING TO SUMP AND REMOTEALARM. REFER TO PUMP SCHEDULE SHEET M002 FOR CONTROLLER MODEL NUMBER ANDDETAIL 1, SHEET M502.

10PROVIDE AND INSTALL NEW SUMP ACCESS COVER TO ACCOMMODATE NEW DUPLEX PUMPREQUIREMENTS. RE: PUMP SCHEDULE, SHEET M002 AND DETAIL 2, SHEET M502.

9PROVIDE AND INSTALL NEW SUMP ACCESS COVER TO ACCOMMODATE NEW PUMPREQUIREMENTS. RE: PUMP SHCEDULE, SHEET M002 AND DETAIL1, SHEET 502.

8PROVIDE AND INSTALL NEW DUPLEX SUMP PUMPS. RE: PUMP SCHEDULE, SHEET M002 ANDSUMP DETAIL 2, SHEET M502.

7PROVIDE AND INSTALL NEW SUMP PUMP. RE: PUMP SCHEDULE, SHEET M002 AND SUMPDETAIL 1, SHEET M502.

NEW CONSTRUCTION NOTES NOTE: NOT ALL CONSTRUCTION NOTES ARE USED ON EACH SHEET

NO. BY PURPOSE DATE CKD

1 CEG 100% DESIGN 01/18/19 PDS

2 CEG IFC 4/18/19 PDS

4 CEG Addendum #1 09/18/19 PDS

4

Page 6: Volume No. 01 Addendum #1 - Denver International …business.flydenver.com/bizpdf/DIAID_2433.pdfCONTACT: BRENDA GLAVIN EMAIL: bglavin@pkelectrical.com name@zzz.com CODE INFORMATION

AN

N

1 3

5

3

5

W1W2

S8

W2

S8

W1

(E) 2" DISCHARGE

(E) 3" INLET

SP56-C-W1

JANITORCLOSET

CCC_00_2C_020

AGTS STATION

CCC_00_2C_021

7 9

W1W2

S8

W2

S8

W1

(E) 2" DISCHARGE

(E) 3" INLET

CCC_00_2C_SP_S_02J

JANITOR CLOSET

CCC_00_2C_020

AGTS STATION

CCC_00_2C_021

STAIR #02

CCC_00_2C_ST02

11

14

SANITARY SUMP ASSEMBLY - CCC_00_2C_SP_S_01

LASE

EVN

ED

FO

R

D

NA

YT IC

YTOC NU

CITY & COUNTYof DENVER

DENVERINTERNATIONAL

AIRPORT

BIM FILE NAME:

SHEET NO.

SHEET TITLE

VOLUME NO.

DESIGN CONTRACT NO.

WORK BREAKDOWN NO.

FAA AIP NO:

CHECKED BY:

DRAWN BY:

DATE:

ISSUE RECORD

CONST. CONTRACT NO.

SCALE:

DESIGNER OF RECORD

PDS

201732415-04 / P0-00046097

TBD

As indicated

DE

NV

ER

IN

TE

RN

AT

ION

AL A

IRP

OR

TC

ON

CO

UR

SE

C S

EW

ER

RE

PA

IRS

09/18/2019

JRS

01

CONCOURSE CSUMP PITS

M105C

9100 PENA BLVDDENVER, CO 80249

3'4' 4'1'2' 0 8'

N

KEY PLAN

CONCOURSE C

3'4' 4'1'2' 0 8'

N

KEY PLAN

CONCOURSE C

1/4" = 1'-0"M100C M105C

JANITOR CLOSET SOUTH CCC_00_2C_020 ENLARGEDDEMOLITION PLUMBING PLAN1

1/4" = 1'-0"M100C M105C

JANITOR CLOSET SOUTH CCC_00_2C_020 ENLARGED NEWPLUMBING PLAN2

4 JANITOR SUMPS ARE 3' DEEP AND CONSIST OF ONE MANHOLE BARREL

3 FOOTER SUMPS ARE 7' DEEP AND CONSIST OF 2 MANHOLE BARRELS.

2 INDUSTRIAL AND SANITARY SUMPS ARE 12' DEEP AND CONSIST OF 3 MANHOLE BARRELS.

1

SUMP NOMENCLATURE:"F" REFERS TO SIMPLEX FOOTER SUMP."I" REFERS TO DUPLEX INDUSTRIAL SUMP."S" REFERS TO DUPLEX SANITARY SUMP."J" REFERS TO SIMPLEX JANITORS SANITARY SUMP.

GENERAL NOTES

6REMOVE (E) SUMP ACCESS LADDER RUNGS AND SUPPORTS. GRIND/REMOVE LADDERSUPPORTS FROM SUMP WALL PRIOR TO SEALING THE SUMPS. THIS SUMP HAS RUNGS.

5DISCONNECT VENT PIPING TO ALLOW REMOVAL OF SUMP COVER. REINSTALL WHEN NEWPUMPS AND VALVING, ETC. ARE COMPLETE.

4

DISCONNECT AND REMOVE EXISTING DISCHARGE PIPING ABOVE SUMP TO POINT INDICATEDAS SHOWN ON DETAIL 2, SHEET M501 AND THE PICTURE ON THIS SHEET TO ALLOW FORNEW VALVES. REMOVE SUMP PUMPS, QUICK DISCONNECT AND PUMP RAILS. EXISTING SUMPCOVER TO ALSO BE REMOVED.

3

DISCONNECT AND REMOVE EXISTING DISCHARGE PIPING ABOVE SUMP TO POINT INDICATEDAS SHOWN ON DETAIL 1, SHEET M501 AND THE PICTURE ON THIS SHEET TO ALLOW FORNEW VALVES. REMOVE SUMP PUMP, QUICK DISCONNECT AND PUMP RAIL. EXISTING SUMPCOVER TO ALSO BE REMOVED.

2ISOLATE ALL EXISTING WASTE OR STORM DRAINAGE ENTERING DUPLEX SUMP OR PROVIDEMEANS TO KEEP SUMP IN OPERATION DURING CONSTRUCTION. RE: DETAIL 2, SHEET M501AND DETAIL 3, SHEET M502

1ISOLATE ALL EXISTING WASTE OR STORM DRAINAGE ENTERING SUMP, OR PROVIDE MEANSTO KEEP SUMP IN OPERATION DURING CONSTRUCTION. RE: DETAIL 1, SHEET M501 ANDDETAIL 3, SHEET M502.

DEMOLITION NOTES

0

NOTE: NOT ALL DEMO NOTES ARE USED ON EACH SHEET

15CONTRACTOR TO INSERT DYE OR OTHER TRACING MATERIAL IN ALL FOOTING ANDINDUSTRIAL SUMPS AND DETERMINE LOCATION OF OUTFLOW OF FOOTING PUMPS.

14 REMOTE STROBE FURNISHED WITH PUMP PACKAGE.

13 SUMP IS FIBERGLASS AND REQUIRES NO RESTORATIVE ACTIONS.

12LOCATION ON NEW DUPLEX SUMP CONTROLLER. CONDUIT AND WIRING TO SUMP ANDREMOTE ALARM. REFER TO PUMP SCHEDULE SHEET M002 FOR CONTROLLER MODELNUMBER AND DETAIL 2, SHEET M502.

11LOCATION ON NEW SUMP PUMP CONTROLLER. CONDUIT AND WIRING TO SUMP AND REMOTEALARM. REFER TO PUMP SCHEDULE SHEET M002 FOR CONTROLLER MODEL NUMBER ANDDETAIL 1, SHEET M502.

10PROVIDE AND INSTALL NEW SUMP ACCESS COVER TO ACCOMMODATE NEW DUPLEX PUMPREQUIREMENTS. RE: PUMP SCHEDULE, SHEET M002 AND DETAIL 2, SHEET M502.

9PROVIDE AND INSTALL NEW SUMP ACCESS COVER TO ACCOMMODATE NEW PUMPREQUIREMENTS. RE: PUMP SHCEDULE, SHEET M002 AND DETAIL1, SHEET 502.

8PROVIDE AND INSTALL NEW DUPLEX SUMP PUMPS. RE: PUMP SCHEDULE, SHEET M002 ANDSUMP DETAIL 2, SHEET M502.

7PROVIDE AND INSTALL NEW SUMP PUMP. RE: PUMP SCHEDULE, SHEET M002 AND SUMPDETAIL 1, SHEET M502.

NEW CONSTRUCTION NOTES NOTE: NOT ALL CONSTRUCTION NOTES ARE USED ON EACH SHEET

NO. BY PURPOSE DATE CKD

1 CEG 100% DESIGN 01/18/19 PDS

2 CEG IFC 4/18/19 PDS

4 CEG Addendum #1 09/18/19 PDS

4

Page 7: Volume No. 01 Addendum #1 - Denver International …business.flydenver.com/bizpdf/DIAID_2433.pdfCONTACT: BRENDA GLAVIN EMAIL: bglavin@pkelectrical.com name@zzz.com CODE INFORMATION

AN

N

1 3

5

E1

N8

EW

3

5

E1

N8

EW

(E) 3" INLET

(E) 2" DISCHARGE

JANITORCLOSET

CCC_00_3C_008

AGTS STATION

CCC_00_2C_021

97

E1

N8

EW E1

N8

EW

(E) 3" INLET

(E) 2" DISCHARGE

CCC_00_3C_SP_N_01

J 11

JANITOR CLOSET

CCC_00_3C_008

STAIR #05

CCC_00_3C_ST05

AGTS STATION

CCC_00_3C_021

14

PHOTO OF CCC_00_2C_SP_S_01. PUMP THIS LOCATION IS SIMILAR TO THIS PHOTO.

LASE

EVN

ED

FO

R

D

NA

YT IC

YTOC NU

CITY & COUNTYof DENVER

DENVERINTERNATIONAL

AIRPORT

BIM FILE NAME:

SHEET NO.

SHEET TITLE

VOLUME NO.

DESIGN CONTRACT NO.

WORK BREAKDOWN NO.

FAA AIP NO:

CHECKED BY:

DRAWN BY:

DATE:

ISSUE RECORD

CONST. CONTRACT NO.

SCALE:

DESIGNER OF RECORD

PDS

201732415-04 / P0-00046097

TBD

As indicated

DE

NV

ER

IN

TE

RN

AT

ION

AL A

IRP

OR

TC

ON

CO

UR

SE

C S

EW

ER

RE

PA

IRS

09/18/2019

JRS

01

CONCOURSE CSUMP PITS

M106C

9100 PENA BLVDDENVER, CO 80249

3'4' 4'1'2' 0 8'

N

KEY PLAN

CONCOURSE C

1/4" = 1'-0"M106C

JANITOR CLOSET NORTH CCC_00_3C_008 ENLARGEDDEMOLITION PLUMBING PLAN1

1/4" = 1'-0"M106C

JANITOR CLOSET NORTH CCC_00_3C_008 ENLARGED NEWPLUMBING PLAN2

3'4' 4'1'2' 0 8'

N

KEY PLAN

CONCOURSE C

4 JANITOR SUMPS ARE 3' DEEP AND CONSIST OF ONE MANHOLE BARREL

3 FOOTER SUMPS ARE 7' DEEP AND CONSIST OF 2 MANHOLE BARRELS.

2 INDUSTRIAL AND SANITARY SUMPS ARE 12' DEEP AND CONSIST OF 3 MANHOLE BARRELS.

1

SUMP NOMENCLATURE:"F" REFERS TO SIMPLEX FOOTER SUMP."I" REFERS TO DUPLEX INDUSTRIAL SUMP."S" REFERS TO DUPLEX SANITARY SUMP."J" REFERS TO SIMPLEX JANITORS SANITARY SUMP.

GENERAL NOTES

6REMOVE (E) SUMP ACCESS LADDER RUNGS AND SUPPORTS. GRIND/REMOVE LADDERSUPPORTS FROM SUMP WALL PRIOR TO SEALING THE SUMPS. THIS SUMP HAS RUNGS.

5DISCONNECT VENT PIPING TO ALLOW REMOVAL OF SUMP COVER. REINSTALL WHEN NEWPUMPS AND VALVING, ETC. ARE COMPLETE.

4

DISCONNECT AND REMOVE EXISTING DISCHARGE PIPING ABOVE SUMP TO POINT INDICATEDAS SHOWN ON DETAIL 2, SHEET M501 AND THE PICTURE ON THIS SHEET TO ALLOW FORNEW VALVES. REMOVE SUMP PUMPS, QUICK DISCONNECT AND PUMP RAILS. EXISTING SUMPCOVER TO ALSO BE REMOVED.

3

DISCONNECT AND REMOVE EXISTING DISCHARGE PIPING ABOVE SUMP TO POINT INDICATEDAS SHOWN ON DETAIL 1, SHEET M501 AND THE PICTURE ON THIS SHEET TO ALLOW FORNEW VALVES. REMOVE SUMP PUMP, QUICK DISCONNECT AND PUMP RAIL. EXISTING SUMPCOVER TO ALSO BE REMOVED.

2ISOLATE ALL EXISTING WASTE OR STORM DRAINAGE ENTERING DUPLEX SUMP OR PROVIDEMEANS TO KEEP SUMP IN OPERATION DURING CONSTRUCTION. RE: DETAIL 2, SHEET M501AND DETAIL 3, SHEET M502

1ISOLATE ALL EXISTING WASTE OR STORM DRAINAGE ENTERING SUMP, OR PROVIDE MEANSTO KEEP SUMP IN OPERATION DURING CONSTRUCTION. RE: DETAIL 1, SHEET M501 ANDDETAIL 3, SHEET M502.

DEMOLITION NOTES

0

NOTE: NOT ALL DEMO NOTES ARE USED ON EACH SHEET

15CONTRACTOR TO INSERT DYE OR OTHER TRACING MATERIAL IN ALL FOOTING ANDINDUSTRIAL SUMPS AND DETERMINE LOCATION OF OUTFLOW OF FOOTING PUMPS.

14 REMOTE STROBE FURNISHED WITH PUMP PACKAGE.

13 SUMP IS FIBERGLASS AND REQUIRES NO RESTORATIVE ACTIONS.

12LOCATION ON NEW DUPLEX SUMP CONTROLLER. CONDUIT AND WIRING TO SUMP ANDREMOTE ALARM. REFER TO PUMP SCHEDULE SHEET M002 FOR CONTROLLER MODELNUMBER AND DETAIL 2, SHEET M502.

11LOCATION ON NEW SUMP PUMP CONTROLLER. CONDUIT AND WIRING TO SUMP AND REMOTEALARM. REFER TO PUMP SCHEDULE SHEET M002 FOR CONTROLLER MODEL NUMBER ANDDETAIL 1, SHEET M502.

10PROVIDE AND INSTALL NEW SUMP ACCESS COVER TO ACCOMMODATE NEW DUPLEX PUMPREQUIREMENTS. RE: PUMP SCHEDULE, SHEET M002 AND DETAIL 2, SHEET M502.

9PROVIDE AND INSTALL NEW SUMP ACCESS COVER TO ACCOMMODATE NEW PUMPREQUIREMENTS. RE: PUMP SHCEDULE, SHEET M002 AND DETAIL1, SHEET 502.

8PROVIDE AND INSTALL NEW DUPLEX SUMP PUMPS. RE: PUMP SCHEDULE, SHEET M002 ANDSUMP DETAIL 2, SHEET M502.

7PROVIDE AND INSTALL NEW SUMP PUMP. RE: PUMP SCHEDULE, SHEET M002 AND SUMPDETAIL 1, SHEET M502.

NEW CONSTRUCTION NOTES NOTE: NOT ALL CONSTRUCTION NOTES ARE USED ON EACH SHEET

NO. BY PURPOSE DATE CKD

1 CEG 100% DESIGN 01/18/19 PDS

2 CEG IFC 4/18/19 PDS

4 CEG Addendum #1 09/18/19 PDS

4

Page 8: Volume No. 01 Addendum #1 - Denver International …business.flydenver.com/bizpdf/DIAID_2433.pdfCONTACT: BRENDA GLAVIN EMAIL: bglavin@pkelectrical.com name@zzz.com CODE INFORMATION

AN

N

2 4

4

5

5

E6

N5

N6

N5

N6

E5.9 E6

(E) 4" INLET

(E) 2" VENT

MECH ROOM

CCC_00_3C_020

8 10

E6

E6

N5

N6

N5

N6

E5.9 E6

(E) 4" INLET

(E) 2" VENT

CCC_00_3C_SP_N_02

S

12

MECH ROOM

CCC_00_3C_020

STAIR #14

CCC_00_3C_ST14

14

(E) 2" ST OUTLET

SANITARY SUMP ASSEMBLY - CCC_00_3C_SP_N_01

LASE

EVN

ED

FO

R

D

NA

YT IC

YTOC NU

CITY & COUNTYof DENVER

DENVERINTERNATIONAL

AIRPORT

BIM FILE NAME:

SHEET NO.

SHEET TITLE

VOLUME NO.

DESIGN CONTRACT NO.

WORK BREAKDOWN NO.

FAA AIP NO:

CHECKED BY:

DRAWN BY:

DATE:

ISSUE RECORD

CONST. CONTRACT NO.

SCALE:

DESIGNER OF RECORD

PDS

201732415-04 / P0-00046097

TBD

As indicated

DE

NV

ER

IN

TE

RN

AT

ION

AL A

IRP

OR

TC

ON

CO

UR

SE

C S

EW

ER

RE

PA

IRS

09/18/2019

JRS

01

CONCOURSE CSUMP PITS

M107C

9100 PENA BLVDDENVER, CO 80249

3'4' 4'1'2' 0 8'

N

KEY PLAN

CONCOURSE C

3'4' 4'1'2' 0 8'

N

KEY PLAN

CONCOURSE C

1/4" = 1'-0"M100C M107C

MECHANICAL ROOM CCC_00_3C_020 ENLARGEDDEMOLITION PLUMBING PLAN1

1/4" = 1'-0"M100C M107C

MECHANICAL ROOM CCC_00_3C_020 ENLARGED NEWPLUMBING PLAN2

4 JANITOR SUMPS ARE 3' DEEP AND CONSIST OF ONE MANHOLE BARREL

3 FOOTER SUMPS ARE 7' DEEP AND CONSIST OF 2 MANHOLE BARRELS.

2 INDUSTRIAL AND SANITARY SUMPS ARE 12' DEEP AND CONSIST OF 3 MANHOLE BARRELS.

1

SUMP NOMENCLATURE:"F" REFERS TO SIMPLEX FOOTER SUMP."I" REFERS TO DUPLEX INDUSTRIAL SUMP."S" REFERS TO DUPLEX SANITARY SUMP."J" REFERS TO SIMPLEX JANITORS SANITARY SUMP.

GENERAL NOTES

6REMOVE (E) SUMP ACCESS LADDER RUNGS AND SUPPORTS. GRIND/REMOVE LADDERSUPPORTS FROM SUMP WALL PRIOR TO SEALING THE SUMPS. THIS SUMP HAS RUNGS.

5DISCONNECT VENT PIPING TO ALLOW REMOVAL OF SUMP COVER. REINSTALL WHEN NEWPUMPS AND VALVING, ETC. ARE COMPLETE.

4

DISCONNECT AND REMOVE EXISTING DISCHARGE PIPING ABOVE SUMP TO POINT INDICATEDAS SHOWN ON DETAIL 2, SHEET M501 AND THE PICTURE ON THIS SHEET TO ALLOW FORNEW VALVES. REMOVE SUMP PUMPS, QUICK DISCONNECT AND PUMP RAILS. EXISTING SUMPCOVER TO ALSO BE REMOVED.

3

DISCONNECT AND REMOVE EXISTING DISCHARGE PIPING ABOVE SUMP TO POINT INDICATEDAS SHOWN ON DETAIL 1, SHEET M501 AND THE PICTURE ON THIS SHEET TO ALLOW FORNEW VALVES. REMOVE SUMP PUMP, QUICK DISCONNECT AND PUMP RAIL. EXISTING SUMPCOVER TO ALSO BE REMOVED.

2ISOLATE ALL EXISTING WASTE OR STORM DRAINAGE ENTERING DUPLEX SUMP OR PROVIDEMEANS TO KEEP SUMP IN OPERATION DURING CONSTRUCTION. RE: DETAIL 2, SHEET M501AND DETAIL 3, SHEET M502

1ISOLATE ALL EXISTING WASTE OR STORM DRAINAGE ENTERING SUMP, OR PROVIDE MEANSTO KEEP SUMP IN OPERATION DURING CONSTRUCTION. RE: DETAIL 1, SHEET M501 ANDDETAIL 3, SHEET M502.

DEMOLITION NOTES

0

NOTE: NOT ALL DEMO NOTES ARE USED ON EACH SHEET

15CONTRACTOR TO INSERT DYE OR OTHER TRACING MATERIAL IN ALL FOOTING ANDINDUSTRIAL SUMPS AND DETERMINE LOCATION OF OUTFLOW OF FOOTING PUMPS.

14 REMOTE STROBE FURNISHED WITH PUMP PACKAGE.

13 SUMP IS FIBERGLASS AND REQUIRES NO RESTORATIVE ACTIONS.

12LOCATION ON NEW DUPLEX SUMP CONTROLLER. CONDUIT AND WIRING TO SUMP ANDREMOTE ALARM. REFER TO PUMP SCHEDULE SHEET M002 FOR CONTROLLER MODELNUMBER AND DETAIL 2, SHEET M502.

11LOCATION ON NEW SUMP PUMP CONTROLLER. CONDUIT AND WIRING TO SUMP AND REMOTEALARM. REFER TO PUMP SCHEDULE SHEET M002 FOR CONTROLLER MODEL NUMBER ANDDETAIL 1, SHEET M502.

10PROVIDE AND INSTALL NEW SUMP ACCESS COVER TO ACCOMMODATE NEW DUPLEX PUMPREQUIREMENTS. RE: PUMP SCHEDULE, SHEET M002 AND DETAIL 2, SHEET M502.

9PROVIDE AND INSTALL NEW SUMP ACCESS COVER TO ACCOMMODATE NEW PUMPREQUIREMENTS. RE: PUMP SHCEDULE, SHEET M002 AND DETAIL1, SHEET 502.

8PROVIDE AND INSTALL NEW DUPLEX SUMP PUMPS. RE: PUMP SCHEDULE, SHEET M002 ANDSUMP DETAIL 2, SHEET M502.

7PROVIDE AND INSTALL NEW SUMP PUMP. RE: PUMP SCHEDULE, SHEET M002 AND SUMPDETAIL 1, SHEET M502.

NEW CONSTRUCTION NOTES NOTE: NOT ALL CONSTRUCTION NOTES ARE USED ON EACH SHEET

NO. BY PURPOSE DATE CKD

1 CEG 100% DESIGN 01/18/19 PDS

2 CEG IFC 4/18/19 PDS

4 CEG Addendum #1 09/18/19 PDS

4

Page 9: Volume No. 01 Addendum #1 - Denver International …business.flydenver.com/bizpdf/DIAID_2433.pdfCONTACT: BRENDA GLAVIN EMAIL: bglavin@pkelectrical.com name@zzz.com CODE INFORMATION

AN

NA

NN

1 3

2 4

4

5

3

5

5

5

E19

S2

S3

S4

S5

6

S2

S2.1

S3

S4

S5

S5.1

E18.1 E18.6 E19

(E) 4"

(E) 4"

(E) 4" INLET

(E) 2" DISCHARGE

(E) 2" DISCHARGE

(E) 6"

(E) 4" PERF. PVC INLET

(E) 4" PERF. PVC INLET

CONCRETE OVERCOVER

MECHANICAL

CCC_00_3E_004

ELEV HOLDROOM

CCC_00_3E_006

7

8 10

9

E19

S2

S3

S4

S5

S2

S2.1

S3

S4

S5

S5.1

E18.1 E18.6 E19

(E) 4"

(E) 4"

(E) 4" INLET

(E) 2" DISCHARGE

(E) 2" DISCHARGE

(E) 6"

(E) 4" PERF. PVC INLET

(E) 4" PERF. PVC INLET

CONCRETE OVERCOVER

12 11

CCC_00_3E_SP_S_01

S

CCC_00_3E_SP_S_02

F

MECHANICAL

CCC_00_3E_004

ELEVATOR MACHINEROOM CE-06

CCC_00_3E_002

ELEVATOR CE-06

CCC_00_3E_EL06

ELEV HOLD ROOM

CCC_00_3E_006

STAIR #26

CCC_00_3E_ST26

FIRE VALVE

CCC_00_3E_008

BASEMENT

CCC_00_4E_002

14

15

FOOTER SUMP ASSEMBLY - CCC_00_3E_SP_S_02 SANITARY SUMP ASSEMBLY - CCC_00_3E_SP_S_01

LASE

EVN

ED

FO

R

D

NA

YT IC

YTOC NU

CITY & COUNTYof DENVER

DENVERINTERNATIONAL

AIRPORT

BIM FILE NAME:

SHEET NO.

SHEET TITLE

VOLUME NO.

DESIGN CONTRACT NO.

WORK BREAKDOWN NO.

FAA AIP NO:

CHECKED BY:

DRAWN BY:

DATE:

ISSUE RECORD

CONST. CONTRACT NO.

SCALE:

DESIGNER OF RECORD

PDS

201732415-04 / P0-00046097

TBD

As indicated

DE

NV

ER

IN

TE

RN

AT

ION

AL A

IRP

OR

TC

ON

CO

UR

SE

C S

EW

ER

RE

PA

IRS

09/18/2019

JRS

01

CONCOURSE CSUMP PITS

M108C

9100 PENA BLVDDENVER, CO 80249

1/4" = 1'-0"M108C

MECHANICAL ROOM CCC_00_3E_004 ENLARGEDDEMOLITION PLUMBING PLAN1

1/4" = 1'-0"M108C

MECHANICAL ROOM CCC_00_3E_004 ENLARGED NEWPLUMBING PLAN2

3'4' 4'1'2' 0 8'

N

KEY PLAN

CONCOURSE C

3'4' 4'1'2' 0 8'

N

KEY PLAN

CONCOURSE C

4 JANITOR SUMPS ARE 3' DEEP AND CONSIST OF ONE MANHOLE BARREL

3 FOOTER SUMPS ARE 7' DEEP AND CONSIST OF 2 MANHOLE BARRELS.

2 INDUSTRIAL AND SANITARY SUMPS ARE 12' DEEP AND CONSIST OF 3 MANHOLE BARRELS.

1

SUMP NOMENCLATURE:"F" REFERS TO SIMPLEX FOOTER SUMP."I" REFERS TO DUPLEX INDUSTRIAL SUMP."S" REFERS TO DUPLEX SANITARY SUMP."J" REFERS TO SIMPLEX JANITORS SANITARY SUMP.

GENERAL NOTES

6REMOVE (E) SUMP ACCESS LADDER RUNGS AND SUPPORTS. GRIND/REMOVE LADDERSUPPORTS FROM SUMP WALL PRIOR TO SEALING THE SUMPS. THIS SUMP HAS RUNGS.

5DISCONNECT VENT PIPING TO ALLOW REMOVAL OF SUMP COVER. REINSTALL WHEN NEWPUMPS AND VALVING, ETC. ARE COMPLETE.

4

DISCONNECT AND REMOVE EXISTING DISCHARGE PIPING ABOVE SUMP TO POINT INDICATEDAS SHOWN ON DETAIL 2, SHEET M501 AND THE PICTURE ON THIS SHEET TO ALLOW FORNEW VALVES. REMOVE SUMP PUMPS, QUICK DISCONNECT AND PUMP RAILS. EXISTING SUMPCOVER TO ALSO BE REMOVED.

3

DISCONNECT AND REMOVE EXISTING DISCHARGE PIPING ABOVE SUMP TO POINT INDICATEDAS SHOWN ON DETAIL 1, SHEET M501 AND THE PICTURE ON THIS SHEET TO ALLOW FORNEW VALVES. REMOVE SUMP PUMP, QUICK DISCONNECT AND PUMP RAIL. EXISTING SUMPCOVER TO ALSO BE REMOVED.

2ISOLATE ALL EXISTING WASTE OR STORM DRAINAGE ENTERING DUPLEX SUMP OR PROVIDEMEANS TO KEEP SUMP IN OPERATION DURING CONSTRUCTION. RE: DETAIL 2, SHEET M501AND DETAIL 3, SHEET M502

1ISOLATE ALL EXISTING WASTE OR STORM DRAINAGE ENTERING SUMP, OR PROVIDE MEANSTO KEEP SUMP IN OPERATION DURING CONSTRUCTION. RE: DETAIL 1, SHEET M501 ANDDETAIL 3, SHEET M502.

DEMOLITION NOTES

5

NOTE: NOT ALL DEMO NOTES ARE USED ON EACH SHEET

15CONTRACTOR TO INSERT DYE OR OTHER TRACING MATERIAL IN ALL FOOTING ANDINDUSTRIAL SUMPS AND DETERMINE LOCATION OF OUTFLOW OF FOOTING PUMPS.

14 REMOTE STROBE FURNISHED WITH PUMP PACKAGE.

13 SUMP IS FIBERGLASS AND REQUIRES NO RESTORATIVE ACTIONS.

12LOCATION ON NEW DUPLEX SUMP CONTROLLER. CONDUIT AND WIRING TO SUMP ANDREMOTE ALARM. REFER TO PUMP SCHEDULE SHEET M002 FOR CONTROLLER MODELNUMBER AND DETAIL 2, SHEET M502.

11LOCATION ON NEW SUMP PUMP CONTROLLER. CONDUIT AND WIRING TO SUMP AND REMOTEALARM. REFER TO PUMP SCHEDULE SHEET M002 FOR CONTROLLER MODEL NUMBER ANDDETAIL 1, SHEET M502.

10PROVIDE AND INSTALL NEW SUMP ACCESS COVER TO ACCOMMODATE NEW DUPLEX PUMPREQUIREMENTS. RE: PUMP SCHEDULE, SHEET M002 AND DETAIL 2, SHEET M502.

9PROVIDE AND INSTALL NEW SUMP ACCESS COVER TO ACCOMMODATE NEW PUMPREQUIREMENTS. RE: PUMP SHCEDULE, SHEET M002 AND DETAIL1, SHEET 502.

8PROVIDE AND INSTALL NEW DUPLEX SUMP PUMPS. RE: PUMP SCHEDULE, SHEET M002 ANDSUMP DETAIL 2, SHEET M502.

7PROVIDE AND INSTALL NEW SUMP PUMP. RE: PUMP SCHEDULE, SHEET M002 AND SUMPDETAIL 1, SHEET M502.

NEW CONSTRUCTION NOTES NOTE: NOT ALL CONSTRUCTION NOTES ARE USED ON EACH SHEET

NO. BY PURPOSE DATE CKD

1 CEG 100% DESIGN 01/18/19 PDS

2 CEG IFC 4/18/19 PDS

4 CEG Addendum #1 09/18/19 PDS

4

Page 10: Volume No. 01 Addendum #1 - Denver International …business.flydenver.com/bizpdf/DIAID_2433.pdfCONTACT: BRENDA GLAVIN EMAIL: bglavin@pkelectrical.com name@zzz.com CODE INFORMATION

AN

NA

NN

1 3

24

3

5

4

5

5

5

E21 E22

N2

N3

N4

N5

6

N4

N3

N5

N2.1

N2

E21 E21.4 E22

(E) 4" PERF. PVC INLET

(E) 2" DISCHARGE(E) 2" DISCHARGE

(E) 4" PERF. PVC INLET

3"PVC INLET

(E) 4" INLET

(E) 4" (E) 4"

MECHANICAL

CCC_00_3E_012

BASEMENT

CCC_00_4E_002

(E) 4" PERF. PVC INLET

9

8

7

10

E21 E22

N2

N3

N4

N5

N4

N3

N5

N2.1

N2

E21 E21.4 E22

(E) 4" PERF. PVC INLET

(E) 2" DISCHARGE(E) 2" DISCHARGE

(E) 4" PERF. PVC INLET

3"PVC INLET

(E) 4" INLET

(E) 4" (E) 4"

CCC_00_3E_SP_N_02

F S

CCC_00_3E_SP_N_01

MECHANICAL

CCC_00_3E_012

STAIR #27

CCC_00_3E_ST27

BASEMENT

CCC_00_4E_002

11 12

14

15

FOOTER SUMP ASSEMBLY - CCC_00_3E_SP_N_01 SANITARY SUMP ASSEMBLY - CCC_00_3E_SP_N_02

LASE

EVN

ED

FO

R

D

NA

YT IC

YTOC NU

CITY & COUNTYof DENVER

DENVERINTERNATIONAL

AIRPORT

BIM FILE NAME:

SHEET NO.

SHEET TITLE

VOLUME NO.

DESIGN CONTRACT NO.

WORK BREAKDOWN NO.

FAA AIP NO:

CHECKED BY:

DRAWN BY:

DATE:

ISSUE RECORD

CONST. CONTRACT NO.

SCALE:

DESIGNER OF RECORD

PDS

201732415-04 / P0-00046097

TBD

As indicated

DE

NV

ER

IN

TE

RN

AT

ION

AL A

IRP

OR

TC

ON

CO

UR

SE

C S

EW

ER

RE

PA

IRS

09/18/2019

JRS

01

CONCOURSE CSUMP PITS

M109C

9100 PENA BLVDDENVER, CO 80249

3'4' 4'1'2' 0 8'

N

KEY PLAN

CONCOURSE C

3'4' 4'1'2' 0 8'

N

KEY PLAN

CONCOURSE C

1/4" = 1'-0"M100C M109C

MECHANICAL ROOM CCC_00_3E_012 ENLARGEDDEMOLITION PLUMBING PLAN1

1/4" = 1'-0"M100C M109C

MECHANICAL ROOM CCC_00_3E_012 ENLARGED NEWPLUMBING PLAN2

4 JANITOR SUMPS ARE 3' DEEP AND CONSIST OF ONE MANHOLE BARREL

3 FOOTER SUMPS ARE 7' DEEP AND CONSIST OF 2 MANHOLE BARRELS.

2 INDUSTRIAL AND SANITARY SUMPS ARE 12' DEEP AND CONSIST OF 3 MANHOLE BARRELS.

1

SUMP NOMENCLATURE:"F" REFERS TO SIMPLEX FOOTER SUMP."I" REFERS TO DUPLEX INDUSTRIAL SUMP."S" REFERS TO DUPLEX SANITARY SUMP."J" REFERS TO SIMPLEX JANITORS SANITARY SUMP.

GENERAL NOTES

6REMOVE (E) SUMP ACCESS LADDER RUNGS AND SUPPORTS. GRIND/REMOVE LADDERSUPPORTS FROM SUMP WALL PRIOR TO SEALING THE SUMPS. THIS SUMP HAS RUNGS.

5DISCONNECT VENT PIPING TO ALLOW REMOVAL OF SUMP COVER. REINSTALL WHEN NEWPUMPS AND VALVING, ETC. ARE COMPLETE.

4

DISCONNECT AND REMOVE EXISTING DISCHARGE PIPING ABOVE SUMP TO POINT INDICATEDAS SHOWN ON DETAIL 2, SHEET M501 AND THE PICTURE ON THIS SHEET TO ALLOW FORNEW VALVES. REMOVE SUMP PUMPS, QUICK DISCONNECT AND PUMP RAILS. EXISTING SUMPCOVER TO ALSO BE REMOVED.

3

DISCONNECT AND REMOVE EXISTING DISCHARGE PIPING ABOVE SUMP TO POINT INDICATEDAS SHOWN ON DETAIL 1, SHEET M501 AND THE PICTURE ON THIS SHEET TO ALLOW FORNEW VALVES. REMOVE SUMP PUMP, QUICK DISCONNECT AND PUMP RAIL. EXISTING SUMPCOVER TO ALSO BE REMOVED.

2ISOLATE ALL EXISTING WASTE OR STORM DRAINAGE ENTERING DUPLEX SUMP OR PROVIDEMEANS TO KEEP SUMP IN OPERATION DURING CONSTRUCTION. RE: DETAIL 2, SHEET M501AND DETAIL 3, SHEET M502

1ISOLATE ALL EXISTING WASTE OR STORM DRAINAGE ENTERING SUMP, OR PROVIDE MEANSTO KEEP SUMP IN OPERATION DURING CONSTRUCTION. RE: DETAIL 1, SHEET M501 ANDDETAIL 3, SHEET M502.

DEMOLITION NOTES

5

NOTE: NOT ALL DEMO NOTES ARE USED ON EACH SHEET

15CONTRACTOR TO INSERT DYE OR OTHER TRACING MATERIAL IN ALL FOOTING ANDINDUSTRIAL SUMPS AND DETERMINE LOCATION OF OUTFLOW OF FOOTING PUMPS.

14 REMOTE STROBE FURNISHED WITH PUMP PACKAGE.

13 SUMP IS FIBERGLASS AND REQUIRES NO RESTORATIVE ACTIONS.

12LOCATION ON NEW DUPLEX SUMP CONTROLLER. CONDUIT AND WIRING TO SUMP ANDREMOTE ALARM. REFER TO PUMP SCHEDULE SHEET M002 FOR CONTROLLER MODELNUMBER AND DETAIL 2, SHEET M502.

11LOCATION ON NEW SUMP PUMP CONTROLLER. CONDUIT AND WIRING TO SUMP AND REMOTEALARM. REFER TO PUMP SCHEDULE SHEET M002 FOR CONTROLLER MODEL NUMBER ANDDETAIL 1, SHEET M502.

10PROVIDE AND INSTALL NEW SUMP ACCESS COVER TO ACCOMMODATE NEW DUPLEX PUMPREQUIREMENTS. RE: PUMP SCHEDULE, SHEET M002 AND DETAIL 2, SHEET M502.

9PROVIDE AND INSTALL NEW SUMP ACCESS COVER TO ACCOMMODATE NEW PUMPREQUIREMENTS. RE: PUMP SHCEDULE, SHEET M002 AND DETAIL1, SHEET 502.

8PROVIDE AND INSTALL NEW DUPLEX SUMP PUMPS. RE: PUMP SCHEDULE, SHEET M002 ANDSUMP DETAIL 2, SHEET M502.

7PROVIDE AND INSTALL NEW SUMP PUMP. RE: PUMP SCHEDULE, SHEET M002 AND SUMPDETAIL 1, SHEET M502.

NEW CONSTRUCTION NOTES NOTE: NOT ALL CONSTRUCTION NOTES ARE USED ON EACH SHEET

NO. BY PURPOSE DATE CKD

1 CEG 100% DESIGN 01/18/19 PDS

2 CEG IFC 4/18/19 PDS

4 CEG Addendum #1 09/18/19 PDS

4

Page 11: Volume No. 01 Addendum #1 - Denver International …business.flydenver.com/bizpdf/DIAID_2433.pdfCONTACT: BRENDA GLAVIN EMAIL: bglavin@pkelectrical.com name@zzz.com CODE INFORMATION

(N) SUBMERSIBLE SUMP PUMP

2"

(N) GATE VALVE

(N) 2" DISCHARGE TO STORM SEWER WASTE LINE. RE: PLANS

(N) REMOTE VISUAL ALARM MOUNTED OUTSIDE MECHANICAL ROOM ON WALL WITH PLACARD. (SEE ELECTRICAL PLANS FOR EXACT LOCATION)

(N) 20"X20" PLASTIC PLACARD ON WALL OUTSIDE OF MECHANICAL ROOM. LOCATE ADJACENT TO VISUAL ALARM. PLACARD SHALL READ, "IF HORN OR STROBE ARE ACTIVATED, PLEASE IMMEDIATELY CALL MAINTENANCE CONTROL AT 303-342-2800" PLACARD TO HAVE WHITE BACKGROUND AND RED LETTERING.

(N) CONTROL PANEL MOUNTED ON WALL IN MECH. ROOM WITH AUDIBLE / VISUAL ALARM. (SEE ELECTRICAL PLANS FOR EXACT LOCATION)

(N) CONTROL PANEL WIRING CONDUITPROVIDED BY ELECTRICAL CONTRACTOR

CONNECT NEW TO EXISTING

FINISHED FLOOR

(N) GUIDE RAIL

OFF/STOP

START

HIGH WATER ALARM LEVEL

(E) 4" C.I. INLET FROM STORM AND PERIMETER DRAINS

CAULK PIPE PENETRATION WATERTIGHT ALL AROUND (TYPICAL) USE DAP CONCRETE ACRYLIC

LATEX SILICONE SEALANT OR APPROVED EQUAL. INSTALL PRIOR TO LINING SYSTEM INSTALLATION REFER TO SPECIFICATION 33 01

30

(N) SUMP PIT COVER ANDINSPECTION ACCESS OPENING

(N) CHECK VALVE SWING CHECK.

(N) LIFTING CHAIN ANCHOR INTO SUMP.

(E) SUMP PIT

(N) LEVEL CONTROL MOUNTING RAIL

CONNECT NEW TO EXISTING

(N) PIPE GROMMET(N) PIPE GROMMET

(N) LIFTING CHAIN OR CABLE

(N) WEIGHTED FLOATS TO BE MOUNTED AT DIFFERENTANGLES AROUND THE PEDESTAL TO PREVENT

BECOMING TANGLED (TYPICAL)

PROVIDE 3/16" AIR HOLE IN RISER PIPE

CONTRACTOR TO COORDINATE THIS DIMENSION WITHPUMP IN FIELD. PUMP INLET SHOULD BE LOWER THAN

THE OFF FLOAT . CONTRACTOR TO ENSURE PUMPSUCTION STAYS FLOODED .

(N) MONOLITHIC PATCHING SYSTEM, (N) LINING-SEALING SYSTEM RE: SPECIFICATION SECTION 33 01 30.

3 1/4" TYP

3 11/16" Ø DISCHARGE FLANGE

6 1/4" Ø

(4) 3/8"-16 x 1 LG WELDSTUDS ON

7 1/4" DIA B C

WELDSTUDS ON 7 1/4" DIA B C

(2) 13/16" THRU HOLES

(6) 11/16" SLOTS ON 38 1/2" DIA B C

4∅ VENT PIPE FLANGE(2) 5/8"-11 x 2 1/4" LG

WELDSTUDS

(4) 11/16" MOUNTING SLOTS ON 38 1/2" DIA B C

40"∅

HINGE SIDE

INSPECTION ACCESS OPENINGOPENING TO BE DIRECTLYOVER FLOATS AND PUMPS

MOTOR CABLE PLATE

WET SUMP COVER FOR 36" Ø SUMPS

SANITARY TEE WITH CAP

(N) PROVIDE THREADED SCHEDULE 40 CPVC FROM DISCHARGE OF PUMP TO INLET OF CHECK VALVE. PIPING DOWNSTREAM OF SHUT OFF VALVE TO BE GALVANIZED STEEL OR COPPER PIPING. VALVING TO ALSO BE METALLIC NO PLASTIC VALES.

TY

P

60°

15"

10" 5"

11"

14"

22"

14"

TY

P45°

(N) 3" VENT

NOTE: 1. ALL SEWAGE, FOOTER AND INDUSTRIAL SEWAGE

EJECTOR PITS AND SYSTEMS MUST REMAIN OPERATIONAL DURING REPLACEMENT. RE DETAIL 3 FOR RECOMMENDED TEMPORARY SOLUTION. AT CONTRACTORS OPTION, PROVIDE DEN AND EOR WITH AN EQUAL OR BETTER SOLUTION FOR REVIEW.

2. PUMP INFRASTRUCTURE INCLUDING GUIDE RAILS, LIFTING CHAIN AND TOP RAILS SHALL BE COMPATIBLE AND PROVIDED BY THE SAME MANUFACTURER AS THE PUMP.

3. SET FLOAT LEVEL CONTROL 2" BELOW INVERT OF LOWEST GRAVITY DRAIN INLET PER CODE 712.3.4 REGARDING MAXIMUM EFFLUENT LEVEL.

4. SET ALL FLOAT LEVELS AT SAME HEIGHT AS EXISTING FLOAT LEVELS. DOCUMENT FLOAT LEVELS DURING DEMOLITION PHASE

SIMPLEX ALTERNATING CONTROL PANEL 8197

ALARM PANEL 8301

JANITORS CLOSET SUMP PUMP DETAIL (3'-0" DEEP)

(N) TOP RAIL SUPPORT MOUNTED TO SIDEWALL OF SUMP GROUT ANY HOLES LEFT FROM EXISTING RAIL SUPPORT ANCHOR BOLTS. ALL NEW ANCHORS SHALL BE TYPE 316 STAINLESS STEEL 1/16" ø SMALLER THAN NEW RAIL SUPPORT BOLT HOLES. EMBED 2" MIN. USE HILTI HIT-RE-500-SD EPOXY OR EQUAL.

UNION

SIMPLEX PANEL H8197

POINT LIST

INPUTS

OVERLOAD 1STOP FLTLEAD FLT

HIGH WATER FLTPRESSURE TRANSDUCERCURRENT TRANSDUCER

GROUND0 VDC

+ 24 VDC

OUTPUTS

M1 CONTACTORDOME LIGHT/HORNPROCESSOR RUN

+24 VDCHIGH WATER (CUSTOMER USE)

GEN ALARM CUSTOMER USECUSTOMER SUPPLIED POWER

4

(E) SUMP PIT

(E) 4" C.I. INLET FROM SANITARY WASTE LINE

CONNECT TEMPORARY HOSE FROM SUBMERSIBLE PUMP/BYPASS PUMP ASSEMBLY TO EXISTING REMAINING DISCHARGE LINE

PROVIDE TEMPORARY CONTAINMENTVESSEL THAT CAN BE REMOVED AFTER BYPASS

PUMP IS IN PLACE AND OPERATIONAL.

PROVIDE TEMPORARY 120 VOLT SUBMERSIBLE EJECTOR PUMP ANDDISCHARGE HOSE THAT CAN BE REMOVED AFTER BYPASS PUMP IS IN PLACE AND OPERATIONAL.

NOTE: 1. ALL SEWAGE, STORM AND INDUSTRIAL SEWAGE

EJECTOR PITS AND SYSTEMS MUST REMAIN OPERATIONAL DURING REPLACEMENT. RE DETAIL 3 FOR RECOMMENDED TEMPORARY SOLUTION. AT CONTRACTORS OPTION, PROVIDE DEN AND EOR WITH AN EQUAL OR BETTER SOLUTION FOR REVIEW.

2. PUMP INFRASTRUCTURE INCLUDING GUIDE RAILS, LIFTING CHAIN AND TOP RAILS SHALL BE COMPATIBLE AND PROVIDED BY THE SAME MANUFACTURER AS THE PUMP.

3. SET FLOAT LEVEL CONTROL 2" BELOW INVERT OF LOWEST GRAVITY DRAIN INLET PER CODE 712.3.4 REGARDING MAXIMUM EFFLUENT LEVEL.

DISCHARGE HOSE

SUCTION HOSE

CONTRACTOR PROVIDED BYPASS PUMP ASSEMBLY. COORDINATE TEMPORARY ELECTRICAL HOOKUP TO (E) ELECTRICAL PANELS.

SUCTION HOSE WITH FLEXIBLE/PLIABLE BUSHING TO BE

INSERTED INTO (E) C.I. PIPING.

REMOVE A PORTION OF THE INLET PIPING TO ALLOW FOR A TEMPORARY DISCHARGE HOSE TO BE ATTACHED DURING SETUP OF BYPASS

PUMP ASSEMBLY.

NOTE: TEMPORARY BYPASS PUMP WILL BE REQUIRED TO ALLOW FOR MATERIAL CURING DURING THE SUMP LINING PROCESS. CONTRACTOR TO DETERMINE THE MEANS AND METHODS TO FACILITATE THE BYPASS CONCEPT SHOW.

(N) SUMP PIT COVER ANDINSPECTION ACCESS OPENING

(E) 4" C.I. INLET FROM SANITARY WASTE LINE

HIGH WATER ALARM LEVEL

LEAD/START

OFF/STOP

FINISHED FLOOR

(N) CHECK VALVE SWING CHECK

(N) GATE VALVE

(N) 3" DISCHARGE TO SANITARY OR INDUSTRIAL SEWER WASTELINE RE: PLANS

CONNECT NEW TO EXISTING

(N) SUBMERSIBLE SUMP PUMP TYP. 2

CAULK PIPE PENETRATION WATERTIGHT ALL AROUND (TYPICAL) USE DAP CONCRETE ACRYLIC LATEX SILICONE

SEALANT OR APPROVED EQUAL. INSTALL PRIOR TO LINING SYSTEM INSTALLATION. REFER TO SPECIFICATION 33 01 30

(N) LEVEL CONTROL MOUNTING RAIL

(N) GUIDE RAIL

(E) SUMP PIT

(N) 3" VENT

CONNECT NEW TO EXISTING

(N) PIPE GROMMET(N) PIPE GROMMET

(N) LIFTING CHAIN

(N) WEIGHTED FLOATS TO BE MOUNTED AT DIFFERENT ANGLESAROUND THE PEDESTAL TO PREVENT BECOMING TANGLED

(TYPICAL)

PROVIDE 3/16" AIR HOLE IN RISER PIPE

COORDINATE ALL REQUIRED CONDUIT, CIRCUITS,ELECTRICAL COMPONENTS ETC.WITH THEELECTRICAL DRAWINGS.

CONTRACTOR TO COORDINATE THIS DIMENSION WITHPUMP IN FIELD. PUMP INLET SHOULD BE LOWER THAN

THE OFF FLOAT . CONTRACTOR TO ENSURE PUMPSUCTION STAYS FLOODED .

(N) LIFTING CHAIN ANCHOR INTO SUMP.

(N) MONOLITHIC PATCHING SYSTEM, (N)LINING-SEALING SYSTEM RE: SPECIFICATION SECTION 33 01 30.

21"

20"

45°TYP

36"

3"

12"TYP

22"

3 1/4"TYP.

(8) 3/8"-16 x 1" LGWELDSTUDS ON

7 1/4" DIA B C

3 3/4" TYP.

4"∅ VENT PIPE FLANGE

(2) 5/8"-11 x 2 1/4" LGWELDSTUDS

60°TYP

(6) 11/16" SLOTSON 51 DIA B

3 11/16" DIA. DISCHARGE FLANGE

(4) 13/16" THRU HOLES

(4) 11/16" SLOTS

ON 51" DIA B C

53"∅

11"TYP

"6 1/4" ∅ MOTOR CABLE PLATE

5" TYP

WET SUMP COVER FOR 48" Ø SUMPS

INSPECTION ACCESS OPENINGOPENING TO BE DIRECTLYOVER FLOATS AND PUMPS

SANITARY TEE

(N) PROVIDE SCHEDULE 40 CPVC FROM DISCHARGE OF PUMP TO INLET OF CHECK VALVE. PIPING DOWNSTREAM OF SHUT OFF VALVE TO BE GALVANIZED STEEL OR COPPER PIPING. VALVING TO ALSO BE METALLIC NO PLASTIC VALVES.

3 11/16" DIA. DISCHARGE FLANGE

(N) 20"X20" PLASTIC PLACARD ON WALL OUTSIDE OF MECHANICAL ROOM.LOCATE ADJACENT TO VISUAL ALARM. PLACARD SHALL READ, "IF HORN OR STROBE ARE ACTIVATED, PLEASE IMMEDIATELY CALL MAINTENANCE CONTROL AT 303-342-2800" PLACARD TO HAVE WHITE BACKGROUND AND RED LETTERING.

(N) REMOTE VISUAL ALARM MOUNTED OUTSIDE MECHANICAL ROOM ON WALL WITH PLACARD. (SEE ELECTRICAL PLANS FOR EXACT LOCATION)

(N) CONTROL PANEL MOUNTED ON WALL IN MECH. ROOM WITH AUDIBLE / VISUAL ALARM. (SEE ELECTRICAL PLANS FOR EXACT LOCATION)

(N) CONTROL PANEL WIRING CONDUITPROVIDED BY ELECTRICAL CONTRACTOR

6 1/4" DIA. LEVEL CONTROL PLATE

NOTE: 1. ALL SEWAGE, STORM AND INDUSTRIAL SEWAGE

EJECTOR PITS AND SYSTEMS MUST REMAIN OPERATIONAL DURING REPLACEMENT. RE DETAIL 3 FOR RECOMMENDED TEMPORARY SOLUTION. AT CONTRACTORS OPTION, PROVIDE DEN AND EOR WITH AN EQUAL OR BETTER SOLUTION FOR REVIEW.

2. PUMP INFRASTRUCTURE INCLUDING GUIDE RAILS, LIFTING CHAIN AND TOP RAILS SHALL BE COMPATIBLE AND PROVIDED BY THE SAME MANUFACTURER AS THE PUMP.

3. SET FLOAT LEVEL CONTROL 2" BELOW INVERT OF LOWEST GRAVITY DRAIN INLET PER CODE 712.3.4 REGARDING MAXIMUM EFFLUENT LEVEL.

4. SET ALL FLOAT LEVELS AT SAME HEIGHT AS EXISTING FLOAT LEVELS. DOCUMENT FLOAT LEVELS DURING DEMOLITION PHASE.

PLC DUPLEX ALTERNATING CONTROL PANEL 8162P

ALARM PANEL 8301

(N) TOP RAIL SUPPORT MOUNTED TO SIDEWALL OF SUMPGROUT ANY HOLES LEFT FROM EXISTING RAIL SUPPORT ANCHOR BOLTS. ALL NEW ANCHORS SHALL BE TYPE 316STAINLESS STEEL 1/16" ø SMALLER THAN NEW RAIL SUPPORT BOLT HOLES. EMBED 2" MIN. USE HILTI HIT-RE-500-SD EPOXY OR EQUAL

UNION

DUPLEX PANEL H8162P

POINT LIST

INPUTS

OVERLOAD 1STOP FLTLEAD FLTLAG FLT

HIGH WATER FLTLEVEL TRANSMITTER

CURRENT TRANSDUCEROVERLOAD 2OVER TEMP 1OVER TEMP 2

MOISTURE SENSOR GROUND

0 VDC+ 24 VDC

OUTPUTS

M1 CONTACTORM2 CONTACTOR

DOME LIGHT/HORNPROCESSOR RUN

+24 VDCHIGH WATER (CUSTOMER USE)

GEN ALARM CUSTOMER USECUSTOMER SUPPLIED POWER

4

4

LASE

EVN

ED

FO

R

D

NA

YT IC

YTOC NU

CITY & COUNTYof DENVER

DENVERINTERNATIONAL

AIRPORT

BIM FILE NAME:

SHEET NO.

SHEET TITLE

VOLUME NO.

DESIGN CONTRACT NO.

WORK BREAKDOWN NO.

FAA AIP NO:

CHECKED BY:

DRAWN BY:

DATE:

ISSUE RECORD

CONST. CONTRACT NO.

SCALE:

DESIGNER OF RECORD

PDS

201732415-04 / P0-00046097

TBD

N.T.S.

DE

NV

ER

IN

TE

RN

AT

ION

AL A

IRP

OR

TC

ON

CO

UR

SE

C S

EW

ER

RE

PA

IRS

09/18/2019

JRS

01

MECHANICALDETAILS

M502

9100 PENA BLVDDENVER, CO 80249

NO. BY PURPOSE DATE CKD

1 CEG 100% DESIGN 01/18/19 PDS

2 CEG IFC 4/18/19 PDS

4 CEG Addendum #1 09/18/19 PDS

N.T.S.M502

SIMPLEX FOOTING SUMP PUMP DETAIL (7'-0" DEEP)2

N.T.S.M502

TEMPORARY SIMPLEX AND DUPLEX SANITARY, INDUSTRIALAND STORM SEWER SUMP PUMP DETAIL3

N.T.S.M502

DUPLEX SANITARY SEWER AND INDUSTRIAL SEWER PUMPDETAL (12'-0" DEEP)1

4