VENTING PLAN VIEW - NTS Vent PipeC Air Pipe Pioneer Church Solon, Ohio SYSTEM PUMP Primary/Secondary...

26
VENTING PLAN VIEW - NTS Vent Pipe C Air Pipe Pioneer Church Pioneer Church Solon, Ohio Solon, Ohio SYSTEM PUMP Primary/Secondary not required, but check flow Delta Tee and running temperatures. HYDROTHERM KN6 CONDENSING BOILERS - Reverse Return Suggested Piping - NTS Boiler Vent & Combustion Air Elevation – NTS Elevations can be from 4’-6’ off the floor. Vents should stagger off the back of the boiler to leave through the wall at the same height (AL29). Combustion air to be PVC and may be common connected. 18 26” 18” 10’ 30” Outside wall This drawing is for conceptual purposes and should not be used for installation. The drawing does not include many required accessories such as expansion air elimination, etc.

Transcript of VENTING PLAN VIEW - NTS Vent PipeC Air Pipe Pioneer Church Solon, Ohio SYSTEM PUMP Primary/Secondary...

Page 1: VENTING PLAN VIEW - NTS Vent PipeC Air Pipe Pioneer Church Solon, Ohio SYSTEM PUMP Primary/Secondary not required, but check flow Delta Tee and running.

VENTING PLAN VIEW - NTS

Vent Pipe C Air Pipe

Pioneer Church Pioneer Church Solon, OhioSolon, OhioPioneer Church Pioneer Church Solon, OhioSolon, Ohio

SYSTEM PUMP

Primary/Secondary not required, but check flow Delta Tee and running temperatures.

HYDROTHERM KN6 CONDENSING BOILERS - Reverse Return Suggested Piping - NTS

Boiler Vent & Combustion Air Elevation – NTS

Elevations can be from 4’-6’ off the floor.

Vents should stagger off the back of the boiler to leave through the wall at the same height (AL29). Combustion air to be PVC and may be common

connected.

18”

26”

18”

10’

30”

Outside wall

This drawing is for conceptual purposes and should not be used for installation. The drawing does not include many required accessories such as expansion air elimination, etc.

Page 2: VENTING PLAN VIEW - NTS Vent PipeC Air Pipe Pioneer Church Solon, Ohio SYSTEM PUMP Primary/Secondary not required, but check flow Delta Tee and running.

Cargil Salt Brewer Cargil Salt Brewer Garrett Akron OfficeGarrett Akron OfficeCargil Salt Brewer Cargil Salt Brewer Garrett Akron OfficeGarrett Akron Office

HYDROTHERM KN4 CONDENSING BOILER - Flow through design Suggested Piping - NTS

Boiler Vent & Combustion Air Elevation – NTS

CA to be piped in PVC and come back through the low point of the existing

opening.

KN4 boiler vent through existing opening. Once through, continue for 2’

and then head up 3’ and goose neck down. Existing ‘outside’ chimney to be

dropped.

8’

This drawing is for conceptual purposes and should not be used for installation. The drawing does not include many required accessories such as expansion air elimination, etc.

SYSTEM PUMP Taco 132-9A170

Existing 400mbh Boiler.

Existing Expansion Tk 14” x 6’

SYSTEM PUMP Taco 132-9A170

CWMU add a

backflow preventer

New bladder type Expansion by Elbi

Existing piping and 400mbh boiler Suggested Piping - NTS

3’

Page 3: VENTING PLAN VIEW - NTS Vent PipeC Air Pipe Pioneer Church Solon, Ohio SYSTEM PUMP Primary/Secondary not required, but check flow Delta Tee and running.

2550 LANDER ROAD 2550 LANDER ROAD Chagrin, Ohio Chagrin, Ohio2550 LANDER ROAD 2550 LANDER ROAD Chagrin, Ohio Chagrin, Ohio

GARAGE HEAT SYSTEM PUMP

FPE set at 90F

HYDROTHERM KN10 CONDENSING BOILER - Suggested Piping - NTS

Snow Melt System Held @ 90F by FPE Valve

This drawing is for conceptual purposes and should not be used for installation. The drawing does not include many required accessories such as expansion air elimination, etc.

Page 4: VENTING PLAN VIEW - NTS Vent PipeC Air Pipe Pioneer Church Solon, Ohio SYSTEM PUMP Primary/Secondary not required, but check flow Delta Tee and running.

SYSTEM PUMP

2.5” FPE bypass valve to allow for boiler reset at 110F.

RBI FUTERA III MODEL MB0500 - Primary / Secondary Suggested Piping - NTS

Max 12” Apart

Boiler Vent & Combustion Air Elevation - NTS

24”

Vent through the wall into factory SS vent Hood. Direct Connect CA

Air Inlet Damper – Pigtail into boiler panel.

SUGGESTED AIR MOVEMENT - NTS

We will provide an Exhausto RSIB modulating fan to move the warm air OUT of the condenser area and over the warm dishwasher area. The fan will have a manual speed control to obtain a comfort level both in the dishwasher area and the condenser area. The Exhaust fan (existing in the wall) will be turned off but left in position. The colder air will be brought in and across the hot coils, but used to condition the space. This area will reduce or eliminate the negative in the mechanical room. An interlock Freon detection system should be added to shut off our fan and start the exhaust fan if there is a Freon leak.

Current exhaust to remove heat. Exhaust is creating a very dangerous situation with the combustion equipment.

NOTES:

The existing louver should be sealed and the vent run as high as possible through the wall. The air inlets for the boiler and the water heaters should be placed much lower than the vent. You should construct a duct to direct the outside air to dump over the water heater.

Current Condenser Area that overheats

Vent Pipe C Air Pipe

The Raintree The Raintree Restaurant Restaurant Chagrin Falls, OhioChagrin Falls, Ohio

The Raintree The Raintree Restaurant Restaurant Chagrin Falls, OhioChagrin Falls, Ohio

Run duct in front of chimney (hugging wall) to allow air for old water heaters.

Dishwasher area. Shaft to Upstairs Mechanical

Room

This drawing is for conceptual purposes and should not be used for installation. The drawing does not include many required accessories such as expansion air elimination, etc.

Page 5: VENTING PLAN VIEW - NTS Vent PipeC Air Pipe Pioneer Church Solon, Ohio SYSTEM PUMP Primary/Secondary not required, but check flow Delta Tee and running.

Boiler Vent

Elevation - NTS

24”

Swoop Into Breeching

RBI CW1000 WATER HEATERS – TYP. OF 4

Engineered Modulating Draft Control Damper by Exhausto.

225’ Chimney lined in AL29-4C Single Wall. If Fans are used, 24” dia. Acceptable.

Modulating Combustion air fan from outside Ducted into the space

Winton Place - General Venting Winton Place - General Venting Ambrose / Karpinski Ambrose / KarpinskiWinton Place - General Venting Winton Place - General Venting Ambrose / Karpinski Ambrose / Karpinski

Exhausto Engineered Modulating Fan System – In line (typ. of 3)

RBI CB2000 BOILERS – TYP. OF 4

RBI CB2000 BOILERS – TYP. OF 4

Draft Balancing Baffle supplied by Exhausto.

Page 6: VENTING PLAN VIEW - NTS Vent PipeC Air Pipe Pioneer Church Solon, Ohio SYSTEM PUMP Primary/Secondary not required, but check flow Delta Tee and running.

Winton Place – General Piping Winton Place – General Piping Ambrose / Karpinski Ambrose / KarpinskiWinton Place – General Piping Winton Place – General Piping Ambrose / Karpinski Ambrose / Karpinski

SYSTEM PUMP

RBI FUSION MODEL CB2000 FULLMOD-HEATNET - Primary / Secondary Suggested Piping - NTS

Max 12” Apart

NOTES:

• All boilers are RBI High efficiency model CB2000. Input is 1999MBH and output is rated at 1899MBH. Total rated output 15,192MBH.

• Fusion boilers are Hybrid condensing boilers. All primary pumps and mixing valves are mounted in the package and part of the boiler design.

• Fusion boilers include HeatNet control system. This system allows a daisy chain between boilers communicating off of one master.

• Each boiler has a required flow rate of 116gpm @ 13.8ftpd. Pumps mounted on boilers are rated at this capacity with up to 30’ of normal piping and fittings.

• Each boiler has a continuous turndown of 3:1. HeatNet will utilize all boilers to maximize efficiency with the turndown ratio. System turndown is from 15,192MBH to 627MBH output. (About a 23:1 system turndown without straining single boiler combustion or operation.

• Layout is purely conceptual, all components are not shown. Please refer to normal engineering design practices and/or the RBI Fusion manual.

Page 7: VENTING PLAN VIEW - NTS Vent PipeC Air Pipe Pioneer Church Solon, Ohio SYSTEM PUMP Primary/Secondary not required, but check flow Delta Tee and running.

SYSTEM PUMP

RBI fully condensing boiler set to receive the coldest return water. It will have no minimum temperature requirement.

RBI FUTERA III MODEL MB4000 FULL MOD BOILERS - RBI FUSION SERIES MODEL CB2000 FULLY CONDENSING BOILERS

Boiler Vent & Combustion Air Elevation - NTS

24”

Swoop Into Breeching With WYE.

Air Inlet Damper – Pigtail into boiler panel.

The Futera III 4000 MBH boilers will be designed to come on with a reset ratio that comes on when the KN can no longer keep up. This will be designed at temps of 120F or above.

Hybrid Boiler Hybrid Boiler Concept – Perkins SchoolsConcept – Perkins SchoolsHybrid Boiler Hybrid Boiler Concept – Perkins SchoolsConcept – Perkins Schools

VENTING PLAN VIEW - NTS

Vent Pipe

C Air Pipe

To the vent outlet through the roof in a category II liner (combined), or through the wall (category IV) typical of 3 (not combined).

To air inlet from wall or roof. Sized by the manufacturer. Copper boilers shall have a freeze protection damper on each inlet.

CB 2000

MB 4000

MB 4000

Honeywell BMS tied simply to the ‘master’ boiler. Boilers tied together with a single twisted pair for communications

BMS Lonworks

This drawing is for conceptual purposes and should not be used for installation. The drawing does not include many required accessories such as expansion air elimination, etc.

Page 8: VENTING PLAN VIEW - NTS Vent PipeC Air Pipe Pioneer Church Solon, Ohio SYSTEM PUMP Primary/Secondary not required, but check flow Delta Tee and running.

Firestone Country Club - CONCEPT Firestone Country Club - CONCEPT Akron, Ohio Akron, OhioFirestone Country Club - CONCEPT Firestone Country Club - CONCEPT Akron, Ohio Akron, Ohio

This drawing is for conceptual purposes and should not be used for installation. The drawing does not include many required accessories such as expansion air elimination, etc.

EXISTING STORAGE

TANKS

NEW RBI FUTERA II WATER HEATERS 750MBH INPUT EACH

NEW 200 GALLON ASME STORAGE

DISHWASHER

135F 135F

135F

180F

•WATER HEATERS SHALL OFFER ADDITIONAL CAPACITY BASED ON AN 85% EFFICIENCY RATING

•A PUMP SHALL BE ADDED TO EACH EXISTING PUMP WITH AN AQUASTAT TO START/STOP AT 135F

•NEW STORAGE TANK SUPPLIED WITH A PUMP AND AQUASTAT TO START/STOP AT 180F

•WHEN ALL PUMPS ARE STOPPED, LOOP SHALL COME UP TO 180F AND WATER HEATERS SHALL SHUT DOWN ON TEMPERATURE

•WATER HEATER PUMPS SHALL RUN CONSTANT TO MONITOR LOOP TEMPERATURE. AS TANKS DROP BELOW SET POINT, TANK PUMP SHALL START AND LOWER THE LOOP TEMPERATURE WHICH WILL ACTIVATE THE WATER HEATER.

•RBI SHALL PROVIDE TWO (2) FUTERA II FW0750 WATER HEATERS, WATER HEATER PUMPS, 200 GALLON STORAGE TANK JACKETED WITH INSULATION.

•CONTRACTOR TO SUPPLY NEW TANK PUMPS (ALL BRONZE), AQUASTATS, RELIEF OR T/P VALVES AS REQUIRED. MAIN LOOP PIPE SIZE TO BE DETERMINED, FLOW OF NEW PUMPS TO BE SIZED.

Page 9: VENTING PLAN VIEW - NTS Vent PipeC Air Pipe Pioneer Church Solon, Ohio SYSTEM PUMP Primary/Secondary not required, but check flow Delta Tee and running.

Boiler Vent & Combustion Air Elevation

– NTS

Elevations can be from 4’-6’ off the floor.

Vents should stagger off the back of the boiler to leave through the wall at the same height (AL29).

Combustion air to be PVC and may be common connected.

18”

East 4East 4thth Street Garage Street Garage Cleveland, Ohio Cleveland, OhioEast 4East 4thth Street Garage Street Garage Cleveland, Ohio Cleveland, Ohio

HYDROTHERM KN6 CONDENSING BOILERS Geothermal Suggested Piping - NTS

From Building

200 GPM

Boilers @ 100 GPM each 10F Delta Tee / 2.7 psi drop

To Building

HX1

CT-1

ST1

System shall flow through the boilers. The boilers shall sense the temperature and be set to fire below 50F. Boilers will be wired to each other and modulate together on the highest point of the efficiency curve.

This drawing is for conceptual purposes and should not be used for installation. The drawing does not include many required accessories such as expansion air elimination, etc.

Page 10: VENTING PLAN VIEW - NTS Vent PipeC Air Pipe Pioneer Church Solon, Ohio SYSTEM PUMP Primary/Secondary not required, but check flow Delta Tee and running.

SYSTEM PUMP

RBI FUTERA III MODEL MB0750 FULL MOD BOILERS –

With Exhausto Combustion Air System

Boiler Vent & Combustion Air Elevation - NTS

24”

Swoop Into Breeching With WYE.

Using Exhausto CA system, no Combustion air Piping Needed.

The Futera III 750 MBH boilers will have a built in reset system. The first boiler will be the ‘master’ and the other the ‘member’. The boilers will communicate with each other to assure they are running at the highest efficiency (modulation point) and report back to the Trane system.

BOILER REPLACEMET BOILER REPLACEMET Concept – Nestles Solon, Concept – Nestles Solon, OhioOhio

BOILER REPLACEMET BOILER REPLACEMET Concept – Nestles Solon, Concept – Nestles Solon, OhioOhio

VENTING PLAN VIEW - NTS

Vent Pipe

Entry point of the chimney is about 8’ off the floor. Single wall stainless steel liner to be fabricated to run through the chimney up about 15’. Water heater shall vent ‘around’ the stainless steel liner. Chimney is estimated at 24” x 30” Liner shall be sized for the two boilers only (750mbh input each).

MB 0750

MB 0750

Honeywell BMS tied simply to the ‘master’ boiler. Boilers tied together with a single twisted pair for communications

Trane BMS Modbus (Lonworks BacNet?)

This drawing is for conceptual purposes and should not be used for installation. The drawing does not include many required accessories such as expansion air elimination, etc.

Max 12” Apart

Existing 199MBH water heater with 4” vent remaining in the chimney

Small Exhausto Combustion air system fed from existing louver ‘boxed’ under air handler duct.

15’10’

3’

RBI MB0750 has a 6” vent outlet each boiler

Locate Barometric

here.

Page 11: VENTING PLAN VIEW - NTS Vent PipeC Air Pipe Pioneer Church Solon, Ohio SYSTEM PUMP Primary/Secondary not required, but check flow Delta Tee and running.

ARMSTRONG IWH INSTANT

WH

RBI MB2000 W/HEATNET TYPICAL OF 3

SYSTEM SUPPLY

SYSTEM RETURN

ARMSTRONG EXPANSION

TANK

ARMSTRONG SYSTEM PUMPS

• SYSTEM PUMPS ARE SKID PACKAGED BY ARMSTRONG WITH CONTROLS

• MASTER/MEMBER BOILERS SET TO ACCOMPLISH OUTDOOR RESET AS PROGRAMMED.

• IWH AT 150F PROVIDING CONSTANT TEMPERATURE TO THE HEAT EXCHANGER

• DOMESTIC PRIORITY SIGNAL SHALL BE SENT TO SYSTEM PUMP CONTROL PANEL TO SHUT THEM DOWN WHILE DOMESTIC HOT WATER IS NEEDED.

• IWH SHALL FLOW CONSTANT WITH A 80F DELTA TEE, MASTER BOILER SHALL REACT TO THE SYSTEM TEMPERATURE REQUIREMENTS TO MAKE UP TEMPERATURE TAKEN FROM THE IWH.

MASTER BOILER RESET

MEMBER BOILER RESET

MEMBER BOILER RESET

Page 12: VENTING PLAN VIEW - NTS Vent PipeC Air Pipe Pioneer Church Solon, Ohio SYSTEM PUMP Primary/Secondary not required, but check flow Delta Tee and running.

ARMSTRONG IWH INSTANT

WH

RBI MB2000 W/HEATNET TYPICAL OF 3

SYSTEM SUPPLY

SYSTEM RETURN

ARMSTRONG EXPANSION

TANK

ARMSTRONG SYSTEM PUMPS

MASTER BOILER RESET

MEMBER BOILER RESET

MEMBER BOILER RESET

SYSTEM SUPPLY

SYSTEM RETURN

ARMSTRONG EXPANSION

TANK

ARMSTRONG SYSTEM PUMPS

ARMSTRONG IWH INSTANT

WH

RBI MB2000 W/HEATNET TYPICAL OF 3

MASTER BOILER RESET

MEMBER BOILER RESET

MEMBER BOILER RESET

Page 13: VENTING PLAN VIEW - NTS Vent PipeC Air Pipe Pioneer Church Solon, Ohio SYSTEM PUMP Primary/Secondary not required, but check flow Delta Tee and running.

CASE WESTERN RESERVE LARGE DORM BOILER REPLACEMENT CASE WESTERN RESERVE LARGE DORM BOILER REPLACEMENT Cleveland, Ohio Cleveland, OhioCASE WESTERN RESERVE LARGE DORM BOILER REPLACEMENT CASE WESTERN RESERVE LARGE DORM BOILER REPLACEMENT Cleveland, Ohio Cleveland, Ohio

System shall flow through the boilers. The boilers shall sense the temperature and be set to fire and modulate in accordance with it’s on board outdoor reset control. Boilers will be wired to each other and modulate together on the highest point of the efficiency curve.

This drawing is for conceptual purposes and should not be used for installation. The drawing does not include many required accessories such as expansion air elimination, etc.

From Building

200 GPM

Boilers @ 99.47 GPM each 35F Delta Tee / 2.7 psi drop

To Building

Sensor to be mounted in supply header

Sensor to run to outdoors

Master Boiler

Member Boiler

Boiler Vent & Combustion Air Elevation

– NTS

Vents to be routed up and through the existing penetration (AL29).

Combustion air may be PVC routed through the existing 2nd penetration

18”

Page 14: VENTING PLAN VIEW - NTS Vent PipeC Air Pipe Pioneer Church Solon, Ohio SYSTEM PUMP Primary/Secondary not required, but check flow Delta Tee and running.

This drawing is for conceptual purposes and should not be used for installation. The drawing does not include many required accessories such as expansion air elimination, etc.

CASE WESTERN RESERVE SMALL DORM BOILER REPLACEMENT CASE WESTERN RESERVE SMALL DORM BOILER REPLACEMENT Cleveland, Ohio Cleveland, OhioCASE WESTERN RESERVE SMALL DORM BOILER REPLACEMENT CASE WESTERN RESERVE SMALL DORM BOILER REPLACEMENT Cleveland, Ohio Cleveland, Ohio

System shall flow on it’s own. For good temperature control and boiler life, we are supplying primary (boiler) pumps. This pump will be activated on a call for heat, remove water from the secondary (system) loop and replace that water with heated water (25F rise) as needed. Boilers shall be provided with an enable/disable relays (24V) for the existing building management control to reset temperatures. The boilers can also run off of it’s own single set point operating control.

RBI FUTERA II MODEL FB0500 - Primary / Secondary Suggested Piping - NTS

SYSTEM PUMP

Primary pump supplied with the boiler. Pump wired to and controlled by the boiler.

Max 12” Apart

51gpm @ 20’

34gpm @ .35pd shall give you 25F delta tee

Boiler Vent & Combustion Air Elevation - NTS

24”

Vent directly

into existing

chimney. Boiler is

category I

Barometric Damper supplied with the boiler

Page 15: VENTING PLAN VIEW - NTS Vent PipeC Air Pipe Pioneer Church Solon, Ohio SYSTEM PUMP Primary/Secondary not required, but check flow Delta Tee and running.

BOILER REPLACEMET BOILER REPLACEMET Concept – Honeywell 5/14/08 Concept – Honeywell 5/14/08BOILER REPLACEMET BOILER REPLACEMET Concept – Honeywell 5/14/08 Concept – Honeywell 5/14/08

VENTING PLAN VIEW - NTS

SEQUENCE OF OPERATION (CONCEPTUAL)

1. The RBI boiler will be run on an outdoor reset schedule for the reheat loop.

2. On a call for heat, the boiler primary pump (supplied by RBI) will be enabled flowing the primary loop.

3. When the indirect DHW tank drops in temperature, the domestic pump will start.

4. DHW indirect coil will require 140F so a signal can be sent to the boiler to override the reset and fire the boiler to a local set point (140F). Once the DHW is satisfied, the signal will be dropped and the boiler will return to it’s programmed reset.

5. If the on board “Heat Net” controls are not used, the sequence will be controlled by others and the boiler will offer a 4-10ma modulation connection and a T to T enable/disable connection.

This drawing is for conceptual purposes and should not be used for installation. The drawing does not include many required accessories such as expansion air elimination, etc.

SYSTEM (Reheat) PUMPRBI FUTERA III MODEL MB1500 FULL MOD BOILERSRBI FUTERA III MODEL MB1500 FULL MOD BOILERS

The Futera III 1500MBH IN

Honeywell BMS Modbus (Lonworks BacNet?)

Max 12” Apart

200 Gallon ASME indirect

DWH

Boiler Primary Pump

(supplied by manufacturer)

DHW Pump by Others

RBI modulating 88% boiler (Futera III) shall require AL29-4C vent material (Category II) lining the chimney all the way out. The vent sizing (standard) is 8”. You may use a single wall liner in the chimney. If you chose to substitute an 85% - two stage RBI boiler (Futera II) you may vent into the chimney without the use of a liner. The vent size on the Futera II is 12”. If you chose a fully condensing RBI Fusion boiler, you will need to also line the chimney in AL29-4C sized at 8”.

Existing Existing MB 1500

Water Temperature Sensor

Outdoor Air Sensor

PRICING OPTIONS:

All options include Start up, one year warranty service, and freight to job site (FOB). All options include jacketed and insulated indirect storage tank, Boiler PRIMARY

pump, and control sensors when available (FII does not have Heatnet).

Option 1: Fully condensing RBI Fusion boiler model CB1500 (92+ ratings) $27,500.00

Option 2: 88% RBI Futera III Model MB1500 $20,744.00

Option 3: 85% Futera II model FB1500 $19,350.00

Page 16: VENTING PLAN VIEW - NTS Vent PipeC Air Pipe Pioneer Church Solon, Ohio SYSTEM PUMP Primary/Secondary not required, but check flow Delta Tee and running.

BOILER REPLACEMET BOILER REPLACEMET Concept – Lubrizol Office Concept – Lubrizol Office BldgBldg

BOILER REPLACEMET BOILER REPLACEMET Concept – Lubrizol Office Concept – Lubrizol Office BldgBldg

VENTING PLAN VIEW - NTS

SEQUENCE OF OPERATION (CONCEPTUAL)

1. The RBI boiler will be run on an outdoor reset schedule for the reheat loop.

2. On a call for heat, the boiler primary pump (supplied by RBI) will be enabled flowing the primary loop.

3. When the indirect DHW tank drops in temperature, the domestic pump will start.

4. DHW indirect coil will require 140F so a signal can be sent to the boiler to override the reset and fire the boiler to a local set point (140F). Once the DHW is satisfied, the signal will be dropped and the boiler will return to it’s programmed reset.

5. If the on board “Heat Net” controls are not used, the sequence will be controlled by others and the boiler will offer a 4-10ma modulation connection and a T to T enable/disable connection.

This drawing is for conceptual purposes and should not be used for installation. The drawing does not include many required accessories such as expansion air elimination, etc.

RBI modulating 88% boiler (Futera III) shall require AL29-4C vent material (Category II) lining the chimney all the way out. The vent sizing (standard) is 8”. You may use a single wall liner in the chimney. If you chose to substitute an 85% - two stage RBI boiler (Futera II) you may vent into the chimney without the use of a liner. The vent size on the Futera II is 12”. If you chose a fully condensing RBI Fusion boiler, you will need to also line the chimney in AL29-4C sized at 8”.

Existing Existing

PRICING OPTIONS:

All options include Start up, one year warranty service, and freight to job site (FOB). All options include jacketed and insulated indirect storage tank, Boiler PRIMARY

pump, and control sensors when available (FII does not have Heatnet).

Option 1: Fully condensing RBI Fusion boiler model CB1500 (92+ ratings) $27,500.00

Option 2: 88% RBI Futera III Model MB1500 $20,744.00

Option 3: 85% Futera II model FB1500 $19,350.00

Page 17: VENTING PLAN VIEW - NTS Vent PipeC Air Pipe Pioneer Church Solon, Ohio SYSTEM PUMP Primary/Secondary not required, but check flow Delta Tee and running.

The Chapel Akron, OhioThe Chapel Akron, Ohio

Learning Center/ AdminLearning Center/ Admin

The Chapel Akron, OhioThe Chapel Akron, Ohio

Learning Center/ AdminLearning Center/ Admin

HYDROTHERM KN10 CONDENSING BOILERS Learning Center / Admin Suggested Piping - NTS

This drawing is for conceptual purposes and should not be used for installation. The drawing does not include many required accessories such as expansion air elimination, etc.

250 GPM Boilers @ 70 GPM each

24F Delta Tee / 1.12’ drop each boiler

Boiler room loop

ZONE RETURNS

Z-1 Z-2 Z-3 Z-4

Z-5

Old second boiler loop

VENTING PLAN VIEW - NTS

Modulating Combustion air fan from outside

Venting shall be routed to include a common breaching to all three boilers to the existing chimney. The chimney shall be lined all the way out with a single wall stainless steel liner. Material in the boiler room shall be double wall AL29-4C as manufactured by Schebler.

** Existing water heater to be routed into another ** Existing water heater to be routed into another chimney at the other end of the room.chimney at the other end of the room.

Page 18: VENTING PLAN VIEW - NTS Vent PipeC Air Pipe Pioneer Church Solon, Ohio SYSTEM PUMP Primary/Secondary not required, but check flow Delta Tee and running.

The Chapel Akron, OhioThe Chapel Akron, Ohio

Learning Center / AdminLearning Center / Admin

The Chapel Akron, OhioThe Chapel Akron, Ohio

Learning Center / AdminLearning Center / Admin

This drawing is for conceptual purposes and should not be used for installation. The drawing does not include many required accessories such as expansion air elimination, etc.

VENTING PLAN VIEW - NTS

Venting shall be routed to include a common breaching to all three boilers to the existing chimney. The chimney shall be lined all the way out with a single wall stainless steel liner. Material in the boiler room shall be double wall AL29-4C as manufactured by Schebler.

• Chimney is approximately 35’ rise from entry point. Entry point is approximately 8’ from the floor.

• Centerline of boiler vent outlet is 13.75” from the floor (another 4” for the pad).

• Boilers should have about 10” between them but can have as little as 6”.

• We would like to see the boilers all come out of the back from 16” – 24” and rise in 6” ID. All should ‘swoop’ into a common 12” breaching and run all the way out the chimney in 12”.

• Please supply a tee in the horizontal behind the boiler for a full size 6” barometric (supplied by the boiler manufacturer).

• Please supply drain tee at the vertical rise off the boilers.

** Measurements are approximations. ** Measurements are approximations. Pricing shall be a budget for now.Pricing shall be a budget for now.

30”30” 30”30” 30”30”10”10” 10”10”

72”72”

6”6” 6”6”6”6”

50”50”

Page 19: VENTING PLAN VIEW - NTS Vent PipeC Air Pipe Pioneer Church Solon, Ohio SYSTEM PUMP Primary/Secondary not required, but check flow Delta Tee and running.

Kirtland Country Club - CONCEPTKirtland Country Club - CONCEPTKirtland Country Club - CONCEPTKirtland Country Club - CONCEPT

This drawing is for conceptual purposes and should not be used for installation. The drawing does not include many required accessories such as expansion air elimination, etc.

EXISTING Domestic System SET AT 160F – 170F

COLD WATER

MAKE UP

HOT WATER OUTLET

NEW 340 GALLON ASME STORAGE

NEW 340 GALLON ASME STORAGE

NEW 340 GALLON ASME STORAGE

Page 20: VENTING PLAN VIEW - NTS Vent PipeC Air Pipe Pioneer Church Solon, Ohio SYSTEM PUMP Primary/Secondary not required, but check flow Delta Tee and running.

Renaissance Center Renaissance Center Akron, Ohio Akron, OhioRenaissance Center Renaissance Center Akron, Ohio Akron, Ohio

HYDROTHERM KN4 CONDENSING BOILERS - Piping - NTS

This drawing is for conceptual purposes and should not be used for installation. The drawing does not include many required accessories such as expansion air elimination, etc.

VENTING PLAN VIEW - NTS

Vent Pipe C Air Pipe

10’

28”

72”

22” 22”

Boiler outlet is 4”. Combined flue at 8” travels up through the roof about 14’ with standard terminations.

SYSTEM PUMP Primary/Secondary not required,

but check flow Delta Tee and running temperatures.

Isolation valves and check valves not shown.

Page 21: VENTING PLAN VIEW - NTS Vent PipeC Air Pipe Pioneer Church Solon, Ohio SYSTEM PUMP Primary/Secondary not required, but check flow Delta Tee and running.

BRUNSWICK MIDDLE BRUNSWICK MIDDLE SCHOOL (EDWARDS)SCHOOL (EDWARDS)BRUNSWICK MIDDLE BRUNSWICK MIDDLE SCHOOL (EDWARDS)SCHOOL (EDWARDS)

NOTES:

1. Boiler must be vented in AL29-4C material. Vent dia. 4”.

2. Boiler may be directly connected to outside air.

3. KN boilers have the ability to communicate through Modbus (standard), Lon and BacNet (Add). They can also take a simple 4-20ma set point signal, or if ordered with sensors, all temperature reset can be accomplished with the supplied Heatnet control system.

HYDROTHERM KN4 CONDENSING BOILER - Suggested Piping - NTSSuggested Piping - NTS

KN BOILERS CAN HANDLE VERY LOW FLOW. AT 6.98GPM THE BOILER WILL HAVE A 100F DELTA TEE. LOW FLOW RATES SHOULD ONLY BE CONSIDERED

WHEN VERY LOW RETURN TEMPERATURES ARE EXPECTED (AS NOT TO EXCEED THE HIGH LIMIT.. 200F).

This drawing is for conceptual purposes and should not be used for installation. The drawing does not include many required accessories such as expansion air elimination, etc.

MAIN GYM DEMAND LOAD – 176,000 BTU

LOCKER DEMAND LOAD – 71,000 BTU

KN SERIES (KN4) FLOW AND TEMP RISE(observe maximum operating temp – Max Input 399MBH / Min. input 80MBH )

Temp. Rise @ flow of (gpm)

Expected Outlet Temp based on a return temp of 160F

20F 34.9 180F

25F 27.92 185F

30F 23.26 190F

Page 22: VENTING PLAN VIEW - NTS Vent PipeC Air Pipe Pioneer Church Solon, Ohio SYSTEM PUMP Primary/Secondary not required, but check flow Delta Tee and running.

DOWNTOWN OFFICE DOWNTOWN OFFICE TOWER TOWER

Brewer Garrett Brewer Garrett CompanyCompany

MAIN BOILER PLANTMAIN BOILER PLANT

DOWNTOWN OFFICE DOWNTOWN OFFICE TOWER TOWER

Brewer Garrett Brewer Garrett CompanyCompany

MAIN BOILER PLANTMAIN BOILER PLANT

01 02 03 04 05 06 07 08 09

10 11 12 13 14

48”

48”

60” 13’

This is currently a louver on the exterior that will be boxed on the interior. The esthetics are critical and can’t be changed. The louver is about 40’ from the center of the boiler rows. Would be desirable to have a common outlet from the fans, but not a deal breaker. The least amount of fans the better.

Air intake louver is about 30’ from the boilers, same as exhaust louver. SFTA????

30’ 6”

30”12”

Boilers are RBI Model MB4000 Futera XLF

Vent outlets are 10” centered on the lower back of the boiler.

Boilers should have 2’ of horizontal off the back before entering into a 90D.

Balancing baffles and barometric dampers may be required.

Page 23: VENTING PLAN VIEW - NTS Vent PipeC Air Pipe Pioneer Church Solon, Ohio SYSTEM PUMP Primary/Secondary not required, but check flow Delta Tee and running.

PCC AIRFOILS – OVEN HEAT RECOVERY CONCEPT PCC AIRFOILS – OVEN HEAT RECOVERY CONCEPT PCC AIRFOILS – OVEN HEAT RECOVERY CONCEPT PCC AIRFOILS – OVEN HEAT RECOVERY CONCEPT

• Ovens bake molds filled with Alumina to create turbine blades.

• Oven bakes at about 1900F in the oven.

• Air is diluted a great deal as it only reads about 110F just outside the hood.

• Exit temperature on the roof read >500F.

• Temp at Exhaust fan read about 95F exiting the space.

• Space temperature was about 88F.

• Entire plant is short make up air and has been mandated to induce air into this plant.

• Oven Stack was about 30” OD.

• Stack has an induced fan.

SMELTING OVEN – TYPICAL OF FOUR

Space Exhaust – Prop type, low velocity About

48” Diameter

ROOF PLAN VIEW OF STACK / EXHAUST

Higher Plant Elevation Higher Plant

Elevation

BASIC ROOF ELEVATION

Page 24: VENTING PLAN VIEW - NTS Vent PipeC Air Pipe Pioneer Church Solon, Ohio SYSTEM PUMP Primary/Secondary not required, but check flow Delta Tee and running.

PCC AIRFOILS – OVEN HEAT RECOVERY CONCEPT PCC AIRFOILS – OVEN HEAT RECOVERY CONCEPT PCC AIRFOILS – OVEN HEAT RECOVERY CONCEPT PCC AIRFOILS – OVEN HEAT RECOVERY CONCEPT

HEATSPONGE RECOVERY MODULES

Summer Load Shed to Domestic?

Winter Heat

HEATING COIL RAPID AIR

HEAT RECOVERY

UNIT

EWT 160F GPM 75 PD 8.6’

LWT 124.9F

EWT 125F – EACH ECONOMIZER @ 15GPM – PD 1.2 PSI

LWT 169F

Rough budget numbers:

• Rapid air handler complete with coil, temperature controls, DDC, and Exhaust heat recovery (face/bypass): $ 70,000.00

• Economizers (total of 4): $ 35,000.00

• Pumps, three way valves, additional controls (pure guess): $6,000.00

• Total equipment cost budget including freight, start up, etc: $111,000.00

Estimated annual fuel savings:

Again, rough estimate, but I used a similar heat calculation based on losses for another project. This project had a 25,000 cfm unit on it. Operating 24/7, figuring $1 per therm with an average temp of 60F the direct fired unit (99% efficiency) running at 100% OA (outdoor air) would cost $38,223.00 annually in fuel. This puts the ‘equipment’ (not installation) at under a 3 year payback. Also, can’t get much ‘greener’ since there is no combustion used.

Stored heated water for process or coil for domestic.

Page 25: VENTING PLAN VIEW - NTS Vent PipeC Air Pipe Pioneer Church Solon, Ohio SYSTEM PUMP Primary/Secondary not required, but check flow Delta Tee and running.

UPTOWN DOMESTIC HOT WATER PROJECTUPTOWN DOMESTIC HOT WATER PROJECTUPTOWN DOMESTIC HOT WATER PROJECTUPTOWN DOMESTIC HOT WATER PROJECT

500 GALLON STORAGE

TANK

RBI FUSION PACKAGED

WATER HEATER

Page 26: VENTING PLAN VIEW - NTS Vent PipeC Air Pipe Pioneer Church Solon, Ohio SYSTEM PUMP Primary/Secondary not required, but check flow Delta Tee and running.

ARMSTRONG IWH PIPING AND SELECTIONARMSTRONG IWH PIPING AND SELECTIONARMSTRONG IWH PIPING AND SELECTIONARMSTRONG IWH PIPING AND SELECTION

203 GPM @ 35F DELTA T

95 GPM @ 35F DELTA T

95 GPM @ 35F DELTA T

RBI DOMINATOR 1950

RBI DOMINATOR 1950

RACK OPTIONAL – EACH BOILER TO BE 4 STAGE

ARMSTRONG IWH INSTANT DOMESTIC HOT WATER SYSTEM 107 GPM @ 65F RISE

Note: Conditions based on 180F supply temperature. Conditions also based on worse case. Full load likely to never happen.